NRX Asset Center - POSC Caesar – Trac · NRX Asset Center. Configuration control. Technical Asset...

19
NRX Asset Center – the gateway between ISO15926 and SAP EAM 22 nd October, 2008 Julian Bourne, NRX Global Corp. Anderson Ding, SAP Malaysia Stephen Crampton, NRX Global Corp.

Transcript of NRX Asset Center - POSC Caesar – Trac · NRX Asset Center. Configuration control. Technical Asset...

  • NRX Asset Center the gateway between ISO15926 and SAP EAM

    22nd October, 2008

    Julian Bourne, NRX Global Corp.Anderson Ding, SAP Malaysia

    Stephen Crampton, NRX Global Corp.

  • SAP Lifecycle WorkflowISO15926 and the NRX Asset CenterISO15926 Barriers to AdoptionISO15926 Example WorkflowThe Solution in Detail

  • Asset Information Management Plan Construct Operate Sense Optimize

    Ongoing Content

    ManagementHand over to

    Operation Operate

    Observe and record

    Establish Needs Design, Build and OperateCollaborate

    Plan

    Maintain

    Design & Engr. Procure & Build

    Optimize & Improve

    FEED

    Rea

    dy fo

    r D

    esig

    n

    Rea

    dy fo

    r C

    onst

    ruct

    ion

    Design & Procure

    Rea

    dy fo

    r C

    omm

    issi

    onin

    g

    Construct Operate

    Document / Knowledge Management

    Program and Project Management

    NRX Asset Center

    Configuration control

    Technical Asset Mgmt.

    Management of Change

  • Asset Center Solution Fit with SAP

    * MES/PAS: Mfg Executive Systems & Process Automation Systems, i.e. WonderWare, Honeywell, ABB, Siemens

    Engineering Partners

    Suppliers

    MRO Suppliers

    Plant

    Corporate

  • Where does ISO15926 fit?

    Engineering Data information on all of the as-builtsKey data that owners will use in their applications to support Maintenance and Procurement targeted at providing the reliability that is required.Data typically resides in the systems of EPC Partners

    ISO15926 can allow efficient handover of data from Engineering

    Data from Suppliers forms the bulk of requirements for ownersRecommended Operating ProceduresRecommended Safety ProceduresRecommended Maintenance Procedures Recommended Maintenance schedulesRecommended spare parts listsRecommended does not equal accepted or optimizedOnce reviewed and accepted, needs to be deployed

    Engineering Partners

    Suppliers

    YES

    NO

  • ISO15926 Barriers to Adoption expensive middleware

    Expensive middleware provides significant barriers to adoption of ISO15926

    Customers must insist on Tool Compliance with ISO15926

    Innovation from Vendors delivers value to customersVendors should store tool information as best suits innovation in their toolsBut Vendors need to provide interfaces to and from their tools directly

    Instrumentation Tool

    P&ID Tool

    3D Tool

    Other Tools $$$

    Mid

    dlew

    are

    $$$

    ISO15926 Compliant Data

    & Definitions

  • ISO15926 Example Workflow

    End to end workflow without middleware

    NRX Asset Center provides SAP certified synchronization with SAP EAM

    Support for ISO15926 is not part of SAPNRX Asset Center provides this gateway

    ISO15926 Compliant Data & Definitions

    Unstructured Data

    Structured QualityAssured Data Suppliers

    Engineering Partners

  • ISO15926 Example Workflow

  • More Detail - Process Overview

    Model & Register

    Transform

    Import & Sync

    Use & Maint.

  • Step 1: Model & Register

    Find inRDS/WIP

    ItemExists Add toRDS/WIP

    Use

    no

    yes

  • Step 1 : Snapshots: RDS/WIP Search

  • Step 1 : Snapshots: ID Generator

  • Step 1 : Explanation - QXF Family

    ISO15926Definitions

    in QMXF

    Definitionsand DataIn QXF

    ISO15926Definitionsand Data inOWL/RDF

    XSLT XSLT

    Done

    XSLT

    Definitionsin DTD

    for QTXF

    ISO 15926Data

    In QTXF

    XSLT

    validates

    QXMF DTD QXF DTD

    validates validates

    model.dtd schema.dtd

    qxf2rdf.xslmodel2base.xsl

    model2dtd.xsl template2base.xsl

  • Step 2: Transform

    ISO15926Definitionsin QMXF

    Definitionsand DataIn QXF

    TransformedTo XML

    ISO15926Definitionsand Data inOWL/RDF

    XSLT XSLT

    XSLT

    ALCIMData inCSV

    ALCIMData inDatabase

    Done

    public

    public

    proprietary

  • Step 2 : Snapshots - Transform

  • Step 3: Import & Sync

    ISO15026Definitionsand data inOWL/RDF

    Java+

    SPARQLDone

    RDFTriplestore

    Re-importInternally Asset Center

    Database

    Importvia

    Client

    NRXInternal

    XML

    SyncSAP

    RDS/WIP

  • Step 3 : The process in action

  • Step 4: Use & Maintain

    AssetCenterServer

    SAP

    ISO15926Updates inOWL/RDF

    Asset CenterClients

    Sync

    Sync

    ISO15926Export inOWL/RDF

    SAPUser Interfaces

  • Asset Center Accelerates Capital Project Timelines and Provides a Foundation for Operational Excellence

    NRX Asset Center the gateway between ISO15926 and SAP EAM

    . and so much more

    Asset InformationCollaboration: Timely & cost effective access to information supports efficient execution of Owner/Operator & EPC business processes

    Owner / Operator

    MRO SuppliersEquipment Suppliers

    Operational Readiness:Complete asset information reduces capital project timeline &

    cost ensures efficient plant startup;

    enables engineering, procurement, construction, commissioning, operations, maintenance, & reliability processes

    Operational Excellence: Ability to intuitively deliver & sustain asset information improves user adoption &

    decision-making increases safety &

    reliability reduces costs

    Supply Chain Excellence:Ability to associate materials with assets reduces parts shortage reduces MRO inventory levels & search

    time ensures access to the right part at the

    right time and place

    Engineering Partners

    NRX Asset Center the gateway between ISO15926 and SAP EAM Slide Number 2Asset Information Management Plan Construct Operate Sense OptimizeAsset Center Solution Fit with SAPWhere does ISO15926 fit?ISO15926 Barriers to Adoption expensive middlewareISO15926 Example WorkflowISO15926 Example WorkflowMore Detail - Process OverviewStep 1: Model & RegisterStep 1 : Snapshots: RDS/WIP SearchStep 1 : Snapshots: ID GeneratorStep 1 : Explanation - QXF FamilyStep 2: TransformStep 2 : Snapshots - TransformStep 3: Import & SyncStep 3 : The process in actionStep 4: Use & MaintainAsset Center Accelerates Capital Project Timelines and Provides a Foundation for Operational Excellence