NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W....

124
1 / MtWPIDEPAIZIMENT OF EMRONMEiTALOUU1V If L0 7 2nji, MINING NOTICE OF INTENT (MNOI) MDE FOR COVERAGE UNDER MINING STORM WATER GENERAL NPDES PERMIT MSR32 j aa L (Number to be assigned by State) File at least 30 days prior to the commencement of mining; 15 days if a Storm Water Pollution Prevention Plan (SWPPP) is already on file. Lateral expansion of an existing mine that has storm water permit coverage does not require submittal of a new MNOI however, modification of the existing SWPPP to include the expansion is required. Also, according to 40 CFR 12236 (b) (14) (lii), mining operations that do not discharge storm water contaminated by contact with any overburden, raw material, intermediate products, finished products, byproducts or waste products shall not be required to ifie a MNOL IS APPLICANT THE OPERATOR OR OWNERf? (Cirde one or both) OPERATOR CONTACT PERSON: W. C. Fore OPERATOR COMPANY NAME: . W. C Fore. LLC. OPERATOR STREET (P.O. BOX):. P.O. Box 3058 OPERATOR CiTY:. Gulfioqt STATE:. MS ZIP: OPERATOR TELEPHONE NUMBER (INCLUDE AREA CODE):. (228h 8634314 (List owner if different than operator) OWNER CONTACT PERSON:. Same as Above OWNER COMPANY:. OWNER STREET (P.O. BOX):. OWNER CITY: STATE:. ZIP:.______________ OWNER TELEPHONE NUMBER (INCLUDE AREA CODE):. (Mine infonnation) NAME OF MINE:. - STREET ADDRESS OR NEAREST NAMED.____________________________________ MINE LOCATION: CITY:. Gulfoort COUNTY:. Harrison 21Z0103

Transcript of NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W....

Page 1: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

1/

MtWPIDEPAIZIMENT OFEMRONMEiTALOUU1VIfL0 7 2nji,MINING NOTICE OF INTENT (MNOI) MDEFOR COVERAGE UNDER MINING STORM WATERGENERAL NPDES PERMIT MSR32jaaL(Number to be assigned by State)File at least 30 days prior to the commencement ofmining; 15 days if a Storm Water Pollution Prevention Plan

(SWPPP) is already on file. Lateral expansion of an existing mine that has storm water permit coverage does

not require submittal of a new MNOI however, modification of the existing SWPPP to include the expansion is

required. Also, according to 40 CFR 12236 (b) (14) (lii), mining operations that do not discharge storm water

contaminated by contact with any overburden, raw material, intermediate products, finished products,

byproducts or waste products shall not be required to ifie a MNOL

IS APPLICANT THE OPERATOR OR OWNERf? (Cirde one or both)OPERATOR CONTACT PERSON: W. C. ForeOPERATOR COMPANY NAME: . W. C Fore. LLC.OPERATOR STREET (P.O. BOX):. P.O. Box 3058OPERATOR CiTY:. Gulfioqt

STATE:. MS ZIP:OPERATOR TELEPHONE NUMBER (INCLUDE AREA CODE):. (228h 8634314(List owner if different than operator)OWNER CONTACT PERSON:. Same as Above

OWNER COMPANY:.

OWNER STREET (P.O. BOX):.

OWNER CITY:STATE:. ZIP:.______________

OWNER TELEPHONE NUMBER (INCLUDE AREA CODE):.

(Mine infonnation)NAME OF MINE:.-

STREET ADDRESS OR NEAREST NAMED.____________________________________MINE LOCATION: CITY:. Gulfoort

COUNTY:. Harrison21Z0103

Page 2: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

(Mine information continued)SEE ATrACHED SHEET1/40F., 1!4OFSECT1ONJ.1 ,TOWNSHIP. 6South ,RANGE.12 WestATFACH A USGS QUAD MAP OUTLINING MINE LOCATION(Maps can be obtained from the Mississippi Office of Geology. For information call 601-961.5523).RECEIVING STREAM:. Via Unnamed Tributaries to the Little Biloxi River

STANDARD INDUSTRIAL CLASSIFiCATION (SIC) CODE: 1442MATERIAL TO BE MINED:. Sand &ClavTOTAL ACREAGE (If modification, give original acreage, expanded acreage and total acreage):. 40 Acres

DOES THIS MINE NEED A CORPS OF ENGINEERS WETLANDS (Sec. 404) PERMiT?. NoWILL HYDRAULIC DREDGING BE USED? (Y/N). No WASHING OF SAND/GRAVEL? (Y/N). NoLIST ANY: NPDES PERMIT NO...-...

____________

HAS A “NOTICE OF EXEMPT OPERATIONS” BEEN FILED WITH GEOLOGY? (YIN).A Geology “Notice of Exempt Operations” or “Notice of Intent to Mine Class I or Class H Materials” must be filed before

coverage will be granted under the mining storm water NPDES permit. For information on Office of Geologyrequirements call 601-961-5515ESTIMATED START DATE:. 1012004 END DATE:. 12/2010AACH A STORM WATER POLLUTION PREVENTION PLAN (SEE PERMIT FOR REQUIREMENTS)IDENTIFY THE ASSOCIATION OR GENERIC SWPPP PREVIOUSLY SUBMr1TD:

I certd’ under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance

with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my

inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the infonnation, the

information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant

penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations,

-

- Søntmhr 2R.. 2004Signat&rei

. W.C.ForePrinted Name

TitlezThIs application shall be signed according to the General Permit,Part V.L, as follows:

- For a corporation, by a responsible corporate offlcer- For a partnership, by a general partner.For a sob proprietorshIp, by the proprietor.- For a municipal, state or other public faclUt3’, by either a principal ezecutlve officer, the mayor, or ranking elected omclal.

- Duly Authorized Reprizentative

I

GEOLOGY PERMIT APPLICATION NO.

N IA

N/A

STATE OPERATING PERMiT NO.

GEOLOGY PERMIT NO.

NIA

NIA

it/riDate Signed

2/201113

2

Page 3: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

1

W. C. FORE, LLCP. 0. Box 3058 • Gulfport, MS 39505 • (228) 883-1314 • fax (228) 864-0013

Via Facsimile & U. S. Mall(601) 354:5521

October 5, 2004

Mississippi Department of Environmental QualityOffice of Pollution ControlPost Office Box 10385Jackson, Mississippi 39289-6612

Attention: Mr. Ross Williams

Surface Mining Notice of Intent (Reconfigured Pit)Shaw Road PIt, 400 AcresSection 11, Township 6 South,Range 12 WestHarrison County, Mississippi

Dear Mr. Williams,

Attached for your review and approval is our Mninq Notice of intent (MNOI) for the abovecaptioned 40 acre reconfigured mining application. This MNOI shall replace the ConstructionNotice of Intent (ONOl) that have previously been transmitted to you.The surface mine shall be stripped of overburden and the topsoil segregated for use in platingthe slopes of the pit for vegetation. The balance of the spoil material shall be used to constructearthen berms around the perimeter of the pit. The berms will be constructed so as to precludestorm water from entering the pit.Construction and excavation of the pit will be in such a configuration with grade changes thatonly the incidental storm water and ground water will flow to a temporary sump at the lowestelevation in the pit. No storm water or ground water shall leave the surface mining pit. All stormwater shall be contained within the pit.If you have any questions at all, please do not hesitate to call our office.

Sincerely,

frEt,oc11’..

Reference:

R.F.

end: As-Noted

Page 4: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

11

1ff

I I;

Q)

m

a

Page 5: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

I

STORM WATER POLLUTIONPREVENTiON PLAN

(SWPPP)

Shaw Road Pit40 Acres

811, T6S, RI2W

Gulfport,Harrison County,

Mississippi

W. C. Fore, LLC.Post Office Box 3058Gulfport, MS 39505

(228) 863-1314

I

Page 6: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

STORM WATER POLLUTION CONTROL PLAN

Shaw Road Pit40 AcresSection 11, Township 6S, Range 12W

Harrison. County, Mississippi

Table of ContentsPageOverview

Introduction

3Objective

4General RequirementsImplementation

4Erosion and Sediment Controls

5Structural Practices

6Inspection Requirements

8Maintenance

8Post Construction

9ReportIng

9Noncompliance ReportingAnticipated Noncompliance

9Unanticipated Noncompliance

9Termination of Reporting and Permit Coverage10Pollution Prevention Plan Certification10Attachment I

Storm Water Pollution Prevention Plan11

Site Location Map11

Reclamation Site Map11

Page 7: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

IStorm Water Pollution Control Plan

Shaw Road Pit

W. C. Fore, LLC.

Harrison County, Mississippi

Typical DrawingsTypical Interceptor Dikes and Swales

Figure 1Filter Fence Details

Figure 2Brush Barrier

Figure 3Typical Sediment Trap

Figure 4Surface Roughening

Figure 5Level Spreaders

Figure 6

2

Page 8: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

I

Storm Water Pollution Control Plan

Show Road Pit

W. C. Fore, LLC.

Harrison County, Mississippi

OVERVIEWIntroduction

This document is the Storm Water Pollution Prevention Plan (SWPPP) forproperty owner and operator, W. C. Fore, LLC, Post Office Box 3058, Gulfport,Mississippi 39505, for the surface mining pit known as “Shaw Road Pit”, a 40-acre site located in Gulfport, Harrison County, Mississippi.The purpose of this application is to allow W. C. Fore, LLC, Gulfport, Mississippi,the property owner and operator, to enlarge an existing surface mining site thatwas established and operational in 1973 to a total mining area of 40.0 acres. Thisexisting pit was created to provide imported fill material for the State Aid Project,County Farm Road.

The existing haul road shall be utilized for ingress and egress. This haul road shallbe reconstructed to become a stabilized all weather construction entrance foringress and egress of all construction traffic. The buffer zones shall remain in theirnatural vegetative state around the periphery of the site. Only those trees andvegetative growth will be removed that will impede the location and excavationprocesses of this surface mining pit. Storm water in the buffer zones will follow theexisting natural watercourse. Disturbed areas caused by construction or miningactivities shall be temporarily or permanently seeded as the circumstances direct.ln the interim, sedimentation and erosion controls shall be put in place as needed.Flow of surface water into the mine will be controlled by the use of erosion controlstructures.

1. Clearing and excavation of the surface mining pit will be in a west to eastdirection. The removed topsoil shall be stockpiled and the overburden willbe used to construct the perimeter berm of the mined area. The berm willbe constructed and elevated above the existing natural ground. This raisedlevee will preclude storm water from entering the mined area from thesurrounding property. A temporary sump basin shall be located in thesoutheast area of the surface mining operation. The purpose of this

3

Page 9: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water PollutIon Control Plan

Shaw Road PIt

W. C. Fore, LL.C.

HarrIson County, Mlsslsslppltemporary sump Is to collect sediment and Incidental stormwater tailing intothe mining pit. No impounded stormwater or sediment shall leave themining pit. All storm water and ground water shall be contained within theconfines of the mining pit. The earthen berms comprised of the strippedoverburden around the periphery of the excavated areas shall preclude themingling of the storm water outside the pit area and the groundwater/stormwater from the excavation.

Storm water falling outside the pit area shall drain from the area through existingnatural watercourses. Ultimately the receiving waters of the State of Mississippiwill be the Little Biloxi River to the north and north east of the project area throughunnamed tributaries. In its undeveloped state the surface mining pit areaencompasses the 50-foot elevation, the highest point in the area and stormwaterpresently appears to flow to all points of the compass.The Storm Water Permit shall be displayed in a conspicuous location to enablepublic review.

This Plan is the criteria for compliance with regulations set forth by theEnvironmental Protection Agency, 40 CFR, Parts 122, 123 and 124, NationalPollutant Discharge Elimination System Application Reaulations for Storm WaterManagement for Construction Activities.

Oblective

The purpose and objective of this Storm Water Pollution Prevention Plan is tomeet the requirements of the State of Mississippi and the U. S. EnvironmentalProtection Agency for the control and mitigation of pollutants to storm waterdischarges associated with this surface mining operation for sand and clay.A ditch was cut allowing stormwater from the pit are to flow into what appears tobe wetlands. This ditch has been filled in and the ditch perimeter has beenbermed to preclude any additional stormwater from flowing out of the pit.

4

Page 10: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

I

Storm Water PoHuton Control Plan

Shaw Road Pit

W. C. Fore, LLC.

Harrison County, Mississippi

GENERAL REQUiREMENTS

This Storm Water Pollution Prevention Plan consists of certain major activities andcontrols appropriate for surface mining activities.

Implementation

1. Install stabihzed construction entrance.

2. Install erosion control structures as needed.3. Perform stripping activities: Topsoil shall be stockpiled for future plating ofthe slopes and the overburden shall be used to construct the berms aroundthe perimeter of the mining site. Clearing and excavation of the surfacemining pit will be in a west to east direction. The topsoil shall be removedand stockpiled. The overburden will be used to construct the perimeterberm of the mined area. The berm will be constructed and elevated abovethe existing natural ground. This raised levee will preclude storm wateroutside the pit zone from entering the mined area. Storm water shall drainaway from the site through existing natural watercourses and elevationchanges. A temporary sump basin shall be located in the southeast area ofeach phase of the surface mining operation. The purpose of this temporarysump is to collect sediment and stormwater falling into the mining pit. Allincidental storm water entering the mining operation and ground water willnot leave the pit and shall not be discharged into the waters of the State ofMississippi.

4. The general configuration of the mining operation and the constructiontechniques of the surface mining area has been arranged to minimize anyimpact to the adjacent lands.

S

Page 11: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control Plan

Shaw Road Pit

W. C. Fore, LLC.

Hamson County, MississippiErosion and Sediment ControlsMine development will proceed in the planned sequence and every attempt will bemade to prevent erosion. All disturbed areas will be managed and revegetated assoon as practicable after construction activities. Where apphcable, disturbedareas will be stabilized by temporary seeding, permanent seeding, mulchingand/or vegetative buffer strips as each case dictates.

Structural Practices

In addition to vegetative practices referenced above, certain structural erosioncontrol measures shall be implemented as needed. The measures includediverting flows from exposed soils, storing flows or otherwise limiting runoff fromexposed areas. Other structural methods will include straw bale dikes, silt fences,earth dikes, brush barriers, drainage swates, check dams, outlet protection,detention/retention basins, sediment traps, temporary sediment basins orequivalent sediment controls.

1. Construct the sediment I detention pond with the spoils from the excavationto be used in berms.

2. Divert upslope surface water around disturbed areas of the site as shown infigure 1, Diversion Dikes.

3. Limit the exposure of the disturbed area to the shortest amount of time aspracticable.

4. Minimize the amount of surface area that must be disturbed at one time.5. Implement the best management practices to mitigate adverse impactsfrom storm water runoff. Shown in Figures 2, 3, 4, 5 and 6.

Erosion and sediment controls consisting of vegetative and structural practicesshall be designed to preserve vegetation or timely revegetated disturbed areasand divert from exposed soils or otherwise limit runoff from exposed areas.

6

Page 12: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control Plan

Show Road Pit

W. C. Fore, L.LC.

Harrison County, MississippiControls shall be placed to minimize off-site vehicle tracking of sediments.Controls shall be implemented as needed to retain storm water in the on-sitedetention pond to prevent adverse impact to receiving streams. When work is notbeing performed in a disturbed area, appropriate temporary andlor vegetative andstructural practices shall be initiated.

Any of the following erosion and sedimentation control measures may be used tocontrol/reduce pollutants in storm water.

• Temporary Seeding• Sedimentation Basin

• Permanent Seeding• Check Dams

• Mulching• Straw Bale Dikes

• Sod Stabilization• Earth and/or Sandbag Dikes

• Vegetative Buffer Strips • Brush Barriers• Grassy Swales

• Subsurface Drains• Modification of Contours • Pipe Slope Drains• Silt Fences

• Storm Drain Inlet Protection• Detention Basin

• Drainage Swales• Sediment Traps

• Rock Outlet ProtectionA rain gauge shall be set up on site during mining operations. The rain gauge shall be locatedin the vicinity of the mining pit. Within twenty-four hours after commencement of a rainfallevent greater than or equal to a Two Year 24 Hour Storm Event (6 inches), an inspection of allcontrols and other SWPPP requirements shall be performed during the permit coverage incompliance with Part IV.B of the permit.

Other controls of importance may include, but are not limited to:

7

Page 13: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control PlanShaw Road Pit

W. C. Fore, LLC.Harrison County, Mississippi

1. Topsoil will be removed from the area to be mined and used to plate diversion dikesand berms.

2. Preserving existing vegetation and revegetating disturbed soil as soon as possible tolimit the exposure time of the disturbed area.

3. Surface area that must be disturbed will be minimized.4. Management practices to mitigate adverse impacts from storm water runoff are, but notlimited to, interceptor dikes and swales, hay bales, brush barriers, silt fences, andsediment traps. Figures 1, 2, 3, 4, 5 and 6.

5. Structurally sound dams and levees will be constructed for impoundments.6. Encompassing various stockpiles such as fill or topsoil materials with silt fence and orhay bales.

7. Properly maintaining, cleaning, repairing the site, and erosion prevention controls.

Inspection RequirementsInspection of all temporary and vegetative, erosion and sediment controls, and other protectivemeasures and SWPPP requirements will be performed during the permit coverage.

After each significant rainfall, but not less than once a week all disturbed areas, erosion andsediment controls shall be inspected.At least once every month:

1. Within twenty-four hours after commencement of a rainfall event greater than or equalto a Two Year 24 Hour Storm Event (6 inches).2. As often as necessary ensure that appropriate erosion and sediment controls havebeen properly constructed and maintained.

Maintenance

1. All needed repairs shall be made within 24 hours.

8

L1.

Page 14: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

[orm Water Polluliori Control p

Shaw Road Pit

W. C. Fore, LLC.

Hamson County, Mississippi2. Remove sediment from inlet protection devices and silt fences when accumulated silthas attained 50 percent capacity.3. Reseed, fertilize and mulch as needed.

Post ConstructionUpon completion of mining activities, post construction control measures shall include on-siteinfiltration, flow attenuation in vegetated swales and natural depressions and retentionstructures. Velocity dissipation devices may be required at the outfall of these structures andalong the outfall channels provide non-erosive flows.

REPORTING

Inspections will be reported on copies of the forms provided. The report form shall besubmitted semi-annually, postmarked not later than the 2&’ day of July or January for eachsix-month period. All records, reports and information resulting from activities required by thispermit shall be retained of at least three years from the date of the MNOI, inspection or report.The inspection report is attached at the end of ihs SWPPP. This form shaii be dupiicated asnecessary.

NONCOMPLIANCE REPORTiNG

1. Anticipated Noncompliance: The Mississippi Office of Pollution Control (OPC) will begiven at least ten days advance notice, if possible, before any planned noncompliancewith permit requirements.2. Unanticipated Noncompliance: The Mississippi Office of Pollution Control (OPC) shallbe notified orally within 24 hours from the time that the operator becomes aware of theunanticipated noncompliance. A written report will be provided to the OPC within fiveworking days from the time the operator becomes aware of the circumstances. Thereport shall describe the cause, the exact dates and times, steps taken or planned toreduce, eliminate, or prevent reoccurrence and, if the noncompliance has not ceased,the anticipated time for correction.

9

Page 15: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control p,Shaw Road Pit

W. C. Fore, LLC.Harrison County, Missssipp4

TERMINATION of REPORTING & PERMIT COVERAGE

Upon successful completion of all permanent erosion control and sediment controls for acovered project, a certification of the same will be submitted to the Mississippi Office ofPollution Control. Inspections shall continue for at least two months beyond completion. Ifcontrols have been successful during these two months, reporting and permit coverage isautomatically terminated unless notified by OPC within thirty days of receiving the finalinspection report.

POLLUTION PREVENTION PLAN CERTIFICATION

I certify under penalty of law that this document and all attachments were prepared under mydirection or supervision in accordance with a system designed to assure that qualifiedpersonnel properly gathered and evaluated the information submitted. Based on my inquiry ofthe person or persons who manage the system, or those persons responsible for gathering theinformation, the information submitted, to the best of my knowledge and belief, true accurateand complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations.

Signed: 4,/’7’ç2

Date:

,.-.- I

W. C. Fore

Seotember 28. 2004

10

Page 16: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control PlanShaw Road Pit

W. C. Fore, LLC.Harrison CountV, Mississippi

ATTACHMENT ISTORM WATER POLLUTION

PREVENTION PLANSITE LOCATION MAP

RECLAMATION SITE MAP

11

Page 17: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

-

-

NI

/

-J

N

—..-V—.-’

.—---,-----—--- -.-----------—-—-—-—-- \‘— —_..r -

V.,

—“—-— ‘,I/j.

V

7’

;

%

--. .“V

• V

“7

. 1V. /:/

0

N ‘‘ - ‘—_

c1_•I “H,—..

V

.1

‘-UV-V.” ‘—V.

Page 18: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

SE

CT

ION

11

F

GRAP

HIC

SCA

L$—

PT

PER

MIT

AR

EA

SIT

EPL

AN

LE

GE

ND

Exi

stin

gS

urfa

ceM

inin

gPi

t+

1-4

Acr

es:

Exi

stin

gS

urfa

ceD

rain

age:

TO

TA

LPE

RM

ITA

REA

40.0

0A

CR

ES

Wor

tham

Qua

dran

gle,

Sect

ion

11T

owns

hip

6SO

UT

HR

ange

12W

EST

Har

,so

nC

ount

yM

issi

ssip

piN

.W 2004-0

6-3

0-

1w.C

.FO

RE,

LLC.

P0.

eox

3058

GU

IPP

OR

T,

MS

(228

)ti6

3131

4

(AW

RO

AD

SI-l

AW

ROA

DG

ULF

POR

T,M

ISSI

SSIP

PI

(RbF

.G

av,n

r

/N

W1/

4N

OW

OR

FOR

ME

RL

YW

.C

.FO

RE

,LL

C

1N

E1/4

NO

WO

RFO

RM

ER

LY

W.

C.

1-O

RE,

LLC

/

/I

/7

PRO

POSE

DSU

RFA

CE

MIN

ING

SIT

E‘

,

40.0

AC

RES

.,•

:‘

//

NSW

1/4

NO

WO

RFO

RM

ER

LY

W.

C.

FOR

E,

UC

SE1/4

NO

WO

RFO

RM

ER

LY

W.

C.

FOR

E,

LLC

Page 19: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

r

SHA

WR

OA

DSU

RFA

CE

MIN

fNG

PIT

MIN

EP

ER

M1

AR

EA

40.0

00

SUFF

ER

ZO

NE

18.8

82

AC

CE

SSR

OA

D0.6

86

TO

TA

LIM

PAC

TA

RE

A59.5

68

AC

RE

S

WE

ST

LN

alura

(Pll

.lE

l,e.

41-Ie,l

l

:1le

loT

e.,.l

,ora

i-y

or

Pe-

.,’v’

Ot

_j//

Se5

llr.

gT

yp)

3i

Slop

e(l

yp)

3’

EA

STT

rpa!

1Y

P)C

AL

,jN

GP

IT&

R14

+1—

Sl.

5lI

N-U

r,l

Gro

end

Be.

.*1

-8D

’5

(NT

S)

‘U

”,

95.dL

—.

EX

IStI

NG

--,

RE

CL

AM

AT

ION

DE

TA

ILS

NO

TES

1.t’J

lS

lope

sIn

Be

31.

2.Jl

Slo

pes

To

Be

Slo

eded

,

3.P1

1B

Uff

erZ

ones

1’.t

Re.

dTo

B’M

nlnt

.jlre

.d..

4.E

sl.i

’lle

hE

rosI

onU

ofl

lrO

nA

llS

lopee

&lp

cO

f

TO

TA

LPE

RM

ITA

RE

A40.0

AC

RE

SW

orln

nrn

Quat

iran

nli

Spc

tlon

1)T

ow

osh

lo6

SOlJ

Tt-

lR

rope

12

WE

’,I

Hnir

lsoi

CU

uniy

Mls

sE.l

ppl

7.d

100.

0’—

,,c

a’

--

\...

—S

CU

IHU

ThR

t-

NO

RtH

FC

UO

NP1

-H

70.0

90.0

’-‘..

..

-.

EX

IST

ING

ao0-

-

- -\

I

ztzE

ZW

EST

FISr

UR

EE

AS

tS

E.

[IO

NA

-AI

20t1

4•-

06-3

0I

ZO

NE

W.

C.FO

RE,

LLC.

P.(1

.B

OX

3O

BG

UL

EPO

RT

,P

439ll

J5

e__

SHA

WR

OA

DPI

T

SHA

WR

OA

I)H

l.IL

FPO

RT

,(B

;

II-

1A

SN

oW[

BU

FFE

RZ

ON

r

Page 20: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

.I

I Iii

r1up

rzO

irkL

CR

OS

S-S

FC

TIO

N

PA

JUI3

LJC

CR

O5S

-SIC

TIO

N

FIG

UR

E/.

TY

PIC

AL

INT

ER

CE

PTO

RD

IKE

SA

ND

SWA

LE

S(M

odif

ied

from

Sta

teof

Mar

’Ian

d,I 0

B3)

SHA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

SIP

4S

TO

RM

WA

TE

RP

OL

LU

TIO

NC

ON

TR

OL

PL

AN

Page 21: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

SHA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

SIP

PI

ST

OR

MW

AT

ER

PO

LL

UT

ION

CO

NT

RO

LP

LA

N

Page 22: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

FIG

UR

E3

Bfl

UH

BA

RR

IER

(Mod

ifie

dfr

omW

ashi

nQ(o

nS

tate

,19

92)

Si-lA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

IP

F’/

/c,‘

i’br,

Drr

,otl

2rrr

Br,

rrhf1;/p4I

rrcA

/JC

cr.

f4(j

dg1/,

.Q

-

-—

,4A

Ao,

-rY

4//td5

if

£l,

-w;4

---------—

—-.

r-s

frr4i

ci,%f114f

t2(I

r)S

/&W

AIc

’,•/

f4!

ri-”

7’.

‘4rf’—

’ ST

OR

MW

AT

ER

PO

LL

UT

IC

ON

TR

OL

PL

AN

Page 23: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

C

r

rrc2<rn—,

C,10

0

•‘(/

C

LD

r

C‘—p

>

‘I

5HAWROADPIT;EcTI0N11,TOWNSHIP6S,RANGE12W 1ARRISONCOUNTY,MISSISSIPPI

STORMWATERPOLLUTIONCbNTROLPLAN

Page 24: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

D

C

rn

C

C,‘a

C

&>

SHAWROADPITSECTION11,TOWNSHIP6S,RANGE12W HARRISONCOUNTY,MISSISSIPPI

STORMWATERPOLLUTIONCONTROLPLAN

0I..

o

V

C

‘a

a

z

NC

C

3

Page 25: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

SHAWROADPITSECTION11,TOWNSHIP6S,RANGE12W HARRISONCOUNTY,MISSISSIPPI

STORMWATERPOLLUTIONCONTROLPLAN

—---—---..-.——--——------

--—

—.—

--:

•‘•:\b-——

-

- :‘• .:.•-•-•.•—•

-—••.-

.\I

C

C

C-)CD-dD

0

0

0

C

I-

••.—•.

--x.—

k

-

.•Th•t\•.::. —•• ——

—-, •—

-—•—‘.——— ---s

•.S ••••‘)

I•••. ••

‘:— •L.•

••-I. r

• ••‘•I•-

-C ,-—

_)

S-r

•I’S

.••%•_

- —••—

?-.-S.

.A’

•—

•I

a

- •S

S S_i-.

•••, —.1•S

5%

Page 26: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

STATE OF MISSiSSiPPI

SURFACE MINING PERMIT APPLICATIONMISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALiTYOFFiCE OF GEOLOGY / MINiNG & RECLAMATION DIVISIONP. 0. Box 20307

Jackson, Mississippi 39289-1307

_____

(601) 961-5515Fax (601) 961-5521

For Office use only

P. 0. Box 3058rgavinl be11south . net(228) 863—1314

Authorized Representative W - C. Fore2. Engineering Firm, Consultant, etc.:

_________

Mailing Address:

______________

E-mail Address:Phone No.

________________________

3. Name of Mine: Harrington PitPhoneNo. (228) 8631314

Fax No.

— Mine Supervisor: W • C • ForeFaxNo. (228) 86400134. Location of Operation (to nearest quartet-quarter section):

XX Initial Permit for OperationO Amendment to Expand OperationO Amendment to an Existing Operation

(not involving acreage change)0

XX Open Pit 0 Strip 0 Dredge0 Wash Operation, if so

Water Source

_____________

Wash System Type[]Closed system 0 Open system

7. Number ofAcres to be Permitted:Excavation 40Haul roads, plant site, ponds,

Existingstorage piles, etc.

_________

If this application is an amendment toexpand an existing permit, number ofadditional acres to be permittedTOTAL PERMflTED AREA 40.0

acres

8. Is the Permit Area located: Yes Noa. within 100 feet of a public road?b. within 100 feet of a cemetery?c. within 300 feet of an occupied building?d. within 25 feet of a property line

-xxxx

-xx—xxIfYES to a, b, c, ord, a letter must be filed with theOffice giving permission from the owner or maintainingauthority to mine within these distances to the subjectproperty.

9. Materials to be Mined: Sand

---s

Permit No. -

Application No. (6

Other permits required: Y/N DateNPDES

____

State Operating Permit —

___

Corps of Engineera —

____

City/County approvalRequired Yes — NoReceived Date:__________County

___________

City

A. GENERAL iNFORMATION

1. Name of Applicant: W. C. Fore Trucking, Inc.Mailing Address:E-mail Address:

Phone No.

_____

ftI_ ii 262004 hLL..•..J

nEPT. OFFaxNo. (226) 864—0013

Wortham Quadrangle 11 6S 12W HarrisonSection Township Range County5. Type ofApplication 6. Method ofOperation

Form MRD-3, Rev. 3-03I

Page 27: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

TiI lIP ‘) .-“iIU jj %J.iL L J10. Has the applicant applied for, or have, any other permits or licenses that pertain to this 4r any1othmining operation? Yes XX No

cL__DtTIf“YES,” list them in the space provided on page 5,01 attach separate pages. and give the current status of each,including any violations or penalties.

2. Anticipated Schedule

Begin clearing

Begin mining

Complete mining

Begin reclamation

Complete reclamation

(month,car)

08 12004

.09 /200412 /2010

12 /2008

12 /2010

3. Depth to ground water:

4. How will dust be controlled?

XX Water on haul roads

0

15—20 ft. 5. Types oferosion control structures that will beutiuized

Settling ponds U Drainage ditchesU Diversion berms U Terraced slopesU

O berm around the storage pile

grass cover on the pile (recommended)O stored under a cover

U

3. How will highwalls, standing faces, and banks bereduced to minimize erosion? (All bighwallsmust be sloped, minimum 3 horizontal to I vertical.)0 slopes will be terraced

U slopedtoagradientof tel

0 blended with surrounding contouis

2 No uighwalls

B. MINING PROCEDURE AND ENVIRONMENTAL ANALYSIS1. Description of materials:

Thickness of overburden .50 ft.(Topsoil MUST be stockpiledfor use during reclamation)Thickness ofuseable materiaL 1520 ft.Total depth of excavation 20 ft.Estimated annual production 100 ,00uis

6. Describe the land to be affected by mining as it presently exists:a. Land use Scrub Pines

b. Predominant vegetation__Grass7. Will explosives be used? — Yes XX No 8. Is test-boring data available? — Yes No9. Are toxic materials likely to be encountered at any time? — Yes No

10. Will there be any discharge to local streams or other bodies ofwater? — Yes XX.. NoIf any of questions 7-10 are answered “YES,” provide additional information on page 5, or attach separate pages.

C. RECLAMATION PLAN NOTE: It is suggested that the county NRCS office be consulted for specificrecommendations on the following items.1. Describe the soil handling technique for the reclamation phase of the operation:

Topsoil segregated U Mixed strata U

_________________________________________

2. Describe the protection method for thestockpiled topsoil.

Form MRD-3, Rev. 3-032

Page 28: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

fl4. What is the general plan for reclamation?

[]reforestation

kesiab1ish grass cover

[1 pondorlake

U

_______________________

6. How will fertilizer and lime be applied and incorporated?

harrowing broadcasting

7. Quantity of lime and fertilizer to be applied?a. For initial planting

lime: 2 tons tons per acre

fertilizer: j- - J,J. (type)

______

b. For successive years prior to 100% releasefertilizer 13 -13 -13 (type)

____

when: April (month)

8, Describe the planting schedule: Tme spacingTree or Seed Species or lbs./acre

__________________________

30

______

No Ifyes. rate per acre

______________

10. How will the vegetation be maintained until the tinal bond release?

O watering

EJ mowing

times per year

______

approximate month(s)

_______________________________________

________

X repairing gullies

XX replanting eroded areas

U

________________________

11. How win debris be disposed of when the mine is finally closed?U butying jburn1ng U hauling away

12. Will a soil analysis be submitted for this site? — Yes NoNOTE: available 1mm the Cooperative Extension Service through the applicants County Agent13. Estimated cost per acre for reclamation of this site: 300 .00 (ininimwn of $500 per acre)

5. What planting method will be used?

roadcast seed U mechanical seeding

[1 seeding by manual labor

U

0 disking

400 poundaperacre

200 poundsperacre

Bahia

JUL 262004I_ r

Planting SeasonApril

9. Will the area be mulched?

Method of holding in place:

_Yes .

U crimped U

Form MRD-3, Rev. 3-033

Page 29: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

NAMES AND ADDRESSES OF PERSONS AFFECTED BY THIS OPERATION1. Landowner(s) of area to be mined/leased

Name: W. C. Fore Trucking, Inc. Name:Address: P. 0. Box 3058 Address:

Gulfport, MS 39505Phone: (228) 863—1314 Phone:

2. Landowner(s) within 500 feet ofthe areaName: None

Address:

_______

3. Pemon(s) living on permit areaName: None

Address:

I declare that! have knowledge of the facts presented in the preceding pages and in all of the items attachedto this application; furthermore, 1 certify that they are true to the best of my knowledge.

signature

W. C. Foreprinted name

Presidenttitle

fli[_JuL 26 2’

i,r

Name:

Address:

Phone:

__________________

Phone:

Name:

Address:Name:

Address:

Phone:Phone:

Name:

Address:

Phone:Phone:

July 16. 2004date

Form MRD-3, Rev. 34)34

Page 30: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

[flTJ -

1L iii 26ADDITIONAL COMMENTS

Space for detailed answers to any of the previous items. Indicate item number to which the answers apply.

10 PerinitP87-027 28 acres Harrison County10 Permit P93—048 29 acres Hancock County10 Permit p87-045 35 acres Jackson County10 Permit P88—027 38 acres Harrison County10 Permit P92—024 22 acres Hancock County10 Permit P02—027 40 acres Hancock County

.1

E.

ItemNumber

If more space is required, use full sheets ofpaper the same size as this page. Attach all sheets to this application.

Form MRD-3, Rev. 34)3

5

Page 31: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

\y

\

V

I’

Page 32: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

AUG—02—2004

NON 02:20 PM W C FORE TRUCKING INC

W. C. FORE TRUCKING, INC.

.—.

_.1W1..... .1.

P.04 SQE 3058 • Gulport, MS 39505 • (228) 863-1314 • fax (226) 664.0013

VIA FAcslrnL

Mgust 2, 2004

Mississippi Department of Environmental QualityOffice of GeologyMining and Reclamation OMsionPost Office Box 20307Jackson, Mississippi 39289-1307

Attontloit Mr. Ken McCadey:

Reference: Surface Mining Permit Application51mw Road Pft 40.0 Acres,T6$, R12-W, SectIon 11Harrison County, Mississippi

Dear Mr. McCarley,

Pursuant to our telephone conversation this morning regarding the above captionedapplication, we are requesting that line item three (Name of Mine) of the Surface MiningPermit Application (Form MRD-3) be changed from Harrington Pit to Shaw Road PitAll other documentation that accompanied our July 22, 2004 application indicated thecorrect mfre name of Shaw Road Pit.

If you have any questions at a(l, please do not hesitate to call our office.Thank you for your assistance.

Sincerely,

-

rt. r.

cc Charity RockinghamEnvironmentai Permits Division(801) 961-5703

FAX NO. 2288640013 P. 01

Page 33: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Authorized Representative W. C. Fore

City/County approvalRequired Yes — NoReceived Date:____________County

___________

City

2. Engineering Finn, Consultant. etc.:Mniling Address:

____________

E-mail Address:

Phone No.

_________________________

3. Name of Mine: Harrington PitPhoneNo. (228) 863—1314

Fax No.

— Mine Supervisor: W. C. ForeFaxNo. (228) 864—00134. Location of Operation (to nearcst quarter-quarter section):

5. Type ofApplication

XX Initial Permit for OperationO Amendment to Expand OperationO Amendment to an Existing Operation

(not involving acreage change)

13. 6S 12WSection Township Range

6. Method of Operation

XX Open Pit C Strip 0 Dredge0 Wash Operation, if so

Water Source —

Wash System TypeEl Closed system Cl Open system

7. Number of Acres to be Permitted:Excavation 40

Haul roads, plant site, ponds,Existingstorage piles, etc.

_________

If this application is an amendment toexpand an existing permit, number ofadditional acres to be permittedTOTAL PERMuTED AREA

If YES ton, b, c, or d. a letter must be filed with theOffice giving permission from the owner or maintainingauthority to mine within these distances to the subjectproperty.

I

Permit No.

____________

STATE OF MiSSiSSiPPI Application No.

Other permits required: Y/N DateNPDES

____

State Operating Permit

____

Corps of Engineers —

____

SURFACE MINING PERMIT APPLICATIONMISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITYOFFiCE OF GEOLOGY I MINING & RECLAMATION DiVISiON

P. 0. Box 20307Jackson, Mississippi 39289-1307

_____

(601) 961-5515Fax (601) 961-5521

For Office use only

A. GENERAL INFORMATION

1. Name of Applicant: W. C. Fore Truckina - Inc -

Mailing Address:E-mail Address:Phone No.

_____

3?5O5

u=

Rh JL262004 1•

(228) 863—1314

P. 0. Box 3058 - --nrgavin1be11south.net

FaxNo. (226) 864—0013

Worthain OnadranaleHarrison

County

8. Is the Permit Area located: Yes Noa. within 100 feet of a public road?b. within 100 feet of a cemetery?c. within 300 feet of an occupied building?d. within 25 feet of a property line

-xxxx

-xx-xx

40 .0 9. Materials to be Mined: Sandacres

Form MRD-3, Rev. 3-03

Page 34: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

STATE OF MISSISSIPPIHALEY BARB0UR

GOVERNORMISSISSIPPI DEPARTMENT OF ENViRONMENTAL QUALITY

CHARLEs H. Cm5OLM, EXECUTIVE DIREcToR

July 27, 2004Mr. W. C. ForeW. C. Fore Trucking, Inc.P0 Box 3058Gulfport, MS 39505

Dear Mr. Fore:

Re: Storm Water NPDES PermittingHarrington PitSection 11, Township 6S, Range 12WHarrison County

The Office of Geology has informed us that you have filed a permit application for the referenced surfacemine.

Federal Storm Water Regulations. 40 CFR 122.26(b)(14)(iii), require mines with storm water discharges tohave NPDES storm water permit coverage. Therefore operating a mine without the needed coverage violatesState Law, sections 49-17-1 through 49-17-43, which includes significant penalties.Enclosed is a Mining Notice of Intent (MNOI) form that can be used to apply for coverage under our MiningStorm Water General NPDES Permit, copy enclosed. This MNOI form must be filed at least 30 days prior tothe commencement of mining or 15 days if a Storm Water Pollution Prevention Plan (SWPPP) is already onfile. If you are operating without coverage, you may be operating in violation of the storm water regulationsand subject to potential enforcement action. Therefore, you should submit the enclosed MNOI and a SWPPP,as described in the permit, within 15 days of receipt of this correspondence.

Please do not hesitate to call me at 961-5722 if you have any questions.

Sincerely,

Enclosures

OFFICE OF POLLUTION CONTROl,POST OIFICE Box 10385 .JACKSON, MississiPPi 39289-0385 • TEL: (601) 961-5171 • FAx. (601) 354-6612 . www.deq.state.ms.usAN EQUAL OPPORTUNITY EMPLOYER

Division

Page 35: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

MEMORANDUM

Date: July 27, 2004

From: Charity Rockingham, EPD Division, Solid Waste and Mining Branch

To: Ken McCarley, Chief, Mining and Reclamation Division

Re: W. C. Fore Trucking, Inc.Harrington PitSection II, Township 6S, Range 12W, Harrison County

We have reviewed the Initial Surface Mining Permit Application submitted for our review.The applicant will need to apply for Stormwater Coverage under the Mining StormwaterGeneral Permit for this facility or certify through demonstration that coverage is notrequired due to the applicant’s ability to hold all impacted stormwater on site. We will sendthe applicant the necessary forms to file for stormwater coverage.

Please contact me at 5722 with any concerns you may have.

hnks

Charity Rockin m

Page 36: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

/AUG-3-2004pR20WCFOTRUNG FAX NO. 2288640013 P. 01

W. C. FORE TRUCKING, INC.

..

i

P. 0. Box O58 a Cu1fpcrt, MS 3SO5 • (228) 883-13t4 • fx (228) 854-0013

Via Facsimile & U.. S. Mail(601) 354-6612

August 13, 2004

Mississippi Department of Environmental Quahty

Office of Pollution ControlPost Office Box 10385Jackson, Mississippi 39289-6612

Attention: Mr. Ross Williams

Reference: Surface Mining Notice of Intent

Shaw Road PIt, 40.0 Acres

SectIon 11, TownshipS South,

Range 12 WestHarrison County, Mississippi

Dear Mr. Williams,

Attached for your review and approval Is our Mijg. Noce.pfJntent (MNQi for the above

captioned 40 acre mining application. This MNOI shall replace the Construction Notice of Intent

(CNOI) that was transmitted on August 11, 2004

The surface mine shaN be stripped of overburden and the topsoil segregated for use in plating

the slopes of the pit for vegetation. The balance of the spoil material shall be used to construct

earthen berms around the perimeter of the pit. The berms wfll be constructed so as to preclude

storm water from entering the pit.

Construction and excavation of the pit will be in such a configuration with grade changes That

only the incidental storm water and ground water wilt flow to a temporary Bump at the lowest

elevation in the pit. No storm water or ground water shall leave the surface mining pit. All storm

water shall be contained within the pit.

If you have any questions at all, please do not hesitate to call our office.

Sincerely,

R. F,

end: As-Noted

Page 37: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

nI

hK

“S

4f

,\!

3S

ttr

)

:t/

4:‘

::.

.z;;jk

t•

4N

44

A

ka;aa

:1?fsi‘

3cj

SI‘

rJ??tc:s::’%

k9

11‘

1/,

\d

i *c

;t:4fJ

\w*ak’

%\1

/N’7

t1&

sii

:;‘

tfl\\J

9ij

n!

t‘

4i

!‘(S

1dk..:

3:?‘

ItI

2

—p::%

*):

.JeH

ti

ii:

M.

a:

Page 38: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

FAX NO. 2288640013 P. 05Page 1 or i

Image courtesy of the US. GeoogkI Survey

2004 MIcrosoft Corporation. Terms of USe Privacy Statement

SHAW ROAD IT

WORTHAM QUADRANGLE

TOWNSHIp 6 SOUTHRANGE 12 WEST

SECTION 21

AU-13-2OO4 FRI 09:23 AN W C FORE TRUCKING INC

eñeir L giCourThsy thetJS(

Sen1 To Printer Change to 14x17 Print Size - Siow Grid Ufl6 Ch&nge to Landscape

sack To TarrSerierI-— I C

JL

httn:/Iwww terras ver.microsoftcon,/rjntjmage.aspx?T1 &S=16/30/04

Page 39: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

I

STORM WATER POLLUTIONPREVENTION PLAN

(SWPPP)

m 1—

Shaw Road P!tSli, T6S, RI2W

Gulfport,

Harrison County,

Mississippi

W. C. Fore Trucking Inc.Post Office Box Box 3058

Gulfport, MS 39505(228) 863-1314

Page 40: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

STORM WATER POLLUTION CONTROL PLAN

Shaw Road Pit

Section 8, Township 7S, Range 12WHarrison County, Mississippi m

Table of ContentsPage

OverviewIntroduction 3Objective 4

General RequirementsImplementation 4Erosion and Sediment Controls 5Structural Practices 6Inspection Requirements 8Maintenance 8Post Construction 9

ReportIng9

Noncompliance ReportingAnticipated Noncompliance 9Unanticipated Noncompliance 9

Termination of Reporting and Permit Coverage 9Attachment I

Site Location Map 11Reclamation Site Map 11

Page 41: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

__

I

Storm Water Pollution Contro’ pj Shaw Road PitW. C Fore Trucking, IflC. Harnson County, Mississippi

Typical DrawingsTypical Interceptor Olkes and Swales Figure 1Filter Fence Detafls Figure 2Brush Barrier Figure 3Typical Sediment Trap Figure 4Surface Roughening Figure 5Level Spreaders Figure 6

2

Page 42: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

___

IStorm Water Pollution Control Plan Show Road PitW. C, Fore Trucking, j, Harrison County, Mississippi

OVERVIEW

iNTRODUCTION

This document is the Storm Water Pollution Prevention Plan (SWPPP) forproperty owner W. C. Fore Trucking, Inc., Post Office Box 3058, Gulfport,Mississippi 39505, of the surface mining pit known as ‘Shaw Road Pit”, a 40-acresite located fri Gulfport, Harrison County, Mississippi.

The purpose of this application is to allow W. C. Fore Trucking, Inc., ulfport,Mississippi, the property owner, to enlarge an existing surface mining site that wasestablished and operational in 1973 to a total mining area of 40.0 acres. Thisexisting pit was created to provide imported fill material for the State Aid Project,County Farm Road.

The existing haul road shall be utilized for ingress and egress. This haul road shallbe reconstructed to become a stabilized all weather construction entrance foringress and egress of all construction traffic. The buffer zones shall remain in theirnatural vegetative state around the periphery of the site. Only those trees andvegetative growth will be removed that will impede the location and excavationprocesses of this surface mining pit. Storm water in the buffer zones will follow thenatural watercourse. Disturbed areas caused by construction or mining activitiesshall be temporarily or permanently seeded as the circumstances direct. In theinterim, sedimentation and erosion controls shall be put in place as needed. Flowof surface water into the mine will be controlled by the use of erosion controlstructures.

1. Clearing and excavation of the surface mining pit will be in an west to eastdirection. The removed topsoil shall be stockpiled and the overburden willbe used to construct the perimeter berm of the mined area. The berm willbe constructed and elevated above the existing natural ground. This raisedlevee will preclude storm water from entering the mined area. A temporarysump basin shall be located in the southeast area of the surface mining

3

Page 43: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control Plan Shaw Road PitW. C. Fore Trucking, Inc. Harrison County, Mississippi

operation. The purpose of this temporary sump is to collect sediment and

incidental stormwater falling into the mining pit. No impounded stormwater

or sediment shall leave the mine pit. All storm water and ground water shall

be contahied within the confines of the mining pit. The earthen berms

comprised of the stripped overburden around the periphery of the

excavated areas shall preclude the mingling of the storm water outside the

pit area and the ground waterlstormwater from the excavation,

Storm water falling outside the pit area shall drain from the area through existing

natural watercourses. Ultimately the receiving waters of the State of Mississippi

will be Little Biloxi River to the south and south east of the project area through

unnamed tributaries. In its undeveloped state the surface mining pit area

encompasses the 50-foot elevation, the highest point in the area and stormwater

appears to flow to all points of the compass.

The Storm Water Permit shall be displayed in a conspicuous location to enable

public review.

This Plan is the criteria for compliance with regulations set forth by the

Environmental Protection Agency, 40 CFR, Parts 122, 123 and 124, National

Pollutant Dichpre Elimination System Aoolication Fequlations for Storm Water

Management for Construction Activities.

OBJECTiVE

The Purpose of this Storm Water Pollution Prevention Plan is to meet the

requirements of the State of Mississippi and the Environmental Protection Agency

for the control and mitigation of pollutants to storm water discharges associated

with this surface mining operation for sand and clays

4

Page 44: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Poflubon Control Plan Show Road PitW. C. Fore Thicdng, Inc. Harnson County, Mississippi

General Reauirements

This Storm Water Pollution Prevention Plan consists of certain major activities andcontrols appropriate for surface mining activities.

Implementation

1. Install stabilized construction entrance.

2. Install erosion control structures as needed.

3. Perform stripping activities. Topsoil shall be stockpiled for future plating ofthe slopes and the overburden shall be used to construct the berms aroundthe perimeter of the mining site. Clearing and excavation of the surfacemining pit will be in an east to west direction. The topsoil shall be removedand stockpiled. The overburden will be used to construct the perimeterberm of the mined area. The berm will be constructed and elevated abovethe existing natural ground. This raised levee will preclude storm wateroutside the pit zone from entering the mined area. Storm water shall drainaway from the site through existing natural watercourses and elevationchanges. A temporary sump basin shall be located in the southwest area ofeach phase of the surface mining operation. The purpose of this temporarysump is to collect sediment and stormwater falling into the mining pit. Allincidental storm water entering the mining operation and ground water willnot leave the pit and shall not be discharged into the waters of the State ofMississippi.

4. The general configuration of the mining operation and the constructiontechniques of the surface mining area has been arranged to minimize anyimpact to the adjacent lands.

5

Page 45: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Controlp Shaw Road PitW. C. Fore Trucking, Inc. Hemson County, Mississippi

Erosion and Sediment Controls:

Mine development will proceed in the planned sequence and every attempt will be

made to prevent erosion. All disturbed areas will be managed and revegetated as

soon as practicable after construction activities. Where applicable, disturbed

areas will be stabilized by temporary seeding, permanent seeding, mulching

and/or vegetative buffer strips as each case dictates.

Structural Practices

In addition to vegetative practices referenced above, certain structural erosion

control measures shall be Implemented as needed. The measures include

diverting flows from exposed soils, storing flows or otherwise limiting runoff from

exposed areas. Other structural methods will include straw bale dikes, silt fences,

earth dikes, brush barriers, drainage swales, check dams, outlet protection,

detention/retention basins, sediment traps, temporary sediment basins or

equivalent sediment controls.

1. Construct the sediment I detention pond with the spoils from the excavation

to be used in berms.

2. Divert upslope surface water around disturbed areas of the site as shown in

figure 1, Diversion Dikes.

3. Limit the exposure of the disturbed area to the shortest amount of time as

practicable.

4. Minimize the amount of surface area that must be disturbed at one time.

5. Implement the best management practices to mitigate adverse impacts

from storm water runoff. Shown in Figures 2, 3, 4, 5 and 6.

Erosion and sediment controls consisting of vegetative and structural practices

shall be designed to preserve vegetation or timely revegetated disturbed areas

and divert from exposed soils or otherwise limit runoff from exposed areas.

6

Page 46: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Control Plan Shaw Road PitW. C. Fore Trucking, Inc. Harrison County, Mississippi

Controls shall be placed to minimize off-site vehicle tracking of sediments.

Controls shall be implemented as needed to retain storm water in an on-sitedetention pond to prevent adverse impact to receMng streams. When work is notbeing performed in a disturbed area, appropriate temporary and I or vegetativeand structural practices shall be initiated.

Any of the following erosion and sedimentation control measures may be used tocontrol I reduce pollutants in storm water.

• Temporary Seeding • Sedimentation Basin

O Permanent Seeding • Check Dams

• Mulching • Straw Bale Dikes

• Sod Stabilization • Earth andlor Sandbag Dikes

• Vegetative Buffer Strips • Brush Barriers

• Grassy Swales • Subsurface Drains

• Modification of Contours • Pipe Slope Drains

• Silt Fences • Storm Drain Inlet Protection

• Detention Basin • Drainage Swales

• Sediment Traps • Rock Outlet Protection

A rain gauge shall be set up on site during mining operations. The rain gauge shallbe located in the vicinity of the mining pit. Within twenty-four hours aftercommencement of a rainfall event greater than or equal to a Two Year 24 HourStorm Event (6 inches), an inspection of all controls and other SWPPP requirementsshall be performed during the permit coverage in compliance with Part IV. B of thepermit.

Other controls of importance may include, but are not limited to:

7

Page 47: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

L_Storm Water PoHutlon Control Plan Shaw Road PitW. C. Fore Trucking, Inc. Harrison County, Mississippi

1. Topsoil will be removed from the area to be mined and used to plate diversiondikes and berms.

2. Preserving existing vegetation and revegetating disturbed soil as soon aspossible to limit the exposure time of the disturbed area.

3. Surface area that must be disturbed will be minimized.

4. Management practices to mitigate adverse impacts from storm water runoffare, but not limited to, interceptor dikes and swales, hay bales, brush barriers,silt fences and sediment traps. Figures 1, 2, 3, 4, 5 and 6.

5. Structurally sound dams and levees will be constructed for impoundments.

6. Encompassing various stockpiles such as fill or topsoil materials with haybales or silt fence.

7. Properly maintaining, cleaning, repairing the site and erosion preventioncontrols.

INSPECTION. REQUIREMENTS:

Inspection of all temporary and vegetative, erosion and sediment controls and otherprotective measures and SWPPP requirements will be performed during the permitcoverage.

After each significant rainfall, but not less than once a week all disturbed areas,erosion and sediment controls shall be inspected.At least once every month:

1. WIthin twenty-four hours after commencement of a rainfall event greater thanor equal to a Two Year 24 Hour Storm Event (6 inches).

2. As often as necessary ensure that appropriate erosion and sediment controlshave been properly constructed and maintained.

8

Page 48: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

I

Storm Water Pollution Control Pis,i ShaW Road PitW. C. Fore Trucking, Inc. Harrison County, Mississippi

MAI NTENANCE

1. All needed repairs shall be made within 24 hours.2. Remove sediment from inlet protection devices and silt fences when

accumulated silt has attained 50 percent capacity.3. Reseed, fertilize and mulch as needed.

POST CONSTRUCTION

Upon completion of mining activities, post construction control measures shallinclude orisite infiltration, flow attenuation in vegetated swales and naturaldepressions and retention structures. Velocity dissipation devices may be required atthe outfall of these structures and along the outfall channels provide non-erosiveflows.

REPQRTiN

Inspections will be reported on copies of the forms provided. The report form shall besubmitted semi-annually, postmarked not later than the 28th day of July or Januaryfor each six-month period. All records, reports and information resulting fromactivities required by this permit shall be retained of at least three years from thedate of the MNOI, inspection or report. The inspection report is attached at the endof this SWPPP. This form shall be duplicated as necessary.

NONCOMPLIANCE REPORTING1. Anticloated Noncompliance: The Mississippi Office of Pollution Control (OPC)

will be given at least ten days advance notice, if possible, before any plannednoncompliance with permit requirements.

2. Unanticioated Noncompliance; The Mississippi Office of Pollution Control(OPC) shall be notified orally within 24 hours from the time that Alton or Vickiebelancey becomes aware of the unanticipated noncompliance. A writtenreport will be provided the OPC within five working days from the time theoperator becomes aware of the circumstances. The report shall describe thecause, the exact dates and times, steps taken or planned to reduce, eliminate,

9

Page 49: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

—IStom Water Pollution Control Plan Shaw Road PitW. C. Fore Trucldng, Inc. Hartison County, Mississippi

or prevent reoccurrence and, if the noncompliance has not ceased, theanticipated time for correction.

TERMINATION of REPORTiNG and PERMiT COVERAGEUpon successful completion of all permanent erosion control and sediment controlsfor a covered project, a certification of the same will be submitted to the MississippiOffice of Pollution Control. Inspections shall continue for at least two months beyondcompletion. if controls have been successful during these two months, reporting andpermit coverage is automatically terminated unless notified by OPC within thirty daysof receiving the final inspection report.

POLLUTION PREVENTION PLAN CERTIFICATION1 certify under penalty of law that this document and all attachments were preparedunder my direction or supervision in accordance with a system designed to assurethat qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system, or thosepersons responsible for gathering the information, the information submitted, to thebest of my knowledge and belief, true accurate and complete. I am aware that thereare significant penalties for submitting false information, including the possibility offine and imprisonment for knowing violations.

Signed:_______________________________

Date: Anoust 11 2004

10

Page 50: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Storm Water Pollution Controt elan Shaw Road PitW. C. Fore Thjcking, Inc. •Narrison County, MIFiSlt3sIppl

ATTACHMENT 1STORM WATER POLLUTION

PREVENTION PLAN

SITE LOCATION MAP

RECLAMATION SITE MAP

II

Page 51: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

/.1 I

II•

ill

4-

I;

f

*

C(

A

)

I-

•,7

_. 4.. ‘1

--—

-I

WO

RT

JIA

J4Q

UA

DR

AN

GL

ET

OW

NS

HIp

6S

OU

TH

RA

NG

E12

WE

ST

SE

CT

ION

11

Page 52: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

nc.

//

13

O,Q

D’

•.

Acre

)-

——

øN

E1/4

•.--.--I

..

Now

or

Form

erL

y-

V.

C.

Fore

Tru

ckIr

Inc.

ExistI

.:

Proposed

Surf

::A

cce’;s

.-..-

HIn)n

Site

--;

+/-“

9O

QQ

-13

Exis1In

Surfuce

M)n

in

PI-

t—

+/

—4

Acres

.—

\\_

/_--..,,

.4—

—\\

Ex1in

Surface

____________________________________

/TO

TAL

PER

MIT

AR

Ki

!40.0

0A

CR

ES

SW1/4

SE1/

4N

owor

For

mer

Ly

Now

or

For

mer

Ly

WO

RTH

AM

QU

AD

RA

NG

LE,

V.

C.F

ore

TruckinU

,Inc.

V.

C.F

ore

Tru

ckin

g,

Inc.

HA

RR

ISO

NCO

UN

TY,

Mis

siss

Ippi

.

PRC

IPER

TYSf

lIJA

TED

INIi

TOW

NSH

iP6

SOU

TH.

RA

NG

E12

WES

T.SE

CTI

ON

Ii,

IIH

AR

RIS

ON

CO

UN

TY.

IIM

ISSI

SSIP

PIII

VV.

ThUQ

ONG.

ii—

—-1I4

If

I4nI

II

S*W

SU

ZZ

UINJ

IdO

PIT

Pu

wu

,W

EPL

AN

______

HM

R5O

Icc

lJm

v.M

5S

ISP

R

Page 53: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Fii

I

__

TYPC

øLW

NN

OPI

T(m

S)

DbS

flN

G-.—

-—

-------.--

55.0

’-FU

TURE

80.0

’-

Ifl

’_

WES

T

fNti

rLotm

dO

.v.

4/-

IOOU

W

Sap

.(T

m)

/P

it£3

c.ya

1Sa..a

tE

L,..

+i-

.sr

tojr

___

EAST

f1..

4/-

£L

rL+

j—m

ar

100.

0’-

I Iw

r

SEC

UO

NA

-A

SHA

WR

OA

DSU

RFA

CE

MIN

!NG

Pff

Min

eP

erm

itA

rea

40.0

000

Buf

fer

Zon

e16

.100

0A

cces

sR

oad

00.0

689

1.AU

Slo

pes

tobe

3sL

aAU

Slo

pes

tobe

Seed.

IAL

LB

uF

fer

Zon

esat

Roo

dto

be

Iblo

tain

ed4.

Esa

b4kh

Ero

an

Con

trol

alttopes

nd

Top

sof

’B

ern

40.0

0A

CRES

OR

fl

OD

RN

OR

RO

NO

UN

ER

YRT

UATE

DIN

S12

WES

t.SE

CTIO

N11

,N

OU

NU

SSiS

SIPP

I

Tot

alIm

pact

Are

a56

.168

9A

cres

SECT

ION

8—5

I1—

—.1

——

——

1WI

—r

&a

IS

W

Page 54: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

FIG

UR

EI.

TY

PIC

AL

INT

ER

CE

PT

OR

DIK

ES

AN

DS

WA

LE

S(M

odfi

cdfr

om

Sta

teof

Mar

ylan

d,1983)

SHA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

SIP

PI

I,T

RA

PE

ZO

ID.

1.C

RO

SS

-SIC

TIO

N

PAR

AIX

L!C

CR

OS

S—

SrC

TT

ON

ST

OR

MW

AT

ER

PO

LL

UT

IOT

CO

NT

RO

LP

LA

N

Page 55: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

•E

xten

sion

oFFa

bric

and

wir

ein

toth

etr

ench

FIG

UR

E2

FILT

ERFE

NC

ED

ET

AIL

S(M

odif

ied

from

Sta

tôof

Nor

thC

arol

ina,

1988

;an

dS

late

ofW

isco

nsin

,19

88)

SHA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

SIP

PI

STO

RM

WA

TE

RP

OL

LU

TIO

NC

ON

TR

OL

PL

AN

Filte

rfa

bric

)•—

wir

e JI

Page 56: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

FIG

UR

E3

flR

USH

RA

RR

IER

(Mod

ifie

dfr

omW

ashi

nQio

nS

tate

,19

92)

SHA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

IP

ST

OR

MW

AT

ER

PO

LL

UT

ION

CO

NT

RO

LP

LA

N

‘‘//c’-F

’b

Drr

1’tI

Qrf

rB

r’ch

,°/t

041

5czirc

drre’

cAW

f/bC

t-r.

/4c,’

cd

84d/

.-

-

- —j4

AcA

c,-,-

4,’

,iI

cdJ(

.—

jf2—

gi

Ca

‘-‘•

-‘-

•—

-—

-—

-7-i

‘11

&rA

ifl

AW

’f%

4if

-—

-5----

-

Vsg

./a,

r’cj,

r/s9

rwA

fii

fil

Ui,

‘in

rb’

1’.fZ

-‘4

,r.

Page 57: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

•1(/’‘!f))!(f( •‘(I/

,(,?‘

-7

-7

VCd(( 4

r)

‘7

cii

,r.41

t

HAWROADPITSTOPMWATER ECTION11,TOWNSHIP6S,R1NGE12WPOLLUTIONCONTROLPLAN LARRISONCOUNTY,MISSISSIPPI

0c--n

C,-I0LA

C,

0

..

Page 58: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

C

Ott,-r

C

—D0Li

-0 •1

27 I

r)-—

‘A0 —

Q.

.I1

It

SHAWROADPITSECTION11,TOWNSHIP65,RANGE12WHARRISONCOUNTY,MISSISSIPPI

STORMWATERPOLLUTIONCONTROLPLAN

______-

-‘

—CoOo

0o—-:•

c!.

0••

C

‘A

&

z

•4

C

CC,‘.1

Page 59: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

(O66L

‘iU

iiA

JO11IjM

UO

UJW

O3

WO

iJplJ

ipO

*)

I3o(I)

HH

cn:i

cj

H0’

cJ

cn

H

0H

tI’

0

——

••‘•

•)!•

•,•

.

_••v

_I*

It

•I

*•

•I

I,.

•I..

ti

—.

•J•I:%

__

••

——

—•

••••

••.

1•

..

:—------..--—

Page 60: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

ft3 V3

s.srn DrJp I,r

MINING NOTICE OF INTENT (MNOI)FOR COVERAGE UNDERMINING STORM WATER

GENERAL NPDES PERMIT MSR321J(Number to be assigned by State)

(file at least 30 days prior to the commencement of minin15 days if Storm Water Pollution Prevention Plan is already o C E a v E

Applicant must be operator or owner. AIJ6 1(Applicant receives coverage and is responsible for operator’s compliance w rink) U d)04IS APPLICANT THEfOPERATOR OR OWNERI (circle one or[both) 1 MDEOPERATOR CONTACT PERSON: W. C. Fore

OPERATOR COMPANY NAME: W. C. Fore Trucking, Inc.

OPERATOR STREET (P.O. BOX): 1 0. Box 3058

OPERATOR CITY: u1’p0dSTATE:__MS ZIp: 39505

OPERATOR TELEPHONE NUMBER (INCLUDE AREA CODE): (228) 863-1314

(List owner if different than operator)

OWNER CONTACT PERSON: Same as Above

OWNER COMPANY:_____________________________________________

OWNER STREET (P.O. BOX):__________________________________________OWNER CITY: STATE: ZIP:______________

OWNER TELEPHONE NUMBER (INCLUDE AREA CODE):

NAME OF MINE: Shaw Road Pit

MINE LOCATION: City “P° County Hauison

ATEACH A USGS QUAD MAP OUTLINiNG MiNE LOCATION(Maps can be obtained from the Mississippi Office of Geology - 601-961-5523).

RECEIVING STREAM:__Via Unnamed Tributaries to Little Biloiu River

Page 61: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

STANDARD iNDUSTRIAL CLASSIFICATION (SIC) CODE:__(if known)

MATERiAL TO lIE MINED: Sand & ClaY TOTAL ACREAGE:

DOES THIS MINE NEED A CORPS OF ENGINEERS WETLANDS (Sec. 404) PERMIT? No

WILL HYDRAULIC DREDGiNG BE USED?_No WASHiNG OF SAND/GRAVEL? No

LIST ANY NPDES PERMIT NO. , STATE OPERATING PERMIT NO.. Applied For

GEOLOGY PERMIT APPLICATION NO. . OR GEOLOGY PERMIT NO.__________

HAS A “NOTiCE OF EXEMPT OPERATiONS” BEEN FILED WITH GEOLOGY? (V/N)_No

A Geology “Notice of Exempt Operations” or “Notice of Intent to Mine Class I or Class H Materials” must be filed beforecoverage will be granted under the mining storm water NPDES permit For information on Omce of Geology requirements call601-961-5515.

ESTIMATED START 08/30’04 END 01/01115

ATTACH A STORM WATER POLLUTiON PREVENTION PLAN (SWPPP). (SEE PERMiT)

IF USING AN ASSOCIATiON OR GENERiC SWPPP ALREADY SUBMiTTED, GIVE NAME:

1 certIfy under penalty of law that this document and aft attachments were prepared under my direction orsupervision In accordance with a system designed to assure that qualified personnel properly gathered andevaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information, the Information submitted Is, to the best ofmy knowledge and belief, true, accurate and complete. 1 am aware that there are significant penalties for

fling Information, Including the possibility of fine and Imprisonment for knowing violations.

________________________________

08/13/04

Signature Date SignedLF.Gavm ProjectManagerPrinted Name’ Title

‘This application shall be signed according to the General Permit,Part V.E.., as follows:

- For a corporation, by a responsible corporate officer.- For a partnership, by a general partner.- For a sole proprietorship, by the proprietor.- For a municipal, state or other public facility, by either a principal executive officer, the mayor, or

ranking elected officiaL- Duly Authorized Representative

06106/02

Page 62: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

W. C. FORE TRUCKING, INC.P. 0. Box 3058 • Gulfport, MS 39505 • (228) 863-1314 • fax (228) 864-0013

Via Facsimile & U. S. Mad “/fr.(601) 354-6612

August 13, 2004

Mississippi Department of Environmental QualityOffice of Pollution ControlPost Office Box 10385Jackson, Mississippi 39289-6612

Attention: Mr. Ross WilUams

Reference: Surface Mining Notice of IntentShaw Road Plt 400 AcresSectIon 11, Township 6 South,Range 12 WestHarrison County, Mississippi

Dear Mr. Williams,

Attached for your review and approval is our MininQ Notice of Intent (MNOI) for the abovecaptioned 40 acre mining application. This MNOI shall replace the Construction Notice of Intent(CNOI) that was transmitted on August 11, 2004

The surface mine shall be stripped of overburden and the topsoil segregated for use in platingthe slopes of the pit for vegetation. The balance of the spoil material shall be used to constructearthen berms around the perimeter of the pit, The bernie will be constructed so as to precludestorm water from entering the pit.

Construction and excavation of the pit will be in such a configuration with grade changes thatonly the incidental storm water and ground water will flow to a temporary sump at the lowestelevation in the pit. No storm water or ground water shall leave the surface mining pit. All stormwater shall be contained within the pit.

If you have any questions at all, please do not hesitate to call our office.

Sincerely,

R.F.

end: As-Noted

Page 63: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

9J/

it

I4

.__

_pS

)j43%

f‘

L%

t(A

j

.19

cI..—

.*

‘it•

•‘

‘I

.

f5

9

.9dullS

I%

:tz

..$‘

.6

.ø1••1

4.•..

—-

j

e(_øas;;ç;;

_tvth(

¶436

%‘f.

7

cIN

Isi;

NO

usb

a‘%

$%•if7

‘N6r4.

-ad

4nL

NvIL

Tao

1a.4/!

)\‘

-..

;

rs%_l

i’L:-4/

rr*

)4‘

4f’i*m’

.rJ

..4

•••

••

:...:

:.•.

•.y

.•

...* .

//

./

6

4

2’4

.‘sa

jt

a4f’*

’I

_‘

/f

4/

4.4

LtWfl7j$

iç/b

t(trtt<

44tA

—#47

ç..fft)

:j(/

..:

*A

L.\

s%

%.

j:,j

C/

%4

iU

I.

!*.

•6

(,

•‘4i

?t

,.

.,.,__.P

÷............

•..•• .

t•.•

,...

9T

’#‘it

I1)

/If

4....(

4tMY

4.c

it.fltt/:.. .:

.....j.

.::%J;...i.;.

..

Ps

•kif

/;>

dS

:•

..,t%

j.

c4?

•‘

,s”*..5

kk

21t..

I5

‘14

t4_

‘t.4

e”

if’-

t__

I,ZiI

;::jr

:Pt

; ?J:\

““*ç

t2’r

()t

••

1)1 2

StI

:ç(e

——

3)6

‘T2I

Page 64: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

rrraSveTLaourtesy of the USGS Page 1 ofSend To Pnnter

Image courtesy of the U.S. Geological Survey© 2004 Microsoft Corporation. Terms of Use Privacy Statement

SHAW ROAD PITWORTHAM QUADRANGLE

TOWNSHIP 6 SOUTHRANGE 12 WEST

SECTION 11

Back To TerraServer“L1flkC NE

Change to 11x17 Print Size Show Grid Lines

- 11.Change to Landscape

-- I— - -- I C 0’ • ‘.Z5Mi

ttp://www.terraserver.microsoft.comjprintimage.aspx?T= 1 &S=1 2&X365&Y=4224&Z=1 6&P1 06+km+... 6/30/04

Page 65: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

ENSEARCH - Agency Interest Details Page 1

W C Fore Trucking mc, Shaw Road Pit

Al General InformationID Branch SIC County Basin Start End

Mining andNONE

19386 Solid Waste SELECTED Harrison NONE SELECTED 08/16/2004Management

Physical and Mailing AddressPhysical Address (Primary) Mailing Address

Shaw Road P0 Box 3058Gulfport, MS 39505 Gulfport, MS 39505

TelecommunicationsType Address or Phone

Work phone number (228) 863-1314

Alternate I Historic Al Identifiers

Alt ID Alt Name Alt Type Start Date

19386 W. C. Fore Trucking, Inc., Shaw Official Site Name 08/16/2004Road Pit

Regulatory ProgramsProgram SubProgram

Locational DataLatitude Longitude Method Datum Section I Township I Range Map It

Report Date: 8/18/2004 11:29:21 AM

http ://opcweb/ensearch/agency_interest_details.aspx?ai= 19386 8/18/20

Page 66: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

ENSEARCH - Agency Interest Details Page 1 0

W C Fore Trucking mc, Shaw Road Pit

Staff to Al Assignments

Name Assignment

Warden, Billy Permitting, Branch Manager

Vinson, Michelle Permitting, Coverage Writer

Related PeopleName Relationship Start Date End Date

Gavin, Robert Is Application Signatory for 08/16/2004

Gavin, Robert Is General Permit Contact For 08/16/2004

Related OrganizationsName Relationship Start Date End Date

Report Date: 8/18/2004 11:29:21 AM

http ://opcweb/ensearchlagency_interest_details. aspx?ai=1 9386 8/1 8/2

Page 67: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Harrison

Complaint Media: Air 1iaz Waste ESolid Waste EWater Waste Tire EUSTOther:

Responsible Party/Contact Person:

______

RP/CP Type: EOwnerOther Zoning Administrator

Telecom 1: 228-831-3367Mailing ddress: j09-C Community Rd.

City: Gulfport

GPS Datn: Location: Fore propertyLAT: 300 31 45”8” LON: 089° 10’ 010”

Attachments: Photos jMap Othei: Remedial Action Plan

Zip:

Mark one of the following - Resolved By RO: Route to ECED for Resolution:N

On the 1st of September 2004, 1 investigated the complaint, and learned the county zoning commission sent letters toresidents informing them Mr. Fore was making arrangements to mine 40 acres of his property off Shaw Rd.. Mis.Pluniiner who lives next to the property said the dirt would be used as land fill for the Gulfport Docks. The kcalresidents put together a petition to try and stop the mining operations, sighting contamination issues from a nearh>hazardous waste storage site. The hazardous waste site in question stores creosote waste on the property next to thesite to be mined. I approached the site and stopped at the property line due to warning signs, however, I could see themonitoring wells and a recovery system only 100 yards up hill from the fence line. I can not determine if the propertyis contaminated or not. The complainant will bring the issue to the Zoning Administrator at the public hearingSeptember the 16th, and hopes to have the MI)EQ aware ofthis issue as well. I spoke to Billy Warden at the centraloffice about Mr. Fore’s permit #-MSR321396, informed him about the nearby waste site, and that a complaint hasbeen filed, which he noted.

Mrs. Regina Plummer is heading this effort on behalf of residents in the area. Their concerns are: the soil mined couldbe contaminated harming aquatic life; the mining could draw contaminated water away from the recovery plantspossibly entering their wells, and the added dust could cause health problems for the elderly in this heavily populatedarea.

Attached is the Remedial Action Plan of the Lyman Site for consideration by the permitting commission.

II

Complaint II):

Date of Report: Friday. August27, 2004

Complaint County:

22130 Investigator:

Date Investigated:

Mike Puckett

Confirmed Complaint Site:Physical Address:

City:

Wednesday. September 01. 2004

MID: 19386

Property of W.C. ForeParcel # 0605M01-001.000. East of Shaw Rd. North of Morgan Lane.Lyman State: MS Zip: 39503

Patrick BonckLiOperator LI Manager

Telecom 2:

State: MS

Page 1 of I

Page 68: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

V’

•14.)’

Complaint 22130 1 Sep04

Recovery system on hilltop photographed from property line.

- V.

S caution szgr on the property line

Page 69: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

SA

ES

TO

SA

G

291

10’

293

294

295

000m

E

Page 70: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

enSearch Online - Al DetailsPage 1 of

enSearch Online,‘ \

Mississippi Department of Environmental Quality

The information contained in this report is obtained from MDEQs enSite (electronic environmental Site Information System)System used by the En,ironrntal Permits Division and Environmental Come iance and Enfogement Division . The purpose of thissystem is to support the permitting and compliance activities of the Office of Pollution Control. Regulatory programs that aresupported by this database are the Surface Water National Pollutant Discharge Elimination System (NPDES) Program; the Air TitleV, Construction and Operating Programs; and the Solid and Hazardous Waste Programs (the Waste Tire and UST programs arecurrently not supported). There are other regulatory programs within the Department that do not currently utilize this databaseincluding programs managed by the Office of Geciegy, the Office of Land and Water, and the Total Maximum Daily Load (TMDUPipgm.

W C Fore Trucking mc, Shaw Road PitGeneral InformationAl ) Branch

iunty Basin Start EndMining and

NONE19386 Solid WasteSELECTED

Harrison NONE SELECTED 08/16/2004Management

Physical and Mailing AddressPhd \ddrass rirry) Mailhig dressShaw Road P0 Box 3058Gulfport, MS 39505 Gulfport, MS 39505

Permits and Alternate/Historic Al IdentifiersI j I

Office of Pollution Control Contacts

MiningMSR321396Coverage

<<<< Return to enSearch Online - Home

— a

EPD ECED- DII

Warden, Billy Permitting, Branch Manager (601) 961-5047

Current Status of General Permit ApplicationsPermitPrçj emt Type Status L-te StMiis Desc.Number

GP08/16/2004 Notice of Intent for General Permit

Coverage Received

http://opc.deq.state.ms.us/ai info .aspx?ai= 193869/2/2004

Page 71: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

ARRISON COUNTYZONING ADMINISTRATION

15309-C CoMMuNITY RoAD • GuIFPoRT, MississiPPI 39503(228) 831-3367/FAx (228) 831-3356

July26, 2004

James C. & Regina A. Plummer Sr.16536 Shaw RoadGulfport, MS 39503

Dear Sir or Madam:

Case File Number: 0408HC 152

In conformance with Section 904 of the Harrison County, Mississippi Zoning Ordinance, 2000 as amended,notice is hereby given advising that the Harrison County Planning Commission for the County of Harrison,Mississippi will hold a public hearing for the purpose of considering a petition for a Conditional UsePermit.

Said petition was filed by WC. Fore Trucking, LLC requesting a Conditional Use Permit to allow for theexpansion of an existing dirt pit to 40-acres on a 380-acre parcel of land as identified on the site plan. TheA-i (general agricultural) District requires a conditional use permit for the establishment or expansion of“extraction operations”. The subject property is located north of Morgan Lane Road, east of Shaw Roadand south of Bell Lane. The subject property is a portion of ad valorem tax parcel number 0605M-Ol-001.000.

The public hearing to consider the above request will be held in the City of Gulfort, Mississippi at 3:00P.M., Thursday, August 19, 2004 in the Board of Supervisors Conference Room on the first floor of theFirst Judicial District Courthouse which is located at 1801-23rd Avenue. A copy of the petition will beavailable for public review at the office of the Zoning Administrator located at 15309-C Community RoadGulfport, MS 39503. The phone number is (228) 831-3367.

It is your option whether or not to submit a letter to the Commission appear personally andlor speak for oragainst the petition at the scheduled hearing. If you desire, it is also your choice to be represented by anagent or attorney. Additionally, any appeal from the decision of the Harrison County Planning Commissionwill be heard by the Harrison County Board of Supervisors.

If you have any questiàns or comments, please contact this office at (228) 831-3367.

Sincerely,

Pcc-Patrick Bonck

Patrick C. BonckZoning Administrator

Page 72: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

2286640013CCTO520O4TUE02:30 PM W C FORE TRUCKING INC FAX NO. 2288640013

W. C. FORE, LLC- P. 0. Box 3058 • Guifpoil, MS 39505. (228) 863-1314. tax (228) 864-0013

Via Facsimile & U. S. Mail(601) 35t5521

October 5, 2004

Missiszppi Department of Environmental QuahtyOffice of Pollution ControlPost Office Box 10385Jackson, Mississippi 39289-6612

Attention: Mr. Ross Wilharns

Reference: Surface Mining Notice of Intent (Reconfigured Pit)Shaw Road PIt, 40.0 AcresSection 11, Township 6 South,Range 12 WestHarrison County, Mississippi

Dear Mr Williams,

Attached for your review and approval is our MIino Notice of Intent IMNOI) for the abovecaptioned 40 acre reconfigured mining application. This MNOI shall replace the ConstructionNotice of intent (CNOI) that have previously been transmitted to you.

The surface mine shall be stripped of overburden and the topsoil segregated for use In platingthe slopes of the pit for vegetation. The balance of the spoil material shall be used to constructearthen berms around the perimeter of the pit. The berms will be constructed so as to precludestorm water from entering the pit.

Construction and excavation of the pit will be in such a configuration with grade changes thatonly the incidental storm water and ground water will flow to a temporary sw-np at the lowestelevation in the pit. No storm water or ground water shall leave the surface mining pit. All stormwater shalt be contained within the pit.

if you have any questions at all, please do not hesitate to call our office.

Page 73: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:30 PM W C FORE TRUCKING INC FAX NO. 2288640013 P. 02

aM6SISSJPPI D&ARTMEW OFEtMRONMENTAL QUALITY

MINING NOTICE OF INTENT (MNOI)FOR COVERAGE UXDER MINING STORM WATER

GENERAL NPDES PERMIT MSRS2- (Number to be assigned by Sç) -

File at least 30 days prior to the commencement of mining; 15 days If a Storm Water Pollution Prevention Plan(SWPPP) Is already on file. Lateral expansion of an existing mine that has storm water permit coverage doesnot require submittal of a new MNOI however, modification of the existing SWPPP to include the expansion isrequired. Also, according to 40 (YR 122.26 (b) (14) (lii), nilning operadon.s that do not discharge storm watercontaminated by contact with any overburden, raw material, intermediate products, finished products,byproducts or waste products shall not be required to me a MNOI.

IS APPLICANT THE flPERATOR OR OWNEft? (Circle one or both)

OPERATOR CONTACT PERSON:. W. C. Fore.

‘OPERATOR COMPANY NAME: W. C. Fore,. LLC..-

OPERATORSTREET(p.aaoyfl;. P.OQX3OSt..

----

OPERATOR CiTY: Gultpofl. STATE:. MS ZIP: .

OPERATOR TELEPHONE NUMBER (INCLUDE AREA CODE):. (228) 863-1314

(List owner if different than operator)

OWNER CONTACT PERSON: -. ø.me sAb9yt - ..

OWNER COMPANY:... --

OWNER STREET (P.O. BOX):______________________________________________

OWNERCITY:?. STATE:.

. ZIP:. . .. -

OWNER TELEPHONE NUMBER (INCLUDE AREA CODE):. ..

- ....-

(Mise infonnasien)

NAMEOFMINE;-

tj3WRD8d Pit.

-1

STREET ADDRESS OR NEAREST NAMED ROAD:. ..SIpvy Raid — -

MINE LOCATION: CITY:. Guffoort.. —. COUNTY:. Harrlsoq

mass

.Vpg.a..

Page 74: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:31 PM N C FORE TRUCKING INC FAX NO. 2288640013 P. 03

SEE AflAHEft SHEET(Mine infonnatlon continued)

—-.. 1/40F. -- J,/4OFSECflON. 11. ,TOWNSUJP.tSOIfl ,RANGE.12 West..

ArTACU A USGS QUAD MAP OUTLINING MINE LOCATION(Maps cart be obtained from the Mississippi Office of Geology. For infennation call 601.961-5523).

RECEIVING STREAM:-i

Via tinnamnel Trlhntarias tn the Unit RhInwi Rh,tr

STANDARD INDUSTRIAL CLASSIFICATION (SIC) CODE 1442

MATERIAL TO BE MINED: Sand & Clay

TOTAL ACREAGE (If modification, give original acreage, npanded acreage and total acreage);

DOES THIS MiNE NEED A CORPS OF ENGINEERS WETLANDS (Sec. 404) PERMiT? No

an Arraa

WILL HYDRAULIC DREDGING BE USED? (Y/N). No WASHING OF SAND/GRAVEL? (Y/N). No

LIST ANY: NPDES PERMIT NO. N/A STATE OPERATING PERMIT NO.. N/A

GEOLOGY PERMIT APPLICATION NO..___ N IA GEOLOGY PERMIT NO. N/A

HAS A “NOTICE OF EXEMPT OPERATIONS” BEEN FILM) WiTH GEOLOGY? (Y/N) No

A Geology “Notice of Exempt Operations” or “Notice of Intent to Mine Class I or Class II Materials” must be filed beforecoverage will be granted under the mining storm water NPDES permit For information on Office of Geologyrequirements call 601-961-5515.

ESTIMATED START DATE: 10/21104 END DATE; 12/2010

ATTACH A STORM WATER POLLUTION PREVENTION PLAN (SEE PERMIT FOR REQUIREMENTh)

WE]%TI}Y THE ASSOCIATION OR GENERIC SWPPP PREVIOUSLY S1fBMED

S— -rat- a- 7. --Signaturei

WC.prePrinted Name‘This apphado,, shalt be signed aecordh,g to the Central Permit,?N;l v.a. as lbJJo,n:

- For a corponiioii, by a responsible corporate alfretra parmenwp, by a general partrwr.

- Form sole proprietorship, by the proprietor.- For * municipal, state or other public racwsy. by cuber a principal cEcCuti’Vc omar, (tie mayor, or ranking elected omelet- Duly Authorized Representative

I certify under penalty of law thug this document and all attachments were prepared under my direction or supervision in accordancewith a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. listed on myinquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, theinformation submitted is, to the best of my knowledge and belief, true, accurate and complete. 1 am aware that there are significantpenalties for submitting false information, including the possibility of fine and Imprisonment fur knowing violations

. . Seotgmbgr ZB 2004Date Signed

..

PresIØntTitle

Z’28t1?32

Page 75: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT—05—2004 TUE 02:31 PM W C FORE TRUCKING INC FAX NO. 2288640013 P. 04

SHAW ROAD PiT

WORThAM QUADRANGLE SECTION 11 IWNSHIP6 SOUTH RANGE 12 WEST

West Corners are Located in the Northeast ¼ of th€ Southeast ¼ of Section 11

Northeast Corner Is located in the Southeast 1/ of the Noitheast 14

- Southeast Corner Is Ioca1d In the Northeast 1/4 of the Southeast 1/4

3

Page 76: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT—05-2004 TUE 023i PN N C FORE TRUCKNQ INC FAX NO. 2288640013 P. 05

STORM WATER POLLUTIONPREVENTION PLAN

(SWPPP)

Shaw Road Pit40 Acres

Sli, T6S, RI2W

Gulfport,

Harrison County,

Mississippi

W. C. Fore, LLC.Post Office Box 3058Gulfport, MS 39505

(228) 883.1314

Page 77: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:31 P11 N C FORE TRUCKING INC FAX NO. 2288640013 P. 06

STORM WATER POLLUTION CONTROL PLAN

Shaw Road Pit40 Acres

Section 11, Township GS, Range 12W

Harrison. County, Mississippi

Table of ContentsPage

OverviewIntroduction 3Objective 4

General RequirementsImplementation 4Erosion and Sediment Controls 5Structural Practices 6Inspection Requirements BMaintenance BPost Construction

Reporting 9

Noncompliance ReportingAnticipated Noncompliance 9Unanticipated Noncomphance 9

Termination of Reporting and Permit Coverage 10

Pollution Prevention Plan Certiticatlon 10

Attachment IStorm Water Pollution Prevention Plan 11Site Location Map 11Reclamation Site Map 11

Page 78: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:31 PM N C FORE TRUCKING INC FAX NO. 2288640013 P. 07

Storm Water Pollution Control Plan Sbaw Road PitW. C Fore, LLC Harrison County, Mississippi

Typical DrawingsTypical Interceptor Dikes arid Swales Figure 1Fitter Fence Details Figure 2Brush Barrier Figure 3Typical Sediment Trap Figure 4Surface Roughening Figure 5Level Spreaders Figure 6

2

Page 79: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-O52004 TUE 02:31 PM N C FORE TRUCKING INC FAX NO. 2288640013 P. 08

Storm Water Pollution Control Plan Shaw Road PitW. C. Pore, LLC. Harrison County, Mississippi

OVERVIEW

Introthsctlon

This document is the Storm Water Pollution Prevention Plan (SVVPPP) for

property owner and operator, W. C. Fore, LLC. Post Office Box 3058, Gulfport,

Mississippi 39505, for the surface mining pit known as “Shaw Road Pit a 40-

acre site located in Gulfport, Harrison County, Mississippi.

The purpose of this application is to allow W. C. Fore, LLC, Gulfport, Mississippi,

the property owner and operator, to enlarge an existing surface mining site that

was established and operational in 1973 to a total mining area of 40.0 acres. This

existing pit was created to provide imported fill material for the State Aid Project,

County Farm Road.

The existing haul road shall be utilized for ingress and egress. This haul road shall

be reconstructed to become a stabilized all weather construction entrance for

ingress and egress of alt construction traffic. The buffer zones shall remain in their

natural vegetative state around the periphery of the site. Only those trees and

vegetative growth will be removed that will impede the location and excavation

processes of this surface mining pit. Storm water in the buffer zones will follow the

existing natural watercourse. Disturbed areas caused by construction or mining

activities shall be temporarily or permanently seeded as the circumstances direct.

In the interim, sedimentation and erosion controls shall be put in place as needed.

Flow of surface water into the mine will be controlled by the use of erosion control

structures.

1. Clearing and excavation of the surface mining pit will be in a west to east

direction. The removed topsoil shall be stockpiled and the overburden will

be used to construct the perimeter berm of the mined area. The berm will

be constructed and elevated above the existing natural ground. This raised

levee will preclude storm water from entering the mined area from the

surrounding property. A temporary sump basin shall be located in the

southeast area of the surface mining operation. The purpose of this

3

Page 80: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OOT05-2004 TUE 02:32 PM W 0 FORE TRUCKING INC FAX No, 2288640013 P. 09

storm Water PoHuflon Contot Plan Sliaw Road PitW. 0 Pore, LLC. Harrison County. MIeslaeappI

temporary sump is to collect sediment and incidental storrnwater failing intothe mining pit. No impounded stormweter or sediment shall leave themirnng pit. All storm water and ground water shall be contained within theconfines of the mining pit. The earthen bernie comprised of the stripped

overburden around the periphery of the excavated areas shall preclude the

mingling of the storm water outside the pit area and the ground

wateristormwater from the excavation.

Storm water falling outside the pit area shall drain from the area through existing

natural watercourses. Ultimately the receiving waters of the State of Mississippiwill be the Little Biloxi River to the north and north east of the project area throughunnamed tributaries. In its undeveloped state the surface mining pit area

encompasses the 50-foot elevation, the highest point in the area and stormwater

presently appears to flow to all points of the compass.

The Storm Water Permit shall be displayed in a conspicuous location to enable

public review.

This Plan is the criteria for comphance with regulations set forth by the

Environmental Protection Agency, 40 CER, Parts 122, 123 and 124, Nationai

Pollutant Discharge Elimination System ADpUq?tiopeauJQtions for Storm Water’

Aagemept foy Qonstrqctipn Activities.

Qblectiv!

The purpose and objective of this Storm Water Pollution Prevention Plan is tomeet the requirements of the State of Mississippi and the U. S. EnvironmentalProtection Agency for the control and mitigation of pollutants to storm waterdischarges associated with this surface mining operation for sand and clay.

A ditch was cut allowing stormwater from the pit are to flow into what appears tobe wetlands. This ditch has been filled in and the ditch perimeter has beenbermed to preclude any additional stormwater from flowing out of the pit.

4

L

Page 81: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 tUE 02:32 PM N C FORE TRUCKING INC FAX NO. 2288040013 P. 10

Storm Water Pollutori Conb’ol Piail Shew Road Pit

W. C. Fore. LLC. Harrison County, MiaslsØpI

GENERAL REQUIREMENTS

This Storm Water Pollution Prevention Plan consists of certain major activities and

controls appropriate for surface mining activities.

ftnplementation

1. Install stabilized construction entrance.

2. Install erosion control structures as needed.

3. Perform stripping activities: Topsoil shall be stockpiled for future plating of

the slopes and the overburden shall be used to construct the berms around

the perimeter of the mining site. Clearing and excavation of the surface

mining pit will be in a west to east direction. The topsoil shall be removed

and stockpiled. The overburden will be used to construct the perimeter

berm of the mined area. The berm will be constructed and elevated above

the existing natural ground. This raised levee will preclude storm water

outside the pit zone from entering the mined area. Storm water shall drain

away from the site through existing natural watercourses and elevation

changes A temporary sump basin shall be located in the southeast area of

each phase of the surface mining operation. The purpose of this temporary

sump is to collect sediment and stormwater falling into the mining pit. All

incidental storm water entering the mining operation and ground water will

not leave the pit and shall not be discharged into the waters of the State of

Mississippi.

4. The general configuration of the mining operation and the construction

techniques of the surface mining area has been arranged to minimize any

impact to the adjacent lands.

S

-

p

__________________________________________

Page 82: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

O0T-05-2004 TUE 02:32 PM W C FORE TRUCKING INC FAX NO. 2288640013 P. 11

Stcrm Water PoIftt1on Control PIen Shaw Road PIt

W. C. Fore, LLC. Harrluan Cowity, MiB&ppi

roson and SecfImen Cp4gj

Mine development will proceed in the planned sequence and every attempt will be

made to prevent erosion. All disturbed areas will be managed and revegetated as

soon as practicable after construction activities. Where applicable, disturbed

areas will be stabthzed by temporary seeding, permanent seeding, mulching

andlor vegetative buffer strips as each case dictates.

trj’cturaI Prc!ic

In addition to vegetative practices referenced above, certain structural erosion

control measures shall be implemented as needed. The measures include

diverting flows from exposed soils, storing flows or otherwise limiting runoff from

exposed areas. Other structural methods will include straw bale dikes, silt fences,

earth dikes, brush barriers, drainage swales, check dams, outlet protection,

detentionlretention basins, sediment traps, temporary sediment basins or

equivalent sediment controls.

1. Construct the sediment I detention pond with the spoils from the excavation

to be used in berms.

2. Divert upsiope surface water around disturbed areas of the site as shown in

figure 1 Diversion Dikes.

3. Limit the exposure of the disturbed area to the shortest amount of time as

practicable.

4. Minimize the amount of surface area that must be disturbed at one time.

5. Implement the best management practices to mitigate adverse impacts

from storm water runoff. Shown in Figures 2, 3. 4, 5 and 6.

Erosion and sediment controls consisting of vegetative and structural practices

shall be designed to preserve vegetation or timely revegetated disturbed areas

and divert from exposed soils or otherwise limit runoff from exposed areas.

6

.1

Page 83: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

DCT-05-2004 TUE 02:33 PM W C FORE TRUCKING INC FAX NO. 2288640013 P. 12

Storm Water PolkItjon Control Pkrn Show Road PIt

W. C Fore, LLC. Harrfaon County, si$ipp

Controls shall be placed to minimize off-site vehicle tracking of sediments.

Controls shall be implemented as needed to retain storm water in the on-site

detention pond to prevent adverse impact to receiving streams. When work is not

being performed in a disturbed area, appropnate temporary and/or vegetative and

structural practices shalt be initiated.

Any of the following erosion and sedimentation control measures may be used to

control/reduce pollutants in storm water

• Temporary Seeding • Sedimentation Basin

• Permanent Seeding • Check Dams

• Mulching • Straw Bale Dikes

• Sod Stabilization • Earth and/or Sandbag Dikes

• Vegetative Buffer Strips • Brush Barriers

• Grassy Swales • Subsurface Drains

• Modification of Contours • Pipe Slope Drains

• Silt Pences • Storm Drain Inlet Protection

• Detention Basin • Drainage Swales

• Sediment Traps • Rock Outlet Protection

A rain gauge shall be set up on site during mining operations. The rain gauge shall be located

in the vicinity of the mining pit. Within twenty-four hours after commencement of a rainfall

event greater than or equal to a Two Year 24 Hour Storm Event (6 inches), an inspection of all

controls and other SWPPP requirements shall be performed during the permit coverage in

compliance with Pai-t IVB of the permit.

Other controls of importance may include, but are not limited to:

7

Page 84: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:33 PM W C FORE TRUCKING INC FAX NO. 2288640013 P. 13

Storm Water PoiluUon Control Plan Shaw Road PitW. C Fore, LLC. Hartison County, Mlsallppl

1. Topsoil will be removed from the area to be mined and used to plate diversion dikes

and berms.

2. Preserving existing vegetation and revegetating disturbed soil as soon as possible to

limit the exposure time of the disturbed area.

3. Surface area that must be disturbed will be minimized.

4. Management practices to mitigate adverse impacts from storm water runoff are, but not

limited to, interceptor dikes and swales, hay bales, brush barriers, silt fences, and

sediment traps, Figures 1, 2, 3, 4, 5 and 6.

5. Structurally sound dams and levees will be constructed for impoundments.

6. Encompassing various stockpiles such as fill or topsoil materials with silt fence and or

hay bales.

7. Properly maintaining, cleaning, repairing the site, and erosion prevention controls.

!aspection flegufreniyrgsInspection of all temporary and vegetative, erosion and sediment controls, and other protective

measures and SWPPP requirements will be performed during the permit coverage.

After each significant rainfall, but not less than once a week all disturbed areas, erosion and

sediment controls shall be inspected.

At least once every month:

1. Within twenty-four hours after commencement of a rainfall event greater than or equal

to a Two Year 24 Hour Storm Event (6 inches).

2. As often as necessary ensure that appropriate erosion and sediment controls have

been properly constructed and maintained.

falntenançg

1. All needed repairs shall be made within 24 hours.

S

Page 85: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:33 P11 U C FORE TRUCKINC INC FAX NO. 2288640013 P. 14

Storm Water Pollution Confli Plan Shaw Road Pit

W. C. Fore, ISO, Hamson County. Miesiseippl

2. Remove sediment from inlet protection devices and silt fences when accumulated silt

has attained 50 percent capacity.

3. Reseed, fertilize and mulch as needed.

post Constructign

Upon completion of mining activities, post construction control measures shall include on-site

infiltration, flow attenuation in vegetated swales and natural depressions and retention

structures, Velocity dissipation devices may be required at the outfall of these structures and

along the outfall channels provide non-erosive flows.

REPORTING

Inspections will be reported on copies of the forms provided. The report form shall be

submitted semi-annually, postmarked not later than the 28th day of July or January for each

six-month period. All records, reports and information resulting from activities required by this

permit shall be retained of at least three years from the date of the MNOI, inspection or report.

The inspection report is attached at the eno of this SWPPP. This form shall be dupiicated as

necessary.

NONCOMPLIANCE REPORTING

1. Anticipated Noncompliance: The Mississippi Office of Pollution Control (OPC) will be

given at least ten days advance notice, if possible, before any planned noncompliance

with permit requirements.

2. Unnticipaed Noncomoliance: The Mississippi Office of Pollution Control (OPC) shall

be notified orally within 24 hours from the time that the operator becomes aware of the

unanticipated noncompliance. A written report will be provided to the OPC within five

working days from the time the operator becomes aware of the circumstances. The

report shall describe the cause, the exact dates and times, steps taken or planned to

reduce, eliminate, or prevent reoccurrence and, if the noncompliance has not ceased,

the anticipated time for correction.

9

.1

Page 86: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT—05-2004 TUE 02:34 PM U C FORE TRUCKING INC FAX NO. 2288640013 P. 15

Storm Water Po(luUqn Control pi,

W. C. Fore, LLC.

Shaw Road PitI*rrison County, Mleeieelpp4

TERMINATION of REPORTING & PERMIT COVERAGE

Upon successful completion of all permanent erosion control and sediment controls for a

covered project, a certification of the same will be submitted to the Mississippi Office of

Pollution Control. Inspections shall continue for at least two months beyond completion. If

controls have been successful during these two months, reporting and permit coverage is

automatically terminated unless notified by OPC within thirty days of receiving the final

inspection report.

POLLUTION PREVENTION PLAN CERTIFiCATION

I certify under penalty of law that this document and all attachments were prepared under my

direction or supervision in accordance with a system designed to assure that qualified

personnel properly gathered and evaluated the information submitted. Based on my inquiry of

the person or persons who manage the system, or those persons responsible for gathering the

information, the information submitted, to the best of my knowledge and belief, true accurate

and complete. I am aware that there are significant penalties for submitting false information,

including the possibility of fine and imprisonment for knowing violations.

Signed: jj’6’r17

Date:

jcr. 4 --

W. C. Fore

. September 28, 2004

10

Page 87: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

>-z

LJ1-0

U

/ -

OCT-05-2004 TUE 02:29 PM W C FORE TRUCKING INC FAX NO, 2288640013 P. 16

—;:- —U -:

r--- -—-

f)fl(1 II —

<u.J ôflL

L) ‘

Ip i (I)

I lbJjIj

7N Iwcf)

w

I

/I

JJ

&

C

/

(P

Page 88: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OOT-052004 TUE 02:34 PM W C FORE TRUCKING INC FAX NO. 2288640013 P. 16

Storm Water Pdlluiton Confrol Plan Shaw Road PitW. C. Fore, LLC. 1rron County, M&ssippl

ATTACHMENT I

STORM WATER POLLUTIONPREVENTION PLAN

slit LÔàATION MAP

RECLAMATfON STE MAP

11

Page 89: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OCT-05-2004 TUE 02:34 PM W C FORE TRUCKING INC FAX NO. 2288840013 P. 17

.7

/— S

‘1

77

C13

(N

/

.4

ii,

V

7

flC:—-

7--

-C,. .

if! ‘t_’-”_-,E7- . -.

‘-“C)

-:> *-!:r

•1.

.:• , ‘N • F

N‘Nu-”—. N,

.7-,

!‘

-

zz •_?z E

-

‘:‘

/1?

SI’

•1 ••,•

I t

Page 90: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

1

LEG

END

E.I

stin

gSa

Jrfd

ct’

Min

mg

Pit

+1-4

Acr

es

aL

xis

tin

Surf

alt

Dra

inag

e

TOTA

LPE

RM

ITA

REA

40

.00

AC

RE

SW

ortt

iam

Qua

.iIra

ngIe

.)

Sect

ion

11

rcsw

nsnl

p6

SO

uTH

Ran

ge12

WtS

TH

anr6

onC

ouri

WM

issl

naap

pl

i’2O

O4-

O&

3O4.

..

rw.

C.

FOR

E,

LL

C1

10

80

*3

05

6

naJL

rpca

rthi

S

I{22D

1ln

&J-i

1tJ

(TA

WR

OA

DP

iSF

IAW

RO

AD

r,M

ISS

ISS

IPP

I

r

I /

SECT

ION

H

NW

114

NO

WO

RFO

RM

ERLY

Vi.

CF

OR

t-,

tiC

I

PIt

1/4

P40W

OR

FOR

MER

LYw

.C

.rc

ou,ti

c

‘9

a

PER

MIT

AR

EASI

TE

PLA

N

/I

//

V

0 C)

—1 b r 0 0 = rn 0 P

c)

U)

-c

= C)

-n 0 rn = 0 = C)

0 -n DC

= p Pc)

Pc)

3D 3D

C)

0 0 U)

SU

RF

E.-“:

-

MIN

II1B

S1T

E-

-

-4O

1AC

RE

S

/I

NN

SW

1/4

NO

WO

RFO

RM

ER

lYW

.C

.F

OR

E,ti

c

SE1/

4N

OW

OR

FOR

ME

RL

YW

.C

.FO

RE

,U

f

-

t

Page 91: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

WES

T

•r

ST

4

EAST

5It.

\—

TY

PT

M

(r1S

)

•I

fii5

U

.:.Jc

gY

_____••%

RE

CL

AM

AT

ION

DET

AIL

S

NO

TE

S

i.M

SIo

pe1

O4

e1

.

2Jd

IS

Jo

pT

oc

.ee.1

eJ.

3.I

t1if

tZ

ow

TOS

iie

Lat4

tE

ro!I

IrC

nti

-

E‘

SonS

ET

.)1s

Of

rrn. TOTA

LPE

RM

ITA

REA

40.0

AC

RE

S

C--

)

—1

ro m CO

(31

= C)

C)

m —3

= C-)

= C)

•tPV

AI

-

ec4

__

__

__

__

aL

it

FIf

lIJR

ESO

UT

hN

OIU

i

SE

C1)O

9-B

-iS

TIP

iG

::t

l

° 10

.0

—-

.-..-

-.

WE

STF

UT

1flt

Wott

wii

ud

rii

Ie

Seti

ui

11T

uVfl

5fiI

I)6

SOIJ

T}l

Rn9P

12W

ET

Illr

iSO

rlC

Uri

LM

I1s1

Is’

5p•

11

‘C = C)

R)

c c 0)

C)

C)

(.0

SEC

TiO

NA

A

SHA

WR

OA

I)SU

RFA

CE

MIN

ING

FIT

MIN

EPE

RM

ITA

REA

40.O

CD

BU

FFER

ZON

E18

.882

AC

CES

SR

OA

I0.

686

TorA

lIM

PAC

TA

REA

59.5

&8

AC

RES

W.

C.

FOR

E,LL

C.

P.O

.B

OX

3O5.

GU

LF

PO

R,

MS

3130

5(6)

fi63431.4

BU

FFE

R

r_

—SH

AW

RO

AD

PiT

S114

WR

O.D

GU

LR

’OR

T,

MS

bT

I— ISep

t.27

,!0

04—

I— AS

NE

t-

Page 92: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

0 CD j 0 91

RD0 0 -d = rn 0 RD

Ct)

0 0 = 0 -n 0 rn 0 0 = 0 -n ‘C = 0 RD

RD

GD cc 0)

0 0 Ct)

‘I

‘I it F [ Il •

S

AT

R4P

rzo,j

ir

Pai

FIG

UR

E/

TY

PIC

Al

INT

{n

cF

py

oD

IKE

SA

ND

SWA

LE

S(M

acI i

fir

ci(t

ore

Snit

eo(

Mar

yIl

I,(

1903

SHA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP65,

RA

NG

E12

WP

OL

LU

TIO

NC

ON

TR

OL

PL

AN

HA

RR

ISO

NC

OU

NT

Y,

MIS

SIS

SIP

PI

-o

Page 93: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

0 C) P r C C c m C U)

0 -t

C m C rn -a C C = C)

C

SHA

WR

O1D

PIT

SE

CT

ION

11,

TO

WN

SH

IP65,

RA

NG

E12

WH

AR

RIS

ON

CO

UN

TY

.M

ISS

ISS

IPP

I

STO

RM

WA

IfE

RP

OL

LU

TtO

NC

ON

TR

OL

PL

AN

-o

Page 94: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

SIIA

WR

OA

DP

ITS

EC

TIO

N11,

TO

WN

SH

IP6S

,R

AN

GE

12W

HA

RR

ISO

NC

OU

NT

Y,t4IS

SI5

C)

C)

C)

r\)

C)

C)

C)

C)

03

C)

C)

rfl

—3

C)

C)

C)

C)

F’/

/t’-

F”hr,

Dr?

,ot1

1rfC

fls

rh

f/

p1

1tC

vr(

dFt

1rtw

r/4

Cc-,

ø,’

dS

4d/I

-

-

4A

,iI

_.z

EE

.f-./

A—

7qg

cv’

/i

fçrr

’%

4

15h/h

11t

OC

ri/tJrh’,(

f,/

ilti

n, r

y“

(./r

vi

d4rr.-

flG

tJB

E3

I1FU

SHB

AR

[IIU

I(M

odili

edf(

orn

Was

hnlo

nS

iale

,1 9

92)

STO

RM

WA

TE

RP

OL

LU

TIO

NC

ON

TR

OL

PL

AN

-d 1’)

Page 95: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

SHAwROADPITSECTION11,TOWNSHIP65,RANGE12WHARRISONCOUNTY,MISSISSIPPI

STORMWATERPOLLUTIONCNTROLPLAN

F

SdEtOOP998‘ONXUJONIONINQflNIdO3CMWd9E:O3fl1OO3—9O-IQO

Page 96: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

C

-0 Ji

s-.

0

U,

11.,

0

C

‘a

C

&

SaAWROADPITS.CTION11,TOWNSHIP6$,pRNGE12WHARRISONCOUNTY,MISSISSI’

$TORMWATERPOLLUTIONCONTRCPLAN

--

t’Ed-NOdQM9EO3fl

0OQ

,‘..l

‘a

C3‘a

g.. 3

1.

Page 97: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

I.-

.

J..

4.

4’.-,

4A.

‘4..’ F

•41

P11

4•*%

4L

•14

St..

•.

...

II•4•S

__4$•

—I...

•j•

‘...,

444

.4

•,‘%

I.

_....

•V

..4.

....

I.

,.

••••.nI•f’•

‘4—

.

—1

C.

I

•;

.‘:.

4‘4

4,.

.t—

.S

.•

¼

•1!

-p

I,

-

J..4

,••

.

—•

——

S

•.••

•;—

:...,

••._

#454

j4

•I.A

i.

4444

I.,

-i4.

/.1

1.

It

•,L

%J

•“

4’

—‘

•1#.

j•

44

At.

.‘l

’——

_31

It.5

_t.

1(.t

*

.

‘t•’

’’

m.l

AdF

6” lii 4

V-

4

,—1 a El z 0

a”-) E

lZ

n V1 (5 Izp H

tflW

tOH If

)04(1

)H

H

eE

’Z

I-1:

04-o

rIO

Qr-4

zozo

ct0

U)

F-I

N

4U

ft

to

lo

jO C

T,

0 0 rn

0 R)

C)

0)

-o

C) -I,

0 rn

= 0 C)

0 Ct V

liw

lSI4t4A

1,

4A

FIG

LJA

E5.

LvF

LS

PR

EA

DE

RS

(Mod

flie

dU

omC

ornr

nonw

cafl

hiof

Vir

&o,

1990i

Page 98: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

LU

r,tt5WFI tF.’.TO‘N’/ ‘.L o:.&r’

__

CONSTRUCTION NOTICE OF INTENT (CNOFOR COVERAGE UNDER CONSTRUCTION STORM WATER

GENERAL NPDES PERMIT MSR1O(NUMBER TO BE ASSIGNED BY STATE)

FILE AT LEAST 30 DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCrION;

15 DAYS IF A STORM WATER POLLIFIION PREVENTION PLAN (SWPPP) IS ALREADY ON FILE.

DISCHARGE OF STORM WATER FROM A CONSTRUCTiON SIT£ WITHOLTF

WRIITEN NOFIFICATION OF COVERAGE ISA ViOLATiON OF STATE LAW

INSTRUCTIONS

SUBMITTALS WITH THIS CNOI MUST INCLUDE: A USGS QUAD MAP (OR A COPY) SHOWING SITE

LOCATION AND STORM WATER OUTFALLS AND STORM WATER POLLUTION PREVENTION

PLAN (SWPPP). SEE CONSTRUCTION GENERAL PERMIT PART III.

ADDITIONAL SUBMITrALS MAY INCLUDE DOCUMENTATION OF SWPPP APPROVAL WITH LOCAL ORDINANCES

(CONSTRUCTION GENERAL PERMIT PART III. B.); APPROPRIATE SECTION 404 DOCUMENTATION FROM CORPS OF

ENGINEERS (IF REQUIRED); APPROPRiATE DOCUMENTATION FROM HEALTH DEPARTMENT AND/OR MDEQ!OPC FOR

FUTURE DISPOSAL OF SANITARY SEWAGE AND SEWAGE COLLECTION SYSTEM; APPROPRIATE DOCUMENTATION

FROM MDEQ/OFFICE OF LAND & WATER, FOR DAM CONSTRUCTION AND LOW FLOW REQUIREMENTh.

APPLICANT MUST BE OWNER OR PRIME CONTRACTOR,. THE APPLICANT RECEIVES COVERAGE AND IS

RESPONSIBLE FOR PERMIT COMPLIANCE. OWNER MAY APPLY AND AT A LATER DATE REQUIRE PRiME CONTRACTOR

TO ASSUME PERMIT COMPLIANCE (SEE PRIME CONTRACTOR CERTIFICATION)..

All QUESTIONS MUST BE ANSWERED (Muwer “NA” if the question Is not applicable)

IS APPLICANT THE OWNER OR PRIME CONTRACTOR? (CIRCLE ONE OR BOTH)

OWNER INFORMATION

OWNER CONTACT PERSON: W. C. Fore

OWNER COMPANY NAME: W. C. Fore Trucking, Inc.

OWNER STREET (P.O. BOX): P. o. Box 3058

OWNER CITY: Gulfport STATE: MS ZIP:39505

OWNER PRONE # (INCLUDE AREA CODE): (228)8634314

PRIME CONTRACTOR INFORMATION

PRIME CONTRACTOR CONTACT PERSON: Bob Gavin or W. C. Fore

PRIME CONTRACTOR COMPANY: W. C. Fore Trucking, Inc.

PRIME CONTRACTOR STREET (P.O. BOX): P.O. Box 3058

PRIME CONTRACTOR CITY: Gulfpott STATE: MS 39505

PRIME CONTRACTOR PHONE # (INCLUDE AREA CODE): (228) 863-1314

Revised June 12,2002

Page 99: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

PROJECT INFORMATION

‘Acreage for subdivision development includes areas disturbed by construction of roads, utilities and drainage. Additionally,

a housesite of at least 10,000 fl2 per lot (entire lot, if smaller) shall be included in calculating acreage disturbed.

PROJECT NAME: Shaw Road Pit

DESCRIPTION OF CONSTRUCTION ACTIViTY:

Surface mining of sand and clay.

PROPOSED DESCRIPTION OF PROPERTY USE AFTER CONSTRUCTION HAS BEEN COMPLETED (INCLUDE

STANDARD INDUSTRiAL CLASSIFICATION CODE (SIC) IF KNOWN):

Revegetation of area being mined SIC Code 1442

PHYSICAL SITE ADDRESS (IF N(YF AVAILABLE INDICATE THE NKARES NAMED ROAD - FOR LINEAR PROJECTS INDiCATE

BEGINNING OF PROJECF. IN ADDITiON, IDENTIFY ALL COUNTIES THAT LINERAR PROJECT TRAVERSES.):

STREET: Shaw Road

CITY: GtMP01 , COUNTY: Harrison

ZiP: 39503

NEAREST NAMED RECEIVING STREAM: Via unnamed tributaries to Little Bioxi River

ARE THERE ANY WETLANDS, RECREATIONAL STREAMS, PRiVATE/PUBLIC PONDS OR LAKES WITHIN

MILE DOWNSTREAM OF PROJECT BOUNDRy?None

TOTAL ACREAGE THAT WILL BE DISTURBED’:4°

EST. ART DATE: 08/20/04 EST. COMPLETION DATE; 12/31/10

TYPE SOIL ON SITE: Eustis Loamy Sand, Poach Fine Loamy Sand

2

Page 100: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

DOCUMENTATION Of COMPLIANCE WITH OTHERREGULATIONS/REQITLREMENTS

IS TillS NOTiCE FOR A FACILITY THAT WILL REQUIRE OTHER PERMITS (Yes or No)? No If so,

circle which one(s): AIR, HAZARDOUS WASTE, PRETREATMENT, STATE OPERATING, INDWIDUAL NPDES,

CORPS OF ENGINEERS SECTION 404 (If so, provide appropriate documentation from the Corps), other(s):

IS A LAKE REQUIRING THE CONSTRUCHON OF A DAM BEING PROPOSED (Yes or No)? No

IF SO, PROVIDE APPROPRIATE APPROVAL DOCUMENTATION FROM MDEQ, OFFICE OF LAM) AND WATER,

DAM SAFETY.

IF THE PROJECT ISA SUBDWISION, INDUSTRIAL PARK OR LARGE APARTMENT COMPLEX HOW WILL

SANITARY SEWAGE BE DISPOSED? Circle one of the following and attach the pertinent documents.

1. ExistIng Municipal or Commercial System. Please attach a copy of the letter from MDEQ that the plans and

specifications for the collection system have been submitted and approved.

2. Collection and Treatment System will be Constructed. Please attach a copy of the cover of the NPDES discharge

permit from MDEQ or indicate the date the application was submitted to MDEQ (Date: .)

3. Individual Onsite Wastewater DisosaI Systems for Subdivisions Less than 35 Lots. Please attach a copy of the Letter

of General Acceptance from the Mississippi State Department of Health or certification from a registered professional

engineer that the platted lots should support individual onsite wastewater disposal systems.

4. Individual Onsite Wastewater Disposal Systems for Subdivisions Greater than 35 Lots. A determination of the

feasibility of installing a central sewage collection and treatment system must be made by MDEQ. A copy of the

response from MDEQ concerning the feasibility study must be attached. If a central collection and wastewater system

is not feasible, then please attach a copy of the Letter ofGeneral Acceptance from the State Department of Health or

certification from a registered professional engineer that the platted lots should support individual onsite wastewater

disposal systems.

IF THE PROJECT IS NOT ONE OF THE ABOVE, HOW WILL SANITARY SEWAGE BE DISPOSED?

Portable Toilets

INDICATE ANY LOCAL STORM WATER ORDINANCE WITH WHICH THE PROJECT MUST COMPLY AND

SUBMIT ANY DOCUMENTATION OF APPROVAL. (APPROVED PLANS WILL RECEIVE EXPEDITED REVIEW):

N/A

3

Page 101: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

________________

________ ___________ _______

I

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) ANDUSGS QUAD MAP REQUIREMENT

ATTACH A CONSTRUCTION SWPPP THAT INCLUDES THE MINIMUM COMPONENTS FOUNI) IN PART Ill.C.

OF THE CONSTRUCTION PERMIT.

INDICATE ANY ASSOCIATION OR GENERIC SWPPP — ADDiTIONALLY ATTACH SiTE MAP WiTH APPROPRIATE EROSLON

AND SEDIMENT CONTROLS LOCATED ON THE PROJECT SITE MAP. FOR LINEAR PROJECTS (ROAD AND PIPELINE PROJECTS)

PROVIDE DRAWINGS OF TYPICAL CONTROLS USED (SEE PERMiT):

________________________________________

N/A

ATTACH A USGS QUAD MAP OR COPY OF QUAD MAP EXTENDING AT LEAST ONE-HALF OF A MILE BEYOND

THE SiTE’S PROPERTY BOUNDRY OUTLINING THE SITE LOCATION. (QUAD MAPS CAN BE OBTAINED FROM THE

OFFICE OF GEOLOGY: 601-961-5523).

II? A COPY IS SUBMITTED PROVIDE THE NAME OF THE QUAD MAP (FOUND IN UPPER RIGHT HAND CORNER OF MAP)

Section 1, Township 6S, Range 12W: Wortham Quadrangle, Mississippi - Harrison County

I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE PREPARED

UNDER MY DiRECTION OR SUPERViSiON IN ACCORDANCE WITH A SYsl:EM DESIGNED TO ASSURE THAT

QUALIFIED PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION SIJBMT1TED. BASED

ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY

RESPONSIBLE FOR GATHERING THE INFORMATION, THE INFORMATION SUBMflTuD IS, TO THE BEST OF

MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBiLITY OF FINE

AND IMPRISONMENT FOR KNOWING VIOLATIONS.

when different than owner) Date Signed

W.ForeTide

1ThIs application shall be signed according to the General Permit, Part V.E., as follows:

- For a corporation, by a responsible corporate officer.- For a partnership, by a general partner.- For a sole proprietorship, by the proprietor.- For a municipal, state or other public facility, by principal executive officer, mayor, or ranking elected official.

- Duly Authorized Representative

4

Page 102: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

PRIME CONTRACTOR CERTIFICATION

The prime contractor, if different from original applicant, will take responsiblilty for permit compliance by filing this certification prior to

the commencement of construction. This certification Is unnecessary when the prime contractor has already completed, signed, and

submitted pages 1,2,3 and 4 of the CNOI By completing and submitting this certification to MDEQ, the prime contractor accepts full

responsibility for permit compliance and meeting all permit conditions. Otherwise the initial applicant (applicant who filed pages 1, 2,3 and

4 of the CNOI) is solely responsible for permit compliance. Notwithstanding any permit condition to the contrary, the coverage recipient

and any person who causes pollution of waters of the state or places waste In a location where they are likely to cause pollution of any waters

of the state shaLl remain responsible under applicable federal and state laws and regulations, and applicable permits.

PRIME CONTRACTOR INFORMATION

PRIME CONTRACTOR CONTACT PERSON: Same As Above PHONE NuMBER:__________

PRIME CONTRACTOR COMPANY:_________________________________________________

PRIME CONTRACTOR STREET (P.O. BOX):

PRIME CONTRACTOR CITY: STATE:

OWNER INFORMATION

OWNER CONTACT PERSON: PHONE NUMBER;______________

OWNER COMPANY NAME:____________________________________________________

PROJECT IM?ORMATION

CONSTRUCTION STORM WATER GENERAL PERMIT COVERAGE NUMBER; MSR10 — — — —

PROJECT NAME:

DESCRIPTION 01? CONSTRUCTION ACTIVITY:_______________________________________

PHYSICAL SITE ADDRESS (IF NOT AVAILABLE INDiCATE TilE NEARESF NAMED ROAD - FOR LINEAR PROJECrS iNDiCATE

BEGINNiNG OF PROJECf. IN ADDmON, IDENTIFY ALL COUNTIES THAT LINERAR PROJECf TRAVERSES.):

STREET:___________________________________________

CITY: COUNTY:_________________________________

1 CERTIFY THAT I AM THE PRIME CONTRACTOR FOR THIS PROJECT AND WILL COMPLY WITH ALL THE

REQVIREMENTS IN THE ABOVE REFERENCED GENERAL NPDES PERMiT.

I CERTIFY UNDER PENALTY OF LAW THAT THiS DOCUMENT AND ALL ATFACHMENIS WERE PREPARED UNDER MY DIRECTION OR

SUPERVISiON iN ACCORDANCE WitH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHERED AND

EVALUATED THE INFORMATION SUBMflTED. BASED ON MY INQUiRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM, OR

THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATiON, THE INFORMATiON SUBMIFfED IS, TO TilE BESF OF

MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. lAM AWARE THAT THERE ARE SIGNIFiCANT PENALTIES FOR

SUBMITTING FALSE INFORMATION, JNCLLIDING THE POSSiBILITY OF FINE AND IMPRISONMENT FOR KNOWING ViOLATIONS.

Prime Contractor Signature’ Date Signed

Printed Name’ Title

Thb apptkallon shall be signed according to the General Permit, Part V.L,as S,Iows:

- Fora corporatha, by areqmndbte corporate officer.- For a partnership, by a general partner.- For a sole ropriet dp,se proprietor.

: Fora aI, state or public facillty, by principal exectifive officer, mayor, or ranking elected officiaL

Revised June 12, 2002

Page 103: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

MVC-341 S.JPG (JPEG Image, 640x480 pixels)

b

________

-I9 44...

•• %

-- __c_••

______

Page 104: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

MVC-342SJPG (JPEG Imuge, 640x480 pixels)

I

Page 105: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

MVC-343SJPG (JPEG Image, 640x480 pixels)

1

4 -_____

;i%11e:

Page 106: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

1)

000

C1)00

(Z0o>

Page 107: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

MVC-345S.JPG (JPEG Image, 640x480 pixels)

I

Page 108: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

- •1

Si 1IEH..J.I) corn

Posted on Tue, Oct. 26, 2004

LAND USE

Dirt pit denied; landowner to appeal decisionBy ANITA LEE

GUIFPORT - After the Harrison County Board of Supervisors unanimously rejected a 40-acre dirt pit off Shaw Road,residents applauded, but landowner W.C. Fore said he would appeal the decision to Circuit Court.

Fore said the land off Shaw Road is the only property he owns that contains the sand he must supply for expansion atthe State Port in Gulfport. His attorney, Britt Singletary, expects the case to be heard in 90 to 120 days.

Residents packed the boardroom to object to the pit on the narrow, rural road.

‘We’re happy,” said David Reeves, a fourth-generation resident. “We think the supervisors made the right decision. Theylistened to the voice of the people. I’m very impressed.”

Supervisor Larry Benefield offered the motion to reject Fore’s application for a conditional-use permit. Benefield saidShaw Road wasn’t built for heavy truck traffic. It is not on the county’s list of roads that allow trucks over 40,000pounds. Loaded dump trucks weigh twice that much.

Residents feared an increase in accidents because the road has a sharp curve and is only a little over 18 feet wide.School buses also travel Shaw Road. Heavy trucks, they said, would tear up the rural road.

Fore offered concessions: He would keep trucks off the road while buses run, would hire a safety officer to oversee histruck traffic, would add pull-offs in three places on each side of the road, would put up signs about the truck traffic andwould take care of road repairs.

About 300 trucks a day would have traveled 1.4 miles of Shaw Road to and from Mississippi Highway 53.

The Planning Commission approved Fore’s application, but residents appealed the decision.

Benefield said some places along the road do not have enough rights of way for pull-offs.

Supervisor William Martin said: “I don’t see this being the right place to do it. Any time you’ve got to have pull-offs,that’s a problem.”

Supervisor Marlin Ladner opposed the pit based on the public safety risk. Supervisors, he said, needed to err on the sideof caution.

Anita Lee can be reached at 896-2331 or at caIeesunheraid.com

c 2fl04 Thc Sun Ilciulci ad si,e crice sources. .411 Rihis Rc,,’rvcd.1iup:.www.suiihcraIdcom

http://www.sunhera1d.com/m1d/sunheraId/1 00151 52.htm?template=contentModules/print... 10/27/2004

Page 109: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

LETTERSR

eclaimed

ShawR

oadpit

willbe

anim

provement

Much

hasbeen

statedand

printedaboutm

yrequesting

thattheH

arrisonC

ountyZoning

Board

issueus

aconditional use

permitto

extract soilon45

acresofm

yow

nproperty. W

ehave

metor exceeded

alltherequirem

entsofthe

Harrison

County

ZoningO

rdinancethat w

asadopted

bythe

Board

of Supervisorsafter

severalpublic

hearings.T

herequirem

entsto

establisha

surfacem

iningpitcom

eunder

theauspices

oftheM

ississippi Departm

entof Environm

ental Quality.O

urrequestfora

surfacem

iningperm

itcomes

underthereview

oftheM

ining, StormW

aterandthe

Reclam

ationD

ivisionsof

theD

EQ. O

ccasionally, theC

orpsof

Engineers

willbe

requiredto

reviewthe

application.U

ndertheA

-i General A

griculturalZone

area,thefollow

ingis

apartiallist

ofusesthat are

allowed:electric

power

generatingplant-auxiliary; hatcheries.

poultryor

fish; livestock,cattlehorses,

sheepand

goats; livestock, swine.

The

purposeofourapplication

isto

allowW

.C.ForeT

ruckingInc.to

enlargean

existingsurface

mining

sitethatw

asestablished

andoperational in

1973to

atotal m

iningarea

of45acres.

The

existingpit w

ascreated

toprovide

fillmaterialfor C

ountyFarm

Road.Itw

asabandoned

andclosed

priortothe

enactment ofthe

Mississippi Surface

Mining

andR

eclamation

Rules

and

Regulations. T

heproperty

hasbeenan

unauthorizedcollection

point oftrash,rubbish

andhousehold

garbage,anunhealthy

andunsanitary

situation.T

hecom

pletedsurface

mine

willbe

environmentally

safeand

controlledby

MD

EQ; as

ofnowthere

isno

environmental controL

Afterm

iningis

completed, closing

ofthem

inew

illbein

accordanceto

therules

andregulations

ofMD

EQ; the

grassedslopes

andretention

pondw

illstayin

harmony

with

otherpropertiesin

thedistricL

Upon

reclamation

oftheland,

a45-acre

lakew

illbeconstructed.T

helake

willslope

3:1on

theside

andend

andthe

slopesw

illhavetopsoilasw

ellas

grassto

reduceerosion.

Introducingthis

laketo

thearea

will

providethe

ecosystemw

itha

newhabitat forw

ildlifeand

fish.By

thew

ay,W.C

.ForeT

ruèkingInc. ow

nsno

mining

pitnorthofShaw

Road.W

.C.

FOR

EG

uifport

-

Page 110: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

GuItort dirt pit approved by countyvi ..

SisilEftiLD cam

Posted on Thu, Sep. 23, 2004

DIRT PIT

Gulfport dirt pit approved by countyBy ANITA LEE

GULFPORT - Harrison County residents in the Shaw Road area must sacrifice for the State Port at Gulfport expansion,the Planning Commission decided Wednesday.

County commission members voted 3-1 to allow W.C. Fore Trucking to mine sand from 40 acres on Shaw Road. ReillyMorse, an attorney who represents David Reeves and other Shaw Road residents, said the decision will be appealed tothe Board of Supervisors.

Fore also must win approval from the state Department of Environmental Quality, which has a detailed regulatoryprocess.

If the pit is allowed, residents will live with 150 round trips by dump trucks every weekday, and 75 trips on Saturdays,along the narrow rural roadway. The trucks will travel 1.4 miles of Shaw Road north of Mississippi 53.

“This man has a product that he needs to get to market, the Rev. Eddie Hartweli, a planning commissioner, told ahearing room full of residents who objected to Fores request for a conditional-use permit to operate the pit onagricultural land.

Commission Chairman Dan Hensarling was persuaded to vote for the pit because it seemed the best location, withMississippi 53 only a short distance away. If the permit was not approved for this site, another would be selected and anew set of faces would confront the commission with objectIons, he saId,

Also, Hensarling and Hartwel! said they felt Fore had satisfied safety concerns brought up at a previous hearing.

Still, the decision proved difficult. When Hartweli made the first motion to approve the permit, he failed to get a second.When commission member David L.adner moved to deny it, he, too, failed to get a second.

When one resident asked If the commissioners would vote for a dirt pit in their own neighborhoods, commissIon memberSharon Turnipseed said she had recently done just that, although the decision was tough.

In the end, Hensarling seconded the motion to allow the permit. After the vote, resident Reeves questioned whether thechairman could second a motion, an issue that must be resolved before the Board of Supervisors considers therecommendation.

Residents object to the dirt pit operation because they said 80,000-pound loads will only make an inferior road worse.They also fear accidents will increase because the road is not wide enough to handle the traffic and has a sharp curve.

Patricia Griffin, a blueberry farmer who used to work as a designer with a civil engineering firm, said patching potholeswith asphalt will do no good because the road’s subsurface is cracked in many places, allowing water to seep throughand create another hole.

“These potholes are going to happen in a hurry,” GrIffin said, “and they’re going to be big.’

To satisfy other concerns, Fore has agreed not to run trucks during the hours that school buses travel Shaw Road, to hirea safety manager who will oversee Fore’s truck traffic and to build shoulders in three places on each side of the roadway.

“We’re all concerned about safety,” Hensarling said. “God forbid, if one kid got killed, I couldn’t live with it, either.”

Anita Lee can be reached at 896-2331 or caIee)sunherald.com

http://www.sunhera1d.com/m1dJsunhera1d/news/1oca1/9735350.htm?template=contentMod... 9/27/2004

Page 111: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

.JU1IpUJL UIIL JilL appiuvcu uy UUHLrg i ui .

SL1IKtlu corn

Posted on Thu. Sep. 23, 2004

DIRT PIT

Gulfport dirt pit approved by countyBy ANITA LEE

GULFPORT - Harrison County residents in the Shaw Road area must sacrifice for the State Port at Gulfport expansion,the Planning Commission decided Wednesday.

County commission members voted 3-1 to allow W.C. Fore Trucking to mine sand from 40 acres on Shaw Road. ReillyMorse, an attorney who represents David Reeves and other Shaw Road residents, said the decision will be appealed tothe Board of Supervisors.

Fore also must win approval from the state Department of Environmental Quality, which has a detailed regulatoryprocess.

If the pit is allowed, residents will live with 150 round trips by dump trucks every weekday, and 75 trips on Saturdays,along the narrow rural roadway. The trucks will travel 1.4 miles of Shaw Road north of Mississippi 53.

“This man has a product that he needs to get to market,” the Rev. Eddie Hartwell, a planning commissioner, told ahearing room full of residents who objected to Fore’s request for a conditional-use permit to operate the pit onagricultural land.

Commission Chairman Dan Hensarling was persuaded to vote for the pit because it seemed the best location, withMississippi 53 only a short distance away. If the permit was not approved for this site, another would be selected and anew set of faces would confront the commission with objections, he said.

Also, Hensarling and Hartwell said they felt Fore had satisfied safety concerns brought up at a previous hearing.

Still, the decision proved difficult. When Hartwell made the first motion to approve the permit, he failed to get a second.When commission member David Ladner moved to deny it, he, too, failed to get a second.

When one resident asked if the commissioners would vote for a dirt pit in their own neighborhoods, commission memberSharon Tumipseed said she had recently done just that, although the decision was tough.

In the end, Hensarling seconded the motion to allow the permit. After the vote, resident Reeves questioned whether thechairman could second a motion, an issue that must be resolved before the Board of Supervisors considers therecommendation.

Residents object to the dirt pit operation because they said 80,000-pound loads will only make an inferior road worse.They also fear accidents will increase because the road is not wide enough to handle the traffic and has a sharp curve.

Patricia Griffin, a blueberry farmer who used to work as a designer with a civil engineering firm, said patching potholeswith asphalt will do no good because the road’s subsurface is cracked in many places, allowing water to seep throughand create another hole.

“These potholes are going to happen in a hurry,” Griffin said, “and they’re going to be big.”

To satisfy other concerns, Fore has agreed not to run trucks during the hours that school buses travel Shaw Road, to hirea safety manager who will oversee Fore’s truck traffic and to build shoulders in three places on each side of the roadway.

‘We’re all concerned about safety,” Hensarling said. “God forbid, if one kid got killed, I couldn’t live with it, either.

Anita Lee can be reached at 896-2331 or calee@sunheraid. corn

http://www.sunherald.com/mld/sunherald/news/loca1/9735350.htm?template=contentMod... 10/7/2004

Page 112: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

—-

IL COpySTATE OF MISSISSIPPIHALEY BARB0UR

GovEioRMISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY

CHARLES H. CHsoLM, ExEcuTivE DIREa0R

November 5, 2004Mr. W. C. ForeW. C. Fore Trucking, Inc.Post Office Box 3058Gulfport, Mississippi 39505

Dear Mr. Fore:

Re: W C Fore Trucking mc, Shaw Road PitHarrison County, MississippiCoverage No. MSR32 1396

The Department of Environmental Quality (Department) has reviewed the submittedNotice of Intent (NOT) for coverage under the Statewide General Permit for storm waterdischarges from mining operations and other environmental data relative to the proposedproject. Based on the available information, the Department has determined that ahydrogeologic study should be performed to determine any potential impact the proposedmining project may have on the nearby groundwater remediation project at CavenhamForest Industries, Inc., Lyman Site No. 2. The required study should be conducted by aregistered professional engineer and/or professional geologist registered with the state ofMississippi, who is independent of the parties involved in the project.

Additionally, the Department has determined that an individual NPDES permit would bemore appropriate for the proposed project. Therefore, please find the enclosed EPAForm 1 and Form 2D. These applications should be completed as required and submittedto the Department.

Included with the individual application forms, a full site development plan should besubmitted. The site development plan should include a site map indicating all propertyboundaries, storm water controls, mining area, equipment staging areas, siteingress/egress, and any other information pertinent to the site development. The narrativeshould detail the total depth to be mined, the groundwater depths identified during thehydrogeologic study, anticipated amount of groundwater/storm water to be maintainedwithin the mining area, run-on control measures and any other information related to theoverall management of the mining site.

19386 GNP2004000I OFFICE OF POLLUTION CONTROLPOST OFFICE BOX 10385 JACKSON, MississiPPi 39289-0385 • TEL: (601) 961-5171 • FAX: (601) 354-6612 . www.deq.state,ms.usAN EQUAL OPP0RTuNITE EMPLOYER

Page 113: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

Finally, the Department is aware that the required local approvals have not been grantedby the appropriate local government. Please be aware that until all local approvals havebeen obtained, the Department staff does not intend to present the proposed project to theMississippi Environmental Quality Permit Board for consideration.

If you have any questions or comments, please contact me at 601-961-5040.

Sincerely,

Michelle VinsonSolid Waste & Mining, EPD

19386 GNP2004000I

Page 114: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

ENSEARCH - Agency Interest flyils Page 1 of I

W C Fore Trucking mc, Shaw Road Pit

General Information flpcjc’3ID Branch SIC County Basin Start End

19386 Mining and 1442 Harrison NONE SELECTED 08/16/2004Solid WasteManagement

AddressPhysical Address (Primary) Mailing Address

Shaw Road P0 Box 3058Gulfport, MS 39503 Gulfport, MS 39505

TelecommunicationsType Address or Phone

Work phone number (228) 863-1314

Alternate / Historic Al Identifiers S

Alt ID Alt Name Alt Type Start Date

19386 W. C. Fore Trucking, Inc.,Official Site Name 08/16/2004Shaw Road Pit

Regulatory ProgramsProgram SubProgram

Locational DataLatitude Longitude Method Datum S / T / R Map Links

Report Date: 11/29/2004 1:04:58 PM

http ://opcweb/ensearchlagency_interest_details.aspx?ai=19386 11/29/2004

Page 115: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

0 0F “

STATE OF MISSISSIPPIHALEY BARB0UR

GOVERNOR

MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITYCHAiEs H. CHIS0LM, ExFcuTIVE DIREcr0R

November 29, 2004

Mr. W. C. ForeW C Fore Trucking mc, Shaw Road PitP0 Box 3058Gulf,ort, Mississippi 39505

Dear Mr. Fore

Re: W C Fore Trucking mc, Shaw Road PitHarrison CountyWater Ref. No. MS0059773

This letter is to acknowledge receipt of your application on November 29, 2004. Within forty-five days after the date of receipt of the application, you will be notified either the submittedapplication is complete or of the major components required to complete the processing of yourpermit application.

If any of these actions involve construction activities, please notify us of your projected schedulefor commencement of construction and completion of construction if this information is notalready contained in the submitted application.

If you have any questions regarding the application or the permitting process, please contactMichelle Vinson at (601) 961-5171.

Sincerely,

Teresa DenningtonEnvironmental Permits Division

19386 PER2004000I

OFFICE OF POLLUTION CONTROLPosi’ OFFICE Box 10385 JACKSON, Mississippi 39289-0385 • TEL: (601) 961-5171 • FAx: (601) 354-6612 • www.deq.state.ms.us

AN EQUAL OPP0RTuNIFY EMPLoR

Page 116: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

0 04//c739(p

W. C. Fore Trucking, Inc.14270 Creosote RoadP. 0. Box 3058Gutfport, MS 39505PHONE; (228) 883-1314

FAX: (228) 864-0013E-MAIL: bgavin44bellsouth.net

16CEIfr,

bttI ©IJ

RE:

CC:

Michelle VinsonMississippi Dept. of Environmental QualityOffice of Pollution Control

EA FORM I & FORM 2DSHAW ROAD SAND MINEGJLFPORT, MS

PHONE: 865-4300FAX: 865-4307

Dear Ms. Vinson,

Enclosed are the required, completed documents in order to obtain a Permit toDischarge Wastewater for the aforementioned sand mine.

The enclosed EPA forms are listed below:

ö Form I General

8 Form2NPDES.

If you have any questions, please do not hesitate to call.

Thank you,

DATE: November 23, 2004

TO:

TIME: 2:17PM

Michael Rouse

Page 117: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

OLLLJIANT CHARACTER IS1i

STRUCTIONS: Complete A through .1 to determine that you need to submit any permit app(icaion forms to thi EPA.. If you anjww “y to any

ittions, you mutt submit this form and the supplemental farm Iixt,d in the parenthe following the queston. Mitt X in th. box in the third column

he suppiemental form is attached. If you ansr Tho” to each question, you need .aot-a,bmit any of th forms. You may anr na if your activity

ixciuded from permit requirements: e Section C of the instrucons. S.. eisa, Section 0 of the irtstnictions for definition: of bold—faced tarms.

XSPCCIFIC oucerleNS s,gc..c OUiST1ONS V.. ••

‘ aVV=c.si

—gwhich results in a dhare to waters of the U.S.? I a.sof fiiIs this f.cility a publidy

X

8. Do.. or w,lI thu flbty 1WU’ or

I FORM 2A1‘m Podeon faclkv wfli ‘lU as a

— — to s of the U.S.? (FORM 28) w

Is this a facility wflidi currently resutta in ds )< 0. Ia thw a propd tlty /oOser the,

to waters of thi U.S. ethel’ thin thoe dMibed in In A or S ovej w4tids wIll rit is a to

A or B above? (FORM 2C) .. ., .. —.wei of th U.S.? (FORM 20)

F. Do you or will you infect et tho fedhity industrial or

Does or will this facility treat. store, or ioae of pea .u.ntb Ole 1014.rm.4t stratum fl

taming, within one quatwr miii of the well bore.hazaroui ,net& (FORM 3) -

.. und..,..jrsd acur of drotkirqwesar? (FORM 4) -— --“

——

Do you or will you inject at this taciiity any orocuce

in connection with conventional oil or natural gas pro-cial pro m.scfl mining of oihiur by the Fresdi xwater or other fluics which are brought to the surface

H. Do you or will you inject it this facility fluids for

duction, inject fluids used for enhanced i’e,qry ofpru, ioitrt)on mining of neraIs., initi anrrcua.

tior, of foesll fuel, or rscy of ,..ot3i....,l .niy?oil or natural gas, or nj.ct fluids for rtorega of hiuid (FORM 41hvrc5ron$ (FORM 4)

one of the 28 industrial cetegorlis hiite in Oh 155. NOT one of the 2$ Industrial Is the

s’tructions arid Whith will potentially emit 100 tDlO irorrua.iorw and whids wIll pato,tlally risk 280 tone -

><

Is this facility a orooaseo rtatien.ry acuree wn,d is — .J. Is this facility a prcooe.d ts.-,’

per ye.r of any air pollutant regulated under Ose y of any alr poliust rejsj1 under OesQs

Cln Air Act and may affect or be l Is an Aw Au er o offeat rn be Is iu.J

rrta,nmenteree7(FORMS) •, ‘to?(FORU5) ...— —

dAME OF FACILITYI I I i a a i a I a a I a I a i I a I a I I a

“( 5iuii. R.ô.&. .5A.kD. ai r17t I ii

FACILI1’Y CONTACT

a. NAbIg C TITL.L (1it. first, a taUt) I. PhION( (aleS code a no.)

I• C. F.b.R6.ITII iii 1 I 1 I I I l

lIiIJ

L4

AC1LIYY MAILiNG ADDRESS

1 a I I I I I I IA. STRIg? 00 P.O. lOX

.. crr on ‘sewn Ic.sr*r - ox pp cool -

• I I I I I I I I I I I

ILLF Po.T V.

FACILITY LOCATION

r—r I I I I I I I I 1 I Ia. cmxx’s. nOu’r( no. am omen seciic OeNTI,iC0

-I.S.UA.W .RoAtxa. COUNtY NAMI

Ill lull I I I I I

..1C. Cliv 00 iOWN .STATEj I. Zip coog 1 F. COUNTY CODE

. I .Ji II

. I II.....

M.IjiS.3l I.

— • I i £7 .I - L

print Or type in Iris unsriaoed areas Only

r ‘.isi, ryoe, I. •.. 12 CflaP1vre,fnci’ NU.S. lkvl..-_..JCNTAI.. QTKCTiO0 AGCNC

GENERAL INFORMATIONConaoi,d. led Pri,i,tr

ffit ‘General Jnjrrsirtioni” before

Frn, MS N 2OdO-6 A -_d a- 7.jj

If a pricrirned label P been ‘ou,o.It in me Oesqrwt,O . Review the irifor,,,.ation Ivfully; if any of it is iriittlfvugh it and ricer in. deta in OhC1OI. seta fill—rn ito below. Alto, if any ofme prapr,nt dat. I, ..nt (a,. ar.. to owIelr of USe label w list Use rnfon,,atoa,that mould too..,), pd.. Dro-noe it in me

pooi fill—in .rto(z) bel. If the label is

rnmete and cvrs’ecs. you need not lipiate

llama I, III, V. and VI (.ar IfI-B escornplated iegardiJ, Comoirie all

items if r label hm been prov,bec. Refer to

irs. instructions for detailed rtern d*ip

lions end lot Us. legal iuthOl’Igations urir

which this data is onll.ctad.

CONTINUE ON REVERS

Page 118: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

A. FtWT.

-T (:pecify

MINw46 c’F 5r.P.AvL,. .. -.

- c. 1a—

—.

--

:- ..• - a.

..L. ji,pecify, -

-T I I

.

VIII. OP!RATOR INFORMATIONA. pAUt

I•i .i.

i I 1 I I 1 I I I I I I I I I T

1W C. FcRE TRVCk1I L..1-c

C. STA’SS OF OP(ATOP fEnter tflt approprre Aetge,mw rhs aru-r box: if “O,h,ep”. wecfy.) I 0. PMONE ta,w coda a no.)

j1 O xrre) p jecifyj 2 ‘ I

c. srigr ec .e. aOK - -•

I I I I II I I I I I I I II 1 I I 1 1 I I —

,• P. O &b.x. .. ...

F. cirv OP OWN O.SI’ATl 14. ZIP CODE IX.. INDIAN LAND

I I I I I I I I I I I l__j.I__I I I I_ 1

j ,G,oLFPor., 3,95,O DYES o

,. ... .j . -. :.. .. a, -.

X. £XTINO ENVIROt4MNTAl. PERMfl

A. NPOES fDij 1ao’ W. ?z—rt) ... .•..•;

UIC (UPdc,,vwd In,ece.i of F7Wdz/ g• O5NE lspcfy) .- i- -: - -. -

11I II I I I 1 I I C I I I I I I I I I I I

iij tilt, I ii

. .—--.

II Ii . S.

C. PCPA (Hawous Wam) S. orwi j’y,

XI. MAP

Attach to this appcation • topographic map of area extending to at east one mile beyond property boundenes. The map must show

the outline of the facIlity, the lotion of each of i existmg and proposed intaki and disdar i.sras, each of r hazardous waste

treatent, storage. dispoul facilities, and each wall where it in.cu fiui underound.lndude all spnn. rivers and other surfeos

water bodies in the map area. See irstuctios 101 F.cII. requiremenu. . .‘- :-

XII. NATURE OF SUS1NE (prw$ a tWt UipD)

•5AND MUN& rr

I crrify under penalty of law that I hive pernally examined and am familiar with the information ainirred in this ippllcatin and ill

attachment and that, band on my inquiry of thow perne immediately rongible for obtaining the information cont•3ined in the

application, J believe that the information s true, irare and complete. I am aware that there ere significant penalties ‘or wbmirting

fal information, including the powbÜiry of fine and impriwrvrier,t.

A NAME OFFICIAl. TrYL.L (rype orpnnr) P. SIGNArUPE IC CATE SIGNED

W.C. FORE I I

PREsitir ICOMMENTS FOR OFFICIAL. USE ONLY

.1CI I I I I I I I I I I I I I I I I I I I I I I I I I I I Ii I

tilt.

PA Penn 3510.1 IRa,. 10401 R’.r

)

- .-.

-- 4 —

. U.S. Co.rtt..nl Pt,ntlnI Oflic, 191S - i.e.7ss/:q;

Page 119: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

••* ‘ Lc_-T—- - -. :— AW * - -.

TON\,rI 12 WT ORTHAMIM -

2

(MARY SHAMIS ROAD - -

_

-

N ‘I \ífl

- J

I /

S— ‘

‘\

Po9qSED 0 ACRELI

(

ST

I-IV\fr c

Page 120: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

- - ..IIrn.e.,Uu CFCU JrIIy

Form

2D •_

‘ New Sources and New DischargersNES o’E PA Application for Permit to Discharge Process Wastewatei

I. Outfall Location

For each outfall, list the latitude and longitude, and the name of the receiving water.

Outfall Number Latitude Longitude Receiving Water (namej

(lisi) Deg Mm Sec .Deg Mm Sec

11r

II. Discharge Date (When do you expect to begin discharging?)

Ill. Flows. Sources of Pàllutlan, end Treatment Technologies

For each outfall, provide a description oT(1) All operations contributing wastewater to the effluent, includingprocess wastewater, sanitary wastewater. cooling water, and stormwater runoff; (2) The average flow contributed by each operation; and (3) The treatment received by the wastewater. Continue on additional sheetsif necessary.

Outfall 1. Operations Contributing Flow 2. Average Flow 3. Treatment

Number (list) (include units) (Description or List Codes from Table 2D- 7)

. S1OPJ’4 -WATER NEL1ItLE 3alIerirkm

Please iVDe or 0dm in the

___________

PS 8-1-g8.

EPô Number (copy from Item 1 of Form 7)

EPA Form 3510-20 (Rev. 8-90)Page 1 of 5

Page 121: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

B. Attach a line drawing showing thter flqw- through the facility. Indicatë’Jrces of intake wate,operations contributing wjstewater to the effluent, and treatment units labeled to correspond to the moredetailed descriptions in item Ill-A. Construct a waterbalance on the line drawing by showing average flowsbetween intakes, operations, treatment units, and outfalls. If a water balance cannot be determined (e.g., forcertain mining activities), provide a pictorial description of the nature and amount of any sources of water andany collection or treatment measures.

C. Except for storm runoff, leaks, or spills, will any of the discharges described in itemlll-A be intermittent orseasonal? -

Yes (compietdthe following table) No (go to item IV)

. - 1. Frenuency 2. FlowOutfall a. Days b. Months a. Maximum b. Maximum. c. DurationNumber Per Week Per Year Daily Flow Total Volume

. - fspecify (specify Rate (specify (in days)average) average) (in mgd) with units)

N)A i’

lv. Production-

If there is an applicable production-based effluent guideline or NSPS,.foreach outfall list the estimated level of production (projection ofactual production level, not design). expressed in the terms and units used in the applicable effluent guideline or NSPS. for each of thefirst 3 years of operation. If production is likely to vary. YOU may also submit alternative estimates (attach a separate sheet).

a. Quantity b. Units ofYear Per Day Measure c. Operation. Product. Material. etc (specify)

I 170b c.Y - c1sin—, .

It —11oc

3 •17 LY •t .

EPA Form 351 O-2D (Rev. B-90) Page 2 of 5 CONTiNUE ON NEXT PAGE

Page 122: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

(IcONTINUED FROM THE FRONT EA ID Number (copy from Item 1 of Form 1) Outfamber

V Effluent Characteristica

A. and B: These items require you to report estimated amounts (both concentration andmass) of the pollutants tobe discharged from each of your outfalls. Each part of this item addresses a different set of pollutants and shouldbe completed in accordance with the specific instructions for that part. Data for each outfall Should be on aseparate page. Attach additional sheets of paper if necessary.

General Instructions (See table 2D-2 for Pollutants)Each part of this item requests you to provide an estimated daily maximum and average for certain pollutants andthe source of information. Data for all pollutants in Group A, for all outfalls, must be submitted unless waived bythe permitting authority. For all outfalls, data for pollutants in Group B should be reported only for pollutantswhich you believe will be present or are limited directly by an effluent limitations guideline or NSPS or indirectlythrough limitations on an indicator pollutant.

. 2. Maximum 3. Average

Daily Daily

1. Pollutant Value Value 4. Source (see instructions)(include units) (include units)

____________

j/s.

EPA Form 3510-20 (Rev. 8-90) Page 3 of S CONTINUE ON REVERSE

Page 123: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

C: Use the space below to list any of the pollutants listed in Table 20-3 of the instructions which you know or have• reason to believe will be discharged from

any outfall. For every pollutant you list, briefly describe the reasons youbelieve it will be present.

1. PollutantV

- 2. Reason for Discharge

t\14otbE V

VI. Engineering Report on Wastewater Treatment. If there is any technicaT evaluation concerning your wastewater treatment, including engineering reports or pilot plant studies, check theappropriate box below.

VD Report Available No Report

_______________________________

B. Provide the name and location of any existing plant(s) which, to the best of your knowledge, resembles this- V

production facility with respect to production processes. wastewater constituents, or wastewater treatments.

CONTINUED FROM THE FRONT• V

V EPA ID Number (copy from item 1 of Form 1)

0 0

Name Location

EPA Form 3510-2D (Rev. 8.90) Page 4 of 5 CONTINUE ON NEXT PAGE

Page 124: NPDES PERMIT MSR32 GENERAL MINING STORM WATER …Storm Water Pollution Control Plan Shaw Road Pit W. C. Fore, LLC. Hamson County, Mississippi Erosion and Sediment Controls Mine development

0 ioEler (copy from item one of Form 17

Use the space below to expand upon any of the above questions or to bring to the attention of the reviewer anyother information you feel should be considered in establishing permit limitations for the proposed facility.Attach additional sheets if necessary.

AT V’flc ‘gL)4OVf

sI%\c ii/U- &l E. €i iz

ELeVAT NTU1&L

O1’U /3 (y PcE. Mtt -- ‘‘ “TEt AT 1•

• VR*. CG&WCe 77cJ o ccvrfle5, NIN€ WkL

U_oW &t fl) RL. W R LVE4. fl4 5 F 0I

i LJSe.

Ill. Certification

I certify under penalty of law that this document and all attachments were prepared under my direction orsupervision in accordance with a system designed to assure that qualified personnel properly, gather ardevaluate the information submitted. Based on my inquiry of the person or persons who manage the system, orthose persons directly responsible for gathering the information, the information submitted is, to the best of myknowledge andbeliel true, accurate, andcomplete. lam aware that there are significantpenalties for subrñittingfalse information, including the possibility of fine and imprisonment for knowing violations.

L Name and Official Title (type or print) B. Phone No.,

. 22S.W. t FRE PR&Lwr , t 14

. Signature ,. D. Date Signed

EPA Form 3510-2D (Rev. 8-90) Page 5 of 5.