Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012....

123
Notice of Letting Transportation Bulletin Illinois Department of Transportation 2300 South Dirksen Parkway, Springfield, Illinois 62764 HELP & INFORMATION FEDERAL FRAUD HOTLINE Letting Date:

Transcript of Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012....

Page 1: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Notice of Letting

Transportation BulletinIllinois Department of Transportation

2300 South Dirksen Parkway, Springfield, Illinois 62764

HELP &

INFORMATION

FEDERAL FRAUD

HOTLINE

Letting Date:

marstonml
Oval
marstonml
Note
Accepted set by marstonml
Page 2: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

STATE OF ILLINOIS Department of Transportation 2300 South Dirksen Parkway

Springfield, Illinois 62764 The Transportation Bulletin is the official Illinois Procurement Bulletin for the Illinois Department of Transportation as authorized by Section 15-1 of the Illinois Procurement Code, 30 ILCS 500/15-1. It is available on the Web at http://www.dot.il.gov and through the IDOT Subscription Service. Three versions of the Transportation Bulletin are currently published.

Transportation Procurement Bulletin

Professional Transportation Bulletin

Invitation for Bids

Questions concerning file downloads and/or subscription service information should be directed to Tim Garman at 217-524-1642 or email [email protected].

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 3: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Transportation Procurement Bulletin Formerly published as the Transportation Bulletin – Weekly Procurement, this bulletin is now located at http://www.dot.il.gov/desenv/transprocbulletin.html. It features procurement information for the construction and consulting industry, and the general public. Postings include Invitations to Bid and Request for Proposals from a variety of Bureaus within the Department of Transportation. The site also features important procurement information and links to contract award notices for construction and engineering, sole source procurements, emergency purchases, change orders which exceed $30,000, and renewal notices. Questions concerning this Bulletin should be directed to:

Tim Garman or E-mail [email protected] 2300 South Dirksen Parkway Room 326 Springfield, IL 62764 217-524-1642

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 4: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Professional Transportation Bulletin Contains information pertaining to the advertisement for offers of interest for professional services for Department of Transportation projects. Questions concerning this Bulletin should be directed to:

Carrie Kowalski or E-mail [email protected] 2300 South Dirksen Parkway Room 330 Springfield, IL 62764

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 5: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Invitation For Bids

Contains information pertaining to the advertisement for bidding of Highways, Aeronautics and Department of Natural Resources. Questions concerning this Bulletin should be directed to:

Jim Layden Rm 326 (217) 782-7806 [email protected]

Ted Walschleger Rm 330 (217) 782-4894 [email protected]

2300 South Dirksen Parkway Springfield, IL 62764

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 6: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Illinois Department of Transportation

INVITATION FOR BIDS

Volume 15 Springfield, Illinois, March 23, 2011 No. 12 This invitation is the official advertisement and solicitation for bids issued by the Illinois Department of Transportation to secure the performance of highway work by contract, airport work by contract and contract work solicited by the Illinois Department of Natural Resources. The Invitation for Bids is published in this Transportation Bulletin and is available on the Department’s website at http://www.dot.il.gov and through electronic subscription. Questions concerning this invitation should be directed to:

Mr. Jim Layden Harry R. Hanley Building

Room 326 2300 South Dirksen Parkway

Springfield, IL 62764 (217)782-7806

Fax: (217)785-1141 TDD: (217)524-4875

[email protected]

NOTICE OF LETTING – April 27, 2012 1. LETTING DUE DATE AND TIME FOR SUBMISSION AND OPENING OF BIDS. The

Department of Transportation is requesting offers in the form of sealed bids from responsible contractors to fill the State’s needs as described in this invitation. Sealed bids for the contract items described herein will be accepted at the above address of the Chief Contract Official and at the auditorium in the Harry R. Hanley Building by U.S. Mail, delivery service or hand deposit until 10:00 a.m. prevailing local time April 27, 2012, at which time the bids will be publicly opened and read. The Department will not open or read bids received after the stated opening date and time.

2. RULES GOVERNING LETTING. This letting is subject to and governed by the rules of the

Department adopted at 44 Illinois Administrative Code Part 650 and Part 6, and by the provisions of this invitation. Copies of the rules are available by contacting the above address of the Chief Contracts Official.

3. INSTRUCTIONS TO BIDDERS. Read the following instructions carefully before submitting

any bid. Failure to follow these instructions and the rules may result in the rejection of your bid. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 7: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

(a) CONTRACT ITEM DESCRIPTIONS. A summary description of each contract item advertised in this invitation is given following these instructions by item numbers. Bids shall be submitted by item number. A contract number appears after the item number. The contract number will also be shown on the contract documents for the contract that the item number represents. The summary description provided for the proposed work, quantities and time for completion for each item are for information only and are subject to the terms published in the contract documents for bidding.

(b) CONTRACT DOCUMENTS FOR BIDDING. Contract documents for bidding include

a Notice to Bidders, Specifications, Proposal, Contract and Contract Bond document and a set of Plan documents. These documents may be separate or combined into one document. Contract documents for bidding applicable to each item number advertised in this invitation may be examined at the above address of the Chief Contracts Official. In addition, contract documents for bidding highway work may be examined at the respective District Offices in which the prospective work is located. The names and addresses of the District Engineers are as follows:

REGION DISTRICT ENGINEER ADDRESS

1 1 D. M. O'Keefe 201 West Center Court, Schaumburg, IL 60196-1096

2 2 E. S. Therkildsen 819 Depot Avenue, Dixon, IL 61021-3546

2 3 E. S. Therkildsen 700 East Norris Drive, PO Box 697, Ottawa, IL 61350-0697

3 4 J. E. Crowe 401 Main Street, Peoria, IL 61602-1111

3 5 J. E. Crowe 13473 IL Hwy 133, PO Box 610, Paris, IL 61944-0610

4 6 R. L. Driskell 126 East Ash Street, Springfield, IL 62704-4792

4 7 R. L. Driskell 400 West Wabash, Effingham, IL 62401-2699

5 8 Omer Osman 1102 Eastport Plaza Dr., Collinsville, IL 62234-6198

5 9 Omer Osman State Transportation Bldg., PO Box 100, Carbondale, IL 62901-0100

Contract documents for bidding will not be loaned to prospective bidders. Electronic plans and proposals may be downloaded from the Department’s web site http://www.dot.il.gov/desenv/delett.html.

(c) PREQUALIFICATION. Any contractor desiring to submit a bid shall be prequalified in accordance with the rules of the Department, adopted at 44 Illinois Administrative Code Section 650, prior to being granted authorization to bid. Prequalification may be waived for particular contract items. In such cases, the manner of determining bidder responsibility will be stated in the contract documents for bidding. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor’s Statement of Experience and Financial Condition no later than 4:30 p.m. prevailing local time, April 6, 2012. A contractor will not be prequalified for this letting unless the statement is received before the time and day established.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 8: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

(d) AUTHORIZATION TO BID. Contractors planning to submit a bid MUST request authorization to bid prior to 4:30 p.m. prevailing time April 24, 2012. No authorization to bid will be issued after that time. Requests for authorization to bid submitted by U.S. Mail or courier delivery will not be honored unless received prior to 4:30 p.m. prevailing local time April 24, 2012 at the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764. The Request for Authorization to Bid/or Not For Bid Status” (BDE 124) can be downloaded from the Department’s Website.

(e) AFFIDAVIT OF AVAILABILITY. In addition to the authorization to bid, prospective

bidders shall submit an Affidavit of Availability prior to 4:30 p.m. prevailing time April 24, 2012. The Affidavit must include all uncompleted contracts awarded to them and all low bids pending award for all public and private work using the prescribed format. The sworn statement relative to contracts and pending awards must be in complete detail, be properly signed and be notarized. Facsimiles of the sworn statement will be accepted for analysis, but Authorization to Bid will be issued only upon receipt of a signed and properly completed original Affidavit of Availability. Any omission or misstatement of fact in the sworn statement will be considered as sufficient grounds for the disqualification of the bidder and the rejection of bids. Prospective bidders shall notify the Department within two working days of any low bids pending award or contracts awarded which might occur between the date of submission of the sworn statement and the date of letting. The Affidavit of Availability (BC 57). can be downloaded from the Department’s Website.

(f) JOINT VENTURES. Prequalified contractors desiring to bid as a joint venture must

submit the properly completed documentation no later than 4:30 p.m. prevailing local time April 20, 2012. The required forms for the joint venture are:

“Affidavit of Availability” (BC 57) from each of the joint venture entities, “Certificate of Joint Venture” (BC 2267), “Request for Authorization to Bid/or Not for Bid Status” (BDE 124).

The Certificate of Joint Venture and the Request for Authorization to Bid/or Not for Bid Status forms must be in the name of the Joint Venture. The original, signed and notarized Certificate of Joint Venture and Affidavits of Availability must be received before consideration will be given for the Joint Venture request.

(g) EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF THE WORK. The

bidder shall, before submitting a bid on any contract item, carefully examine the provisions of the contract documents for bidding and all contract documents referenced therein that comprise the contract as defined in Article 101.09 of the Standard Specifications for Road and Bridge Construction. The bidder shall inspect in detail the site of the proposed work, investigate and become familiar with all the local conditions affecting the contract and the detailed requirements for construction.

If the Department has made a sub-surface examination of the site of the work, the borings, test pits, or other information pertaining thereto are available for examination by all bidders by written request to the office of the District Engineer of the district in which the work is to be performed. The availability of subsurface information from the Department is solely for the convenience and information of the bidder and shall not relieve the bidder of the duty to make, and the risk of making, examinations and investigations as required to assess conditions affecting the work. Any data furnished in the contract plans is for information only and does not constitute a part of the contract. The Department makes no representation or warranty, expressed or implied, as to the information conveyed or as to any interpretations made from the data.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 9: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Submission of a bid shall be a conclusive assurance and warranty the bidder has made these examinations and the bidder understands all requirements for the performance of the work. If the bid is accepted, the bidder will be responsible for all errors in the proposal resulting from a failure or neglect to comply with these instructions. The Department will not be responsible for any costs, expenses, losses, or change in anticipated profits resulting from such failure or neglect of the bidder to make these examinations. The bidder shall take no advantage of any error or omission in the proposal and advertised contract. Any prospective bidder who desires an explanation or interpretation of the plans, specifications, or any of the contract documents, shall request such in writing from the Central Bureau of Design and Environment at the above address of the Chief Contracts Official. The request should be made in sufficient time to allow a written reply by the Department that can reach all prospective bidders before submission of their bids. Any reply given a prospective bidder concerning any of the contract documents, plans, and specifications will be furnished to all prospective bidders in the form determined by the Department including, but not limited to, an addendum, if the information is deemed by the Department to be necessary in submitting bids or if the Department concludes the information would aid competition. Oral explanations, interpretations, or instructions given before the submission of bids unless at a pre-bid conference will not be binding on the Department.

(h) ADDITIONAL INSTRUCTIONS. The Notice to Bidders, Specifications, Proposal,

Contract and Contract Bond document for each contract item includes specific and additional information and instructions pertaining to submission of bids. That information should be carefully read and the instructions followed by the bidder.

4. IMPORTANT DATES FOR BIDDERS. All due dates published in this invitation are

summarized for convenient reference by potential bidders on the page entitled “Important Dates for Bidders”. Bidders are cautioned that all due dates are strictly enforced.

5. PART OF THE CONTRACT. This invitation is made part of the contract by operation of

Article 101.09 of the Standard Specifications for Road and Bridge Construction. This invitation issued under the authority of the Department of Transportation, State of Illinois. Ann L. Schneider Secretary of Transportation

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 10: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

IMPORTANT DATES FOR BIDDERS

April 27, 2012 Bid Opening

PREQUALIFICATION

Any contractor who desires to become prequalified to bid on work advertised by IDOT must submit the properly completed prequalification forms to the Bureau of Construction no later than 4:30 p.m. prevailing time twenty-one days prior to the letting of interest. This prequalification requirement applies to first time contractors, contractors renewing expired ratings, contractors maintaining continuous prequalification or contractors requesting revised ratings The prequalification cut-off date is 4:30 p.m. prevailing time April 6, 2012 . To be eligible to bid, existing prequalification ratings must be effective through the date of letting.

JOINT VENTURES Prequalified contractors wishing to combine bidding capacity and bid items as joint ventures must submit the appropriate properly completed forms no later than 4:30 p.m. prevailing time, seven (7) days prior to the letting date. The required joint venture forms are the “Request for Authorization to Bid/or Not for Bid Status” (BDE 124), the ORIGINAL “Affidavit of Availability” (BC 57) and the ORIGINAL “Certificate of Joint Venture” (BC 2267). The Joint venture cut-off date is 4:30 p.m. prevailing time April 20, 2012 .

REQUESTS FOR AUTHORIZATION TO BID Contractors wanting to bid on items included in a particular letting must submit the properly completed “Request for Authorization to Bid/or Not for Bid Status” (BDE 124) and the properly completed ORIGINAL “Affidavit of Availability” (BC 57) to the proper office no later than 4:30 p.m. prevailing time, three (3) days prior to the letting date. The Authorization to Bid request cut-off date is 4:30 p.m. prevailing time April 24, 2012 .

SUBMITTAL OF BIDS The time and place of letting is always listed in the Transportation Bulletin. Most lettings are held at 10:00 a.m. prevailing time in the Auditorium of the IDOT Harry R. Hanley Building located at 2300 South Dirksen Parkway, Springfield, Illinois. No bid will be accepted unless delivered prior to the time specified in the Transportation Bulletin. Bidders submitting bids by U.S. Mail or courier are cautioned to allow sufficient time for delivery.

DBE UTILIZATION PLANS Projects with DBE participation require all bidders to submit a DBE Utilization Plan with their bid.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 11: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Transportation Bulletin

Pre‐Qualification "Cut Off"

Joint Venture "Cut Off"

Bid Authorization "Cut Off"

Letting Day DBE Utilization Plan        (SBE 2025 and SBE 2026)

3/23/2012 4/6/2012 4/20/2012 4/24/2012 4/27/2012 Submit With Bid

5/11/2012 5/25/2012 6/8/2012 6/12/2012 6/15/2012 Submit With Bid

6/29/2012 7/13/2012 7/27/2012 7/31/2012 8/3/2012 Submit With Bid

8/17/2012 8/31/2012 9/14/2012 9/18/2012 9/21/2012 Submit With Bid

10/5/2012 10/19/2012 11/2/2012 11/7/2012 11/9/2012 Submit With Bid

12/7/2012 12/28/2012 1/11/2013 1/15/2013 1/18/2013 Submit With Bid

2/1/2013 3/15/2013 3/1/2013 3/5/2013 3/8/2013 Submit With Bid

3/22/2013 4/5/2013 4/19/2013 4/23/2013 4/26/2013 Submit With Bid

5/10/2013 5/24/2013 6/7/2013 6/11/2013 6/14/2013 Submit With Bid

6/28/2013 7/12/2013 7/26/2013 7/30/2013 8/2/2013 Submit With Bid

8/16/2013 8/30/2013 9/13/2013 9/17/2013 9/20/2013 Submit With Bid

10/4/2013 10/18/2013 11/1/2013 11/5/2013 11/8/2013 Submit With Bid

IDOT LETTING SCHEDULE

2012 - 2013

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 12: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

“LETTING YOU KNOW” The Illinois Department of Transportation (IDOT) is interested in maintaining close communications with industry. This newsletter highlights subjects which we believe will be of interest to you.

No. 132 March 2012

WEEKLY TRUCKING REPORT

To more precisely track and report DBE goal credit, beginning with the June 15, 2012 letting, the department will be requiring contractors to provide a weekly summary of all trucks used on a construction jobsite. The summary will include such items as contractor information, contract information, trucking company, DBE status, dates of trucking and other information. See the inserted contract special provision for further details.

PROJECT LABOR AGREEMENT REPORTING

Pursuant to the Project Labor Agreements (PLA) Act, Public Act 97-0199, the department is required to submit quarterly reports regarding the number of minorities and females employed under these agreements. As a result, contractors with projects containing PLAs will be required to submit data to the department on a quarterly basis. The data should be provided to the Central Bureau of Construction on form BC 820. The reports are due the 15th of the month following the end of the quarter (I.e., April 15 for the January-March reporting period). Contracts in this and future lettings contain a special provision outlining the requirements.

PESTICIDE REPORT

The department is now required to report pesticide, herbicide, fungicide, etc., use on our ROW in accordance with the National Pollutant Discharge Elimination System general permit ILG87. Required data includes date, location, applicator name and license, weather conditions and other information. In order to comply with this requirement, effective immediately, the department is requiring that the contractor submit a properly completed form OPER 2720 within 48 hours of the application of any of the reportable applications within the ROW. The form will be available on the department’s website.

MULTI-YEAR CONTRACT RECERTIFICATION

In accordance with PA 96-0795, prime contractors with a multi-year contract and subcontractors with a multi-year subcontract are required to recertify per the Illinois Procurement Code, Section 50-2, by July 1

of each year.

In May the department will determine which prime contracts are considered multi-year and will notify the prime contractors. The prime contractors will be required to submit the Multi-Year Contract Recertification form for each contract into the Vendor Doc. System.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 13: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

In addition, the prime contractors will need to determine if they have a subcontract agreement with any subcontractor that would be considered multi-year (greater than 365 days). If so, the prime will need to submit the subcontractor’s Multi-Year Contract Recertification form into the Vendor Doc. system The Multi-Year Contract Recertification form will be located on the department’s website along with the other PA 96-0795 documents.

PROFILE EQUIPMENT VERIFICATION (PEV) PROGRAM

The 2012 Profile Equipment Verification (PEV) program will be conducted by Applied Pavement Technology, Inc. this spring on behalf of the Bureau of Materials and Physical Research. The PEV program was established to address changes to the Special Provision for Surface Testing of Pavements that were made effective as of the August 5, 2005 letting. These changes require any contractor on a project using this Special Provision (0.00-inch Blanking Band) to verify their profile equipment through the PEV program. This also applies to equipment used by a subcontractor on the project. The 2012 PEV program is tentatively scheduled for the weeks of April 23 and April 30, 2012 at the Rantoul Airport. Participants in last year's program will need to have their profile equipment re-verified (this is an annual program). If you or a subcontractor have profile equipment to be verified, please contact either of the following individuals for scheduling:

NOTE: No walk-ins will be allowed.

John Storm Applied Pavement Technology, Inc. (217) 398-3977 [email protected]

Dustin Pulleyblank Applied Pavement Technology, Inc. (217) 398-3977 [email protected] If you have any questions regarding the PEV Program, please contact the following individual at the Bureau of Materials and Physical Research:

LaDonna Rowden Illinois Department of Transportation Bureau of Materials and Physical Research (217) 782-8582 [email protected]

STAY INFORMED!

Keep in touch with your representative on the IDOT/Industry Policy Committee and the IDOT/Industry Joint Co-op Committee.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 14: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Bureau of Design and Environment Contractor Publications

Electronic Subscription Service

To receive construction contractor related publications and reports through the free subscription service, please follow the instructions to subscribe. The information will be automatically emailed to the subscriber on the publish date. The following publications and reports are currently available for subscription: To subscribe to the list, click on “SUBSCRIBE” and send the blank email that opens (Don’t add anything to the subject line or to the body of the email). Directions for unsubscribing are included with each email notification. IDOT Contractor’s Packet SUBSCRIBE PLEASE NOTE: The IDOT Contractor’s Packet automatically subscribes the requestor to all of the following publications and reports. Those not wishing to receive all of the following lists can subscribe to the desired lists individually

IDOT Addendum/Revision Checklist SUBSCRIBE A list showing Letting items that have changed as a result of a revision or an addendum. The contractors should use this checklist to ensure they have incorporated into their plans and proposals all addenda that have been issued for each particular letting item. The checklist also identifies withdrawn and deleted items. The checklist is published regularly whenever addenda are processed. IDOT Aeronautics Unit Price Tabulation of Bids SUBSCRIBE A listing of all unit price bids on awarded jobs for the letting, sorted by letting item. The listing identifies the actual bidders, the as-read bid amounts, the corrected bid amounts (if applicable) and the low bidders. The listing is not published until jobs are awarded. Typically, Unit Price Tabulation of Bids listings begin to be published four to eight weeks after the letting, excluding the federal discretionary seeking projects placed on the March and August lettings. These may take several months before funds are secured and the projects awarded.

IDOT As Read Tabulation of Bids SUBSCRIBE A listing of all bids as they were read at the bid opening. The bid amounts are not checked at the time this listing is produced. This listing also includes a page which identifies all letting items for which the as read low bid was, prior to a post letting review, within a reasonable approximation of the Engineer’s estimate. The listing is usually published by 4:30 p.m. of the day of the letting. IDOT Price Indices SUBSCRIBE A monthly posting of the average price of Bituminous, Steel and Fuel; used in determining cost adjustments on contracts containing the special provision.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 15: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

IDOT CBID Files SUBSCRIBE The CBID files contain the pay items and quantities for a contract, as well as macros to prepare and print a bid. These files are in Microsoft Excel format (xls). CBID files are put on the Website as they become available. It is your responsibility to determine which, if any, addenda pertains to any project you may be bidding. Failure to incorporate all relevant addenda may cause your bid to be declared unacceptable. Note that the CBID filename is the same as the IDOT Contract Number. Please refer to the Transportation Bulletin – Notice of Letting for the correct contract number. IDOT Construction Contractor’s Transportation Bulletin – Notice of Letting SUBSCRIBE This is the official publication and invitation for construction bids by the Illinois Department of Transportation’s Division of Highways, IDOT Division of Aeronautics and the Illinois Department of Natural Resources. The bulletin also contains information pertaining to pre-bid meetings, the DBE program and other current information. The bulletin will be published on the advertised publish date for each regularly scheduled letting. Special lettings will have applicable bulletins published at least 14 days prior to the letting on an as-needed basis. IDOT Corrected Tabulation of Bids SUBSCRIBE A report that lists of all bids for the letting, sorted by letting item. All bids have been recalculated and checked before this listing is produced. The report identifies the eligible bidders, the actual bidders, the as-read bid amounts, the corrected bid amounts (if applicable) and the low bidders for the letting. The listing is usually published within 14 days after the letting. IDOT Federal Wage Rates Listing SUBSCRIBE Identifies the current federal wage rates to be used by contractors for preparing bids whenever the construction activities are federally participating. The federal wage rates will be published 10 days prior to the letting date. IDOT For Bid List of Bidders SUBSCRIBE The IDOT For Bid List of Bidders is a compilation of all potential bidders who have been authorized to bid on each letting item for each letting. A separate list is compiled for each letting and the list is sorted by letting item. The list will be published several times with the last time being one day prior to the letting. IDOT Local Roads Contractors Bulletin SUBSCRIBE The Contractors Bulletin is a weekly publication advertising locally let and "material only, bids" for local agencies, counties, cities/villages, and road districts throughout the state. The bulletin is in three parts: (1) previous advertisements for two weeks, (2) new advertisements with a description of the job, the date and time of letting, description of the material needed for bidding and any other information, and (3) awarded projects identifying the successful bidder and the dollar amount. IDOT News Flash from BDE SUBSCRIBE A News Flash is important information released by the IDOT Bureau of Design and Environment which all contractors should read. This is information that becomes available after publication of the Notice of Letting Bulletin.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 16: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

IDOT Not For Bid List of Bidders SUBSCRIBE A compilation of companies interested in participating in a construction project as a sub-contractor or as a supplier. A separate list is compiled for each letting and the list is sorted by letting item. The list will be published several times prior to the Letting and a final list will be published the day before the Letting. IDOT Pay Item Report SUBSCRIBE A report showing all the pay items on the letting. For each pay item, the listing identifies the quantity, letting item number, contract number, county, IDOT district office and the unit of measure. The Pay Item Report will be published after all proposals have been posted to the Web Site. IDOT Pay Item Report with Awarded Prices SUBSCRIBE A listing of all pay items on a letting. For each pay item, the listing identifies the quantity, letting item number, contract number, county, IDOT district office and the unit of measure. This report has an added column which is the awarded unit price of each item. The Pay Item Report with Awarded Prices will be published after the last item on the letting is awarded. IDOT Unit Price Tabulation of Bids SUBSCRIBE A listing of all unit price bids on awarded jobs for the letting, sorted by letting item. Whereas the As Read Tabulation of Bids and the Corrected Tabulation of Bids provide the sum total amount bid for each letting item, the Unit Price Tabulation of Bids provides the break down of all bids per line item unit price, and it is only provided for awarded jobs. The listing identifies the actual bidders, the as-read bid amounts, the corrected bid amounts (if applicable) and the low bidders. The listing is not published until jobs are awarded. Typically, Unit Price Tabulation of Bids listings begin to be published within three weeks after the letting and may continue for up to 60 days. Jobs through the Division of Aeronautics and the Department of Natural Resources are not included. IDOT Transportation Procurement Bulletin SUBSCRIBE The Transportation Procurement Bulletin Web Page features procurement information for the construction and consulting industry, and the general public. Postings include Invitations to Bid and Request for Proposals from a variety of Bureaus within the Department of Transportation. The site also features important procurement information and links to contract award notices including sole source procurements, emergency purchases, change orders which exceed $30,000, and renewal notices. Subscribers will receive notification when new procurement opportunities are posted to the Web page.

If you have questions, contact Tim Garman at (217)524-1642 or [email protected]

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 17: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Electronic Subscription Service

Bureau of Design and Environment Manual and Procedure Memorandum Updates

Bureau of Design and Environment Manual The Bureau of Design and Environment Manual (BDE Manual) has been prepared to provide uniform policies and procedures for the Department and consultant personnel preparing Phase I studies and reports and contract plans for Department. The BDE Manual presents most of the information normally required for location, design and environmental evaluation of highway construction projects on the state highway system. Download the BDE Manual at: http://www.dot.il.gov/desenv/bdemanual.html BDE Procedure Memorandums The BDE Procedure Memorandums are used as a means to implement changes in procedures, policies, directives, and/or criteria in the interim between issuance of updates to the BDE Manual. The designer should refer to these when using the BDE Manual until such time as they are superseded or incorporated into an updated edition of the BDE Manual. BDE Procedure Memorandums are available at: http://www.dot.il.gov/desenv/bdemems.html To receive updates related to the BDE Manual and BDE Procedure Memorandums through the free subscription service, click on the link below and send the blank email that pops up. (Do not add anything to the subject line or to the body of the email). Directions for unsubscribing are included with each email notification. SUBSCRIBE to the BDE Manual and Procedure Memorandum Updates subscription list If you have questions, contact Tim Garman at (217)524-1642 or [email protected]

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 18: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Electronic Subscription Service

Highway Standards Highway Standards are drawings that show the details of various construction items and are considered part of the plans. The Highway Standards applicable to a particular contract are referenced on the cover sheet of the plans. The Highway Standards are only available electronically. To access them, please visit the Department’s website at http://www.dot.il.gov/desenv/hwystds/stnds.html

To receive updates related to the Highway Standards through the free subscription service, click on the link below and send the blank email that pops up. (Do not add anything to the subject line or to the body of the email). Directions for unsubscribing are included with each email notification. SUBSCRIBE to the Highway Standards subscription list

If you have questions, contact Tim Garman at (217)524-1642 or at [email protected]

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 19: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

NOTICE TO ALL BIDDERS TO REPORT BID RIGGING, BIDDER COLLUSION OR OTHER FRAUDULENT ACTIVITIES The U.S. Department of Transportation (USDOT) maintains a Hotline Complaint Centerand operates a toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., easterntime. Anyone with knowledge of possible bid rigging, bidder collusion, DBE fraud orother fraudulent activities should use the following hotline number or address to reportsuch activities:

Hotline Number:

(202) 755-1855 or 800-424-9071

Hotline Address:

Office of Inspector General P. O. Box 23178 L’Enfant Plaza Station Washington, D.C. 20024-0178

The hotline is part of USDOT’s continuing effort to identify and investigate highwayconstruction contract fraud and abuse and is operated under the direction of USDOT’sInspector General. All information will be treated confidentially and caller anonymity willbe respected.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 20: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

The department has created a new option in the Vendor Documents System for electronic Good Faith Effort submittals. The option to upload your GFE documents will not be available until February 17, 2012. Please check the Letting & Bidding page on the department’s web site for a link to the Vendor Documents System and a link for instructions for electronic GFE submittal.

http://www.dot.il.gov/desenv/030912/030912letg.html

If you have any questions please contact Jim Layden at 217/782-7806.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 21: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE   In accordance with recent legislative action the Department has included a new affidavit that will need to be completed and submitted with each bid proposal.    When opening the bid proposal PDF the affidavit will be the first page of the PDF.  Please insert the completed affidavit after page 4 of your bid proposal submittal.  We have included a sample of the new affidavit on the following page.  Please note that the bidder and notary signatures must be original for each submitted bid.   This affidavit is not required on federally‐funded projects.  If the affidavit is not the first page of the PDF, then the project is federally‐funded.   If you have any questions please contact Jim Layden at [email protected] or at 217‐782‐7806.  

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 22: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

 

 

RETURN WITH BID  

State of _______________________ )                                                                   ) ss. County of _____________________ )  

AFFIDAVIT    _____________________________ (name of affiant), of ________________________, 

________________, being first duly sworn upon oath, states as follows: 

1. That I am the _________________________ (officer or position) of ________________________________ (bidder) and have personal knowledge of the facts herein stated. 

2. That, if selected under this proposal,  _____________________________________ (bidder) will maintain a business office in the State of Illinois which will be located in _______________ County, Illinois. 

3. That this business office will serve as the primary place of employment for any persons employed in the construction contemplated by this proposal. 

4. That this Affidavit is given as a requirement of state law as provided in Section 30‐22(8) of the Illinois Procurement Code.  

______________________________________                               Signature   ______________________________________                       Print Name of Affiant 

    

This instrument was acknowledged before me on the _____ day of ______________________, 20 ___ by ___________________________________.                _____________________________________                                          Notary Public  (SEAL) 

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 23: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Special Notice Regarding IDOT Proposals and Authorization To Bid.

ABOUT IDOT PROPOSALS All proposals issued by IDOT are potential bidding proposals. Each proposal contains all Certifications and Affidavits, a proposal signature sheet and a Proposal Bid Bond required for a Prime Contractor to submit a bid after written AUTHORIZATION TO BID has been issued by IDOT. A Proposal Bid Bond and Authorization To Bid are not required on items designated as Small Business Set-Asides.

ABOUT AUTHORIZATION TO BID (Not required for Small Business Set-Asides)

WHO CAN BID? Bids will be accepted from only those companies that request and receive written Authorization to Bid from IDOT. To request authorization, a potential bidder must complete and submit Part A of the Request for Authorization to Bid/or Not For Bid Status for (BDE 124). WHAT CONSTITUTES AUTHORIZATION TO BID? When a prospective prime bidder submits a BDE 124 and the Affidavit of Availability (BC 57), he/she must indicate at that time which items are being requested for bidding purposes. Only those items requested For Bidding will be analyzed. After the request has been analyzed, the bidder will be issued an Authorization To Bid or Not For Bid Report that indicates which items have been approved for bidding. If Authorization to Bid cannot be approved, the Authorization To Bid or Not For Bid Report will indicate the reason for denial. FIRMS UNSURE AS TO AUTHORIZATION STATUS? Firms that have not received an authorization form within a reasonable time of complete and correct original document submittal should contact the department as to status. This is critical in the week before the letting. These documents must be received by three days before the letting date. Firms unsure as to authorization status should call the Prequalification Section of the Bureau of Construction at 217/782-3413.

NOTICE NO AUTHORIZATION TO BID WILL BE ISSUED UNTIL A COMPLETED PART A OF FORM BDE 124 AND THE ORIGINAL AFFIDAVIT OF AVAILABILITY HAS BEEN FILED WITH THE CENTRAL BUREAU OF CONSTRUCTION. FOR SMALL BUSINESS SET-ASIDES, THE AFFIDAVIT OF AVAILABILITY IS NOT REQUIRED.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 24: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

The Department strongly encourages the prime contractor and their

approved sub-contractors to hire minority, women and disadvantaged

individuals from its federally funded Highway Construction Careers Training

Program (HCCTP) to help meet workforce and trainee goals. This program

is training minorities, women and disadvantaged individuals in highway

construction-related skills, e.g., math for the trades, job readiness, technical

skills coursework (carpentry, concrete flatwork, blueprint reading, site

plans, site work, tools use, etc.) and OSHA 10 hour certification, to prepare

them for a career in the highway construction trades. Graduates are well-

trained and ready to become productive entry-level construction workers.

Contact the appropriate district EEO officer to learn more about the

program and for assistance in meeting workforce and trainee goals.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 25: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

Please discontinue faxing your Affidavit of Availability with your Request for Authorization to Bid/or Not For Bid Status request. We are required to use only the Original Affidavit of Availability to determine a contractor’s authorization to bid. This document has a notarized signature and we must have the original signature prior to processing your request. The faxed copies are not being looked at and are just generating excess paper that we have to destroy. Thank you for your cooperation in this matter.

If you have questions please contact Jim Layden at (217) 782-7806 or [email protected].

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 26: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

Subcontractor Registration

Subcontractors interested in participating on contracts are required to register with the Department. Prequalified contractors, consultants, material suppliers and trucking companies are NOT required to register. Subcontractors can register electronically at the Department’s web site, http://www.dot.il.gov/. At the home page click on “Doing Business”. The subcontractor registration form is listed under Contractor Services. The registration form requires minimal information and can be completed in minutes. Confirmation, along with a registration number, will be received by e-mail in 1-2 days. Registration is valid for one year and will then require renewal. Questions may be addressed to the Prequalification Section, Bureau of Construction.

Phone: (217) 782-3413 E-mail: [email protected]

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 27: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

IMPORTANT NOTICE FOR ALL ILLINOIS CONTRACTORS/CONSULTANTS

The Procurement Communication Reporting requirements of Public Act 96-0795 and Public Act 96-0920 (Senate Bill 51 and Senate Bill 3576) became effective on January 1, 2011. The new law requires the following communications to be reported to the Procurement Policy Board (PPB):

• Communication pertaining to the substance of a procurement matter. • Communication that suggests a change or asks for a change to be made to a procurement

matter. • Communication regarding a change order, contract renewal or extension, and contract

awards for a procurement matter initiated by a vendor.

In addition, a vendor is prohibited from bidding on or entering into a contract if the vendor:

• Assisted the agency in determining a need for a contract (except as part of a public Request for Information).

• Assisted the agency by reviewing, drafting or preparing an invitation for bid, RFI or RFP, etc. (except as part of public opportunity).

Please note that the following communications need not be reported:

• Statements made by a person in a public forum such as a trade show or public meeting. • Statements made regarding a matter of practice or procedure. • Statements initiated by a state employee about products, services, or industry best

practices. • Statements initiated by a vendor concerning general information about products, services,

or industry best practices -- so long as they are not specific to a current or potential procurement matter.

• Communications initiated by a vendor regarding construction or construction-related contracts resulting in a contract modification of less than $250,000.

In order to conform to these new requirements, please note that IDOT intends to fully report the substance of any reportable procurement communications to the PPB through a web application developed by Central Management Services. The law requires the PPB to post all communications received on their website within 7 days of receipt of the report.

It is important to understand that all communications received by IDOT employees from vendors will be handled in compliance with the new law. This means that any phone calls, face-to-face conversations, e-mails, or other types of communications that trigger reporting will be fully reported to the PPB in accordance with the law and will ultimately be made public on the PPB Internet site.

More information regarding IDOT Procurement Reform initiative is available on the IDOT Internet Site at the following address: http://www.dot.il.gov/procurementreform.htm

SPECIAL NOTICE 

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 28: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE  

All bids must contain a properly completed Form A, Financial Information & Potential Conflicts of Interests Disclosure.

A separate Form A must be submitted for each individual who can answer “yes” to the questions in paragraph C on page 12 of the proposal package

A properly completed form includes the name and address of the contractor and an original signature.

If a contractor is signing the Not Applicable Statement, the contractor’s name and address is still required on the first page of Form A.

If you have questions please contact Jim Layden at (217) 782-7806 or [email protected]  

 

 

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 29: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

PAY ITEMS SUBMITTED WITH BIDS

• Please refer to paragraph 7 in the proposal referring to the Schedule of Prices when submitting bids.

• Unit prices are to be submitted in U. S. dollars and cents.

• Fractions of a cent will be rounded down to the next whole number.

  

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 30: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE  

 

BID SUBMISSIONS FOR LETTINGS

Please use the provided Cover Page (page 4 of the proposal package) as the first page of your submitted bid.

Please remember to staple your bid together. Proposals should be printed one-sided. (double side copies create

problems processing the bid). Thank you for your cooperation.

If you have questions please contact Jim Layden at (217) 782-7806 or [email protected]  

 

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 31: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

Clarification of Reconsideration for DBE Utilization Plans

All prime contractors please take note that the DBE utilization plans, both forms SBE 2025 and SBE 2026, are required to be submitted with the bid on all construction contracts that contain a specified goal in the special provision for Disadvantaged Business Enterprise Participation. Based on recent FHWA clarification, the DBE Special Provision has been updated to clarify what conditions warrant providing the bidder an opportunity for an administrative reconsideration and what documentation may be provided during the reconsideration process.

Under the DBE Special Provision the bidder must either document that it has obtained enough DBE participation to meet the contract DBE goal or, in the event that the bidder has not obtained enough DBE participation to meet the contract DBE goal, documented good faith efforts. If the Department determines that the apparent low bidder has either failed to achieve the contract DBE goal or failed to provide sufficient documentation of its good faith efforts, the bidder will be afforded an opportunity for an administrative reconsideration at which time additional written documentation or argument of the bidder’s good faith efforts made prior to the bid may be submitted.

The additional documentation that may be provided and considered during the reconsideration should be limited to information further supporting the bidder’s original submittal. In limited cases, where a bidder had genuinely thought it had achieved the DBE goal but a review of the Utilization Plan establishes that the goal was not met, the bidder may submit documentation of its good faith efforts that were made prior to submitting its bid. Allowing additional documentation to be submitted during an administrative reconsideration is not intended to be a method by which a bidder may circumvent the intent of the regulations and the DBE Special Provision by withholding required documentation until the time of a reconsideration proceeding. It is also not intended to allow a bidder to wait until after submitting a bid, but in advance of the reconsideration proceedings, to begin making good faith efforts to meet the goal.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 32: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

SMALL BUSINESS SET-ASIDES

Several items on this Letting are designated as small business set-asides. In accordance with Section 45-45 of the Illinois Procurement Code and the rules of the Department, only bids from qualified small businesses will be considered for award. No construction business is a small business if its annual sales and receipts exceed $10,000,000. To encourage maximum competition, these Small Business Set-Asides are open bidding items. In accordance with the rules of the Department, prequalification is waived for these items. All bidders, including those correctly prequalified by the Department, are required to submit with the bids a Qualification and Equipment Inventory Certification Form. The form is included with the proposal and bidding documents (pages 11a – 11h). You will find a current list of Set-Asides on the following page of this bulletin. There will be Small Business Set-Asides on future Lettings as well. Authorization to bid is not required; however, firms wishing to be listed on the For Bid list should so indicate by sending a Request For Authorization To Bid/or Not For Bid Status form (BDE 124). If you have any questions please contact Jim Layden at 217-782-7806.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 33: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SMALL PROJECTS LISTING

04/27/2012 Letting

Small Business Initiative Projects The following items are designated as Small Business Set-Asides. In accordance with Section 45-45 of the Illinois Procurement Code and the rules of the Department, only bids from qualified small businesses will be considered for award. No construction business is a small business if its annual sales and receipts exceed $10,000,000. To encourage maximum competition, these Small Business Set-Aside projects are open bidding items. All bidders are required to submit with the bids a Qualification and Equipment Inventory Certification Form. The form is included with the proposal and bidding documents.

11 13 14 25 36 37

38 42 69 70 86

Hot-Mix Asphalt Projects (less than 3000 Ton) The following items are small HMA projects designated to encourage the participation of prequalified small businesses and or prequalified Disadvantaged Business Enterprises. These items have up to 3,000 tons of bituminous products; however, the ownership of a bituminous plant is not required in accordance with 44 Illinois Administrative Code 650.70. These designated projects are open for bidding by any pre-qualified contractor with a Hot-Mix Asphalt (HMA) Paving work rating or a Hot-Mix Asphalt (HMA) Plant Mix work rating. All other prequalification requirements are unchanged.

4 18 20 21 31 63 74

79 82 95 110 115 193

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 34: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

SPECIAL NOTICE

RULE FOR SUBMITTAL OF DBE UTILIZATION PLANS All prime contractors please note that a complete DBE Utilization Plan includes forms SBE 2025 and SBE 2026. Both forms are required to be submitted with the bid on all construction contracts that contain a specified goal in the special provision for Disadvantaged Business Enterprise Participation. Bids that do not have a DBE Utilization Plan as required by special provision will be rejected.   

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 35: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- SPECIAL NOTICE REGARDING DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION -

1. Disadvantaged Business Enterprise (DBE) Utilization Plan For proposals that contain a Special Provision for Disadvantaged Business Enterprise Participation it is the responsibility of each bidder to submit a DBE Utilization Plan (Plan) (Form SBE 2026 and Form SBE 2025) as required by the Special Provision. Forms for the submittal of the Plan are available on the IDOT Web Site, in each district’s Bureau of Construction office or by calling IDOT’s Bureau of Small Business Enterprises at (217) 782-5490. DBE Plan submittal - As detailed in the Special Provision entitled “DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)”; all bidders must submit Form SBE 2026 and Form SBE 2025 with their bid at the Letting. Failure to submit both forms with the bid shall cause the bid to be rejected as not responsive.

SEE THE SPECIAL PROVISIONS WITHIN THE PROPOSALS FOR SPECIFIC DBE GOAL PERCENTAGES 2. Illinois Unified Certification Program DBE Directory

Pursuant to the requirements of the federal regulations, all state transportation agencies that receive federal-aid funds are required to implement a “one-stop” certification process for DBEs. As a result of this requirement, IDOT, together with the City of Chicago, CTA, Metra and Pace, has established the Illinois Unified Certification Program (IL UCP). The IL UCP maintains a DBE Directory to provide a reference source to assist bidders/proposers in meeting DBE contract goals. The DBE Directory lists the DBE-certified firms in alphabetical order with their address, contact information and specialty of work. It is the responsibility of the prime contractor/consultant to make his/her own determination regarding the capability of a DBE firm. Only those firms certified as of the letting date/bid opening may be utilized in meeting a DBE contract goal.

3. Supportive Services Consultants

IDOT’s Office of Business and Workforce Diversity’s Bureau of Small Business Enterprises administers the federal Disadvantaged Business Enterprise (DBE) program. The goal of IDOT’s DBE Supportive Services program is to provide assistance that fosters opportunities for DBE firms to participate in IDOT’s transportation-related contracts. IDOT contracts with outside consultants to provide its DBE firms with management and technical supportive services assistance. This assistance is provided at no cost to IDOT’s DBE firms, to those firms seeking IDOT DBE program certification, to IL UCP DBE-certified firms who hold (or are bidding on) IDOT contracts, and to prime contractors doing business with IDOT. Management assistance includes, but is not limited to, assistance with cash flow, bonding and financing, obtaining work/equipment/other resources, obtaining payments for work completed, preparation of business plans, computer technology, certification/prequalification application assistance, assessment of management/accounting/computer systems, assistance with loan package preparation, development of web site/marketing materials/safety plans, and IDOT DBE workshops on various topics. Districts 1 - 3 (contract period 11/17/11 – 11/16/12) Mr. Theo Joyner, Project Director Ralph G. Moore & Associates 401 South LaSalle, Suite 1401 Chicago, IL 60605 Phone: 312/419-7260 Fax: 312/419-1918 Email: [email protected]

Districts 4, 5, 6, 7, 8, 9 (contract period 11/18/11 – 11/1712) Mr. Mark Vaughn, Project Director Franklin & Vaughn, LLC 2220 South Route 157, Suite 200 E. Glen Carbon, IL 62034 Phone: 618/614-3194 Fax: 618/675-4426 Email: [email protected]

Technical Assistance includes, but is not limited to, assistance with estimating, bidding, negotiations, technical tasks, reading specifications and plans, developing production schedules, preparing required reporting forms and documentation, reviewing IDOT contract-related documents/reports, assistance with IDOT project site inspections/meetings and contract troubleshooting, and IDOT DBE workshops on various topics. Districts 2, 3 (contract period 01/03/12 – 01/02/13) Ms. Minal Hahm, Project Director M Squared Engineering, LLC W62N215 Washington Avenue Cedarburg, WI 53012 Phone: 262/376-4246 Fax: 262/376-4246 E-mail: [email protected]

Districts 1, 6, 8, 9 (contract period 01/03/12-01/02/13) Mr. Dave Clark, Project Director ESI Consultants, Ltd. 753 Windsor Road Charleston, IL 61920 Phone: 217/348-1900 Fax: 217/348-1903 E-mail: [email protected]

Districts 4, & 7 (contract period 10/9/09-10/8/10) District 1 (contract period 1/03/12 – 1/02/13) Ms. Althea Taylor, Project Director Kevin Hayes Taylor Made Industries ESI Consultants, Ltd 330 S Wells, Suite 1022 208 South LaSalle Street, Suite 1705 Chicago, IL 60606 Chicago, Illinois 60604 Phone: 773/257-7100 Fax: 888/541-4004 Phone: 312/277-1700 Fax: 312/735-9741 E-mail: [email protected] E-mail: [email protected]

(Technical Assistance consultants are continued on next page)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 36: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Technical Assistance (continued)

District 5 (contract period 1/03/12 – 1/02/13) Mr. Richard Nowack, Project Director Quigg Engineering Inc. 2000 South Main Street, Suite A Jacksonville, Illinois 62650 Phone: 217/245-5375 Fax: 217/245-5398 E-mail: [email protected]

4. Minority-Owned Financial Institutions ( It is IDOT’s policy to investigate the full extent of services offered by financial institutions owned and controlled by socially and economically disadvantaged individuals in the community, to make reasonable efforts to use these institutions, and to encourage prime contractors on federally funded contracts to make use of these institutions.

As of September 30, 2011, the list of minority owned financial institutions are as follows:

ALL AMERICAN BANK DES PLAINES, IL

AMERICAN METRO BANK CHICAGO, IL

AMERICAN METRO BANK , 667 N CASS AVE OFF WESTMONT, IL

AMERICAN METRO BANK , CHINATOWN BRANCH CHICAGO, IL

COVENANT BANK CHICAGO, IL

FOSTER BANK ROLLING MEADOWS, IL

FOSTER BANK , ARLINGTON HEIGHTS BRANCH ARLINGTON HEIGHTS, IL

FOSTER BANK , DEVON BRANCH CHICAGO, IL

FOSTER BANK , HMART BRANCH NILES, IL

FOSTER BANK , LINCOLNSHIRE BRANCH LINCOLNSHIRE, IL

FOSTER BANK , NAPERVILLE BRANCH NAPERVILLE, IL

FOSTER BANK , NILES BRANCH NILES, IL

FOSTER BANK , ROLLING MEADOWS BRANCH ROLLING MEADOWS, IL

HIGHLAND CMNTY BANK CHICAGO, IL

HIGHLAND CMNTY BANK , 10537 S HALSTED ST OFF CHICAGO, IL

HIGHLAND CMNTY BANK , WOODLAWN BRANCH CHICAGO, IL

ILLINOIS-SERVICE FS&LA CHICAGO, IL

ILLINOIS-SERVICE FS&LA , CHATAM BRANCH CHICAGO, IL

INTERNATIONAL BANK CHICAGO CHICAGO, IL

INTERNATIONAL BANK CHICAGO , BELLWOOD BRANCH BELLWOOD, IL

INTERNATIONAL BANK CHICAGO , SOUTH CHINATOWN BRANCH CHICAGO, IL

INTERNATIONAL BANK CHICAGO , STONE PARK BRANCH STONE PARK, IL

NATIONAL REPUBLIC BANK CHICAGO CHICAGO, IL

NATIONAL REPUBLIC BANK CHICAGO , 2615 W DEVON AVE OFF CHICAGO, IL

PACIFIC GLOBAL BANK CHICAGO, IL

PACIFIC GLOBAL BANK , 3233 S ASHLAND OFF CHICAGO, IL

PACIFIC GLOBAL BANK , SOUTH ARCHER BRANCH CHICAGO, IL

SEAWAY BANK & TRUST COMPANY CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , BROADVIEW BANKING CTR FACILITY BROADVIEW, IL

SEAWAY BANK & TRUST COMPANY , BONZEVILLE FACILITY CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , CHATHAM RIDGE FACILITY CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , CRESTWOOD BRANCH CRESTWOOD, IL

SEAWAY BANK & TRUST COMPANY , DRIVE-IN FACILITY CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , MAYWOOD BRANCH MAYWOOD, IL

SEAWAY BANK & TRUST COMPANY , MICHIGAN AVE FACILITY CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , MIDWAY FACILITY CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , OHARE FACILITY BRANCH CHICAGO, IL

SEAWAY BANK & TRUST COMPANY , WAUKEGAN FACILITY WAUKEGAN, IL

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 37: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 1 -

April 27, 2012 Letting Index Listing

PAVEMENT 102. Brown 6RS-4 FAP 317 US 24 95. Champaign (10-34,HB-5,106)RS-1 FAS 533 MARKET STREET 97. Champaign (41)RS FAS 522 SIDNEY-LONGVIEW RD 112. Clay-Effingham-Fayette D7 PATCHING 2012-6 VARIOUS VARIOUS 189. Clay 10-00054-00-PV FAU 8526 WORTHEY STREET 107. Coles (39MFT)RS-1 FAU 7623 HARRISON ST 44. Coles 15(22,23,24,25,26)RS-4 FAI 57 I-57 154. Cook 02-00055-00-WR FAU 1587 MCCARTHY ROAD 156. Cook 06-00175-00-TL FAP 344 127TH STREET 78. Cook 10-00055-00-SP VARIOUS 76. Cook 11-00053-00-RS FAU 1071 MINERVA_AVENUE 82. Cook 11-00053-00-RS FAU 1682 POPLAR AVENUE 20. Cook 11-00054-00-RS FAU 1072 DANTE AVENUE 162. Cook 11-00093-00-RS FAU 1411 WASHINGTON BOULEVARD 81. Cook 11-00095-00-RS FAU 1056 & FAU 1055 INDIANWOOD & LAKEWOOD BLVD 77. Cook 11-00111-00-RS FAU 1609 167TH STREET 21. Cook 11-00112-00-RS FAU 1609 167TH STREET 18. Cook 11-00115-00-RS FAU 1043 ELLIS AVENUE 19. Cook 11-00116-00-RS FAU 1042 WOODLAWN AVENUE 79. Cook 11-00134-00-RS FAU 1063 WILLOW ROAD 74. Cook 11-00150-00-RS FAU 3596 STATE STREET 23. Cook 11-00151-00-RS FAU 3787 SIBLEY BOULEVARD 2. Cook 2011-044-PP VARIOUS VARIOUS 68. Cook 2011-225-I FAP 332 IL 394 16. Cook 4040.1RS-1 FAU 2812 CRAWFORD AVENUE 110. Crawford 101RS-2 FAP 779 HUTSONVILLE ROAD 145. Cumberland (108,109,110)RS-3 FAP 828 & 773 IL 121 127. DeKalb 10-00176-01-RS FAS 96 CH 10 98. DeWitt-McLean-Piatt D5 CRACK & JOINT REPAIR 2012-1 VARIOUS VARIOUS 96. Douglas (144R)RS-2&145RS-3 FAP 323 US 36 57. Douglas 09-00096-00-RS FAS 522 CH 6 136. DuPage-Kane LY (HB&VB) FAP 347 IL 38 155. DuPage 05-00069-00-CH FAU 2576 LAMBERT ROAD 73. DuPage 11-00102-00-RS FAU 2614 CARPENTER STREET 59. Edgar 10-00101-00-SP FAS 680 CH 4 111. Effingham 12RS-1 FAP 828 MONTROSE BLCKTP 152. Franklin 12(RS-7) FAU 9481 IL 37 87. Fulton 135[(Z)RS-2,(X)RS-1] FAP 22 IL 78 121. Hamilton (9,10)RS-2 FAP 855 IL 14 43. Hancock 106RS-6 FAP 514 IL 94 26. Henry (130,131,4,5)RS-3 FAP 639 & FAP 37 IL 17 & US 34 142. Iroquois (38-8)RA-8 FAI 57 I-57 52. Iroquois 12-00229-00-SP FAS 316 CH 23 151. Jackson (130,101)N-1 FAP 331 & 312 IL 3 & IL 149 62. Jasper 10-00117-00-FP FAS 1705 CH 3 63. Jefferson 09-00202-00-RS FAS 823 CH 5 30. JoDaviess-Stephenson D2 CS 2012-3 FAP 301 US 20 72. Kane 04-00043-00-PV VARIOUS 80. Kane 11-00182-00-RS FAU 1314 KIMBALL STREET 135. Kane 8R-R FAP 345 US 20 (LAKE ST) 158. Lake 00-00045-00-PV FAU 198 ATKINSON ROAD 164. Lake 08-00100-00-PV FAU 1236 LAKE STREET 160. Lake 11-00012-00-PV FAU 1210 BEACH ROAD 137. Lake 49-1(HB&HB-1)R FAI 94 I-94/US 41 51. LaSalle 09-00163-00-WR FAU 6039 ADAMS STREET 176. LaSalle 10-00090-00-WR FAU 6160 SOUTH OTTER CREEK ROAD 24. Lee 8RS-2 FAP 316 US 52/IL 26 179. Livingston 06-00100-02-RS FAS 1362 CH 8 41. Livingston D3 INTERMITTENT RS 2012-01 FAI 55 I-55 147. Macon D7 HMA RESURF 2012-2 FAP 320 IL 48 192. Madison 08-00045-00-PV FAU 8967 MAIN STREET 193. Madison 10-00018-00-RS FAU 9135 KEEBLER ROAD 163. McHenry 11-00004-00-RS FAU 4083 BARNARD MILL ROAD 83. McHenry 11-00007-00-RS FAU 4086 & FAU 4081 WONDER LK RD & THOMPSON RD 17. McHenry 112R-N FAP 336 IL 31 58. McLean 11-00041-03-RS FAS 489 CH 21 143. Menard-Mason ((E)RS-4,(G)RS-6)I&(F)RS-3,I-1 FAP 658 IL 29 31. Ogle D2 MRS 2012-12 FAP 742 IL 2 101. Pike 4RS-3,BR-1 FAP 304 IL 96 133. Randolph 09-00039-06-RS FAS 863 ROCKCASTLE ROAD 124. Rock Island 10-00043-00-BT MILAN RECREATION PATH 103. Sangamon (84-2-1[FR A]Q FR I-55 WEST WEST OUTER RD

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 38: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 2 -

PAVEMENT (continued) 104. Scott (1-NRHM)I FAP 566 IL 106 188. Shelby 09-00271-00-RS FAS 656 NEOGA ROAD 132. Shelby 10-00051-00-BT GENERAL DACEY TRAIL 114. St Clair-Madison-Monroe DIST8 RESURFACING 2012-1 VARIOUS VARIOUS 149. St Clair 82-1-R(A),82-1-R(B) FAI 64 & 55 I-64 & 55 183. Tazewell 10-00076-00-RS FAS 470 DEE-MACK ROAD 56. Tazewell 10-00109-00-BT FAU 6728 NORTH CUMMINGS LANE 99. Various D5 CRACK & JOINT REPAIR 2012-2 VARIOUS VARIOUS 67. Will 2011-226-I FAI 55 I-55 140. Winnebago 34R FAP 742 IL 2 BRIDGES 39. Bureau (06-4BR-1)I FAI 80 I-80 166. Bureau (22)I FAS 2245 IL 29 181. Bureau 10-16115-00-BR TR 136 182. Bureau 11-07119-00-BR TR 55 130. Christian 08-04118-00-BR TR 307A 70. Cook-Kane 2011-228-I VARIOUS VARIOUS 71. Cook 102Y-A-B FAP 344 IL 83 139. Cook 2011-066-I FAI 94 I-94 (EDENS EXPWY) 10. Cook 2011-212-I VARIOUS VARIOUS 11. Cook 2011-214-I FAU 2857 ASHLAND AVE 66. Cook 2012-001-I FAU 2612;FAP 330 LEMONT RD;US 12/20/45 186. Douglas 07-02122-01-BR TR 151 138. DuPage 534R-B FAP 870 IL 53 14. DuPage JB-I(11) MS 99/FAP 347 IL 38 N FRTG RD/IL 38 146. Fayette D7 BRIDGE REPAIRS 2012-1 FAI 70 I-70 168. Ford (107)I FAP 798 IL 115 89. Fulton (123B)I FAP 687 IL 95 126. Iroquois 08-22102-01-BR TR 351 46. Jackson (12-1)B-1 FAP 331 IL 13 131. Jasper 05-04122-00-BR TR 11 165. Kane 07-03011-01-BR TR 193 HINCKLEY ROAD 169. Kankakee (104B)I-1 FAP 796 IL 115 13. Lake 2011-222-I VARIOUS VARIOUS 85. LaSalle (50-2BR)I FAI 80 I-80 40. LaSalle (50-4HB-1)I FAI 39 I-39 141. LaSalle (G-1)BR-2 FAP 623 US 6 178. LaSalle 10-00651-00-BR FAS 260 CH 13 125. Lee 11-00318-00-BR FAS 1180 KEIGWIN ROAD 180. Livingston 09-20110-02-BR TR 169 170. Madison 64-1BR FAS 770 IL 157 194. Marion 09-07116-00-BR TR 304A FORD ROAD 69. McHenry 2011-227-I VARIOUS VARIOUS 55. Mercer 05-00096-00-BR FAS 217 CH 6 191. Moultrie 07-00066-00-BR FAS 554 CH 9 144. Pike (75-1)BJR-2,RS-2 FAI 72 I-72 119. Pope 6B-2 FAP 885 IL 146 118. Pope 6B-3 FAP 885 IL 146 171. Randolph 110BR-1 FAP 861 IL 4/150 34. Rock Island (81-2HB-1)M FAI 74 I-74 84. Rock Island-Whiteside D2 BRIDGE PAINTING 2012-1 VARIOUS VARIOUS 38. Rock Island D2 DECK SEALING 2012-3 VARIOUS VARIOUS 90. Tazewell (108-HB-1)I-2 FAI 155 I-155 184. Vermilion 09-00171-00-BR FAU 7043 CH 6 108. Wayne D7 BRIDGE REPAIRS 2012-2 FAI 64 I-64 134. White 09-08140-00-BR TR 251 120. White D9 CM BRIDGE REPAIR 2012-4 FAI 64 I-64 36. Whiteside D2 DECK SEALING 2012-1 VARIOUS VARIOUS 117. Williamson 6B-1 SBI 13B OLD IL 13 35. Winnebago (201-1B)M-3 FAI 39 I-39 27. Winnebago (5B)M FAP 738 IL 251 28. Winnebago (5B-1)M-1 FAP 738 IL 251 29. Winnebago (5B-2)M FAP 738 IL 251 175. Winnebago 08-00069-00-BR GARDEN PLAIN AVENUE 37. Winnebago D2 DECK SEALING 2012-2 VARIOUS VARIOUS 93. Woodford 102-[4HB;3HB-2]I FAI 39 I-39

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 39: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 3 -

ELECTRICAL 167. Bureau-Kankakee-LaSalle D3 OVD MESSAGE SG-2012 VARIOUS 157. DuPage 09-00206-08-TL VARIOUS 12. Kane-Kendall 2011-221-I VARIOUS VARIOUS 15. Kane 32-TS (11) FAP 557 IL 72 128. Kankakee 11-00068-00-SP FAP 330 US 45/52 172. Madison-Jersey-St Clair DIST8 TS MODIFICATIONS 2012-1 VARIOUS VARIOUS 116. Madison DIST 8 ITS 2012-1 FAI 270 & I 70 I-270 & I-70 174. Massac (64-3B)L-1 FAI 24 I-24 3. McHenry 2011-020-TS FAP 305 US 14 88. Peoria-Tazewell D4 ITS SYSTEM 2011-2 N/A N/A 33. Rock Island 112TS-9 FAU 5855 19TH ST 105. Sangamon D6 TRAFFIC SIGNAL MOD 2012 FAU 7968 CAMP BUTLER RD 109. Shelby D7 ELECTRICAL 2012-1 TR 389A N/A 173. St Clair-Randolph DIST8 TS MODIFICATIONS 2012-2 VARIOUS VARIOUS 122. Various D9 TRAFFIC SIGNALS 2012-1 VARIOUS VARIOUS 100. Vermilion (92-12)TS FAU 7045 BOWMAN AVE 6. Will 2011-046-L FAI 80 I-80 MISCELLANEOUS 187. Adams 08-00211-01-SC FAS 1600 CH 7 42. Champaign-Vermilion D5 WEED SPRAYING 2012-1 FAI 57 & 74 I-57 & I-74 60. Champaign 10-00026-00-BT LAKE OF THE WOODS PATHWAY 4. Cook 0305-302K-I-5 FAU 2959 & 2960 I-290 E & W FRT RDS 159. Cook 10-00116-00-SW FAU 1026 DIVISION STREET 22. Cook 11-00032-00-SW VARIOUS 161. Cook 11-00088-00-SP FAU 1270 LAKE COOK ROAD 1. Cook 2010-050-I FAP 350 IL 50 7. Cook 2011-092-GRR VARIOUS VARIOUS 8. Cook 2011-094-GRR VARIOUS VARIOUS 49. DeKalb 10-00010-00-SW VARIOUS 5. DuPage-Cook 2011-024-SG FAI 290 & FAP 342 I-290 & IL 53 190. Effingham 10-00125-00-LT VARIOUS 53. Iroquois 12-00229-01-SP FAS 316 CH 23 25. JoDaviess 28-SO-DM FAP 301 US 20 75. Kane 10-00179-00-ST VARIOUS 177. Kendall 10-00038-00-SW VARIOUS 50. Kendall 11-00044-00-SP FAU 2508 DOUGLAS ROAD 86. LaSalle (5Z)I FAP 68 IL 23 148. Macon-Shelby D7 SAFETY 2012-1 FAP 322 US 51 61. Macoupin 10-00037-00-SW LOVELESS PARKWAY 150. Madison 60-(8,9,10,11)-I FAP 310 IL 255 185. McLean 10-00242-00-LT VARIOUS 123. Ogle 10-00007-00-SW SOUTH STREET 129. Peoria 10-00001-00-BT PRINCEVILLE SCHOOLS 92. Peoria 16 I-2 FAP 669 IL 116 32. Rock Island 106M FAP 310 US 67 106. Sangamon D6 COVERED BRIDGE ROOF 2012 COVERED BRIDGE PATH COVERED BRIDGE PATH 113. St Clair 82-1SG VARIOUS VARIOUS 47. Stephenson 09-00024-00-SW VARIOUS 94. Various D4 MCHD 2012 VARIOUS VARIOUS 91. Various D4 PAVEMENT MARKING 2012 VARIOUS VARIOUS 65. Various INT ATTRACT SIGN 2012-37 VARIOUS VARIOUS 64. Various SRWDE FRWY SIGN MAINT 2012-36 VARIOUS VARIOUS 115. Washington 6-I FAP 817 IL 15 AERONAUTICS 10A. Bond GREENVILLE 9A. Crawford CRAWFORD COUNTY 8A. Fayette VANDALIA MUNICIPAL 7A. Kankakee GREATER KANKAKEE 11A. LaSalle ILLINOIS VALLEY REGIONAL 13A. McLean CENTRAL ILLINOIS REGIONAL 6A. Pike PITTSFIELD PENSTONE MUNICIPAL 12A. Richland OLNEY NOBLE 2A. Shelby SHELBY COUNTY 4A. St. Clair ST. LOUIS DOWNTOWN 14A. Stephenson FREEPORT ALBERTUS 3A. Will JOLIET REGIONAL 1A. Williamson WILLIAMSON COUNTY REGIONAL

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 40: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

IMPORTANT NOTICE: TRANSPORTATION BULLETIN REVISIONS

Letting Date: April 27, 2012

The following revisions have been made to this Transportation Bulletin. If you downloaded the bulletin prior to the noted revision date, you should incorporate the revisions or download and use a new copy of the bulletin. REVISION DATE: April 17, 2012 Revision No. 1: Item No. 6 the description reads (Completion Date: August 31, 2012 Plus 10 Working

Days. The description has been changed to read (Completion Date: June 30, 2013 Plus 10 Working Days).

Revision No. 2: Item No. 38 the description reads 94,509 sq ft concrete sealer. The description has been

changed to read 625,732 sq ft concrete sealer. Revision No. 3: Item No. 44 Notice of a Mandatory Pre-Bid Conference for contract 74560 has been

added to the bulletin. Revision No. 4: Item No. 46 the description reads Project ACBRF-331(60). The description has been

changed to read Project ACNHF-331(60) Revision No. 5: Item No. 88 contract 68A16 has been WITHDRAWN from the Letting. Revision No. 6: Item No. 98 the section number reads Section D5 CRACK & JOINT REPAIR 2012-1. It

has been changed to read Section D5 CRACK & JOINT SEAL 2012-1. Revision No. 7 Item No. 99 the section number reads Section D5 CRACK & JOINT REPAIR 2012-2. It

has been changed to read Section D5 CRACK & JOINT SEAL 2012-2. Revision No. 8: Item No. 113 this project now contains a Project Labor Agreement. Revision No. 9: Item No. 118 the description read (55 Working Days). The description has been

changed to read (80 Working Days). Revision No. 10: Item No. 123 the description reads decable warning and crosswalks. The description

has been changed to read detectable warning and crosswalks. Revision No. 11: Item No. 136 has been WITHDRAWN from the letting and is now being advertised for

Review and Inspection Only. Revision No. 12: Item No. 140 a Mandatory Pre Bid Meeting has been scheduled for April 17, 2012 for

this project. Revision No. 13: Item No. 140 the description reads (Completion Date: November 30, 2013). The

description has been changed to read (Completion Date: November 30, 2013 Plus 10 Working Days).

Revision No. 14: Item No. 148 the description reads (Completion Date: October 01, 2012). The

description has been changed to read (Completion Date: October 1, 2012 Plus 10 Working Days).

Revision No. 15: Item No. 150 the description reads (Completion Date: November 21, 2012). The

description has been changed to read (15 Working Days).

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 41: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

Revision No. 16: Item No. 158 contract 63640 has been WITHDRAWN from the Letting. Revision No. 17: Item No. 174 contract 78273 has been WITHDRAWN from the Letting. Revision No. 18: Item No. 195 Contract No. 68A40 has been added to the letting via a supplemental

bulletin. Revision No. 19: Item No. 195 The description reads 749,640 lbs furnishing and erecting structural steel.

The description has been changed to read 755,000 lbs furnishing and erecting structural steel.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 42: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 1 -

APRIL 27, 2012 LETTING

ITEM DESCRIPTIONS 1. Contract No. 60L26 Cook County District 1

Section 2010-050-I FAP Route 350 (IL 50) Project HSIP-350(38) Safety project on IL 50 from 34th St. to Pershing Rd. in Cicero, Stickney and Chicago; includes 2,692 ft unit duct; 177 cu yds earth excavation; 42 cu yds furnished excavation; 90 sq yds topsoil; 550 ft perimeter erosion barrier; 42,400 sq ft PCC sidewalk; 2,700 sq yds pavement removal; 1,304 cu yds non-special waste disposal; 965 ft thermoplastic pavement marking; 11 luminaires; 11 aluminum light poles; 818 ft electric cable; 1 signal head, LED; 2 pedestrian signal heads, LED; maintain existing lighting system; 265 ft curb and gutter removal and replacement; mobilization; traffic control and protection. (30 Working Days) (C-91-662-10) (1-78058-0001) (See the Special Provisions for the DBE Percentage)

2. Contract No. 60N92 Cook County District 1

Section 2011-004-PP Various Routes (VARIOUS) PCC patching on various routes at various locations in northern Cook County; includes 36 sq yds topsoil; 36 sq yds sodding; 11,567 sq yds Class B patches; 15,360 dowel bars; 64,455 ft saw cuts; 975 tie bars; 6,617 ft polyurea pavement marking; 262 ft detector loop replacement; 300 ft electric cable; 213 ft curb and gutter removal and replacement; mobilization; traffic control and protection; (Completion Date: September 28, 2012 Plus 05 Working Days) (C-91-435-11) (1-78900-0400) (See the Special Provisions for the DBE Percentage)

3. Contract No. 60P15 McHenry County District 1

Section 2011-020-TS FAP Route 305 (US 14) Project HSIP-305(46) Traffic signal modernization - LED installation, UPS, controller cabinets and other work along US 14 from Kishwaukee Valley Rd. to Lake Ave. in Woodstock; includes 90 sq ft sign panel; 816 ft underground conduit; 1 controller; 4,824 ft electric cable; 62 signal heads, LED; 122 ft detector loop; 40 retro reflective traffic signal backplates; mobilization; traffic control and protection; Federally funded. (40 Working Days) (Job No. C-91-470-11) (1-78613-0000) (See the Special Provisions for the DBE Percentage)

4. Contract No. 60P20 Cook County District 1

Section 0305-302K-I-5 FAU Route 2959 & 2960 (I-290 E & W FRT RDS) Project HSIP-000S(879) Safety project along I-290 East and West Frontage Roads from IL 72 (Higgins Rd.) to IL 58 (Golf Rd.) in Schaumburg; includes 233 cu yds furnished excavation; 1,145 sq yds topsoil; 1,145 sq yds sodding; 1,060 ft perimeter erosion barrier; 97 tons leveling binder; 1,422 tons HMA binder course; 556 tons polymerized HMA surface course, Mix F; 107 sq yds patching; 1,043 ft concrete curb and gutter; 637 sq ft signal panel; 629 ft telescoping steel sign support; 3,458 ft thermoplastic pavement marking; 5,680 sq yds milling; 302 ft wood sign support; mobilization; traffic control and protection; Federally funded. (35 Working Days) (Job No. C-91-485-11) (1-77879-0000) (See the Special Provisions for the DBE Percentage)

5. Contract No. 60P24 DuPage-Cook Counties District 1

Section 2011-024-SG FAI Route 290 & FAP 342 (I-290 & IL 53) Project HSIP-000-S(882) Sign replacement safety project along I-290/IL 53 from Thorndale Ave. to US 12 in Schaumburg, Rolling Meadows, Palatine and Arlington Heights; includes remove 22,943 sq ft sign panel assembly; 21 mile post marker assemblies; 8,429 lbs structural steel sign support-breakaway; 900 ft telescoping steel sign support; 10,602 ft wood sign support; 93.5 ft overhead sign structure; 20 cu yds concrete foundations; 24.9 cu yds drilled shaft concrete foundations; 32,272 sq ft sign panel; mobilization; traffic control and protection; Federally funded. (75 Working Days) (Job No. C-91-492-11) (1-78667-0000) (See the Special Provisions for the DBE Percentage)

6. Contract No. 60P56 Will County District 1

Section 2011-046-L FAI Route 80 (I-80) Project IM-80-4(194)137 High mast lighting system installed at the I-80/US 30 interchange, includes removal of the existing partial high mast lighting system located in Will County; includes 1,081 cu yds earth excavation; 4,061 cu yds rock excavation; 201 cu yds furnished excavation; 48,100 sq yds topsoil; 10 acres seeding; 27,700 sq yds erosion control blanket; 210 sq yds HMA shoulders; 162.5 ft steel plate beam guardrail; 262 ft detector loop replacement; 300 ft electric cable; 17,300 ft thermoplastic pavement marking; mobilization; traffic control and protection; Federally funded. (Completion Date: June 30, 2013 Plus 10 Working Days) (C-91-579-11) (1-77247-0301) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 43: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 2 -

7. Contract No. 60R20 Cook County District 1 Section 2011-092-GRR Various Routes (VARIOUS) Project HSIP-000S(881) Guardrail improvements at various locations in northern Cook County; includes 52 units excavating and grading existing shoulder; 2,340 sq yds topsoil; 12 sq yds sodding; 0.48 acres seeding; 2,328 sq yds erosion control blanket; 5,424 sq ft median removal; 3,083 sq yds aggregate shoulders; 677 ft steel plate beam guardrail; 64 traffic barrier terminals; 3,949 ft guardrail removal; 0.36 acres selective clearing; 602 sq yds stabilized median surface; 210 units mowing; 103 guardrail markers; mobilization; traffic control and protection; Federally funded. (50 Working Days) (Job No. C-91-047-12) (1-78675-0100) (See the Special Provisions for the DBE Percentage)

8. Contract No. 60R22 Cook County District 1

Section 2011-094-GRR Various Routes (VARIOUS) Project HSIP-000S(880) Safety project including replacement of guardrail end sections at various location in Cook County; includes 134 sq yds excavating and grading existing shoulder; 5,968 sq yds topsoil; 1.23 acres seeding; 5,968 sq yds erosion control blanket; 10,653 sq yds aggregate shoulders; 235 sq yds HMA shoulders; 1,319 ft steel plate beam guardrail; 350 ft long-span guardrail over culvert; 187 traffic barrier terminals; 2,516 ft concrete curb and gutter; mobilization; traffic control and protection; Federally funded. (Completion Date: October 15, 2012 Plus 05 Working Days) (Job No. C-91-049-12) (1-78675-0300) (See the Special Provisions for the DBE Percentage)

9. DELETED FROM LETTING 10. Contract No. 60R54 Cook County District 1

Section 2011-212-I Various Routes (VARIOUS) Scour countermeasures for bridges at various locations in northern Cook County (SN 016-0504, 0555 & 0102); includes 900 sq yds stone riprap; 2,515 sq yds filter fabric; 1,027 sq yds slope mattress; dewatering of 3 structures; 84 cu yds gabions; mobilization; traffic control and protection. (50 Working Days) (C-91-134-12) (1-78595-0300) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 11. Contract No. 60R55 Cook County District 1

Section 2011-214-I FAU Route 2857 (ASHLAND AVE) Scour countermeasures for the bridge along Ashland Ave. at Little Calumet River (SN 016-0301) in Dixmoor; includes 45 cu yds channel excavation; 385 sq yds stone riprap; 1,290 sq yds filter fabric; 58 cu yds gabions; 777 sq yds slope mattress; dewatering structure No. 1; mobilization; traffic control and protection. (15 Working Days) (C-91-255-12) (1-74816-2600) (See the Special Provisions for the DBE Percentage)

12. Contract No. 60R81 Kane-Kendall Counties District 1

Section 2011-221-I Various Routes (VARIOUS) Light emitting diode (LED) installation for traffic signal modernization at various locations in Kane and Kendall counties; includes 2 traffic signal posts; 57 signal heads, LED; 60 pedestrian signal heads (LED); modify 29 existing controller cabinets; 1 controller; 194 signal head, LED, retrofit; 33 pedestrian push-button, non latching; mobilization; traffic control and protection. (40 Working Days) (C-91-222-12) (0-00877-1004) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 13. Contract No. 60R83 Lake County District 1

Section 2011-222-I Various Routes (VARIOUS) Scour countermeasures at various locations in Lake County (SN 049-0079 IL 22 over Flint Creek and SN 049-0081 Sheridan Rd. over Boyinton Ravine); includes 405 sq yds stone riprap; 633 sq yds filter fabric; dewatering of 2 structures; mobilization; traffic control and protection. (25 Working Days) (C-91-255-12) (1-78867-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 44: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 3 -

Small Business Set-Aside. 14. Contract No. 60R88 DuPage County District 1

Section JB-I(11) MS 99/FAP 347 (IL 38 N FRTG RD/IL 38) Scour countermeasures and bridge repair on IL 38 North Frontage Rd. (Brush Hill Rd.) at Salt Creek and IL 38 (Roosevelt Rd.) at Salt Creek in Elmhurst (SN 022-0028, 022-0026); includes 261 sq yds stone riprap; 419 sq yds filter fabric; 280 sq ft structural repair of concrete; dewatering of 2 structures; mobilization; traffic control and protection. (20 Working Days) (C-91-233-12) (1-78868-0000) (See the Special Provisions for the DBE Percentage)

15. Contract No. 60R93 Kane County District 1

Section 32-TS (11) FAP Route 557 (IL 72) Installation of span wire along IL 72 in Hampshire; includes 53 sq ft sign panel; 150 ft thermoplastic pavement marking; 597 ft underground conduit; 1 controller; 350 ft span wire; 350 ft tether wire; 3438 ft electric cable; 917 ft detector loop; 12 signal heads, LED, span wire mounted; mobilization; traffic control and protection. (35 Working Days) (Job No. C-91-265-12) (1-76739-0000) (See the Special Provisions for the DBE Percentage)

16. Contract No. 60R98 Cook County District 1

Section 4040.1RS-1 FAU Route 2812 (CRAWFORD AVENUE) 0.69 mile of resurfacing on Crawford Ave. from Golf Rd. to Gross Point Rd. in Skokie and Evanston; includes 484 sq yds topsoil; 484 sq yds sodding; 40 units supplemental watering; 870 tons polymerized leveling binder (machine method); 1,772 ton polymerized HMA surface course, mix D; 21,087 sq yds milling; 424 sq yds patching; 5,552 ft thermoplastic pavement marking; 1,644 ft detector loop replacement; 2,900 ft curb and gutter removal and replacement; mobilization; traffic control and protection. (25 Working Days) (C-91-272-12) (1-78665-0000) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 17. Contract No. 62537 McHenry County District 1

Section 112R-N FAP Route 336 (IL 31) Project NHF-336(51) Intersection reconstruction and traffic signal modernization of IL 31 at IL 176 and at Terra Cotta Ave. in Crystal Lake, Nunde Twp and unincorporated McHenry County; includes 34,841 cu yd earth excavation and removal and disposal of unsuitable material; 6,201 cu yd furnished excavation; 6,176 sq yd milling; 45,096 sq yd pavement removal; building removal; 5,503 ft sediment control, silt fence; 11,510 ft storm sewers and pipe culverts; 5,644 ft pipe underdrains; 7,137 cu yd trench backfill; 94 ft precast box culvert; 9,249 sq yd temporary pavement; 63,096 sq yd aggregate subgrade and sub-base granular material; 9,943 sq yd HMA base course; 3,929 tons HMA binder and surface course; 47,951 sq yd PCC pavement; 3,009 sq yd HMA shoulders; 35,018 sq ft concrete median; 729 sq yd patching; 18,168 ft concrete curb and gutter; 33,045 ft pavement marking; 46,117 sq yd topsoil; 4.9 acres seeding; 18,296 sq yd sodding; 87 trees; 6,129 sq ft PCC sidewalk; 650 sq ft sign panel; 3,572 ft underground conduit; 1 controller; 20,639 ft electric cable; 2,865 ft fiber optic cable; 19 signal heads; 1,269 ft detector loop; 4 mast arm assemblies and poles; mobilization; traffic control and protection; Federally funded. (Completion Date: August 23, 2013 Plus 10 Working Days) (C-91-351-02) (1-76296-0100) (See the Special Provisions for the DBE Percentage) MANDATORY PRE-BID CONFERENCE

18. Contract No. 63676 Cook County District 1

Section 11-00115-00-RS (DOLTON) FAU Route 1043 (ELLIS AVENUE) Project M-9003(909) This project consists of HMA surface and leveling binder, curb and gutter repair, pavement patching, shoulder repair and pavement markings located on Ellis Avenue from Lincoln Avenue to 142nd Street in the Village of Dolton; includes 10,310 sq yd HMA surface removal; 620 ton polymerized leveling binder (machine method), IL-4.75, N50; 930 ton HMA surface course, Mix "D", N50; 30 sq yd PCC driveway pavement, 7"; 1,500 sq ft PCC sidewalk 5"; 245 sq yd Class D patches; 2,010 ft thermoplastic pavement markings; 12 sq yd HMA driveway pavement, 5"; 1,020 ft combination concrete curb and gutter removal and replacement; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (C-91-160-12) (1-21220-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 45: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 4 -

19. Contract No. 63677 Cook County District 1 Section 11-00116-00-RS (DOLTON) FAU Route 1042 (WOODLAWN AVENUE) Project M-9003(908) This project consists of HMA surface and leveling binder, pavement patching, curb and gutter repair, shoulder repair and pavement marking located on Woodlawn Avenue from Sibley Boulevard to Lincoln Avenue in the Village of Dolton; includes 3,700 sq yd HMA surface removal; 220 ton leveling binder (machine method), N50; 340 ton HMA surface course, Mix "D", N50; 40 sq yd PCC driveway pavement, 7"; 2,110 sq ft PCC sidewalk, 5"; 180 sq yd Class D patches; 1,665 ft strip reflective crack control treatment; 530 ft thermoplastic pavement markings; 200 ft detector loop replacement; 450 ft combination concrete curb and gutter removal and replacement; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (C91-161-12) (1-21221-0000) (See the Special Provisions for the DBE Percentage)

20. Contract No. 63679 Cook County District 1

Section 11-00054-00-RS (GLENWOOD) FAU Route 1072 (DANTE AVENUE) Project M-9003(906) This project consists of resurfacing with leveling binder and HMA surface course, curb and gutter repair, pavement patching and pavement marking located on Dante Avenue from Glenwood-Dyer Road to Glenwood-Lansing Road in the Village of Glenwood; includes 11,153 sq yd HMA surface removal; 156 sq yd topsoil furnish and place, 4"; 489 ton polymerized leveling binder (machine method), IL-4.75, N50; 975 ton HMA surface course, Mix "D", N50; 70 sq yd PCC driveway pavement, 7"; 610 sq ft PCC sidewalk, 5"; 281 sq yd Class D patches; 1,305 ft thermoplastic pavement markings; 36 sq yd HMA driveway pavement, 5"; 800 ft combination concrete curb and gutter removal and replacement; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds) (25 Working Days) (C-91-163-12) (1-21225-0000) (See the Special Provisions for the DBE Percentage)

21. Contract No. 63681 Cook County District 1

Section 11-00112-00-RS (TINLEY PARK) FAU Route 1609 (167TH STREET) Project M-9003(918) Project consists of edge grinding, hot-in-place recycling, curb and gutter repair, pavement patching, sidewalk repair, pavement marking, detector loop replacement and all other incidental items to complete the work on FAU Route 1609 (167th Street) from Cherry Hill Drive to 80th Avenue in the Village of Tinley Park; includes 252 sq yd topsoil furnish and place; 3,078 gal bituminous materials (prime coat); 32 ton aggregate (prime coat); 613 sq yd HMA surface removal-butt joint; 1,293 ton HMA surface course; 1,439 sq ft PCC sidewalk; 368 sq ft detectable warnings; 1,673 sq ft sidewalk removal; 584 sq yd Class D patches; 3,000 ft short term pavement marking; 14,212 ft thermoplastic pavement marking line; 1,540 gal rejuvenating agent; 15,387 sq yd hot-in-place recycling; 252 sq yd sodding, special; 3,998 sq yd HMA surface removal; 1,029 ft combination curb and gutter removal and replacement; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (C91-179-12) (1-21232-0000) (See the Special Provisions for the DBE Percentage)

22. Contract No. 63688 Cook County District 1

Section 11-00032-00-SW (WILLOW SPRINGS) Various Routes Project SRTS-4009(106) Project consists of concrete sidewalks, pavement markings, signing, installation of traffic control devices and flashing beacon signals and all other incidental items to complete the work on various routes in the Village of Willow Springs; includes 247 unit tree removal; 576 cu yd earth excavation; 4,623 sq yd topsoil furnish and place; 1,800 ft grading and shaping ditches; 1,355 sq yd sodding, salt tolerant; 4,623 sq yd erosion control blanket; 1,803 sq yd aggregate base course; 159 sq yd HMA base course; 13.50 ton HMA surface course; 14,790 sq ft PCC sidewalk; 50 sq ft detectable warnings; 228 sq yd driveway pavement removal; 151 ft storm sewers; 105 ft pipe underdrains; 78 sq ft sign panel; 78 ft thermoplastic pavement marking line; 97 sq ft segment control block wall; 2 post mounted flashing beacon installations; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds) (20 Working Days) (C-40-008-11) (0-01683-1010) (See the Special Provisions for the DBE Percentage)

23. Contract No. 63693 Cook County District 1

Section 11-00151-00-RS (CALUMET CITY) FAU Route 3787 (SIBLEY BOULEVARD) Project M-9003(907) This project consists of HMA surface removal and replacement, sidewalk removal and replacement, curb and gutter removal and replacement, drainage structure adjustment and reconstruction located on Sibley Boulevard from Torrence Avenue to State Line Road in the City of Calumet City; includes 20 cu yd earth excavation; 2,222 sq yd subbase granular material, Type B 4"; 580 sq yd HMA base course 6"; 2,184 ton polymerized level binder (machine method), IL-4.75, N50; 3,341 ton HMA surface course; 340 sq yd PCC driveway pavement 6"; 20,000 sq ft PCC sidewalk 5"; 656 sq yd patching; 23,400 sq yd HMA surface removal; 152 ft storm sewers, Class A Type 1, 12"; 114 ft concrete curb, Type B; 6,544 ft combination concrete curb and gutter, Type B-6.12; 21,384 ft thermoplastic pavement markings; 265 ft detector loop replacement; 3,000 sq yd seeding (complete); 109 sq yd parkway restoration; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds) (111 Calendar Days) (C-91-169-12) (1-21219-0000) (1-21219-0010) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 46: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 5 -

24. Contract No. 64259 Lee County District 2 Section 8RS-2 FAP Route 316 (US 52/IL 26) Project NHF-316(39) 1.61 miles of milling, patching and HMA surface on US 52/ IL 26 from 0.1 mile north of Liberty St. to south of Boyd St. in Dixon; includes 3,810 tons polymerized leveling binder; 4,999 tons polymerized HMA surface course, Mix F; 61,814 sq yds milling; 4,120 ft detector loop; 30,202 ft thermoplastic pavement marking; mobilization; traffic control and protection; Federally funded. (65 Working Days) (C-92-089-12) (2-15170-0000, 2-03240-0100 & 2-03240-0200) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 25. Contract No. 64C98 JoDaviess County District 2

Section 28-SO-DM FAP Route 301 (US 20) Removal of Longhollow Scenic Tower located 0.5 mile NW of IL 84 (S) south of Galena; includes removal of existing structure, special; mobilization; traffic control and protection. (10 Calendar Days) (Job No. C-92-039-07) (2-20857-0100) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 26. Contract No. 64G09 Henry County District 2

Section (130,131,4,5)RS-3 FAP Route 639 & FAP 37 (IL 17 & US 34) Project F-000S(883) Milling, patching and resurfacing on IL 17 and U.S. 34 from east of U.S. 150 to Market St. in Galena; includes 964 units excavation and grading of existing shoulders; 13,752 tons leveling binder; 16,521 tons HMA surface course, Mix C; 20,026 sq yds milling; 14,023 tons aggregate wedge shoulders; 300 ft concrete curb and gutter; 29,903 tons material transfer device; 35 days pilot car; 427,136 ft paint pavement marking; mobilization; traffic control and protection; Federally Funded. (90 Working Days) (Job No. C-92-055-12) (2-03270-0100) (See the Special Provisions for the DBE Percentage)

27. Contract No. 64H21 Winnebago County District 2

Section (5B)M FAP Route 738 (IL 251) Removal and replacement of concrete wearing surface and expansion joints on the bridges carrying IL 251 over Dry Run Creek (SN101-0033 & 0034) 0.1 mile north of Rosco; includes 143 tons HMA surface course, Mix C; 86 tons HMA surface course, Mix D; 2,143 sq yds milling; 13.8 cu yds concrete removal; 13.6 cu yds concrete; 730 sq yds bridge deck grooving; 980 lbs epoxy coated reinforcement bars; 163 ft preformed joint strip seal; 2,985 ft shoulder rumble strips; 5,144 ft thermoplastic pavement marking; 784 sq ft bridge deck scarification; 784 sq ft bridge deck latex concrete overlay; 20 sq yds deck slab repair mobilization; traffic control and protection; (35 Working Days) (Job No. C-92-136-11) (0-01618-2006) (See the Special Provisions for the DBE Percentage)

28. Contract No. 64H22 Winnebago County District 2

Section (5B-1)M-1 FAP Route 738 (IL 251) Removal and replacement of concrete wearing surface and expansion joints on structures carrying IL 251 over North Kinnikinnick Creek (SN 101-0035,0036) 0.1 mile south of Hononegah Rd. in Roscoe; includes 120 tons HMA surface course, Mix C; 102 tons HMA surface course, Mix D; 2,108 sq yds milling; 29 cu yds concrete removal; 29 cu yds concrete; 1,057 sq yds bridge deck grooving; 4,010 lbs epoxy coated reinforcement bars; 208 ft preformed joint strip seal; 2,656 ft shoulder rumble strips; 1,017 sq yds bridge deck scarification; 1,017 sq yds bridge deck latex concrete overlay; 20 sq yds deck slab repair; 5,107 ft thermoplastic pavement marking; mobilization; traffic control and protection; (35 Working Days) (Job No. C-92-137-11) (0-01618-2008 & 2009) (See the Special Provisions for the DBE Percentage)

29. Contract No. 64H23 Winnebago County District 2

Section (5B-2)M FAP Route 738 (IL 251) Removal and replacement of the concrete wearing surface and expansion joints on the two structures carrying IL 251 over south Kinnikinnick Creek (SN 101-0037, 101-0038) located 0.8 mile south of Hononegah Rd. in Roscoe; includes 96 tons HMA surface course, mix C; 77 tons HMA surface course, mix D; 1,636 sq yds milling; 12 cu yds concrete removal; 12 cu yds concrete; 880 lbs epoxy coated reinforcement bars; 146 ft preformed joint seal; 2,112 ft shoulder rumble strips; 4,192 ft thermoplastic pavement marking; 637 sq yds bridge deck scarification; 637 sq yds bridge deck latex concrete overlay; 20 sq yds deck slab repair; mobilization; traffic control and protection. (35 Working Days) (C-92-138-11) (0-01618-2015) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 47: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 6 -

30. Contract No. 64H26 JoDaviess-Stephenson Counties District 2 Section D2 CS 2012-3 FAP Route 301 (US 20) Routing, cleaning and sealing the centerline crack on US 20, from Galena Oaks Rd. to Logemann Rd. in Jo Daviess County and from Jo Daviess County line to Rees Rd. in Stephenson County; includes 56,722 ft crack routing (pavement); 23,635 lbs crack filling; 201,338 ft paint pavement marking; mobilization; traffic control and protection. (15 Working Days) (C-92-135-11) (0-01618-2019 & 2021) (See the Special Provisions for the DBE Percentage)

31. Contract No. 64H43 Ogle County District 2

Section D2 MRS 2012-12 FAP Route 742 (IL 2) Intermittent milling and resurfacing on IL 2 from south limits of Oregon to Castle Rock State Park; includes 554 tons leveling binder; 812 tons HMA surface course, Mix C; 9,659 sq yds milling; 21,516 ft paint pavement marking; mobilization; traffic control and protection. (15 Working Days) (C-92-047-12) (0-01618-2026) (See the Special Provisions for the DBE Percentage)

32. Contract No. 64H64 Rock Island County District 2

Section 106M FAP Route 310 (US 67) Project HSIP-310(149) Safety related improvements consisting of flashing beacon, rumble resurfacing and sign repair on US 67, 0.1 mile north of the Mercer County line; includes 54 sq ft sign panel; 120 ft wood sign support; 5 solar-power flashing beacon assemblies (complete); 200 sq yds rumble resurfacing; mobilization; traffic control and protection; Federally funded. (15 Working Days) (C-92-067-12) (2-30080-0100) (See the Special Provisions for the DBE Percentage)

33. Contract No. 64H66 Rock Island County District 2

Section 112TS-9 FAU Route 5855 (19TH ST) Project HSIP-5855(3) Installation of supplemental traffic signals and advance warning signs at the intersection of 19th St. and "Avenue of the Cities" in East Moline; includes 69 ft underground conduit; 1 controller; 30 ft electric cable; 2 signal heads, LED; mobilization; traffic control and protection; Federally funded. (15 Working Days) (C-92-066-12) (2-30077-0100) (See the Special Provisions for the DBE Percentage)

34. Contract No. 64H71 Rock Island County District 2

Section (81-2HB-1)M FAI Route 74 (I-74) Project NHI-74-1(109)3 Deck patching, HMA wearing surface, waterproofing membrane surface and expansion joint replacement on the two structures carrying I-74 under IL 5 in Moline (SN 081-0097, 0098); includes 347 tons leveling binder; 59 tons HMA surface course, mix C; 744 tons HMA surface course, mix E; 527 sq yds milling; 66.7 cu yds concrete removal; 1,400 sq yds protective shield; 72.8 cu yds concrete; 12,420 lbs epoxy coated reinforcement bars; 406 ft preformed joint strip seal; 2,247 ft shoulder rumble strips; 16,232 ft paint pavement marking; 2,404 sq yds sheet waterproofing membrane system; 420 sq yds deck slab repair; mobilization; traffic control and protection; Federally funded. (35 Working Days) (C-92-054-12) (2-30098-0100) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 35. Contract No. 64H72 Winnebago County District 2

Section (201-1B)M-3 FAI Route 39 (I-39) Project NHI-39-1(31)116 Removal and replacement of the HMA wearing surface and waterproofing membrane system and superstructure retrofit on the 2 bridges carrying I-39 over the Kishwaukee River located 0.8 mile south of Blackhawk Rd. south of Rockford (SN 101-0133, 0134); includes 920 cu yds earth excavation; 370 cu yds furnished excavation; 1 acre seeding; 1,571 sq yds subbase granular material; 112 tons HMA surface course, mix C; 1,083 tons HMA surface course, mix D; 1,140 tons HMA surface course, mix E; 1,382 sq yds PCC pavement (jointed); 492 sq yds pavement removal; 20,846 sq yds milling; 998 sq yds HMA shoulders; 17,140 lbs epoxy coated reinforcement bars; 97.5 cu yds concrete; 11,370 ft shoulder rumble strips; 19,445 ft epoxy pavement marking; 9,797 sq yds milling; partially remove and reinstall fixed anti-icing technology (FAST) system; mobilization; traffic control and protection; Federally funded. (Completion Date: November 20, 2012) (C-92-127-12) (2-30093-0100) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 36. Contract No. 64H78 Whiteside County District 2

Section D2 DECK SEALING 2012-1 Various Routes (VARIOUS) Application of concrete sealer to bridges at various locations in Whiteside County; includes 389,105 sq ft concrete sealer; mobilization; traffic control and protection. (25 Working Days) (C-92-056-12) (2-92000-0100) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 48: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 7 -

Small Business Set-Aside. 37. Contract No. 64H79 Winnebago County District 2

Section D2 DECK SEALING 2012-2 Various Routes (VARIOUS) Application of concrete sealer to bridge decks at various locations in Winnebago County; includes 394,572 sq ft concrete sealer; mobilization; traffic control and protection. (25 Working Days) (C-92-057-12) (2-92000-0200) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 38. Contract No. 64H80 Rock Island County District 2

Section D2 DECK SEALING 2012-3 Various Routes (VARIOUS) Application of concrete sealer to bridges at various locations in Rock Island County; includes 625,732 sq ft concrete sealer; mobilization; traffic control and protection. (25 Working Days) (C-92-058-12) (2-92000-0300) (See the Special Provisions for the DBE Percentage)

39. Contract No. 66B49 Bureau County District 3

Section (06-4BR-1)I FAI Route 80 (I-80) Bridge repairs including replacement of expansion joints, deck patching, riprap, beam repairs and other work on the structures carrying I-80 eastbound and westbound over Burea Creek (SN 006-0151, 0152) 2 miles west of IL 26 near Princeton; includes 614 tons stone dumped riprap; 89 tons polymerized HMA surface course, mix D; 14 cu yd concrete removal; 14 cu yd concrete; 2,780 lb epoxy coated reinforcement bars; 176 ft preformed joint strip seal; 1,067 sq yd milling; 77 sq yd deck slab repair; 504 sq yd slope wall breaking; 3,678 ft epoxy pavement marking; 9 sq ft structural repair of concrete; mobilization; traffic control and protection. (30 Working Days) (C-93-130-11) (0-01618-3014) (See the Special Provisions for the DBE Percentage)

40. Contract No. 66B50 LaSalle County District 3

Section (50-4HB-1)I FAI Route 39 (I-39) Structural repair of concrete, and application of silicone joint sealer on the structure carrying Walnut St. over I-39 0.78 mile west of IL 351 (SN 050-0199); includes 445 sq ft structural repair of concrete; 130 ft silicone joint sealer; mobilization; traffic control and protection. (15 Working Days) (C-93-131-11) (0-01618-3015) (See the Special Provisions for the DBE Percentage)

41. Contract No. 66B96 Livingston County District 3

Section D3 INTERMITTENT RS 2012-01 FAI Route 55 (I-55) Project IM-55-5(111)195 Intermittent milling and resurfacing along 10 miles of I-55 in Livingston County; includes 68,670 sq yds milling; 12,370 tons polymerized HMA surface course, Mix D; 378 sq yds patching; 2,166 ft saw cuts; 127 tons HMA shoulders; 45,631 ft modified urethane pavement marking; 45,631 ft grooving for recessed pavement marking; 12,370 tons material transfer device; mobilization; traffic control and protection; Federally funded. (20 Working Days) (C-93-068-12) (3-05553-0200) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 42. Contract No. 70970 Champaign-Vermilion Counties District 5

Section D5 WEED SPRAYING 2012-1 FAI Route 57 & 74 (I-57 & I-74) This project consists of weed spraying at Various Locations along Interstates 57 and 74 in Champaign and Vermilion Counties; includes 26 lb Escort XP herbicide; 23 gal Milestone VM; mobilization. (Completion Date: October 15, 2012) (C-95-007-12) (Formal Contracts) (See the Special Provisions for the DBE Percentage)

43. Contract No. 72C92 Hancock County District 6

Section 106RS-6 FAP Route 514 (IL 94) Project F-514(11) This project consists of 3P resurfacing and patching on Illinois Route 94 from Illinois Route 9 to Powellton Road located east of Coluse; includes 109 cu yd furnished excavation; 140 ton prime coat; 2,389 ton leveling binder (machine method); 541 sq yd HMA surface removal-butt joint; 5,135 ton HMA surface course, N50; 730 sq yd HMA surface removal; 630 sq yd pavement patching; 42,111 ft strip reflective crack control treatment; 1,580 ton aggregate shoulders; 625 ft steel plate beam guardrail; 52,073 ft paint pavement marking line; 290 ft preformed plastic pavement marking line; 267 raised reflective pavement marker; 56,907 sq yd HMA surface removal (variable depth); 380 sq ft sign panel; traffic control and protection; mobilization; Federally funded. (40 Working Days) (C96-087-09) (6-00424-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 49: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 8 -

44. Contract No. 74560 Coles County District 7 Section 15(22,23,24,25,26)RS-4 FAI Route 57 (I-57) Project IM-57-4(131)190 This project consists of patching and resurfacing on Interstate 57 from a point just north of Illinois Route 16 continuing northerly from approximately 10.8 miles; includes 8,999 sq yd HMA surface removal-butt joint; 50,497 ton polymerized HMA binder and surface course; 5,586 sq yd Class D patches; 5,644 ton aggregate shoulders; 31,299 ton HMA shoulders; 6,987 ft remove and re-erect steel plate beam guardrail; 209,520 ft shoulder rumble strips; 26,205 ft preformed plastic pavement marking; 209,640 ft modified urethane pavement marking line; 2,620 raised reflective pavement marker; 1,877 ton partial depth patching; 5,585 sq yd partial depth removal (variable depth); 209,712 ft grooving for recessed pavement marking; 50,497 ton material transfer device; traffic control and protection; mobilization; Federally funded. (Completion Date: November 16, 2012) (C-97-034-12) (7-50885-0000) (See the Special Provisions for the DBE Percentage) MANDATORY PRE-BID CONFERENCE

45. DELETED FROM THE LETTING In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 46. Contract No. 78056 Jackson County District 9

Section (12-1)B-1 FAP Route 331 (IL 13) Project ACNHF-331(60) The project involves replacing two three-span bridges (S.N. 039-0013 & 039-0049), with two new five-span structures located on Illinois Route 18 near Murphysboro; includes 4,963 sq yd stone riprap; 2,108 sq yd HMA pavement; 295 sq yd bridge approach pavement connector; 2 removal of existing structures; 2,255 cu yd structure excavation; 4,750 cu yd cofferdam excavation; 4 cofferdam; 5,817 cu yd concrete; 4,946 sq yd bridge deck grooving; 1,245,870 lb furnishing and erecting structural steel; 1,197,890 lb reinforcement bars, epoxy coated; 19,233 ft furnishing and driving steel piles; 36 elastomeric bearing assembly; 501 ft pipe culverts; 16 traffic barrier terminals; 100 ft steel plate beam guardrail; 4,660 ft thermoplastic pavement marking line; 2,786 ft polyurea pavement marking line; 1,025 ft conduit embedded in structure; 3,075 ft electric cable in conduit; 8 light pole; 340 ft pipe underdrains for structures; traffic control and protection; mobilization; Federally funded. (275 Working Days) (C-99-040-08) (9-97920-0000) (See the Special Provisions for the DBE Percentage) MANDATORY PRE-BID CONFERENCE

47. Contract No. 85522 Stephenson County District 2

Section 09-00024-00-SW (LENA) Various Routes Project SRTS-4009(53) This project consists of construction of sidewalk with related earth excavation, utility adjustments, curb and gutter and driveway removal and replacement located at Various locations within the Village of Lena; includes 948 sq yd topsoil furnish and place, 4"; 25 ton subbase granular material, Type A; 73.2 ton HMA; 978 sq yd PCC driveway pavement, 7"; 17,832 sq ft PCC sidewalk, 5"; 5 ft storm sewer, Class A, Type 1, 15"; 16.50 sq ft sign panel, Type 1; 847 ft epoxy pavement marking - Line 6"; 285 ft curb removal and replacement; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds) (55 Working Days) (C-40-044-09) (0-01683-0000) (See the Special Provisions for the DBE Percentage)

48. DELETED FROM LETTTING 49. Contract No. 87457 DeKalb County District 3

Section 10-00010-00-SW (HINCKLEY) Various Routes Project SRTS-4009(112) This project consists of the construction of PCC sidewalk and the construction of an 8' wide HMA pedestrian path, located at various locations in the Village of Hinckley; includes 538 cu yd earth excavation; 3,775 sq yd topsoil furnish and place, 4"; 508.5 ton aggregate course Type B; 119 ton HMA; 12 sq yd PCC drive pavement, 6"; 15,691 sq ft PCC sidewalk, 5"; 27 sq yd Class D patches, Type III, 4"; 351 ft pipe culverts, Class C, Type 1, 12"; 44 sq ft sign panel, Type 1; 658 ft thermoplastic pavement markings - Line 6"; 245 sq yd HMA driveway pavement, 3"; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (C-40-059-09) (0-01683-3005) (See the Special Provisions for the DBE Percentage)

50. Contract No. 87507 Kendall County District 3

Section 11-00044-00-SP (OSWEGO) FAU Route 2508 (DOUGLAS ROAD) Project M-9003(876) Project consists of constructing a new raised concrete median, signage, pavement markings and all other incidental items to replace a bi-directional left turn lane on FAU Route 2508 (Douglas Road) at the first intersection South of U.S. Route 34 in the Village of Oswego; includes 126.1 ton sub-base granular material; 505 sq yd pavement removal; 650 ft combination concrete curb and gutter; 2,818 sq ft concrete median surface; 751 sq ft concrete median; 2,096 ft thermoplastic pavement marking line; 548 sq ft pavement marking removal; 20 sq ft sign panel; traffic control and protection; Federally Funded. (15 Working Days) (Job No. C-93-036-12) (3-10457-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 50: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 9 -

51. Contract No. 87511 LaSalle County District 3 Section 09-00163-00-WR (OTTAWA) FAU Route 6039 (ADAMS STREET) Project M-5052(27) Project consists of roadway widening, curb and gutter, sidewalk, resurfacing with HMA and all other incidental items to complete the work on FAU Route 6039 (Adams Street) from McKinley Road to 4-H Road in the City of Ottawa; includes 272 unit tree removal; 2,252 cu yd earth excavation; 1,260 sq yd topsoil furnish and place; 2,790 ton aggregate base course; 1,660 gal bituminous materials (prime coat); 570 ton HMA binder course; 370 ton HMA surface course; 76 ton incidental HMA surfacing; 8,531 sq ft PCC sidewalk; 1,581 sq yd HMA surface removal; 576 ft combination curb and gutter removal; 2,177 sq ft sidewalk removal; 313 ft storm sewers; 11 manholes to be adjusted; 2,359 ft combination concrete curb and gutter; 1,069 ft thermoplastic pavement marking line; traffic control and protection; Federally Funded. (50 Working Days) (Job No. C-93-031-12) (3-10377-0000) (See the Special Provisions for the DBE Percentage)

52. Contract No. 87517 Iroquois County District 3

Section 12-00229-00-SP FAS Route 316 (CH 23) Project HSIP-316(110) Project consists of constructing a HMA surface including leveling course, a surface course and all other incidental items to complete the work at the intersection of FAS Route 316 (CH 23) and E 2800 North; includes 450 gal bituminous materials (prime coat); 500 ton level binder (machine method); 490 sq yd HMA surface removal; 375 ton HMA surface course; 40 ton incidental HMA surfacing; 1,000 ton aggregate shoulders; 7,100 ft paint pavement marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (10 Working Days) (C-93-047-12) (0-01663-3002) (See the Special Provisions for the DBE Percentage)

53. Contract No. 87518 Iroquois County District 3

Section 12-00229-01-SP FAS Route 316 (CH 23) Project HSIP-316(111) This project consists of replacing existing bridge rail and install approach guardrail located on CH 23, 2 miles North of IL 116; includes 112.5 ft steel plate beam guardrail, Type A, 6' posts; 237 ft guardrail removal; 12 ea guardrail markers; 192.5 ft steel railing Type 2399 (special); Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (10 Working Days) (C-93-048-12) (0-01663-3001) (See the Special Provisions for the DBE Percentage)

54. DELETED FROM LETTING 55. Contract No. 89432 Mercer County District 4

Section 05-00096-00-BR FAS Route 217 (CH 6) Project BRS-217(106) Project consists of the removal of the existing single span reinforced concrete slab bridge and replacing it with a single span precast prestressed concrete deck beam bridge (33" depth) with approach roadway work on FAS Route 217 (CH 6) over Maids Run Creek, 2.5 miles east of Sunbeam; includes 630 cu yd channel excavation; 3,699 sq yd erosion control blanket; 958 ton subbase granular material; 143 ton aggregate surface course; 641 gal bituminous materials; 115 ton HMA binder course; 152 ton HMA surface course; 149 ton aggregate shoulders; 1 removal of existing structures; 2,205 sq ft precast prestressed concrete deck beams (33" depth); 4,600 lb reinforcement bars; 448 ft furnishing driving shell piles; 662 ft portland cement mortar fairing course; 1,340 cu yd earth excavation; 747 ton stone riprap, Class A5; 273 ton breaker-run crushed stone; 437 ft fence removal; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (55 Working Days) (C-94-131-06) (4-10230-0000) (See the Special Provisions for the DBE Percentage)

56. Contract No. 89598 Tazewell County District 4

Section 10-00109-00-BT (WASHINGTON) FAU Route 6728 (NORTH CUMMINGS LANE) Project TE-D4(110) This project consists of construction of a 10 foot wide shared bicycle and pedestrian HMA recreational trail; pedestrian signals added to current traffic signals located from 501 North Cummings Lane to St. Clare Court in the City of Washington; includes 743 cu yd earth excavation; 654 cu yd furnished excavation; 3,579 sq yd aggregate base course, Type B, 6"; 401 ton HMA surface course, Mix "C", N50; 125 sq yd PCC driveway pavement, 7"; 1,376 sq ft PCC sidewalk, 4"; 72 ft pipe culverts, Class D, Type 1, equivalent round - size 36"; 300 sq ft concrete median surface, 6"; 145 ft chain link fence, 5'; 964 ft thermoplastic pavement markings; 99 sq ft island surface removal and replacement; 901 ft electric cable in conduit, signal, No. 14 7C; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (C-94-032-11) (0-00992-4007) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 51: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 10 -

57. Contract No. 91462 Douglas County District 5 Section 09-00096-00-RS FAS Route 522 (CH 6) Project RS-522(118) Project consist of resurfacing, construction of new aggregate shoulders, incidental HMA surfacing and all other incidental items to complete the work on FAS Route 522 (CH 6) from 50 feet east of Henson Road to the Douglas County Line; includes 127 ton aggregate surface course; 5,271 gal bituminous materials (prime coat) 7,872 ton HMA binder course; 1,625 sq yd HMA surface removal; 5,904 ton HMA surface course; 277 gal bituminous materials (prime coat); 672 ton incidental HMA surfacing; 1,970 sq yd Class D patches; 5,144 ton aggregate shoulders; 69,049 ft thermoplastic pavement marking line; 362 raised reflective pavement markers; traffic control and protection; Federally Funded. (35 Working Days) (Job No. C-95-323-11) (5-10346-0000) (See the Special Provisions for the DBE Percentage)

58. Contract No. 91466 McLean County District 5

Section 11-00041-03-RS FAS Route 489 (CH 21) Project RS-489(108) This project consists of resurfacing FAS 489 from north side of the Baker Bridge to the intersection of CH 18; includes 444 sq yd HMA base course 6"; 1,125 ton leveling binder (machine method), N50; 5,315 ton HMA; 29,150 sq yd area reflective crack control treatment, system A; 2,650 ton aggregate shoulders, Type B; 300 ft combination concrete curb & gutter, Type M-6.18; 37.5 ft steel plate beam guard rail, Type A, 6' posts; 157 raised reflective pavement markers; Federally Funded. (20 Working Days) (Job No. C-95-312-12) (5-10370-0000) (See the Special Provisions for the DBE Percentage)

59. Contract No. 91467 Edgar County District 5

Section 10-00101-00-SP FAS Route 680 (CH 4) Project HSIP-680(109) This project consists of adding a 3' bituminous safety shoulder with rumble strips throughout project, restriping, raised reflective pavement markers, centerline rumble strip, resurfacing, remove and replace deficient guardrail and extend or modify box culverts and cross road pipe culverts located on Lower Terre Haute Road from East edge of Elbridge to the Illinois/Indiana state line; includes 215 cu yd earth excavation; 1,630 cu yd furnished excavation; 179 ton subbase granular material, Type C; 415 ton aggregate surface course, Type B; 4,147 ton leveling binder (machine method), N50; 12,495 sq yd HMA; 5,740 ton HMA; 1,370 lb reinforcement bars, epoxy coated; 65 ft steel railing, Type SM; 5.5 cu yd concrete box culverts; 158 ft pip culverts; 1,400 ft steel plate beam guardrail, Type A, 9' posts; 27,874 ft shoulder rumble strips, 8"; 6 cal mo engineer's field office, Type A; 69,530 ft paint pavement marking - Line 4"; 326 raised reflective pavement markers; 18,565 ft center line - rumble strip - 8"; Federally Funded. (55 Working Days) (Job No. C-95-313-12) (0-01663-5002) (See the Special Provisions for the DBE Percentage)

60. Contract No. 91468 Champaign County District 5

Section 10-00026-00-BT (MAHOMET) LAKE OF THE WOODS PATHWAY Project TE-D5(98) Project is to construct a PCC multi-purpose pathway including earthwork, storm sewer, seeding and other incidental items to complete the work on the Lake of the Woods Pathway, from Barber Park on South McDougal Road to the Forest Preserve Main Entrance in the Village of Mohamet; includes 228 unit tree removal; 394 cu yd earth excavation; 452 cu yd furnished excavation; 1,353 cu yd topsoil excavation and placement; 520 ft perimeter erosion barrier; 80 ton aggregate surface course; 109 gal bituminous materials (prime coat); 214 ft polyurea pavement marking; 428 sq yd HMA pavement (full depth); 39,997 sq ft PCC sidewalk; 1,551 sq yd pavement removal; 393 ft pipe culvert removal; 238 ft pipe culverts; 915 ft storm sewers; 14 trees; traffic control and protection; Federally Funded. (70 Working Days) (Job No. C95-315-12) (0-00992-5005) (See the Special Provisions for the DBE Percentage)

61. Contract No. 93566 Macoupin County District 6

Section 10-00037-00-SW (CARLINVILLE) LOVELESS PARKWAY Project TE-D6(108) Project consists of constructing a new 5' wide 4" thick PCC sidewalk with earth shoulders across city property and undeveloped right of way including earthwork, minor culvert construction, seeding, signing, striping and all other incidental items to complete the work on Loveless Parkway from South Locust Street to 1/4 mile west of the City of Carlinville; includes 80 cu yd earth excavation; 135 lb fertilizer nutrients; 1 ton agricultural ground limestone; 35 lb temporary erosion control seeding; 6,502 sq ft PCC sidewalk; 25 sq ft sidewalk removal; 50 ft pipe culvert removal; 49 ft pipe culverts, Class D; 18 sq ft sign panel; 25 ft metal post; 46 ft paint pavement marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (C-96-214-12) (0-00992-6009) (See the Special Provisions for the DBE Percentage)

62. Contract No. 95675 Jasper County District 7

Section 10-00117-00-FP FAS Route 1705 (CH 3) Project RS-1705(103) Reconstruction of the existing roadway with an 8" soil-cement base course with a bituminous cover and seal on FAS Route 1705 (CH 3) from FAP Route 95 to 1400N; includes 60,518 sq yd processing soil-cement base course; 37,643 cement (100 wt); 36,311 gal bituminous materials (cover and seal coat); Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (C-97-068-12) (7-10622-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 52: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 11 -

63. Contract No. 99469 Jefferson County District 9

Section 09-00202-00-RS FAS Route 823 (CH 5) Project RS-81(66) This project consists of HMA resurfacing, aggregate shoulders and striping located on Log Cabin Road from IL 42 to 1.4 miles South of IL 142; includes 508 ton aggregate; 883.2 ton leveling binder (machine method), N50; 1,675 ton HMA surface course Mix "C", N50; 17,887 ft thermoplastic pavement marking - Line 4"; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (C-99-527-10) (9-10392-0000) (See the Special Provisions for the DBE Percentage)

64. Contract No. 46212 Various Counties District TR

Section SRWDE FRWY SIGN MAINT 2012-36 Various Routes (VARIOUS) This project consists of repairing or replacing damaged sign components and installing new signs as described in work orders; includes 24,500 sq ft sign panel; 60,000 lb structural steel sign support; 90 ft overhead sign structure-span; 250 cu yd concrete foundations; 25 install rest area sign; 1,500 ft furnish and erect graffiti resistant sign panel; 40 repair sign panel; 8,000 sq ft remove and reinstall sign panel; 2,000 sq ft furnish and erect sign panel-logo; 125 re-erect existing structural steel sign support-breakaway; 30 ft replace overhead sign walkway; mobilization. (Completion Date: December 31, 2013) (Job No. C-60-036-12) (0-01568-6002) (See the Special Provisions for the DBE Percentage)

65. Contract No. 46213 Various Counties District TR

Section INT ATTRACT SIGN 2012-37 Various Routes (VARIOUS) This project consists of installing tourist attraction and business logo signs at locations described in work orders; includes 15,000 sq ft sign panel; 43,000 lb structural steel sign support-breakaway; 100 cu yd concrete foundations; 900 sq ft remove and reinstall sign panel; 20 remove existing sign support; 160 install service sign or mileage plate; 50 transfer service sign; traffic control and protection; mobilization. (Completion Date: December 31, 2013) (C-60-037-12) (0-01568-6003) (See the Special Provisions for the DBE Percentage)

66. Contract No. 60T31 Cook County District 1

Section 2012-001-I FAU Route 2612;FAP 330 (LEMONT RD;US 12/20/45) Cleaning and repairing damaged drainage scuppers and downspouts on structures located on Lemont Rd. over Des Plaines River, I&M Canal and railroad in Lemont (SN 016-2504) and Mannheim Rd. over Proviso Railroad Yard in Melrose Park (016-0337); includes cleaning drainage system; 2,232 ft bridge drainage system repairs; mobilization; traffic control and protection. (35 Working Days) (Job No. C-91-323-12) (0-01282-1000) (See the Special Provisions for the DBE Percentage)

67. Contract No. 60R89 Will County District 1

Section 2011-226-I FAI Route 55 (I-55) Crack and joint sealing and restriping along 14.5 miles of I-55 from north of I-80 to Weber Rd. in Will County; includes 858,358 ft crack routing (pavement); 326,176 ft crack filling; 625,926 ft hot spray thermoplastic; pavement marking; mobilization; traffic control and protection. (55 Working Days) (Job No. C-91-266-12) (1-78898-0000) (See the Special Provisions for the DBE Percentage)

68. Contract No. 60R90 Cook County District 1

Section 2011-225-I FAP Route 332 (IL 394) Crack and joint sealing and restriping along 6.69 miles of IL 394 from Thornton-Lansing Rd. to Steger Rd. in Cook County; includes 336,050 ft crack routing (pavement); 127,699 ft crack filling; 160,019 ft hot spray thermoplastic pavement marking line; mobilization; traffic control and protection. (30 Working Days) (C-91-237-12) (1-78899-0000) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 69. Contract No. 60R91 McHenry County District 1

Section 2011-227-I Various Routes (VARIOUS) Bridge deck sealing on various bridges at various locations in McHenry County; includes 265,726 sq ft concrete sealer; mobilization; traffic control and protection. (20 Working Days) (C-91-238-12) (1-78902-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 53: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 12 -

Small Business Set-Aside. 70. Contract No. 60R92 Cook-Kane Counties District 1

Section 2011-228-I Various Routes (VARIOUS) Bridge deck concrete sealing on various structures at various locations in Cook County; includes 354,474 sq ft concrete sealer; mobilization; traffic control and protection. (30 Working Days) (Job No. C-91-239-12) (1-78903-0000) (See the Special Provisions for the DBE Percentage)

71. Contract No. 62339 Cook County District 1

Section 102Y-A-B FAP Route 344 (IL 83) Project NHF-344(55) Replacement of the bridge carrying Calumet Sag Road over Mill Creek (SN 016-2826); includes 381 units tree removal; 775 cu yd earth excavation; 2,420 sq yd compost; 1.0 acre seeding; 2,420 sq yd erosion control blanket; 2,858 sq yd HMA pavement (full-depth); 2,845 sq yd pavement removal; 1,830 sq yd HMA shoulders; removal of existing structures; 850 ft steel plate beam guardrail; 2 traffic barrier terminals; 1,682 cu yd non-special waste disposal; 8,342 ft thermoplastic pavement marking; 26 intermediate trees; 155 ft precast concrete box culvert 12' X 10'; 2,869 sq yd aggregate subgrade; 1,035 cu yd porous granular embankment, subgrade; mobilization; traffic control and protection; Federally funded. (45 Working Days) (C-91-477-01) (1-75751-0100) (See the Special Provisions for the DBE Percentage)

72. Contract No. 63507 Kane County District 1

Section 04-00043-00-PV (EAST DUNDEE) Various Routes Project M-9003(247) Project consists of earth excavation, removal of existing pavement in stages, driveways, and sidewalk construction of water main, storm sewers, drainage structures, combination curb and gutter, and bituminous concrete pavement together with pavement markings and all other incidental items to complete the work on FAU Route 2528 from South Corporate Limits to Barrington Road in the Village of East Dundee; includes 291 unit tree removal; 9,180 cu yd earth excavation; 1,065 cu yd removal and disposal of unsuitable material; 2,554 cu yd trench backfill; 5,542 sq yd topsoil furnish and place; 2,380 sq yd erosion control blanket; 150 lb temporary erosion control seeding; 5,225 ft perimeter erosion barrier; 40 inlet filters; 19,828 sq yd aggregate subgrade improvement; 373 sq yd HMA base course; 305 ton aggregate for temporary access; 13,970 gal bituminous materials (prime coat); 26 ton aggregate (prime coat); 42 ton HMA surface course; 17,195 sq yd HMA pavement (full depth); 9,234 sq ft PCC sidewalk; 15,682 sq yd pavement removal; 929 sq yd driveway pavement removal; 7,810 ft combination curb and gutter removal; 9,549 sq ft sidewalk removal; 3,430 ft storm sewers, rubber gasket; 3,672 ft ductile iron water main; 827 ft water service line; 33 catch basins; 19 valve vaults; 10,523 ft combination concrete curb and gutter; 13,675 ft thermoplastic pavement marking line; 4,912 ft underground conduit; 14,532 ft electric cable conduit, 600V; 37 luminaries; 21 trees; 7,715 lb ductile iron water main fittings; 1,026 sq yd aggregate subgrade; 450 sq ft precast modular block wall; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (170 Working Days) (Job No. C-91-345-09) (1-20552-0000) (See the Special Provisions for the DBE Percentage)

73. Contract No. 63673 DuPage County District 1

Section 11-00102-00-RS (DOWNERS GROVE) FAU Route 2614 (CARPENTER STREET) Project M-9003(871) This project consists of grinding and resurfacing with polymerized level binder and HMA surface course, patching, curb removal, and replacement located on Carpenter Street from Maple Avenue to Gilbert Avenue in the Village of Downers Grove; includes 110 sq yd topsoil furnish and place, 4"; 199 ton polymerized leveling binder (machine method), IL-4.75, N50; 398 ton HMA surface course Mix "D", N50; 55 sq yd PCC driveway pavement, 6"; 520 sq ft PCC sidewalk, 5"; 4,600 sq yd HMA surface removal, 2"; 470 sq yd Class D patches; 355 ft combination concrete curb and gutter, Type B-6.18; 25 ft thermoplastic pavement marking-Line 24"; 15 sq yd HMA driveway pavement, 3"; 17 ea inlet filter cleaning; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-91-105-12) (1-21222-0000) 63673 (See the Special Provisions for the DBE Percentage)

74. Contract No. 63674 Cook County District 1

Section 11-00150-00-RS (CALUMET CITY) FAU Route 3596 (STATE STREET) Project TCSP-IL11(36) This project consists of HMA surface removal and replacement, sidewalk removal and replacement, curb and gutter removal and replacement and drainage structure adjustment located on State Street from Lincoln Avenue to State Line Road in the city of Calumet City; includes 662 ton polymerized leveling binder (machine method), IL-4.75, N50; 993 ton HMA surface course, Mix "D", N70; 1,326 sq ft PCC sidewalk, 5"; 12,233 sq yd HMA surface removal; 1,072 sq yd Class D patches; 412 ft combination curb and gutter, Type B-6.12; 8,210 ft thermoplastic pavement markings; 100 ea raised reflective pavement markers; 192 ft detector loop replacement; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (C-91-099-12) (1-21218-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 54: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 13 -

75. Contract No. 63675 Kane County District 1 Section 10-00179-00-ST (ELGIN) Various Routes Project SRTS-4009(63) This project consists of placement of school crosswalk pavement markings at 18 schools located on Various Routes within the City of Elgin; includes 1,196 sq ft epoxy pavement marking letters and symbols; 26,583 ft epoxy pavement markings; 17,821 sq ft pavement marking removal; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-40-010-10) (0-01683-1008) (See the Special Provisions for the DBE Percentage)

76. Contract No. 63678 Cook County District 1

Section 11-00053-00-RS (GLENWOOD) FAU Route 1071 (MINERVA_AVENUE) Project M-9003(905) This project consists of resurfacing with leveling binder and HMA surface course, curb & gutter repair, pavement patching and pavement markings located on Minerva Avenue from Glenwood-Dyer Road to Glenwood-Lansing Road in the Village of Glenwood; includes 8,720 sq yd HMA surface removal 2"; 115 sq yd topsoil furnish and place, 4"; 370 ton polymerized leveling binder (machine method), IL-4.75, N50; 740 ton HMA surface course, Mix "D", N50; 120 sq yd PCC driveway pavement, 7"; 690 sq ft PCC sidewalk, 5"; 288 sq ft detectable warnings; 161 sq yd Class D patches; 1,349 ft thermoplastic pavement markings; 490 ft combination concrete curb and gutter removal and replacement; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-91-164-12) (1-21224-0000) (See the Special Provisions for the DBE Percentage)

77. Contract No. 63680 Cook County District 1

Section 11-00111-00-RS (TINLEY PARK) FAU Route 1609 (167TH STREET) Project M-9003(919) Project consists of edge grinding, hot-in-place recycling and surface course placement, curb and gutter repair, pavement patching, pavement marking and all other incidental items to complete the work on FAU Route 1609 (16th Street) from 80th Avenue to Harlem Avenue in the Village of Tinley Park; includes 516 sq yd topsoil furnish and place; 5,022 gal bituminous materials (prime coat); 51 ton aggregate (prime coat); 105 ton leveling binder (machine method); 545 sq yd HMA surface removal-butt joint; 2,216 ton HMA surface course; 1,740 sq ft PCC sidewalk removal and replacement; 416 sq ft detectable warnings; 1,784 sq yd HMA surface removal; 252 sq yd class C patches; 468 sq yd class D patches; 1,606 ft strip reflective crack control treatment; 1,682 sq yd fiberglass fabric repair system; 5,600 ft short term pavement marking; 16,716 ft thermoplastic pavement marking line; 2,333 gal rejuvenating agent; 23,325 sq yd hot-in-place recycling; 6,878 sq yd HMA surface removal, special; 3,379 ft combination curb and gutter removal and replacement; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-91-180-12) (1-21231-0000) (See the Special Provisions for the DBE Percentage)

78. Contract No. 63685 Cook County District 1

Section 10-00055-00-SP (LINCOLNWOOD) Various Routes Project SRTS-4009(65) Project consists of two traffic calming bump outs, various new signs and the relocation of existing signs, removal and replacement markings and all other incidental items to complete the work at various locations in the Village of Lincolnwood; includes 45 cu yd earth excavation; 310 sq yd aggregate base course; 125 sq yd PCC course base; 65 gal bituminous materials (prime coat); 95 ton HMA surface course; 5,300 sq yd PCC sidewalk; 775 sq yd HMA surface removal; 890 ft combination concrete curb and gutter removal; 5,150 sq ft sidewalk removal; 540 tie bars; 1,225 ft combination concrete curb and gutter 3,275 ft thermoplastic pavement marking line; 2,000 sq ft pavement marking removal; 350 sq yd topsoil furnish and place; 380 sq ft PCC sidewalk; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 10, 2012) (Job No. C-40-013-10) (0-01683-1009) (See the Special Provisions for the DBE Percentage)

79. Contract No. 63687 Cook County District 1

Section 11-00134-00-RS (HOMEWOOD) FAU Route 1063 (WILLOW ROAD) Project M-9003(784) Project consists of HMA surface removal, leveling binder, HMA surface course, curb repair, sidewalk repair, paint pavement marking, detector loop replacement and all other incidental items to complete the work on FAU Route 1063 (Willow Road) from Harwood Avenue to Riegel Road in the Village of Homewood; includes 850 sq yd topsoil furnish and place; 850 sq yd sodding, salt tolerant; 1,060 sq yd aggregate base course; 1,703 gal bituminous materials (prime coat); 50 ton mixture for cracks, joints and flangeways; 684 ton polymerized leveling binder (machine method); 372 sq yd HMA surface removal-butt joint; 1,430 ton HMA surface course; 9,000 sq ft PCC sidewalk; 768 sq ft detectable warnings; 16,660 sq yd HMA surface removal; 1,225 ft combination curb and gutter removal; 9,000 sq ft sidewalk removal; 405 sq yd class D patches; 25 manholes to be adjusted; 43 frames and lids; 980 ft paint pavement marking line; 180 ft detector loop replacement; 1,225 ft combination concrete curb and gutter; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-91-380-11) (1-21050-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 55: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 14 -

80. Contract No. 63689 Kane County District 1 Section 11-00182-00-RS (ELGIN) FAU Route 1314 (KIMBALL STREET) Project M-9003(847) Project consists of pavement patching, concrete curb and gutter removal and replacement, sidewalk removal and replacement, detector loop replacement, structure adjustments, milling, keyway repair, bearing pad adjustment, waterproofing membrane system, resurfacing, pavement striping and all other incidental items to complete the work on FAU Route 1314 (Kimball Street) from Illinois Route 31 to Dundee Avenue in the City of Elgin; includes 3,198 gal bituminous materials (prime coat); 68 ton aggregate (prime coat); 1,080 ton polymerized leveling binder (machine method); 1,888 ton HMA surface course; 3,492 sq ft PCC sidewalk removal and replacement; 1,584 sq ft detectable warnings; 19,240 sq yd HMA surface removal; 187 sq yd class D patches; 3,110 sq yd waterproofing membrane system; 45 frames and lids; 3,840 ft short term pavement marking; 1,280 sq ft work zone pavement marking removal; 11,313 ft thermoplastic pavement marking line; 2,800 ft detector loop replacement; 3,110 sq yd bridge deck wearing surface; 3,110 sq yd HMA surface removal (deck); 323 ft combination concrete curb and gutter removal and replacement; 3,375 ft keyway repair; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-91-642-11) (1-21223-0000) (See the Special Provisions for the DBE Percentage)

81. Contract No. 63690 Cook County District 1

Section 11-00095-00-RS (PARK FOREST) FAU Route 1056 & FAU 1055 (INDIANWOOD & LAKEWOOD BLVD) Project M-9003(969) This project consists of HMA surface removal, sidewalk removal and replacement, combination concrete curb and gutter removal and replacement, structure adjustment, HMA surface course, leveling binder and pavement markings located on Indianwood Boulevard from Sauk Trail to Western Avenue and Lakewood Boulevard from Sauk Trail to Orchard Drive in the Village of Park Forest; includes 47 cu yd earth excavation; 1,658 ton polymerized leveling binder (machine method), IL-4.75, N50; 3,463 ton HMA surface course; 2,232 sq yd PCC driveway pavement; 41,209 sq yd HMA surface removal; 1,197 sq yd Class D patches; 240 ft storm sewers, rubber gasket, Class A, Type 1, 12"; 11,379 ft thermoplastic pavement markings; 75 ft detector loop, Type I; 3,968 sq ft PCC sidewalk, 5" special; 1,772 sq yd parkway restoration; 4,087 ft combination concrete curb and gutter removal and replacement; federally funded. (45 Working Days) (Job No. C-91-261-12) (1-21227-0000) (See the Special Provisions for the DBE Percentage)

82. Contract No. 63691 Cook County District 1

Section 11-00053-00-RS (RICHTON PARK) FAU Route 1682 (POPLAR AVENUE) Project M-9003(976) Project consists of HMA surface removal, leveling binder, HMA surface course and gutter removal and replacement, sidewalk removal and replacement, structure adjustment, parkway restoration, pavement restoration, pavement markings and all other incidental items to complete the work on FAU Route 1682 (Poplar Avenue) from Cicero Avenue to Governors Highway in the Village of Richton Park; includes 31 cu yd earth excavation; 34 ton aggregate (prime coat); 683 ton polymerized leveling binder (machine method); 1,366 ton HMA surface course; 542 sq ft detectable warnings; 16,245 sq yd HMA surface removal; 1,953 sq ft sidewalk removal; 378 sq yd Class D patches; 62 ton aggregate shoulders; 606 ft short term pavement parking; 2,408 ft thermoplastic pavement marking line; 14 unit grading and shaping shoulders 2,406 sq ft PCC sidewalk; 803 sq yd parkway restoration; 2,125 ft combination concrete and gutter removal and replacement; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-91-319-12) (1-21228-0000) (See the Special Provisions for the DBE Percentage)

83. Contract No. 63695 McHenry County District 1

Section 11-00007-00-RS (WONDER LAKE) FAU Route 4086 & FAU 4081 (WONDER LK RD & THOMPSON RD) Project M-9003(901) Project consists of HMA surface removal and resurfacing, Class D patching, pavement markings and all other incidental items to complete the work on FAU Route 4086 (East Wonder Lake Road) from Illinois Route 120 to McCullom Lake Road and on FAU Route 4081 (Thompson Road) from Illinois Route 120 to Wondermere in the Village of Wonder Lake; includes 3,745 gal bituminous materials (prime coat); 76 ton aggregate (prime coat); 39,170 sq yd HMA surface removal; 1,670 ton leveling binder (machine method); 3,395 ton HMA surface course; 340 sq yd Class D patches; 818 ton aggregate shoulders; 5,730 ft short term pavement marking; 25,082 ft thermoplastic pavement marking line; 585 sq yd HMA surface removal; 985 sq yd HMA driveway removal and replacement; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-172-12) (1-21233-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 56: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 15 -

Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative Code 650.70,…”This contract requires, in addition to the normal IDOT pre-qualifications requirements, that the Contractor be SSPC-QP1 and QP2 certified. Evidence of certification must be provided prior to receiving authorization to bid.” Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractors’ original BC 57 Affidavit of Availability.

84. Contract No. 64H86 Rock Island-Whiteside Counties District 2 Section D2 BRIDGE PAINTING 2012-1 Various Routes (VARIOUS) Cleaning and painting structural steel on 3 bridges along various routes in Rock Island and Whiteside Counties (SN 081-0038, 098-0081 and 098-0082). cleaning and painting structural steel at 3 locations; containment and disposal of lead paint cleaning residues; bridge cleaning and painting warranties; mobilization; traffic control and protection. (65 Working Days) (Job No. C-92-096-12) (0-01508-2001) (See the Special Provisions for the DBE Percentage)

85. Contract No. 66889 LaSalle County District 3

Section (50-2BR)I FAI Route 80 (I-80) Deck patching, structural repair of concrete, expansion joint replacement and other work on the dual structures carrying I-80 (EB and WB) over Vermilion River (SN 050-0220, 0221) located east of IL 351 east of Lasalle; includes 5 sq yd class B patches; 21.4 cu yd concrete removal; 21.4 cu yd concrete; 2,870 lb epoxy coated reinforcement bars; 205 ft preformed joint strip seal; 19 sq ft structural repair of concrete; 198 sq yd deck slab repair; 13,850 ft epoxy pavement marking; mobilization; traffic control and protection. (30 Working Days) (C-93-039-09) (0-01618-3013) (0-01618-3016) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 86. Contract No. 66B08 LaSalle County District 3

Section (5Z)I FAP Route 68 (IL 23) Guardrail installment at IL 23 (Rentz Dr.) northbound, between Bluff and First Streets in Streator; includes 0.64 cu yd concrete; 127 lbs epoxy coated reinforcement bars; 72 ft steel plate beam guard rail; 2 traffic barrier terminals; mobilization; traffic control and protection. (15 Working Days) (Job No. C-93-064-11) (3-02350-0000) (See the Special Provisions for the DBE Percentage)

87. Contract No. 68978 Fulton County District 4

Section 135[(Z)RS-2,(X)RS-1] FAP Route 22 (IL 78) Project F-22(80) This project consists of resurfacing on Illinois Route 78 from Locust Street to the south city limits of Canton; includes 4,525 sq yd HMA surface removal-butt joint; 3,836 ton polymerized HMA surface course; 34,677 sq yd HMA surface removal; 380 sq yd Class D patches; 6,072 ft strip reflective crack control treatment; 24,705 ft modified urethane pavement marking line; 283 raised reflective pavement marker; 1,661 ft electric cable in conduit; 7 signal head; 1,689 ft detector loop; 8 rebuild existing signal head; 1 modify existing controller cabinet; 15 LED signal face; 3,836 ton material transfer device; railroad protective liability insurance; traffic control and protection; mobilization; Federally funded. (30 Working Days) (C-94-098-10) (4-00137-0550) (See the Special Provisions for the DBE Percentage)

88. THIS PROJECT HAS BEEN WITHDRAWN 89. Contract No. 68A58 Fulton County District 4

Section (123B)I FAP Route 687 (IL 95) This project consists of concrete deck patching and substructure repairs on the structure (S.N. 029-0025) carrying Illinois Route 95 over Spoon River located approximately 2 miles west of Smithfield Road in Fulton County; includes 3,628 ft pavement marking tape; 1,482 ft epoxy pavement marking line; 270 sq ft thermal spraying (metalizing) bridge concrete surface; 12 sq ft structural repair of concrete; 25 sq yd deck slab repair; traffic control and protection; mobilization. (25 Working Days) (C-94-001-12) (0-01618-4007) (See the Special Provisions for the DBE Percentage)

90. Contract No. 68A59 Tazewell County District 4

Section (108-HB-1)I-2 FAI Route 155 (I-155) This project involves contract maintenance on the structure (S.N. 090-0101) carrying Toboggan Road over Interstate 155 located south of the Hopedale Junction in Tazewell County; includes 116 sq yd HMA surface removal-butt joint; 60 ton HMA surface course; 2.2 cu yd concrete superstructure; 1,710 lb furnishing and erecting structural steel; 360 lb reinforcement bars, epoxy coated; 61 ft preformed joint strip seal; 10 elastomeric bearing assembly; 601 sq yd waterproofing membrane system; 500 ft epoxy pavement marking line; 10 jack and remove existing bearings; 597 sq yd HMA surface removal (deck); traffic control and protection; mobilization. (20 Working Days) (C-94-002-12) (0-01618-4008) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 57: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 16 -

91. Contract No. 68A63 Various Counties District 4 Section D4 PAVEMENT MARKING 2012 Various Routes (VARIOUS) This project consists of placing pavement markings on various routes at various locations throughout District 4; includes 8,859,721 ft paint pavement marking lines; mobilization. (45 Working Days) (C-94-006-12) (0-01618-4006) (See the Special Provisions for the DBE Percentage)

92. Contract No. 68A73 Peoria County District 4

Section 16 I-2 FAP Route 669 (IL 116) This project consists of storm and gutter improvements to address driveway flooding along Illinois Route 116 from west of Moran Street in Trivoli to Trivoli Road; includes 8 sq yd PCC shoulders; 2.5 ft storm sewers; 2 inlets; 9 ft concrete gutter; traffic control and protection; mobilization. (15 Working Days) (Job No. C-94-029-12) (4-00001-1203) (See the Special Provisions for the DBE Percentage)

Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative

Code 650.70,…”This contract requires, in addition to the normal IDOT pre-qualifications requirements, that the Contractor be SSPC-QP1 certified. Evidence of certification must be provided prior to receiving authorization to bid.” Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractors’ original BC 57 Affidavit of Availability.

93. Contract No. 68A94 Woodford County District 4 Section 102-[4HB;3HB-2]I FAI Route 39 (I-39) This project consists of painting two structures; (S.N. 102-0047) carrying CH 2 over Interstate 39 and (S.N. 102-0049) carrying Illinois Route 116 over Interstate 39 located north of Bloomington; includes cleaning and painting structural steel, location 1 & 2; containment and disposal of non-led paint cleaning residues no. 1 & 2; 319 ft portable temporary barrier system; traffic control and protection; mobilization. (45 Working Days) (C-94-063-12) (0-01508-4001) (See the Special Provisions for the DBE Percentage)

94. Contract No. 68A97 Various Counties District 4 Section D4 MCHD 2012 Various Routes (VARIOUS) This project consists of repairing guardrail and fence damage caused by motorists at various locations in District 4; includes 68 traffic barrier terminal; 8 impact attenuators; 407 ft chain link fence; 500 ft woven wire fence; 1,000 repair high tension cable; 100 repair and replace posts; 500 ft repair cable road guard; 200 guardrail blocks; 64 rail element plates; 100 steel posts; 400 ft vertical adjustment of guardrail; 200 ft tubular thrie beam; 20 emergency work call out; 69 repair traffic barrier terminal; traffic control and protection; mobilization. (Completion Date: June 30, 2013) (C-94-076-12) (0-01618-4013) (0-01842-4001) MCHD (See the Special Provisions for the DBE Percentage)

95. Contract No. 70874 Champaign County District 5

Section (10-34,HB-5,106)RS-1 FAS Route 533 (MARKET STREET) Project RS-533(102) This project consists of milling and resurfacing on Market Street from north of Interstate 57 to Ford Harrison Road in Champaign; includes 1,629 ton polymerized HMA surface course; 16,698 sq yd HMA surface removal; 485 sq yd partial depth removal; 232 sq yd Class D patches; 205 ton aggregate wedge shoulder; 73 ton HMA shoulders; 15,420 ft paint pavement marking line; 65 raised reflective pavement marker; 8,834 ft grading and shaping shoulders; traffic control and protection; mobilization; Federally funded. (20 Working Days) (C-95-051-10) (5-52965-0000) (See the Special Provisions for the DBE Percentage)

96. Contract No. 70902 Douglas County District 5

Section (144R)RS-2&145RS-3 FAP Route 323 (US 36) Project NHF-323(30) This project consists of removing pavement and replacing with HMA surface courses on 0.823 miles of U.S. Route 36 located east of Tuscola; includes 200 sq yd HMA surface removal-butt joint; 5,208 ton HMA binder and surface course; 280 ton HMA shoulders; 9,916 ft paint pavement marking line; 55 raised reflective pavement marker; 1,593 sq yd PCC surface removal; 246 sq yd HMA surface removal; 389 sq yd paved shoulder removal; traffic control and protection; mobilization; Federally funded. (15 Working Days) (C-95-025-11) (5-52944-0000) (See the Special Provisions for the DBE Percentage)

97. Contract No. 70930 Champaign County District 5

Section (41)RS FAS Route 522 (SIDNEY-LONGVIEW RD) This project consists of resurfacing 2.93 miles of Sidney-Longview Road from Block Road to Bongard Road; includes 3,555 ton cold mix asphalt mixture; 440 ton seal coat aggregate; 6,156 sq yd HMA surface removal; 957 ton aggregate wedge shoulder; 41,049 ft paint pavement marking line; 264 ton blotter aggregate; traffic control and protection; mobilization. (20 Working Days) (C-95-039-11) (0-01618-5004) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 58: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 17 -

98. Contract No. 70932 DeWitt-McLean-Piatt Counties District 5 Section D5 CRACK & JOINT SEAL 2012-1 Various Routes (VARIOUS) 44.42 miles of crack and joint sealing along various routes in Dewitt, McLean and Piatt Counties; includes 440,000 ft crack routing; 176,000 lb crack filling; 63,010 ft paint pavement marking line; traffic control and protection; mobilization. (35 Working Days) (C-95-041-11) (0-01618-5006) (See the Special Provisions for the DBE Percentage)

99. Contract No. 70933 Various Counties District 5

Section D5 CRACK & JOINT SEAL 2012-2 Various Routes (VARIOUS) This project consists of 44.32 miles of crack and joint seal at various locations in various counties; includes 444,927 ft crack routing (pavement); 177,971 lb crack filling; 28,750 ft paint pavement marking line; traffic control and protection; mobilization. (30 Working Days) (C-95-042-11) (0-01618-5007) (See the Special Provisions for the DBE Percentage)

100. Contract No. 70958 Vermilion County District 5

Section (92-12)TS FAU Route 7045 (BOWMAN AVE) This project consists of traffic signal installation of Bowman Avenue and eastbound Interstate 74 ramps; includes 1 service installation; 1,810 ft underground conduit; 1 full actuated controller and cabinet; 1 uninterruptable power supply; 4,697 ft electric cable in conduit; 6 traffic signal post; 3 steel mast arm assembly and pole; 56 ft concrete foundation; 14 signal head; 11 inductive loop detector; 601 ft detector loop; 20 sq ft concrete median; 1 intersection video traffic monitoring system traffic control and protection; mobilization. (25 Working Days) (Job No. C-95-058-11) (5-91192-5002) (See the Special Provisions for the DBE Percentage)

101. Contract No. 72243 Pike County District 6

Section 4RS-3,BR-1 FAP Route 304 (IL 96) Project ACF-304(44) This project consists of patching milling and resurfacing and drainage improvements on Illinois Route 96 from just southeast of Bay Street in Pleasant Hill to the Calhoun County Line; includes 1,226 cu yd. earth excavation; 315 unit excavating and grading existing shoulders; 662 sq yd stone dumped riprap; 1,728 ton leveling binder (machine method); 1,124 sq yd HMA surface removal-butt joint; 5,010 ton HMA surface course, N50; 1,790 sq yd HMA surface removal; 240 sq yd pavement patching; 223 sq yd Class C patches; 3,135 ton aggregate shoulders; 4,107 sq yd HMA shoulders; 2 cast in place reinforced concrete end sections; 700 Ft Steel plate beam guardrail; 55,364 Ft Paint pavement marking line; 235 Raised reflective pavement marker; 148 Ft Silicone joint sealer; 45,048 Sq yd HMSA surface removal; 556 Sq ft Sign Panel (70 Working Days) (Job No. C-96-041-09) (6-66820-0200/6-66820-0400) 72243 700 Ft Steel plate beam guardrail; 55,364 Ft Paint pavement marking line; 235 Raised reflective pavement markers; 148 Ft Silicone joint sealer; 45,048 Sq yd HMA surface removal; 556 Sq ft Sign panel; traffic control and protection; mobilization; federally funded. (70 Working Days) (Job No. C-96-041-09) (6-66820-0200/6-66820-0400) a 700 ft steel plate bean guardrail; 55,364 ft paint pavement marking line; 235 raised reflective pavement markers; 148 ft silicone joint sealer; 44,058 sq yd HMA surface removal; 556 sq ft sign panel; traffic control and protection; mobilization; federally funded. (70 Working Days) (Job No. C-96-041-09) (6-66820-0200/6-66820-0400) 72243 (See the Special Provisions for the DBE Percentage)

102. Contract No. 72884 Brown County District 6

Section 6RS-4 FAP Route 317 (US 24) Project F-NHF-317(91) This project consists of patching, milling and resurfacing on U.S. Route 24 from just east of the Adams County Line continuing east to 0.6 mile west of Buckhorn Road; includes 1,829 ton leveling binder (machine method); 2,449 sq yd HMA surface removal-butt joint; 4,837 ton HMA surface course, N70; 5,162 sq yd paved shoulder removal; 280 sq yd pavement patching; 2,556 ton aggregate shoulders; 14,575 sq yd HMA shoulders; 400 ft steel plate beam guardrail; 30,533 ft shoulder rumble strip; 38,907 ft paint pavement marking line; 199 raised reflective pavement marker; 46,009 sq yd HMA surface removal; traffic control and protection; mobilization; Federally funded. (50 Working Days) (C-96-048-08) (6-00116-0000/6-76516-0106) (See the Special Provisions for the DBE Percentage)

103. Contract No. 72F19 Sangamon County District 6

Section (84-2-1[FR A]Q FR I-55 WEST (WEST OUTER RD) This project consists of seal coat treatment on I-55 Frontage Road (West Outer Road) from Sudduth Road to the dead end located just north of Sherman; includes 7.9 ton polymerized bituminous materials (cover and seal coat); 28 ton cover coat aggregate; 28 ton seal coat aggregate; 156 ton leveling binder (machine method); 51 sq yd pavement patching; 24 ton aggregate shoulders; 2,787 sq yd HMA surface removal; traffic control and protection; mobilization. (15 Working Days) (C-96-031-12) (6-76516-0107) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 59: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 18 -

104. Contract No. 72F20 Scott County District 6 Section (1-NRHM)I FAP Route 566 (IL 106) This project consists of resurfacing 689 ft of Illinois Route 106 at the Sandy Creek Bridge located 2 miles South East of Winchester; includes 41 ton leveling binder (machine method); 80 sq yd HMA surface removal-butt joint; 81 ton HMA surface course, N50; 2 concrete headwalls for pipe drains; 1,352 ft pipe underdrains; 1,180 ft paint pavement marking line; 960 sq yd HMA surface removal; traffic control and protection; mobilization. (15 Working Days) (C-96-032-12) (6-76516-0104) (See the Special Provisions for the DBE Percentage)

105. Contract No. 72F24 Sangamon County District 6

Section D6 TRAFFIC SIGNAL MOD 2012 FAU Route 7968 (CAMP BUTLER RD) Project HSIP-7968(1) This project consists of installing traffic signals at the intersection of Camp Butler Road and Colt Road and fiber optic interconnect at the intersection of Sangamon Avenue and Illinois Route 54 located in Springfield; includes 42 sq ft sign panel; 1 service installation; 1030 ft underground conduit; 1 full-actuated controller and cabinet; 1 master controller; 1 uninterruptible power supply; 884 ft fiber optic cable in conduit; 4,517 ft electric cable in conduit; 8 traffic signal post 4 steel mast arm assembly and pole; 77 ft concrete foundation; 15 signal heads; 1 video vehicle detection system; traffic control and protection; mobilization; Federally funded. (30 Working Days) (Job No. C96-036-12) (6-00696-0000) (See the Special Provisions for the DBE Percentage)

106. Contract No. 72F25 Sangamon County District 6 Section D6 COVERED BRIDGE ROOF 2012 COVERED BRIDGE PATH (COVERED BRIDGE PATH) Project ACNHCB-F-000S(884) This project consists of repairs to the roof and painting the siding on a covered bridge; includes 28 units tree removal; containment and disposal of non-lead paint residues; cleaning and painting wooden bridge; remove and replace cedar shingle roofing system; traffic control and protection; mobilization; Federally funded. (30 Working Days) (C-96-040-12) (6-00694-0000) (See the Special Provisions for the DBE Percentage)

107. Contract No. 74465 Coles County District 7

Section (39MFT)RS-1 FAU Route 7623 (HARRISON ST) Project ACM-7623(1) This project consists of patching, milling and resurfacing on (CH 17) Harrison Street from Illinois Route 16 to a point located 1.38 miles to the east; includes 135 unit excavating and grading existing shoulder; 620 sq yd HMA base course widening; 321 ton aggregate surface course; 136 sq yd HMA surface removal-butt joint; 1,694 ton HMA binder course; 1,561 ton HMA surface course; 871 sq yd HMA surface removal; 228 sq yd Class D patches; 1,214 ton aggregate shoulders; 1,820 ft paint pavement marking line; traffic control and protection; mobilization; Federally funded. (30 Working Days) (C-97-107-10) (7-50372-0000) (See the Special Provisions for the DBE Percentage)

108. Contract No. 74536 Wayne County District 7

Section D7 BRIDGE REPAIRS 2012-2 FAI Route 64 (I-64) This project consists of PCC base course widening and bridge deck repairs on the structure (S.N. 096-0039) located on Interstate 64 approximately 5 miles east of the Illinois Route 242 interchange; includes 580 sq yd PCC base course widening; 434 sq yd HMA surface removal; 580 sq yd paved shoulder removal; 18 cu yd concrete superstructure; 441 sq yd bridge deck grooving; 880 lb reinforcement bars, epoxy coated; 1,215 ft urethane pavement marking line; 441 sq yd bridge deck concrete overlay; 434 sq yd bridge deck scarification; traffic control and protection; mobilization. (50 Working Days) (C-97-085-11) (0-01618-7012) (See the Special Provisions for the DBE Percentage)

109. Contract No. 74551 Shelby County District 7

Section D7 ELECTRICAL 2012-1 TR 389A (N/A) Project NHCB-F-389(5) Replacement of fire detection equipment at Thompson Mill Covered Bridge over the Kaskaskia River located 1 mile east of Cowden; includes 1 L sum fire alarm system; 1 L sum electrical room ventilation; mobilization; Federally funded. (15 Working Days) (Job No. C-97-019-12) (7-50877-0000) (See the Special Provisions for the DBE Percentage)

110. Contract No. 74553 Crawford County District 7

Section 101RS-2 FAP Route 779 (HUTSONVILLE ROAD) Project ACF-779(10) This project consists of milling, patching and resurfacing on Hutsonville Road from Illinois Route 1 to South Rose Street in Hutsonville; includes 1,819 ton HMA surface course, N70; 20,287 sq yd HMA surface removal; 1,061 sq yd Class D patches; 381 ton aggregate shoulders; 82 ft thermoplastic pavement marking line; 11,811 ft paint pavement marking line; 90 raised reflective pavement marker; 276 sq yd partial depth removal; 93 ton partial depth patching; traffic control and protection; mobilization; Federally funded. (25 Working Days) (C-97-024-12) (7-50879-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 60: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 19 -

111. Contract No. 74566 Effingham County District 7 Section 12RS-1 FAP Route 828 (MONTROSE BLCKTP) Project ACF-828(22) This project consists of milling, patching and resurfacing on the Montrose Blacktop from the Cumberland County Line to U.S. Route 40 in Montrose; includes 184 sq yd PCC base course widening; 532 ton polymerized HMA surface course; 1,366 sq ft PCC sidewalk; 6,085 sq yd HMA surface removal; 355 ft combination curb and gutter removal; 1,366 sq ft sidewalk removal; 363 sq yd patches; 37 ton aggregate shoulders; 6.1 cu yd concrete structures; 610 lb reinforcement bars; 108 ft storm sewers; 284 ft pipe underdrains; 355 ft combination concrete curb and gutter; 4,104 ft thermoplastic pavement marking line; 26 raised reflective pavement marker; 43 sq ft structural repair of concrete; traffic control and protection; mobilization; Federally funded. (30 Working Days) (C-97-043-12) (7-50856-0000) (See the Special Provisions for the DBE Percentage)

112. Contract No. 74569 Clay-Effingham-Fayette Counties District 7

Section D7 PATCHING 2012-6 Various Routes (VARIOUS) This project consists of class A & B patching at various locations; includes 671 sq yd Class A patches; 774 sq yd Class B patches; 1,658 dowel bars; 683 sq yd patching reinforcement; 8,384 ft saw cuts; traffic control and protection; mobilization. (30 Working Days) (C-97-092-12) (0-01618-7015) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 113. Contract No. 76C45 St Clair County District 8

Section 82-1SG Various Routes (VARIOUS) This improvement consists of the removal and replacement of various Signs, Sign Panels, Overhead Sign Trusses and Breakaway Sign Structures at various locations as described in the plans; includes 2,246 lb reinforcement bars; 450 ft steel plate beam guardrail; 12,568 sq ft sign panel, 80 sq ft sign panel overlay; 2,352 sq ft remove sign panel; 45 sq ft relocate sign panel; 18,984 lb structural steel sign support; 506 ft overhead sign structure span; 333 ft overhead sign structure walkway; 114 ft overhead sign structure-cantilever; mobilization. (Completion Date: November 15, 2013) (C-98-020-12) (8-90000-0750) (See the Special Provisions for the DBE Percentage)

114. Contract No. 76F02 St Clair-Madison-Monroe Counties District 8

Section DIST8 RESURFACING 2012-1 Various Routes (VARIOUS) This project consists of resurfacing at multiple locations in District 8 as described in the plans; includes 602 ton polymerized HMA surface course; 6,959 ft preformed plastic pavement marking line; 73 raised reflective pavement marker; 8,033 sq yd PCC surface removal; 533 sq yd HMA surface removal; traffic control and protection; mobilization. (25 Working Days) (C-98-068-411) (0-01618-8004) (See the Special Provisions for the DBE Percentage)

115. Contract No. 76F17 Washington County District 8

Section 6-I FAP Route 817 (IL 15) Project HSIP-817(10) This project consists of placing safety shoulders on Illinois Route 15 from Old St. Louis Road to point located 1.5 miles to the east; includes 158 unit excavating and grading existing shoulders; 751 ton aggregate wedge shoulders; 5,280 sq yd HMA shoulder; 15,840 ft shoulder rumble strip; 15,840 ft thermoplastic pavement marking line; traffic control and protection; mobilization; federally funded. (30 Calendar Days) (Job No. C-98-006-12) (8-08800-1902) (See the Special Provisions for the DBE Percentage)

116. Contract No. 76F22 Madison County District 8

Section DIST 8 ITS 2012-1 FAI Route 270 & I 70 (I-270 & I-70) Project CMI-000-S(878) This project consists of ITS on Interstate 270 and Interstate 70 near Troy; includes 8 service installation; 5,069 ft underground conduit; 5,788 ft electric cable in conduit; 1 light pole, galvanized steel; wide area network; 10 radar vehicle detection system; 10 cellular modem; 10 light pole, steel 50ft, with camera lowering system; 10 controller cabinet; 2,350 ft underground conduit; traffic control and protection; mobilization; Federally funded. (145 Working Days) (C-98-013-12) (8-55541-0912) (See the Special Provisions for the DBE Percentage)

117. Contract No. 78090 Williamson County District 9

Section 6B-1 SBI Route 13B (OLD IL 13) Project ACF-13(11) This project consists of replacing the structure (s.n. 100-0065) carrying Old Illinois Route 13 over a branch of Little Crab Orchard Creek located in Williamson County; includes 149 cu yd earth excavation; 225 ton porous granular embankment; 109 sq yd stone riprap; 129 sq yd PCC pavement; 52 ft saw cuts; 30 sq yd HMA shoulders; 1 removal of existing structures; 19,390 lb reinforcement bars, epoxy coated; 86 cu yd concrete box culverts; 33 ft pipe culverts; 42 cu yd rock fill-foundation; traffic control and protection; mobilization; federally funded. (40 Working Days) (Job No. C-99-077-08) (9-00143-0100) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 61: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 20 -

118. Contract No. 78165 Pope County District 9 Section 6B-3 FAP Route 885 (IL 146) Project ACF-885(45) This project consists of removing and replacing the structure (s.n. 076-0026) carrying Illinois Route 146 over Little Grand Pierre Creek in Pope County; includes 183 sq yd stone riprap; 135 sq yd HMA base course widening; 87 sq yd HMA surface removal-butt joint; 45 sq yd Bridge approach pavement connector; 540 sq yd HMA shoulders; 1 Removal of existing structures; 186 cu yd structure excavation; 53.4 cu yd concrete structures; 243 cu yd concrete superstructure; 524 sq yd bridge deck grooving; 664 sq yd protective coat; 102,440 lb furnishing and erecting structural steel; 59,660 lb reinforcement bars; 106 sq yd slope wall; 336 ft furnishing and driving steel piles; 425 ft steel plate beam guardrail; 1,686 ft paint pavement marking line; 137 ft pipe underdrains for structures. (80 Working Days) (Job No. C-99-020-10) (9-00264-0000) (See the Special Provisions for the DBE Percentage)

119. Contract No. 78168 Pope County District 9

Section 6B-2 FAP Route 885 (IL 146) Project ACBRF-885(46) This project consists of replacing the structure (s.n. 076-0002) carrying Illinois Route 146 over Big Grand Pierre Creek located approximately 7 miles northeast of Golconda; includes 1,135 sq yd stone riprap; 116 sq yd HMA base course widening; 91 ton HMA surface course, N90; 45 sq yd bridge approach pavement connector; 468 sq yd HMA shoulders; 1 removal of existing structures; 184 cu yd structure excavation; 571 cu yd concrete; 871 sq yd protective coating; 1,122 sq yd bridge deck grooving; 176,410 lb furnishing and erecting structural steel; 148,140 lb reinforcement bars, epoxy coated; 189 ft furnishing and driving steel piles; 34 cu yd drilled shaft in soil; 63 cu yd drilled shaft in rock; 12 elastomeric bearing assembly; 200 ft steel plate beam guardrail; 2,108 ft paint pavement marking line; 138 ft pipe underdrains for structures; traffic control and protection; mobilization; federally funded. (110 Working Days) (Job No. C-99-023-10) (9-00312-0000) (See the Special Provisions for the DBE Percentage)

120. Contract No. 78254 White County District 9

Section D9 CM BRIDGE REPAIR 2012-4 FAI Route 64 (I-64) This project consists of joint repairs and deck drain improvements on (S.N.'s 097-0001 & 097-0002) carrying Interstate 64 over Illinois Route 1 in Greyville; includes 36 cu yd concrete superstructure; 5,040 lb reinforcement bars, epoxy coated; 152 ft preformed joint strip seal; 2 frames and grates to be adjusted; 32 floor drain extension; 40 plug existing deck drains; 185 sq ft structural repair of concrete; 3 ton HMA surface course; traffic control and protection; mobilization. (35 Working Days) (C-99-042-11) (0-01618-9011) (See the Special Provisions for the DBE Percentage)

121. Contract No. 78271 Hamilton County District 9

Section (9,10)RS-2 FAP Route 855 (IL 14) Project ACF-855(6) This project consists of 3P resurfacing on Illinois Route 14 from McLeansboro to the Hamilton/White County Line; includes 18,720 ton material transfer device; 6,277 ton polymerized leveling binder (machine method); 12,443 ton HMA surface course, N90; 147,527 sq yd HMA surface removal; 1,988 sq yd pavement patching; 2,521 ton aggregate wedge shoulders; 134,545 ft paint pavement marking line; 604 raised reflective pavement marker; traffic control and protection; mobilization; Federally funded. (65 Working Days) (C-99-059-11) (9-00290-0000) (See the Special Provisions for the DBE Percentage)

122. Contract No. 78285 Various Counties District 9

Section D9 TRAFFIC SIGNALS 2012-1 Various Routes (VARIOUS) This project consists of installing uninterruptable power supplies and updating pedestrian accommodations with countdown timers at various locations throughout District 9; includes 1 relocate existing lighting controller; 18 uninterruptable power supply; 21 pedestrian signal head, polycarbonate, LED, bracket mounted with countdown timer; 14 pedestrian push button; 15 modify existing controller cabinet; 16 modify existing controller foundation; 1 remove existing traffic signal equipment; traffic control and protection; mobilization. (45 Working Days) (C-99-011-12) (0-00877-9001) (See the Special Provisions for the DBE Percentage)

123. Contract No. 85541 Ogle County District 2

Section 10-00007-00-SW (CRESTON) SOUTH STREET Project SRTS-4009(54) Project proposes to construct or replace sidewalk with detectable warning and crosswalks to provide continuous walks from Kaye Lane to Grove Street on the north side and from Transit Street to Main Street on the south side of South Street in the Village of Creston; includes 146 unit tree removal; 231 sq yd aggregate base course; 92 gal bituminous materials (prime coat); 39 ton incidental HMA surfacing; 14,105 sq ft PCC sidewalk; 256 sq ft detectable warnings; 381 sq yd pavement removal; 5,388 sq ft sidewalk removal; 925 ft saw cuts; 203.4 sq ft sign panels; 453 ft telescoping steel sign support; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-40-045-00) (0-01683-2006) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 62: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 21 -

124. Contract No. 85556 Rock Island County District 2 Section 10-00043-00-BT (MILAN) MILAN RECREATION PATH Project TE-D2(142) This project consists of constructing a HMA path with aggregate base widening and earth excavation located atop the existing flood control levee from an existing path at the Mill Creek Bridge on Airport Road to an existing path on the Rock River Bridge on the Milan Beltway, located in the Village of Milan; includes 319.9 cu yd furnished excavation; 3,894.5 sq yd geotechnical fabric for ground stabilization; 2,251.1 sq yd erosion control blanket; 1,509.2 ft perimeter erosion blanket; 1,810.2 ton aggregate; 1,294.1 ton HMA; 84.0 sq ft PCC sidewalk, 6"; 40.0 sq ft detectable warnings; 114.0 ft storm sewers, Class B, Type 1, 10"; 1,177 ft chain link fence; 1 ea chain link gate, 4' X 10'single; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-92-066-11) (0-00992-2008) (See the Special Provisions for the DBE Percentage)

125. Contract No. 85557 Lee County District 2

Section 11-00318-00-BR FAS Route 1180 (KEIGWIN ROAD) Project BRS-1180(3) Removal of the existing 3 span continuous steel beam bridge on spill thru abutments and concrete piers and replace it with a 3 span concrete deck beam bridge on spill-thru abutments and pile bent piers with related approach roadway on FAS Route 1180 (Keigwin Road) over Green River, 7 miles South of Harmon; includes 722 cu yd earth and channel excavation; 1,560 sq yd erosion control blanket; 671 ft perimeter erosion barrier; 1,129 ton stone dumped riprap; 435 ton aggregate base course; 124 ton aggregate surface course; 318 gal bituminous materials (prime coat); 106 ton incidental HMA surfacing; 1 removal of existing structures; 527 sq yd bridge deck grooving; 5,054 sq ft precast prestressed concrete deck beams; 18,240 lb reinforcement bars; 785 ft furnishing and driving metal shell piles; 310 ton porous granular embankment; 568 sq yd concrete wearing surface; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 31, 2012 Plus 05 Working Days) (Job No. C-92-102-12) (2-10425-0000) (See the Special Provisions for the DBE Percentage)

126. Contract No. 87493 Iroquois County District 3

Section 08-22102-01-BR TR 351 Project BROS-75(146) This project consists of removal of existing structure and replace with a one span composite steel plate girder bridge with integral abutments and approach roadway work, located 1.5 miles southwest of Cissna Park; includes 5,501 cu yd excavation; 1,736 ft perimeter erosion barrier; 568 ton stone riprap, Class A5; 1,207 ton aggregate surface course, Type B; 1 ea removal of existing structures; 160 cu yd structure excavation; 173.8 cu yd concrete; 154,900 lb furnishing and erecting structural steel; 1,300 ea stud shear connectors; 37,750 lb reinforcement bars, epoxy coated; 256 ft steel railing, Type S1; 960 ft furnishing steel piles HP 14 X 73; 74 ft pipe culverts; 71 sq yd geocomposite wall drain; 1 ea flap gate 18"; 1.3 acre seeding, Class 2 (special); 130 ft pipe underdrains for structures 4"; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (65 Working Days) (Job No. C-93-125-11) (3-10290-0000) (See the Special Provisions for the DBE Percentage)

127. Contract No. 87510 DeKalb County District 3

Section 10-00176-01-RS FAS Route 96 (CH 10) Project RS-96(111) This project consists of 5.25 miles of leveling binder, HMA resurfacing and aggregate shoulders located on Somonauk Road from Chicago Road to US Route 34; includes 4,721 ton leveling binder (machine method), N50; 1,877 sq yd HMA surface removal - butt joint; 6,274 ton HMA surface course, Mix "C", N30; 2,502 ton aggregate shoulders, Type B; 93,116 ft paint pavement markings; federally funded. (25 Working Days) (Job No. C-93-030-12) (3-10411-0000) (See the Special Provisions for the DBE Percentage)

128. Contract No. 87514 Kankakee County District 3

Section 11-00068-00-SP (BOURBONNAIS) FAP Route 330 (US 45/52) Project HSIP-5034(25) Project consists of traffic signal modernization, HMA resurfacing, sidewalk, curb and gutter, handicap ramps, pavement markings and all other incidental items to complete the work at the intersection of FAP Route 330 (US45/52) and John Casey road in the Village of Bourbonnais; includes 27 cu yd furnished excavation; 774.3 gal polymerized bituminous materials (prime coat); 252.9 ton polymerized leveling binder; 5,956 sq yd HMA surface removal; 501 ton polymerized HMA surface course; 699 sq ft sidewalk removal; 792 sq ft PCC sidewalk; 192 ft combination concrete curb and gutter; 3,366 ft temporary pavement marking line; 2,366 ft thermoplastic pavement marking line; 946 ft underground conduit; 606 ft electric cable in conduit, 600V; 2,005 ft fiber optic cable in conduit; 6,233 ft electric cable in conduit, signal; 4 steel combination mast arm assemblies and poles; 62 ft concrete foundation; 18 signal heads; 8 pedestrian signal heads; 1,661 ft detector loop; 1,672 ft remove electric cable from conduit; traffic control and protection; federally funded. (40 Working Days) (Job No. C-93-042-12) (0-01663-3003) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 63: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 22 -

129. Contract No. 89590 Peoria County District 4 Section 10-00001-00-BT (PRINCEVILLE) PRINCEVILLE SCHOOLS Project SRTS-4009(124) This project consists of a 10' multi-use path from the southwest intersection of North Street and Cordis Avenue to the elementary school in the Village of Princeville. 42 sq yd pavement removal; 41.5 sq yd Class C patches, Type IV, 8; 67 ft concrete curb and gutter; 846 ft chain link fence, 10' 3.0 sq ft sign panel, Type 1; 20 ft metal sign post, Type A; 241 ft preformed plastic pavement markings; 4,712 sq ft PCC sidewalk, 4", special; 2 ea bicycle racks; 4 ea bollards; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 03, 2012 Plus 10 Working Days) (Job No. C-40-074-09) (0-01683-4006) (See the Special Provisions for the DBE Percentage)

130. Contract No. 93567 Christian County District 6

Section 08-04118-00-BR TR 307A Project BROS-21(178) Replace existing structure with a 3-span PPC deck beam structure, roadway approach work, aggregate base course and bituminous surface treatment located on TR 307A, 7 miles East of Morrisonville over South Fork of the Sangamon River; includes 500 unit tree removal; 5,689 cu yd excavation; 448 ton stone riprap, Class A4; 1,283 ton aggregate; 2,520 gal bituminous materials (cover and seal coats); 2 ea cofferdams; 119.2 cu yd concrete structures; 2,473 sq ft PPC deck beams (17" depth); 10,280 lb reinforcement bars, epoxy coated; 210 ft steel railing, Type S-1; 762 ft furnishing metal shell piles, 12" X 0.25"; 2.0 acre seeding, Class 2 (special); Federally funded. (45 Working Days) (Job No. C-96-225-10) (6-10396-0000) (See the Special Provisions for the DBE Percentage)

131. Contract No. 95491 Jasper County District 7

Section 05-04122-00-BR TR 11 Project BROS-79(133) Project consists of the removal of the existing structure and construction of a single span precast prestressed concrete deck beam bridge (33" depth), aggregate approaches, earthwork and all other incidental items to complete the work on TR 11, 7.5 miles north of Wheeler; includes 229 unit tree removal; 370 cu yd earth and channel excavation; 1,015 cu yd furnished excavation; 250 ft perimeter erosion barrier; 250 ton stone dumped riprap; 60 ton aggregate base course; 1 removal of existing structures; 2,025 sq ft precast prestressed concrete deck beams (33" depth); 3,120 lb reinforcement bars, epoxy coated; 270 ft furnishing and driving steel piles; 9 pile shoes; 2 traffic barrier terminals; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-97-022-07) (7-10268-0000) (See the Special Provisions for the DBE Percentage)

132. Contract No. 95674 Shelby County District 7

Section 10-00051-00-BT (SHELBYVILLE) GENERAL DACEY TRAIL Project TCSP-IL09(33) This project consists of bike trail construction using aggregate base course and bituminous cover and seal coat, earthwork, pipe culverts and sidewalks, beginning at the Army Corps of Engineers administration building and continuing approximately 1.25 miles along Illinois Route 16 to the Shelbyville Visitors Center; includes 3,861 cu yd earth excavation; 2,056 ton aggregate; 3,500 sq ft PCC sidewalk, 5"; 206 ft pipe culverts; 62 sq ft sign panel-Type 1; 656 ft thermoplastic pavement markings; 2 ea bicycle racks; 5 ea bollards 5 ea precast concrete parking blocks; 60 ft timber bicycle railing; 12 ea wood sign posts; 128 cu yd stock pile top soil; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (C-97-053-12) (7-10567-0000) (See the Special Provisions for the DBE Percentage)

133. Contract No. 97490 Randolph County District 8

Section 09-00039-06-RS FAS Route 863 (ROCKCASTLE ROAD) Project RS-863(107) 3.6 miles of HMA resurfacing including binder and surface courses, aggregate wedge shoulders, patching, culvert replacement, guardrail, pavement striping, seeding and all other incidental items to complete the work on FAS 863 (Rockcastle Road) from Steeleville South corporate limits to Wine Hill Road; includes 1,899 cu yd furnished excavation; 501 cu yd trench backfill; 120 lb temporary erosion control seeding; 3,557 gal bituminous materials (prime coat); 3,861 ton leveling binder (machine method); 2,017 sq yd HMA surface removal; 4,007 ton HMA surface course; 188.2 sq yd Class D patches; 1,359 ton aggregate shoulders; 1,016 ft pipe culverts; 1,775 ft steel plate beam guardrail; 3,037.5 ft guardrail removal; 56,695 ft temporary pavement marking line; 20,175 sq ft work zone pavement marking removal; 56,695 ft paint pavement marking line; 237 raised reflective pavement markers; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (60 Working Days) (C-98-350-11) (8-10430-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 64: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 23 -

134. Contract No. 99474 White County District 9 Section 09-08140-00-BR TR 251 Project BROS-193(54) This project consists of replacement of a structure with a 60' single span precast prestressed concrete deck beam bridge and minor approach work located 3 miles North of Norris City over Bear Creek; includes 377 cu yd channel excavation; 349 cu yd furnished excavation; 360 ton stone dumped riprap, Class A4; 330 ton aggregate surface course, Type B; 1 ea removal of existing structures; 26.2 cu yd concrete structures; 1,440 sq ft PPC deck beams (27" depth); 2,680 lb reinforcement bars; 440 ft furnishing steel piles 10X42; 103 ton stone lined ditch Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (C-99-517-10) (9-10395-0000) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 135. Contract No. 60H45 Kane County District 1

Section 8R-R FAP Route 345 (US 20 (LAKE ST)) Project ACNHF-345(56) Interchange reconstruction of US 20 (Lake St.)/McLean Blvd. and bridge replacement of the structure carrying US 20 over McLean Blvd. (SN045-0077) also lighting, traffic signal modernization and other work located in Elgin; includes 149,753 Cu yd Earth excavation; 29,933 Cu yd Removal and disposal of unsuitable material; 13,672 Cu yd furnished excavation; 7,726 Cu yd Trench backfill; 90,589 Sq yd Topsoil; 57,469 Sq yd Compost; 17 Acres Seeding; 135,717 Sq yd Stabilized subbase-HMA; 1,761 Sq yd HMA base course; 1,012 Tons HMA surface course, Mix D; 1,787 Tons Polymerized HMA surface course, Mix F; 50,903 Sq yd PCC pavement (jointed); 40,206 Sq yd Continuously reinforced PCC pavement; 40,206 Sq yd Pavement reinforcement; 46,810 Sq ft PCC sidewalk; 140,195 Sq yd Pavement removal; 26,187 Sq yd Milling; 40,181 Sq yd PCC shoulders; Removal of 2 existing structures; 1258 Cu yd Structure excavation; 3297.4 Cu yd Concrete; 6760 Sq yd Bridge deck grooving; Structural steel; 20,586 Stud shear connectors; 771,860 Lb Epoxy coated reinforcement bars; 6,290 Ft Steel piles HP 14x73; 18,227 Ft Storm sewers; 64 Manholes; 2,565 Sq ft Concrete sealer; 14,841 Ft Concrete curb and gutter; 15,964 Ft Steel plate beam guardrail; 29 Traffic barrier terminals; 27,598 Ft Shoulder rumble strips; 906 Cu yd Non-special waste disposal; 2,146 Sq ft Sign panel; 3,346 Lb Structural steel sign support-breakaway; 64,859 Ft Polyurea pavement marking; 10,713 Ft Underground conduit; 19,461 Ft Unit duct; 89,576 Ft Electric cable; 12 Steel mast arm assemblies and poles; 58 Signal heads, LED; 4 Optically programmed signal heads, LED; 111 Shade trees; 30 Intermediate trees; 1,910 Shrubs; 400 Vines; 1,311 Ft Television inspection of sewer; 48 High load multi-rotational bearings; 10,122 Sq ft concrete median; 135,717 Sq yd Aggregate subgrade; Removal of 6 buildings; Removal and disposal of friable asbestos; Removal and disposal of non-friable asbestos; 36,436 Sq yd Temporary pavement; 9,960 Sq ft Temporary soil retention system; Mobilization; Traffic control and protection; Federally funded. (Completion Date: August 30, 2014 Plus 15 Working Days) (Job C-91-632-09) (1-76012-0100) (See the Special Provisions for the DBE Percentage) MANDATORY PRE-BID CONFERENCE PREVIOUS LETTING: March 9, 2012 (Item 116)

136. WITHDRAWN FROM LETTING In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 137. Contract No. 60L76 Lake County District 1

Section 49-1(HB&HB-1)R FAI Route 94 (I-94/US 41) 0.47 mile of reconstruction of Russell Road and the Russell Road on and off ramps at I-94 along with bridge replacement of 2 structures spanning I-94 all located in Wadsworth (SN 049-0078, 0089); includes 13,875 cu yds earth excavation; 3,469 cu yds removal and disposal of unsuitable material; 84,125 cu yds furnished excavation; 5,725 cu yds granular embankment, special; 192 cu yds trench backfill; 28,520 cu yds topsoil; 13 acres seeding; 62,835 sq yds erosion control blanket; 126 units supplemental watering; 12,436 ft perimeter erosion barrier; 20,722 sq yds stabilized subbase- HMA; 8,440 sq yds preparation of base; 2,226 tons HMA binder and surface course, Mix D; 2,235 tons HMA pavement (full-depth); 16,634 sq yds PCC pavement (jointed); 1,783 sq ft PCC sidewalk; 7,320 sq yds pavement removal; 4,926 sq yds PCC shoulders; removal of 2 existing structures; 528 sq yds protective shield; 3,483 cu yds structure excavation; 1,625.1 cu yds concrete; 2,441 sq yds bridge deck grooving; erecting 773,140 lbs structural steel; 5,148 stud shear connectors; 390 lbs reinforcement bars; 369,580 lbs epoxy coated reinforcement bars; 4,827 ft metal pile shells; 3,175 sq ft concrete sealer; 9,414 ft pipe underdrains; 6,448 ft concrete curb and gutter; 812.5 ft steel plate beam guardrail; 10 traffic barrier terminals; 439 sq ft sign panel; 28,890 ft polyurea pavement marking; 5,892 ft electric cable; 12,649 sq ft mechanically stabilized earth retaining wall; 15 signal heads; 28,412 sq yds aggregate subgrade improvement; 24,411 sq ft stamped colored PCC median surface; 17,398 sq yds porous granular embankment, special; mobilization; traffic control and protection; (Completion Date: May 17, 2013 Plus 10 Working Days) (Job No. C-91-019-11) (1-77364-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 65: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 24 -

138. Contract No. 60M83 DuPage County District 1 Section 534R-B FAP Route 870 (IL 53) Project ACBRF-870(14) Removal of an existing single span bridge and construction of a three sided precast concrete structure, concrete retaining walls and other work on IL 53 over St. Joseph's Creek (SN 022-0082) in Lisle; includes 512 cu yd earth excavation; 44 cu yd channel excavation; 62 cu yd furnished excavation; 2,514 sq yd topsoil; 1.25 acre seeding; 497 sq yd subbase granular material; 680 sq yd HMA base course; 507 tons polymerized HMA binder and surface course, mix F; 1,607 sq yd PCC sidewalk; 430 sq yd pavement removal; 1,231 sq yd milling; removal of existing structure; 228.5 cu yd concrete; 9,550 lb epoxy coated reinforcement bars; 1,548 ft concrete curb and gutter; 50 ft steel plate beam guardrail; 6 traffic barrier terminals; 650 cu yd non-special waste disposal; 4,742 ft thermoplastic pavement marking; 299 ft underground conduit; 2,404 ft fiber optic cable; 83.3 ft three-sided precast concrete structures 28' X 10'; 774 sq yd aggregate subgrade; 12 shade trees; 2,706 ft electric cable; mobilization traffic control and protection; Federally funded. (Completion Date: October 01, 2012 Plus 05 Working Days) (Job No. C-91-170-11) (1-75191-0100) (See the Special Provisions for the DBE Percentage) PREVIOUS LETTING: March 9, 2012 (Item 57)

139. Contract No. 60P85 Cook County District 1

Section 2011-066-I FAI Route 94 (I-94 (EDENS EXPWY)) Sidewalk replacement and structural repair of concrete on the structure carrying Devon Ave. over I-94 (Eden's Expressway) in Lincolnwood, Jefferson Twp., Cook County; includes 95.1 cu yds concrete removal; 849 sq yds protective shield; 185 cu yds concrete; 30,710 lbs epoxy coated reinforcement bars; 129 ft polyurea pavement marking; 1,070 lbs structural steel repair; 948 sq ft structural repair of concrete; mobilization; traffic control and protection. (35 Working Days) (Job No. C-91-622-11) (0-01618-1025) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 140. Contract No. 64515 Winnebago County District 2

Section 34R FAP Route 742 (IL 2) Project HPP-F-742(136) Reconstruction and resurfacing of IL 2 (S. Main) from north of Beltline Rd. to 0.4 mile north of Harrison Ave., located southwest of Rockford, for a total distance of 2.2 miles; includes 61,203 cu yds earth excavation; 8,207 cu yds trench backfill; 54,824 sq yds topsoil; 15.5 acres seeding; 19 acres mowing; 30,740 sq yds erosion control blanket; 16,327 sq yds sodding; 84,198 sq yds aggregate subgrade improvement; 11,880 tons HMA binder and surface course; 67,221 sq yds PCC pavement (jointed); 57,550 sq yds pavement removal; 49,850 sq yds milling; 2,427 sq yds patching; removal of 3 existing structures; 6,460 lbs reinforcement bars; 40.4 cu yds concrete box culverts; 180 ft precast concrete box culverts; 24,115 ft concrete curb and gutter; 33,203 sq ft concrete median surface; 390.5 sq ft sign panel; 8,568 ft underground conduit; 11,442 ft electric cable; 22 signal heads, LED; 79,997 ft modified urethane pavement markings; 33,981 sq yds geotechnical reinforcement; 48 luminaires; 197 shade trees; 30 intermediate trees; 45 shrubs; 56 aluminum light poles; 2,169 sq ft segmental block retaining wall; 3,617 ft detector loop replacement; 9,874 ft storm sewers; 29 manholes; 512.5 ft steel plate beam guard rail; mobilization; traffic control and protection; Federally Funded. (Completion Date: November 30, 2013 Plus 10 Working Days) (C-92-001-12) (2-10160-0100) (See the Special Provisions for the DBE Percentage) MANDATORY PRE-BID CONFERENCE

141. Contract No. 66972 LaSalle County District 3

Section (G-1)BR-2 FAP Route 623 (US 6) Project F-623(30) Replacement of the superstructure of the bridge carrying US 6 over a tributary of I & M Canal located at the east edge of Marseilles (SN 050-0184); includes 140 cu yds earth excavation; 100 cu yds channel excavation; 80 cu yds furnished excavation; 878 sq yds erosion control blanket; 255 sq yds stone riprap; 255 sq yds filter fabric; 320 sq yds subbase granular material; 407 tons HMA binder and surface course Mix C; 230 sq yds pavement removal; 5.2 cu yds concrete removal; 173.3 cu yds concrete; 285 sq yds bridge deck grooving; 724 ft concrete curb and gutter; 358 sq yds milling; 6 traffic barrier terminals; 37,710 lbs epoxy coated reinforcement bars; removal of existing superstructure; temporary wall bracing system; 3,330 ft paint pavement marking; mobilization; traffic control and protection; federally funded. (Completion Date: August 16, 2012 Plus 15 Working Days) (Job No. C-93-125-09) (3-50184-0100) (See the Special Provisions for the DBE Percentage)

142. Contract No. 66B71 Iroquois County District 3

Section (38-8)RA-8 FAI Route 57 (I-57) Concrete pavement widening, stabilized shoulder removal, curb and gutter, embankment, seeding and other work at the northbound and southbound Mainline Rest Areas located 3.06 and 3.70 miles south of Buckley; includes 247 cu yd earth excavation; 2,062 cu yd furnished excavation; 1.81 acres seeding; 8,712 sq yd heavy duty erosion control blanket; 1,033 sq yd subbase granular material; 300 sq ft PCC sidewalk; 400 sq yds patching; 1,368 ft saw cuts; 12 lbs crack filling; 2,992 ft concrete curb and gutter; 35 lbs crack routing and filling; 8,464 ft epoxy pavement marking; mobilization; traffic control and protection. (35 Working Days) (C-93-020-12) (0-01782-3001) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 66: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 25 -

143. Contract No. 72F04 Menard-Mason Counties District 6

Section ((E)RS-4,(G)RS-6)I&(F)RS-3,I-1 FAP Route 658 (IL 29) Project F-658(26) This project consists of milling and resurfacing on Illinois Route 29 from just north of Illinois Route 10 in Mason County to 0.6 mile south of the Menard/Mason County Line; includes 3,729 cu yd earth excavation; 538 unit excavating and grading existing shoulder; 1,167 sq yd stone riprap; 2,906 sq yd base course widening; 5,723 ton leveling binder (machine method); 1,787 sq yd HMA surface removal-butt joint; 8,873 ton HMA surface course; 650 sq yd pavement patching; 4,140 ft strip reflective crack control treatment; 6,203 ton aggregate shoulders; 21,545 sq yd HMA shoulders; 126 ft combination concrete curb and gutter; 317 sq ft concrete median surface; 1,100 ft steel plate beam guardrail; 75,837 ft paint pavement marking line; 15,269 ft modified urethane pavement marking line; 449 raised reflective pavement markers; 83,363 sq yd HMA surface removal; 16,185 sq ft median surface removal; 550 sq ft sigh panel; traffic control and protection; mobilization; Federally funded. (55 Working Days) (C-96-012-12) (6-00803-0000) (See the Special Provisions for the DBE Percentage)

144. Contract No. 72F30 Pike County District 6

Section (75-1)BJR-2,RS-2 FAI Route 72 (I-72) This project consists of replacing bridge deck expansion joints on the structure (S.N. 075-0087) carrying Interstate 72 over Sprague Ditch located 2 miles west of Illinois Route 96; includes 1,115 sq yd HMA base course widening; 36 ton aggregate shoulders; 14 cu yd concrete superstructure; 1,663 lb reinforcement bars; 112 ft preformed joint strip seal; 2,130 ft paint pavement marking line; traffic control and protection; mobilization. (40 Working Days) (Job No. C-96-045-12) (0-01618-6019) (See the Special Provisions for the DBE Percentage)

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. 145. Contract No. 74252 Cumberland County District 7

Section (108,109,110)RS-3 FAP Route 828 & 773 (IL 121) Project F-000S(859) 12.6 miles of HMA resurfacing, box culvert removal and replacement, and highway lighting located on IL Route 121 from U.S. Route 45 to just west of the square in Toledo; includes 10,319 cu yds earth excavation; 1,118 units excavating and grading existing shoulders; 801 sq yds stone riprap; 8,092 tons leveling binder (machine method); 2,150 sq yds HMA surface removal-butt joint; 17,509 tons HMA surface course, N70; 535 sq yds HMA pavement (full-depth); 192,661 sq yds HMA surface removal; 5,640 sq yds patches; 2,465 tons aggregate shoulders; removal of 2 existing structures; 1,968 cu yds structure excavation; 368 cu yds rock excavation for structures; 336 ft precast concrete culvert; 1,600 ft steel plate beam guardrail; 240,520 ft paint pavement marking line; 916 raised reflective pavement markers; 1 electric service installation; 1,846 ft unit duct, 600V (XLP Type use); 1,477 ft trench and backfill for electrical work; 11 luminaires; 1 lighting controller; 11 light poles; 22 shade trees; mobilization; traffic control and protection; Federally funded. (85 Working Days) (Job No. C-97-080-07) (7-50130-0000, 7-50248-0000 and 7-50247-0000) (See the Special Provisions for the DBE Percentage) PREVIOUS LETTING: November 18, 2011 (Item 106)

146. Contract No. 74527 Fayette County District 7

Section D7 BRIDGE REPAIRS 2012-1 FAI Route 70 (I-70) This project consists of repairs including replacing expansion joints and elastomeric bearings at the structure (S.N. 026-0014) located at Interstate 70 and Illinois Route 185 near Vandalia; includes 101 sq yd PCC base course; 48 ton HMA surface course; 17 cu yd concrete; 1,530 lb furnishing and erecting structural steel; 2,120 lb reinforcement bars, epoxy coated; 86 ft preformed joint strip seal; 14 elastomeric bearing assembly; 794 ft shoulder rumble strip; 1,110 ft polyurea pavement marking line; 14 jack and remove existing bearing; traffic control and protection; mobilization. (40 Working Days) (Job No. C-97-076-11) (0-01618-7003) (See the Special Provisions for the DBE Percentage)

147. Contract No. 74530 Macon County District 7

Section D7 HMA RESURF 2012-2 FAP Route 320 (IL 48) This project consists of patching, milling and resurfacing Illinois Route 48 at three locations in Decatur. Location 1 is at the intersection of Illinois Route 48 and Woodford, location 2 is on Illinois Route 48 between Brush College Road and Cundiff Street, location 3 is at the Pride of the Prairie Rest Area along Interstate 72; includes 27 sq yd PCC surface removal-butt joint; 460 ton polymerized HMA surface course; 1,395 sq yd partial depth removal; 78 ton aggregate shoulders; 5,336 ft thermoplastic pavement marking line; 181 ton partial depth patching; traffic control and protection; mobilization. (15 Working Days) (Job No. C-97-079-11) (0-01618-7006) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 67: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 26 -

148. Contract No. 74568 Macon-Shelby Counties District 7 Section D7 SAFETY 2012-1 FAP Route 322 (US 51) This project consists of pavement markings, flashing LED stop signs and speed limit signs at three intersections located in Moweaqua, Macon, and Maroa; includes 310 sq ft concrete median surface; 192 sq ft sign panel; 194 ft wood sign support; 7,527 ft thermoplastic pavement marking line; 8,442 ft underground conduit; 3 flasher controller; 15,366 ft electric cable in conduit; 2 signal head; 8 illuminated sign; 8 radar speed sign; 3 electric service installation; traffic control and protection; mobilization. (Completion Date: October 01, 2012 Plus 10 Working Days) (Job No. C-97-090-12) (7-50903-0000)(See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 68: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 27 -

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor Agreement.

149. Contract No. 76C52 St Clair County District 8 Section 82-1-R(A),82-1-R(B) FAI Route 64 & 55 (I-64 & 55) This improvement consists of the construction of Ramps 70E64E, 55S70W, 70E55N and retaining wall (SN 082-W310); the reconstruction of Ramps 64W55N, 64W55S, 55N64E, O and P; the resurfacing of WB and EB I-64, NB and SB I-55 and Ramp 64W55S. The work also included drainage, lighting, signing, traffic control and protection, pavement markings, deep wells and all incidental and collateral work necessary to complete the improvements as shown on the plans and as described herein; includes 74 cu yd concrete superstructure; 15,430 lb reinforcement bars; 19,768 ton gravel or crushed stone base course; 4,740 ft curb and gutter; 16,229 ft pipe underdrains; 6,518 ft storm sewers; 2,302 cu yd trench backfill; 111,635 cu yd earth excavation; 1,126 sq yd patches; 9,016 ft concrete barrier; 4,825 ft steel plate beam guardrail; 313 sq yd bridge approach pavement; 14,920 ton bituminous concrete binder & surface course superpave; 12,386 sq yd continuously reinforced concrete pavement; 55,217 sq yd bituminous surface removal; 12,386 sq yd pavement reinforcement; 14,237 sq yd concrete pavement; 32,179 sq yd stabilized sub-base; 25,831 sq yd PCC shoulders; 55,964 sq yd protective coat; 1,021 raised reflective pavement removal; 24,309 sq yd pavement removal; 682 ft overhead sign structure; 5,718 sq ft sign panel; traffic control and protection; mobilization. (Completion Date: November 01, 2013) (Job No. C-98-002-12)(8-90000-0375)(8-90000-0350) (See the Special Provisions for the DBE Percentage) MANDATORY PRE-BID CONFERENCE

150. Contract No. 76F16 Madison County District 8

Section 60-(8,9,10,11)-I FAP Route 310 (IL 255) Project HSIP-310(148) This project consists of constructing rumble strips along 6.83 miles of Illinois Route 255 from Interstate 270 to Illinois Route 143; includes 115,622 ft shoulder rumble strips; traffic control and protection; mobilization; Federally funded. (15 Working Days) (C-98-005-12) (8-08800-1901)(See the Special Provisions for the DBE Percentage)

151. Contract No. 78261 Jackson County District 9

Section (130,101)N-1 FAP Route 331 & 312 (IL 3 & IL 149) Project ACF-000S(885) This project consists of removing and replacing the concrete pavement and concrete median located at the intersection of Illinois Route 3 and Illinois Route 149 in Jackson County; includes 7,625 sq ft median removal; 915 ft combination concrete curb and gutter; 1,375 sq ft concrete median; 637 cu yd earth excavation; 6,947 sq yd sub-base granular material; 6,120 sq yd PCC pavement; 6,949 sq yd protective coat; 6,070 sq yd pavement removal; 1,951 sq yd HMA shoulders; 70 ft storm sewers; 5,915 sq ft concrete median surface; 6,467 ft paint pavement marking line; traffic control and protection; mobilization; Federally funded. (40 Working Days) (C-99-002-12) (9-00136-0000) (See the Special Provisions for the DBE Percentage)

152. Contract No. 78272 Franklin County District 9

Section 12(RS-7) FAU Route 9481 (IL 37) Project M-9481(2) This project consists of pavement patching and resurfacing on Illinois Route 37 between Douglas Street and Cleveland Street in West Frankfort; includes 1,119 sq yd HMA surface removal (butt joint); 5,029 ton polymerized HMA binder and surface course; 27,628 sq yd HMA surface removal; 596 sq yd class C Patches; 14,617 ft thermoplastic pavement marking line; 163 raised reflective pavement marker; 490 ft detector loop; traffic control and protection; mobilization; Federally funded. (30 Working Days) (C-99-060-11) (9-99720-0500) (See the Special Provisions for the DBE Percentage)

153. DELETED FROM THE LETTING 154. Contract No. 63557 Cook County District 1

Section 02-00055-00-WR (LEMONT) FAU Route 1587 (MCCARTHY ROAD) Project HPP-M-8003(504) Project consists of the installation of traffic signals, pavement channelization, widening and resurfacing, located at the intersections of McCarthy Road, Archer Avenue and Derby Road located in the Village of Lemont; includes 5,806 cu yd earth excavation; 10,480 sq yd aggregate subgrade improvement; 1,637 sq yd subbase granular material; 674 sq yd HMA base course; 3,559 ton HMA surface course; 352 ton leveling binder; 2,680 sq yd HMA pavement - full depth; 10,150 sq ft PCC sidewalk 2,072 sq yd pavement removal; 7,821 sq yd HMA surface removal; 979 cu yd porous granular embankment subgrade; 9,112 sq ft sidewalk removal; 1,522 ft combination curb and gutter removal; 650 sq yd Class D patches; 6,875 ft combination concrete curb and gutter; 1,721 ft storm sewer removal; 3,483 ft storm sewer; 150 ft steel plate beam guardrail; 8,500 gal special waste ground water disposal; 2,710 cu yd non-special waste disposal; 17,116 ft thermoplastic pavement marking line; 303 raised reflective pavement markers; 5,044 ft underground conduit; 3 full-actuated controllers and cabinets; 1,534 ft fiber optic cable in conduit; 24,060 ft electric cable in conduit; 13 traffic signal posts; 9 steel mast arm assemblies and poles; 25 signal heads; 9 pedestrian signal heads; 1,876 ft detector loop; 7 light detectors; 8,334 sq yd topsoil furnish and place; 7,882 sq yd sodding, salt tolerant; 0.10 acres seeding; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (110 Working Days) (C-91-190-05)(1-20184-0000)(1-20125-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 69: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 28 -

155. Contract No. 63567 DuPage County District 1 Section 05-00069-00-CH (GLEN ELLYN) FAU Route 2576 (LAMBERT ROAD) Project M-8003(923) This project consists of the construction of a right turn lane and the relocation of traffic signal and lighting equipment located on Lambert Road at IL Route 38 (Roosevelt Road) in the Village of Glen Ellyn; includes 340 sq yd HMA base course; 74 ton aggregate; 109 ton leveling binder (machine method), N70; 329 ton HMA surface course; 39 sq yd PCC driveway; 368 sq ft PCC sidewalk; 71 ft storm sewers; 2,427 sq yd HMA surface removal; 822 ft combination curb and gutter; 2,676 ft thermoplastic pavement markings; 663 ft underground conduit; 6,739 ft electric cable in conduit; 1 ea relocate existing lighting unit; 437 ft detector loop, Type I; 1,070 sq ft brick pavers; 111 sq ft detectable warnings, special; 453 sq yd sub-base granular material, Type B 6"; 92 sq yd Class C patches; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 15, 2012) (Job No. C-91-139-08)(1-20384-0000) (See the Special Provisions for the DBE Percentage)

156. Contract No. 63613 Cook County District 1

Section 06-00175-00-TL (BLUE ISLAND) FAP Route 344 (127TH STREET) Project F-344(41) This project consists of pavement widening, PCC base course, HMA pavement (level binder, binder course, surface course), pavement patching, modernize existing traffic signals, sidewalks, and curb and gutter located on 127th Street at Sacramento Avenue in the City of Blue Island; includes 2,200 sq yd topsoil furnish and place, 4": 2,008 sq yd aggregate subgrade improvement, 12"; 1,320 sq yd PCC base course widening; 250 ton leveling binder (machine method), N70; 1,401 ton HMA binder and surface course; 6,030 sq ft PCC sidewalk, 5"; 164 sq yd Class D patches; 3,526 sq yd HMA surface removal; 477 ft storm sewers; 2,607 ft combination concrete curb and gutter, Type B-6.12; 1,405 cu yd non-special waste disposal; 5,880 ft thermoplastic pavement markings; 1,399 ft underground conduit, galvanized steel; 2,800 ft unit duct, 600V, 3-1C No. 4, 1/C No. 6 ground (XLP-Type Use), 1 1/4" dia. polyethylene; 6,227 ft electrical cable in conduit; 17 ea luminaire, sodium vapor, horizontal mount, 250 watt; 1 ea lighting controller, single door, console type; 17 ea light pole, aluminum, 40 ft. M.H. 12 ft. mast arm; 2 ea traffic signal posts; 22 ea signal heads, LED; 516 ft detector loop, Type I; 1,185 ea drill and grout dowel bars; 623 sq ft remove and reset brick pavers; 1,980 cu yd earth excavation (special); 90 ft concrete curb, Type B (special); 1 ea full-actuated controller and Type IV cabinet, special; 1 ea uninterruptable power supply, special; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (80 Working Days) (C-91-013-07) (1-20264-0000) (See the Special Provisions for the DBE Percentage)

157. Contract No. 63625 DuPage County District 1

Section 09-00206-08-TL Various Routes Project CMM-9003(563) Project consists of the modernization of fourteen traffic signals with traffic signal interconnect work which includes full actuated controllers in cabinets, posts and mast arm assemblies, LED traffic and pedestrian signals, fiber optic interconnect cable, fiber optic transceivers, loop detectors and all other incidental and collateral work necessary to complete the work on Geneva Road from Schmale Road to St. Charles Road, on St. Charles Road from Geneva Road to Swift Road and on Glen Ellyn Road from Army Trail Road to Armitage Avenue; includes 3,475 sq ft PCC sidewalk; 468 sq ft detectable warnings; 265 ft combination concrete curb and gutter removal and replacement; 545 ft thermoplastic pavement marking line; 20,449 ft underground conduit; 24,068 ft fiber optic cable in conduit; 24,068 ft electric cable in conduit, tracer; 5,169 ft electric cable in conduit, signal; 18 traffic signal posts; 54 signal heads, LED; 25 pedestrian signal heads, LED; 340 ft detector loop; 28 pedestrian push buttons; 1,434 ft remove electric cable from conduit; 10 remove existing traffic signal equipment; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: October 26, 2012) (C-91-330-10) (1-11012-0060) (See the Special Provisions for the DBE Percentage)

158. WITHDRAWN FROM THE LETTING 159. Contract No. 63654 Cook County District 1

Section 10-00116-00-SW (MELROSE PARK) FAU Route 1026 (DIVISION STREET) Project M-TE-D1(825) Project consists of the installation of landscaped medians with irrigation systems and planting and obelisks, installation of decorative overhead LED strand lights, installation of trees, removal and replacement of existing sidewalk, curb and gutters, driveway aprons, grass parkways and all other incidental items to complete the work on FAU Route 1026 (Division Street) from 25th Avenue to 9th Avenue in the Village of Melrose Park; includes 1,475 sq yds topsoil furnish and place; 950 sq yds sodding; 1,400 sq yds subbase granular material; 155 gal bituminous materials; 50 tons incidental HMA surfacing; 1,780 sq yds protective coat; 7,000 sq ft PCC sidewalk; 650 ft combination curb and gutter removal; 2,900 sq ft sidewalk removal; 1,840 ft concrete curb; 3,305 ft thermoplastic pavement marking line; 1,540 ft underground conduit; 156 trees; 1 lump sum irrigation system; 40 units tree removal; 550 ft combination concrete curb and gutter; 1,700 ft planter curb; 1,600 sq yds HMA removal (special); 1,000 ft tension wire; 18 steel support poles for overhead light strands; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (60 Working Days) (C-91-512-10) (0-00992-1021) (1-21192-0000) (See the Special Provisions for the DBE Percentage) PREVIOUS LETTING January 20, 2012 (Item 129)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 70: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 29 -

160. Contract No. 63683 Lake County District 1 Section 11-00012-00-PV (BEACH PARK) FAU Route 1210 (BEACH ROAD) Project M-9003(855) Project consists of road reconstruction, new roadway profile, widening and, resurfacing, drainage system, an 8 foot recreation path and all other incidental items to complete the work on FAU Route 1210 (Becah Road) between Sheridan Road and Lewis Avenue in the Village of Beach Park; includes 448 unit tree removal; 7,271 cu yd earth excavation; 9,050 cu yd trench backfill; 15,700 sq yd geotechnical fabric for ground stabilization; 879 cu yd topsoil excavation and placement; 5 acre seeding; 1,680 lb fertilizer nutrients; 11,650 sq yd erosion control blanket; 90 inlet filters; 7,713 sq yd subbase granular material; 275 ton aggregate for temporary access; 1,570 gal bituminous materials (prime coat); 2,700 ton HMA binder course; 2,225 ton HMA surface course; 13,830 sq yd pavement removal; 5,305 ft storm sewers, rubber gasket; 9,300 ft pipe underdrains; 41 catch basins; 9,300 ft combination concrete curb and gutter; 2,220 ft thermoplastic pavement marking line; 3,500 sq yd stabilized construction entrance; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (130 Working Days) (Job No. C-91-020-012) (1-21217-0000) (See the Special Provisions for the DBE Percentage)

161. Contract No. 63684 Cook County District 1

Section 11-00088-00-SP (BARRINGTON) FAU Route 1270 (LAKE COOK ROAD) Project HSIP-9003(977) This project consists of installation of solar powered flashing beacons and pedestrians warning signage located on Lake Cook Road at Coldspring Road and on Main Street at North Hager Avenue in the village of Barrington; includes 1 ls mobilization; 4 ea solar-powered flashing beacon assemblies (complete); 24 sq ft furnish sign panel - reflectorized; 1 ls traffic control and protection, (special); Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (C-91-321-12) (0-01663-1005) (See the Special Provisions for the DBE Percentage)

162. Contract No. 63686 Cook County District 1

Section 11-00093-00-RS (RIVER FOREST) FAU Route 1411 (WASHINGTON BOULEVARD) Project M-9003(943) Project consists of the intermittent replacement of defective curb and gutter, sidewalks, pavement patching, HMA surface removal, various utility structure adjustments, resurfacing with leveling binder and HMA surface course, pavement striping, restoring the parkways with topsoil and sod and all other incidental items to complete the work on FAU Route 1411 (Washington Boulevard) from the Des Plaines River to Lathrop Avenue in the Village of River Forest; includes 260 sq yd topsoil furnish and place; 4,100 gal bituminous materials (prime coat); 85 ton aggregate (prime coat); 1,140 ton polymerized leveling binder (machine method); 2,300 ton HMA surface course; 430 sq yd protective coat; 1,300 sq yd PCC sidewalk removal and replacement; 20,400 sq yd HMA surface removal; 1,110 ft combination curb and gutter removal and replacement; 258 sq ft detectable warnings; 2,040 sq yd Class D patches; 67 frames and lids to be adjusted; 30 frames and lids; 13,800 ft thermoplastic pavement marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (C-91-214-12) (1-21230-0000) (See the Special Provisions for the DBE Percentage)

163. Contract No. 63696 McHenry County District 1

Section 11-00004-00-RS (RINGWOOD) FAU Route 4083 (BARNARD MILL ROAD) Project M-9003(900) This project consists of HMA surface removal and resurfacing, aggregate shoulders, pipe culvert removal and replacement, patching, striping located on Barnard Mill Road from Ringwood Road to Howe Road in the Village of Ringwood; includes 155 cu yd trench backfill; 13 ton stone dumped riprap, Class A3; 10,415 ton HMA; 50,885 sq yd HMA removal; 770 sq yd Class D patches; 1,177 ton aggregate shoulders, Type B; 924 ft pipe culverts, Class C; 60.0 ft metal post - Type B; 50,759 ft thermoplastic pavement markings; 560 ea raised reflective pavement markers; 389.50 sq ft sign panel - Type 1 (special); 1,644 sq yd seeding (complete); Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (C-91-173-12) (1-21229-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 71: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 30 -

164. Contract No. 63697 Lake County District 1 Section 08-00100-00-PV (LIBERTYVILLE) FAU Route 1236 (LAKE STREET) Project M-9003(244) This project consists of full-depth patching, drainage system, HMA resurfacing and pavement markings located on Lake Street from Butterfield Road to Brainerd Avenue in the Village of Libertyville; includes 50 unit tree removal (6 to 15 units diameter); 50 unit supplemental watering; 265 cu yd removal and disposal of unsuitable material; 40 cu yd furnished excavation; 4,582 sq yd topsoil furnish and place, 4"; 91 cu yd subbase granular material, Type B; 328 sq yd HMA base course, 8"; 925 ton polymerized leveling binder (machine method), IL-4.75, N50; 1,447 ton HMA surface course, Mix "D", N50; 37 sq yd PCC driveway pavement, 6"; 3,280 sq ft PCC sidewalk; 2,090 sq yd Class D patches; 1,592 ft water mains; 234 ft pipe underdrains, fabric lined trench 6"; 1,762 ft combination curb and gutter, Type B-6.18; 16 cal mo changeable message sign; 22 ft sign panel - Type 1; 102 ft telescoping steel sign support; 6,271 ft thermoplastic pavement markings; 2 ea tree, quercus alba (white oak), 2-1/2" caliper, balled and burlapped; 90 ft sanitary sewer removal; 6,375 lb ductile iron water main fittings; 16 ea water service connections; 6 ea gate valves; 39 sq yd brick driveway removal and replacement; 741 ea drill and grout #6 tie bars; 400 cu yd porous granular embankment, subgrade; 150 ft storm sewer (water main requirements); 110 ft sanitary sewers; 2,866 ft trace wire; 1,373 ft water main, ductile iron pipe, Class 52, directionally drilled; 8 ea fire hydrants with auxiliary valve and valve box; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (55 Working Days) (C-91-331-09) (1-20518-0000) (See the Special Provisions for the DBE Percentage)

165. Contract No. 63699 Kane County District 1

Section 07-03011-01-BR TR 193 (HINCKLEY ROAD) Project BROS-89(138) This project consists of rehabilitation of the existing two span structure including construction of a two span continuously reinforced concrete slab bridge superstructure, pile bent pier, HMA surfaced approaches and traffic barrier terminals located on Hinckley Road 2 miles west of Big Rock over the west branch of Big Rock Creek; includes 149 cu yd excavation; 801 sq yd topsoil furnish and place, 4"; 122 ton aggregate, 87 ton HMA; 1 ea removal of existing structure; 1 ea cofferdam (Type 1)(Location -1); 111.8 cu yd concrete; 34,580 lb reinforcement bars, epoxy coated; 3 cal mo changeable message sign; 135 ft furnishing metal shell piles 14" X 0.312"; 30 ton porous granular embankment, special; 385 ton stone riprap, Class A4 (special); federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 10, 2012 Plus 05 Working Days) (C-91-175-09) (1-20556-0000) (See the Special Provisions for the DBE Percentage)

166. Contract No. 66A65 Bureau County District 3

Section (22)I FAS Route 2245 (IL 29) Stream realignment with the use of spur dikes for the bridge carrying IL 29 over Big Bureau Creek (SN 006-0084) located south of Bureau Junction; includes 30 units tree removal; 475 cu yd channel excavation; 0.36 acre seeding; 99 lb fertilizers; 1,400 ft perimeter erosion barrier; 1,377 sq yd filter fabric; 1,400 tons stone riprap; 15 cu yd controlled low-strength material; 125 sq yd turbidity curtain; 144 lb temporary erosion control seeding; mobilization; traffic control and protection. (30 Working Days) (C-93-122-11) (0-01518-3000) (See the Special Provisions for the DBE Percentage)

167. Contract No. 66B28 Bureau-Kankakee-LaSalle Counties District 3 Section D3 OVD MESSAGE SG-2012 Various Routes Furnishing and installing dynamic message signs on new overhead span and butterfly sign trusses at various locations along I-80, I-39 and I-57; includes 5,250 ft steel plate beam guardrail; 24 traffic barrier terminals; 63 guardrail markers; 360 ft overhead sign structure - span; 116 ft overhead sign structure - butterfly; 162 ft overhead sign structure walkway; 12 ft overhead sign structure walkway - butterfly; 145.1 cu ft drilled shaft concrete foundation; 9 electric service install; 809 ft underground conduit; 9 truss mounted LED dynamic message signs; 4,316 ft electric cable; 9 cellular modems; 4 LCD monitors; 11 CCTV cameras; 9 communications vaults; electrical work; mobilization; traffic control and protection. (Completion Date: July 30, 2013) (C-93-093-11) (ITS) (See the Special Provisions for the DBE Percentage)

168. Contract No. 66B70 Ford County District 3

Section (107)I FAP Route 798 (IL 115) Removal of existing asphalt pavement and constructing a concrete pavement over the existing box culvert; includes 9 tons HMA surface course, Mix C; 41.3 sq yds milling; 3 tons aggregate shoulders; 107 sq yd milling; 9.2 cu yd concrete; 2100 lb epoxy coated reinforcement bars; mobilization; traffic control and protection. (15 Working Days) (C-93-019-12) (0-01518-3001) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 72: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 31 -

169. Contract No. 66B94 Kankakee County District 3 Section (104B)I-1 FAP Route 796 (IL 115) Concrete repairs to the superstructure, steel railing, wearing surface and other work on the structure carrying IL 115 over Reddick Creek, 0.9 mile north of Cabery; includes 16.7 cu yds concrete removal; 11.6 cu yd concrete; 111 sq yd bridge deck grooving; 62 ft steel railing; 1 traffic barrier terminal; 35 ft paint pavement marking; 111 sq yd concrete wearing surface; 10 ft preformed joint filler; 90 sq yds concrete bridge deck scarification; 3,170 lb epoxy coated reinforcement bars; mobilization; traffic control and protection. (30 Working Days) (C-93-064-12) (3-46066-0000) (See the Special Provisions for the DBE Percentage)

170. Contract No. 76401 Madison County District 8

Section 64-1BR FAS Route 770 (IL 157) Project ACBRS-770(106) This project consists of replacing the structure carrying Illinois Route 157 over Sugar Creek located 0.8 miles north of Edwardsville; includes 4,620 cu yd earth excavation; 710 cu yd channel excavation; 643 sq yd stone riprap; 3,059 sq yd aggregate base course; 2,378 sq yd HMA base course; 582 ton HMA surface course; 1,299 sq yd HMA pavement; 1,972 sq yd pavement removal; 4,317 sq yd HMA surface removal; 1 removal of existing structure; 72 cu yd structure excavation; 341 cu yd concrete; 565 sq yd Bridge deck grooving; 691 sq yd protective coat; 85,300 lb furnishing and erecting structural steel; 69,790 lb reinforcement bars, epoxy coated; 702 ft furnishing and driving metal shell piles; 126 ft pipe culverts; 1,584 ft concrete gutter; 163 ft steel plate beam guardrail; 8 traffic barrier terminal; 9,810 ft thermoplastic pavement marking line; 186 ft pipe underdrains for structures; traffic control and protection; mobilization; federally funded; (125 Working Days) (C-98-080-11) (8-89226-0100) (See the Special Provisions for the DBE Percentage)

171. Contract No. 76F07 Randolph County District 8

Section 110BR-1 FAP Route 861 (IL 4/150) This project consists of painting and repairs to the structure (S.N. 079-0007) carrying Illinois Route 4/150 over Mary's River located west of Steeleville; includes 178 sq yd HMA base course widening; 86 ton HMA surface course; 1,095 sq yd HMA surface removal; 16 cu yd concrete superstructure; 2,400 lb reinforcement bars, epoxy coated; 89 ft preformed joint strip seal; 852 sq yd waterproofing membrane system; 2,378 ft thermoplastic pavement marking line; containment and disposal of non-led paint cleaning residues; cleaning and painting steel bridge; traffic control and protection; mobilization. (40 Working Days) (C-98-073-11) (0-01618-8009) (See the Special Provisions for the DBE Percentage)

172. Contract No. 76F20 Madison-Jersey-St Clair Counties District 8

Section DIST8 TS MODIFICATIONS 2012-1 Various Routes (VARIOUS) This project consists of traffic signal upgrades at various locations as described in the plans; includes 364 Rebuild existing pedestrian signal heads, LED; 3,896 LED signal face retrofit; traffic control and protection; mobilization. (285 Working Days) (Job No. C-98-011-12) (0-00877-8001) (See the Special Provisions for the DBE Percentage)

173. Contract No. 76F21 St Clair-Randolph Counties District 8

Section DIST8 TS MODIFICATIONS 2012-2 Various Routes (VARIOUS) This project consists of traffic signal upgrades at various locations in St. Clair and Randolph Counties; includes 432 rebuild existing pedestrian signal head, LED; 3,320 LED signal face retrofit; traffic control and protection; mobilization. (250 Working Days) (C-98-012-12) (0-00877-8002) (See the Special Provisions for the DBE Percentage)

174. WITHDRAWN FROM THE LETTING 175. Contract No. 85547 Winnebago County District 2

Section 08-00069-00-BR (LOVES PARK) GARDEN PLAIN AVENUE Project BHM-5099(105) This project consists of removal of existing bridge and replacement with a 2 span, precast, prestressed deck beam bridge on metal pile shells; roadway approach and sidewalk construction located on Garden Plain Avenue 0.23 mile East of IL 251 over Loves Park Creek in the City of Loves Park; includes 40 unit tree removal 6" - 15"; 175 cu yd excavation; 637 sq yd aggregate base course Type B; 116 ton HMA; 32 sq yd PCC driveway pavement, 6"; 2,085 sq ft PCC sidewalk, 4"; 329 cu yd structure excavation; 192 cu yd concrete structure/superstructure; 2,707 sq ft precast prestressed concrete deck beam (17" depth); 25,884 lb reinforcement bars, epoxy coated; 136 ft pedestrian railing; 1,380 ft furnishing metal shell piles, 14"X0.250"; 27 ft storm sewers, Class A; 356 ft combination concrete curb and gutter, Type B-6.18; 301 sq yd concrete wearing surface, 5"; 56 ft wood fence to be removed and re-erected; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (60 Working Days) (C-92-101-11) (2-10411-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 73: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 32 -

176. Contract No. 87388 LaSalle County District 3 Section 10-00090-00-WR (STREATOR) FAU Route 6160 (SOUTH OTTER CREEK ROAD) Project M-5066(13) This project consists of widening and resurfacing, new curb and gutter and storm sewer located on South Otter Creek Road from IL Route 18 to East 12th Street in the City of Streator; includes 118 unit tree removal (over 15 units diameter); 2,885 cu yd earth excavation; 500 ton porous granular embankment; 580 sq yd stone riprap; 9,372 ton aggregate base course, Type A; 139 ton leveling binder (machine method), N50; 5,159 ton HMA; 1,775.7 sq yd PCC driveway pavement, 6"; 21,350.0 sq ft PCC sidewalk, 4"; 20.4 cu yd concrete structures; 1,960.3 lb reinforcement bars; 170 ft precast concrete box culverts; 11,033 ft concrete; 318.0 ft steel plate beam guardrail, Type A, 6' posts; 141.0 ft chain link fence, 6'; 2,660.0 cu yd non-special waste disposal; 2,306 ft thermoplastic pavement markings; 1,127 ft pipe culverts, Class C; 3,158 ft storm sewers; 130 ton bituminous hot mix sand seal coat; 20 ft precast concrete box culverts; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (150 Working Days) (C-93-078-09) (3-10299-0000) (0-00332-3003) (See the Special Provisions for the DBE Percentage)

177. Contract No. 87456 Kendall County District 3

Section 10-00038-00-SW (PLANO) Various Routes Project SRTS-4009(103) Project consists of installing School Zone Flashing Beacons, construction of PCC sidewalk with ADA ramps, and all other incidental items to complete the work on various streets in the City of Plano; includes 20 unit tree removal; 26,380 sq ft PCC sidewalk; 488 sq ft detectable warnings; 419 sq yd driveway pavement removal; 646 ft curb removal; 8,145 sq ft sidewalk removal; 653 ft combination concrete curb and gutter; 2,531 ft paint pavement marking line; 9 solar-powered flashing beacon assemblies; 532 cu yd earth excavation; 1,718 sq yd restoration; 210 sq yd HMA driveway pavement; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (60 Working Days) (C-40-061-09) (0-01683-3004) (See the Special Provisions for the DBE Percentage)

178. Contract No. 87466 LaSalle County District 3

Section 10-00651-00-BR FAS Route 260 (CH 13) Project BRS-260(105) This project consists of removal and replacement of existing deck and superstructure including new horizontal and vertical alignments, ditches, culverts and guardrail on County Highway 13 located 1.5 North of LaSalle over Tomohawk Creek; includes 10 unit tree removal (6 to 15 units diameter); 1,991 cu yd channel excavation; 340 cu yd removal and disposal of unsuitable material; 4,565 cu yd furnished excavation; 3,457 ton subbase granular material, Type A; 1,114 ton aggregate; 1,626 ton HMA; 70 sq yd bridge approach pavement connector (flexible); 178 cu yd structure excavation; 346.2 cu yd concrete; 539.0 ft furnishing and erecting PPC bulb T-beams 63"; 58,770 lb reinforcement bars, epoxy coated; 170 ft furnishing steel piles HP 12X63; 120 ft pipe culverts; 126 sq yd geocomposite wall drain; 400 ft steel plate beam guardrail, Type A, 6' posts; 24 ea guardrail markers; 3,412 cu yd earth excavation (special); 186 cu yd porous granular embankment, special; 1,683 ton stone riprap; 202 ft pipe underdrains for structures 4"; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (90 Working Days) (C-93-102-10) (3-10256-0000) (See the Special Provisions for the DBE Percentage)

179. Contract No. 87495 Livingston County District 3

Section 06-00100-02-RS FAS Route 1362 (CH 8) Project RS-1362(115) Project consists of Cold In-Place Recycling, a HMA surface course, aggregate shoulders and guardrail installation, located at the I-55 overpass to CH13, 4.80 miles in length; includes 5,265 ton leveling binder; 5,265 ton HMA surface course; 4,226 ton aggregate wedge shoulder; 61,905 sq yd cold in-place recycling; 84,129 gal emulsified asphalt; 3,450 ft cold milling; 1,075 ft steel plate beam guardrail; 31 traffic barrier terminals; 6,375 ft paint pavement marking; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-93-134-11) (3-10286-0000) (See the Special Provisions for the DBE Percentage)

180. Contract No. 87496 Livingston County District 3

Section 09-20110-02-BR TR 169 Project BROS-105(50) Project consists of replacing a 4 span bridge with a 3 span precast concrete channel beam superstructure with spill thru abutments on steel piles and multi-column piers on spread footings, approach roadway work and all other incidental items to complete the work on TR 169, 4 miles north of Chenoa over Pike Creek; includes 995 cu yd earth and channel excavation; 765 cu yd furnished excavation; 296 sq yd heavy duty erosion control blanket; 400 lb temporary erosion control seeding; 368 sq yd stone riprap; 460 ton aggregate surface course; 1 removal of existing structures; 2 cofferdams; 2,356 sq ft precast concrete bridge slab; 6,630 lb reinforcement bars, epoxy coated; 116 ft furnishing and driving steel piles; 36 ft pipe culverts; 1 traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (C-93-135-11) (3-10317-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 74: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 33 -

181. Contract No. 87498 Bureau County District 3 Section 10-16115-00-BR TR 136 Project BROS-11(84) Replace existing bridge with a single span precast prestressed concrete deck beam bridge on spill through abutments and roadway approach work located on TR 136, 3 miles Northeast of Bradford over Fox Creek; includes .74 acre tree removal, acres; 1,202 cu yd excavation; 865 ton aggregate surface course; 1 ea removal of existing structures; 33.8 cu yd concrete structures; 1,984 sq ft PPC deck beams (33" depth); 4,260 lb reinforcement bars; 168 ft steel railing, Type S1; 216 ft furnishing metal shell piles 12" X 0.250"; 156 ft pipe culverts; 194 ton porous granular embankment, special; 1,178 ton stone riprap, Class A5 (special); Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (55 Working Days) (C-93-005-12) (3-10409-0000) (See the Special Provisions for the DBE Percentage)

182. Contract No. 87499 Bureau County District 3

Section 11-07119-00-BR TR 55 Project BROS-11(83) Remove existing bridge and construct a single span precast prestressed concrete deck beam structure on spill thru pile bent abutments, located 4 miles northwest of New Bedford over Union Ditch; includes 230 cu yd channel excavation; 22 cu yd concrete structures; 1,668 sq ft precast prestressed concrete deck beams; 2,480 lbs reinforcement bars; 504 ft furnish and drive metal shell piles; 143 ft steel railing; 505 ton stone riprap; 346 ton subbase granular material; 52 ton aggregate surface course; 78 ton HMA surface course. Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-93-004-12) (3-10407-0000) (See the Special Provisions for the DBE Percentage)

183. Contract No. 89591 Tazewell County District 4

Section 10-00076-00-RS FAS Route 470 (DEE-MACK ROAD) Project HRR-470(108) This project consists of sight distance improvement, resurfacing and superelevation improvements, and shoulder paving along Dee-Mack Road from 725 feet North of Cooper Road to 725 feet South of Cooper Road; includes 847 cu yd excavation; 232 sq yd sub-base granular material, Type B 12"; 1,630 sq yd HMA; 193 aggregate; 385 ton leveling binder (machine method), N50; 412 ton polymerized HMA surface course, Mix "C", N50; 47 sq yd Class D patches Type II, 10"; 4,316 sq yd HMA surface removal; 5,986 ft paint pavement markings; 2 ea remove and relocate existing sign lights; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-94-016-11) (0-01673-4001) (See the Special Provisions for the DBE Percentage)

184. Contract No. 91449 Vermilion County District 5

Section 09-00171-00-BR FAU Route 7043 (CH 6) Project M-BRS-183(308) Project consists of the rehabilitation of a three span continuous steel superstructure and concrete bridge deck along with improved HMA approaches, guardrail, traffic barrier terminals, removal of the existing superstructure and all other incidental items to complete the work on FAU Route 7043 (CH 6), 0.3 miles southeast of Danville over Stony Creek; includes 642 cu yd earth and channel excavation; 246 sq yd erosion control blanket; 165 ft perimeter erosion barrier; 280 sq yd subbase granular material; 78 gal bituminous materials; 79 ton leveling binder; 66 ton HMA surface course; 48 ton HMA shoulders; 1 removal of existing superstructure; 145 ft pipe culvert removal; 417 sq yd bridge deck grooving; 87,170 lbs furnishing and erecting structural steel; 2,826 stud shear connectors; 32,250 lb reinforcement bars; 272 ft steel railing; 283 ft guardrail removal; 1,676 ft paint pavement marking line; 1,350 ton stone riprap, Class A; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (55 Working Days) (Job No. C-95-306-11) (5-10279-0000) (See the Special Provisions for the DBE Percentage)

185. Contract No. 91460 McLean County District 5

Section 10-00242-00-LT (NORMAL) Various Routes Project TE-D5(95) Project consists of the removal of the existing pavement, concrete curb and gutter and sidewalks, construction of concrete or paver sidewalks and pavement and curb and gutter, HMA pavement, removal of earth and various organic materials in preparation for proposed landscape plantings, installation of proposed landscape grasses or sod, furnishing and installation of a proposed lighting system and all other incidental items to complete the work along College Avenue and Mullberry Street between Fell Avenue and Linden Street in the Town of Normal; includes 265 cu yd earth excavation; 262 sq yd topsoil furnish and place; 308 sq yd sodding salt tolerant; 45 gal bituminous materials (prime coat); 40 ton leveling binder (machine method); 55 ton HMA surface course; 2,578 sq ft PCC sidewalk; 1,988 sq ft sidewalk removal; 627 ft concrete curb; 3,690 ft underground conduit; 10,293 ft electric cable in conduit; 453 sq yd HMA surface removal; 17 light pole foundations; 778 sq ft unit pavers; 34 luminaires; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: September 28, 2012 Plus 05 Working Days) (Job No. C-95-321-11) (0-00992-5004) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 75: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 34 -

186. Contract No. 91473 Douglas County District 5 Section 07-02122-01-BR TR 151 Project BROS-41(100) Project consists of the removal of the existing single span thru truss bridge, construction of a three span precast prestressed concrete deck beam bridge (27" depth) on spill thru abutments and pile bent piers, aggregate approach roadway and all other incidental items to complete the work on TR 151 over Kaskaskia River, 0.20 miles east of Chesterville; includes 82 unit tree removal; 2,291 cu yd earth and channel excavation; 1,194 cu yd furnished excavation; 1,842 ft perimeter erosion barrier; 1,096 ton aggregate base course; 1 removal of existing structures; 5,225 sq ft precast prestressed concrete deck beams; 14,000 lb reinforcement bars; 1,361 ft furnishing and driving steel piles; 118 ft pipe culverts; 506 ton stone riprap; 156 cu yd concrete structures; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (65 Working Days) (C-95-325-12) (5-10303-0000) (See the Special Provisions for the DBE Percentage)

187. Contract No. 93565 Adams County District 6

Section 08-00211-01-SC FAS Route 1600 (CH 7) Project ER-1(108) This project consists of embankment slope repairs/stabilization and removal and replacement of guardrail located on CH 7, 4.5 miles Southeast of Meyer, IL; includes 42 unit tree removal; 0.55 acre tree removal, acres; 1,930 cu yd removal and disposal of unsuitable material; 4,124 cu yd earth excavation; 3.50 acre seeding, Class 2; 12,689 cu yd furnished excavation; 3.5 acre mulch, method 2; 700 ton aggregate shoulders; 80 ft pipe culverts, Class D; 2,025 ft steel plate beam guardrail, Type A, 6' posts; 30 cu yd filling existing culverts; 60 ton stone riprap, Class A4 (special); Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (C-96-250-09) (0-99912-6002) (See the Special Provisions for the DBE Percentage)

188. Contract No. 95670 Shelby County District 7

Section 09-00271-00-RS FAS Route 656 (NEOGA ROAD) Project RS-656(112) Roadway reconstruction consisting of PCC pavement with a lime modified subgrade, aggregate shoulders, HMA leveling binder and surface course, patching and all other incidental items to complete the work on FAS Route 656 (Neoga Road) from IL Route 32 to FAS Route 1631; includes 36 unit tree removal; 14,726 cu yd earth excavation; 561 cu yd furnished excavation; 2,727 lb fertilizer nutrients; 4,050 lb temporary erosion control seeding; 22,856 sq yd processing modified soil; 527 ton lime; 306 ton aggregate base course; 394 ton aggregate surface course; 5,183 gal bituminous materials (prime coat); 103 ton aggregate (prime coat); 2,988 ton leveling binder (machine method); 4,482 ton HMA surface course; 112 ton incidental HMA surfacing; 20,643 sq yd PCC pavement; 5,018 ton aggregate shoulders; 242 ton HMA shoulders; 1,086 ft pipe culverts; 1,746 ft storm sewers; 60,939 ft paint pavement marking line; 22,310 ft epoxy pavement marking line; 390 raised reflective pavement markers; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (130 Working Days) (Job No. C-97-031-12)(7-10556-0000)(0-00332-7004) (See the Special Provisions for the DBE Percentage)

189. Contract No. 95672 Clay County District 7 Section 10-00054-00-PV (FLORA) FAU Route 8526 (WORTHEY STREET) Project M-5023(11) Project consists of the construction of PCC pavement with integral curb, storm sewers, entrances and all other incidental items to complete the work on FAU Route 8526 (Worthey Street) from 8th Street to West North Avenue in the City of Flora; includes 2,735 cu yd earth excavation; 1,420 cu yd trench backfill; 800 lb temporary erosion control seeding; 9,956 sq yd processing modified soil; 342 ton lime; 532 ton aggregate base course; 12,110 sq ft PCC sidewalk; 6,860 sq yd pavement removal; 504 sq ft sidewalk removal; 297 ft storm sewer; 1 removal of existing structures; 3,945 ft storm sewers, Class B; 672 ft storm sewer removal; 91 inlets, Type A; 1,429 ft paint pavement marking line; 26 inlets, special; 48 pipe tees; 10,612 sq yd PCC pavement with integral curb; 294 ton aggregate surface course; Traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (145 Working Days) (Job NO. C-97-072-12)(7-10571-0000)(0-00292-7008)(0-00332-7005) (See the Special Provisions for the DBE Percentage)

190. Contract No. 95678 Effingham County District 7

Section 10-00125-00-LT (EFFINGHAM) Various Routes Project TE-D7(39) Work consists of landscaping, lighting, sidewalks, PCC pavement and curb and gutter, located in downtown Effingham; includes 6,666 sq ft sidewalk removal; 6,666 sq ft PCC sidewalk; 104 sq yd PCC pavement; 524 ft combination curb and gutter removal; 524 ft combination curb and gutter; 70 shrubs; 38 trees; 4.36 units ornamental grass; 118 decorative light poles; 5.34 units perennial plants; 2,510 ft thermoplastic pavement marking line; 2,333 sq ft thermoplastic pavement markings; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-97-013-11) (0-00992-7007) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 76: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 35 -

191. Contract No. 95681 Moultrie County District 7 Section 07-00066-00-BR FAS Route 554 (CH 9) Project BRS-554(325) Project consists of the removal of the existing structure and construction of a 3 Sided Precast Concrete structure, aggregate approaches, earthwork and all other items necessary to complete the section located on FAS Route 554 (CH 9), 2.3 miles south of Lake City over Stringtown Branch; includes 420 cu y d earth and channel excavation; 225 ton stone riprap; 175 ton aggregate base course; 460 ton aggregate surface course; 1 removal of existing structures; 510 cu yd cofferdam excavation; 2 cofferdams; 4,010 lb reinforcement bars; 310 ft pipe culvert removal (special); 42 three sided precast concrete structures; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-97-086-10) (7-10442-0000) (See the Special Provisions for the DBE Percentage)

192. Contract No. 97472 Madison County District 8

Section 08-00045-00-PV (EAST ALTON) FAU Route 8967 (MAIN STREET) Project M-5011(306) This project consists of resurfacing, HMA level and surface courses, PCC curb and gutter removal and replacement, and PCC sidewalk removal and replacement located on Main Street from St. Louis Avenue to Shamrock in the Village of East Alton; includes 93 sq yd sub-base granular material, Type 4"; 21 ton sub-base granular material, Type B; 74 sq yd PCC base course; 223 sq yd PCC driveway pavement; 400 ton polymerized leveling binder (machine method), N70; 464 ton polymerized HMA surface course Mix "D", N70; 4,790 sq ft PCC sidewalk; 1,138.5 sq yd Class B patches; 1,216 ea dowel bars 1 1/2"; 106 ft storm sewers; 962 ft combination curb and gutter, Type B (special); 4,270 ft thermoplastic pavement markings; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (50 Working Days) (Job No. C-98-334-10) (8-10323-0000) (See the Special Provisions for the DBE Percentage)

193. Contract No. 97486 Madison County District 8

Section 10-00018-00-RS (MARYVILLE) FAU Route 9135 (KEEBLER ROAD) Project M-5011(315) This project consists of HMA Surface removal, HMA surface course, sidewalk ramps with detectable warnings and pavement markings located on Keebler Road from West Main Street to Sugar Loaf Road in the village of Maryville; includes 1,410 ton HMA surface course, Mix "D", N90; 1,549 sq ft PCC sidewalk, 4"; 332 ft combination concrete curb and gutter, Type B-6.24; 7,042 ft pavement markings; 10,071 sq yd HMA surface removal; 1,365 sq ft sidewalk removal; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-98-361-10) (8-10450-0000) (See the Special Provisions for the DBE Percentage)

194. Contract No. 97491 Marion County District 8

Section 09-07116-00-BR TR 304A (FORD ROAD) Project BROS-121(58) Project consists of the removal of the existing structure, erection of a single span precast prestressed deck beam bridge (27" depth), miscellaneous roadway work and all other incidental items to complete the work on TR 304A, approximately 3 miles northwest of Kinmundy over North Fork; includes 162 unit tree removal; 885 cu yd earth and channel excavation; 546 cu yd furnished excavation; 66 ton porous granular embankment; 130 ton stone dumped riprap; 735 ton aggregate surface course; 1 removal of existing structures; 3,470 lb reinforcement bars; 1,452 sq ft precast prestressed concrete deck beams (27" depth); 273 ft furnishing and driving steel piles; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-98-334-11) (8-10361-0000) (See the Special Provisions for the DBE Percentage)

195. Contract No. 68A40 McDonough County District 4

Section 55-3HB FAP Route 315/407 (US 136/336) Project NHF-000S(866) This project consists of constructing a new bridge carrying US Rte. 136 (Jackson Street) over IL Rte. 336 located west of Macomb; includes 115,989 cu yds earth excavation; 2,407 sq yds stone dumped riprap; 189 tons polymerized HMA surface course; 7,275 sq yds pavement removal; 918 sq yds Class D patches; 459 sq yds HMA shoulders; 864 cu yds structure excavation; 1,429 cu yds concrete; 2,392 sq yds bridge deck grooving; 3,269 sq yds protective coat; 749,640 lbs furnishing and erecting structural steel; 321,750 lbs reinforcement bars; 3,704 ft furnishing and driving steel piles; 684 ft pipe underdrains; 1,081 ft combination concrete curb and gutter; 287 ft steel plate beam guardrail; 5,939 ft epoxy pavement marking line; 552 ft conduit embedded in structure; traffic control and protection; mobilization; Federally funded. (90 Working Days) (Job No. C-94-058-11) (4-02204-0000) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Sanderjt
Typewritten Text
In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor Agreement.
Sanderjt
Typewritten Text
Page 77: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

- 36 -

FOR REVIEW AND INSPECTION ONLY The following Item has been WITHDRAWN from the April 27, 2012 Letting but is intended to be included in the June 15,

2012 letting. It is being published here to allow for review and inspection by potential bidders and suppliers. It is NOT for bidding purposes at this time.

In accordance with the requirements of the Governor’s Executive Order #2010-03, this project contains a Project Labor

Agreement. . Contract No. 60I22 DuPage-Kane Counties District 1

Section LY (HB&VB) FAP Route 347 (IL 38) Project ACF-0347(029) 1.63 miles of grade separation, roadway reconstruction, drainage, traffic signals, striping and other work on IL 38 at Kautz Rd. and the Union Pacific Railroad in Geneva and West Chicago (SN 045-0079); includes 64,409 cu yd earth excavation; 16,785 cu yd removal and disposal of unsuitable material; 385,571 cu yd furnished excavation; 7,775 cu yd trench backfill; 196,406 cu yd topsoil; 33.7 acres seeding; 101,518 sq yd erosion control blanket; 10,570 sq yd sodding; 50 units supplemental watering; 50,574 sq yd stabilized sub-base - HMA; 829 tons HMA surface course, mix O; 51,954 sq yd PCC pavement; 473 sq ft PCC sidewalk; 58,816 sq yd pavement removal; 900 sq yd patching; 7,076 cu yd structure excavation; 3529.7 cu yd concrete; 5,557 sq yd bridge deck grooving; structural steel; 12,824 stud shear connectors; 803,630 lb epoxy coated reinforcement bars; 17,646 ft metal shell piles; 12,363 ft storm sewers; 9,580 sq ft concrete sealer; 31,756 ft concrete curb and gutter; 512.5 ft steel plate beam guardrail; 4 traffic barrier terminals; 191.5 sq ft sign panel; 25.665 ft polyurea pavement marking; 5,245 ft underground conduit; 18,042 ft electric cable; 12 signal heads, LED; 63 shade trees; 33.04 units perennial plants; 94,940 sq yd coarse sand placement; 71,881 sq yd aggregate subgrade; removal of 5 buildings; removal and disposal of friable and non-friable asbestos; 59,250 sq ft geotextile retaining wall; 36,711 sq ft mechanically stabilized earth retaining wall; mobilization; traffic control and protection; Federally funded. (Completion Date: October 31, 2013 Plus 05 Working Days) (Job No. C-91-869-09) (1-90071-0100) (See the Special Provisions for the DBE Percentage)

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 78: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

‐ 1 ‐  

ILLINOIS DEPARTMENT OF TRANSPORTATION DIVISION OF AERONAUTICS

April 27, 2012 LETTING

1A. Contract No. WI054 County Williamson Airport Williamson County Regional Marion, Illinois Illinois Project No. MWA-4169 Federal Project No. 3-17-0065-B2 Project consists of Repaint Runway & Taxiway Markings – which includes the following major work items: 168,571 S.F. Pavement Marking Waterborne; 5,928 S.F. Pavement Marking Black Border; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

2A. Contract No. SE004 County Shelby Airport Shelby County Shelbyville, Illinois Illinois Project No. 2H0-4149 Federal Project No. 3-17-0093-B11 Project consists of Construct Electrical Vault, Light Taxiway & Install Approach Aids – which includes the following major work items: Base Bid: 1 L.S. Refurbish 36” Beacon; 1 Each L-807 WC 12’ Internally Lit; 21,650 L.F. UG Cable in UD; 1 L.S. Construct Electrical Vault; 1 L.S. Install Electrical Equipment; 70 Each MITL-Stake Mounted; 8 Each Taxi Guidance Sign; 32 Each MIRL-Stake Mounted; 1 Each Abbr. PAPI (L-881 System); 1 L.S. Haul Route; 691 S.F. Pavement Marking-Waterborne; 40 Each Remove Reflector; 1 L.S. Upgrade Airport Rotating Beacon; Additive Alt.1; 79 Each MITL LED Upgrade; Additive Alt.2: 133 Each Weed Control Ring; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

3A. Contract No. JO020 County Will Airport Joliet Regional Joliet, Illinois Illinois Project No. JOT-4166 Federal Project No. 3-17-0056-B8 Project consists of Construct a Standalone Electrical Vault, Replace Runway Lights & Install Taxiway Lights – which includes the following major work items: Base Bid; 1 Each L-807 WC 12’ Internally Lit; 17,700 L.F. UG Cable in UD: 1 L.S. Erect Prefabricated Vault; 1 L.S. Install Electrical Equipment; 1 L.S. Remove Electrical Vault; 920 L.F. 2” Directional Bore; 8 Each Electrical Handhole; 54 Each MITL-Stake Mounted; 10 Each MITL-Base Mounted; 8 Each Taxi Guidance Sign; 19 Each MIRL-Stake Mounted; 9 Each MIRL-Base Mounted; 22 Each MI Threshold Light; 1 L.S. Haul Route; Additive Alt.1: 100 L.F. 3” Directional Bore; 1,100 L.F. UG Cable in UD; 1 L.S. Upgrade Airport Rotating Beacon; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

4A. Contract No. SD055 County St. Clair Airport St. Louis Downtown Cahokia, Illinois Illinois Project No. CPS-4138 Federal Project No. 3-17-0039-B28 Project consists of Rehabilitate Entrance Road & Parking Lot – which includes the following major work items: 2 Each Adjust Electrical Handhole; 1 L.S. Traffic Maintenance; 1 L.S. Temporary Erosion Control; 2,000 L.F. Clean & Seal Bituminous Cracks; 186 S.Y. Remove & Replace Bituminous Pavement; 1,333 Ton Bituminous Surface Course-Method I, Superpave; 2,005 S.Y. Bituminous Pavement Milling; 1,433 S.Y. Butt Joint Construction; 4,020 S.F. Pavement Marking Waterborne; 205 L.F. Comb. Curb & Gutter; 14 Each Pavement Marking-Special, Arrow Straight; 6 Each Pavement Marking-Special, “Oliver’s”; 3 Each Handicap Sign; 14 Each Remove Roadway Signs; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

5A. Deleted

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 79: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

‐ 2 ‐  

6A. Contract No. PI015 County Pike Airport Pittsfield Penstone Municipal Pittsfield, Illinois Illinois Project No. PPQ-4082 Federal Project No. 3-17-0081-B14 Project consists of Expand the Apron – which includes the following major work items: 2,513 C.Y. Unclassified Excavation; 842 Ton Bituminous Surface Course-Method I Superpave; 145 S.Y. Butt Joint Construction; 426 S.Y. Remove Bituminous Surface Course; 1,609 Ton Bituminous Base Course-Method I Superpave; 33 Each Tie Down; 446 Gal. Bituminous Tack Coat; 511 S.F. Pavement Marking; 0.6 Acre Seeding & Mulching; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

7A. Contract No. KA043 County Kankakee Airport Greater Kankakee Kankakee, Illinois Illinois Project No. IKK-4155 Federal Project No. 3-17-0057-B20 Project consists of Rehabilitate Southeast Quadrant T-Hangar Pavements-Phase 2 – which includes the following major work items: 1 L.S. Mobilization; 1,000 C.Y. Unclassified Excavation; 2,000 S.Y. Soil Stabilization Fabric; 670 C.Y. Porous Granular Embankment; 2,000 S.Y. Crushed Aggregate Base Course-6”; 8,200 S.Y. Aggregate Base Preparation; 720 Ton Bituminous Surface Course; 8,200 S.Y. Remove Bituminous Pavement; 1,200 Ton Bituminous Base Course; 2,400 Gal. Bituminous Prime Coat; 1,150 L.F. Joint Sealing Filler; 1,210 S.F. Pavement Marking-Waterborne; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

8A. Contract No. VA019 County Fayette Airport Vandalia Municipal Vandalia, Illinois Illinois Project No. VLA-4111 Federal Project No. 3-17-0102-B12 Project consists of Replace Medium Intensity Airfield Lighting on Runways & Taxiways – which includes the following major work items: 1 L.S. Refurbish 36” Beacon; 1 Each L-807 WC 12’ Internally Lit; 24,850 L.F. UG Cable in UD; 1 L.S. Vault Modifications; 1,350 L.F. Directional Bore; 66 L.F. 4-Way Concrete Encased Duct; 4 Each Electrical Handhole; 103 Each MITL; 7 Each Taxi Guidance Sign; 68 Each MIRL; 28 Each MI Threshold Light; 1 Pair REILS; 125 Each Remove Stake Mounted Light; 1 L.S. Mobilization; 1,181 S.F. Pavement Marking-Waterborne; 64 Each Artic Heater Kit; 1 L.S. Upgrade Airport Rotating Beacon; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

9A. Contract No. RB016 County Crawford Airport Crawford County Robinson, Illinois Illinois Project No. RSV-4132 Federal Project No. 3-17-0086-B13 Project consists of Rehabilitate the North and South Taxiways – which includes the following major work items: 1 L.S. Mobilization; 1 L.S. Haul Route; 4,102 S.Y. Shoulder Adjustment; 1,235 Ton Bituminous Surface Course-Method I; 1,530 S.Y. Butt Joint Construction; 517 S.Y. Remove & Replace Bituminous Pavement; 8,717 S.Y. Porous Friction Course, 0.10’; 4,479 Gal. Bituminous Tack Coat; 2,729 S.F. Pavement Marking-Waterborne; 1,682 S.Y. Excelsior Blanket; 0.85 Acre Seeding; 0.51 Acre Mulching; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

10A. Contract No. GR005 County Bond Airport Greenville Greenville, Illinois Illinois Project No. GRE-4164 Federal Project No. 3-17-0049-xx Project consists of T-Hangar Apron Rehabilitation – which includes the following major work items: 260 Ton Bituminous Surface Course-Method I Superpave; 260 Ton Bituminous Base Course-Method I Superpave; 2,200 S.Y. Bituminous Pavement Milling; 100 S.Y. 7” PCC Pavement; 700 Gal. Bituminous Prime Coat; 500 Gal. Bituminous Tack Coat; 900 S.F. 4” Perforated Underdrain; 5 Each Underdrain Connection; 220 S.Y. Remove & Replace Unsuitable Subgrade; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 80: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

‐ 3 ‐  

11A. Contract No. IL028 County LaSalle Airport Illinois Valley Regional Peru, Illinois Illinois Project No. VYS-3888 Federal Project No. 3-17-0060-B19 Project consists of General Aviation Apron Expansion – which includes the following major work items: 2,012 L.F. UG Cable in UD; 2,400 L.F. Remove Cable; 190 L.F. 4-Way Concrete Encased Duct; 6 Each Electrical Handhole; 6 Each MITL; 7,751 C.Y. Unclassified Excavation; 6,486 C.Y. Offsite Borrow Excavation; 10,461 S.Y. Crushed Aggregate Base Course; 73 Ton Bituminous Surface Course-Method I Superpave; 113 Ton Bituminous Base Course-Method I Superpave; 9,250 S.Y. 8” PCC Pavement; 33 Each Tie Down; 543 S.F. Pavement Marking Waterborne; 272 L.F. RCP; 2,170 L.F. 6” Perforated Underdrain w/Sock; 960 L.F. Paved Ditch; 1 Each Relocate Fire Hydrant; 5 Acres Seeding & Mulching; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

12A. Contract No. OL011 County Richland Airport Olney-Noble Noble, Illinois Illinois Project No. OLY-4131 Federal Project No. 3-17-0076-B11 Project consists of 1,856’ Partial Parallel Taxiway to Runway 11/29 – which includes the following major work items: Base Bid: 7,055 L.F. UG Cable in UD; 1 L.S. Install Electrical Equipment; 275 L.F. 4” Directional Bore; 110 L.F. 2-Way Concrete Encased Duct; 53 Each MITL; 2 Each Taxi Guidance Sign; 1 L.S. Haul Route; 7,243 C.Y. Unclassified Excavation; 293 Ton By-Product Lime; 7,933 S.Y. Lime Modified Subgrade-16”; 2,006 L.F. Silt Fence; 3 Each Headwall Protection; 1,799 S.Y. Erosion Control Blanket; 137 S.Y. Riprap; 3,749 Ton Crushed Aggregate Base Course; 914 Ton Bituminous Surface Course-Method I Superpave; 931 Ton Bituminous Base Course-Method I Superpave; 2,777 Gal. Bituminous Prime Coat; 3,766 S.F. Pavement Marking Waterborne; 457 L.F. RCP; 3,421 L.F. 4” Perforated Underdrain w/Sock; 7 Each Inspection Hole; 9 Acre Seeding; 8.7 Acre Mulching; Additive Alt.1: 53 Each MITL LED Upgrade; Additive Alt.2: 2 Each Sign LED Upgrade; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

13A. Contract No. BL068 County McLean Airport Central Illinois Regional Bloomington, Illinois Illinois Project No. BMI-4172 Federal Project No. 3-17-0006-xx Project consists of Install 10’ Perimeter Fence, Phase 5 – which includes the following major work items: Base Bid: 25 C.Y. Borrow Excavation; 71 S.Y. Riprap; 3,360 L.F. Class E Fence 10’; 2 Each Class E Gate 4’; 2 Each Electric Gate 24’; 3,360 L.F. Remove Class E Fence; 2 Each Remove Electric Gate; 40 L.F. 24” RCP, Class IV; 1,000 S.Y. Excelsior Blanket; 1 Acre Seeding & Mulching; Add. Alt.1: 3,360 L.F. Vinyl Coating 10’ Class E Fence; 2 Each Vinyl Coating 4’ Class E Gate; 2 Each Vinyl Coating 24’ Electric Gate; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

14A. Contract No. FR039 County Stephenson Airport Freeport Albertus Freeport, Illinois Illinois Project No. FEP-4174 Federal Project No. 3-17-0045-B24 Project consists of Terminal Apron Rehabilitation/Rehabilitate Taxiways A & E, Phase 2 – which includes the following major work items: Base Bid: 1 L.S. Mobilization; 60 Each Bales; 30,439 S.Y. Crack Control Fabric; 4,445 Ton Bituminous Surface Course; 8,477 S.Y. Bituminous Pavement Milling; 3,021 S.Y. Butt Joint Construction; 467 S.Y. Remove & Replace Bituminous Pavement; 30 Each Tie Down; 33 Each Remove Tie Down; 1,830 Gal. Bituminous Tack Coat; 6,320 S.F. Pavement Marking Waterborne; 144 L.F. RCP; 10 Each Adjust Underdrain Cleanout; 0.78 Acre Seeding & Mulching; 3,776 S.Y. Topsoiling; Additive Alt.1: 110 L.F. UG Cable in UD; 3 Each Electrical Handhole; 2 Each Remove Base Mounted Light; 207 S.Y. Remove Bituminous Pavement; 430 L.F. 4-Way 4” PVC Duct Bank Direct Burial; Additive Alt.2: 5,749 S.Y. Crack Control Fabric; 672 Ton Bituminous Surface Course; 544 S.Y. Butt Joint Construction; 231 S.Y. Remove & Replace Bituminous Pavement; 2,392 S.F. Pavement Marking Waterborne; 2,536 S.F. Pavement Marking Black Border; 4 Each Adjust Underdrain Cleanout; 872 S.Y. Topsoiling; 0.18 Acre Seeding & Mulching; Federally Funded; (See the Special Provisions for the DBE Percentage) Pre-Bid meeting: N/A

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 81: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

MANDATORY PRE-BID CONFERENCE

DISTRICT ONE – PRE-BID CONFERENCE

A mandatory pre-bid conference has been scheduled for Thursday, March 29, 2012 at 8:00 AM. This meeting will be held at the Illinois Department of Transportation –District One, Lower Level Classroom located at 201 West Center Court in Schaumburg, IL 60196 . The purpose of this meeting is to provide the scope of work for the contract and to encourage networking between the contractors, therefore subcontractors and DBE firms are encouraged to attend. This pre-bid meeting is MANDATORY for all prime contractors who plan to submit bids on the following contracts: Contract # 60H45 – Interchange Reconstruction and Bridge Replacement of US 20 (Lake Street) over Mclean Blvd in Kane County

Attendance will be taken. Failure on the part of a prime contractor to attend will cause the contractor’s bid to be rejected. District One IDOT will provide a short presentation and will answer any questions you may have. This will be an opportunity for prime contractors and DBE firms to meet and discuss projects of mutual interest.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 82: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

MANDATORY PRE-BID CONFERENCE

DISTRICT ONE – PRE-BID CONFERENCE

A mandatory pre-bid conference has been scheduled for Thursday, March 29, 2012, 9:30 AM. This meeting will be held at the Illinois Department of Transportation –District One, Lower Level Classroom located at 201 West Center Court in Schaumburg, IL 60196. The purpose of this meeting is to provide the scope of work for the contract and to encourage networking between the contractors therefore subcontractors and DBE firms are encouraged to attend. This pre-bid meeting is MANDATORY for all prime contractors who plan to submit bids on the following contracts:

Contract # 62537

IL Route 31 at IL Route 176 & Terra Cotta Avenue

Attendance will be taken. Failure on the part of a prime contractor to attend will cause the contractor’s bid to be rejected. District One IDOT will provide a short presentation and will answer any questions you may have. This will be an opportunity for prime contractors and DBE firms to meet and discuss projects of mutual interest.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 83: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

MANDATORY PRE-BID CONFERENCE

Contract 64515 Item 140 April 27, 2012 Letting

Plans and special provisions for contract #64515 in Winnebago County for the letting of April 27, 2012 will be available for your review at the District 2 Office, 819 Depot Avenue, Dixon, IL. 61021 at 1:30 p.m. in Sauk Trail Room 1 on Tuesday, April 17, 2012. Contract #64515, reconstruction and resurfacing of IL Route 2 from north of Beltline Road to 0.4 mile north of Harrison Avenue, located southwest of Rockford. This will be an open house format with a short formal presentation beginning promptly at 1:30. It will be mandatory for prime contractors to attend in order to receive authorization to bid. Attendance will be taken and attendees must sign in prior to the meeting beginning. DBE firms are also encouraged to attend this meeting as it provides a networking opportunity with those prime contractors who will be bidding on this project. There will be members of the District 2 staff in attendance to answer any questions you may have. This will be an opportunity for prime contractors to indicate areas of work in which they are interested in receiving bid quotes from DBE firms. Both prime contractors and DBE firms are encouraged to review the project goal prior to this pre-bid conference. Please call Fred Marruffo at (815) 284-5345 or email [email protected] by April 13, 2012 to confirm the names and number of people attending from your company so that we can ensure adequate seating.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 84: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

MANDATORY PRE-BID CONFERENCE DISTRICT 7

Contract Number: 74560 Coles County

Plans and Special Provisions for Contract 74560 in Coles County for the April 27, 2012 letting will be available for your review at the District 7 Office, 400 West Wabash, Effingham, IL in Room 113 from 1 p.m. to 2:00 p.m. on Friday, April 20 2012. The project consists of Pavement Patching, HMA Resurfacing, and Guardrail adjustment on I-57 from North of IL 16 to the Douglass County Line. All prime contractors are required to attend in order to submit bids for this contract. Attendance will be taken at this conference and those prime contractors who fail to attend will not be allowed to bid on this item. DBE firms are also encouraged to attend. There will be members of the District 7 staff in attendance to answer any general questions you may have. This will be an opportunity for prime contractors to indicate areas of work in which they are interested in receiving bid quotes from DBE firms. Both prime contractors and DBE firms are encouraged to review the project goals prior to this pre-bid conference. This will be an open-house format with no formal presentation.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 85: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

PRE-BID MEETING

DISTRICT 8 MANDATORY PRE-BID MEETING A pre-bid meeting, mandatory for all prime contractors interested in bidding on the below-listed project, will be held on Thursday, April 12, 2012, at 5:00 PM at the DBE Resource Center, located at Suite 303, #10 Collinsville Avenue, East Saint Louis, Illinois. The pre-bid meeting applies to the following contract: Contract No. 76C52 Interchange reconstruction, grading, paving, resurfacing and

auxiliary lanes in East St. Louis on I-64 from I-55/70 to 18th Street and on I-55/70 from the structure over the CSX RR to I-64

All prime contractors who desire to bid on this project are required to attend. All interested DBE firms are strongly encouraged to attend. Staff from the design consultant and IDOT staff will be on hand to answer any questions potential bidders may have. This will also be an opportunity for prime contractors to indicate their interest in receiving quotations from DBE firms. Both prime contractors and DBE firms are encouraged to review the project goals prior to the pre-bid meeting. Attendance will be taken to maintain compliance for bidding eligibility. An information sharing session for all other projects in District 8 on the April 27th letting will also be held at the same time and location. All Prime contractors and DBE subcontractors interested in any of the projects are encouraged to attend. This will be an opportunity for both to meet and explore opportunities for bidding.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 86: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

PRE‐BID CONFERENCE FOR April 27, 2012 LETTING 

DISTRICT 9 – PRE‐BID CONFERENCE A pre‐bid conference has been scheduled for Wednesday, April 4, 2012 at 5:30 PM.   The location of this meeting will be:  Illinois Department of Transportation, District Nine 

2801 West Murphysboro Road.Carbondale, Illinois, 62901

Lower Level West Basement Conference Room 

  All prime contractors, subcontractors, and DBE firms are encouraged to attend.  Plans and special provisions for the following contracts will be available for viewing.  The Pre‐Bid Conference meeting is MANDATORY for any Contracts preceded with an “*” below.  For all other contracts the Pre‐Bid Conference is optional.  Item #  Contract  Location  DBE Goal % 

46 *78056 

Mandtory Replace SN 039‐0013 (IL 13EB) & 039‐0049 (IL 13 WB) over Big Muddy River, E of Murphysboro.  Jackson County 

  78090 Replace SN 100‐0065 over Branch of Little Crab Orchard Creek, East of Barbara Kay Road in Crab Orchard.  Williamson County 

118  78165 Replace SN 076‐0026 over Little Grand Pierre Creek, 3.1 miles west of the Hardin County line.  Pope County 

119  78168 Replace SN 076‐0002 over Big Grand Pierre Creek, 7 miles NE of Golconda.  Pope County 

120  78254 Bridge Repairs consisting of joints and deck drains on SN 097‐0001 & 097‐0002 over IL 1 in Grayville.  White County 

15 

  78261  Intersection Reconstruction at IL 3 & IL 149.  Jackson County  5 

121  78271 Resurface 9 miles from McLeansboro to the White County Line. Hamilton County. 

  78272 Resurface along IL 37 in West Frankfort between N Douglas St. and Cleveland St.  Franklin County. 

122  78285 Traffic Signal Improvements throughout the District.  Various Counties. 

63  99469 Asphalt overlay of 1.4 miles of CH‐5, with shoulder widening.  Jefferson County. 

 *This meeting is MANDATORY for all Prime Contractors who plan to submit a bid on Contract 78056.  Attendance will be taken.  The Prime Contractor must sign in at the Pre‐Bid Conference in order to be authorized to bid on the project.  Contractors are encouraged to submit written questions in advance to be answered at the meeting.  Please submit your questions to:  Illinois Department of Transportation 

Omer Osman, Region Five Engineer P.O. Box 100 Carbondale, Illinois 62903‐100 Attn:   Carrie Nelsen 

   This will be an opportunity for prime contractors, subcontractors, and DBE firms to meet and discuss projects of mutual interest.  All firms are encouraged to review the project hiring goals prior to this pre‐bid conference.   

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 87: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

REVISIONS TO THE ILLINOIS PREVAILING WAGE RATES

The Prevailing rates of wages are included in the Contract proposals which are

subject to Check Sheet #5 of the Supplemental Specifications and Recurring Special

Provisions. The rates have been ascertained and certified by the Illinois Department

of Labor for the locality in which the work is to be performed and for each craft or

type of work or mechanic needed to execute the work of the Contract. As required

by Prevailing Wage Act (820 ILCS 130/0.01, et seq.) and Check Sheet #5 of the

Contract, not less than the rates of wages ascertained by the Illinois Department of

Labor and as revised during the performance of a Contract shall be paid to all

laborers, workers and mechanics performing work under the Contract. Post the

scale of wages in a prominent and easily accessible place at the site of work.

If the Illinois Department of Labor revises the prevailing rates of wages to be paid as

listed in the specification of rates, the contractor shall post the revised rates of wages

and shall pay not less than the revised rates of wages. Current wage rate

information shall be obtained by visiting the Illinois Department of Labor web site at

http://www.state.il.us/agency/idol/ or by calling 312-793-2814. It is the responsibility

of the contractor to review the rates applicable to the work of the contract at regular

intervals in order to insure the timely payment of current rates. Provision of this

information to the contractor by means of the Illinois Department of Labor web site

satisfies the notification of revisions by the Department to the contractor pursuant to

the Act, and the contractor agrees that no additional notice is required. The

contractor shall notify each of its subcontractors of the revised rates of wages.

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 88: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

CONTRACTS AWARDED -----------------

THE FOLLOWING AWARDS HAVE BEEN MADE SINCE THE PREVIOUS TRANSPORTATION BULLETIN: ------------------------------------------------------------------------------------------

------------------ November 18, 2011 LETTING

DESCRIPTION CONTRACTOR ----------- ---------- ITEM NO. 017 LORUSSO CEMENT CONTRACTORS, INC. CONTRACT NO. 63593 1090 CAROLINA DRIVE COUNTY(S) COOK WEST CHICAGO, IL 60185 SECTION 10-00259-00-LS PROJECT(S) TE-00D1/834/000 ROUTE FAU 2853 DISTRICT 01 AWARDED DATE 02/01/2012 AWARDED AMOUNT $693,884.00 7 UNSUCCESSFUL BIDDERS ITEM NO. 036 RAUSCH CONSTRUCTION COMPANY, INC. CONTRACT NO. 60N88 2717 S. THIRTEENTH AVENUE COUNTY(S) COOK BROADVIEW, IL 60155-4715 SECTION 3068 A-B-R-1 PROJECT(S) ACBHF-0350/035/000 ROUTE FAP 350 DISTRICT 01 AWARDED DATE 02/02/2012 AWARDED AMOUNT $1,979,990.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 049 CURRAN CONTRACTING COMPANY CONTRACT NO. 62278 286 MEMORIAL COURT COUNTY(S) KANE CRYSTAL LAKE, IL 60014 SECTION 126N-1 PROJECT(S) ROUTE FAP 307 DISTRICT 01 AWARDED DATE 03/08/2012 AWARDED AMOUNT $5,177,663.31 7 UNSUCCESSFUL BIDDERS ITEM NO. 077 JOEL KENNEDY CONSTRUCTING CORP. CONTRACT NO. 60F90 40 NOLL STREET COUNTY(S) COOK WAUKEGAN, IL 60085 SECTION 0102.5-T P.O. BOX 509 PROJECT(S) GURNEE, IL 60031-0509 ROUTE FAI 190 DISTRICT 01 AWARDED DATE 02/07/2012 AWARDED AMOUNT $9,397,519.00 4 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 89: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 079 P. T. FERRO CONSTRUCTION CO. CONTRACT NO. 60L42 700 S. ROWELL AVE. (60433) COUNTY(S) WILL P.O. BOX 156 SECTION 4-N-3 JOLIET, IL 60434-0156 PROJECT(S) HSIP-0846/022/000 ROUTE FAP 846 DISTRICT 01 AWARDED DATE 02/01/2012 AWARDED AMOUNT $1,388,923.91 3 UNSUCCESSFUL BIDDERS ITEM NO. 092 BRANDT CONSTRUCTION CO. CONTRACT NO. 64D57 700 - 4TH ST., WEST COUNTY(S) LEE MILAN, IL 61264-2725 SECTION 102BR-5, 102BR-6, & 102BR-7 PROJECT(S) ACNHF-0316/038/000 ROUTE FAP 316 DISTRICT 02 AWARDED DATE 03/14/2012 AWARDED AMOUNT $3,826,309.10 5 UNSUCCESSFUL BIDDERS ------------------------------------------------------------------------------------------------------------ JANUARY 20, 2012 LETTING DESCRIPTION CONTRACTOR ----------- ---------- ITEM NO. 001 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 60L03 13769 MAIN STREET COUNTY(S) COOK LEMONT, IL 60439-9733 SECTION 101 EXT-RS-2 PROJECT(S) ROUTE FAP 350 DISTRICT 01 AWARDED DATE 02/29/2012 AWARDED AMOUNT $2,688,933.10 4 UNSUCCESSFUL BIDDERS ITEM NO. 001A T. J. LAMBRECHT CONSTRUCTION, INC. CONTRACT NO. MA024 10 GOUGAR RD. COUNTY(S) MARSHALL JOLIET, IL 60432 SECTION MARSHALL COUNTY PROJECT(S) 3170059B12-C75 /398/9 ROUTE DISTRICT 04 AWARDED DATE 03/05/2012 AWARDED AMOUNT $1,607,255.58 7 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 90: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 002 HOME TOWNE ELECTRIC, INC. CONTRACT NO. 60L19 35220 RT. 83 COUNTY(S) LAKE P.O. BOX 863 SECTION 20-N-4 LAKE VILLA, IL 60046 PROJECT(S) ROUTE FAP 337 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $256,833.08 2 UNSUCCESSFUL BIDDERS ITEM NO. 003 ALLIANCE CONTRACTORS, INC. CONTRACT NO. 60L27 1166 LAKE AVENUE COUNTY(S) MCHENRY WOODSTOCK, IL 60098 SECTION 15-N-6 PROJECT(S) NHF-0333/015/000 ROUTE FAP 333 DISTRICT 01 AWARDED DATE 03/02/2012 AWARDED AMOUNT $1,190,392.70 4 UNSUCCESSFUL BIDDERS ITEM NO. 004 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 60L86 13769 MAIN STREET COUNTY(S) COOK LEMONT, IL 60439-9733 SECTION 2010-090-RS PROJECT(S) ROUTE FAP 348 DISTRICT 01 AWARDED DATE 02/29/2012 AWARDED AMOUNT $3,949,992.93 5 UNSUCCESSFUL BIDDERS ITEM NO. 005 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 60L87 13769 MAIN STREET COUNTY(S) COOK LEMONT, IL 60439-9733 SECTION 3068A-RS-1 PROJECT(S) NHF-0350/036/000 ROUTE FAP 350 DISTRICT 01 AWARDED DATE 02/10/2012 AWARDED AMOUNT $2,788,996.35 3 UNSUCCESSFUL BIDDERS ITEM NO. 006 ARROW ROAD CONSTRUCTION COMPANY CONTRACT NO. 60M05 3401 S. BUSSE ROAD COUNTY(S) COOK P.O. BOX 334 SECTION 465Y-RS-4 MT. PROSPECT, IL 60056-0334 PROJECT(S) F-0330/066/000 ROUTE FAP 330 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,235,109.63 2 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 91: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 007 ARROW ROAD CONSTRUCTION COMPANY CONTRACT NO. 60M07 3401 S. BUSSE ROAD COUNTY(S) COOK P.O. BOX 334 SECTION 211K-RS-1 MT. PROSPECT, IL 60056-0334 PROJECT(S) NHF-0374/014/000 ROUTE FAP 374 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,198,975.08 4 UNSUCCESSFUL BIDDERS ITEM NO. 008 DUNNET BAY CONSTRUCTION COMPANY CONTRACT NO. 60M52 115 N. BRANDON DR. COUNTY(S) COOK GLENDALE HEIGHTS, IL 60139 SECTION 1415B-1 PROJECT(S) M-2692/004/000 ROUTE FAU 2692 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $1,267,128.67 7 UNSUCCESSFUL BIDDERS ITEM NO. 009 KUJO, INC. CONTRACT NO. 60M56 5303 WILMOT RD. COUNTY(S) DUPAGE MCHENRY, IL 60050 SECTION 2010-119-GRR PROJECT(S) HSIP-000S/870/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $378,215.25 2 UNSUCCESSFUL BIDDERS ITEM NO. 009A GFS FENCE, GUARDRAIL, & SIGNAGE, INC. CONTRACT NO. BL067 11921 SMITH DRIVE COUNTY(S) MCLEAN HUNTLEY, IL 60142 SECTION CENTRAL ILLINOIS REGIONAL PROJECT(S) 3170006XX-BMI /409/8 ROUTE DISTRICT 05 AWARDED DATE 02/28/2012 AWARDED AMOUNT $502,311.20 3 UNSUCCESSFUL BIDDERS ITEM NO. 010 CURRAN CONTRACTING COMPANY CONTRACT NO. 60N39 286 MEMORIAL COURT COUNTY(S) MCHENRY CRYSTAL LAKE, IL 60014 SECTION 104-RS-11 PROJECT(S) ROUTE FAP 326 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $1,997,868.00 2 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 92: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 011 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 60N43 13769 MAIN STREET COUNTY(S) DUPAGE LEMONT, IL 60439-9733 SECTION 534X-RS-5 PROJECT(S) ROUTE FAP 870 DISTRICT 01 AWARDED DATE 02/29/2012 AWARDED AMOUNT $2,130,539.56 5 UNSUCCESSFUL BIDDERS ITEM NO. 012 MILLENNIUM CONSTRUCTION OF ILLINOIS CONTRACT NO. 60N90 INCORPORATED COUNTY(S) COOK 450 PRAIRIE AVE SECTION 2011-002-PP CALUMET CITY, IL 60409 PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $371,434.50 3 UNSUCCESSFUL BIDDERS ITEM NO. 013 CURRAN CONTRACTING COMPANY CONTRACT NO. 60P09 286 MEMORIAL COURT COUNTY(S) KANE CRYSTAL LAKE, IL 60014 SECTION 107-RS-4 PROJECT(S) ROUTE FAP 326 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $2,356,467.44 5 UNSUCCESSFUL BIDDERS ITEM NO. 014 HERLIHY MID-CONTINENT COMPANY CONTRACT NO. 60P17 1306 MARQUETTE DRIVE COUNTY(S) COOK ROMEOVILLE, IL 60446-1026 SECTION 1415-803HB-R PROJECT(S) IM-080-5/060/152 ROUTE FAI 80 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $1,443,035.88 6 UNSUCCESSFUL BIDDERS ITEM NO. 015 GALLAGHER ASPHALT CORPORATION CONTRACT NO. 60P19 18100 SOUTH INDIANA AVENUE COUNTY(S) WILL THORNTON, IL 60476 SECTION 4R-RS-9 PROJECT(S) ROUTE FAP 846 DISTRICT 01 AWARDED DATE 02/10/2012 AWARDED AMOUNT $1,445,931.95 3 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 93: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 017 CITY LIGHTS, LTD. CONTRACT NO. 60P45 9993 VIRGINIA AVENUE COUNTY(S) COOK CHICAGO RIDGE, IL 60415 SECTION 2011-039-TS PROJECT(S) HSIP-0348/047/000 ROUTE FAP 348 DISTRICT 01 AWARDED DATE 02/27/2012 AWARDED AMOUNT $336,222.23 4 UNSUCCESSFUL BIDDERS ITEM NO. 018 CITY LIGHTS, LTD. CONTRACT NO. 60P46 9993 VIRGINIA AVENUE COUNTY(S) COOK CHICAGO RIDGE, IL 60415 SECTION 2011-040-TS PROJECT(S) HSIP-2937/005/000 ROUTE FAU 2937 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $193,729.34 4 UNSUCCESSFUL BIDDERS ITEM NO. 019 P. T. FERRO CONSTRUCTION CO. CONTRACT NO. 60P48 700 S. ROWELL AVE. (60433) COUNTY(S) WILL P.O. BOX 156 SECTION EX-RS-4 JOLIET, IL 60434-0156 PROJECT(S) F-0856/026/000 ROUTE FAP 856 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $407,671.30 3 UNSUCCESSFUL BIDDERS ITEM NO. 020 JAMES D. FIALA PAVING CO., INC. CONTRACT NO. 60P91 500 EAST FRONTAGE ROAD NORTH COUNTY(S) DUPAGE BOLINGBROOK, IL 60440 SECTION 534-RS-5 PROJECT(S) F-0870/013/000 ROUTE FAP 870 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $803,164.63 4 UNSUCCESSFUL BIDDERS ITEM NO. 021 PAYNE & DOLAN, INC. CONTRACT NO. 60P94 28327 W. RTE. 173 COUNTY(S) LAKE ANTIOCH, IL 60002 SECTION 134-RS-3 PROJECT(S) ROUTE FAP 303 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $781,330.20 3 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 94: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 022 ARROW ROAD CONSTRUCTION COMPANY CONTRACT NO. 60R02 3401 S. BUSSE ROAD COUNTY(S) COOK P.O. BOX 334 SECTION 2011-076-RS MT. PROSPECT, IL 60056-0334 PROJECT(S) ROUTE FAP 307 DISTRICT 01 AWARDED DATE 03/01/2012 AWARDED AMOUNT $639,118.56 3 UNSUCCESSFUL BIDDERS ITEM NO. 024 D. CONSTRUCTION, INC. CONTRACT NO. 63597 1488 SO. BROADWAY COUNTY(S) WILL COAL CITY, IL 60416 SECTION 07-00154-11-TL PROJECT(S) CMM-9003/530/000 ROUTE FAU 367 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,150,000.00 3 UNSUCCESSFUL BIDDERS ITEM NO. 025 PLOTE CONSTRUCTION INC. CONTRACT NO. 63603 1100 BRANDT DRIVE COUNTY(S) COOK HOFFMAN ESTATES, IL 60192 SECTION 11-00110-00-RS PROJECT(S) M-9003/797/000 ROUTE FAU 1047 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $781,026.00 5 UNSUCCESSFUL BIDDERS ITEM NO. 026 MARTAM CONSTRUCTION INCORPORATED CONTRACT NO. 63624 1200 GASKET DRIVE COUNTY(S) COOK ELGIN, IL 60120 SECTION 10-00196-00-BT PROJECT(S) CMM-9003/818/000 ROUTE MCDONALD CREEK PATH DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $263,663.20 9 UNSUCCESSFUL BIDDERS ITEM NO. 028 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 63641 13769 MAIN STREET COUNTY(S) DUPAGE LEMONT, IL 60439-9733 SECTION 11-00150-00-RS PROJECT(S) M-9003/832/000 ROUTE FAU 1485 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $623,531.00 3 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 95: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 029 D. CONSTRUCTION, INC. CONTRACT NO. 63642 1488 SO. BROADWAY COUNTY(S) WILL COAL CITY, IL 60416 SECTION 07-10117-00-BR PROJECT(S) BHM-8003/939/000 ROUTE JOLIET STREET DISTRICT 01 AWARDED DATE 02/10/2012 AWARDED AMOUNT $793,473.70 4 UNSUCCESSFUL BIDDERS ITEM NO. 030 ILLINOIS CONSTRUCTORS CORPORATION CONTRACT NO. 63643 39W866 FABYAN PARKWAY COUNTY(S) KANE ELBURN, IL 60119 SECTION 06-P4005-00-BR PROJECT(S) TE-00D1/848/000 ROUTE FOX RIVER TRAIL DISTRICT 01 AWARDED DATE 02/14/2012 AWARDED AMOUNT $619,091.75 4 UNSUCCESSFUL BIDDERS ITEM NO. 031 ARROW ROAD CONSTRUCTION COMPANY CONTRACT NO. 63653 3401 S. BUSSE ROAD COUNTY(S) DUPAGE P.O. BOX 334 SECTION 11-00057-00-RS MT. PROSPECT, IL 60056-0334 PROJECT(S) M-9003/830/000 ROUTE FAU 2542 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $773,094.92 5 UNSUCCESSFUL BIDDERS ITEM NO. 032 MCGINTY BROS., INC. CONTRACT NO. 63656 3744 RFD CUBA ROAD COUNTY(S) MCHENRY LONG GROVE, IL 60047-7958 SECTION 06-P4001-01-BT PROJECT(S) TE-00D1/839/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $33,930.70 1 UNSUCCESSFUL BIDDER ITEM NO. 033 SCHROEDER AND SCHROEDER, INC. CONTRACT NO. 63657 7306 CENTRAL PARK COUNTY(S) LAKE SKOKIE, IL 60076 SECTION 10-00094-00-SW PROJECT(S) SRTS-4009/037/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $118,661.40 11 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 96: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 034 HECKER AND COMPANY, INC. CONTRACT NO. 63658 250 E. INDUSTRIAL LANE COUNTY(S) DUPAGE WHEELING, IL 60090 SECTION 10-00001-00-TL PROJECT(S) HSIP-0043/026/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $139,106.00 6 UNSUCCESSFUL BIDDERS ITEM NO. 035 CIVIL CONSTRUCTORS, INC. CONTRACT NO. 64F22 2283 HWY. 20 EAST COUNTY(S) ROCK ISLAND P.O. BOX 750 SECTION (81-1B)M-2 FREEPORT, IL 61032-0750 PROJECT(S) ROUTE FAI 280 DISTRICT 02 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,778,538.00 2 UNSUCCESSFUL BIDDERS ITEM NO. 036 ALLIANCE CONTRACTORS, INC. CONTRACT NO. 64H32 1166 LAKE AVENUE COUNTY(S) WINNEBAGO WOODSTOCK, IL 60098 SECTION D2 MRS 2012-1 PROJECT(S) ROUTE FAI 39 DISTRICT 02 AWARDED DATE 02/22/2012 AWARDED AMOUNT $98,506.84 0 UNSUCCESSFUL BIDDERS ITEM NO. 037 ROCK ROAD COMPANIES, INC. CONTRACT NO. 64H67 P.O. BOX 1818 COUNTY(S) WINNEBAGO JANESVILLE, WI 53547-1818 SECTION 111M-1 PROJECT(S) HSIP-0525/018/000 ROUTE FAP 525 DISTRICT 02 AWARDED DATE 02/09/2012 AWARDED AMOUNT $459,502.36 2 UNSUCCESSFUL BIDDERS ITEM NO. 038 D. CONSTRUCTION, INC. CONTRACT NO. 66995 1488 SO. BROADWAY COUNTY(S) BUREAU COAL CITY, IL 60416 SECTION (22 BR)BR PROJECT(S) F-0587/025/000 ROUTE FAP 587 DISTRICT 03 AWARDED DATE 02/09/2012 AWARDED AMOUNT $913,852.69 8 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 97: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 039 D. CONSTRUCTION, INC. CONTRACT NO. 66A20 1488 SO. BROADWAY COUNTY(S) LASALLE COAL CITY, IL 60416 SECTION (3) BR-3 PROJECT(S) BRF-0068/111/000 ROUTE FAP 68 DISTRICT 03 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,348,709.83 5 UNSUCCESSFUL BIDDERS ITEM NO. 041 VENUS PAINTING CO. CONTRACT NO. 66B44 443 FORESTWOOD DR. COUNTY(S) KANKAKEE VALPARAISO, IN 46385 SECTION (1R-B)BP P.O. BOX 5407 PROJECT(S) LAKE STATION, IN 46405 ROUTE FAP 330 DISTRICT 03 AWARDED DATE 02/14/2012 AWARDED AMOUNT $465,416.00 3 UNSUCCESSFUL BIDDERS ITEM NO. 042 VIRGIL COOK & SON, INC. CONTRACT NO. 66B54 119 NORTH 8TH STREET COUNTY(S) DEKALB P. O. BOX 805 SECTION D-3 LED RETROFIT 2012-1 DEKALB, IL 60115 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/09/2012 AWARDED AMOUNT $393,258.60 3 UNSUCCESSFUL BIDDERS ITEM NO. 043 H&H ELECTRIC CO. CONTRACT NO. 66B56 2830 COMMERCE STREET COUNTY(S) VARIOUS FRANKLIN PARK, IL 60131-2927 SECTION D-3 LED RETROFIT 2012-3 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/09/2012 AWARDED AMOUNT $247,208.90 3 UNSUCCESSFUL BIDDERS ITEM NO. 044 BRANDT CONSTRUCTION CO. CONTRACT NO. 68087 700 - 4TH ST., WEST COUNTY(S) KNOX MILAN, IL 61264-2725 SECTION (125BY)BR PROJECT(S) RS-1190/105/000 ROUTE FAS 1190 DISTRICT 04 AWARDED DATE 02/22/2012 AWARDED AMOUNT $1,532,001.50 5 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 98: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 045 WISSEHR ELECTRIC, INC. CONTRACT NO. 72E13 5801 W. HWY. 161 COUNTY(S) MORGAN P.O. BOX 23798 SECTION (69-1)L-1 BELLEVILLE, IL 62223 PROJECT(S) HSIP-0310/146/000 ROUTE FAP 310 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $188,182.46 1 UNSUCCESSFUL BIDDER ITEM NO. 046 MONIGER EXCAVATING COMPANY, INC. CONTRACT NO. 72F10 5965 STATE RT. 140 COUNTY(S) MACOUPIN MORO, IL 62067 SECTION (67)I,(109)I-2 PROJECT(S) F-0662/067/000 ROUTE FAP 662 DISTRICT 06 AWARDED DATE 02/22/2012 AWARDED AMOUNT $247,788.40 3 UNSUCCESSFUL BIDDERS ITEM NO. 047 ILLINOIS VALLEY PAVING, A DIVISION OF CONTRACT NO. 72D78 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) PIKE 3151 ROBBINS ROAD SECTION 20RS-7 SPRINGFIELD, IL 62704 PROJECT(S) F-0757/009/000 P.O. BOX 13490 ROUTE FAP 757 SPRINGFIELD, IL 62791 DISTRICT 06 AWARDED DATE 02/22/2012 AWARDED AMOUNT $1,862,032.83 2 UNSUCCESSFUL BIDDERS ITEM NO. 048 NE-CO ASPHALT CO., INC. CONTRACT NO. 74259 812 NO. ADKINS DRIVE COUNTY(S) COLES MOULTRIE P.O. BOX 25 SECTION (8,9,10)RS-3, (19Z)RS-2 CHARLESTON, IL 61920-0025 PROJECT(S) F-000S/869/000 ROUTE FAP 325 & 320 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $2,693,514.09 1 UNSUCCESSFUL BIDDER ITEM NO. 049 HOWELL PAVING, INC. CONTRACT NO. 74467 1020 N. 13TH STREET COUNTY(S) SHELBY CUMBERLAND P.O. BOX 1009 SECTION (87-1,18-1,18-1-1)RS-1 MATTOON, IL 61938 PROJECT(S) IM-057-4/130/168 ROUTE FAI 57 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $11,027,113.97 0 UNSUCCESSFUL BIDDERS

Revised Notice of Letting Bulletin April 27, 2012 Letting Published April 17, 2012

Page 99: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 050 ILLINOIS VALLEY PAVING, A DIVISION OF CONTRACT NO. 74500 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) MACON 3151 ROBBINS ROAD SECTION (127R,RS-2)(130R,RS-1) SPRINGFIELD, IL 62704 PROJECT(S) F-0716/013/000 P.O. BOX 13490 ROUTE FAP 716 SPRINGFIELD, IL 62791 DISTRICT 07 AWARDED DATE 02/22/2012 AWARDED AMOUNT $1,420,752.20 0 UNSUCCESSFUL BIDDERS ITEM NO. 051 PLOCHER CONSTRUCTION COMPANY, INC. CONTRACT NO. 76388 2808 THOLE PLOCHER RD. COUNTY(S) ST CLAIR HIGHLAND, IL 62249 SECTION 47-1BR PROJECT(S) BRF-0680/003/000 ROUTE FAP 680 DISTRICT 08 AWARDED DATE 02/09/2012 AWARDED AMOUNT $738,457.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 052 D. CONSTRUCTION, INC. CONTRACT NO. 87486 1488 SO. BROADWAY COUNTY(S) GRUNDY COAL CITY, IL 60416 SECTION 10-00083-00-TL PROJECT(S) M-5047/010/000 ROUTE FAU 5952 DISTRICT 03 AWARDED DATE 03/02/2012 AWARDED AMOUNT $1,350,311.82 4 UNSUCCESSFUL BIDDERS ITEM NO. 053 H. J. EPPEL & CO. CONTRACT NO. 91450 1400 TUESBURG COURT COUNTY(S) MCLEAN PONTIAC, IL 61764-1260 SECTION 09-18131-00-BR PROJECT(S) BROS-0113/033/000 ROUTE TR 25 DISTRICT 05 AWARDED DATE 02/22/2012 AWARDED AMOUNT $280,984.15 5 UNSUCCESSFUL BIDDERS ITEM NO. 054 YAMNITZ, WILLIAM D/B/A CONTRACT NO. 93557 YAMNITZ & ASSOCIATES COUNTY(S) MACOUPIN 22782 N. THIRD STREET SECTION 10-00094-00-BR FIELDON, IL 62031 PROJECT(S) BHS-1737/104/000 ROUTE FAS 1737 DISTRICT 06 AWARDED DATE 02/23/2012 AWARDED AMOUNT $348,442.00 4 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 27, 2012 Letting Published March 23, 2012

Page 100: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 056 PERRY COUNTY CONSTRUCTION COMPANY CONTRACT NO. 95669 3170 HERRIN ROAD COUNTY(S) EFFINGHAM CARTERVILLE, IL 62918 SECTION 10-13112-00-BR P.O. BOX 396 PROJECT(S) BROS-0049/160/000 HERRIN, IL 62948 ROUTE TR 266 DISTRICT 07 AWARDED DATE 02/23/2012 AWARDED AMOUNT $138,659.50 4 UNSUCCESSFUL BIDDERS ITEM NO. 057 GEORGE E. JONES EXCAVATING, L.L.C. CONTRACT NO. 99338 1504 E. MAIN COUNTY(S) JACKSON P.O. BOX 1104 SECTION 06-00144-00-WR MARION, IL 62959-1104 PROJECT(S) SR-1919/106/000 ROUTE FAS 1919 DISTRICT 09 AWARDED DATE 03/02/2012 AWARDED AMOUNT $3,038,740.26 2 UNSUCCESSFUL BIDDERS ITEM NO. 058 DEES, INC. CONTRACT NO. 99451 2045 WINERY ROAD COUNTY(S) WHITE WEST FRANKFORT, IL 62896 SECTION 07-00104-00-BR PROJECT(S) BRS-0881/117/000 ROUTE FAS 881 DISTRICT 09 AWARDED DATE 02/23/2012 AWARDED AMOUNT $241,591.00 3 UNSUCCESSFUL BIDDERS ITEM NO. 059 GFS FENCE, GUARDRAIL, & SIGNAGE, INC. CONTRACT NO. 46179 11921 SMITH DRIVE COUNTY(S) VARIOUS HUNTLEY, IL 60142 SECTION D-5 OVD SIN STR REPL 2012-6 PROJECT(S) ROUTE VARIOUS DISTRICT 05 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,472,148.08 4 UNSUCCESSFUL BIDDERS ITEM NO. 060 T.M.F. CONSTRUCTION COMPANY CONTRACT NO. 46196 803 PRINCETON AVENUE (62703) COUNTY(S) SANGAMON P.O. BOX 3555 SECTION D-6 OVD SIN STR REPL 12-23 SPRINGFIELD, IL 62708-3555 PROJECT(S) ROUTE VARIOUS DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $431,358.51 2 UNSUCCESSFUL BIDDERS

Page 101: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 064 D. CONSTRUCTION, INC. CONTRACT NO. 60B10 1488 SO. BROADWAY COUNTY(S) WILL COAL CITY, IL 60416 SECTION D-T PROJECT(S) ACF-0577/293/000 ROUTE FAP 577 DISTRICT 01 AWARDED DATE 03/01/2012 AWARDED AMOUNT $853,763.73 6 UNSUCCESSFUL BIDDERS ITEM NO. 065 D. CONSTRUCTION, INC. CONTRACT NO. 60M78 1488 SO. BROADWAY COUNTY(S) COOK COAL CITY, IL 60416 SECTION 0505-B PROJECT(S) M-2845/007/000 ROUTE FAU 2845 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $865,845.23 5 UNSUCCESSFUL BIDDERS ITEM NO. 066 ARROW ROAD CONSTRUCTION COMPANY CONTRACT NO. 60P12 3401 S. BUSSE ROAD COUNTY(S) KANE P.O. BOX 334 SECTION S-RS-5 MT. PROSPECT, IL 60056-0334 PROJECT(S) ROUTE FAU 3887 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,608,190.12 2 UNSUCCESSFUL BIDDERS ITEM NO. 067 GALLAGHER ASPHALT CORPORATION CONTRACT NO. 60P71 18100 SOUTH INDIANA AVENUE COUNTY(S) WILL THORNTON, IL 60476 SECTION 111-RS-9 PROJECT(S) M-0327/055/000 ROUTE FAU 0327 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $338,567.82 3 UNSUCCESSFUL BIDDERS ITEM NO. 068 MARTAM CONSTRUCTION INCORPORATED CONTRACT NO. 62116 1200 GASKET DRIVE COUNTY(S) COOK ELGIN, IL 60120 SECTION 3222-W-BR PROJECT(S) BRM-2742/006/000 ROUTE FAU 2742 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $939,258.50 5 UNSUCCESSFUL BIDDERS

Page 102: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 069 MARTAM CONSTRUCTION INCORPORATED CONTRACT NO. 62195 1200 GASKET DRIVE COUNTY(S) KANE ELGIN, IL 60120 SECTION 129-R-2 PROJECT(S) NHF-CMF-0307/035/000 ROUTE FAP 307 DISTRICT 01 AWARDED DATE 03/02/2012 AWARDED AMOUNT $9,617,630.44 6 UNSUCCESSFUL BIDDERS ITEM NO. 070 ALLIANCE CONTRACTORS, INC. CONTRACT NO. 63197 1166 LAKE AVENUE COUNTY(S) DUPAGE WOODSTOCK, IL 60098 SECTION 02-00077-00-SW PROJECT(S) CMF-0347/016/000 ROUTE FAP 347 DISTRICT 01 AWARDED DATE 02/27/2012 AWARDED AMOUNT $552,538.69 9 UNSUCCESSFUL BIDDERS ITEM NO. 071 COPENHAVER CONSTRUCTION, INC. CONTRACT NO. 63652 121 CENTER DR. COUNTY(S) DUPAGE GILBERTS, IL 60136 SECTION 11-00179-00-LS PROJECT(S) TE-00D1/880/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 03/02/2012 AWARDED AMOUNT $761,036.30 10 UNSUCCESSFUL BIDDERS ITEM NO. 072 JAMES D. FIALA PAVING CO., INC. CONTRACT NO. 63659 500 EAST FRONTAGE ROAD NORTH COUNTY(S) DUPAGE BOLINGBROOK, IL 60440 SECTION 11-00149-00-RS PROJECT(S) M-9003/831/000 ROUTE FAU 82 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,102,373.88 2 UNSUCCESSFUL BIDDERS ITEM NO. 073 D. CONSTRUCTION, INC. CONTRACT NO. 63660 1488 SO. BROADWAY COUNTY(S) KANE COAL CITY, IL 60416 SECTION 03-01130-00-BR PROJECT(S) BHOS-00D1/653/000 ROUTE TR 256 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $398,661.99 5 UNSUCCESSFUL BIDDERS

Page 103: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 074 WILLIAM CHARLES ELECTRIC LLC CONTRACT NO. 64H29 A (D/B/A) OF WILLIAM CHARLES CONSTRUCTION CO LLC COUNTY(S) WINNEBAGO 5290 NIMTZ RD. SECTION D2 GREENLIGHT 2012-1 LOVES PARK, IL 61111 PROJECT(S) P.O. BOX 2071 ROUTE VARIOUS LOVES PARK, IL 61130 DISTRICT 02 AWARDED DATE 02/14/2012 AWARDED AMOUNT $268,093.45 1 UNSUCCESSFUL BIDDER ITEM NO. 075 TWIN CITY CONSTRUCTION COMPANY CONTRACT NO. 64H34 3900 PINE HILL DRIVE COUNTY(S) WHITESIDE STERLING, IL 61081-9313 SECTION D2 MRS 2012-3 PROJECT(S) ROUTE FAI 88 DISTRICT 02 AWARDED DATE 02/09/2012 AWARDED AMOUNT $229,777.90 2 UNSUCCESSFUL BIDDERS ITEM NO. 076 VALLEY CONSTRUCTION CO. CONTRACT NO. 64H36 3610 78TH AVENUE, WEST (61201) COUNTY(S) HENRY P.O. BOX 2020 SECTION D2 MRS 2012-5 ROCK ISLAND, IL 61204-2020 PROJECT(S) ROUTE FAP 585 DISTRICT 02 AWARDED DATE 02/29/2012 AWARDED AMOUNT $268,799.90 4 UNSUCCESSFUL BIDDERS ITEM NO. 077 NORTHERN CONTRACTING, INC. CONTRACT NO. 64H50 1851 COLTONVILLE RD. COUNTY(S) VARIOUS SYCAMORE, IL 60178 SECTION D2 MCHD (NORTH) 2012 PROJECT(S) ROUTE VARIOUS DISTRICT 02 AWARDED DATE 02/09/2012 AWARDED AMOUNT $210,322.50 2 UNSUCCESSFUL BIDDERS ITEM NO. 078 NORTHERN CONTRACTING, INC. CONTRACT NO. 64H51 1851 COLTONVILLE RD. COUNTY(S) VARIOUS SYCAMORE, IL 60178 SECTION D2 MCHD (SOUTH) 2012 PROJECT(S) ROUTE VARIOUS DISTRICT 02 AWARDED DATE 02/09/2012 AWARDED AMOUNT $203,197.50 2 UNSUCCESSFUL BIDDERS

Page 104: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 080 H&H ELECTRIC CO. CONTRACT NO. 66B57 2830 COMMERCE STREET COUNTY(S) KANKAKEE IROQUOIS FRANKLIN PARK, IL 60131-2927 SECTION D-3 LED RETROFIT 2012-4 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/09/2012 AWARDED AMOUNT $275,933.20 2 UNSUCCESSFUL BIDDERS ITEM NO. 082 O'NEIL BROS., A DIVISION OF CONTRACT NO. 70924 MACC OF ILL., INC. COUNTY(S) CHAMPAIGN 2906 N. OAK STREET SECTION (10-33HB)BDR URBANA, IL 61802 PROJECT(S) P.O. BOX 848 ROUTE FAI 57 URBANA, IL 61803 DISTRICT 05 AWARDED DATE 02/22/2012 AWARDED AMOUNT $409,252.83 1 UNSUCCESSFUL BIDDER ITEM NO. 083 CHAMPAIGN SIGNAL AND LIGHTING CO. CONTRACT NO. 70963 A DIVISION OF CHAMPAIGN ASPHALT COMPANY LLC COUNTY(S) VERMILION 1414 W. ANTHONY DRIVE SECTION GPS CORE STATION 2012-1 URBANA, IL 61802 PROJECT(S) P.O. BOX 1730 ROUTE FAI 74 CHAMPAIGN, IL 61824-1730 DISTRICT 05 AWARDED DATE 02/09/2012 AWARDED AMOUNT $31,953.00 0 UNSUCCESSFUL BIDDERS ITEM NO. 084 MONIGER EXCAVATING COMPANY, INC. CONTRACT NO. 72D74 5965 STATE RT. 140 COUNTY(S) PIKE MORO, IL 62067 SECTION 75-2I PROJECT(S) IM-072-1/082/013 ROUTE FAI 72 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,131,586.38 4 UNSUCCESSFUL BIDDERS ITEM NO. 085 DIAMOND CONSTRUCTION COMPANY CONTRACT NO. 72E43 2000 NORTH 18TH STREET (62301) COUNTY(S) PIKE P.O. BOX 3486 SECTION 104RS2,BR3;105RS7,BR3,4;106RS6 QUINCY, IL 62305-3486 PROJECT(S) NHF-0321/014/000 ROUTE FAP 321 DISTRICT 06 AWARDED DATE 02/10/2012 AWARDED AMOUNT $2,040,832.74 1 UNSUCCESSFUL BIDDER

Page 105: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 086 CHRIST BROS. ASPHALT, INC. CONTRACT NO. 72E47 820 SOUTH FRITZ STREET COUNTY(S) MACOUPIN P.O. BOX 158 SECTION 14RS-5 LEBANON, IL 62254 PROJECT(S) F-0325/057/000 ROUTE FAP 325 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,308,913.02 3 UNSUCCESSFUL BIDDERS ITEM NO. 087 THE KILIAN CORPORATION CONTRACT NO. 72E64 608 S. INDEPENDENCE COUNTY(S) MACOUPIN P.O. BOX A SECTION (23)RS-4,(I)3 MASCOUTAH, IL 62258-0187 PROJECT(S) ROUTE FAU 8141 DISTRICT 06 AWARDED DATE 02/22/2012 AWARDED AMOUNT $131,498.21 2 UNSUCCESSFUL BIDDERS ITEM NO. 088 CONCRETE STRATEGIES, LLC CONTRACT NO. 72F01 2199 INNERBELT BUSINESS CENTER DRIVE COUNTY(S) SANGAMON ST. LOUIS, MO 63114 SECTION (84-10-1)BDR PROJECT(S) IM-072-2/093/107 ROUTE FAI 72 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $2,028,862.00 6 UNSUCCESSFUL BIDDERS ITEM NO. 089 DIAMOND CONSTRUCTION COMPANY CONTRACT NO. 72F03 2000 NORTH 18TH STREET (62301) COUNTY(S) PIKE P.O. BOX 3486 SECTION D6 SHOULDER REPAIR 2012 QUINCY, IL 62305-3486 PROJECT(S) ROUTE VARIOUS DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $182,258.85 2 UNSUCCESSFUL BIDDERS ITEM NO. 090 HOWELL PAVING, INC. CONTRACT NO. 74415 1020 N. 13TH STREET COUNTY(S) FAYETTE P.O. BOX 1009 SECTION (23-2)RS-1,(W,V)RS-2 MATTOON, IL 61938 PROJECT(S) F-0752/005/000 ROUTE FAP 752 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,704,541.81 0 UNSUCCESSFUL BIDDERS

Page 106: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 091 KEELEY & SONS, INC. CONTRACT NO. 76415 6303 COLLINSVILLE ROAD (62201) COUNTY(S) ST CLAIR P.O. BOX 837 SECTION 82-(3,4)RS EAST ST. LOUIS, IL 62203 PROJECT(S) ACIM-0641/129/004 ROUTE FAI 64 DISTRICT 08 AWARDED DATE 02/10/2012 AWARDED AMOUNT $12,989,845.28 1 UNSUCCESSFUL BIDDER ITEM NO. 093 MASSMAN CONSTRUCTION CO. CONTRACT NO. 76D29 8901 STATE LINE, SUITE 240 COUNTY(S) JERSEY P.O. BOX 8458 SECTION 2I-3 KANSAS CITY, MO 64114-0458 PROJECT(S) FBD-0040/011/000 ROUTE FAP 304 DISTRICT 08 AWARDED DATE 02/15/2012 AWARDED AMOUNT $3,055,651.00 1 UNSUCCESSFUL BIDDER ITEM NO. 094 HALVERSON CONSTRUCTION CO., INC. CONTRACT NO. 76E99 620 NORTH 19TH STREET COUNTY(S) ST CLAIR SPRINGFIELD, IL 62702 SECTION 125BR-2 PROJECT(S) ROUTE FAP 805 DISTRICT 08 AWARDED DATE 02/22/2012 AWARDED AMOUNT $419,267.07 4 UNSUCCESSFUL BIDDERS ITEM NO. 095 E. T. SIMONDS CONSTRUCTION COMPANY CONTRACT NO. 78049 1500 NO. OAKLAND (62901) COUNTY(S) JACKSON P.O. BOX 2107 SECTION 114B-1 CARBONDALE, IL 62902-2107 PROJECT(S) ACF-0686/012/000 ROUTE FAP 686 DISTRICT 09 AWARDED DATE 02/06/2012 AWARDED AMOUNT $4,182,932.73 2 UNSUCCESSFUL BIDDERS ITEM NO. 096 E. T. SIMONDS CONSTRUCTION COMPANY CONTRACT NO. 78255 1500 NO. OAKLAND (62901) COUNTY(S) UNION P.O. BOX 2107 SECTION 13B-1 CARBONDALE, IL 62902-2107 PROJECT(S) F-0885/044/000 ROUTE FAP 885 DISTRICT 09 AWARDED DATE 02/22/2012 AWARDED AMOUNT $227,641.43 3 UNSUCCESSFUL BIDDERS

Page 107: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 097 THOMAS INDUSTRIAL COATINGS, INC. CONTRACT NO. 78269 2070 HWY. Z COUNTY(S) ALEXANDER PEVELY, MO 63070 SECTION 133P-1 PROJECT(S) ROUTE SBI 150C DISTRICT 09 AWARDED DATE 02/14/2012 AWARDED AMOUNT $532,921.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 099 RONALD L. MORING D/B/A MORING CONSTRUCTION CONTRACT NO. 85548 215 W. MAIN ST. COUNTY(S) STEPHENSON P.O. BOX 215 SECTION 10-00177-00-BR MCCONNELL, IL 61050 PROJECT(S) BRS-0063/106/000 ROUTE FAS 63 DISTRICT 02 AWARDED DATE 02/09/2012 AWARDED AMOUNT $262,586.00 6 UNSUCCESSFUL BIDDERS ITEM NO. 100 COUNTY CONTRACTORS, INC. CONTRACT NO. 93550 1228 E. 1350TH STREET COUNTY(S) PIKE P.O. BOX 3522 SECTION 09-00083-00-BR QUINCY, IL 62305-3522 PROJECT(S) BRS-0597/103/000 ROUTE FAS 597 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $229,788.85 2 UNSUCCESSFUL BIDDERS ITEM NO. 101 HANK'S EXCAVATING & LANDSCAPING, INC. CONTRACT NO. 97478 5825 W. STATE ROUTE 161 COUNTY(S) ST. CLAIR BELLEVILLE, IL 62223-7921 SECTION 10-00036-03-PV PROJECT(S) CMM-5011/304/000 ROUTE FAU 9172 DISTRICT 08 AWARDED DATE 02/15/2012 AWARDED AMOUNT $649,760.92 6 UNSUCCESSFUL BIDDERS ITEM NO. 102 DEES, INC. CONTRACT NO. 99445 2045 WINERY ROAD COUNTY(S) WHITE WEST FRANKFORT, IL 62896 SECTION 09-09126-00-BR PROJECT(S) BROS-0193/051/000 ROUTE TR 112 DISTRICT 09 AWARDED DATE 02/09/2012 AWARDED AMOUNT $168,482.00 2 UNSUCCESSFUL BIDDERS

Page 108: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 103 LORIG CONSTRUCTION COMPANY CONTRACT NO. 60M79 250 EAST TOUHY AVE. COUNTY(S) COOK DES PLAINES, IL 60018 SECTION 1515.1-B PROJECT(S) IM-090-5/083/080 ROUTE FAI 90 DISTRICT 01 AWARDED DATE 03/20/2012 AWARDED AMOUNT $3,804,753.25 8 UNSUCCESSFUL BIDDERS ITEM NO. 104 CURRAN CONTRACTING COMPANY CONTRACT NO. 60N40 286 MEMORIAL COURT COUNTY(S) MCHENRY CRYSTAL LAKE, IL 60014 SECTION 105X-RS-3 PROJECT(S) ROUTE FAP 326 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $1,285,215.24 4 UNSUCCESSFUL BIDDERS ITEM NO. 105 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 60N69 13769 MAIN STREET COUNTY(S) WILL LEMONT, IL 60439-9733 SECTION 29Y-RS-3 PROJECT(S) ROUTE FAU 0378 DISTRICT 01 AWARDED DATE 02/10/2012 AWARDED AMOUNT $1,148,997.00 3 UNSUCCESSFUL BIDDERS ITEM NO. 106 VIXEN CONSTRUCTION, INC. CONTRACT NO. 60P60 7600 WEST 79TH STREET COUNTY(S) COOK BRIDGEVIEW, IL 60455 SECTION 2011-050-I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 03/02/2012 AWARDED AMOUNT $449,855.50 6 UNSUCCESSFUL BIDDERS ITEM NO. 107 WABASH STEEL LLC CONTRACT NO. 60P69 2007 OLIPHANT DRIVE COUNTY(S) LAKE P.O. BOX 117 SECTION 2011-056-F VINCENNES, IN 47591 PROJECT(S) ROUTE FAI 94 DISTRICT 01 AWARDED DATE 03/02/2012 AWARDED AMOUNT $1,052,316.00 2 UNSUCCESSFUL BIDDERS

Page 109: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 109 LORIG CONSTRUCTION COMPANY CONTRACT NO. 60P89 250 EAST TOUHY AVE. COUNTY(S) COOK DES PLAINES, IL 60018 SECTION 2011-070-I PROJECT(S) ROUTE FAI 90/94 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $238,041.50 5 UNSUCCESSFUL BIDDERS ITEM NO. 110 AREATHA CONSTRUCTION CO., INC. CONTRACT NO. 60R03 410 E. NORTH AVENUE COUNTY(S) COOK STREAMWOOD, IL 60107 SECTION 2011-077-BR PROJECT(S) ROUTE FAP 373 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $793,966.84 6 UNSUCCESSFUL BIDDERS ITEM NO. 111 D. CONSTRUCTION, INC. CONTRACT NO. 60R05 1488 SO. BROADWAY COUNTY(S) WILL COAL CITY, IL 60416 SECTION 2011-078-I PROJECT(S) ROUTE FAI 55 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $221,100.99 2 UNSUCCESSFUL BIDDERS ITEM NO. 113 LION CONSTRUCTION 1, LLC CONTRACT NO. 60R56 2598 S. 1400E RD. COUNTY(S) VARIOUS PEMBROKE TOWNSHIP, IL 60958 SECTION 2011-216-I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $144,987.75 4 UNSUCCESSFUL BIDDERS ITEM NO. 114 LION CONSTRUCTION 1, LLC CONTRACT NO. 60R57 2598 S. 1400E RD. COUNTY(S) COOK PEMBROKE TOWNSHIP, IL 60958 SECTION 2011-215-I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $124,400.07 4 UNSUCCESSFUL BIDDERS

Page 110: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 115 WILLIAM CHARLES CONSTRUCTION COMPANY, LLC & CONTRACT NO. 64C29 PLOTE CONSTRUCTION INC. COUNTY(S) WINNEBAGO 5290 NIMTZ ROAD SECTION (X2-1)R LOVES PARK, IL 61111 PROJECT(S) ACNHI-0901/032/000 P.O. BOX 2071 ROUTE FAI 90 LOVES PARK, IL 61130 DISTRICT 02 AWARDED DATE 03/07/2012 AWARDED AMOUNT $33,759,648.57 4 UNSUCCESSFUL BIDDERS ITEM NO. 116 H&H ELECTRIC CO. CONTRACT NO. 66B55 2830 COMMERCE STREET COUNTY(S) BUREAU LASALLE FRANKLIN PARK, IL 60131-2927 SECTION D-3 LED RETROFIT 2012-2 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/09/2012 AWARDED AMOUNT $253,131.80 3 UNSUCCESSFUL BIDDERS ITEM NO. 117 SANGAMO CONSTRUCTION COMPANY CONTRACT NO. 68A41 2100 E. MOFFAT AVENUE COUNTY(S) MCDONOUGH SPRINGFIELD, IL 62702 SECTION 55-3HB-1 PROJECT(S) NHF-0407/001/000 ROUTE FAP 407 DISTRICT 04 AWARDED DATE 02/09/2012 AWARDED AMOUNT $2,961,800.22 5 UNSUCCESSFUL BIDDERS ITEM NO. 118 MIDWEST SEEDLING SUPPLY, LLC CONTRACT NO. 68A53 534 SPUNKY RIDGE RD. COUNTY(S) VARIOUS MEREDOSIA, IL 62665 SECTION D4 WEED SPRAYING 2012 PROJECT(S) ROUTE VARIOUS DISTRICT 04 AWARDED DATE 02/09/2012 AWARDED AMOUNT $58,025.00 2 UNSUCCESSFUL BIDDERS ITEM NO. 119 MOTT EXCAVATING, INC. CONTRACT NO. 68A54 1210 LAKE AUTUMN LANE COUNTY(S) VARIOUS P.O. BOX 613 SECTION D4 WEED SPRAYING 2012-1 VIENNA, IL 62995 PROJECT(S) ROUTE VARIOUS DISTRICT 04 AWARDED DATE 02/22/2012 AWARDED AMOUNT $80,010.00 2 UNSUCCESSFUL BIDDERS

Page 111: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 120 FREEHILL ASPHALT, INC. CONTRACT NO. 68A55 P.O. BOX 154 COUNTY(S) VARIOUS WATSEKA, IL 60970-0154 SECTION D4 ROUT & SEAL 2012 PROJECT(S) ROUTE VARIOUS DISTRICT 04 AWARDED DATE 02/09/2012 AWARDED AMOUNT $368,419.62 3 UNSUCCESSFUL BIDDERS ITEM NO. 121 COMPLETE ASPHALT SERVICE CO. CONTRACT NO. 68A56 ROUTE 107 N. COUNTY(S) VARIOUS P.O. BOX 457 SECTION D4 ROUT & SEAL 2012-1 PITTSFIELD, IL 62363 PROJECT(S) ROUTE VARIOUS DISTRICT 04 AWARDED DATE 02/09/2012 AWARDED AMOUNT $360,396.20 3 UNSUCCESSFUL BIDDERS ITEM NO. 122 STARK EXCAVATING, INC. CONTRACT NO. 68A57 1805 WEST WASHINGTON ST. COUNTY(S) TAZEWELL BLOOMINGTON, IL 61701 SECTION 6N-1 PROJECT(S) ROUTE FAS 2466 DISTRICT 04 AWARDED DATE 02/09/2012 AWARDED AMOUNT $35,385.00 2 UNSUCCESSFUL BIDDERS ITEM NO. 123 BERGER EXCAVATING CONTRACTORS, INC. CONTRACT NO. 63623 1205 GARLAND ROAD COUNTY(S) KANE WAUCONDA, IL 60084-1357 SECTION 06-00345-00-CH PROJECT(S) CMF-8003/711/000 ROUTE FAP 336 DISTRICT 01 AWARDED DATE 02/23/2012 AWARDED AMOUNT $2,037,222.00 5 UNSUCCESSFUL BIDDERS ITEM NO. 124 ELMUND AND NELSON CO. CONTRACT NO. 63628 1510 SHELDON DRIVE COUNTY(S) COOK ELGIN, IL 60120 SECTION 05-00162-00-LS PROJECT(S) HPP-3465/002/000 ROUTE FAU 2775 DISTRICT 01 AWARDED DATE 02/29/2012 AWARDED AMOUNT $769,856.75 8 UNSUCCESSFUL BIDDERS

Page 112: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 125 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 63635 13769 MAIN STREET COUNTY(S) COOK LEMONT, IL 60439-9733 SECTION 06-00090-00-FP PROJECT(S) M-8003/661/000 ROUTE FAU 2836 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $7,216,158.40 4 UNSUCCESSFUL BIDDERS ITEM NO. 126 PAN-OCEANIC ENGINEERING CO., INC. CONTRACT NO. 63636 8501 W. HIGGINS RD., SUITE 630 COUNTY(S) COOK CHICAGO, IL 60631 SECTION 08-00094-01-BR P.O. BOX 66465 PROJECT(S) BRM-9003/820/000 CHICAGO, IL 60666 ROUTE FAU 2556 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $369,892.50 14 UNSUCCESSFUL BIDDERS ITEM NO. 127 PETER BAKER & SON CO. CONTRACT NO. 63646 1349 ROCKLAND ROAD COUNTY(S) LAKE P.O. BOX 187 SECTION 11-00012-00-RS LAKE BLUFF, IL 60044-0187 PROJECT(S) M-9003/859/000 ROUTE FAU 2718 DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $642,235.00 2 UNSUCCESSFUL BIDDERS ITEM NO. 128 MEADE ELECTRIC COMPANY, INC. CONTRACT NO. 63648 9550 W. 55TH STREET, SUITE A COUNTY(S) KANE MCCOOK, IL 60525 SECTION 10-00403-00-TL PROJECT(S) CMM-9003/634/000 ROUTE FAP 360 DISTRICT 01 AWARDED DATE 02/27/2012 AWARDED AMOUNT $1,186,207.80 2 UNSUCCESSFUL BIDDERS ITEM NO. 130 CHAMPAIGN SIGNAL AND LIGHTING CO. CONTRACT NO. 70938 A DIVISION OF CHAMPAIGN ASPHALT COMPANY LLC COUNTY(S) CHAMPAIGN 1414 W. ANTHONY DRIVE SECTION 32TS URBANA, IL 61802 PROJECT(S) P.O. BOX 1730 ROUTE FAP 804 CHAMPAIGN, IL 61824-1730 DISTRICT 05 AWARDED DATE 02/09/2012 AWARDED AMOUNT $245,374.20 1 UNSUCCESSFUL BIDDER

Page 113: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 131 THREE STAR PAINTING, INC. CONTRACT NO. 70955 2880 E. 84TH PLACE COUNTY(S) MCLEAN MERRILLVILLE, IN 46410 SECTION (57-9HB-1)(57-20HB-3)P PROJECT(S) ROUTE VARIOUS DISTRICT 05 AWARDED DATE 02/09/2012 AWARDED AMOUNT $453,161.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 133 M & M CONCRETE, INC. CONTRACT NO. 74524 10092 E. GOLF RD. COUNTY(S) VARIOUS STOCKTON, IL 61085 SECTION D7 BR DECK SEALING 2012 PROJECT(S) ROUTE VARIOUS DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $224,997.95 7 UNSUCCESSFUL BIDDERS ITEM NO. 134 ROGER SELLE D/B/A CONTRACT NO. 74526 R & S CONSTRUCTION COUNTY(S) VARIOUS 13426 WILLY RD. SECTION D7 GUARDRAIL 2012-1 COULTERVILLE, IL 62237 PROJECT(S) P.O. BOX 446 ROUTE VARIOUS SPARTA, IL 62286 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $43,835.00 1 UNSUCCESSFUL BIDDER ITEM NO. 135 NORTH AMERICAN COATINGS, LLC CONTRACT NO. 74529 8450 W. 191ST STREET - UNIT #19 COUNTY(S) WAYNE MOKENA, IL 60448 SECTION D7 BRIDGE PAINTING 2012-1 PROJECT(S) ROUTE FAP 776 & 821 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $465,357.00 5 UNSUCCESSFUL BIDDERS ITEM NO. 136 HOWELL PAVING, INC. CONTRACT NO. 74532 1020 N. 13TH STREET COUNTY(S) MOULTRIE P.O. BOX 1009 SECTION D7 PATCHING 2012-3 MATTOON, IL 61938 PROJECT(S) ROUTE FAS 642 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $139,787.45 3 UNSUCCESSFUL BIDDERS

Page 114: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 137 CHRIST BROS. ASPHALT, INC. CONTRACT NO. 76F03 820 SOUTH FRITZ STREET COUNTY(S) ST CLAIR P.O. BOX 158 SECTION 29RS-7 LEBANON, IL 62254 PROJECT(S) ROUTE FAU 9189 DISTRICT 08 AWARDED DATE 02/22/2012 AWARDED AMOUNT $282,124.82 3 UNSUCCESSFUL BIDDERS ITEM NO. 138 THE KILIAN CORPORATION CONTRACT NO. 76F05 608 S. INDEPENDENCE COUNTY(S) BOND P.O. BOX A SECTION 3-1RS-2 MASCOUTAH, IL 62258-0187 PROJECT(S) ROUTE FAI 70 DISTRICT 08 AWARDED DATE 02/22/2012 AWARDED AMOUNT $367,832.82 2 UNSUCCESSFUL BIDDERS ITEM NO. 139 THOMAS INDUSTRIAL COATINGS, INC. CONTRACT NO. 76F09 2070 HWY. Z COUNTY(S) ST CLAIR PEVELY, MO 63070 SECTION 82-3HVB-HDF PROJECT(S) ROUTE FAI 55/70/64 DISTRICT 08 AWARDED DATE 02/09/2012 AWARDED AMOUNT $96,460.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 140 MOTT EXCAVATING, INC. CONTRACT NO. 76F15 1210 LAKE AUTUMN LANE COUNTY(S) VARIOUS P.O. BOX 613 SECTION DIST 8 WEED SPRAYING 2012-1 VIENNA, IL 62995 PROJECT(S) ROUTE VARIOUS DISTRICT 08 AWARDED DATE 02/22/2012 AWARDED AMOUNT $83,180.00 1 UNSUCCESSFUL BIDDER ITEM NO. 141 PINOY CONSTRUCTION, INC. CONTRACT NO. 78262 420 N. MILL COUNTY(S) PULASKI HARRISBURG, IL 62946 SECTION D9 BRIDGE WASHING 2011-1 PROJECT(S) ROUTE FAI 57 DISTRICT 09 AWARDED DATE 02/09/2012 AWARDED AMOUNT $57,068.00 3 UNSUCCESSFUL BIDDERS

Page 115: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 142 RCS CONSTRUCTION, INC. CONTRACT NO. 97484 197 OLD ST. LOUIS ROAD COUNTY(S) MADISON WOOD RIVER, IL 62095-1413 SECTION 10-00026-02-LS PROJECT(S) TE-00D8/142/000 ROUTE LEWIS & CLARK DISTRICT 08 AWARDED DATE 03/02/2012 AWARDED AMOUNT $277,825.53 5 UNSUCCESSFUL BIDDERS ITEM NO. 144 MARTAM CONSTRUCTION INCORPORATED & CONTRACT NO. 62410 HERLIHY MID-CONTINENT COMPANY COUNTY(S) KANE DUPAGE 1200 GASKET DR. SECTION 130R-2 ELGIN, IL 60120 PROJECT(S) NHF-0307/033/000 ROUTE FAP 307 DISTRICT 01 AWARDED DATE 03/19/2012 AWARDED AMOUNT $39,568,013.38 5 UNSUCCESSFUL BIDDERS ITEM NO. 145 ILLINOIS CONSTRUCTORS CORPORATION CONTRACT NO. 63645 39W866 FABYAN PARKWAY COUNTY(S) KANE ELBURN, IL 60119 SECTION 08-14117-00-BR PROJECT(S) BROS-0089/142/000 ROUTE TR 194 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $923,922.19 6 UNSUCCESSFUL BIDDERS ITEM NO. 146 JAMES MCHUGH CONSTRUCTION CO. CONTRACT NO. 63650 1737 SOUTH MICHIGAN AVENUE COUNTY(S) KANE CHICAGO, IL 60616 SECTION 04-00092-00-BR PROJECT(S) M-TE-CMM-HD-TCS-IL08/030/000 ROUTE RED GATE ROAD DISTRICT 01 AWARDED DATE 03/09/2012 AWARDED AMOUNT $21,024,825.54 5 UNSUCCESSFUL BIDDERS ITEM NO. 147 BOLDER CONTRACTORS, INC. CONTRACT NO. 63651 440 LAKE COOK #36 COUNTY(S) COOK DEERFIELD, IL 60015 SECTION 07-00122-01-PV PROJECT(S) M-9003/875/000 ROUTE FAU 1694 DISTRICT 01 AWARDED DATE 02/10/2012 AWARDED AMOUNT $4,356,768.25 5 UNSUCCESSFUL BIDDERS

Page 116: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 148 CURRAN CONTRACTING COMPANY and CONTRACT NO. 63553 PLOTE CONSTRUCTION, INC COUNTY(S) MCHENRY 286 MEMORIAL COURT SECTION 96-00209-01-PV CRYSTAL LAKE, IL 60014 PROJECT(S) M-HPP-4064/003/000 ROUTE FAU 3887 DISTRICT 01 AWARDED DATE 03/07/2012 AWARDED AMOUNT $8,463,493.55 4 UNSUCCESSFUL BIDDERS ITEM NO. 149 COPENHAVER CONSTRUCTION, INC. CONTRACT NO. 63655 121 CENTER DR. COUNTY(S) MCHENRY GILBERTS, IL 60136 SECTION 09-00078-00-WR PROJECT(S) CMM-M-BRM-9003/555/000 ROUTE FAU 4010 DISTRICT 01 AWARDED DATE 02/29/2012 AWARDED AMOUNT $3,038,106.55 8 UNSUCCESSFUL BIDDERS ITEM NO. 151 ERA-VALDIVIA CONTRACTORS, INC. CONTRACT NO. 72F02 11909 SOUTH AVENUE O COUNTY(S) MENARD SANGAMON CHICAGO, IL 60617 SECTION D6 BRIDGE PAINTING 2012 PROJECT(S) ROUTE VARIOUS DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $688,000.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 152 SANGAMO CONSTRUCTION COMPANY CONTRACT NO. 74216 2100 E. MOFFAT AVENUE COUNTY(S) WAYNE SPRINGFIELD, IL 62702 SECTION (22,B2A)B-1&(22,B2B)B-1 PROJECT(S) F-BRF-0823/012/000 ROUTE FAP 823 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $2,667,384.84 5 UNSUCCESSFUL BIDDERS ITEM NO. 153 G. M. SIPES CONSTRUCTION, INC. CONTRACT NO. 74559 503 E. ADAMS STREET COUNTY(S) COLES P.O. BOX 109 SECTION D7 PATCHING 2012-5 RUSHVILLE, IL 62681 PROJECT(S) ROUTE FAI 57 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $369,598.00 2 UNSUCCESSFUL BIDDERS

Page 117: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 154 BAXMEYER CONSTRUCTION, INC. CONTRACT NO. 76E06 1034 FLORAVILLE RD. COUNTY(S) ST CLAIR WATERLOO, IL 62298-3108 SECTION 82-2-1K PROJECT(S) ROUTE FAP 998 DISTRICT 08 AWARDED DATE 02/22/2012 AWARDED AMOUNT $9,477,161.33 3 UNSUCCESSFUL BIDDERS ITEM NO. 155 MASON'S LANDSCAPING & CONTRACT NO. 76F29 CONSTRUCTION SERVICE, INC. COUNTY(S) ST CLAIR 1716 TUDOR AVENUE SECTION 82-1-DM EAST ST. LOUIS, IL 62207 PROJECT(S) ROUTE FAI 55/70 DISTRICT 08 AWARDED DATE 02/09/2012 AWARDED AMOUNT $178,875.15 2 UNSUCCESSFUL BIDDERS ITEM NO. 156 HAYES CONTRACTING, INC. CONTRACT NO. 76F30 5460 SUGAR LOAF RD. COUNTY(S) ST CLAIR COLLINSVILLE, IL 62234 SECTION 82-1-12DM PROJECT(S) ROUTE FAU 9214 DISTRICT 08 AWARDED DATE 02/09/2012 AWARDED AMOUNT $17,013.88 7 UNSUCCESSFUL BIDDERS ITEM NO. 157 F. H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC CONTRACT NO. 78182 8725 W. HIGGINS, SUITE 200 COUNTY(S) WILLIAMSON CHICAGO, IL 60631 SECTION (X1-6-2)HBK-2,HB-1,2;(1X-1)R-1 PROJECT(S) ACNHI-ACNHF-000S/871/000 ROUTE FAI 57 & FAP 331 DISTRICT 09 AWARDED DATE 02/10/2012 AWARDED AMOUNT $40,472,485.49 3 UNSUCCESSFUL BIDDERS ITEM NO. 158 KUJO, INC. CONTRACT NO. 46194 5303 WILMOT RD. COUNTY(S) COLES MACON MCHENRY, IL 60050 SECTION D-7 OVD SIN STR REPL 12-21 PROJECT(S) ROUTE VARIOUS DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $298,970.00 3 UNSUCCESSFUL BIDDERS

Page 118: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 159 CHRISTY WEBBER & COMPANY CONTRACT NO. 60R26 2900 W. FERDINAND ST. COUNTY(S) VARIOUS CHICAGO, IL 60612 SECTION 2011-096-I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $198,648.00 3 UNSUCCESSFUL BIDDERS ITEM NO. 160 CHRISTY WEBBER & COMPANY CONTRACT NO. 60R27 2900 W. FERDINAND ST. COUNTY(S) VARIOUS CHICAGO, IL 60612 SECTION 2011-097-I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/09/2012 AWARDED AMOUNT $95,680.00 4 UNSUCCESSFUL BIDDERS ITEM NO. 161 BOLDER CONTRACTORS, INC. CONTRACT NO. 63566 440 LAKE COOK #36 COUNTY(S) COOK DEERFIELD, IL 60015 SECTION 00-00243-00-CH PROJECT(S) M-8003/373/000 ROUTE FAP 350 DISTRICT 01 AWARDED DATE 02/22/2012 AWARDED AMOUNT $6,302,389.10 6 UNSUCCESSFUL BIDDERS ITEM NO. 162 HECKER AND COMPANY, INC. CONTRACT NO. 63630 250 E. INDUSTRIAL LANE COUNTY(S) COOK WHEELING, IL 60090 SECTION 10-00258-00-TL PROJECT(S) CMM-9003/590/000 ROUTE FAU 2853 DISTRICT 01 AWARDED DATE 02/28/2012 AWARDED AMOUNT $1,239,883.90 1 UNSUCCESSFUL BIDDER ITEM NO. 163 SCHROEDER AND SCHROEDER, INC. CONTRACT NO. 63639 7306 CENTRAL PARK COUNTY(S) DUPAGE SKOKIE, IL 60076 SECTION 11-00088-00-SW PROJECT(S) CMM-9003/860/000 ROUTE FAU 1370 DISTRICT 01 AWARDED DATE 02/15/2012 AWARDED AMOUNT $158,584.71 12 UNSUCCESSFUL BIDDERS

Page 119: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 164 SANGAMO CONSTRUCTION COMPANY CONTRACT NO. 72B55 2100 E. MOFFAT AVENUE COUNTY(S) CASS SPRINGFIELD, IL 62702 SECTION 144(B-4); 144(B-5) PROJECT(S) ACF-0614/032/000 ROUTE FAP 614 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $2,731,243.58 6 UNSUCCESSFUL BIDDERS ITEM NO. 165 ALL STATES PAINTING, INC. CONTRACT NO. 72C48 RR 1 COUNTY(S) SANGAMON P.O. BOX 110 SECTION D6 PAINTING 2012 ALEXANDER, IL 62601 PROJECT(S) ROUTE FAP 666 DISTRICT 06 AWARDED DATE 02/09/2012 AWARDED AMOUNT $153,700.00 1 UNSUCCESSFUL BIDDER ITEM NO. 166 ILLINOIS VALLEY PAVING, A DIVISION OF CONTRACT NO. 72D67 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) MONTGOMERY 3151 ROBBINS ROAD SECTION (15,21)RS-7,22RS-4,24RS-8 SPRINGFIELD, IL 62704 PROJECT(S) ACF-000S/868/000 P.O. BOX 13490 ROUTE FAP 325/42 SPRINGFIELD, IL 62791 DISTRICT 06 AWARDED DATE 02/22/2012 AWARDED AMOUNT $4,037,779.84 0 UNSUCCESSFUL BIDDERS ITEM NO. 167 MCCARTHY IMPROVEMENT COMPANY CONTRACT NO. 74299 FOLEY CONSTRUCTION COMPANY COUNTY(S) EFFINGHAM 5401 VICTORIA AVE. SECTION (25-3,4)R & (25-3)PB DAVENPORT, IA 52807 PROJECT(S) ACIM-000S/855/159 ROUTE FAI 57/70 DISTRICT 07 AWARDED DATE 02/10/2012 AWARDED AMOUNT $41,469,368.43 3 UNSUCCESSFUL BIDDERS ITEM NO. 168 CHARLES E. MAHONEY CO. CONTRACT NO. 76B80 208 SERVICE STREET COUNTY(S) MADISON SWANSEA, IL 62226 SECTION (132-2,3,4,133-1)RS PROJECT(S) F-0785/032/000 ROUTE FAP 785 DISTRICT 08 AWARDED DATE 02/06/2012 AWARDED AMOUNT $5,374,570.43 1 UNSUCCESSFUL BIDDER

Page 120: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 169 R.A. CULLINAN AND SON, A DIVISION OF CONTRACT NO. 89569 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) FULTON 121 WEST PARK SECTION 08-00032-00-SW P.O. BOX 166 PROJECT(S) SRTS-4008/090/000 TREMONT, IL 61568 ROUTE WILSON STREET DISTRICT 04 AWARDED DATE 03/02/2012 AWARDED AMOUNT $79,089.38 2 UNSUCCESSFUL BIDDERS ITEM NO. 171 KINNEY CONTRACTORS, INC. CONTRACT NO. 74528 19342 E. FRONTAGE RD., #1 COUNTY(S) MACON RAYMOND, IL 62560-5061 SECTION D7 PATCHING 2012-1 PROJECT(S) ROUTE FAP 322 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $633,549.50 2 UNSUCCESSFUL BIDDERS ITEM NO. 173 SANGAMO CONSTRUCTION COMPANY CONTRACT NO. 74244 2100 E. MOFFAT AVENUE COUNTY(S) COLES SPRINGFIELD, IL 62702 SECTION (5BR)B-1 PROJECT(S) BRF-0091/072/000 ROUTE FAP 91 DISTRICT 07 AWARDED DATE 02/09/2012 AWARDED AMOUNT $4,120,913.60 3 UNSUCCESSFUL BIDDERS ------------------------------------------------------------------------------------------

------------------ MARCH 09, 2012 LETTING

DESCRIPTION CONTRACTOR ----------- ---------- ITEM NO. 039 R.A. CULLINAN AND SON, A DIVISION OF CONTRACT NO. 68914 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) TAZEWELL 121 WEST PARK SECTION 90[108RS-4;(107,106,106X)RS-2] P.O. BOX 166 PROJECT(S) IM-155-1/010/031 TREMONT, IL 61568 ROUTE FAI 155 DISTRICT 04 AWARDED DATE 03/20/2012 AWARDED AMOUNT $18,653,556.91 0 UNSUCCESSFUL BIDDERS

Page 121: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 050 THE KILIAN CORPORATION CONTRACT NO. 76E96 608 S. INDEPENDENCE COUNTY(S) MADISON P.O. BOX A SECTION (6-3,6-1)RS-3 MASCOUTAH, IL 62258-0187 PROJECT(S) F-0582/031/000 ROUTE FAP 582 DISTRICT 08 AWARDED DATE 03/16/2012 AWARDED AMOUNT $1,351,479.68 2 UNSUCCESSFUL BIDDERS ------------------------------------------------------------------------------------------

------------------ CONTRACTS REJECTED ------------------

THE FOLLOWING REJECTIONS HAVE BEEN MADE SINCE THE PREVIOUS TRANSPORTATION BULLETIN ------------------------------------------------------------------------------------------

------------------ MARCH 11, 2011 LETTING

DESCRIPTION CONTRACTOR ----------- ---------- ITEM NO. 002A BAXMEYER CONSTRUCTION, INC. CONTRACT NO. SC066 1034 FLORAVILLE RD. COUNTY(S) ST. CLAIR WATERLOO, IL 62298-3108 SECTION MIDAMERICA ST. LOUIS PROJECT(S) 3170146XX-BLV /406/1 ROUTE DISTRICT 08 REJECTED AMOUNT $2,238,147.02 ITEM NO. 006A MARTIN & COMPANY EXCAVATING CONTRACT NO. DK052 2456 PLEASANT GROVE ROAD COUNTY(S) DEKALB P.O. BOX 443 SECTION DEKALB TAYLOR MUNICIPAL OREGON, IL 61061 PROJECT(S) 3170139B49-DKB /392/3 ROUTE DISTRICT 03 REJECTED AMOUNT $100,249.30 ------------------------------------------------------------------------------------------

------------------ JANUARY 20, 2012 LETTING

DESCRIPTION CONTRACTOR ----------- ---------- ITEM NO. 027 GALLAGHER ASPHALT CORPORATION CONTRACT NO. 63626 18100 SOUTH INDIANA AVENUE COUNTY(S) COOK THORNTON, IL 60476 SECTION 10-00047-00-TL PROJECT(S) M-9003/674/000 ROUTE FAP 348 DISTRICT 01 REJECTED AMOUNT $524,850.45

Page 122: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 040 EAGLE PAINTING & MAINTENANCE COMPANY, INC. CONTRACT NO. 66B33 1865 BERNICE ROAD COUNTY(S) LASALLE LANSING, IL 60438 SECTION (1ZR)I-3 PROJECT(S) ROUTE FAP 68 DISTRICT 03 REJECTED AMOUNT $687,288.00 ITEM NO. 061 SUPERIOR ROAD STRIPING INCORPORATED CONTRACT NO. 46200 1967 CORNELL COURT COUNTY(S) KANE MELROSE PARK, IL 60160 SECTION D 1 REFLECTOR REPL 2012-27 PROJECT(S) ROUTE VARIOUS DISTRICT 01 REJECTED AMOUNT $287,247.00 ITEM NO. 062 SUPERIOR ROAD STRIPING INCORPORATED CONTRACT NO. 46201 1967 CORNELL COURT COUNTY(S) MCHENRY MELROSE PARK, IL 60160 SECTION D 1 REFLECTOR REPL 2012-28 PROJECT(S) ROUTE VARIOUS DISTRICT 01 REJECTED AMOUNT $231,218.50 ITEM NO. 063 SUPERIOR ROAD STRIPING INCORPORATED CONTRACT NO. 46203 1967 CORNELL COURT COUNTY(S) COOK WILL MELROSE PARK, IL 60160 SECTION D 1 REFLECTOR REPL 2012-30 PROJECT(S) ROUTE VARIOUS DISTRICT 01 REJECTED AMOUNT $341,823.00 ITEM NO. 098 BODINE ELECTRIC OF DECATUR CONTRACT NO. 78273 A DIVISION OF RATHJE ENTERPRISES, INC. COUNTY(S) MASSAC 1845 N. 22ND STREET (62526) SECTION (64-3B)L-1 P.O. BOX 976 PROJECT(S) DECATUR, IL 62525 ROUTE FAI 24 DISTRICT 09 REJECTED AMOUNT $157,487.40 ITEM NO. 129 M.Q. SEWER WATER CONTRACTORS, INC. CONTRACT NO. 63654 D/B/A M. Q. CONSTRUCTION COMPANY COUNTY(S) COOK 4323 N. CENTRAL AVENUE SECTION 10-00116-00-SW CHICAGO, IL 60634 PROJECT(S) M-TE-00D1/825/000 ROUTE FAU 1026 DISTRICT 01 REJECTED AMOUNT $1,527,679.95

Page 123: Notice of Letting Bulletin - Illinois Department of Transportation · 2020-02-28 · April 6, 2012. A contractor will not be prequalified for this letting unless the statement is

ITEM NO. 143 SUPERIOR ROAD STRIPING INCORPORATED CONTRACT NO. 46202 1967 CORNELL COURT COUNTY(S) COOK MELROSE PARK, IL 60160 SECTION D 1 REFLECTOR REPL 2012-29 PROJECT(S) ROUTE VARIOUS DISTRICT 01 REJECTED AMOUNT $614,918.50 ITEM NO. 150 R.A. CULLINAN AND SON, A DIVISION OF CONTRACT NO. 68370 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) TAZEWELL 121 WEST PARK SECTION 36R-7 P.O. BOX 166 PROJECT(S) ACF-0399/012/000 TREMONT, IL 61568 ROUTE FAP 399 DISTRICT 04 REJECTED AMOUNT $11,459,965.19