Notice of Proposed Construction or Alteration -Off Airport · Notice of Proposed Construction or...

25
Notice of Proposed Construction or Alteration - Off Airport Federal AYfation Admlni$tratlon Notice of Proposed Construction or Alteration - Off Airport Details for Case: PMT Show Project Summary Case Status ASN: Status: 2010-WTE-2092-0E Work In Progress Construction / Alteration Information Notice Of: Construction Duration: Permanent if Temporary: Months: Days: Work Schedule - Start: 12/06/2009 Work Schedule - End: 12/06/2011 State Filing: Structure Details Latitude: Longitude: Horizontal Datum: Site Elevation (SE): Structure Height (AGL): Requested Marking/Lighting: Other: Recommended Marking/Lighting: Current Marking/Lighting: Other: Nearest City: Nearest State: Description of Location: Description of Proposal: 43 0 44' 25.42" N 71 0 47' 44.86" W NAD83 2173 (nearest foot) 428 (nearest foot) White Paint Only N/ A New Structure Plymouth New Hampshire 3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport 19 of 25 THIS IS A NEW MET TOWER LOCATION. Iberdola Renewables proposes the construction of the Groton wind project. Date Accepted: 02/26/2010 Date Determined: Letters: None Documents: None Structure Summary Structure Type: Met Tower Structure Name: PMT FCC Number: Prior ASN: Common Frequency Bands Low Freq HIgh Freq Specific Frequencies Freq Unit ERP https:lloeaaa.faa.gov/oeaaa/extemalleFiling/locationAction.iso?action=showT « OE/AAA , ERPUnlti 1/1 {;;/')01 0

Transcript of Notice of Proposed Construction or Alteration -Off Airport · Notice of Proposed Construction or...

Notice of Proposed Construction or Alteration - Off Airport

Federal AYfation Admlni$tratlon

Notice of Proposed Construction or Alteration - Off Airport

Details for Case: PMT

Show Project Summary

Case Status

ASN:

Status:

2010-WTE-2092-0E

Work In Progress

Construction / Alteration Information

Notice Of: Construction

Duration: Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43 0 44' 25.42" N

71 0 47' 44.86" W

NAD83

2173 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

19 of 25 THIS IS A NEW MET TOWER LOCATION. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Met Tower

Structure Name: PMT

FCC Number:

Prior ASN:

Common Frequency Bands

Low Freq HIgh Freq

Specific Frequencies

Freq Unit ERP

https:lloeaaa.faa.gov/oeaaa/extemalleFiling/locationAction.iso?action=showT .0~::ttionF{\rtrI

« OE/AAA

, ERPUnlti

1/1 {;;/')01 0

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Project Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEWABLES

Details for Case: W6

Show Project Summary

ASN:

Status

201O-WTE-2080-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of: Construction

Duration: Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

Filing:

Structure Details

Latitude:

Longitude:

Elevation (SE):

St,·uctur·" Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43° 45' 43.91" N

71° 49' 22.74" W

NAD83

1886 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

25 of 25 THIS IS A NEW FlUNG FOR THIS LOCATION. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: W6

FCC Number:

Prior ASN:

Common Frequency Bands

Low Freq

Specific Frequencies

« OE/AAA

Freq Unit ERP ERP

https://oeaaa.faa.gov/oeaaalexternaVeFilingllocationAction. i sn ?actl0n=Qhrmr T ",..<>t~ "' .... V ~~ ...., /1 £,1"""1"\-1 A

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration· Off Airport

Project Name: IBERD-000140851-10

Case Status

ASN: 201O-WTE-2079-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

IBERDROLA RENEWABLES

Details for Case: W5

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: W5

FCC Number:

Prior ASN: 2009-WTE-6132-0E

Common Frequency Bands

« OE/AM

Latitude: 43 0 45' 52.46" N

71 0 49' 23.40" W

NAD83

Low Freq High Freq Freq Unit ERP

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

1962 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

24 of 25 refiling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Specific Frequencies

https://oeaaa.faa.gov/oeaaaiexternaVeFiling/locationAction.iso?action=showT ,or.lltl{)nPOrtl'l 1 11/iJ',)() 1 ()

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration· Off Airport

Project Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEWABLES

Details for Case: W4

Show Project Summary

Case Status

ASN: 201O-WTE-2094-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of: Construction

Duration: Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End:

State Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

12/06/2011

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

I Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

430 45' 58.90" N

71 0 49' 15.66" W

NAD83

2044 (nearest foot)

428 (nearest foot)

White Paint Only

N/A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

23 of 25 refiling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: W4

FCC Number:

Prior ASN: 2009-WTE-6131-0E

Common Frequency Bands

Low Freq HIgh Freq

Specific Frequencies

Freq Unit ERP

https://oeaaa.faa.gov/oeaaaJ extemaVeFilingllocationAction.i sD?action=~how TO(,l'Iti .. m P Ann

« OE/AM

ERP unit!

I I I

~/lhnolo

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Name: IBERD-000140851-10 IBERDROLA RENEWABLES i...-":'~ ___ _

Details for Case: W3

Show Project Summary

Status:

201O-WTE-2095-0E

Work In Progress

construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other: Recommended Marking/Lighting:

Current Marking/Lighting:

other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

430 46' 5.52" N

71 0 49' 8.32" W

NAD83

1922 (nearest foot)

428 (nearest foot)

White Paint Only

N/A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Munidpal Airport

22 of 25 refiling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: W3

FCC Number:

Prior ASN: 2009-WTE-6130-0E

Common Frequencv Bands

Low Freq High Freq

Specific Frequencies

Freq Unit ERP

https://oeaaa.faa.gov/oeaaaJexternal/eFiling/locationAction.isD?action=showT .or.l'Itl0nPortn

« OE/AAA

ERP

'Vl h/,"){\l {\

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation AdmInistration

Notice of Proposed Construction or Alteration· Off Airport

Project Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEW ABLES

Details for Case: W2

Show Project Summary

Case Status

ASN: 2010-WTE-2093-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of: Construction

Duration: Permanent

jf Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Height (AGL):

Other:

Marking/Lighting:

Other:

43 0 46' 8.81" N

71 0 48' 57.45" W

NAD83

1766 (nearest foot)

428 (nearest foot)

White Paint Only

N/A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

21 of 2S refiling for turbine relocatlon. lberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: W2

FCC Number:

Prior ASN: 2009-WTE-6129-0E

Common Frequency Bands

I..owFreq High Freq

Specific Frequencies

Freq unit ERP

htlps:lloeaaa.faa.gov/oeaaaJextemal/eFiling/locationActlon.isn?::I r.fl {)n=<;!h,mrT AI"'<>f'A ... Ii,., ........

« OE/AAA

ERP

'1/1 £: 1""1 A 1 A

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Admlnl$tratlon

Notice of Proposed Construction or Alteration· Off Airport

! Case Status

! ASN: 201O-WTE-2078-0E

i Status: Work In Progress

i Construction; Alteration Information I I Notice Of: Construction

! Duration: Permanent

! if Temporary: Months: Days:

I Work Schedule· Start: 12/06/2009

I Work Schedule· End: I I State Filing:

i Structure Details

12/06/2011

Details for Case: W1

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: W1

FCC Number:

Prior ASN: 2009-WTE-6128-0E

Common Frequency Bands

« Of; AAA

I I i

I·· I Latitude: 43 0 46' 11.76" N Low Freq ........ .. ···tiighFreq Freq unit ..... ER!> " ..... _ ..... ", ........ , ,,1

ERP Unltl

i Longitude:

i Horizontal Datum:

I Site Elevation (SE):

I Structure Height (AGL):

! Requested Marking/Lighting:

I i Other:

I Recommended Marking/Lighting:

j Current Marking/Lighting:

! I , ; Nearest City: I I Nearest State:

i Description of Location:

! I Description of Proposal:

Other:

71 0 48' 46.42" W

NAD83

1570 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

20 of 25 refiling for turbine relocation . Iberdola Renewables proposes the construction of the Groton wind project.

Specific Frequencies

i

i t

.~. f

, t

i

I ! I i L"'_'_'_A"~ '''~' ' _ 'WA.~ .• ~ .n~N_ . , ._"""~,,,,, ....... · .· ......• .....•. w._ ....................... _ •...... _ ............... _ ..... _._ .. -•.. ____ . ___ .. _._ .. ___ .. ____ . __ ,, ___________ ._. __ .... __ _ J

https:!!oeaaa.faa.gov!oeaaa/external!eFilingllocationAction. i sn?action=.;:h(')UT T r\1"<lt; ru ... t;' ro.~ ") 11 £/"\£'\"1 A

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Details for Case: N6

Show Project Summary

Case Status

ASN: 201O-WTE-2077-0E

Work In Progress

Construction / Alteration Information

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43 0 46' 30.58" N

71 0 49' 44.10" W

NAD83

1451 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red U9hts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

18 of 25 THIS IS A NEW TURBINE LOCA nON. Iberdola Renewables proposes the constructlon of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: N6

FCC Number:

Prior ASN:

Common Frequency Bands

Low Freq High Freq

Specific Frequencies

« OE/AAA

i=req Unit ERP ERP

https:lloeaaa.faa.gov/oeaaalextemaVeFiling/locationAction i"n?llC'tliln=<'hr",rT ,....~n+;~_L'~_

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviatlon Administration

Status: Work In Progress

construction I Alteration Information

Of: Construction

Duration: Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

Details for Case: N5

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: N5

FCC Number:

Prior ASN:

Common Frequency Bands

« OEjAAA

latitude:

longitude:

43 0 46' 50.57" N

71 0 49' 12.75" W

NAD83

iowFreq HlgtiF.eq ... ... ··· Fr.,qunliERP ..

Horizontal Datum:

Elevation (SE):

Other:

Recommended Marking/lighting:

Current Marking/lighting:

Other:

Nearest City:

Nearest State:

Description of location:

Description of Proposal:

1526 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structu re

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

17 of 25 THIS IS A NEW TURBINE LOCATION. Iberdola Renewables proposes the construction of the Groton wind project.

Specific Frequencies

https://oeaaa.faa.gov/oeaaaiexternaVeFiling/locationAct1()n i~n?ll{'t;"n=",h"n,T ""An~;~_T:'~_

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration· Off Airport

« OE/AAA

i_'"W WW'WW'W' ,,,W_'_'_" _"" W •• " '_W""_"._'" .••. _. __ •• "., ___ "' __ •.•. ~._._ .. ____ • _____ . _______ ". ____ • ___ ~w. ____ , ____ •• ______ • ______ •• _ . ______ ••• _, ___ ,,"_. _ ,,' __ .,

I Project Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEWABLES

Details for Case: N4

Show Project Summary

Case Status

ASN: 201O-WTE-2091-0E

Work In Progress

Construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months : Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/ 2011

Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other: Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43 0 46' 51.75" N

71 0 49' 25.28" W

NAD83

1632 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structu re

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

16 of 25 THIS IS A NEW TURBINE LOCATION . Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: N4

FCC Number:

Prior ASN:

Common Frequencv Bands Low Freq .... ······· Hiiili Freq '"

SpeCific Frequencies

Freq Unit ERP

https://oeaaa,faa.gov/oeaaaJexternaVeFiling/locationActl0n i<m?l"Il't;{'\n=~hnmT ,,~,.,+;~_1:'~_

ERP

· •... _ .. _----------Notice of Proposed Construction or Alteration - Off Airport

Federal Avtatlon Administration

Notice of Proposed Construction or Alteration - Off Airport

« OE/AAA

, ... _-........ - .. -.-_ ......... - .. "'." ....•....• ,', . ....... , .. , "',.- ....... , ' ...... , ..... ..... -.. , ... , ... " .. ... - ... .. , ...... , ...• '-"".,-" ---''' '-, ... ,. __ ., .. _-,-_._-,-",,-,, .. '' .. __ .. _._-_ ..... _ .. __ . __ ..... _--" ..... ,._---" .. ,._ .. ,-"] i Project Name: ~~ERD-~00140851:~ _ _ ______ , Sponsor: IBERDROLA RENEWABLES ._

Details for Case ; N3

Show Project Summary

c·- " ·--'-,,·,,,·-·-..... ----·-------"'''-'---·--·-'--·--'''·,,·-.--,,,-.-.. ---,,---.,--,,---I Case Status ; .... .

! ASN: 201O-WTE-2090-0E

i Status: Work In Progress

i Construction / Alteration Information I j Notice Of: Construction

I Duration:

I Work :~:::O::;':rt~ i Work Schedule - End: ! I State Filing:

! I Structure Details

lL.atit~d~:

Permanent

Months : Days :

12/06/2009

12/06/2011

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: N3

FCC Number:

Prior ASN: 2009-WTE-6127-0E

Common Frequency Bands " ... HigiiFie<j

i i I i I

." .... .. , ... j ERP Unit;

I I Longitude:

43 0 46' 52,81" N

71 0 49' 37,05" W

NAD83 Specific Frequencies i

.... . "...- ... ' ., .. .. _ ...... _ •. ' ' ..... _, . _ - ,,_ ... _ .• , ....... ... " ... .... '"." .... _._ .... ,., ,, _. , ,,_.j i Horizontal Datum:

! Site Elevation (SE):

: Structure Height (AGL):

i Requested Marking/Lighting:

Other:

i Recommended Marking/Lighting:

i Current Marking/Lighting:

! I , i Nearest City : , ! Nearest State:

I Description of Location:

I i DeSCription of Proposal : !

Other:

1592 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Munidpal Airport

15 of 25 refiling for turbine relocation , Iberdola Renewables proposes the construction of the Groton wind project,

https:lloeaaa.faa.gov/oeaaaiextemalieFiling/locatlonAdjon i<1n?<>f't;r\"-~h~ ... T

Notice of Proposed Construction or Alteration - Off Airport

Federal AViation AdmlnlStration

Notice of Proposed Construction or Alteration· Off Airport

Name: IBERD-000140851-10

Case Status

ASN: 201O-WTE-207S-0E

Work In Progress

Construction I Alteration Information

Notice Of: Construction

i Duration: Permanent i I if Temporary: Months: Days:

Sponsor: IBERDROLA RENEW ABLES

Details for Case: N2

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: N2

FCC Number:

« OE/AAA

i Work Schedule - Start: 12/06/2009 Prior ASN: 2009-WTE-6126-0E

I Work Schedule - End: 12/06/2011

I State Filing: ! I Structure Details

i latitude: I . ; longItude:

I Horizontal Datum: I i Site Elevation (SE):

I Structure Height (AGl): , i Requested Marking/lighting:

i Other: I Recommended Marking/lighting:

! Current Marking/lighting:

I Other:

I Nearest City:

i Nearest State:

I Description of location:

i

I Description of Proposal: I

43 0 46' 51.31" N

71 0 49' 50.36" W

NAD83

1576 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

14 of 25 refiling for turbine relocation. Iberdola Renewables proposes the oonstructlon of the Groton wind project.

Common Frequency Bands

Low Freq High Freq

Specific Frequencies

Freq unit ERP ERP unit! i j i !

https:/ loeaaa.faa.gov/oeaaalextemaVeFiling/locationAction.jsp?action=showLocationForm... 3/16/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal AvUitlon Adm inlstratlon

Notice of Proposed Construction or Alteration - Off Airport

« OE/AAA

i Project Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEWABLES ................. _ ...... _ ..... _ ............. __ ._ ........... _ . .,---._-_.- ..... _ .. _---_ .... _._-_ ... _ .. _-----------_._--_. __ .. _ ... _ ... _ .. -------_._._-_ ... _ ......... _. __ .-.. _ ............ -... -.. - .. --.--.. -~] ~______ ~~~~ ___________________________ ~~~_=~=_~~~~~~~ __________________________ J

Case Status

ASN:

Status:

201O-WTE-2074-0E

Work In Progress

Construction I Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Details for Case: N1

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: N1

FCC Number:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Prior ASN: 2009-WTE-6125-0E

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43 0 46' 49.95" N

710 50' 1.89" W

NAD83

1428 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

13 of 25 refiling for turbine relocation. lberdola Renewables proposes the construction of the Groton wind project.

Common Frequency Bands

Low Freq High Freq Freq Unit ERP

Specific Frequencies

https:lloeaaa.faa.gov/oeaaaiextemal/eFiling/locationAction.jsp?action=showLocationForm... 311612010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Name: IBERD-000140851-10

~_~'w~~_~~.~ _._~~_~~_,~

i Case Status f ! ASN: 2010-WTE-2073-0E

i Status: Work In Progress

I

i I Construction I Alteration Information f

: Notice Of: Construction

Duration: Permanent

if Temporary: Months: Days:

IBERDROLA RENEWABLES

Details for Case: E9

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E9

FCC Number:

« OE/AM

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Prior ASN: 2009-WTE-6120-0E

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43° 44' 45.95" N

71° 47' 28.78" W

NAD83

2104 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

12 of 25 refiling for turbine relocatlon. Iberdola Renewables proposes the construction of the Groton wind project.

Common Frequency Bands

Low Fraq !iraq Unit ERP ERP

Specific Frequencies

https:lloeaaa.faa.gov/oeaaalextemaVeFiling!locationAction.jsp?action=showLocationForm... 3/16/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Adm!nlstratlon

Notice of Proposed Construction or Alteration - Off Airport

Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEWABLES

Details for Case : E8

Show Project Summary

Case Status

ASN:

Status:

201O-WTE-2089-0E

Work In Progress

Construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Structure Details

latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43 0 44' 54.15" N

71 0 47' 23.81" W

NAD83

2032 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth MuniCipal Airport

11 of 25 reflling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E8

FCC Number:

Prior ASN: 2009-WTE-6119-0E

Common Frequency Bands

Low Freq High Freq

Specific Frequencies

---------~~-----

Freq Unit ERP

« OE/AAA

i !

ERP Unit;

!

https:lloeaaa.faa.gov/oeaaaiextemaVeFiling/locationAction.jsp?action=showLocationForm... 3/16/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal Avfatlon Administration

Notice of Proposed Construction or Alteration - Off Airport

I Project Name~ iBERD-OOO 140851-1 0 ------------------------ ·····------S;,~;.;;;IBERDROLA-RENEWABLES----~ -

Details for Case: E7

Show Project Summary

: Case Status

; ASN: 2010-WTE-2088-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

: State Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

: Recommended Marking/Lighting:

; Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

: Description of Location: I

: Description of Proposal: I

43 0 45' 7.31" N

71 0 47' 22.52" W

NAD83

2068 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

10 of 25 refiling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E7

FCC Number:

Prior ASN: 2009-WTE-6118-0E

Common Frequency Bands

Low Freq High Freq

Specific Frequencies

« OE/AAA

Freq Unit ERP ERP unit!

https:lloeaaa.faa.gov/oeaaa/ extemaVeFilingilocationAction.j sp?action=show LocationF orm... 3/1612010

Notice of Proposed Construction or Alteration - Off Airport

Federa' Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Name: IBERD-000140851-10

r~~~--'~'~¥_A~' __ -~'¥~A~~~W~"

i Case Status f i ASN: 201O-WTE-2072-0E i I Status: Work In Progress

I ~ Construction / Alteration Information

I Notice Of: Construction

I Duration: Permanent

I if Temporary: Months: Days:

Sponsor: IBERDROLA RENEWABLES

Details for Case: E6

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E6

FCC Number:

: Work Schedule - Start: 12/06/2009 Prior ASN: 2009-WTE-6117-0E

i Work Schedule - End: 12/06/2011 I i State Filing:

I I Structure Details I ~ I latitude: 43° 45' 15.36" N

I Longitude: 71° 47' 17.73" W I i Horizontal Datum: NAD83

I Site Elevation (SE): 1998 (nearest foot)

: Structure Height (AGL): 428 (nearest foot)

I Requested Marking/Lighting: White Paint/Synchronized Red Ughts

Other:

Recommended Marking/Lighting:

Marking/Lighting: N/ A New Structure

Other: =:J Nearest City: Plymouth

Nearest State: New Hampshire

Description of Location: 3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

Description of Proposal: 9 of 25 reflilng for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind proJect.

Common Frequency Bands

LOW Freq High Freq Freq Unit

Specific Frequencies

« OE/AAA

ERP ERP

https:lloeaaa.faa.gov/oeaaaiextemaVeFiling/locationAction.jsp?action=showLocationForrn... 3/1612010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviatlon Administration

Notice of Proposed Construction or Alteration - Off Airport

Details for Case: E5

Show Project Summary

Case Status

ASN: 201O-WTE-2087-0E

Work In Progress

, Construction / Alteration Information ! I Notice Of: I . I DuratIon:

I if Temporary :

Construction

Permanent

Months: Days:

! Work Schedule - Start: 12/06/2009 i i Work Schedule - End: 12/06/2011 , i State Filing:

I ! Structure Details ! ! Latitude: I

i Longitude:

I Horizontal Datum:

I Site Elevation (SE):

i Structure Height (AGL):

I Requested Marking/Lighting: f

Other:

! Recommended Marking/Lighting: ! I Current Marking/Lighting:

I Other:

I Nearest City:

I Nearest State: I I Description of Location:

I I I Description of Proposal: I

43 0 45' 22.11" N

71 0 47' 10.67" W

NAD83

2094 (nearest foot)

428 (nearest foot)

White Paint Only

N/A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Munldpal Airport

8 of 25 refiling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E5

FCC Number:

Prior ASN: 2009-WTE-6116-0E

Common Frequency Bands

Low Freq High Freq

Specific Frequencies

« OE/AAA

Freq unit ERP ERP

https:lloeaaa.faa.gov/oeaaa/extemaVeFiling/locationAction.jsp?action=showLocationFonn... 3/1612010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Name: IBERD-000140851-10 Sponsor: IBERDROLA

Details for Case: E4

Show Project Summary

: Case Status ! IASN: I iStatus:

201O-WTE-2086-0E

Work In Progress

i Construction I Alteration Information

I Notice Of: Construction

1 Duration: Permanent

! if Temporary: Months: Days:

i Work Schedule - Start: 12/06/2009

I Work Schedule - End: 12/06/2011 i i State Filing:

I i Structure Details I i Latitude: I I Longitude:

I Horizontal Datum:

430 45' 30.83" N

71 0 47' 8.85" W

NAD83

i Site Elevation (SE): 2024 (nearest foot)

I Structure Height (AGL): 428 (nearest foot)

: Requested Marking/Lighting: White Paint Only

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Munldpal Airport

7 of 25 refiling for turbine relocation. lberdola Renewables proposes the construction of the Groton wind proJect.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E4

FCC Number:

Prior ASN: 2009-WTE-6115-0E

Common Frequency Bands

Low Freq High Freq

Specific Frequencies

« OE/AAA

Freq Unit ERP ERP

https:lloeaaa.faa.gov/oeaaaiextemal/eFiling/locationAction.jsp?action=showLocationFonn... 3/16/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Adm Inistration

Notice of Proposed Construction or Alteration - Off Airport

Project Name: IBERD-000140851-10 Sponsor: T"~:O riD'"

Details for Case: E3

Show Project Summary

Case Status

ASN: 2010-WTE-2085-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

Filing:

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43° 45' 38.48" N

71° 47' 9.01" W

NAD83

1880 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

6 of 25 refillng for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind proJect.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E3

FCC Number:

Prior ASN: 2009-WTE-6114-0E

Common Frequencv Bands

Low Freq High Freq

Specific Frequencies

Freq Unit ERP

« OE/AAA

I I

ERP unit;

I I

j

https:lloeaaa.faa.gov/oeaaaJ extemaVeFiling/locationAction.j sp?action=show LocationF onn... 3/16/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal AViatIon Administration

Notice of Proposed Construction or Alteration - Off Airport

IBERDROLA RENEWABLES

Case Status

!ASN:

'Status:

2010-WTE-2071-0E

Work In Progress

Details for Case: E2

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: 02/26/2010 'Il FAA Turbine Coord".

02/26/2010 S Proposed FAA Ugh ...

I i Construction / Alteration Information I ! Notice Of: Construction ! ! Duration: Permanent

if Temporary: Months: Days:

: Work Schedule - Start: 12/06/2009

i Work Schedule - End: 12/06/2011

i State Filing: ! I Structure Details

!Latitude: 43 0 45' 46,58" N

I Longitude: 71 0 47' 9.97" W

I Horizontal Datum: NAD83

!Site Elevation (SE): 1777 (nearest foot)

! Structure Height (AGL): 428 (nearest foot)

i Requested Markingl Lighting: White Paint/Synchronized Red Ughts

I Other: I Recommended Marking/Lighting:

! Current Marking/Lighting:

; Nearest City:

: Nearest State:

: Description of Location: ! t I Description of Proposal:

I L~ _______ ~ __

Other:

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Munldpal Airport

5 of 25 refiling for turbine relocation. lberdola Renewables proposes the construction of the Groton wind project.

Structure Summary

Structure Type: Wind Turbine

Structure Name: E2

FCC Number:

Prior ASN: 2009-WTE-6113-OE

Common Frequency Bands

Low Fr.q High Freq Freq Unit ERP

Specific Frequencies

https:lloeaaa.faa.gov/oeaaaiextemaVeFiling/locationAction.jsp?action=showLocationForm

m

« OE/MA

1/1 "n() 1 ()

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

'Project Name: IBERD-000140851-10

Case Status

ASN: 2010-WTE-2076-0E

Status: Work In Progress

Construction / Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Sponsor: IBERDROLA RENEWABLES

Details for Case: E13

Show Project Summary

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E13

FCC Number:

-------------- -----

« OE/AAA

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

State Filing:

Prior ASN: 2009-WTE-6124-0E

Structure Details

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

Requested Marking/Lighting:

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43 0 44' 13.49" N

71 0 47' 37.28" W

NAD83

2231 (nearest foot)

428 (nearest foot)

White Paint/Synchronized Red Ughts

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

4 of 25 refillng for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Common Frequency Bands

Low Freq High Freq Freq Unit ERP

Specific Frequencies

https:lloeaaa.faa.gov/oeaaaiextemal/eFiling/locationAction.jsp?action=showLocationForm... 3116/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviatlon Administration

Notice of Proposed Construction or Alteration - Off Airport

Details for Case: E12

Show Project Summary

Case Status

ASN:

Status:

Of:

201O-WTE-2084-0E

Work In Progress

Construction

Permanent

If Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End: 12/06/2011

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: E12

FCC Number:

Prior ASN: 2009-WTE-6123-0E

Structure Details Common Frequency Bands

Other:

Recommended Marking/Lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

430 44' 21.54" N

71 0 47' 33.60" W

NAD83

2254 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

3 of 25 refillng for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind proJect.

Low Freq High Freq

Specific Frequencies

« OE/AAA

Freq Unit ERP ERP unlti

I

https:lloeaaa.faa.gov/oeaaalexternal! eFilingllocationAction.i sp?action=showLocationF orm... 3116/2010

Notice of Proposed Construction or Alteration - Off Airport

Federal AViatlon Adm inistratlon

Notice of Proposed Construction or Alteration - Off Airport

Project Name: IBERD-000140851-10 Sponsor:

Details for Case: E11

Show Project Summary

r-'~-~~~~~~ ~ ____ V_"_"_~~ v' ,,~~"¥~~_, -,-

I Case Status

! ASN: 201O-WTE-2082-0E

I Status:

i I

i

Work In Progress

I Construction / Alteration Information ! i Notice Of: Construction ! : Duration:

I if Temporary: ,

Permanent

Months: Days:

! Work Schedule - Start: 12/06/2009

I Work Schedule - End: 12/06/2011

; State Filing:

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: Ell

FCC Number:

Prior ASN: 2009-WTE-6122-0E

Structure Details Common Frequencv Bands

Latitude:

Longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

i Requested Marking/Lighting:

Other:

i Recommended Marking/Lighting:

Current Marking/lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

43° 44' 30.31" N

71° 47' 34.76" W

NAD83

2138 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structure

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Munldpal Airport

2 of 25 reflling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Low Freq High "req

Specific Frequencies

<, OE/AAA

Freq Unit ERP ERP

https:lloeaaa.faa.gov/ oeaaalextemaVeFilingilocationAction.j sp?action=show LocationF onn... 3/1612010

Notice of Proposed Construction or Alteration - Off Airport

Federal Aviation Administration

Notice of Proposed Construction or Alteration - Off Airport

Project Name: IBERD-000140851-10 Sponsor: IBERDROLA RENEW ABLES

Details for Case: E10

ShOw Project Summary

,Y~~-Y ~~_~~<

i Case Status t i ASN: 201O-WTE-2083-0E

! Status: Work In Progress i

construction I Alteration Information

Notice Of:

Duration:

Construction

Permanent

if Temporary: Months: Days:

Work Schedule - Start: 12/06/2009

Work Schedule - End:

State Filing:

Structure Details

latitude:

longitude:

Horizontal Datum:

Site Elevation (SE):

Structure Height (AGL):

12/06/2011

Requested Marking/Lighting:

Other:

Recommended Marking/lighting:

Current Marking/Lighting:

Other:

Nearest City:

Nearest State:

Description of Location:

Description of Proposal:

430 44' 37.48" N

71 0 47' 28.42" W

NAD83

2148 (nearest foot)

428 (nearest foot)

White Paint Only

N/ A New Structu re

Plymouth

New Hampshire

3.9 miles from Plymout NH and 1.4 miles from Plymouth Municipal Airport

1 of 25 reflling for turbine relocation. Iberdola Renewables proposes the construction of the Groton wind project.

Date Accepted: 02/26/2010

Date Determined:

Letters: None

Documents: None

Structure Summary

Structure Type: Wind Turbine

Structure Name: ElO

FCC Number:

Prior ASN: 2009-WTE-6121-0E

Common frequency Bands

Low Freq High Freq

Specific frequencies

« OE/AAA

Freq Unit ERP ERP