Nov / Dec 2009 LPSC leakless first test

5
1 Julien Giraud December 16 th , 2009 Nov / Dec 2009 LPSC leakless first test Julien Giraud ([email protected] )

description

Nov / Dec 2009 LPSC leakless first test. Julien Giraud ( [email protected] ). Julien Giraud – December 16 th , 2009. LPSC Leakless test. 10 m. LPSC Leakless test. Working on formulation of leakless system: => Excel table. LPSC Leakless test. Some pictures:. - PowerPoint PPT Presentation

Transcript of Nov / Dec 2009 LPSC leakless first test

Page 1: Nov / Dec 2009  LPSC leakless first test

1Julien Giraud – December 16th, 2009

Nov / Dec 2009 LPSC leakless first

test

Julien Giraud ([email protected])

Page 2: Nov / Dec 2009  LPSC leakless first test

2Julien Giraud – December 16th, 2009

LPSC Leakless test

10 m

Page 3: Nov / Dec 2009  LPSC leakless first test

3Julien Giraud – December 16th, 2009

LPSC Leakless test

Working on formulation of leakless system:

=> Excel table

P hauteur P Regulière SommeViscosité cinématique (m²/s) 9.52E-07 Psortie pompe 0.52Masse volumique (Kg/m3) 1000 P1 0.18 0.20 0.139 0.18

P2 -0.08 0.20 0.067 -0.08P3 -0.29 0.20 0.013 -0.29

Diam int tuyaux aller (mm) 4 P4 -0.50 0.20 0.013 -0.50Diam int tuyaux retour (mm) 4 Point haut (P5) -0.72 0.20 0.027 0.259 -0.72Perte charge échangeur (bar) 0 P6 -0.55 0.20 0.027 -0.55Débit (l/min) 0.211 P7 -0.37 0.20 0.013 -0.37P relative pompe (bar) 0.5168 P8 -0.19 0.20 0.013 -0.19P relative réservoir (bar) 0 P9 -0.06 0.20 0.067 -0.06Limite régime lam turb 2000 P10 0.00 0.20 0.138 0.258 0.00

P Re 0.000.517

L1 (m) 26H1 (m) 2L2 (m) 12.5H2 (m) 2L3 (m) 2.5H3 (m) 2 H0 => H1 2L4 (m) 2.5 H0 => H2 4H4 (m) 2 H0 => H3 6L5 (m) 5 H0 => H4 8H5 (m) 2 H0 => H5 10L6 (m) 5

H6 (m) 2 H10 => H9 2L7 (m) 2.5 H10 => H8 4H7 (m) 2 H10 => H7 6L8 (m) 2.5 H10 => H6 8H8 (m) 2 H10 => H5 10L9 (m) 12.5H9 (m) 2 48.5L10 (m) 26 48.5H10 (m) 2

0.2584Aller 0.2584Reynolds 1176 0.5168Vitesse (m/s) 0.28Régime Laminaire

RetourReynolds 1176Vitesse (m/s) 0.28Régime Laminaire

GénéralPression au point haut (bar) -0.72Hauteur sur/sous atmo (m) 2.63Hauteur zone leakless (m) 9.57Hauteur max totale 12.20

OK

Répartion des pression (Bar)

Haute

ur

Alle

r (m

)

ATTENTION DESAMORCAGE SI FUITE

Haute

ur

Reto

ur

(m)

Perte de charge régulière aller (bar)Perte de charge régulière retour (bar)

Longueur tuyau retour (m)Longueur tuyau aller (m)

-0.80

-0.60

-0.40

-0.20

0.00

0.20

0.40

0.60

1 2 3 4 5 6 7 8 9 10 11Série1

Page 4: Nov / Dec 2009  LPSC leakless first test

4Julien Giraud – December 16th, 2009

LPSC Leakless testSome pictures:

Top of loop => -0.8 bar => cavitation start (extreme point) => LEAK LESS SYSTEM

Page 5: Nov / Dec 2009  LPSC leakless first test

5