    Document number 

    NRF-204-PEMEX-2012 Standardization Committee of

    Petróleos Mexicanos and Subsidiary Entities March, 2012 Standardization Technical

    Subcommittee of Pemex Refinacion 

    EMERGENCY BLOCK VALVES

    (REMOTE ACTVATION INSULATION VALVES) (This reference standard cancels and replaces NRF-204-PEMEX-2008 dated May 18, 2008)

    PAGE 1 of 36 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    2/36

    2 Copyright www.pemexenglishlibrary.com

    Petróleos Standardization

    Committee 

    Mexicanos and Subsidiary Entities 

    Emergency block valves

    (insulation valves remote

    activation) 

    NRF-204-PEMEX-

    2012 

    Rev.: 0 

    APPROVAL SHEET 

    This reference standard was approved by the Committee on Standards of

    Petróleos Mexicanos and Subsidiary Entities 01-12 at the special meeting

    held on April 27, 2012.

    Page 2 of 36 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    3/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 3 of 33

    3 Copyright www.pemexenglishlibrary.com

    CONTENT 

    CHAPTER PAGE 

    0. INTRODUCTION 4 

    1. OBJECTIVE 5 

    2. SCOPE 5 

    3. APPLICATION FIELD 6 

    4. UPDATE 6 

    5. REFERENCES 6 

    6. DEFINITIONS 8 

    7. SYMBOLS AND ABBREVIATIONS 9 

    8. DEVELOPMENT 11 

    8.1 General 11

    8.2 Valve 13

    8.3 Pneumatic Actuator 19

    8.4 Test Device 21

    8.5 Local Control System for remote manual operation 21

    8.6 Control Stations (Button) field 23

    8.7 Control Stations (Button) in control room 24

    8.8 Accumulator actuator power source 24

    8.9 Tests 25

    8.10 Documentation 26

    8.11 Training 29

    8.12 Packing, packaging and shipment 29

    9. RESPONSIBILITIES 30 

    10. ACCORDANCE WITH INTERNATIONAL OR MEXICAN STANDARDS 31 

    11. REFERENCES 31 

    12. ANNEXES 32

  • 8/18/2019 Nrf 204 Pemex 2012.English

    4/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 4 of 33

    4 Copyright www.pemexenglishlibrary.com

    0. INTRODUCTION 

    In particular, the existence of large amounts of oil or hazardous substances with a high potential for explosions, fire

    and / or damage to the health of large magnitudes, requires the presence of process safety systems for the

    prevention and mitigation devices accidental event. This in addition to the emergency actions of the operators and

    the emergency plans of the facility.

    Likewise, it has established a philosophy of safety risks through various "independent protection layers", including the

    presence of independent safety instrumented systems Digital System Monitoring and Control, has taken greatimportance and is required by several rules international. (IEC-61508-1: 2010 and IEC-61511-1: 2004).

    Typically the safety instrumented system is composed of a set of Safety Instrumented Functions (SIF) and is composed

    of sensors that detect abnormal operating conditions, a logical processor that commands the actions of the FIS and

    final elements, which have activity on the process to prevent or mitigate the risk condition.

    In particular, when the final element is a valve whose function is to isolate equipment, vessels and pipe and / or

    systems for volumes of oil or hazardous substances, they are called Emergency Valve Block (Insulation Valve or

    Remote Activation Insulation Valve operated remotely).

    This is why this Reference Standard Petróleos Mexicanos and Subsidiary Entities establishes the requirements forsuppliers or contractors for the supply and tests of emergency block valves (Insulation Valves or Remote Activation

    Operated Insulation Valves Distance) to ensure and maintain their level of reliability to a real demand for action, i.e.,to maintain the integrity level (SIL).

    This reference standard was performed taking as support:

    Law of Petroleos Mexicanos, its and Administrative Provisions of Contract Procurement, Leases, Works and Servicesof the core activities of a productive nature of Petróleos Mexicanos and Subsidiary Entities.Federal Law on Metrology and Standardization and RegulationLaw of Public Works and Related Services and its regulationsLaw of Acquisitions, Leases and Services Public Sector and RegulationGeneral Law of Ecological Balance and Environmental Protection and Regulations

    Guide for Issuing Reference Standards Petróleos Mexicanos and Subsidiary Entities (CNPMOS-001, September 30,2004)

    Oil industry process operation, including its auxiliaries, involves inherent risks due to the presence of flammable and

    highly risky activities under the corrosive, reactive, explosive, toxic and flammable products handled in amounts that,

    in the event of a leak or release are by battery leaks  or explosion would cause a significant impact to the

    environment, people or property.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    5/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 5 of 33

    This standard was formed with the participation of specialists from the following units:

      Petróleos Mexicanos.

      PEMEX-Exploración y Producción.

      PEMEX-Gas y Petroquímica Básica.

      PEMEX-Petroquímica.

      PEMEX-Refinación.

      Instituto Mexicano del Petróleo.

    External Participants:

      A GFT Company

      ASCOMATICA S.A de C.V.

      CCA Corporation, S.A de C.V.

      Corporativo de Válvulas DASA, S.A. de C.V.

      Dresser México

      Emerson Process Management S.A. de C.V.

      Equipos y Servicios Vica, S.A. de C.V.

      Flowcontrol, S.A. de C.V.

      FT Ingeniería de Fluidos S.A. de C.V.

      Global Flow Technologies

      Integración de Sistemas de Actuación, S.A. de C.V. Luis Borioli, S.A. de C.V.

      Metso Automation  Puffer-Zwick

      Rawson Mexicana

      Rotork Servo Controls de México, S.A. de C.V.

      Tecsite, S.A. de C.V.

      Tyco Valves & Controls de México, S.A. de C.V.

      Walworth Válvulas, S.A. DE C.V.

      Xomox Chihuahua, S.A. de C.V.

    1. OBJECTIVE 

    To establish the technical and documentary requirements for the acquisition of Block Valves Emergency (Activation

    Insulation Valves Insulation Valves Remote or Remote Operated) to isolate oil or hazardous substances in workplacesand facilities of PEMEX.

    2. SCOPE 

    This reference standard establishes the technical and documentary check valves pneumatic Emergency operation,

  • 8/18/2019 Nrf 204 Pemex 2012.English

    6/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 6 of 33

    including: valve tester, pneumatic actuator, actuator manual, "tubing" and patch cable), its control system andcontrol stations (keypads), and can be purchased separately.

    This reference standard cancels and replaces NRF-204-PEMEX-2008 dated May 18, 2008.

    3. SCOPE 

    This reference standard is generally applicable and mandatory in the purchase or rental of goods and services

    covered by the same, conducting workplace of Petróleos Mexicanos and Subsidiary Entities. For what must beincluded in procurement procedures: public tender invitation to at least three people or direct award as part of the

    requirements to be fulfilled by the supplier, contractor or bidder.

    4. UPDATE 

    This reference standard must be reviewed and where necessary change at least every five years or sooner if the

    suggestions or recommendations for changes warrant.

    Suggestions for the review and updating of this policy must be forwarded to the Secretary of the Technical StandardsSubcommittee of PEMEX Refining, who must schedule and perform the update according to the origin of them andwhere appropriate, include it in any Annual Program Standardization of Petróleos Mexicanos and Subsidiary Entities.

    Proposals and suggestions for change must be made in the format CNPMOS-001-A01, of the Guide to Reference

    Emission Standards CNPMOS-A01, Rev. 1, September 30, 2004 and write to:

    PEMEX-Refining

    Standardization Technical Subcomité PEMEX-RefiningPiso 2, Building "B-2"

    Av. Marina Nacional 329

    Col. Petroleos Mexicanos

    11311, Mexico, D. F.Direct phones: 5250-2756 and 5203-4083; Switchboard: 1944-2500, Length: 53,107Email: antonio.alvarez @ pemex.com. 

    5. REFERENCES 

    ISO 10434:2004 5.1. Bolted bonnet steel gate valves for the petroleum, petrochemical and allied industries.

    5.2 IEC 61508-2:2010. Functional Safety of Electrical / Electronic / Programmable Electronic Safety-Related Systems -

    Part 2: Requirements for E / E / PE Safety-Related Systems Edition 2.0, 2010-04

    3.5 IEC 61511-1:2004. Functional safety-instrumented systems Safety for the Process Industry Sector Part

    1: Framework, definitions, systems, hardware and software Requirements-First Edition, Corrigendum 1:11 / 2004

    5.4 ISO 5208:2008. Industrial Valves-Pressure tests of metallic valves. 8.1.2008 Third Edition

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

  • 8/18/2019 Nrf 204 Pemex 2012.English

    7/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 7 of 33

    5.5 ISO-5752: 1982. Metal flanged valves for use in pipe systems-Face-to-face and center-to-face dimensions.

    Second edition-1982-06-01

    5.6 ISO 6708:1995. Pipework Components - Definition and Selection of DN (Nominal Size) Second Edition:

    1995

    5.7 ISO 9712:2005. Non-destructive tests - Qualification and certification of personnel, Third edition 2005 -02-15, Corrected 2005-03-15.

    5.8 ISO-10497: 2010. Tests of valves-Fire type-tests requirements. 01.15.2010 Third edition

    5.9 ISO-14313:2007. Petroleum and natural gas industries-Pipeline transportation systems-Pipeline valves.

    12/15/2007 Second edition

    Part 2: Production acceptance test of valves. First edition 08.15.2006

    5.12 ISO-15156:2009. Petroleum and natural gas industries-Materials for use in H2S-containing environments in

    oil and gas production - Part 1 Cor. 1-2005, Cir. 1-2007: General principles for selection of cracking-resistant

    materials - Part 2 Cor.1-2005, Cir. 1-2007: Cracking-resistant steels Carbon and low alloy, and the use of cast irons -Part 3 Cor.1-2005-2005 Cor.2, Cir. 1-2007, and Cir. 2-2008: Cracking-resistant CRAs

    5.13 NMX-B-482-1991. Training, qualification and certification of NDT personnel.

    5.14 NMX-CC- IMNC-9001-2008. Management systems Quality requirements.

    5.15 NOM-004-STPS-1999. protection and safety systems and devices on machinery and equipment used in the

    workplace.

    NOM-008-16.5-2002 SCFI. "Measurement unit’s general system ".

    5.17 NOM-018-STPS-2000. System for the identification and communication of hazards and risks from hazardous

    chemicals in the workplace.

    5.18 NOM-026-STPS-2008. Safety and hygiene, and risk identification by fluids conducted in pipes.

    5.19 NRF-009-PEMEX-2004. Identification of products transported by pipeline or storage tank contents.

    5.20 NRF-028-PEMEX-2010. Design and construction of pressure vessels.

    5.21 NRF-032-PEMEX-2012. Pipe threads in Industrial Plants - Design and Specifications

    Materials.

    5.22 NRF-036-PEMEX-2010. Classification hazardous area and selection of electrical equipment.

    5.11 ISO-15848-2: 2006. Industrial valves-Measurement, test and qualification Procedures for leak  Emissions-

    5.10 ISO-15848-1:2006. Industrial valves-Measurement, test and qualification Procedures for Leak Emissions-

    Part 1: Classification system and qualification Procedures for type tests of valves. First edition

    15/1.2006.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    8/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 8 of 33

    5.23 NRF-045-PEMEX-2010. Safety Functional - Safety Instrumented Systems - For

    Processes Industrial Sector.

    5.24 NRF-048-PEMEX-2007. Design electrical installations in industrial plants.

    5.25 NRF-049-PEMEX-2009. Inspection of goods and services.

    5.26 NRF-053-PEMEX-2006. Systems based corrosion protection coatings for surface installations.

    5.27 NRF-111-PEMEX-2012. Equipos measurement and metrological services.

    5.28 NRF-152-PEMEX-2006. Actuators for valves.

    5.29 NRF-164-PEMEX-2011. Manometers.

    6. DEFINITIONS 

    6.1 Reliability. Probability a system that can perform a function defined under specified conditions for a period of

    time.

    6.3 DN (Nominal Diameter). Diameter alphanumeric designation for components of a piping system which is used

    for reference purposes, this comprises DN followed by a dimensionless integer which indirectly relates to physicaldiameter in millimeters (as stipulated in ISO 6708:1995).

    6.4 Equivalent Normative Document. En compliance with the provisions of Annex 12.5 of this

    Standard Reference.

    Overseas Regulatory Document 6.5. Policy document issued by foreign standards, applicable in their country of

    origin.

    6.6 Internal valve ("Trim"). Internal designation for such as a valve closure element (flap, ball hinge male plug, etc.),

    seat ring, box, stem and parts that connect stem with closing element, bushings or weld deposit , among others.

    6.7 Integrity Level (SIL, for its acronym in English). is a discrete level for specifying integrity requirements of safety

    instrumented functions to be assigned to safety instrumented systems.

    6.9 Hydrostatic Test or valve body. is test pressure exceeding the working pressure of the valve in order to validate

    the integrity of the valve mechanics.

    6.10 Safety Instrumented systems. System composed of sensors, logic solvers and final elements intended to

    bring the process to a safe state when predetermined conditions are violated.

    6.8 Tightness test or closed valve. is test pressure valve closed, in order to validate the leak through the closure

    mechanisms of the valve.

    6.2 Zero seat leak. No visible leaks (drops or bubbles) in the duration of the test.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    9/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 9 of 33

    6.11 hazardous substances. Are those that by their physical and chemical properties, presents the possibility ofhealth hazards, flammability, reactivity and special that can affect the health of exposed people or cause damage to

    the facilities or the environment. Which are classified by their degree of risk as established in NOM-018-STPS-2000.

    6.12 Emergency block valve. Block valve open / closed (ON / OFF) of fluids to control a hazardous occurrence,

    these valves are for emergency insulation and are designed to stop the uncontrolled discharge of flammable or toxic,

    must be integrated with the devices required for proper operation and tests. These valves must be fireproof if they

    are located in the fire zone. The Emergency block valves are also known as (Activation Insulation Valves InsulationValves Remote or Remote Operated).

    6.13 Fire Zone. under which the area is unsafe to enter during an emergency situation. This area is considered to a

    minimum radius of 7.62 m (25 ft.) around the source of the leak.

    7. ABBREVIATIONS 

    7.1  AISI  American Iron and Steel 

    7.2  API  American Petroleum Institute 

    7.3  ASME  American Society of Mechanical Engineers

    7.4  ASTM  American Society for Tests and Materials

    7.5  DN  Nominal Diameter 

    7.6  DPDT  Double Pole, Double Throw

    7.7  ETG  Nickel Plate by electrolysis 

    7.8  HT  Heat Treated 

    7.9  IEC  International Electro technical Commission 

    7.10  ISO  International Organization for Standardization 

    7.11  LED  Light Emitting Diode

    7.12  LFMN  Federal Law on Metrology and Standardization 

    7.13 MSS SP  Manufacturers Standardization Society of Valve and Fittings Industry Standard Practice 

    7.14  MTTFs  Mean Time To Fail Mean time between failures spurious or false triggering. 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    10/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 10 of 33

    7.15  NACE  National Association of Corrosion Engineers

    7.16  NEMA  National Electrical Manufacturers Association

    7.17  NBR  Nitrile butadiene Rubber 

    7.18  NDE  Nondestructive Examination

    7.19  NPS  Piping Nominal Size.

    7.20  NMX  Mexican Standard 

    7.21  NPT  National (American) Standard Pipe Taper

    7.22  NRF  Reference Standard 

    7.23  PEMEX  Petróleos Mexicanos and Subsidiary Entities 

    7.24  P op  Operation accuracy 

    7.25  psi  Pound per square inch

    7.26  SAE  American Society of Automotive Engineers 

    7.27  SIL  Safety Integrity Level

    7.28  SIS  Safety Instrumented System

    7.29  SPDT  Single pole, double throw 

    7.30  STPS  Labor and Social SECRETARIAT 

    7.31  T op  Operating temperature 

    7.32  TUV  Technischer Überwachungs-Verein. (Verification Technical Association) 

    7.33  UL  Underwriters Laboratories Inc.

    7.34  UNS  Unified Numbering System 

    7.35  VAAR  Remote Activation Insulation valves 

    7.36  VAOD  valves Distance Operated Insulation

    7.37  VBE  Emergency block valves

  • 8/18/2019 Nrf 204 Pemex 2012.English

    11/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 11 of 33

    8. DEVELOPMENT 

    Supplier or contractor must provide VBE, actuators, test device, control systems, monitoring stations (keypads),accumulator or cylinder support and services specified in Annex 12.1 of this standard of reference, which must

    comply with the following:

    8.1 General 

    8.1.1 VBE will be supplied with the test device, the pneumatic, manual actuator, indicator and position switchesand accessories, assembled and tested by Supplier or contractor, which must have the backing and support letters

    from manufacturers the VBE, and actuator test device, as required by subsection i) of this Rule 8.10.1 of reference.

    8.1.2 Moving parts that are exposed must have physical protection (barriers or guards), as required by the NOM-

    004-STPS-1999, to prevent access to the operating point and avoid risks to workers.

    8.1.3 VBE closes to the failure of the power supply source for its operation (air or process gas instrument).

    8.1.4 When specified in Annex 12.1 of this Standard Reference, VBE must have a backup tank or cylinder for eachVBE, to ensure that the source of power supply to the pneumatic actuator (pressure and flow) will be uninterrupted

    or decrease.

    8.1.5 Control devices and operating under VBE and must comply with the specified SIL to ensure safety

    instrumented function and prevent unwanted closure of the VBE. The failure of any control or operation of theactuator must be alarmed so bright in the control stations (pendant) local and / or in the control room of the Center

    for Work, as specified in 8.6 and / or 8.7 of This reference standard.

    8.1.6 When specified service or service bitter to VBE hydrogen sulphide or to the power supply source, thematerials and manufacturing the tire valve or actuator, and gas accumulator pipe must be as stated:

    a)  ISO15156: 2009 for installation in production work centers and Gas Oil and gas treatment plants naturally.

    b)  NACE MR0103: 2010 or equivalent, for installation in workplaces oil refining, and prosecutions containing H2S in gasor dissolved in the aqueous phase, with or without hydrocarbon processes.

    8.1.7 VBE, actuators and devices (solenoids and position switches) must be supplied with components designed

    and certified based on the Integrity Level (SIL) specified in Annex 12.1 of this Reference Standard. The VBE, actuatorsand devices (solenoids and position switches) must have certificates with effect from the date of delivery of the

    goods, in compliance with IEC 61508-2: 2010 or earlier, must provide the appropriate certificate issued by an

    accredited in terms of the LFMN.

    8.1.8 Requirements fireproof behavior: When specified in Annex 12.1 of this Standard Reference, VBE must

    withstand a fire with a temperature of 750 to 1000 ° C in the valve body for 30 minutes as required Clause 5.2 of ISO10497:2010. The actuators and components must have fire protection to keep all internal controls and wiring below

    60 ° C, under fire conditions cited above, so it does not affect the performance of these.

    8.1.9 Area classification. The items, electrical and control devices must comply with the area classificationspecified in Annex 12.1 of this Reference Standard, as established by NRF-036-PEMEX-2010.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    12/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 12 of 33

    8.1.10 Identification

    a)  VBE must be identified by the key (VBE, VAAR o VAOD) followed by sequencing identification number, specified inAnnex 12.2, 12.3 and / or 12.4 of this Reference Standard.

    a)  Supplier or contractor must provide VBE labeled, in the black and fulfilling 8.13.12 13.8.16 of NRF-009-PEMEX-2004,

    with the identification sequenced was stated in the previous paragraph.

    b)  VBE must be marked as required by Annex "E" of ISO-14313: 2007, including butterfly VBE is not covered by ISO. Thename or identification plate must include the corresponding key VBE.

    c)  Operator must have a name or ID plate type 304 stainless steel permanently secured with stainless steel rivets (notallowed glue or adhesive to secure the plate), with the following minimum information: 

    I. Service and password

    II. Make, model and serial numberIII. Material of inmates

    IV. Operating Range

    V. Date of manufacture

    VI. country of OriginVII. Classification marking of hazardous areas

    e) The system of local control must have a name or identification plate type 304 stainless steel permanently securedwith stainless steel rivets (not allowed glue or adhesive to secure the plate), with the following minimuminformation: 

    I. Service and passwordII. Make, model and serial numberIII. Material of inmates

    IV. Operating Range

    V. Date of manufacture

    VI. Country of  OriginVII. Classification marking of hazardous areas

    F) The accumulator actuator power source must have a name or ID plate type 304 stainless steel permanentlysecured with stainless steel rivets (not allowed glue or adhesive to secure the plate). For identification plate mustcontain, refer to paragraph 8.3.1.42 of NRF-028-PEMEX-2010 or as required by ASME Section VIII or equivalent.

    8.1.11 The measuring instruments used in VBE settings, actuators and devices must be calibrated with standardequipment and calibration certificates or reports must comply with NRF-111-PEMEX-2012.

    8.1.12 The power supply voltage for auxiliary control, protection and measurement must comply with as specified

    in Annex 12.1 of this Standard Reference, its installation must comply with NRF-048-PEMEX-2007. Do not include the

    power source for the control system.

    8.1.13 The electrical input into the control system and control stations (keypads) must comply with the following:

    a) Selected for high temperature as required by NRF-048-PEMEX-2007.b) Cables and electrical terminals must be permanently identified at both ends or

  • 8/18/2019 Nrf 204 Pemex 2012.English

    13/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 13 of 33

    point to point.c) Electrical connections in the control system must be performed on terminal stripsriel mounted (high density terminals).

    8.2 Valve 

    Valves must comply with the following:

    8.2.1 Butterfly Valve 

    8.2.1.1 Design Features: 

    C O N C E P T DESCRIPTION 

    Type:  Butterfly a quarter turn, triple offset zero friction. 

    Seat:  Integral to the body. Gland:  Without grease injections to stem packing or seal. Union drive-shaft:  Through wedges or "pin" must unite Leaded

    stem must provide tools for assembly and disassembly. 

    Stem type: One-piece, anti-blasting design, as required by API609:2009 or equivalent, if not specified otherwise in the

    Annex 12.1 of this Reference Standard. 

    8.2.1.2 Construction Materials: 

    CONCEPT  DESCRIPTION Body:  Must be indicated in Annex 12.2 of this Statement ofReference. 

    Seat:  The same material as the body type coated"Stellite 21 "minimum thickness 3 mm, if none is specified in Annex coati

    12.2 of this Reference Standard. Disc:  Of the same material as the body, when not otherwise specified

    in Annex 12.2 of this Reference Standard in compliance with the specifmaterial for No. trim, indicated in Material Specification for Pipe NRF-

    032-PEMEX-2012, which corresponds to the fluid service and operatconditions specified in Annex 12.2 of this Reference Standard. 

    Seal disk  Solid mounted disk (in one piece), stainless steel ASTM A 564 H1150 (4PH) or equivalent, if not specifiedotherwise in Annex 12.2 of this standard reference, in compliance with specified material for No. trim, indicated in Material Specification for PNRF-032-PEMEX-2012, which corresponds to the fluid service and operatconditions specified in this Annex 12.2 of thisStandard Reference. 

    Seal:  Metal-to-metal seal with zero leak, bi. 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    14/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 14 of 33

    Stem :  Material must be specified for the No. trim, indicated inla Specification Piping Materials NRF-032-PEMEX-2012, which correspoto the fluid service and operating conditions specified in Annex 12.2 of t

    Standard Reference, if not otherwise specified in this Annex. 

    Stem bushings:  316 stainless steel or type "stellite 6" or equivalentWith integrated protectors on graphite reinforced, if not otherw

    specified in Annex 12.2 of this standard reference, in compliance with specified material for No. trim, indicated in Material Specification for PNRF-

    032-PEMEX-2012, which corresponds to the fluid service and operat

    conditions specified in Annex 12.2 of this Reference Standard. 

    Gasket:  Graffito. Glands live load type:  At least equal to the valve body. Coating valves(Anticorrosive): 

    Must comply with as indicated in Annex 12.1 of this Statement ofReference and applying NRF-053-PEMEX-2006. 

    8.2.1.3 Valve Manufacture: 

    CONCEPT  DESCRIPTION Design:  ASME B16.34: 2004 and API-609: 2009 Class B or equivalent. Flanged ends:  ASME B16.5: 2009 or equivalent to DN 600 (NPS 24), ASME

    B16.47:2011 or equivalent series A (MSS SP/44) or equivalent

    Greater than DN 600 (NPS 24). Distance between flanges:  As specified in Annex 12.1 of this Reference Standard. Design for fire resistance,when specified in Annex12.1 of this Standard: 

    Rated by the type of litmus test as required by ISO-10497:2010. 

    8.2.1.4 Tests: 

    CONCEPT  DESCRIPTION Closed valve orairtightness testtightness or closed

    valve (seat): 

    Procedure andPressure test 

    As established ISO-5208: 2008 and API-STD-598: 2009 orequivalent.

    The test must be bidirectional seal and must be performed in bdirections, both hydrostatic (high pressure) and low pressure pneumatic or inert gas at a pressure of from 4.08 to 7.13 kg/cm2, regardless of valve class).Must deliver the report airtight valve seat, in both flow directi

    bidirectional flow . Duration  Over time table established 11 ISO-14313: 2007. Criterionacceptance 

    Reference. Closed valve orairtightness testhydrostatic(Body): 

    Procedure andPressure test 

    As established ISO-5208: 2008 and API-STD-598: 2009 orequivalent. 

    Duration  Eventually they set the table 10 of ISO-14313: 2007. 

    Hermetic zero seat leak as the arrangements(Rate) "A" of ISO 5208:2008 and as described in 6.2 of this Statement of

    Acceptance  Airtight zero leaks 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    15/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 15 of 33

    Closed valve orairiness test oftightness in the stemseal: 

    Procedure andPressure test  As established ISO-15848-1: 2006. 

    Duration  As established ISO-15848-1: 2006. Acceptance  As established ISO-15848-1: 2006. 

    fire test type, when specified in Annex 12.1

    of this Standard: As established ISO-10497: 2010. 

    Torque operation test:  As stated in ISO 14313:2007 B.6. 

    As stated in ISO 14313:2007 B.7. 

    8.2.2 Ball Valve. 

    8.2.2.1 Design Features: 

    CONCEPT  DESCRIPTION Type:  Full pitch wave of a quarter turn. 

    Gland  Live load type, without injection of grease and stem packingseal. 

    Stem type  Design anti-blasting. 

    8.2.2.2 Construction Materials: 

    CONCEPT  DESCRIPTION Body  must be at least as suitable for this type of valve, the

    Pipe Materials specification of NRF-032-PEMEX-2012, which correspondsthe fluid service and operating conditions specified in Annex 12.3 of tstandard of reference, if not otherwise specified in this Annex. 

    Seat:  At least the same material coated body as specified in the Annex to tStandard 12.3 Reference, unless otherwise specified in this Anncompliance with the specified material for No. trim, indicated in MateSpecification for Pipe NRF-032-PEMEX-2012, which corresponds to the flservice and operating conditions specified in Annex 12.3 of this RefereStandard. 

    Ball: Of the same material as the body, at least, if not otherwise specifiedAnnex 12.3 of this Reference Standard, in compliance with the specifmaterial for No. trim, indicated in Material Specification for Pipe NRF-0PEMEX-2012, which corresponds to the fluid service and operatconditions specified in Annex 12.3 of this Reference Standard. 

    Closed valve or airtightness test joint stress

    Seal:  Without direct metal to metal or polymer elastomer inserts withcoatings as specified in Annex 12.3 of this Reference Standard, sealed wit

    zero leak, bi. 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    16/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 16 of 33

    Seal:  As specified in Annex 12.3 of this Reference Standard. 

    Stem :  At least the material must be specified for the No. trim, indicatedMaterial Specification for Pipe NRF-032-PEMEX-2012, which correspondthe fluid service and operating conditions specified in Annex 12.3 of tStandard Reference, if not otherwise specified in this Annex . 

    Stem bushings:  At a minimum, type 316 stainless steel with heat treatment of nitruratand reinforced graphite integrated protectors, if not otherwise specifiedAnnex 12.3 of this standard of reference, in compliance with the specifmaterial for No. trim, indicated in Material Specification for Pipe NRF -0PEMEX-2012, which corresponds to service 

    fluid and operating conditions specified in Annex12.3 of this Reference Standard. 

    Gasket:  Graffito. Glands :  At least equal to the valve body. Coating valves(Anticorrosive): 

    Must comply with as indicated in Annex 12.1 of this Statement ofReference and applying NRF-053-PEMEX-2006. 

    8.2.2.3 Valves Manufacture: 

    CONCEPT  DESCRIPTION Design:  ISO-14313: 2007 Flanged ends:  ASME B16.5: 2009 or equivalent to DN 600 (NPS 24) N, ASME

    B16.47:2011 or equivalent series A (MSS SP/44) or equivalentGreater than DN 600 (NPS 24). Distance between flanges:  Comply with ASME B16.10: 2009 or equivalent. Design for fire resistance,when specified in Annex

    12.1 of this Standard: 

    Rated by the type of litmus test as required by ISO-10497:2010. 

    8.2.2.4 Tests: 

    CONCEPT  DESCRIPTION Closed valve orairtightness testtightness or closedvalve (seat): 

    Procedureand pressure test 

    As established ISO-5208: 2008.The test must be bidirectional and must be made in both directions and is

    due on test report. Duration  Over time table established 11 ISO-14313: 2007. Criterionacceptance 

    Reference. Closed valve orairtightness testhydrostatic(Body): 

    Test and pressureproceduretest 

    As established ISO-5208: 2008. 

    Duration  Eventually they set the table 10 of ISO-14313: 2007. 

    Hermetic zero seat leak as the arrangements(Rate) "A" of ISO 5208:2008 and as described in 6.2 of this Statement of

    Acceptance  Airtight zero leaks 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    17/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 17 of 33

    Closed valve orairtightness test oftightness in the stemseal: 

    Procedure andPressure test  As established ISO-15848-1: 2006. 

    Duration  As established ISO-15848-1: 2006. Acceptance  As established ISO-15848-1: 2006. 

    fire test type , when specified in Annex 12.1

    of this Standard: As established ISO-10497: 2010. 

    Torque operation test:  As stated in ISO 14313:2007 B.6. 

    As stated in ISO 14313:2007 B.7. 

    8.2.3 Gate Valve. 

    8.2.3.1 Design Features: 

    CONCEPT  DESCRIPTION Type:  Must be wedge or blade as indicated in Annex 12.4 of

    This reference standard. 

    Seat:  Integral to the body. Gland  Live load type, without injection of grease and stem packing

    seal. Stem type  One piece, anti-blasting design. 

    8.2.3.2 Construction Materials: 

    CONCEPT  DESCRIPTION Body  It must be right for this type of valve, in Pipeline Materials Specification

    NRF-032-PEMEX-2012, which corresponds to the fluid service and operatconditions specified in Annex 12.4 of this Standard Reference, if otherwise specified in this Annex . 

    Seat:  The same material as the body is coated specified in Annex 12.4 of tstandard of reference, if not otherwise specified in this Annex, compliance with the specified material for No. trim, indicated in MateSpecification for Pipe NRF-032-PEMEX-2012, which corresponds to the flservice and operating conditions specified in Annex 12.4 of this RefereStandard. 

    Wedge or Blade:  The same material as the body, at least when not otherwise specifiedAnnex 12.4 of this standard of reference, in compliance with the specifmaterial for No. trim, indicated in Material Specification for Pipe NRF-0PEMEX-2012, which corresponds to the fluid and service operatconditions specified in Annex 12.4 of this Reference Standard. 

    Closed valve or airtightness test joint stress

    Seal:  Metal-metal (zero leaks) bidirectional. 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    18/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 18 of 33

    Stem :  Material must be specified for the No. trim, indicated in la SpecificatPiping Materials NRF-032-PEMEX-2012, which corresponds to the flservice and operating conditions specified in Annex 12.4 of this StandReference, if not otherwise specified in this Annex . 

    Valve Coating:  Must comply with stated Appendix 12.1 of this StandardReference and applying NRF-053-PEMEX-2006. 

    8.2.3.3 Valve Manufacture: 

    CONCEPT  DESCRIPTION 

    Design:  Comply with ISO-14313: 2007. Flanged ends:  ASME B16.5: 2009 or equivalent to DN 600 (NPS 24), ASMEB16.47:2011 or equivalent series A (MSS SP/44) or equivalentGreater than DN 600 (NPS 24). 

    Distance between flanges:  As specified in Annex 12.1 of this Reference Standard. 

    Design for fire resistance, when specified inAnnex12.1 of this Standard: 

    Rated by the type of fire test as required by ISO-10497:2010. 

    8.2.3.4 Tests: 

    CONCEPT  DESCRIPTION 

    Closed valve orairtightness testtightnessor closed valve (seat): 

    Test and pressureproceduretest 

    As established in ISO-5208: 2008.The test must be bidirectional and must be made in both directions and isdue on test report. 

    Duration  Over time table established 11 ISO-14313: 2007. Criterionacceptance 

    Reference. Closed valve orairtightness testhydrostatic

    (Body): 

    Procedureand pressure test 

    As established ISO-5208: 2008. 

    Duration  Eventually they set the table 10 of ISO-14313: 2007. 

    Closed valve or

    airtightness test oftightness in the stemseal: 

    Procedure and

    Pressure test 

    fire test type , when specified in Annex 12.1

    of this Standard: 

    Torque operation test:  As stated in ISO 14313:2007 B.6. 

    As stated in ISO 14313:2007 B.7. Closed valve or airtightness test actuatorassembly stress VBE: 

    Gasket:  Graffito, zero leaksGlands :  At least equal to valve body. 

    Acceptance  Airtight zero leaks

    As established per ISO-15848-1: 2006. 

    As established by ISO-10497: 2010. 

    Duration  As established by ISO-15848-1: 2006. Acceptance  As established by ISO-15848-1: 2006. 

    Hermetic zero seat leaks as the arrangements(Rate) "A" of ISO 5208:2008 and as described in 6.2 of this Statement of

  • 8/18/2019 Nrf 204 Pemex 2012.English

    19/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 19 of 33

    8.2.4 VBE must be provided with the class or nominal pressure rating design specified in Annex 12.2, 12.3 and / or12.4 of this Reference Standard. Where not indicated, the class must be indicated on the Piping MaterialsSpecification of NRF-032-PEMEX-2012, which corresponds to the fluid service and operating conditions specified in

    Annex 12.2, 12.3 and / or 12.4 of this Reference Standard.

    8.2.6 VBE will be supplied with a manual actuator or hand wheel to race from 0 to 100 percent for valves up to

    DN 250 (NPS 10). For more than DN 250 (NPS 10) nominal diameter must be supplied with a hydraulic hand pump

    race from 0 to l00 percent, both meeting the requirements of NRF-152-PEMEX-2006, if not stated otherwise.

    8.2.7 Valve stem must be supplied with such dimensions that resist tension, compression, bending and torque

    required for valve including stuck and its length allows the installation of all devices such as the test device, theactuator the steering wheel and, when applicable, hydraulic hand pump.

    8.2.8 When specified in Annex 12.1 of this standard VBE reference that must be designed for fire resistance,

    indicate their compliance with fire resistance as permanently set to ISO-10497: 2010 or API-6FA: 2006 or equivalent,

    as appropriate.

    8.2.9 Switches must have VBE position: for the open and closed position, and a check-back switch to indicate whenit is carrying out the partial closure test. The switches must comply with the following features:

    a) Must be dry contact type.

    b)  Magnetic element or proximity type, as specified in Annex 12.1 of this Statement ofReference. 

    c) Double switch, type: Micro, SPDT or DPDT, as specified in Annex 12.1 of this Statement ofReference. 

    d) Switches enclosure must be NEMA 4X or equivalent type 316 stainless steel and as required by the hazardous area

    classification indicated in Annex 12.1 of this Reference Standard.

    8.02/10 VBE must have a mechanical indicator of high visibility position made of stainless steel type 304.

    02/8.11 The non-metallic parts of valves intended for hydrocarbon gas service at nominal pressures PN 100 (Class600) or higher, must resist explosive decompression.

    8.3 Pneumatic Actuator 

    8.3.1 Features 

    CONCEPT  DESCRIPTION 

    8.2.5 VBE for hazardous use with at least a degree of risk than four or when specified in Annex 12.1 of this standard

    of reference, must be tested and stamped "ISO FE" (ISO Leak  Emission) for leak  emissions as 15848-1/2

    established in ISO: 2006, temperature range, pressure VBE and Class specified in Annex 12.2, 12.3 and / or 12.4 of

    this Reference Standard.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    20/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 20 of 33

    Pneumatic actuator:  a) The actuator piston to be high starting torqueposition spring return for a failure of the power supply source (gas or airtools).

    c) Must work in any position, even upside down.d) Must have visual indicator of valve position

    o en closed . Power supply source pressure (instrument airor gas) available on site: 

    El actuator must be designed to operate with the power supply source (gor air tools) as itestablishes the pressure indicated in Annex 12.1 of this Statement ofReference. 

    Enhancer "booster":  a) The pressure Increaser of the supply source power (gas or instrumentair) must be hosted on the local control system of the VBE.must operate only with the available pressure of the power supply sou

    (gas or instrument air) specified in Annex 12.1 of this Reference Standardust provide a stainless steel filter with automatic purge input connected

    the power supply source to the increaser, with draining with discharge l

    to the outside. 

    transmission Type:  Scotch yoke must be a quarter turn or linear, depending on the typevalve. 

    Housing or enclosure:  Must be NEMA 4X or equivalent, fully sealed. Piston rod:  With guidance or support bar to eliminate lateral loads and balance the

    forces on the piston. Limit switches:  Must be adjustable in both directions to calibrate the position

    opening and closing of the valves. Design:  As far as mounting position must be modular to allow 

    its interchangeability in four positions (0, 90, 180 and 270degrees). 

    Actuators orientation with respect to valves:spectrum to valves: 

    Must comply with as indicated in Annex 12.2, 12.3 and / or 12.4 ofThis reference standard. 

    Closing time:  Maximum 10 seconds, regardless of the size of the valves, when no othertime is specified in Annex 12.2, 12.3 and / or 12.4 of this ReferenceStandard. 

    8.3.2 Construction materials: 

    CONCEPT  DESCRIPTION Housing:  As specified in Annex 12.1 of this Reference Standard. Bushings: Permanently lubricated low friction. Cylinder:  316 stainless steel type or equivalent. Piston:  Ductile Iron ASTM A-395 or equivalent or ASTM carbon steel

    A283 gr. D or equivalent. Piston rod:  must be hardened steel AISI 1045 or equivalent or alloy steel AISI SAE 984

    SKF ETG 100 or equivalent.b) must be coated with hard chrome. 

    Spring:  Low alloy steel ASTM A29 Gr 9254 or equivalent.  Piston seals: NBR (Nitrile Butadiene). 

    Anticorrosive coating cabinet:  Must comply with stated Appendix 12.1 of this Reference Standard andcomply with NRF-053-PEMEX-2006. 

  • 8/18/2019 Nrf 204 Pemex 2012.English

    21/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 21 of 33

    Yoke: Ductile Iron ASTM A-395 Gr 80-55-06 60-40-18 or ductile iron, orCarbon Steel API 5LX Gr X 52 + ASTM A537 Class 1 or equivalent. 

    Guide Bar:  Chromed steel alloy or nitred steel alloy, AISI HT 4140 or equivalent.  

    O-Ring  NBR Screws  Stainless steel Cartridges:  Ductile Iron ASTM A-395 Gr 60-40-18 or equivalent. 

    8.3.3 Fireproof  

    When specified in Annex 12.1 of this standard VBE reference that must be designed for fire resistance and must

    comply with the following:

    8.3.3.1 Actuator must be protected from passive protection fire retardant material.

    8.3.3.2 The fireproof protection must be maintenance-free and detachable (jacketed) into segments and allow

    access to the actuator for maintenance.

    8.3.3.3 The protection against fire must ensure at least 30 minutes of operation of the actuator at a temperature to60 ° C.8.3.3.4 Passive protection must withstand temperatures up to 1000 °C over direct heat over a period of 30

    minutes, at least, as established by the method UL-1709: 2011 or equivalent.

    8.3.3.5 The materials of passive fire protection must be chemically inert and resistant to acidic substances, andbasic solvents.

    8.3.3.6 Joining pieces included passive protection to insulate the actuator as set out in 8.3.3.4 of this Standard

    Reference.

    8.3.3.7 Passive protection against fire must include installation accessories, sheet, and strip and jacket seals,

    including type 304 stainless steel.

    8.3.3.8 Jacketed actuator must be fireproof and waterproof. Among the passive protection

    (jacketed) and actuator must maintain a waterproof layer.

    8.3.4 Particular requirements 

    8.3.4.1 Actuator must be designed to provide an output torque of at least 1.2 times the design torque defined by

    the valve manufacturer.

    8.3.4.2 Actuator must be mounted after mechanical tests (where applicable). The valves must be designed to

    support the weight of the mechanical test (if applicable), the pneumatic actuator, the actuator manual override, thefire protection and components associated with them. Must require the installation of additional supports, themanufacturer must provide the valve.

    8.4 Test Device 8.4.1 VBE, must have a device for the partial closure test must close the valve and up to 20 percent. This device

    may be electronic or mechanical, as specified in Annex12.1 of this Reference Standard.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    22/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 22 of 33

    8.4.2 When specified address must comply with the requirements of the bid when specified mechanical and

    must comply with the requirements of paragraph 8.4.3 below:

    8.4.3 Mechanical Test Device partial 

    8.4.3.1 Design must have a special safety key cannot be removed during the test, so it must have a position switch

    with signaling control stations (keypad) or SIS, as specified in Annex 12.1 of this Reference Standard to indicate thatthe test is being carried out and the instantaneous position during partial closure of the valve.

    8.4.3.2 Mechanical device must be constructed of at least the following materials:

    a) Steel body ASTM A 108 Gr 1045 or equivalent.

    b) Coupling ASTM A 108 Gr steel blued 1045 or equivalent.c) Arrow type stainless steel cam ASTM A276 Gr 410 or equivalent.

    8.4.3.3 Test device design must ensure that no partial transmitted lateral loads on the valve stem.

    8.4.3.4 This mechanical device must be of the "proven in use" as required by the IEC 02/03/60

    61511-1:2004 11.5.3 and must comply with the same IEC 61511-1:2004.

    8.4.3.5 Must provide copies of reports the results of failure mode and hit test certificate issued by TUV andfunctionality, Lloyds, EXIDA or any other certification body in terms of LFMN.

    8.5 Local Control System for remote manual operation 

    As indicated in Annex 12.1 of this Standard Reference, providing local control system for remote manual operationfield, it must comply with the following:

    8.5.1 The components installed within the control system must comply with the following:

    a) On Type 316 or equivalent 12 gauge (2.66 mm), NEMA 4X or equivalent, with front access door. The interior must be

    accommodated:I. Regulatory power supply source (gas or instrument air), pressure switches, pressure gauges, solenoid valves,

    pneumatic valves, filter, "tubing", chutes, and valve-and-check valves.II. An explosion proof enclosure for housing terminal boards.III. Electrical and pneumatic connections must be identified.

    c)  Must have at least two holes for pipes for power and control electric, DN20 (NPS ¾).

    c) Must have at least three holes air tubes (one input and two outputs) DN 15 (NPS ½) with sockets of type "bulkhead".d) The location of the holes must be as specified in Annex 12.1 of this Reference Standard.

    8.5.2 The pressure regulator power supply source of the pneumatic actuator must be housed in the control

    system must be of type 316 stainless steel, which must include the following:

    a)  A duplex filter body type 316 stainless steel, and interchangeable filter elements particle retention capacity of 5microns at least.

    e) When specified in Annex 12.1 of this Reference Standard that assembly is in floor anchoring elements must include,

    as noted in the pedestal assembly is to be supplied for installation accessories and when to include wall lugs  for

    installation.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    23/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 23 of 33

    b)  Moisture trap, with outflow pressure and consistent with the requirements of the actuators and automatic

    Supplier or contractor must determine pressure and flow regulator inlet and the capacity of the dryer or moisture

    trap, so that the pressure, flow and quality than those required in the pneumatic actuator.

    8.5.3 As specified in Annex 12.1 of this Standard Reference, supplier or contractor must provide alarm switches for

    low pressure, which must be installed as follows: in the supply line of the power supply source (gas or instrument air)

    to the actuator (control system within or near the actuator, as specified in Annex 12.1 of this Reference Standard), inthe circuit of the battery or backup roll and out of each solenoid valve and outlet pneumatic valve, which must

    comply with the following:

    a)  Dry contact type.b)  Magnetic type element.c)  Switch, type: Micro, SPDT or DPDT, as specified in Annex 12.1 of this Reference Standard.

    d)  When specified in Annex 12.1 of this Standard Reference, must be calibrated to the minimum pressure that

    defines Supplier or contractor.Pressure switch body must be stainless steel.

    8.5.4 Pressure indicators (gauges) before and after the filter, must be Bourdon of type 316 stainless steel, stainless

    steel mechanism 316, diameter cover at least 65 mm (2 ½ inches), with connections type male 15 mm (½ inch) or 6.4mm (¼ inch) NPT 316 stainless steel and stainless steel case with screw bezel, solid proof against vapors and

    humidity, as required by NRF-164-PEMEX-2006.

    8.5.5 Solenoid valves housed in the local control system must comply with the following requirements:

    a)  Normally energized spool.

    b)  Redundant.c)  Spools for constant operation and low consumption, electrical insulation class "F".d)  Body material must be Type 316 stainless steel UNS S31600 or equivalent.

    e)  Set up of solenoid valves must comply with the SIL and MTTFs in Annex 12.1 of this Reference Standard. The

    fulfillment of these two parameters must determine the reliability of the control system architecture local. In the

    event that the architecture does not include redundancy in the solenoid valves, must have a mechanism to perform

    maintenance of them without VBE is activated, the redundancy may include a solenoid valve. This must be

    determined in designing the implant to SIS FIS.

    f)  Must include protective grilles type 316 stainless steel in the vents to prevent entry of foreign elements.

    8.5.6 Pneumatic and accessories lines within the control system must comply with the following:

    c)  Pipe "tubing" must be seamless and compression type connectors with double seal.d)  When specified in Annex 12.1, the arrangement of the solenoid valves and pneumatic switch must allow the coils

    and the same pneumatic valve without affecting the power supply source (gas and instrument air) to the actuator ofthe VBE. This arrangement must include a type selector bypass (bypass) with safety key.

    e)  Selector diversion type (pneumatic valve manual) must be 5 way 2 position (5/2), type 316 stainless steel.

    a)  Pipe "tubing" must be 316L stainless steel and comply with ASTM A 269-04, ASTM / A 269 degree TB 316L (UNS 31603or equivalent solution heat treatment and marking, must comply with section 31.1 of ASTM 1016 A/1016M-04 A o

    equivalent marking must be made "tubing" with diameters of DN 13 (NPS 1/2), DN 10 (NPS 3/8) and DN 8 (NPS 1/4).b)  Block Valves [block, check  and pneumatics] pneumatic and accessories must be stainless steel type 316 or

    higher.

    condensate drain.c)  Pressure indicator before and after filter.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    24/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 24 of 33

    8.5.7 When requested in Annex 12.1 of this Reference Standard supply interconnect cable and VBE design must

    withstand fire, Supplier or contractor must supply the cable mentioned the following requirements:

    a)  Insulation must be flame retardant.

    b)  Cable must comply with what specified in Annex 12.1 of this Reference Standard.

    c)  The fire protection must ensure at least 30 minutes of operation at a temperature 60 ° C.d)  Passive protection must withstand temperatures up to 1000 ° C in direct heat over a period of 30 minutes or

    more; tested by the method of UL-1709: 2011 or equivalent.

    e)  The passive protection components must be chemically inert and must withstand acidic substances, basic

    solvents.f)  Joining pieces included passive protection must isolate totally miss the heat generated by the fire.

    8.6 Control Stations (pushbutton) field 

    As indicated in Annex 12.1 of this Standard Reference, providing monitoring stations

    (pushbutton) field, its components must comply with the following:

    a) Copper free aluminum box (less than 1% Cu), As stated in the hazardous area classification and NEMA 4X or

    equivalent tightness. b) two position sustained contact switch, open / close in NEMA 4X or equivalent, Class I Division 1, Group B, C, D,

    mushroom of red pole, normally closed contact.c) Pilot lamp type LED display, NEMA 4X or equivalent, Class I, Division 1 Group B, C, D:

    I. One for red for closed valve indication.

    II. One green to open valve indication.III. One amber to display test valve partial closure.IV. One red for fault indication coil A.

    V. One red for fault indication coil B.VI. Three for low pressure alarm: actuator, accumulator or cylinder and pneumatic valve.

    c)  I.D. plates of VBE which triggers, graphical operating instruction and emergency warning device that says

    "EMERGENCY VALVE BLOCK – ACTIVATE ONLY WHEN THERE IS FIRE ", as required by the NOM-026-STPS-2008.e) I.D. plate, each pilot light, indicating its corresponding alarm, failure or position.

    F) Cables, accessories for mounting, connection, and connectors, terminal strip and identify any component or part and

    necessary for the proper operation and installation of monitoring stations (pushbutton) field, including supports and

    connection.g) High resistance acrylic guards to avoid accidental actuation of the switch, but which at the same time not prevent its

    activation immediately in case of emergency.

    8.7 Control Stations (Button) in control room 

    When specified in Annex 12.1 of this Standard Reference, must supply a control stations (keypad) for installation in

    the control room of the unit and must be located in a safe area (outside the risk area) and easily accessible to theoperating personnel with the features and components (which must be installed within control stations (keypads)) asfollows:

    a) Control stations (buttons) to be installed in the control room must be in sheet 12 gauge carbon steel withelectrostatic baked paint in NEMA 12 or equivalent, if not otherwise specified in Annex 12.1 of this ReferenceStandard.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    25/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 25 of 33

    b) Two position sustained contact switch, open-close fungus type red pole, as specified in Annex 12.1 of this StandardReference, of openers.

    c) LED type pilot lamp indication, NEMA 4:

    I. One red for closed valve indication.

    II. One green to open valve indication.III. One amber to display test valve partial closure.IV. One red for fault indication coil A.

    V. One red for fault indication coil B.

    VI. Threes for low pressure alarm: actuator, accumulator or cylinder and pneumatic valve.

    d)I.D. plates triggering VBE, graphical operating instruction and emergency warning device that says "EMERGENCY VALVE

    BLOCK - ON FIRE ONLY", as required by the NOM-026-STPS-2008.e) I.D. plates , each pilot light, indicating its corresponding alarm, failure or position.

    F) Cables, accessories for mounting, connection, and connectors, terminal strip and identify any component or part and

    necessary for the proper operation and installation of monitoring stations (pushbutton) field, including supports andconnection.

    g) High strength acrylic guard to avoid accidental actuation of the switch, but which at the same time not prevent its

    activation immediately in case of emergency.

    8.8 Accumulator Actuator Power source 

    8.8.1 When specified in Annex 12.1 of this Reference Standard for every VBE must supply a battery forinstrument air, for up to three close-open cycles. The dimensions of the tank must be calculated by Supplier or

    contractor.

    8.8.2 Backup battery must be designed and constructed as required by NRF-028-PEMEX-2010, with the following characteristics:

    a) Must be vertical with a separation step of moisture and particles.

    b) Unless otherwise specified in item 12.1 of this Annex reference standard, the battery must be carbon steel with 3

    mm minimum allowable corrosion.

    c) must have at least one safety valve as required by the NOM-093-SCFI-1994, installed at the top of the vessel, with the

    following characteristics:

    1. Loaded spring conventional type 

    2. Closed type bonnet .3. Threaded type hood4. Without lever.5. Alloy steel spring material.

    a.  must have a connection DN 15 to purge the lowest point with automatic purge valve ball or plug type, the bodymaterial bleed valves can be carbon steel or bronze but its inmates must be stainless steel type 304 .

    b.  Air outlet connection must be located in the upper part of the vessel, to prevent entrainment of moisture, liquid

    or solid.

    c.  Must have a pressure gauge Bourdon type 316 stainless steel, stainless steel mechanism 316, minimum coverdiameter 114.3 mm (4 ½ inches), with male type connections DN 15 (NPS ½) stainless steel type phenol 316 andbevel box threaded solid proof against vapors and humidity, as required by NRF-164-PEMEX-2011.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    26/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 26 of 33

    8.9 Tests 

    8.9.1 General 

    8.9.1.1 Tests and NDE nondestructive examinations, procedures must be performed under previously reviewed by

    PEMEX, they must carry the accredited laboratories in terms of LFMN.

    8.9.1.2 Supplier or contractor personnel must perform nondestructive tests and examinations must be trained,

    qualified and certified as required by the ASTM-A-482-1991 or ISO 9712:2005; well as the apparatus, equipment andinstruments used in these tests or examinations, must comply with specified in 8.2.3 of NRF-111-PEMEX-2012.

    8.9.1.3 Tests, examinations and interpretations must be made by certified level II or III as required by the ASTM-A-

    482-1991 or Level 2 or 3 of ISO 9712:2005, the interpretation of tests and examinations must be by certified level IIas established by ASTM-A-482-1991 or ISO 9712:2005 level 2 at least.

    8.9.1.4 Contractor or supplier must examine and verify, materials or components, to verify their compliance withrespect to its material certificates and perform additional NDE required by this Standard and Reference VBEspecification, to detect imperfections jeopardize the integrity.

    8.9.1.5 To perform the inspection, can use the following methods:

    I. - With contractors as required by the Reference Standard (NRF-049-PEMEX-2009) to perform inspection services or

    supervision of goods, leases or services, or

    II. - With personnel designated by Petróleos Mexicanos, Subsidiary Entities and Subsidiary companies as required by

    the Institutional Procedure Inspection of Goods, Leasing and Services-PA-800-70600 01.

    To verify that this assembly provides the required watertight seal, thus certifying that the actuator provides the

    required torque, and actuation thereof in the closing direction (actual verification of the operation of the set).

    8.9.2 Factory Acceptance (When specified in Annex 12.1 of this Reference Standard). 

    8.9.2.1 Must notify the completion of the factory acceptance tests with 30 days’ notice when the tests are carriedout in the country and 45 days when they are abroad, they must include when applicable test assembly and

    operation of the valve -actuator device partial closure test, calibration of position switches, control panel and controlstations (keypad).

    8.9.2.2 Previous notification of the tests is due to PEMEX, the protocols of factory acceptance tests, including

    program, procedures and acceptance criteria.

    8.9.2.3 Factory tests shall include at least the following:

    a)  Closed valve or airtightness test s nondestructive, including liquid penetrant, magnetic particle, ultrasonic, hardness

    and radiography, when specified in Annex 12.1 of this Reference Standard.b)  Closed valve or airtightness test identification of materials, when specified in Annex 12.1 of this Statement of

    c)  Reference.d)  Operation of valve, opening, closing and closing time.e)  Closed valve or airtightness test manual operation of the auxiliary device.f)  Test device partial closure .

  • 8/18/2019 Nrf 204 Pemex 2012.English

    27/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 27 of 33

    g)  Closed valve or airtightness test s of VBE as indicated in 8.2.1.4, 8.2.2.4 and 8.2.3.4, as applicable, of this Statementof

    h)  Reference.i)  Closed valve or airtightness test position switches.

     j)  Closed valve or airtightness test control system and control stations (keypads) (where applicable). Checking theresponse and operation of each actuating device or component.

    8.10 Documentation 

    Unless otherwise requested in the bid, it must comply with the following:

    8.10.1  Must be submitted with the technical bid the following documents: 

    a.  Legible copy of the certificate and valid test of the valves as required by ISO-10497:2010, issued by a laboratoryaccredited by an agency recognized by the Mexican government on the terms of the Federal Law on Metrologyand Standardization, protecting the diameters and classes requested valves, when specified in Annex 12.1 of thisReference Standard, the design must withstand fire VBE. 

    b. Legible copy of current certificate of test of actuator passive protection as required by the UL-1709: 2011 orequivalent, issued by a laboratory accredited by an agency recognized by the Mexican government on the terms

    of the Federal Law on Metrology and Standardization.c.  legible Catalogs of manufacturer of valves, actuators, proofer, switches, solenoids, pressure regulating filter

    enhancer, control system, control stations (keypads), accumulator for air tools that support all the featuresrequested in this Standard Reference, indicate the source, noting therein requested features and the models

    proposed by Bidder s.d.  Calculation report selecting each of the actuators and their backup batteries.

    e.  Valves opening speed calculation, pressure drop and closure calculation report

    f.  Dimensional drawing of the valve / actuator, control stations (keypad) and control system.g.  Instrumentation diagram for each of the valves requested.

    h.  Diagram of electrical interconnection of all accessories including switches valve position.

    i.  Must submit with its bid, original and copy for collation of the notarized letter that includes the effective date ortermination of the representation, the backing and support issued by manufacturers of valves, actuators and

    device partial closure test. If the manufacturer is a foreigner, the letter must be submitted apostilled. These

    documents must be valid at least until the expiry of the guarantees.

     j.  In case bidder offer construction materials with technical specifications higher than those requested in this

    Reference Standard, must state in its technical proposal and prove through comparative sheet manufacturer.

    k.  Commitment letter saying that in the event of a failure of the goods supplied, is committed to on-site technicalservice no later than 24 hours after being notified via phone call, fax, emai l or any other means, without charge,

    within the warranty period.

    l.  Commitment letter from valve manufacturer, actuator and partial test device which expresses the supply of

    parts of the property for 10 years at least, since they supply.m.  When specified in Annex 12.1 of this Reference Standard must be included in the technical proposal, the training

    courses as specified in section 8.11 of this Standard Reference.n. Must provide for VBE’s, actuators and devices (solenoid and position switches), readable copy of the certificates

    or reports issued by laboratories accredited by an agency recognized by the Mexican government in terms of

    LFMN, to perform functions safety based on the SIL and MTTFFs (for solenoid valves) specified in Annex 12.1 ofthis Reference Standard, effective the date of delivery of the goods, complying with IEC-61508-2: 2010 or above

    and must include copies of certificates evidencing such reports.

    8.10.2  The following must be provided with the goods:

  • 8/18/2019 Nrf 204 Pemex 2012.English

    28/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 28 of 33

    a.  Installation, operation and maintenance of the actuators, valves, instrumentation, control systems, control

    stations (keypads) and other components supplied, which must include part numbers for each component

    of the goods to be delivered. And also, it must give the documents mentioned in Annex C of ISO

    14313:2007.

    b.  materials manufacturer Reports that make up valve and records the chemical composition analysis of thematerials of the valves.

    c.  Legible copy of the certificate or report current test of valves as required by ISO-10497: 2010, issued by a

    laboratory accredited by an agency recognized by the Mexican government on the terms of the Federal Law

    on Metrology and Standardization, protecting diameters and classes requested valves, when specified in

    Annex 12.1 of this standard of reference, the design must withstand fire VBE.d.  Legible copy of the certificate or report OF current test of the actuator passive protection as required by the

    UL-1709: 2011 or equivalent, issued by a laboratory accredited by an agency recognized by the Mexican

    government on the terms of the Federal Metrology and Standardization when specified in Annex 12.1 of

    this standard of reference, the design must withstand fire VBE.e.  Certificates or reports issued by laboratories accredited by an agency recognized by the Mexican

    government in terms of LFMN, to perform safety functions based on the SIL and MTTFs (for solenoid valves)

    specified in Annex 12.1 of this Reference Standard , effective the date of delivery of the goods, provided the

    IEC-61508-2: 2010 or above and must include copies of certificates evidencing such reports.

    b.  Test Report of valves, indicated in 8.2. of this Standard Reference.c.  Vent valve adjustment report and calibration certificate or report of instruments, as required by NRF-111-

    PEMEX-2012. d.  Factory performance test proof, indicated n 8.9.1 of this Standard Reference, duly endorsed by the

    manufacturer.e.  Calculation report for sizing and actuator selection.f.  Report sizing calculation (capacity) of the cylinder or accumulator backup.

    g.  Supplier or contractor must generate and provide all the documentation of design, construction, inspection

    and tests of all the elements of the supply as provided in this standard reference.h.  Local control system arrangement drawings and monitoring stations (keypads), including size, location and

    dimensions of media and / or anchor, position and dimensions of the battery connections limit, list of parts

    / materials, with part number and catalog accordingly.

    i.  Dimensional drawing and detail of the valve - actuator including operating data, design and test, test device,position indicators, manual override actuator, fire protection, supports, location of points of

    interconnection to limit battery list materials / parts with part numbers and catalog as appropriate, and

    operating empty weight, sequence assembly, lifting points, among others.

     j.  Control wiring diagrams and local control system and control stations (keypads), including cable list withidentification point - point connection, bill of materials and parts, with part number and catalog accordingly.k.  Diagrams pneumatic local control system, indicating operating conditions, design and setting ranges of the

    pressure regulator and low pressure switches, and including materials and parts list with part number and

    catalog accordingly.

    l.  VBE Data Sheet, pneumatic actuator, actuator auxiliary hydraulic pressure gauges, valve (s) vent.m.  Pressure subject vessel mechanical integrity documents, including the operating license granted by the STPS.

    n.  Minimum recommended spare part list continuous operation of the equipment (Valve / actuator /

    accessories) for 2 years, with its part number.

    o.  Test report of material and valve identification.p.  Report hardness tests of valve materials, when applicable and requested in Annex 12.1 of this Reference

  • 8/18/2019 Nrf 204 Pemex 2012.English

    29/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 29 of 33

    standard.q.  Certificates or reports issued by laboratories accredited by an agency recognized by the Mexican

    government in the LFMN terms of compliance with the leak test on the stem seal as required by ISO-15848-1: 2006.

    8.11 Training 

    Unless otherwise requested in the bid, it must comply with the following:

    8.11.1 Supplier or contractor must provide training courses that PEMEX specified in Annex 12.1 of this standard of

    reference, they must be theoretical and practical guidance on the operation and maintenance of VBE and its

    components. The courses will be taught in Spanish, the duration, and the number of people and place of delivery

    indicated in Annex 12.1. Supplier or contractor must provide training materials for each course.

    Supplier or contractor must deliver the training program for approval.

    8.11.2 The course must include:

    a.  Selectionb.  Installation.c.  Test procedures and tests (functionality, tightness, etc.).

    d.  Assembly, disassembly and adjustment and calibration of VBE in valve-actuator assembly, and their

    components individually (valve, test device, pneumatic actuator, auxiliary manual actuator, position switches,travel stops, etc.).

    e.  Failure Identification and repairf.  Inspection, removal and installation of fireproof material.

    g.  Care and recommendation in handling, assembly and disassembly of valves, actuators and other components.h.  Intervention and replacement of components in the system of local control and monitoring stations (keypads) in

    operation.i.  Preventive and corrective maintenance tasks and inspection

    8.11.3 Must give each participant the support material and operation and maintenance manual, both in Spanish, foreach course.

    8.12 Packing, packaging and shipment 

    8.12.1 Supplier or contractor is responsible for packing, loading and transportation of valves, actuators and other

    components, to the workplace, as indicated by the range set. All components that come factory damaged, must bereplaced at no cost to PEMEX in a time that does not affect the work program.

    8.12.2 Valve actuators and integrated instrumentation must be packed and sealed in airtight boxes dust proof,

    moisture proof and a rigidity that support both the handling during transport and storage in the center of the

    extreme environmental conditions of work defined in Annex 12.1 of this Reference Standard, without damage. Itmust use a mechanical insulation between the tools and the vessel wall and between two tools in the same vessel,

    unless the vessel itself constitutes insulation as in the case of polyurethane foam vessels or corrugated cardboard. All

    instruments and any other moving body inside the package must be fixed.

    8.12.3 Wires in the electrical and electronic instrumentation, must be sealed at the ends before shipment and mustnot allow moisture penetration. The shell must be free of grease, oil, dirt or other foreign substances.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    30/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 30 of 33

    8.12.4 All  openings connections and electrical, hydraulic and pneumatic exposed to the environment must beprotected with removable material, using wood, plastic or metal. Desiccant must be placed in labeled vessels of lowpermeability in each section or compartment.

    8.12.5 valve flanges must be plugged with removable plastic material, without the introduction of dust, moistureand foreign matter into the valve.

    9. RESPONSIBILITIES 

    9.1 Of Petróleos Mexicanos and Subsidiary Entities. 

    The application and compliance with this reference standard in the acquisition of the emergency block valves Emas

    specified and control system and manual stations (keypads).

    9.2 Suppliers, contractors or bidders. 

    Comply with as minimum specified in this Reference Standard in the design, manufacture, construction, inspection

    and tests.

    Supplier or contractor is responsible for the final quality of the work, materials and services, whether provided by

    him or his suppliers and / or subcontractors.

    Supplier and / or contractor must comply with NMX-CC-9001-IMNC-2008 (as provided in Article 13 and 13-A of the

    Rules of the Procurement Act Leases and Public Sector Services, Article 24, 3 ° paragraph of the Law on Public Works

    and Related Services thereof and Article 11 of the Regulations of the Law on Public Works and Related Services

    thereof).

    The information must comply with the technical specification of PEMEX SSIME GNT-2008-G002 or P.1.0000.06: 2000

    information must be validated by Supplier or contractor (stamp and signature). This must be submitted in electronicand print media as required by the bid.

    All documentation and records generated in the works that fall within this standard of reference, before and during

    the development of manufacturing and / or engineering (procedures, plans, logs, charts, reports, studies,

    correspondence, etc.), must be delivered in Spanish, except for own catalogs of suppliers or contractors that may be

    in English, and the units of measurement can be as stipulated in Section 12.8.5 of the NOM-008-SCFI-2002 (was maybracketing system language or other measures). Furthermore, such delivery must be made by electronic and print

    media, as required by the bid, and must be stamped and validated rubric of responsible company, supplier,

    manufacturer or appropriate.

    Supplier or contractor is solely responsible for the supply and installation of the work and must adhere to all

    regulations and orders of the competent authorities in the field of construction, safety, road use, ecological

    protection and environmental governing in the federal, state or municipal, as well as instructions to that effect will

    bring the agency or entity. The liabilities and damages that may result by a failure will be borne by Supplier orcontractor.

    Provide technical support in the workplace of PEMEX destined to which the goods is destined to in a period no

    longer than 24 hours, when the supply presents troubleshooting.

  • 8/18/2019 Nrf 204 Pemex 2012.English

    31/36

    Note: ETotal l of this Annex 12.3, invariably must request the supplier or contractor, fully filled.

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 32 of 33

  • 8/18/2019 Nrf 204 Pemex 2012.English

    32/36

     

    pH

    SPDT DPDT

    SPDT DPDT

    Annex 12.1 Supply Requirement  REVIEW  BY  DATE REVIEWD 

    CONTRACT  DATE 

    REQUISITION

      ELABORATED  REVIEWED  VALIDATED 

    WORK CENTER EXTREME CONDITIONS

    Environmental variable Max. Mín.  Annual Average  Units 

    Temperatur e  °C

    Humidity  % @

     Atmospheric pressure  mm Hg

    Vibrations 

    Wind Speed 

    Rain 

    Solar Radiation 

    GENERAL REQUIREMENTS

    Hazardous area classif. Does not classify Class I, Division 1 Class I, Division 2 Gr oup 

    Safety instrumented level: N/A  SIL-1 SIL-2 SIL-3

    Nominal power electric voltage 127 VCD  10% 24 VCD 24 VCDwith intrinsic proteciton

      Current regime  mA

     Anticorrosive coating: Environment: System: according to NRF-053-PEMEX-2006

    EMERGENCY BLOCK VALVES 

    VBE supply: Yes  Password  N/A 

    Stem type:

    Stem Material:

    Dimensins between flanges: ISO-5752:1982 ASME B16.10:2009

    Service: Substance risk degree:

    Health:  Airtightness: Reactivity:

    Special:

    Leak emission stamp “ISO-FE”, due to hazardous substances:  Yes  N/A 

    Fire resistance design ISO-FT: Does apply  N/A 

     Auxiliary manual actuator : Yes  N/A 

    Type position switches: Proximity  Magnetic 

    Nominal power electric voltage:  127 VCD  10% 24 VCD 24 VCD with intrinsic protection 

    Current regimen  mA

  • 8/18/2019 Nrf 204 Pemex 2012.English

    33/36

     

    Min. °C

    MTTFS:

    SPDT DPDT

    Annex 12.1 Supply requirements (cont.)

    PARTIAL TEST DEVICE

    PNEUMATIC ACTUATOR

    ACTUACTOR IGNIFUGE PROTECTION

    REMOTE OPERATION LOCAL CONTROL SYSTEM

    FIELD MANUAL STATIONS (BUTTONS)

    CONTROL ROOM MANUAL STATIONS (BUTTONS)

    N/A

    CONTRACT DATE 

    REQUISITION

      ELABORATE  REVIEWED VALIDATED 

    REVISION BY  DATE  REVIEWED

      Mechanical (mechanical limitator ) Electronic (Positioner control ) N/A 

    Protection: Yes  

    Type: Tarp  Jacket  

    Other  

    Power fluid  Gas, type:___________________ Instrument air  

    Pressure: kg/cm2 (man) (psi

     man) Temperatur e: Máx. °C

    Supply: Yes, Annex 12.2, 12.3 y/o 12.4 of this reference standard N/A 

    Shell material: Ductil Iron  Carbon Steel: Stainless Steel  

    Supply: Yes  N/A

    Orifice location: Upper   Lower   Lateral right Lateral left

     Assembly: Floor   Pedestal Wall 

    Low pressure switch: N/A  SPDT DPDTQty. of switches to supply:__________________________________________________________________________

    Solenoid valves: SIL N/A SIL

     Actuactor power source switch installation Inside cabinet Close to actuator  

    Pressure switches: 127 VCD  10% 24 VCD 24 VCD with intrinsic protection 

    Current regime  mA

    Interconnection cable supply:  Does apply  N/A

     Armored Armed 

    Observations: 

    Manual stations (Buttons): Yes  N/A

    Manual stations (Buttons): Yes  N/A

    Independient On panel VBE Integrated to SIS

    Box type: NEMA 12 NEMA 1

  • 8/18/2019 Nrf 204 Pemex 2012.English

    34/36

     

    Material:

    Otras:_______________________________________

    Nota: El total de este Anexo 12.1, invariablemente debe solicitarlo el proveedor o contratista, totalmente llenado.

    Annex 12.1 Supply Requirement (cont.) 

    CONTRACT  DATE 

    REQUISITION

      ELABORATED REVIEWED VALIDATED 

    AIR ACCUMULATOR

      REVISION  BY  DATE REVIEWED

    TESTS

    TRAINING

    Pruebas de aceptación en fábrica Sí N/A

    Prueba de dureza: Sí N/A

    Pruebas no destructivas Sí N/A

    Pruebas de identificación de materiales Sí N/A

    Suministro: Sí N/A

    Identificación positiva de materiales “PMI”  Sí N/A

     Agrietamiento inducido por hidrógeno “HIC”  Sí ___CSR___CLR___CTR N/A

    Suministro: Sí N/A

    Número de personas por curso:____________ Número de cursos:________________

    Lugar donde se impartirán:__________________________

  • 8/18/2019 Nrf 204 Pemex 2012.English

    35/36

     

    P op.kg/cm

    (psi) 

    T op.°C 

    DN(NPS) 

    Nota: El total de este Anexo 12.2, invariablemente debe solicitarlo el proveedor o contratista, totalmente llenado. 

    Annex 12.2 Valve Requirements (Butterflytype)

    REVIEW  BY DATE  REVIEWED CONTRACT  DATE

     REQUISITION

      ELABORATEDREVIEWED VALIDAT

    STEMMATERIAL

    ACTUATORORIENTATIO

    CODE SERVICE FLUID No.LINE 

    Flow m

    3 /hr  

    FACECLASSANDTYPE

    DISK ANDBODY

    MATERIAL

    CLOSING TIME 

    (seg) 

    SEATCOATING

    SEAL RINGMATERIAL

    BITTERSERVICE

    OR OTHER

    PIPESPECIFIC

    ATION

  • 8/18/2019 Nrf 204 Pemex 2012.English

    36/36

    PEMEX

    STANDARDIZATION COMMITTEE

    OF PETROLEOS MEXICANOS AND

    ITS SUBSIDIARIES

    EMERGENCY BLOCK VALVES

    (REMOTE ACTIVATION INSULATION

    VALVES)

    NRF-204-PEMEX-2012

    REV. 0

    Page 33 of 33

    ANNEX 12.5 

    Equivalent representation of normative documents. 

    12.5.1 The words "or equivalent", mentioned in this NRF, after foreign documents, means the following:

    Policy document which indicates characteristics, rules, specifications, requirements, attributes, guidelines or

    requirements for a good, process, activity, service or method, and those relating to its compliance or application, ina quantitative, qualitative, as that proposed in this NRF.

    12.5.2 Foreign documents, "equivalent", must comply with the indicated and / or required by Exhibit

    NRF abroad referred by this.

    12.5.3 Not accepted as normative documents or equivalent National Guidelines, international, industry or foreign,that have requirements, specifications or requirements relating to minors and / or requested by PEMEX (eg lower

    thickness, lower safety factors, lower pressures and / or temperatures, lower levels of electrical insulation propertiesat a lower temperature, higher smoke emissions and constructional characteristics of the electrical conductors,

    lower capacity, efficiency, operating characteristics, physical properties, chemical and mechanical properties, amongothers).

    12.5.4 This also applies to the requirements outlined in the Technical Documents Basic Engineering Packages of

    Licensors or Technologists.

    12.5.5 In  all cases, the features, specifications, requirements and / or obligations specified in thi