Nova Scotia, CANADA DUFFERIN GOLD MINE Targeting First Gold Dore Q1 2014 OU3 (FWB) / APP (TSX.V) Presented by: Alain Hupé – President & CEO Douglas keating – Mine Manager

description

DUFFERIN GOLD MINE. Targeting First Gold Dore Q1 2014. Presented by: Alain Hupé – President & CEO Douglas keating – Mine Manager. Nova Scotia, CANADA. OU3 (FWB) / APP (TSX.V). Forward-Looking Statements. - PowerPoint PPT Presentation

Transcript of Nova Scotia, CANADA

Page 1: Nova Scotia, CANADA

Nova Scotia, CANADA

DUFFERIN GOLD MINE

Targeting First Gold Dore Q1 2014

OU3 (FWB) / APP (TSX.V)

Presented by:

Alain Hupé – President & CEO Douglas keating – Mine Manager

Page 2: Nova Scotia, CANADA

Forward-Looking Statements

This presentation may contain certain forward-looking statements regarding (i) estimated resources and reserves, (ii) planned production and operating costs profiles, (iii) planned capital requirements and (iv) plans, strategies and corporate objectives.

Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Ressources Appalaches and Dufferin Resources. The forward-looking statements are inherently uncertain and may therefore differ materially from results ultimately achieved.

External and other factors may impact the Company and affect the forward-looking statements in this release since its preparation. Subject to applicable law and stock exchange listing rules, the Company does not intend to publicly update any of the forward-looking statements or any assumptions on which any such forward-looking statement is made.

2OU3 (FWB) / APP (TSX.V)

Page 3: Nova Scotia, CANADA

Corporate Objectives

Become the next Nova Scotian gold producer

Extend resources

Increase production capacity

Three phase plan :

Phase #1 – Restart gold production at 300 TPD by Q1-2014.

Phase #2 – Production of 20,000 to 25,000 oz of gold per year.

Phase #3 – Explore the anticline structure towards the East and at depth

to double production capacity in 2015

3OU3 (FWB) / APP (TSX.V)

Page 4: Nova Scotia, CANADA

Corporate Profile

Direction & Gestion Experience

Alain Hupé, Eng.President, CEO & Cofounder

20 years in explorationEngineer-geologist, specialising in mining exploration geology, President of Gestion LesTrois Inc.

Jean-Claude Morel, M.A.DEMExecutive Vice-President & COO

25 years of management experienceDevelopment and managing of multi-disciplinary teams ranging from engineeringto logistics, including administrative, legal, environmental and financial components.

John A. Thomas, Eng Ph.D. Director

39 years in mining industryExperienced mining engineer from process development, engineering,Management, construction and operation of mines.

Jose Oro, Ph.D. Director

35 years in mining industryPh.D. in geology, held various Senior Vice-President and Chief Operating Officer position in the mining industry, as well as Director of the Ministry of Basic Industries

André Proulx, M.A. Director & Cofounder

30 years in company managementExperienced manager of mining and oil exploration companies, President andCEO of Pétrolia Inc.

Dominique Doucet, Eng.Director

28 years in explorationEngineer-geologist and has held senior management positions with Dios Exploration Inc., Sirios Inc. and Kalkhos Inc.

4

Company Description

Listed FWB: 2013Listed TSX.V: 1997

Shares Outstanding: 182,661,748 Market Cap 20 000 000 $Year Hi/Low: 0,12 / 0,05

OU3 (FWB) / APP (TSX.V)

Page 5: Nova Scotia, CANADA

Canada

Halifax

Sheet Harbour

0 20

kilometres

Miller Lake

Dufferin Mine

Dufferin Mine & Surrounding Appalaches Properties

Chocolate Lake

Ecum Secum

5

25 kilometers (km) radius

Dufferin EastDufferin North

OU3 (FWB) / APP (TSX.V)

Dufferin Mine

Page 6: Nova Scotia, CANADA

Dufferin Mine Existing Infrastructures

Existing mining infrastructure on site:

• Mining lease in good standing• 300 tonnes per day plant• Very short distance from mine to plant (150 m) • Gravity and flotation process• Tailings pound• Acces by decline

PORTAL AND DECLINE MILL

6

MILLING

OU3 (FWB) / APP (TSX.V)

Page 7: Nova Scotia, CANADA

Dufferin Mine Past and Existing Facilities

Ball Mill Shaking Table

Flotation System Infrasructure On-site

OU3 (FWB) / APP (TSX.V) 10

Page 8: Nova Scotia, CANADA

Dufferin Mine Past Operations

8

Quartz Vein – Saddle Quartz Vein – Saddle

OU3 (FWB) / APP (TSX.V)

Page 9: Nova Scotia, CANADA

Dufferin Mine Past Operations – Type of Veins

9OU3 (FWB) / APP (TSX.V)

Page 10: Nova Scotia, CANADA

Saddle Reef Vein Deposit

AnticlineFold Nose

D

Dufferin Mine Gold Quartz Vein

20-100 meters

1.4 - 8.4 km

10OU3 (FWB) / APP (TSX.V)

Potential continuity in depth and toward east open structure

Page 11: Nova Scotia, CANADA

Production and Exploration

Gold Surface Sample Wide Quartz Veins Milling

Dufferin Gold MineMining Lease no. 94-2

Area Drilled1,400 meters

Portal

Mined Zone450 metersMined Zone450 meters

11

Deposit OpenTowards East and at Depth

Ressources Appalaches owns claims covering anticline structure over

8.4 km long

OU3 (FWB) / APP (TSX.V)

Page 12: Nova Scotia, CANADA

Drilling Campaigns

12

1999-2001 2008-2009 2010-2011

OU3 (FWB) / APP (TSX.V)

Page 13: Nova Scotia, CANADA

Dufferin Mine Plan

Mine General Layout

13APP-TSX-V

700 m

Page 14: Nova Scotia, CANADA

Dufferin Mine Plan

14APP-TSX-V

Potential Resources

Mine Plan

Page 15: Nova Scotia, CANADA

Milestones Achieved

Latest Goals Achieved Past 6 months

Mid-2013: The following works have been completed since the announcement of the loan financing of US $10M (May 2013):

1. Mine underground dewatering & rehabilitation works

2. Refurbished the primary and secondary underground ventilation3. Completed plant rehabilitation and testing of all crushing circuit

components4. Finalised and filed mine plan with provincial authorities & filed

production permit (Industrial Approval) application

5. Acquisition and delivery of heavy equipment6. Started the vetting of 688 applications for the remaining

approximately 70 staffing positions required to resume mining operations

15OU3 (FWB) / APP (TSX.V)

Page 16: Nova Scotia, CANADA

Portal Flooded – Water Level May 17, 2013

16APP-TSX-V

Page 17: Nova Scotia, CANADA

Portal Rehabilitation

17OU3 (FWB) / APP (TSX.V)

Page 18: Nova Scotia, CANADA

Infrastructures

18OU3 (FWB) / APP (TSX.V)

Page 19: Nova Scotia, CANADA

Mill Refurbishment

19OU3 (FWB) / APP (TSX.V)

Page 20: Nova Scotia, CANADA

Galleries Rehabilitation

20OU3 (FWB) / APP (TSX.V)

Page 21: Nova Scotia, CANADA

Milestones to Achieve

Path to Production

Targeting First Gold Dore Q1 2014

2013: Complete development works required to restart production at 300 t/d

2014: Start of mining & milling ramp-up operations resume gold production Q1 2014

post-2014: Reinvest profits to increase resources and upgrade plant capacity

21OU3 (FWB) / APP (TSX.V)

Page 22: Nova Scotia, CANADA

DUFFERIN GOLD MINE

October, 2013

Questions

OU3 (FWB) / APP (TSX.V)

Presented by: