Transcript of NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.
![Page 1: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/1.jpg)
NRC Inspection Panel Presentation
Johnny Eads
Craig Bassett
Marcus Voth
Kevin Witt
![Page 2: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/2.jpg)
2
Major Program Changes in 2007
• Improvements to Inspection Report issuance timeliness
• Completion of all inspection procedures at each facility each cycle (2 inspections per cycle)
• Inspections now conducted within the primary interval (12 or 24 months) without reliance on 25 percent grace period
![Page 3: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/3.jpg)
3
Performance Measures
• Inspection reports issued within 30 days = 98.3%• Inspection reports issued within 45 days = 100%• Class 1 Inspection cycles completed within 12
months = 100%• Class 2 Inspection cycles completed within 24
months = 100%
![Page 4: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/4.jpg)
4
Major Issues in 2007
• 5 Level IV Violations
• 6 Non-Cited Violations
![Page 5: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/5.jpg)
5
Shipping Labeling Violation (1)
• Contrary to the regulations, the licensee made a shipment of radioactive material without properly affixing the markings to the package.
• During transit the markings and labeling apparently came off.
• As a result, the cask was being transported without being properly marked and labeled.
![Page 6: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/6.jpg)
6
Shipping Labeling Violation (2)
• The licensee made seven shipments of radioactive material without including the required information on the shipping papers.
• Multiple and various deficiencies in the labeling were identified in these shipments.
![Page 7: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/7.jpg)
7
Operator Not in Requal Program
• One licensed senior reactor operator did not take requalification written examinations or annual operating tests between 1998 and 2004
![Page 8: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/8.jpg)
8
Inadequate Experiment Approval
• Four experimental samples were irradiated in the reactor pneumatic irradiation experimental facility that were not reviewed and approved in accordance with written operating procedures.
![Page 9: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/9.jpg)
9
Emergency Plan Staffing
• Emergency Plan staffing commitments not met• Two of the three positions designated in the
plan to be Emergency Director were no longer staffed and the third designee was not readily available to perform duties had there been an emergency
![Page 10: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/10.jpg)
10
Operator Control Operations NCVs
• Two Non-Cited Violations (NCVs) for failure to have an operator at the controls as required.
• One NCV for failure to maintain the console key properly locked in the key box
![Page 11: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/11.jpg)
11
New Initiatives
• NRC-Sponsored PRA Research• New PRA Models developed by 2012• Risk-Informed Performance-Based RTR
Oversight by 2015– New Baseline Inspection Program– Significance Determination Process
![Page 12: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/12.jpg)
12
Inspector Assignments
Craig Bassett Kevin Witt Marcus Voth
Class 1 UC - Davis Rhode Island MIT
MURR NIST
Class 2 Aerotest Arizona AFRRI
Florida Dow Kansas St
Oregon St GE Lowell
Ohio St Idaho St Maryland
Reed College New Mexico NC State
U. Texas Penn St UM - Rolla
Utah Purdue RPI
USGS Texas A&M (TRIGA) UC - Irvine
Washington St Texas A&M (AGN) Worcester
Wisconsin
![Page 13: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/13.jpg)
Week of Craig Kevin Marcus Week of Craig Kevin Marcus
10/01/07 MURR 04/21/08 USGS
10/08/07 04/28/08 MIT
10/15/07 Dow MIT 05/05/08 Utah Penn St
10/22/07 UC-Davis 05/12/08
11/05/07 U. Texas 05/19/08 Washington St Maryland
11/12/07 05/26/08
11/26/07 Reed Arizona 06/02/08 UC-Davis
12/03/07 UC-Irvine 06/09/08
12/10/07 06/16/08 Idaho
01/07/08 AFRRI 06/23/08 Wisconsin
01/14/08 Oregon St Purdue 06/30/08
01/21/08 07/07/08
01/28/08 NC State 07/14/08 Washington St
02/04/08 Florida 07/21/08
02/11/08 Texas A&M Lowell 07/28/08 Rhode Island
02/18/08 08/04/08 Ohio St Kansas St
02/25/08 08/11/08
03/03/08 MURR Rhode Island Rolla 08/18/08
03/10/08 08/18/08
03/17/08 08/25/08 U. Texas
03/24/08 09/01/08
03/31/08 Aerotest New Mexico 09/08/08 RPI
04/07/08 NIST 09/15/08 MURR GE
04/14/08 09/22/08
![Page 14: NRC Inspection Panel Presentation Johnny Eads Craig Bassett Marcus Voth Kevin Witt.](https://reader036.fdocuments.net/reader036/viewer/2022082418/5697c0271a28abf838cd6478/html5/thumbnails/14.jpg)
14
Community Feedback
• We are here to listen to your feedback• Where can we improve our performance or
processes?• Other concerns or comments?