Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food...

118
U C S B L E T T H E R E B E LI G H T A Y U N I V E R S I T O F C A L I F O R N I A H 1 8 6 T E 8 University of California Santa Barbara OFFICE OF CAMPUS PLANNING & DESIGN February 2018 Notice of Impending Development Edible Campus Program Student Garden Project

Transcript of Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food...

Page 1: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

U

C

S

B

LETT

H

ERE BE

LIGH T

A

Y

UN

IVE

RSIT OF

CA

LIF

OR

NIAH

186

TE

8

University of CaliforniaSanta Barbara

OFF

ICE

OF

CA

MPU

S P

LAN

NIN

G

&

DES

IGN February 2018

Notice of ImpendingDevelopment

Edible Campus ProgramStudent Garden Project

Page 2: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

NOTICE OF IMPENDING DEVELOPMENT FOR

UNIVERSITY OF CALIFORNIA, SANTA BARBARA

Edible Campus Program Student Garden Project

Table of Contents

I.  INTRODUCTION ........................................................................... 1 

Project Need and Objectives .............................................................................................................. 1 Location and Environmental Setting ................................................................................................ 1 

III.  PROCEDURE ................................................................................. 6 

IV.  CONSISTENCY WITH THE 2010 LONG RANGE DEVELOPMENT PLAN .......................................................................... 6 

Public Access ....................................................................................................................................... 7 Recreation ............................................................................................................................................. 7 Marine Environment .......................................................................................................................... 7 Land Resources ................................................................................................................................... 7 New Development .............................................................................................................................. 8 

V.  REFERENCES ............................................................................... 9 

List of Appendices Appendix A: Project Location Map Appendix B: Project Plans Appendix C: Archeolgical Resources Survey Report Appendix C: Interested Persons and Agencies/Public Notice

Page 3: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

1

I. INTRODUCTION This Notice of Impending Development (NOID) has been prepared for the Edible Campus Program Student Garden Project. The project would install a student garden on an approximately 16,026 square foot area. The garden would provide healthy food for distribution through the Associated Student’s Food Bank and provide education in sustainable food production. The project is located on the West Campus adjacent to the north side of the Orfalea Family Children’s Center (Location Map Appendix A). Project Need and Objectives UC Food Security and Access has found that “42 percent of students UC system wide reported having experienced a reduced quality of diet or reduced food intake in the past 12 months” due to financial reasons. The Santa Barbara campus therefore proposes to construct a garden space that will reduce campus food insecurity by supplying the Associated Students Food Bank with a necessary additional source of healthy produce, and by creating a center for discourse around the accessibility of healthy and sustainable food. This space will also allow students to learn and practice small scale gardening techniques that address social, economic, and environmental aspects of sustainability, and create opportunities for students and the campus community to connect with all phases of the food production cycle. Location and Environmental Setting The Edible Campus Program Garden (ECP) will be constructed in the open mulched area (currently with no vegetation), located immediately north of the Orfaela Children’s Center and surrounded on three sides by the small road that leads in and out of the center to West Campus Point Lane. West Campus Mesa Recreation and Open Space areas are to the west with Devereux Slough Road and Devereux Slough beyond. Isla Vista Elementary School is to the east and West Campus Family Apartments are to the north. See attached location and site map. Program: ECP is intended to provide a space to grow food for distribution through the Associated Students (AS) Food Bank and other campus outlets. Student staff from the Associated Students Department of Public Worms (DPW) will conduct daily management of the garden space. AS DPW will also train student volunteers to assist with work in the garden, which will both help offset some of the farm operational costs and will further engage students in sustainable food production. Activities in the space will include large volunteer workdays, small classes and educational workshops, and daily maintenance tasks such as planting, weeding, and harvesting. The farm will be opened up to hold classes as well as educational workshops. Local experts and advocates will be brought in to teach students about specific topics in food production, preparation, and food security. Workshops on growing and preparing fresh produce fit well with the Food, Nutrition, and Basic Skills program offered through the Associated Students Food Bank and the fourteen other partners in that effort. Several populations will use the area, though at very different frequencies and durations:

● Student workers, staff, and volunteers, associated with AS DPW, UCSB Sustainability, and the UCSB Edible Campus Program will regularly occupy the area for shifts ranging from 1 to 4 hours per day several days per week and will primarily focus on maintaining the garden plants.

Page 4: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

2

● UCSB Early Childhood and Educational Services and academic classes will occupy the space for approximately 1 hour lessons several times per quarter and will be supervised by teachers or instructors.

● The UCSB general student body will be invited to workshops a few times per quarter; these workshops are expected to attract around 20 people and last less than 2 hours. Workshops will be run by trained student staff, interns, or volunteers. Most students will bike or walk to the space, so parking need will be minimal.

● Rare special events (such as a grand opening ceremony) may attract large numbers (up to 75) people if such events are allowable. In these cases, AS DPW will reserve off-site parking and shuttles, and encourage alternative transportation.

Associated Students DPW lock-in fee supports up to 7 paid student staff who will provide ongoing essential maintenance for the farm space and ensure that the farm consistently meets health requirements and that critical tasks are completed in a timely manner. Anywhere from 10 to 30 visitors are expected in the area up to 2 times per week for a few hours at a time during the academic year. Visitors will only be present during daylight hours, and off-site parking and alternative transportation will be set up for large groups. Project Description: The Edible Campus Program (ECP) Garden will be constructed in an un-vegetated, previously disturbed area immediately north of the Orfaela Children’s Center and is surrounded on 3 sides by the small road that leads in and out of the Children’s Center. The space will have several components and are described below and shown on the attached project plans. Raised Beds and Trellis Archways The area will include 20-4 by 16 foot beds, 12-4 by 12 foot beds, and 4- 4 by 6 foot beds, for a total of 1,952 square feet of bed space. Each bed will measure 1.5 feet tall and be constructed out of rot-resistant, non-chemically treated, sustainable wood, preferably FSC certified redwood. Beds will run north to south to maximize sun exposure and be arranged with a 4-foot aisle on one side and a 2-foot aisle on the other side (aisles run between beds that are east-west adjacent to each other). The 4-foot aisle allows larger groups or those who need more space to navigate to reach and view each bed, while the 2-foot aisle allows for greater overall bed density without blocking access to all areas of the bed by trained student workers. Beds on the north and south half of the garden will be separated by a 4-foot aisle. Beds that are immediately north and south of each other will jointly support an archway that can act as a trellis for vining plants. These archways will connect to the end of each bed, and plants that utilize the arch as a trellis will root in the soil within 1-foot of the end of the bed. The archways will be wide enough to cross the 4-foot aisle and tall enough that the majority of people can walk underneath. Ideally, each bed would have its own spigot that could connect to an efficient irrigation system that would be customized for that bed. In order to minimize the need for infrastructure, spigots should be placed on the end of the bed closest to the aisle running east-west through the center of the

Page 5: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

3

garden. This way, all spigots could branch off of a single main water line. Diagrams show that a main water line runs under the road north of the site; this may be the best possibility for a connection. There would be approximately 122,500 gallons of potable water needed per year though this can be reduced by the amount of rainfall in each season. Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot high pre-fabricated shed (TuffShed or similar) would be located at the south east corner of the garden. This location was selected because it is partially shaded by a tree growing inside the Children’s Center space, so it is less useful for plant growth than other areas of the garden space. This shed will be used to store basic tools, gloves, wheelbarrows and other equipment used in the garden. The shed will have electricity for charging drills, etc., and minimal indoor lighting. The shed will be positioned so that the door is on the north side. A 160 square-foot (10 by 16), 10-foot high pre-fabricated greenhouse will be located on the western edge of the space and run north-south. The doorway will be on the north end. A shelf including a 4 basin sink will run the length of the greenhouse on the eastern outside wall. The greenhouse requires a water connection both inside and out for the sink and for watering seedlings. Electricity would be provided for basic indoor lighting and other simple tools. The sink will be connected to an existing sewer line. Raised Open Planting Area The central focus of the garden space is a raised open planting area. This space will be approximately 82 feet long and 20 feet wide, and will raise from ground level to a 3 foot height gradually through 2-3 tiers. An access ramp will begin at the east end of the planting area and gradually rise to the full 3-foot height by the time it reaches the center of the space, where a set of stairs will provide quick access to the full height of the area. A solid walkway will run from the south to the north end of the space at this point, with an additional set of stairs on the north side, and a wider observation area in the center. Stepping stones will also lead from the center aisle to a final set of stairs on the western edge of the space. The ramp and aisle walkways will be built with independent support posts that reach the ground level rather than laid on top of the raised planting soil, as the dirt will settle over time and impact the smoothness and slope of the walkways. The remainder of the space will be filled with quality planting soil and used for mixed edible plants and fruit trees. Users of the space should be able to step off the pathways and walk amongst the plants to make closer observations and to care for the space. Several types of fruit trees, vegetables, legumes, and grains would be planted in the garden. The proposed plant list is attached. All of the plants on the list have been compared with the Cal-IPC Inventory: http://www.cal-ipc.org/plants/inventory/). None of the plants are listed as invasive. Two of the plants are on the “watch” list-Banana Passion fruit and Jerusalem artichoke. Watch species are not currently invasive in California. The assessment has found them to be a high risk of becoming invasive in the future.

Page 6: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

4

Covered Classroom Space-Pergola A 240 square-foot (12 by 20) foot space will be designated for workshops, lectures, and other educational activities for 25-40 participants This area will be in the northwest corner of the space since this area is closest to the parking lot and thus where most visitors will enter. A wooden pergola will provide shade for the area and each of the pergola’s support posts will also feature a small planter. Plants grown in these planters will be selected so that they grow up the posts and over the pergola roof to deepen the shade, provide an attractive visual, and increase the amount of edible food grown in the space. Fence Enclosure Since the garden grown food will be distributed to campus students, the Environmental Health and Safety Department requires the entire garden area be surrounded by a fence that satisfies the following criteria:

Minimum 4 feet tall Cannot be climbed or crawled under or through by any rodent, raccoon, etc (smooth sided

with no openings) Ideally clear, and if clear should be resistant to UV discoloration and/or scratching

Possible materials include Lexan or PVC. The fence must be completely enclosed, meaning there cannot be any gaps under or around gates or around support posts. The garden will have three gates. One gate will be in the northwest corner and will be approximately 12 feet wide for an electric cart to enter. The other will be a pedestrian gate on the eastern border near the parking lot. It will be positioned so that it directs visitors smoothly into the educational space. The final gate connects the garden space to the Children’s Center play yard as this is a shared fence, and will only be used if children from the center visit the garden space. Walkways and Ground Level All walkways will be permeable and smooth enough for wheelbarrow and wheelchair access. Walkways will likely be constructed with Class II Road Base. The entire ground level of the garden, both under the walkways and under all planter beds, must be designed in such a way that burrowing pests cannot enter the garden space from underneath. Quarter or half inch hardware cloth and or chicken wire may be used. The majority of walkways are 4 feet wide, and all beds or structures are at least 4 feet from the perimeter fence so nothing from inside the garden is reachable from outside the space. Alternating walkways between beds are 2 feet wide in order to maximize available bed space; these walkways are primarily designed for student workers and not for visitors. Utilities The farm will need extensive irrigation and light electricity. There will be no outdoor lighting. It is planned to have a spigot at every bed, and given bed placement this is possible using a single main water line with short offshoots running east to west down the center of the bed. This may not be

Page 7: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

5

feasible due to funding. Water would be connected to an existing water line under the road to the north. Electricity will be installed on the east side of the garden and be connected to existing electrical conduit. The electricity will be used for a wide variety of things. Some things that electricity might be used for: -Power tools -Water meters, weather meters, and other scientific data collection systems -Hot water at the sink -Vertical hydroponic gardens -Educational programs – for example one of the common lesson plans in garden education is making recycled paper with seeds and plants. This requires use of a blender. The sink, currently proposed to be positioned near the greenhouse, will connect to an existing sewer line. Parking Staff, students, and visitors to the site will primarily access it by bicycle or on foot. Bicycle parking will be provided in a concrete area at the main entrance to the Children’s Center near the parking lot. Six visitor parking spaces in parking lot 41 adjacent to the Children’s Center, but farthest away from the Children’s Center would be used by AS DPW staff or students visiting the site when needed. Construction requirements The total project site area is approximately 16,026 square feet and site preparation includes, importing soil to “fill” the northwest side of the garden and for the garden beds, installation of the garden, excavation and installation of the fence including fence posts, and excavation for utilities including water and electrical connection. There would be 220 cubic yards of fill soil imported to the project site total. Some of this soil would be over Archaeological area A as identified in the archeological study (attached –Gamble 2017). Additional soil would be imported to gently contour most of the site to drain away from the Children’s Center and match existing grades to fill soil area grades. There would be approximately 130 cubic yards of fill and no cut in the garden spaces. Excavated areas for the fence and utilities would be backfilled with soil from the site. Any excess soil would be used back on the site. There would be no soil export. Fence posts would be installed up to 15 inches deep into the soil. Depending on the topography at each specific fence post location, the fence posts could be into the native soil up to 12 inches, but less in most cases. The objective is to bring fill to the site minimizing disturbance to native soil and avoid potential impacts to undiscovered archeological resources. Construction staging would take place in the open area east of the project site adjacent to Parking Lot 41. This area has an Academic and Support land use designation. See Sheet L-0 for the location of the staging area. There would be no construction site trailer.

Page 8: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

6

Schedule: Construction is proposed to commence in spring 2018 and take approximately two months III. PROCEDURE This Notice of Impending Development is being distributed to local governments, community groups, and interested parties pursuant to California Code of Regulation Section 13549-51. A list of interested parties and the NOID public notice is included as Appendix I. Section 30606 of the Coastal Act and Article 14, Section 13547 through Section 13550 of the California Code of Regulations govern the Coastal Commission’s review of subsequent development where there is a certified LRDP. Section 13549(B) requires the Executive Director or his designee to review the Notice of Impending Development within ten days of receipt and determine whether it provides sufficient information to determine if the proposed development is consistent with the certified LRDP. The Notice is deemed filed when all necessary supporting information has been received. Within thirty days of filing the Notice of Impending Development, the Executive Director shall report to the Commission and make a recommendation regarding the consistency of the proposed development with the certified LRDP. After a public hearing, by a majority of its members present, the Commission shall determine whether the development is consistent with the certified LRDP and whether conditions are required to bring it into conformance with the LRDP. No construction shall commence until after the Commission votes to render the proposed development consistent with the certified LRDP. Environmental Review Based on the project assessment, the proposed project is classified as exempt from the provisions of CEQA under Section 15304, Minor Alterations to Land. None of the exceptions cited in Section 15300.2 apply to this project. The garden would be installed on a known archeological site however the site would be protected as no major excavation would take place and fill would be placed to avoid potential contact with cultural resources. Fence posts would be hand dug and all soil would be screened by a qualified archeologist. There would be an archeological and Native American monitor onsite during site preparation and earthwork. The project site has previously been disturbed during construction of the adjacent Children’s Center and is currently a mulched, non-vegetated site. All actions will be consistent with applicable federal, state, and local environmental permitting requirements. Relevant LRDP EIR (SCH #2007051128) mitigation measures (MM) are incorporated into the design for the project. IV. CONSISTENCY WITH THE 2010 LONG RANGE DEVELOPMENT PLAN

Consistency with the LRDP: The project site area land use is currently designated as Academic & Support in the 2010 LRDP. Greenhouses and Gardens are an allowed use under the Academic and Support land use designation. The proposed project is consistent with the Academic & Support land use designation.

The shed and greenhouse would be about 10 feet high and well within the height limit of 35 feet established for this area and shown in LRDP Figure D.4. Height Limits.

Page 9: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

7

The project is adjacent to the Orfalea Family Children’s Center play yard and building. The new garden is compatible with the Children’s Center as it will serve as an educational component and the children will have supervised access to the new garden.

See the attached 2010 LRDP Policy Consistency Table. Public Access The LRDP implements Coastal Act §30210 through §30214 by requiring that new development not generate traffic that exceeds roadway capacity of existing coastal access routes on Campus and therefore restrict or impede coastal access to or along the coast. The LRDP also requires adequate public access parking be provided for new development. The project will not impact public access to the coast. There would be a short term increase in vehicular traffic to the project area from construction contractor vehicles and equipment and no long term impact. Since the project is small, heavy grading equipment will not be required and construction equipment and vehicle traffic is minimal. Most staff, students, and visitors will bike or walk to the garden during operation of the garden. Parking There are six visitor spots in the Children’s Center parking lot that would be used by staff managing the garden and occasional visitors. Most students and visitors will bike or walk to the garden, so parking need will be minimal. Rare special events (such as a grand opening ceremony) may attract large numbers (up to 75) people to the site. In these events, off-site parking and shuttles will be arranged. Recreation In accordance with Coastal Act §30220 through §30224, the project would not impact the use of oceanfront land for recreation and does not include any development that would impact water-oriented recreational uses. The Campus beaches would remain open to the public. The proposed project does not limit recreational use of oceanfront land. Marine Environment The proposed project would maintain marine resources. The proposed project would be in accordance with Coastal Act §30230 through §30236 (§30237 for Bolsa Chica wetlands is not applicable.). Implementation of erosion control and sedimentation LRDP policies and the project construction erosion control measures during construction as shown on the attached erosion control plan (Sheet L-0) would serve to reduce potential sediment transfer from the project site during construction and would not impact Devereux Slough or the Pacific Ocean. The site would be developed with permeable raised garden beds and therefore site drainage would stay relatively the same as existing conditions. The project site is currently an undeveloped, mulched area. There would be approximately 959 square feet of impermeable surface post project development. The slightly depressed mulched areas would retain rainfall on the site; a French drain with gravel designed to allow water to percolate and excess to be carried off of only a portion of the site which drains to Children’s Center playard. Raised vegetable beds and planters will retain rainwater within them. Land Resources Coastal Act § 30240 requires protection of ESHAs from disruption by adjacent development. The proposed project is not within ESHA or ESHA buffers. Following LRDP policy for erosion control

Page 10: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

8

will serve to reduce any potential sediment transfer from the project site during construction and would not impact the Devereux Slough or the Pacific Ocean. See the project’s erosion control plan. Coastal Act §30244 states reasonable mitigation measures shall be required to protect archaeological and paleontological resources. Consistent with §30244 the LRDP identifies coastal policies/LRDP EIR mitigation measures that have been adopted by the University to protect unidentified cultural resources. Cultural Resources: The project site is within the boundaries of a recorded archeological site. An in depth archeological resources evaluation has been conducted and potentially significant resources were identified at the project site (Gamble 2017). Results of the archeological resources study determined implementing the following actions will reduce or eliminate potential impacts to cultural resources. All applicable LRDP Mitigation Measures for cultural resources will also be followed. The archeological resources study is attached.

Proposed ground disturbances within Section A (map included in attached archeological resources study) primarily consists of approximately 13 fence post footings, about 20 feet of irrigation line trenching, and the greenhouse curb footing (Figure 6 of attached archeological resources study). Assessment of these impacts assumes that no grading will occur in this area beyond two inches in depth, including for any continuous concrete curbing between fence posts. The ground level will be brought up with imported fill in Section A to reduce excavation depths into the native soil. To reduce ground disturbances in Section A to less than significant the following actions will be implemented:

1. A Chumash and archaeological monitor will be present for all ground disturbance in Section A. In Section A (in the attached archeological study), fence post footings, the irrigation trench, and the greenhouse curb will be hand-dug and all soil from these excavations will be screened by a qualified archaeologist and Chumash monitor using ¼” mesh. All diagnostic artifacts, diagnostic bone, and chipped stone will be collected for laboratory analysis. The amount of required work may be reduced by re-siting the greenhouse outside of Section A and decreasing the extent of irrigation trenching in Section A.

2. A Chumash and archaeological monitor will be present for all ground disturbance in Section B (shown in the attached archeological resources study).

3. A Chumash monitor will be present for all ground disturbance in Section C and a qualified archaeologist should be available to visit the site at the Chumash monitor’s request should anything be encountered that requires further identification by a qualified archaeologist.

4. Any collected artifacts and faunal material should be placed in an archaeological curation facility following lab analysis. Findings from analysis should be documented and copies should be made accessible to future researchers at both the curation facility and the Central Coast Information Center at the UCSB Anthropology Department. New Development The LRDP contains land use designations, development guidelines, and policies to ensure the location of new development will not adversely affect coastal resources to implement Coastal Act § 30250 (a). LRDP Land Use Designations

Page 11: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Notice of Impending Development Edible Campus Program Student Garden Project

University of California, Santa Barbara

9

The current land use designation for the site is Academic Uses. Gardens and Greenhouses are an allowed use in Academic Uses land use designation. The proposed project would be consistent with this land use. Development Guidelines In accordance with Coastal Act § 30251 the project will not affect the view corridors to and along the coast that are identified in the LRDP. There would not be development that would impact height limits. The greenhouse would be approximately 10 feet high, well below the 35-foot height limit in this area. Consistent with Coastal Act § 30252 the project maintains public access to the coast. V. REFERENCES Barbier, Brian J., and Lynn H. Gamble 2017 Preliminary Report of 2017 Archaeological Field Excavations at CA-SBA-51 for the UCSB’s Edible Campus Farm Project. Prepared for Katie Maynard, University of California, Santa Barbara, Sustainability Coordinator, Geography Department. Maynard 2016, 2017, and 2018 Personal communication with Katie Maynard, project proponent and University of California, Santa Barbara Sustainability Coordinator. Pierce 2017, 2017 Personal communication with Jennifer Pierce, project manager, University of California, Santa Barbara Design and Construction Services. True Nature 2017 Project Plans for the Student Edible Farm Program Project. Developed by Kim True of True Nature Landscape Architects for the University of California, Santa Barbara. Final Plans in 2018. UCSB 2008 Vision 2025 UC Santa Barbara Long Range Development Plan Final Environmental Impact Report. Prepared for the University of California, Santa Barbara by Crawford, Multari, and Clark. UCSB 2010 2010 Vision 20205 Long Range Development Plan, University of California, Santa Barbara

Page 12: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

BIKE PARKING

West Campus Point Lane

West Campus Point Lane

Slough Road

Student Garden Project Area

´0 100 200 30050 Feet

Student Garden Project Location Map

Page 13: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Edible Campus Program/Student Garden Project Plant List

All plants were evaluated with the Cal-IPC Inventory: http://www.cal-ipc.org/plants/inventory/). Two plants were on the watch list-Banana passionfruit and Jerusalem artichoke. Watch species are not currently invasive in California. The a ssessment has found them to be a high risk of becoming invasive in the future. Other plants were limited, moderate, or high as indicated below. Fruit Trees Apple Malus Pumila Granny Smith, Golden Delicious Banana Antique Avocado (Haas) Persea americana Bananas Musa acuminata Cherry Prunus avium Citrus Guava Psidium guajava Jackfruit Artocarpus heterophyllus Jujube Ziziphus jujuba Pear Pyrus communis Plantains English Plantain "Plantago lanceolata" (Limited) Quince Cydonian oblonga Stone Fruits Prunus persica – (Limited) Tamarind Fig Ficus Carica –(Moderate) Pomegranate Punica granatum Melons Bitter melon Momordica charantia Cantaloupe Cucumis melo Honeydew Melon Cucumis melo Korean melon Cucumis melo Melon (generally) Watermelon Citrullus lanatus Winter melon Benincasa hispida Other Fruits Cactus/Cactus pear Grapes Vitis -Only grow to dry Kiwi Actinidia Naranjilla Passion Fruit Banana Passionfruit "Passiflora tarminiana" is listed as "watch". Pineapple Ananas comosus Chayote Golden berry Physalis peruvian

Page 14: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Veggies Artichoke Cynara scolymus-(Moderate) Asparagus Asparagus officinalis –(Moderate) Asparagus asparagoides Broccoli Brassica Brussel Sprouts Brassica Burdock Arctium Cabbage Brassica Cardoon Cauliflower Brassica Celeriac Celery Apium Chives Corn Zea mays Cucumber Cucumis sativus Eggplant Solanum melongena Gourds (general) Lagenaria Kurrat Leafy Greens Lotus Root Malanga Xanthosoma Mallow Okra Abelmoschus esculentus Peppers Capsicum Tomatillos Physalis philadelphica Tomatoes Solanum lycopersicum Root Vegetables Arrowroot Maranta arundinacea Beets Beta vulgaris Black salsify Carrot Daucus carotus Cassava Manihot esculenta Chinese Water Chesnut Daikon Raphanus sativus Jerusalem artichoke-on the watch list Jicama Pachyrhizus erosus Kohlrabi Brassica oleracea green onion Allium Onions Allium Parsnip Pastinaca sativa Potatoes Solanum tuberosum Radishes Raphanus raphanistum Rutabaga Brassica napobrassica Shallots Allium cepa

Page 15: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Sweet potato Ipomoea batatas Taro Colocasia esculenta Turnips Brassica rapa Yams Dioscorea Legumes Shelling beans Lentils Peas American Groundnut Azuki Bean Black-eyed Pea Chickpea/Garbanzo beans Common Bean Drumstick Moringa oleifera Dolichos Bean Fava Bean Green/French Bean Guar Cyamopsis tetragonoloba Horse Gram Indian Pea Lima Bean Moth Bean Mung Bean Peanut Pigeon pea Ricebean Runner Bean Snap Pea Snow Pea Soybean Tepary Bean Urad Bean Velvet Bean Winged Bean Yardiong Bean Edamame Squash Acorn squash Cucurbita Butternut squash Delicata squash Kabocha squash Kuri squash Pumpkin squash Spaghetti squash Turban squash

Page 16: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Winter squash Chayote Squash Crookneck Squash Gem squash Patty Pan Yellow Squash Zucchini Spices Anise Basil Bay Leaf Caraway Cardamom Chamomile Chervil Cicely Cilantro Coriandor Seed Cumin seeds Curry Dill Epazote Fennel Fenugreek Galanga Alpinia galangal Garlic Allium sativum Ginger Zingiber officinale Ginseng Horseradish Lavender Lemongrass Marjoram Mint Mustard:

Black Mustard (Moderate) Field Mustard (Limited) Sahara Mustard (High) Tansy Mustard (Limited) Short Pod Mustard (Moderate) Wild Mustard (Limited)

Nutmeg Oregano Paprika Parsley: Hedge Parsley (Moderate) Peppercorn Piper nigrum

Page 17: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Rosemary Rosmarinus officinalis 1 Saffron Sage-Mediterranean Sage (Limited) Savory Tarragon Thyme Thymus vulgaris Turmeric Curcuma longa Wasabi Seeds and Nuts Sunflower seeds Pistachio Almond Pecan Squash seeds Peanuts Grains Wheat Barley Quinoa, Amaranth

Page 18: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Edible Campus Program Student Garden Project

2010 LRDP Consistency Analysis

2010 LRDP Policy Consistency Analysis

INTRODUCTORY POLICIES

Policy INTRO-1 - The policies of the Coastal Act (PRC Sections 30210 through 30263) are adopted herein as policies with full force and effect as part of the certified Long Range Development Plan.

Consistent.

Policy INTRO-2 - If conflicts occur between requirements of the LRDP, the policies most protective of coastal re-sources shall control. Protection of environmentally sensi-tive habitat areas (ESHA) and public access shall take pri-ority over other development standards and where there is any conflict between general development standards and ESH and/or public access protection, the standards that are most protective of ESHA and public access shall have precedence.

Consistent.

Policy INTRO-3 - If there is a conflict between a provision of the LRDP and any other Campus Plan or Program that is not certified as part of the LRDP, and it is not possible for the development to comply with both the LRDP and such other plan, the LRDP shall take precedence and the development shall not be approved unless it complies with the LRDP provisions.

Consistent.

Policy INTRO-4 - Where the LRDP references applicable provisions of State law (e.g., the California Government Code or Public Resources Code) the reference shall be construed to be the applicable State law provisions effec-tive on the date of the 2014 LRDP certification. Where provisions of the State law are amended in such a way that they are inconsistent with the LRDP, such changes require an LRDP amendment.

Consistent.

Policy INTRO-5 - MOUs, or other agreements with other Consistent.

Page 19: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

2

2010 LRDP Policy Consistency Analysis

entities, shall not replace or supersede any policy or provi-sion of the certified LRDP, and may require future LRDP amendments to secure implementation.

LAND USE – COASTAL ACT SECTION 30250

GENERAL POLICIES

Policy LU-01 - A maximum of 3.6 million gross square feet (GSF) of additional academic and support uses may be de-veloped on the UCSB campus where designated on Figure D.3, Potential Development Areas, and provided that it is consistent with all other policies and provisions of the LRDP. The University shall maintain a running account of the changes to Academic and Support (A&S) development on campus. The A&S build-out documentation shall sum-marize the total A&S build-out in gross square feet and ac-count for new A&S structural area, additions to existing A&S structures, demolition of existing A&S structural area, and any other changes that affect the GSF of A&S devel-opment. The A&S build-out documentation shall include a running annual total and shall provide the current build-out in relation to the Academic and Support “baseline.” The baseline shall be the total build-out of A&S campus-wide as of the date of certification of the 2010 LRDP. The A&S build-out documentation shall be submitted with each NOID or Exemption Request that adds or removes A&S build-out. Any new structures on lands designated as Recreation or Open Space shall also count toward the A&S development cap. Solar energy systems, such as solar panels, on roof-tops shall not be counted toward the A&S development cap.

Not Applicable. There is no GSF development for the proposed project. The only “building” proposed is a 160 square foot (10 by 16), 10 foot high prefabricated greenhouse and a 100 square-foot (10 by10) pre-fabricated shed (TuffShed or similar) about 8 feet high.

Policy LU-02 - New housing units sufficient to accommo-date up to 5,000 additional student bed spaces (including up to 240 student-family units) and a maximum of 1,874 additional faculty and staff housing units over the housing baseline may be cumulatively constructed on Main, Storke, and West Campuses where designated on Figure

Not Applicable. This is not a housing project.

Page 20: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

3

2010 LRDP Policy Consistency Analysis

D.3 and provided that it is consistent with the site-specific build-out parameters identified for each housing develop-ment and all other policies and provisions of the LRDP. New housing shall be consistent with the following maxi-mum build-out parameters for each housing type, which shall be calculated over and above the housing baseline: a total of 2.82 million gross square feet (GSF) of faculty and staff housing, up to 1.77 million new GSF of housing units to accommodate 4,760 student bed spaces, and a maxi-mum of 360,000 GSF of student family housing campus-wide. Each housing project may also be assigned an additional 15% GSF (over and above the housing unit caps above) to serve ancillary residential or non-residential uses; where identified, Academic & Support GSF on Housing sites has a separate cap which will count towards the overall A & S development cap. The University shall maintain a running account of the housing development on campus corresponding to the three categories described above (faculty and staff, indi-vidual students, and student-family housing). The housing build-out documentation shall summarize the total housing build-out in gross square feet, number of units/bed spaces, number of units serving each resident type, and the location. In addition, the build-out documen-tation shall account for new housing structural area, addi-tions to existing housing structures, demolition of existing housing structural area, and any other changes that affect the GSF of housing development. The housing build-out documentation shall include a running total and shall pro-vide the current build-out in relation to the Housing “base-line.” The baseline shall be the total build-out of housing campus-wide as of the date of certification of the 2010 LRDP (Sierra Madre and North Campus Faculty Housing are under construction and shall be considered part of the baseline). The housing build-out documentation shall be

Page 21: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

4

2010 LRDP Policy Consistency Analysis

submitted with each NOID or Exemption Request that adds or removes housing build-out. Policy LU-2.1 UCSB shall by July 1st each year provide to the Executive Director and post to the UCSB website a re-port on its enrollment numbers for on-campus/three-quarter average student population. In this report the Campus will track the growth of the campus from July 2015 to the cur-rent reporting year including the percentage change in population over the prior year. If the student population reaches 24,500 (as defined above) prior to November 2025, the campus will include in the report, the measures that the University will take to conform enrollment to the 25,000 student target in November 2025.

Not Applicable. The garden project doesn’t impact student en-rollment. This policy is adhered to annually.

Policy LU-03 - To provide flexibility to address future plan-ning needs and with the exception of the West Campus Mesa and Devereux sites described in Policies LU-32 and LU-31 respectively, all housing sites have the ability to ex-ceed the estimated number of units or beds by up to ten (10) percent without requiring a LRDP Amendment. How-ever, in no case shall the total net number of faculty and staff units included in this LRDP exceed 1,874 nor will the net number of student beds exceed 5,000. As each project is proposed, a tally of the net new units and/or beds shall be provided as part of the NOID process.

Not Applicable. This is not a housing project.

Policy LU-04 – The individual development site build-out parameters as identified in the policies (including LU-02 and LU-03) and provisions of this LRDP represent the maximum build-out potential. Prior to site design, the Uni-versity shall confirm the environmental conditions through updated environmental resource surveys, including biolog-ical resources (e.g., wetlands, ESHAs, Monarch Butterflies, etc.) completed within 1 year prior to submitting the Notice of Impending Development; traffic, parking and coastal ac-cess constraints analyses; and archaeological resource evaluations, as applicable, to establish up-to-date resource constraints for preparation of the Notice of Impending De-velopment. The updated constraints may further limit the development footprint and/or the maximum build-out po-

Consistent. The project site area is completely devoid of any vegetation –is covered with mulch. An archeological resources survey has been conducted for the project and is attached. The project involves installing a garden including fruit trees and does not remove trees or vegetation.

Page 22: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

5

2010 LRDP Policy Consistency Analysis

tential or design parameters to ensure consistency with the LRDP. Policy LU-05 - Development shall be planned to fit the to-pography, soils, geology, hydrology, and other conditions existing on the site so that grading is kept to a minimum. Campus development shall protect, and where feasible restore, natural hydrologic features such as natural stream corridors, groundwater recharge areas, floodplains, vernal pools, and wetlands.

Consistent. Fill will be brought to the project site to protect ar-cheological resources and also to building the garden beds. There would be no grading at the site but some land disturbance to create the garden. There are no streams, floodplains, vernal pools, or wetlands at the project site. The hydrologic features of the site would be as existing.

Policy LU-06 - New campus development shall be located within, contiguous with, or in close proximity to existing de-veloped areas able to accommodate it and where it will not have significant adverse effects, either individually or cu-mulatively, on coastal resources.

Consistent. The student garden would be located adjacent to the Children’s Center play yard and would be incorporated into the Children’s Center curriculum. There would be no impacts to coastal resources.

Policy LU-07 – Trailers, storage units, and temporary manufactured structures shall be located or relocated pur-suant to a Commission-approved NOID. Where the struc-ture serves an A&S function, it shall be accounted for un-der the A&S development cap as described in Policy LU-01.

Consistent. The project would have a 160 square foot (10 by 16) premanufactured greenhouse and a 100 square foot (10 by 10) tool shed which is are allowed uses in the Academic and Support land use designation. The greenhouse will serve the student garden.

MAIN CAMPUS POLICIES

NORTH CAMPUS POLICIES

STORKE CAMPUS POLICIES

WEST CAMPUS POLICIES Policy LU-30 – The Devereux South Knoll site shall not be redeveloped until and unless a targeted LRDP Amendment is certified by the Coastal Commission……

Not Applicable.

Policy LU-31 – Development at the Devereux North Knoll Housing site shall be located within the 9.3-acre po-tential development envelope designated as Housing on Figure D.3 ….

Not Applicable.

Policy LU-32 – A. Development at the West Campus Mesa Housing site shall be located within the 4.6-acre potential development envelope designated as Housing on Figure D.3 and shall be consistent with the following build-out provisions:

Consistent. The student garden project would install a 100 square foot (10 by 10), 8 foot high pre-fabricated shed and a 160 square foot (10 by 16) pre-fabricated greenhouse that would be 10 feet high. This would not exceed allowed GSF or height limits at the site. The project would provide bicycle parking at the gar-

Page 23: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

6

2010 LRDP Policy Consistency Analysis

• a maximum of 45 faculty housing units; • Up to 90,000 GSF development; • Heights shall not exceed 35 as shown in Figure D.4.; • Site coverage up to 50 percent; and • Maximum onsite population of 180. 1. Housing unit build-out on this site shall be counted to-ward the housing development cap consistent with Policy LU-02. 2. Bicycle and vehicular parking serving the development shall be provided on the site. 3. If not already separately installed, the 20 dedicated coastal access parking spaces currently located at Cam-eron Hall shall be relocated to West Campus Mesa west of West Campus Point Lane concurrent with the housing de-velopment, consistent with the requirements of Policy TRANS-23. 4. The two isolated patches of California Brome on the site may be removed and reestablished on campus within the nearby open space at a mitigation ratio of 3:1 (area to be planted in relation to area removed) with the express pur-pose of restoring and establishing the grassland habitat as ESHA. 5. The CC&Rs for the development shall identify a land-scaping plant palette of plant species beneficial to mon-arch butterflies, and residents shall be encouraged to in-clude these as a component of the landscaping. 6. Signs identifying public access opportunities and re-strictions through the Coal Oil Point Reserve shall be posted at the site. 7. If not already separately installed, the Coal Oil Point public access improvements shall be installed concurrent with the housing development, consistent with the re-quirements of Policy PA-13. 8. Development shall be planned to ensure that the pro-posed development will not conflict with any necessary widening or formalizing of West Campus Point Lane to ac-commodate all south-bound traffic upon the conversion of Slough Road to pedestrian, bicycle, and emergency ac-cess use only.

den site. The student garden vegetables and trees will attract bees and butterflies. The project is not near Slough Road and does not impact any potential changes to Slough Road.

Page 24: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

7

2010 LRDP Policy Consistency Analysis

9. Native trees and shrubs compatible with the area shall be closely planted along the east side of Slough Road to enhance the bird roosting habitat of bluff trees, and to shield the Reserve from light and glare. This planting shall take place in conjunction with West Campus Mesa resi-dential development. B. Development at the West Camps Mesa Recreation site shall be located within the 5.4-acre potential devel-opment envelope designated as Recreation on Figure D.3 and shall be consistent with the following build-out provi-sions: 1. Recreation facilities shall be for one active recreational field and passive recreation only such as picnic benches, nature trails, etc. Indoor or other enclosed sports facilities shall be prohibited. As allowed in Policy OS-2, minor ad-justments may be made to the adjacent Open Space boundary as necessary to accommodate a regulation size recreation field provided a 300-foot setback is made from Devereux Slough. 2. Outdoor sports lighting shall be prohibited on this site consistent with Policy ESH-15. 3. Recreation facilities on this site shall be for day use only and shall not be lighted except the minimum necessary for safety purposes and consistent with lighting standards in Policy ESH-15. Lighting for sports is prohibited. 4. The one isolated patch of California Brome on the site may be removed and reestablished on campus within the nearby open space at a mitigation ratio of 3:1 (area to be reestablished in relation to area removed) with the express purpose of restoring and establishing the grassland habitat as ESHA. 5. Parking is not required to be provided to serve the rec-reational use unless monitoring indicates that the desig-nated coastal access parking spaces are overcrowded as a result of recreational use of the West Campus Mesa Recreation site. 6. Development on this site shall not include buildings and therefore the site is not assigned a height limit on Figure D.4.

Page 25: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

8

2010 LRDP Policy Consistency Analysis

7. Landscaping shall include plant species beneficial to monarch butterflies. 8. Turf may be allowed if served by reclaimed water. 9. Signs identifying public access opportunities and re-strictions through the Coal Oil Point Reserve shall be posted at the site. 10. If not already separately installed, the Coal Oil Point public access improvements shall be installed concurrent with the housing development, consistent with the re-quirements of Policy TRANS-24. 11. Development shall be planned to ensure that the pro-posed development would not conflict with any necessary widening or formalizing of West Campus Point Lane to ac-commodate all southbound traffic upon the conversion of Slough Road to pedestrian, bicycle, and emergency ac-cess use only. C. Development at the West Campus Mesa Academic and Support site shall be located within the 1.9-acre po-tential development envelope designated as Academic and Support on Figure D.3 and shall be consistent with the following build-out provisions: 1. Academic and support build-out on this site shall not exceed a maximum of 120,000 GSF. New academic and support build-out on this site shall be counted toward the 3.6 million GSF campus-wide Academic and Support de-velopment cap consistent with Policy LU-01. 2. Bicycle and vehicular parking serving the development shall be provided on the site. 3. Development shall not exceed 35 feet in height as shown on Figure D.4. 4. Landscaping shall include plant species beneficial to monarch butterflies. 5. Development shall be planned to ensure that the pro-posed development will not conflict with any necessary widening or formalizing of West Campus Point Lane to ac-commodate all south-bound traffic upon the conversion of Slough Road to pedestrian, bicycle, and emergency ac-cess use only.

Page 26: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

9

2010 LRDP Policy Consistency Analysis

Policy LU-33 (as amended LRDP Amendment No. LRDP-4-UCS-16-0001-1 Part A) – Policy LU-33 – The Coal Oil Point Reserve shall be used for …..

Not Applicable.

Policy LU-34 (as amended LRDP Amendment No. LRDP-4-UCS-16-0001-1 Part A)- Development at the Coal Oil Point Reserve Field Station site shall be locat-ed….

Not Applicable.

Policy LU-35 – Development at the West Campus Apartments site shall be located within the 15.5-acre po-tential development envelope designated as Housing on Figure D.3 and shall be consistent with the following build-out provisions:

Not Applicable.

SCENIC AND VISUAL RESOURCES – 30251

GENERAL POLICIES

Policy SCEN-01 - New structures on the campus shall be in general conformance with the scale and character of surrounding development. Clustered developments and innovative designs are encouraged.

Consistent. The only structures would be a 100 square-foot (10 by 10) square-foot, 8-foot high, pre-fabricated shed and a 160 square foot (10 by 16), 10 foot high pre-fabricated greenhouse. This would be in conformance with the scale and character of the adjacent Children’s Center.

Policy SCEN-02 - New development proposed for bluff top locations shall be designed and set back from the bluff edge sufficiently to protect public coastal views. A visual analysis shall be submitted in support of the Notice of Im-pending Development for all bluff-top development pro-posals.

Not Applicable. This project is not on the ocean bluffs.

Policy SCEN-03 – New development shall be sited and designed to minimize adverse impacts to the greatest ex-tent feasible on scenic resources, including places on, along, within, or visible from public viewing areas such as public parklands, public trails, beaches, and state waters that offer scenic vistas of mountains, coastline, beaches, and other unique natural features, as identified as view points, scenic routes, and trails on Figure F.4. The Univer-sity shall seek to enhance primary and secondary view corridors where feasible to the ocean and scenic coastal areas shown in Figure F.4 such as by the removal of tem-porary buildings.

Consistent. The project would not impact any view corridors or scenic areas identified on LRDP F.4. The student garden project would not impact views to the coast or the mountains.

Page 27: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

10

2010 LRDP Policy Consistency Analysis

Policy SCEN-04 - Development shall not exceed the height limits established in Figure D.4. Height shall be measured as the vertical distance at any one point from the existing grade to the highest point of the top of the roof of the structure. The highest point shall be the coping of a flat roof, or peak of the ridge for a pitch or hip roof. Me-chanical and electrical equipment and solar energy sys-tems on the roof shall not be included in the height meas-urement. However, mechanical equipment shall be set-back as far as feasible from public roads and other viewing areas and screened by architectural features.

Consistent. The project would install a 100 square-foot (10 by 10) square-foot, 8-foot high, pre-fabricated shed and a 160 square foot (10 by 16), 10 foot high pre-fabricated greenhouse. The garden beds and fruit trees are not subject to height limits. The project is within the designated height limit of 35 feet for this area.

Policy SCEN-05 - Natural building materials and colors that are compatible with the surrounding landscape will be used where practical.

Consistent. The 100 square-foot (10 by 10) square-foot, 8-foot high, pre-fabricated shed and a 160 square foot (10 by 16), 10 foot high pre-fabricated greenhouse would blend in with the stu-dent garden and adjacent Children’s Center.

Policy SCEN-06 - All new development shall include land-scaping which mitigates the development’s visual impacts. A landscape plan representing these landscape elements shall be submitted in support of the Notice of Impending Development.

Not Applicable. The project does not include landscaping and consists of a garden where vegetables and fruit trees would be grown.

Policy SCEN-07 - For trees with significant scenic value, the first priority shall be to avoid tree removal where feasi-ble. If tree removal cannot be avoided, the second priority shall be relocation of the tree. If the scenic tree cannot feasibly be retained in place, the tree removal shall be conducted and mitigated consistent with the Tree Trim-ming and Removal Program in Appendix 2. Where a sce-nic tree is located within ESHA or Open Space the tree trimming and removal shall be subject to Policy ESH-29.

Not Applicable. No trees would be removed for the project.

MAIN CAMPUS POLICIES

NORTH & WEST CAMPUS POLICIES Policy SCEN-09 - Existing topography, native vegetation and scenic features of the North and West Campuses are to be retained and incorporated into the proposed devel-opment wherever feasible.

Consistent. The project would not alter the natural topography in the area.

Policy SCEN-10 - Contours of finished surfaces on the North and West Campuses are to be blended to achieve a consistent grade and natural appearance. Borders of cut

Not Applicable. There is no grading including cut and fill that would alter the topography or require slopes or fills that would be “rounded off.”

Page 28: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

11

2010 LRDP Policy Consistency Analysis

slopes and fills are to be rounded off to a minimum radius of five feet so as to blend with the natural terrain. Policy SCEN-11 - Native plantings, including California native tree species of particular value to raptors, will be used to visually integrate natural areas with development on North and West Campuses, while also buffering natural areas from the disturbance imposed by nearby develop-ment, including outdoor lighting or interior lighting that may be visible from natural areas.

Not Applicable. The student garden includes planting edible vegetation and would not plant trees to support raptor habitat. There would be no lighting at the project site.

SAFETY, STABILITY, POLLUTION, ENERGY CONSERVATION, VISITORS - 30253 through .13

GEOLOGIC HAZARDS

Policy GEO-01 - New development proposals shall be supported by geotechnical and soil studies conducted by a California-licensed geologist or geotechnical engineer, as appropriate, to determine technical requirements for ade-quate building foundation and infrastructure designs; such studies shall include an appropriate evaluation of seismic or liquefaction hazards that may affect the subject site. The results of such studies, and the recommendations of the preparing professional, shall be submitted in support of the pertinent Notice of Impending Development.

Not Applicable. The student garden project does not require a geotechnical study as there are no foundations or major con-struction.

Policy GEO-02 - Building setbacks from an active fault trace shall be a minimum of fifty (50) feet, or a greater dis-tance if required by the California Building Code and Cali-fornia Geologic Survey standards in effect at the time of University design approval.

Consistent. The project is not within an active fault or setback and does not include inhabitable structures.

BLUFF FACES AND SHORELINE STRUCTURES Policy GEO-03 - New development shall be constructed at a sufficient distance to maintain the proposed structure for a minimum of 100 years without the construction of a shoreline protective device. The 100-year bluff-top setback shall be determined based on a report by a California-registered engineering geologist or other qualified profes-sional, with substantial experience evaluating shoreline erosion, evaluating the effects of sea level rise and conse-quent bluff or shoreline changes expected to affect the site

Consistent. The project is not near the ocean bluff or in a place where it would ever require a shoreline protection device.

Page 29: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

12

2010 LRDP Policy Consistency Analysis

within a minimum of 100 years following the completion of the proposed project. The report shall consider multiple sea level rise scenarios consistent with the additional re-quirements in Policy SH-04. The report shall include a recommendation for the minimum setback necessary to ensure the safety of the proposed development, including the safety of the public utilizing the nearby bluffs and/or shoreline area, for a minimum of 100 years, without con-struction of a bluff stabilization or shoreline armoring de-vice. The NOID submittal shall include written evidence of the University’s commitment to remove or relocate such development pursuant to a future NOID submittal should bluff erosion threaten the stability of the structure, or the safety of the public. Policy GEO-04 - A. The geologic bluff-top setback in Policy GEO-03 shall not apply to the development of public access stairways, pathways, fences, or parks. Utility infrastructure or the re-placement or expansion of existing structures shall be sub-ject to the geologic bluff-top setback unless the Commis-sion determines that: 1) An appropriate, California-licensed geologist or ge-otechnical engineer has favorably reviewed the subject plans as described below; 2) That no feasible alternative exists; 3) That the subject structure has been designed to facili-tate removal or relocation in the future as bluff erosion ad-vances; 4) That the University acknowledges as a condition of Commission approval of such development that no future bluff stabilization measures shall be installed to protect such development in lieu of removal or relocation; and 5) The University accepts as a condition of Commission approval a legal “assumption of risk” condition acceptable to the Executive Director. B. If the University proposes development that does not comply with the geologic bluff-top setback requirements, the Notice of Impending Development for the development

Not Applicable. The project is not near a bluff-top.

Page 30: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

13

2010 LRDP Policy Consistency Analysis

shall include evidence that a California-licensed geologist or geotechnical engineer, as appropriate, has determined that the development will assure stability and structural integrity, and neither create nor contribute significantly to erosion, geologic instability, or destruction of the site or surrounding, for the expected life of the development. Policy GEO-05 - New development located less than 50 feet from the bluff edge shall be constructed to insure that all surface and subsurface drainage shall not significantly contribute to bluff erosion or instability. The Notice of Im-pending Development submittal for the development shall include evidence that a California-licensed geologist or geotechnical engineer, as appropriate, has determined that the project’s surface and subsurface drainage shall not contribute to bluff erosion or instability. The NOID submittal shall include written evidence of the University’s commitment to remove or relocate such development pur-suant to a future NOID submittal should bluff erosion threaten the stability of the structure, or the safety of the public.

Not Applicable. The project is not located near an ocean bluff.

Policy GEO-06 – Whenever development, including grad-ing, is proposed within 100 feet of a bluff edge, existing non-native vegetation shall be replaced with drought toler-ant, locally native plants, and undisturbed established na-tive plants shall be maintained to minimize erosion due to long-term application of landscape irrigation water to the bluff face.

Not Applicable. The project is not located near an ocean bluff.

Policy GEO-07 - No development shall be permitted on the bluff face, except for staircases or access ways to pro-vide public beach access.

Not Applicable. The project is not located near an ocean bluff.

Policy GEO-08 - Pedestrian use of unimproved paths up and down the bluff face shall be discouraged. Where needed for pedestrian safety or to discourage volunteer trails on the bluff face, a Commission- approved fence or other barrier may be constructed at hazardous locations on the coastal bluff edge. Fencing or other barriers installed along the bluff-top shall

Not Applicable. The project is not located near an ocean bluff.

Page 31: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

14

2010 LRDP Policy Consistency Analysis

be designed to be visually permeable, compatible with the character of the surrounding area, and of the minimum height necessary to ensure safety (e.g., low- profile post and rail designs or post, rail, and mesh designs). New chain-link fencing is prohibited; existing chain-link fencing shall be removed and/or replaced by the University at the earliest feasible opportunity. Policy GEO-09 - Drainage devices shall be sited and de-signed to prevent bluff erosion. New drainage devices shall not extend over or through coastal bluffs. Stormwater and dry weather flows that are conveyed through existing storm drains or other outfalls that discharge to the bluffs shall be re-routed to the maximum extent feasible, and the drainage device removed as feasible.

Not Applicable. The project is not located near an ocean bluff.

Policy GEO-10 - The east-facing bluffs will be protected from future erosion only if campus development becomes immediately threatened, consistent with Policy SH-06.

Not Applicable. The project is not near ocean bluffs.

FLOODING AND TSUNAMIS

Policy GEO-11 - New development shall comply with Federal Emergency Management Agency (FEMA) re-quirements for development in an A1-30 flood hazard zone provided that the development fully complies with all other provisions of the certified LRDP.

Not Applicable. The project is not within the floodplain.

Policy GEO-12 - Maintain Tsunami-Ready compliance, or equivalent procedures to provide and document communi-cation, readiness, and evacuation procedures for all cam-pus-based populations, including summer programs.

Not Applicable. The campus maintains tsunami-ready proce-dures. The project does not include inhabitable spaces.

SUSTAINABILITY AND RECYCLING

Policy SUST-01 -The University shall reduce transporta-tion emissions associated with fleet vehicles by imple-menting the following measures: replacing vehicles with low or zero emission vehicles; right-sizing fleets (determin-ing the appropriate fleet size, revising business practices to reduce need for travel); reducing fleet fuel consumption; reducing fleet vehicle miles traveled; and increasing use of fuels with lower GHG emissions. The University shall pur-

Not Applicable. This is not a project specific policy. The cam-pus Transportation and Parking Services department continu-ously strives to meet these policy requirements.

Page 32: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

15

2010 LRDP Policy Consistency Analysis

chase the most efficient fleet vehicles with the goal of 95% of the campus light-duty fleet purchases using alternative fueled vehicles (AFV’s) (Biodiesel, Electricity, Ethanol, Hy-drogen and Natural Gas as per DOE& CEC’s supported fuels) by 2016. Policy SUST-02 - The University shall reduce greenhouse gas emissions and the use of non-renewable resources by complying with the campus-wide sustainability programs.

A. All Notice of Impending Development submittals shall be supported by an evaluation of the project’s consistency with the campus-wide sustainability programs, including but not limited to measures pertaining to:

Green Building; Clean Energy; Transportation; Climate Protection; Sustainable Operations; Waste Reduction and Recycling; Environmentally Preferable Purchasing; Sustainable Foodservice; and Water Conservation.

Not Applicable. This policy is not applicable to the project. The campus continues its programs to reduce greenhouse gas emis-sions and the use of non-renewable resources.

Policy SUST-03- The University shall promote the use of vehicles with alternative fuel sources on campus by such means as: locating infrastructure to support alternative ve-hicles (e.g., electrical vehicle charging stations), or provid-ing incentives such as first-floor parking spaces and dis-counts on long-term parking passes. Electrical vehicle charging stations shall be provided in the necessary num-bers and conveniently located in campus housing devel-opments as well as in the parking facilities on each cam-pus to encourage the use of such vehicles.

Not Applicable. This is not a project specific policy. The Univer-sity continues to promote the use of vehicles with alternative fuel sources.

Policy SUST-04- The campus shall continue to reduce greenhouse gas emissions in accordance with the campus Climate Action Plan and shall continue to inventory and publicly report all greenhouse gas emissions annually in accordance with the protocol set forth by The Climate Registry.

Not Applicable. This is not a project-specific policy. The Uni-versity continues to implement campus-wide greenhouse gas emission reduction programs.

Page 33: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

16

2010 LRDP Policy Consistency Analysis

Policy SUST-05- The University shall reduce consumption of non-renewable energy by using a portfolio approach that includes a combination of energy efficiency projects, the incorporation of local renewable power measures for existing and new facilities, green power purchases from the electrical grid, and other energy measures with equiva-lent demonstrable effect on the environment and reduction in fossil fuel usage.

Not Applicable. The project is a student garden project and does not result in the consumption of non-renewable energy. The University continues to implement programs to develop re-newable energy sources on campus.

Policy SUST-06- The University shall minimize energy use and reduce pollution through such methods as the use of solar power and other renewable energy systems, natu-ral lighting, passive solar heating and cooling and other techniques to produce energy efficient development, build-ing management techniques such as smart metering and lighting/appliance management systems that limit waste, and use of light colored buildings and roofing materials.

Not Applicable. The project is student garden project and does not use energy or result in emissions that would cause pollution. The University continues to implement energy efficient, renewa-ble energy sources on campus.

Policy SUST-07- The campus shall continue to monitor energy usage and make available for public review an An-nual Energy Report detailing purchased electricity and natural gas consumption, as well as onsite and offsite re-newable energy generation.

Not Applicable. The project is a student garden project and will not result in the use of energy. The University continues to moni-tor energy use and post the Annual Energy Report online.

PUBLIC SERVICES AND INFRASTRUCTURE - 30253.14 - 16, 30254

WATER SUPPLY AND DEMAND

Policy PS-01- In recognition of the need to conserve and manage its water resources to achieve the LRDP land use planning objectives, the University shall implement a water conservation program as follows: A. Water consumption in existing and new development shall be minimized by using the best available water-conserving plumbing fixtures. B. Landscaping practices shall minimize potable water use by: planting locally native plant species and/ or non-invasive, drought tolerant species; using reclaimed water for landscaping to the maximum extent feasible; designing efficient irrigation systems that use the minimum amount of water necessary for the applicable landscaping; and maintaining and managing irrigation systems to ensure

Consistent. The student garden project will require use of pota-ble water. The University continues to implement water conser-vation programs.

Page 34: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

17

2010 LRDP Policy Consistency Analysis

continued water efficiency. C. The University shall maintain a public awareness cam-paign on campus and in campus residential facilities for saving water. All dormitory residents shall be required to receive annual training on water conservation. Policy PS-02- Future development provided for in the LRDP land use plan will only be authorized after the Uni-versity demonstrates at the time of NOID submittal that adequate water supplies, water mains, reclaimed water distribution systems, water treatment facilities, sewer ser-vices, utility lines, parking lots and structures, roadways and bicycle/pedestrian corridors, fire suppression facilities, and other essential infrastructure services will be available to supply the existing and proposed development.

Consistent. There would be approximately 122,500 gallons of potable water needed to water the garden per year. This can be reduced by the amount of rainfall in each season. This is not a significant amount of water and would not re-sult in an impact to water resources on campus.

Policy PS-03- For development that requires water sup-ply, at the time of NOID submittal, the University shall pro-vide, sufficient water conservation, efficiency, and supply strategies to factually support a projection of adequate permanent future supplies for the life of the entire devel-opment. To minimize impacts to the long-term water sup-ply, each new development shall offset the development’s anticipated potable water use in accordance with the fol-lowing hierarchy. Notwithstanding the availability of GWD water supplies, the following water conservation measures shall be implemented to the maximum extent feasible, ex-cept as required pursuant to Policy PS-07, prior reliance on GWD’s potable water supply: A. Maximum feasible incorporation into the proposed pro-ject plans of water conservation and efficiency measures, and reclaimed water use measures. B. Increased campus water conservation and efficiency measures, and increased campus reclaimed water use to reduce campus potable consumption, such as for irriga-tion, use in toilets, and in industrial applications. C. Further development of enhanced reclaimed water sys-tems on campus to utilize reclaimed water for industrial applications such as cooling towers to reduce potable consumption.

Consistent. There would be approximately 122,500 gallons of potable water needed to water the garden per year. This can be reduced by the amount of rainfall in each season. This is not a significant amount of water and would not re-sult in an impact to water resources on campus. The campus continues to implement water conservation programs.

Page 35: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

18

2010 LRDP Policy Consistency Analysis

D. New uses of reclaimed water on campus as technology and systems become available.

PS-04- A project-specific water availability analysis shall be provided for each proposed development that requires water input and shall be submitted with the Notice of Im-pending Development. At the time a new campus building is proposed, and before environmental review is complete, the University shall meet with GWD and ascertain that permanent potable water supplies of the quantity needed to serve the proposed development are available from the District as part of the water availability analysis. The water availability analysis shall include but not be limited to the following information: (1) a description of cumulative campus development (ex-isting and approved); (2) cumulative water use (for existing and approved devel-opment), including use by University-owned facilities oc-cupied or operated by third parties (such as food service or other vendors, affiliated or independent research pro-grams and institutes, summer programs and camps using University-owned facilities, etc.) and outdoor recreational facilities, landscaping, habitat restoration sites (such as Ocean Meadows), open space and habitat management, and the Coal Oil Point Reserve; (3) an estimate of the remaining quantity of water supply available to the University within the University’s 945 AFY planning threshold (which, depending on development lo-

Consistent. There would be approximately 122,500 gallons of potable water needed to water the garden per year. This can be reduced by the amount of rainfall in each season. This is not a significant amount of water and would not re-sult in an impact to water resources on campus. The campus continues to work with GWD as it regards to water supplies.

Page 36: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

19

2010 LRDP Policy Consistency Analysis

cation, would be served by a portion of one of the Univer-sity’s three existing allotments from Goleta Water District, including the 945 AFY available campus wide, the 200 AFY available at North Campus, and the 66 AFY available at Devereux School) establishing the maximum amount of potable water needed to fully serve the 2010 LRDP build-out; (4) the estimated quantity of potable water necessary to serve the proposed development; (5) an analysis of year-to-year compliance with campus conservation goals articulated in the 2013 Campus Water Action Plan approved by the Regents of the University of California, and as updated from time to time; (6) a cumulative regional assessment of water supply and demand within the Goleta Water District’s (GWD) bounda-ries. This assessment shall include a narrative of any changes to GWD’s cumulative water supply and demand setting. Policy PS-05- The University shall participate in water use reductions during declared water supply shortages within Goleta Water District (GWD) boundaries and/or other af-fected campus water service areas to the maximum extent feasible. For each formally declared water shortage Stage I-V, the campus will meet with the GWD and establish specific emergency water conservation benchmarks ex-pressed as a percentage of the University’s regular pota-ble water use based on that assessment, the campus will further reduce potable water consumption to the maximum extent feasible. Once implemented, the pertinent short-term water use reductions shall be maintained to the max-imum extent feasible until the GWD reduces or lifts the pertinent water shortage declaration.

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement its water conservation programs.

Policy PS-06- If the long-term water supplies relied on by the University in planning the 2010 LRDP (i.e., the 945 AFY planning threshold) build-out are jeopardized and/or cannot be acquired and delivered from Goleta Water Dis-

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement its water conservation programs.

Page 37: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

20

2010 LRDP Policy Consistency Analysis

trict (GWD), the University shall halt further water-consuming development under the LRDP unless the Uni-versity secures the equivalent offsets by underwriting measures to conserve existing potable water supplies within the customer base of GWD, or by underwriting new infrastructure construction to deliver reclaimed water to GWD customers presently irrigating with potable water. For example, the University may, in cooperation with GWD, elect to meet a portion of, or all of, a proposed new campus building’s otherwise unmet water requirements by:1) underwriting the installation of additional reclaimed wa-ter infrastructure (such as treatment systems, pipelines and metering systems) to deliver reclaimed water to exist-ing agricultural water users served by Goleta Water Dis-trict, or 2) through the retrofitting of existing development within the Isla Vista/Goleta Water District service area by such measures as replacing appliances with certified low water and energy use appliances, and installing low flow show-erheads and toilet fixtures. At the time of NOID submittal, if the University has selected such an option to ensure ade-quate potable water supplies for the subject development, the University shall provide to the satisfaction of the Exec-utive Director: a) evidence of the certification by GWD of the equivalent potable water conservation and b) evidence of a binding contract between the University and GWD to permanently secure and redirect the equivalent potable water supply for the University’s benefit. Policy PS-07 – A. The University shall annually prepare and submit to the Executive Director a report analyzing campus water supply and demand including but not limited to information required in these water supply and demand policies which shall reflect campus-wide demand infor-mation tabulated annually, expressed in acre-feet per year, and separated into potable and reclaimed water supply categories. The report shall include an estimate of the potable water necessary to serve the remaining build-ing of the 2010 LRDP. The report shall also include the

Not Applicable. This is not a project specific policy. The Univer-sity continues to prepare an annual campus water use analysis and makes the report available to the public.

Page 38: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

21

2010 LRDP Policy Consistency Analysis

results of any short-term water use reductions implement-ed by the University during the previous year in response to water shortages affecting the Goleta Water District, and GWD’s most recent projection of its water supply portfolio for the forthcoming year. The University shall make the report available to the public by posting the report on the University’s website, and shall reference the report availa-ble to the public by posting the report on the University’s website, and shall reference the report in any environmen-tal review process for new development. B. The policies of the 2010 LRDP notwithstanding, if the Executive Director of the Coastal Commission determines that an extraordinary water supply shortage to GWD’s wa-ter supply exists based on: 1) the report provided by the University pursuant to Sub-paragraph A (above); or 2) a declaration, or similar official action, by the Governor, the State Water Resources Control Board, or the Goleta Water District; Then any NOID submitted to the Commission thereafter shall demonstrate that the development will not result in a net increase of potable water demand over existing use levels at the time the NOID is submitted.

PUBLIC ACCESS & CIRCULATION – 30210 & 30221

PUBLIC ACCESS

Policy PA-01 - Public access to campus beaches, coastal access stairways, and coastal trails shown in Figures E.3 and E.4 shall remain open to protect the permanent right of the public for pedestrian access and recreational uses of the beach at all times, except as provided in Policy PA-06.

Not Applicable. The student garden project does not impact public access. The site is on an undeveloped, mulched area ad-jacent to the Children’s Center and is not near public access or trails.

Policy PA-02 - The coastal access improvements shown in Figures E.3 and E.4 shall be implemented in conjunction with nearby development projects and submitted as part of the relevant Notice of Impending Development. Alternate-

Not Applicable. The project is an underground utility project and does not impact public access.

Page 39: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

22

2010 LRDP Policy Consistency Analysis

ly, these improvements may be implemented independent-ly in advance, as funding permits. Policy PA-03 -The University shall continue to maintain adjacent beaches and coastal access trails for the use of all the public. Beaches adjacent to campus include: • Campus Point Beach • Depressions Beach • West Campus Beach • Sands Beach Key coastal accessways and trails through campus in-clude: • West Campus Bluffs Trail • Dune Pond Trail • Lagoon Trail • Campus Point Stairs

Not Applicable. This is not a project specific policy. The project does not impact public access.

Policy PA-04 - Pedestrian trails and scenic overlooks along the bluff top and base of the North Bluffs shall be permanently available to the public. The routes shall be prominently posted with signs that indicate that the trails are for public pedestrian use only. Pedestrian pathways shall, by design, discourage bicyclists from use of the trails located on the North Bluff face, and such trails shall be limited to 5 feet in width.

Not Applicable. The project is not near the North Bluffs.

Policy PA-05 - Coastal access parking lots shall be moni-tored annually during the anticipated peak coastal access use to measure their use and prevent overburdening one area. Each monitoring report shall include a summary of any pertinent parking changes that have been authorized by the Commission since the previous reporting period and shall identify the restrictions and fees associated with the specific parking lot. The University shall submit the monitoring results to the Executive Director within ninety (90) days after each monitoring period is completed. Where monitoring indicates that public coastal visitor park-ing demand is inadequately supplied in a particular cam-pus parking location, the University shall propose options to address the capacity problem, including additional coastal access parking in a proximate location, directional

Not Applicable. This is not a project specific policy. The project does not impact coastal access parking or public access.

Page 40: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

23

2010 LRDP Policy Consistency Analysis

signs directing coastal users to other nearby parking, re-distribution of existing campus parking to increase the supply of campus public coastal visitor parking spaces in popular locations, or other measures. Such changes shall be subject to Commission review through a Notice of Im-pending Development or an LRDP amendment, as appli-cable. Policy PA-06: The University may temporarily restrict pub-lic coastal visitor access, including public coastal access parking provided for in the Coastal Access Parking Map (Figure E.4) when required to address an unforeseeable emergency or to protect fragile coastal resources pursuant to a Commission-approved sensitive resources manage-ment plan. Where such circumstances arise, the subject closure shall be: A. For the minimum amount of time necessary to ensure the health and safety of the campus population and its physical property; B. Limited to the least disruption of public access neces-sary to respond to specific campus concerns; and C. Communicated immediately to the Executive Director, subject to an emergency permit or Notice of Impending Development as applicable. Unforeseeable emergencies may include threats to public health or safety; natural dis-aster, civil disorders which pose a threat to property, or other such seriously disruptive events; the need for ex-traordinary measures required to immediately avert, allevi-ate, or repair damage to campus property; or immediate threats to other coastal resources.

Not Applicable. This is not a project specific policy. The project does not impact public access.

Policy PA-07 - Feasible access for the physically chal-lenged shall be provided where topographical and envi-ronmental constraints allow. Coastal access for the physi-cally challenged to bluff-top viewing points shall be provid-ed in Lagoon Park and West Campus Bluffs. Coastal ac-cess for the physically challenged will be provided by the installation of at least one ADA accessible parking space in each of the coastal access parking lots shown on Figure E.4; however, three new ADA parking spaces shall be

Consistent. The project does not impact public access however the garden will be ADA accessible.

Page 41: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

24

2010 LRDP Policy Consistency Analysis

provided at Coal Oil Point consistent with Policy TRANS-23. Coastal access amenities that are ADA accessible should be conspicuously posted with coastal access sign-age, linking coastal access parking to the trails or other amenities. Policy PA-08: The University shall maintain a publicly ac-cessible, accurate, on-line map of campus pedestrian and bicycle routes, public transportation routes and bus stops, and public coastal access parking locations, including any applicable daily or seasonal restrictions. The subject map shall also be prominently posted at information kiosks and campus parking locations. The map shall identify ADA ac-cessible coastal access parking and amenities.

Not Applicable. This is not a project specific policy. The cam-pus continues to maintain public access maps and signage.

Policy PA-09 - The University shall conspicuously post coastal access signage that identifies and directs visitors to all publicly available coastal access parking, beach ac-cess points, trails, and stairways. Within six months of cer-tification of the 2010 LRDP, the University shall install coastal access signage at the entrances to campus and along key roadways on campus to direct coastal visitors to the designated coastal access parking on Main and West Campuses. At the same time, the University shall install signage within the parking lot(s) as necessary, to identify the dedicated coastal access spaces and specify the park-ing rules that apply to those spaces. At such time any fu-ture parking areas are built or assigned to accommodate dedicated coastal access parking spaces, the coastal ac-cess signage shall be installed concurrently with the provi-sion of the spaces.

Not Applicable. This is not a project specific policy. The cam-pus continues to maintain public access maps and signage.

Policy PA-10 - The University will cooperate with the County of Santa Barbara and the California Department of Parks and Recreation, and consult with the Coastal Com-mission staff, in the proposed expansion of the California Coastal Trail System. New trail segments and routes trav-ersing campus lands shall require a Notice of Impending Development and may require an LRDP amendment.

Not Applicable. This is not a project specific policy. The Univer-sity continues to cooperate with these jurisdictions on the Cali-fornia Coastal Trail.

Policy PA-11 - Public access trails and bicycle routes shall be provided to maximize access to the coast and

Not Applicable. The project is an underground utility project and does not impact public access.

Page 42: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

25

2010 LRDP Policy Consistency Analysis

provide recreational opportunities. Figures E.2 and E.3 identify existing and planned routes for bicycle and trails routes, including trail types, allowed users, and locations. The alignments shown in Figures E.2 and E.3 are approx-imate. The final alignments shall be designed based on topographic constraints and shall be sited to minimize im-pacts to coastal resources to the maximum extent feasible. Where such trails or routes are in or near ESHA or natural open space areas, the siting and design of such routes shall be subject to Policy ESH-03. Policy PA-12 - Motor vehicle traffic generated by new de-velopment shall not restrict or impede public access to or along the coast by exceeding the roadway capacity of ex-isting coastal access routes on Campus. Should any pro-posed development significantly impact the roadway ca-pacity of existing coastal access routes on Campus, the University shall implement or pay its fair share of costs to the City of Goleta and/or County of Santa Barbara to im-plement improvements to roadways and intersections or other traffic control measures necessary to mitigate the impacts.

Consistent. The project will not generate a significant amount of traffic. Staff, students, and visitors to the site will primarily ac-cess it by bicycle or on foot. Bicycle parking will be provided. Six visitor parking spaces in parking lot 41 adjacent to the Children’s Center, but farthest away from the Children’s Center would be used by AS DPW staff or students visiting the site when needed.

Policy PA-13 – Public access shall be maintained at Coal Oil Point consistent with the Coastal Access Program (Figure E.4). New development to facilitate public access opportunities shall include, at a minimum: establishment of three disabled public coastal access parking spaces, bike racks, picnic table(s), and ADA-compliant trail improve-ments to the bluff and overlook. The feasibility of a re-stroom and drinking fountain should also be considered. These public access features shall be included in the de-velopment proposed for the first Notice of Impending De-velopment for a significant West Campus or Reserve de-velopment that is submitted subsequent to the date of ef-fective certification of ht 2010 LRDP. The public coastal access improvements approved by the Commission pur-suant to the pertinent NOID shall be installed in conjunc-tion with the other construction proposed in the NOID. The design and location of the parking shall facilitate an ADA-

Not Applicable. The project is not at Coal Oil Point.

Page 43: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

26

2010 LRDP Policy Consistency Analysis

accessible connection to the trail corridor along the West Campus Bluffs and, if feasible, to a portion of the Slough Road trail/road corridor. CIRCULATION Policy TRANS-01 - A. The University will work with the Cities, County, SBCAG, SBMTD and other transit providers to provide a balanced transportation system on campus, offering ve-hicular, bicycle, pedestrian, and transit mobility, including augmentation of external transit systems with University shuttle systems to increase capacity, efficiency, and use by the UCSB-affiliated population. The University shall in-clude in the plans and designs submitted in support of the requisite Notice of Impending Development for new cam-pus development, intersection and roadway improvements necessary to offset the proportional impacts of the Univer-sity’s LRDP build-out on roadway capacity. Roadway and intersection improvements shall not conflict with existing or planned pedestrian and bicycle facilities or degrade mobili-ty for pedestrians and bicyclists. The University shall main-tain campus intersections at a minimum Level of Service D. B. If a proposed project causes an intersection to degrade to LOS E, measures shall be identified and implemented to restore operations to LOS D or better conditions. Prior to intersection improvements, the University shall imple-ment alternative transportation measures to reduce road-way demand such as the timing of “after hours” parking; additional bus and/or shuttle service; additional incentives to faculty, staff, and students to utilize the available alter-native modes of transportation; or other similar measures.

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement alternative transportation programs.

Policy TRANS-02 - The University in cooperation with the Metropolitan Transit District shall maintain or expand regu-lar bus and/or shuttle service between all University hous-ing, campus neighborhoods, Camino Real Marketplace, Goleta Train Station and the Main Campus, including through the use of University-owned and operated transit if necessary.

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement alternative transportation programs.

Page 44: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

27

2010 LRDP Policy Consistency Analysis

Policy TRANS-03 - The University shall continue its transportation alternatives program with the goal of divert-ing at least 10 percent of all single occupancy vehicle pas-senger trips to and from campus. The University shall conduct campus surveys to help determine alternative transportation system adequacy and solicit comments on unmet alternative transportation needs and suggestions for alternative transportation facility and program im-provements, and report annually to the community the re-sults and conclusions of the survey process. The Universi-ty shall inventory the number of daily single occupancy vehicle trips from all sources to and from campus during the regular academic and summer sessions over the course of the year and prepare the University’s Annual Transportation Report. Within ninety (90) days after com-pletion of the Annual Transportation Report, the University shall prepare and submit a Notice of Impending Develop-ment for any new development, if any, associated with Transportation Alternatives Program intended to reduce single occupancy vehicle trips.

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement alternative transportation programs.

Policy TRANS-04 -To improve traffic flow and thereby re-duce auto emissions, the University shall implement Commission-approved improvements to the transportation and parking system, including roadways, parking, bicycle, and pedestrian facilities, necessary to ensure that traffic congestion, auto emissions, and other adverse impacts from the increased traffic associated with a pending devel-opment are fully mitigated. Transportation and parking system measures shall be subject to a Notice of Impend-ing Development (NOID). Where such measures are nec-essary to mitigate the impacts of new development, the University shall submit the improvements with the relevant Notice of Impending Development. The Commission may condition the NOID to ensure that these requirements are met.

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement alternative transportation programs.

Policy TRANS-05 - The University will work with MTD, SBCAG Traffic Solutions, and Clean Air Express to devel-op a transit plan to offset the increased demand for public

Not Applicable. This is not a project specific policy, however students will undoubtedly use the bus to access the student gar-den. The University continues to implement alternative transpor-

Page 45: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

28

2010 LRDP Policy Consistency Analysis

transit that will result from build-out of the LRDP. The Uni-versity shall provide for subsidies, free passes, additional transit services, transit vehicles, and transit facilities, in-cluding community car-loan pools such as Zip-Car, and media costs such as for related motivational outreach to UCSB affiliates, to address future transit overloads that will otherwise result from unmitigated future campus growth.

tation programs.

Policy TRANS-06 - The University shall provide additional bicycle parking facilities as part of all campus building pro-jects. The University shall periodically survey campus bi-cyclists (at a minimum before undertaking the environmen-tal review of significant projects) to determine the kinds and locations of bicycle facilities and other bicycle support features (such as bus access for bicyclists, securable bi-cycle lockers, etc.) that are most needed. The University shall incorporate the requested features in new campus development projects to the maximum extent feasible. The University shall additionally provide bicycle parking facili-ties near public coastal accessways and trails, where ap-propriate, to support public access opportunities while en-suring adequate protection of sensitive resources. The bi-cycle features shall be indicated on the campus visitor’s map upon construction. The University shall identify the requisite bicycle parking facilities as part of the Notice of Impending Development submittal for all significant new campus development proposals.

Consistent. This is not a project specific policy however the pro-ject will provide bicycle parking at the student garden. The Uni-versity continues to implement alternative transportation pro-grams.

Policy TRANS-07 - Site plans submitted in support of the Notice of Impending Development for all significant new campus development proposals shall include: a) pedestri-an and bicycle corridors designed to link the development with other campus locations and with coastal access and recreational amenities in a manner that reduces vehicle miles traveled by campus affiliates, and b) where appro-priate, public trails and vehicle/bicycle parking amenities designed to facilitate continuing public coastal visitor ac-cess to coastal access and recreational amenities availa-ble on and near the campus. All public trails shall be clear-ly signed to ensure that campus visitors are aware of

Not Applicable. The project is an underground utility project and does not increase traffic or result in traffic impacts. The Uni-versity continues to implement alternative transportation pro-grams.

Page 46: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

29

2010 LRDP Policy Consistency Analysis

coastal access availability. Policy TRANS-08 - The University will provide interpretive signs, as funding allows, to highlight environmentally sen-sitive areas which could be damaged by excessive or un-authorized access. The University shall continue to sign, maintain and improve authorized bicycle and pedestrian accessways to the beach to protect sensitive habitat areas and public safety.

Not Applicable. The project does not contain environmentally sensitive habitat that requires signage for pedestrians or bicy-clists. The campus continues to sign, maintain, and improve au-thorized bicycle and pedestrian access ways to the beach to protect sensitive habitat areas and public safety.

Policy TRANS-09 - The University will work with the County of Santa Barbara, City of Goleta and others, in-cluding the Coastal Commission staff, to create a sensi-tively-designed comprehensive network of trails to link the University’s housing developments to each other and to publicly accessible open space and recreational areas. Implementation of trail segments may be undertaken in accordance with a Notice of Impending Development for specific locations and subject to all other provisions of the certified LRDP, including siting and design criteria near open space and environmentally sensitive habitat areas. The University shall submit evidence of coordination with the County and the City, including comments received, at the time of the subject Notice of Impending Development submittal.

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement alternative transportation programs.

Policy TRANS-10 - The University shall contribute funds toward intersection and transportation improvements in the City of Goleta and County of Santa Barbara proportionate to the University’s impacts to the intersection and/or road-way.

Not Applicable. This is not a project specific policy. The Univer-sity continues to contribute funds to these jurisdictions as appli-cable, and implement alternative transportation programs.

Policy TRANS-11 - A sensitively-designed, permeable bike path may be provided along Mesa Road, between Ocean Road and Los Carneros, provided that the new alignment minimizes intrusion into ESHA buffers, avoids ESHAs and is sited within the existing road prism to the maximum extent feasible.

Not Applicable. This policy is not specific to the project.

Policy TRANS-12 - In order to prevent adverse effects to the Coal Oil Point Natural Reserve, the following roadway and circulation measures shall apply on West Campus: A. Vehicular access to West Campus shall be from the

Not Applicable. The project is not on Coal Oil Point.

Page 47: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

30

2010 LRDP Policy Consistency Analysis

intersection of Storke and El Colegio Roads. The Campus shall coordinate and contribute to the installation of traffic control devices and other improvements at that intersec-tion; B. Slough Road shall be converted exclusively to use by pedestrians, bicyclists, and essential emergency vehicles and shall not be expanded beyond its existing footprint. All West Campus development shall utilize West Campus Point Lane for vehicular access. Vehicular access to Coal Oil Point Reserve (the Reserve) and the ADA coastal ac-cess parking spaces at Coal Oil Point shall utilize West Campus Point Lane, but shall be allowed to merge onto Slough Road through the Devereux South Knoll site in or-der to reach the applicable destination. The conversion of Slough Road shall be completed prior to occupancy of the first redevelopment project or other significant construction of 10,000 GSF or greater on West Campus at either the West Campus Mesa or North Knoll site. C. The existing West Campus Point Lane crossing of the North Finger of Devereux Slough, from West Campus Me-sa to North Knoll, shall be replaced with a bridge, or alter-native crossing that retains a natural open connection, to maximize wetland connectivity and avoid fill of wetlands. The construction of the new bridge or crossing shall be completed no later than prior to occupancy of the new res-idential construction on the North Knoll of the Devereux property. However, the bridge, or crossing, shall be in-stalled earlier if significant structural changes or roadway modifications are necessary to accommodate traffic in the area of the Slough crossing prior to North Knoll develop-ment D. Emergency vehicle, bicycle and pedestrian access may be provided from the existing Isla Vista streets of Fortuna or Pasado Roads; and E. Where deemed to be biologically beneficial, the Univer-sity will replace the wetland crossings on Slough Road with crossings that are designed to restore the connection between the North and South Fingers to Devereux Slough and to avoid fill of existing and historic boundaries of the

Page 48: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

31

2010 LRDP Policy Consistency Analysis

wetland to the maximum extent feasible. The replacement will occur as funding is available. The University will pur-sue potential University and non-University funding options to implement this project. PARKING Policy TRANS-13 - Visitors shall be entitled to use the parking facilities (all “C” or metered spaces) on campus after payment of the appropriate parking fee and in ac-cordance with campus parking regulations. Subject to Campus Consultation3 , the University will limit issuance of quarterly and annual day time (commuter) parking permits to faculty, staff, and students that reside in UCSB housing (excluding the West Campus Faculty Housing and North Campus Faculty Housing developments), unless the need for such permit is demonstrated by virtue of temporary or permanent physical disability, or other extraordinary cir-cumstance, as determined on a case-by-case basis. 3 Campus Consultation is defined in Appendix B to the UCSB-SUN Agreement

Consistent. Visitors will use “C” or metered spaces in Parking Lot 41 near the project site. This is not a housing site and the rest of this policy is not applicable.

Policy TRANS-14 (as amended LRDP-Amendment No. LRDP-4-UCS-16-0001-1 Part B)- A. The University shall provide and maintain a minimum of 154 dedicated coastal access parking spaces on Main Campus: • two (2) spaces in Lot 5; • twenty (24) spaces in Lot 6; • forty (40) in Structure 10; • sixty (60) in Structure 22; • fourteen (14) in Structure 23S; and • fourteen (14) on Ocean Road. These dedicated coastal access parking spaces shall be permanently maintained on Main Campus in close proximi-ty to the coast. B. Dedicated coastal access parking shall be identified on the Coastal Access Program Map (Figure E.4), and shall be delineated to encompass the entire road segment used for on-street parking and the entire parking lot or structure

Not Applicable. The project does not impact coastal access. The University continues to monitor parking on campus.

Page 49: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

32

2010 LRDP Policy Consistency Analysis

for off-street parking. Based on the requirements of the respective Notice of Impending Development, Figure E.4 shall indicate whether each of the dedicated spaces is: 1. Located on the first floor if the structure is multi-level (coastal visitor parking shall be prioritized for the first floor in such cases); 2. ADA accessible; 3. Subject to any hourly, daily, weekend, or seasonal re-strictions on use by public coastal visitors; and 4. Metered or subject to a purchased campus parking pass. C. Any modification to the terms of use or specified loca-tion(s) of the designated coastal access parking spaces shall require an LRDP amendment. The relocation of dedi-cated coastal access parking spaces may be approved only when: the equivalent number of spaces are replaced on the same Campus; the spaces are distributed to max-imize public access; and the spaces are relocated in bene-ficial proximity to nearby public coastal access, recreation-al, and ADA accessible amenities. The relocated spaces shall be identified on the Coastal Access Program Map (Figure E.4) as part of the LRDP amendment. The addition of new dedicated coastal access parking spaces, required as mitigation for the cumulative loss of parking on Campus that is required pursuant to a Notice of Impending Devel-opment, shall not require an amendment to the LRDP. However, the Coastal Access Program Map shall be peri-odically updated, for instance by folding Figure E.4 in with other LRDP amendments, to reflect the location and terms of any new dedicated coastal access spaces and any re-numbering or renaming of parking lots or structures. Coastal access parking required as mitigation pursuant to a NOID shall be subject to the requirements of the policy irrespective of whether the parking has been officially rec-orded by an LRDP amendment to Figure E.4; and D. Coastal access signage shall be updated concurrent with a relocation and or addition of dedicated coastal ac-cess parking spaces.

Page 50: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

33

2010 LRDP Policy Consistency Analysis

Policy TRANS-15 - A. All family housing (faculty, staff and student) shall have a minimum of 1.5 parking spaces per unit plus ½ space per unit for guest parking for a total of 2 parking spaces per unit. Dormitory housing, or other housing that accom-modates individuals rather than families, shall provide a minimum of one parking space per four student bed-spaces and adequate guest parking based on a site-specific parking study that evaluates the types of residents (e.g., graduate students, undergraduate students, faculty, etc.), the availability of surrounding campus visitor parking, and describes the parameters for determining the devel-opment’s peak potential need for campus visitor parking. These parking ratios shall apply except as required in Pol-icy LU-14, LU-24, LU-20, and LU-18. B. A reduced or greater number of parking spaces may be approved where a site-specific parking study, submitted with the relevant Notice of Impending Development, pro-vides a detailed evaluation of the site’s current and poten-tial parking needs for the life of the development that evi-dences that the actual parking need for the development is lower or higher than the total number of spaces required in “A” above. The detailed parking analysis shall include, but not be limited to: housing size and types; resident popula-tion; resident restrictions; designated location of parking; potential areas where parking may inadvertently occur due to convenience or an insufficient designated parking ca-pacity; University commitments to alternative transporta-tion for the life of the project; monitoring provisions; and potential adaptive measures to be approved through a fu-ture NOID if monitoring shows that parking associated with the development is being displaced to areas outside of the designated location. C. Where otherwise-required parking is reduced pursuant to the provisions of Subparagraph B above, the University shall monitor the parking to determine whether parking as-sociated with development is displaced to sites other than the designated parking area, and submit a resultant report to the Executive Director of the Coastal Commission, an-

Not Applicable. The project is not a housing project.

Page 51: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

34

2010 LRDP Policy Consistency Analysis

nually. If the Executive Director determines that monitoring of parking shows displacement, the Executive Director shall notify the University and within one year from receipt of such notification the University shall provide a NOID, or LRDP Amendment as necessary, to remediate the parking capacity. Policy TRANS-16 - Where new development would re-move existing commuter or residential parking, the NOID for the project must account for the removed spaces and identify where the removed spaces can either be accom-modated in existing campus parking facilities or where new spaces will be built to replace the lost spaces. Where redevelopment of a site also removes a building function and associated potential commuter population, and where the function/population is not displaced elsewhere on campus, the spaces may be removed without being reas-signed.

Not Applicable. The project does not remove existing commut-er or residential parking.

Policy TRANS-17 - A. For the purposes of this policy, commuter parking shall mean the parking spaces that serve all vehicles arriving to campus except for residential parking spaces; B. Commuter parking shall be maintained on campus in a sufficient quantity to accommodate all UCSB-bound driv-ers. Commuter parking to serve faculty, staff, students, researchers, vendors, and visitors shall be dispersed at multiple locations on Main Campus to avoid over-crowding at any one location. The University shall continue to im-plement its Transportation Demand Management Program to reduce parking demand to the maximum extent feasible consistent with Policy TRANS-03. Parking demand that is not eliminated through TDM measures shall be accommo-dated on the campus; C. The University shall maintain a running account of the commuter parking supply consistent with the following cat-egories: (1) the permanently designated commuter parking locations and number of spaces reserved for particular us-ers groups and (2) the non-reserved spaces available to all commuters, including visitor spaces. This parking doc-

Not Applicable. The project does not impact commuter parking. The University continues to monitor parking on campus.

Page 52: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

35

2010 LRDP Policy Consistency Analysis

umentation shall be updated and submitted with each No-tice of Impending Development (NOID) that adds, re-moves, or relocates commuter/ visitor parking spaces; and D. The University shall evaluate commuter parking supply and demand for each new development that has an impact on commuter parking. Any development that reduces commuter parking supply shall demonstrate that adequate commuter parking capacity still exists, or will exist prior to occupancy of the development, for campus commuters in general, as part of the NOID submittal (as determined in subparagraph “D” below). Where the proposed develop-ment contributes to the use of commuter parking, com-muter parking supply shall not be deemed adequate for the development if the parking surveys demonstrate 85% occupancy, or greater, for commuter parking within a 10-minute walk of the proposed development. E. The University shall undertake periodic monitoring, a minimum of once per Fall, Winter, and Spring quarters, of the occupancy of commuter parking spaces for the entire campus during the peak use of parking of this nature (commuters). If parking surveys show average commuter parking occupancy reaches 85% (or greater) of total com-muter parking spaces over a period of at least one school year (not including summer session when use is signifi-cantly lower), the University shall submit a NOID, and/or LRDP Amendment as applicable, to implement additional alternative transportation demand measures, or where al-ternatives are demonstrated to be insufficient to reduce parking demand to less than 85% occupancy, the Univer-sity shall propose and construct additional parking. The new parking shall be fully implemented as soon as feasible and no later than when the average campus commuter occupancy (not including summer session) reaches 90% of available spaces. F. The University shall not construct new commuter park-ing spaces unless the parking surveys required pursuant to subdivisions D and/or E demonstrate that commuter parking occupancy reaches 85% or greater, with the ex-ception of construction of large parking structures desig-

Page 53: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

36

2010 LRDP Policy Consistency Analysis

nated primarily for residential parking that accommodates a shared use secondary to residential use. This require-ment shall not apply to retention, reconfiguration, or rede-velopment of existing parking spaces. Policy TRANS-18 - A. Residential parking shall be maintained for all campus housing developments in a sufficient quantity to serve the needs of the residential community, as required pursuant to Policy TRANS-15. Residential parking shall be located and assigned to a particular parking location(s) for each campus housing development. Parking may be assigned to existing or new parking locations with available capacity pursuant to a NOID. Assigned residential parking spaces may be relocated as feasible to maintain campus flexibility provided that such relocation shall not have adverse im-pacts to coastal resources (e.g., displacement of coastal access parking) and that any such reassignment shall re-quire a NOID prior to reassignment; B. The University shall maintain a running account of the permanently assigned parking lot(s) and number of spaces accommodating residents and guests for each campus housing development. This parking documentation shall be updated and submitted with each Notice of Impending Development (NOID) that proposes new development, re-development, or renovation of housing and with each NOID that adds, removes, or relocates parking spaces rel-ative to housing developments C. The University shall evaluate residential parking supply and demand for each new development that has an impact on residential parking. Where the residential parking sup-ply is determined to be insufficient to serve a campus housing development and/or residential parking is displac-ing parking into Isla Vista, the University shall submit a NOID, or LRDP Amendment as applicable, to construct additional parking and remediate the constrained parking situation. The new parking shall be fully implemented as soon as feasible and no later than within one year of iden-tifying the parking issue; and

Not Applicable. The project does not impact residential parking.

Page 54: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

37

2010 LRDP Policy Consistency Analysis

D. Along with any individual monitoring requirements rele-vant to approved housing developments, the University shall also monitor occupancy of the assigned residential parking spaces for the entire campus during the anticipat-ed peak use of parking of this nature (residential), no less than once per year. The purpose of the annual monitoring shall be to evaluate the residential use of the assigned parking. If parking is at 85% occupancy or greater, addi-tional surveys shall also be completed in Fall, Winter, and Spring quarters to determine adequacy of residential park-ing. Residential parking analyses shall not average park-ing use to include the summer session, when use is signif-icantly lower. Policy TRANS-19 - The University shall provide and main-tain parking to serve the typical recreational parking needs of the Storke and Main Campus Core Recreation Areas, including but not limited to locations within Parking Lot 38 and Parking Structure 18. Parking for peak recreational events may be distributed to other locations on Main Campus using signage and/or other system (e.g., flag per-son) to direct traffic to intended spaces.

Not Applicable. The project is not within the Storke or Main Campus Core Recreation Areas.

Policy TRANS-20 - The University shall contribute fair-share funds toward the development and implementation of a parking program in Isla Vista proportionate to the Uni-versity’s contribution to Isla Vista parking use which in-cludes use of parking by student or other University-affiliated residents in Isla Vista, student or other University-affiliated residents on campus, commuters, and campus visitors. The University’s fair-share will be determined by the Coun-ty of Santa Barbara in consultation with the University and based on surveys documenting Isla Vista parking trends. The parking program shall be designed and implemented with the goal of protecting coastal access and coastal ac-cess parking in Isla Vista.

Not Applicable. The project is student garden project and does not impact parking. The University continues to monitor parking on campus and contribute its fair share to the County of Santa Barbara as it relates to IV Parking.

NORTH AND WEST CAMPUSES POLICIES Policy TRANS-21 - Pedestrian access to the beach shall Not Applicable. The project does not impact pedestrian access

Page 55: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

38

2010 LRDP Policy Consistency Analysis

be maintained from North and West Campus. Vertical ac-cess to the beach shall at a minimum be provided at the following locations: A. A new stairway along West Campus Bluffs midway be-tween Camino Majorca and Coal Oil Point; B. A boardwalk/stairway at the Sands Beach entrance from Coal Oil Point; C. The Dune Pond Trail through Coal Oil Point Reserve; and D. A trail from the coastal access parking lot at the west terminus of Phelps Road via a trail along the western boundary of North Campus that outlets to the beach. Trail access up-coast along the bluff top should be marked with appropriate directional information and cautions against intrusion down the steep bluff face

to the beach.

Policy TRANS-22 - Site planning for the North and West Campuses shall ensure that trails through the North and West Campuses (Figure E.3) are aligned to connect with existing and planned public trails in the adjoining Ellwood-Devereux open space.

Not Applicable. The project does not impact trails on North and West campuses.

Policy TRANS-23 - A. The University shall provide and maintain a minimum of 70 dedicated coastal access parking spaces on the North and West Campuses: • twenty (20) spaces at the north entrance to West Cam-pus at Cameron Hall until relocated to West Campus Me-sa; • twenty (20) spaces at the western terminus of Phelps Road; • twenty-seven (27) spaces on the Devereux South Knoll site; and • three (3) ADA accessible spaces at Coal Oil Point. These dedicated coastal access parking spaces shall be permanently maintained on North and West Campuses in close proximity to coast access and trails; B. Dedicated coastal access parking areas shall be identi-fied on the Coastal Access Program Map (Figure E.4). Where already formally established, Figure E.4 shall indi-

Not Applicable. The project does not impact public coastal ac-cess parking.

Page 56: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

39

2010 LRDP Policy Consistency Analysis

cate, based on the requirements of the respective Notice of Impending Development (NOID), whether each of the dedicated spaces is: a) ADA accessible; b) subject to any hourly, daily, weekend, or seasonal restrictions on use by public coastal visitors; and c) metered or subject to a pur-chased campus parking pass. Any changes to the Coastal Access Program Map (Figure E.4) shall require an amendment to the LRDP; C. The dedicated coastal access parking spaces for each parking area identified in Section “A” above shall be re-viewed as a component of the NOID for the adjacent hous-ing development and installed or formally established con-current with the housing component. Coastal access park-ing spaces may also be reviewed and established sooner under a separate NOID. Commission-approved coastal access signs sufficient to direct the public from major in-tersections to the parking site shall be installed concurrent with the establishment of the dedicated coastal access parking spaces. Any terms of use, such as metering, hour or day of week limitations, and parking fees applicable to the designated public coastal access parking on the North and West Campuses shall be reviewed pursuant to a NOID and shall allow for the daily use of the beach by the public during day and nighttime hours, except as provided for temporary closures in Policy PA-06. D. Relocation of dedicated coastal access parking spaces or any other modifications to a parking lot, structure, road-way, or procedure that modifies the terms or use of the dedicated coastal access spaces shall require an LRDP amendment. The relocation of dedicated coastal access parking spaces may be approved only when: the equiva-lent number of spaces are replaced on the same campus; the spaces are distributed to maximize public access; and the spaces are relocated in beneficial proximity to nearby public coastal access, recreational, and ADA accessible amenities. The relocated spaces shall be identified on the Coastal Access Program Map (Figure E.4) as part of the LRDP amendment.

Page 57: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

40

2010 LRDP Policy Consistency Analysis

Policy TRANS-24 - Public access shall be allowed within and around the Coal Oil Point Reserve, consistent with the Coastal Access Program and Trails Maps (Figures E.3 and E.4). Fences, signs and information maps delineating the perimeter of the Reserve shall be provided and main-tained to restrict unauthorized access by pedestrians, dogs, motor vehicles and off-road bicycles (except essen-tial service and emergency vehicles) for the purpose of protecting the Reserve’s sensitive resources by encourag-ing and directing the public to remain on the authorized trails. Restrictions placed on coastal access, such as limits on timing or location of access, require authorization pur-suant to an LRDP Amendment, except for temporary clo-sures for emergencies or to protect fragile coastal re-sources consistent with Policy PA-06.

Not Applicable. The project does not impact public access and is not located on Coal Oil Point Reserve.

Policy TRANS-25 - The cost of parking shall not exceed the fee charged for parking permits on the Main Campus. The University shall ensure that any fees or permits nec-essary for public parking may be paid or obtained onsite or at the entrance to each coastal access parking lot on the North and West Campuses. The University shall provide signs at the nearest public road to the entrance to each coastal access parking lot on North and West Campuses that inform the public of the availability of public parking for beach users. Information as to the location, limitations, and availability of public coastal access parking on the North and West Campuses shall also be included in infor-mational materials and maps at the kiosk located in Uni-versity Plaza.

Consistent. The project does not add or delete parking spaces that would result in a fee. Up to six parking spaces would be available in existing parking lot 41 to staff working at the garden. These spaces require the general campus fee for “C” spaces.

Policy TRANS-26 - Any changes to the development and implementation of open spaces, public access and trails planning for North and West campuses, including the Coal Oil Point Reserve, shall be coordinated with the City of Goleta, the County of Santa Barbara, and the California Coastal Commission

Not Applicable. There are no changes to the development and implementation of open spaces, public access and trails from the project.

Policy TRANS-27- A. The University shall track and maintain a detailed ac-count of the number and location of the parking supply for

Not Applicable. This is not a project specific policy. The Univer-sity continues to implement this policy.

Page 58: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

41

2010 LRDP Policy Consistency Analysis

each of the following: Commuter parking spaces, with a specific subcat-

egory evaluating commuters for recreational events and a subcategory evaluating visitor spaces;

Residential parking spaces (residents and guests) for each housing development;

Dedicated Coastal Access Parking Other Reserved Spaces and Timed Parking

For the purposes of this policy, commuter parking shall mean the parking spaces that serve all vehicles arriving to campus except for residential parking spaces. B. The University shall track and maintain records regard-ing: (1) the number of parking permits issued to students, faculty, and staff for residential purposes; (2) the number of parking permits issued in association with each residen-tial development; and (3) the type(s) and number of com-muter parking permits issued to students, faculty, and staff for commuter purposes each quarter. C. The above information shall be integrated into all park-ing supply and demand evaluations required for develop-ment that impacts residential or commuter parking sup-ply/demand as outlined in Policy TRANS-17 and Policy TRANS-18. D. The parking information above shall be compiled and submitted annually to the Executive Director.

RECREATION – 30213, 30220-30221, & 30255

GENERAL POLICIES

Policy REC-01 – A. Recreation facilities serving organized sports and rec-reational programs are allowed in the Recreation-designated areas on Main Campus (Policy LU-13), Harder Stadium, and Storke Field (Policy LU-29). Outdoor lighting of these recreational facilities shall be determined as al-

Not Applicable. The project does not impact recreation facili-ties.

Page 59: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

42

2010 LRDP Policy Consistency Analysis

lowed in Policy ESH-15. B. Recreational facilities on West Campus (LU-32) shall not serve organized sports or recreational programs. Rec-reational amenities allowed in the Recreation-designated area on West Campus shall be low-intensity recreation facilities for day use only and shall not be lighted except the minimum necessary for safety purposes and con-sistent with lighting standards in Policy ESH-15. Indoor or other enclosed sports facilities shall be prohibited in the Recreation-designated areas on West Campus. C. Other recreational amenities that are not for organized sports or recreational programs may be developed: 1. Within housing developments to serve the on-site resi-dents or 2. Within Academic and Support areas to serve campus populations, provided such amenities are indoor or limited to daytime recreation only. Lighting for the allowed outdoor amenities in housing developments or Academic and Sup-port areas shall be for safety purposes only and consistent with lighting standards in Policy ESH-15. D. New, replacement, expansion, relocation or other signif-icant modifications to facilities within Recreation-designated areas shall be processed as a Notice of Im-pending Development. Policy REC-02 – Outdoor recreational facilities, including recreation fields, basketball and tennis courts, may be used by the public at prevailing cost, when not being used by campus classes or programs.

Not Applicable. The project does not impact recreation facili-ties.

Policy REC-03 – Indoor recreational facilities such as weight rooms, gymnasia and the swimming pool may be used by the public on a low cost per-use or quarterly ba-sis, as established by campus administrative programs.

Not Applicable. The project does not impact recreation facili-ties.

Policy REC-04 – New Housing projects, including those adjacent to coastal bluff top park and open space recrea-tion areas, will contain recreational facilities and open space within the development so that oceanfront recrea-tional areas will not be overburdened.

Not Applicable. The project does not impact recreation facili-ties.

MAIN CAMPUS POLICIES

Page 60: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

43

2010 LRDP Policy Consistency Analysis

LAND RESOURCES/ESH - 30240 (a) & (b)

OPEN SPACE Policy OS-01: The Open Space designated on Figure D.1 shall establish the location and limits of Open Space (OS) areas subject to the OS policies set forth herein. The Open Space protection Policies OS-02 through Policy OS-10 shall apply to all designated opens space areas with the exception of the open space areas at: Commencement Commons, UCEN lawn, and Pearl Chase Garden (Figure B.8).

Not Applicable. The project is in an area designated Academic and Support and does not impact open space.

Policy OS-02: The campus lands designated “Open Space” (OS) on the Land Use Map (Figure D.1) shall be set aside and permanently preserved and protected from development and disturbance for the primary purpose of providing spatially and ecologically connected areas and corridors in perpetuity. OS lands shall be managed to en-hance, restore, preserve and expand wetlands, grass-lands, raptor habitat, rare species habitat, and other signif-icant habitat areas. Where supported by biological evalua-tion, minor adjustments may be feasible along the periph-ery of the Open Space-designated lands, through a Com-mission-approved LRDP amendment. The intent of the edge adjustments shall be to refine the boundary of the 2010 LRDP land uses rather than accommodate additional land uses.

Not Applicable. The project is in an area designated Academic and Support and does not impact open space.

Policy OS-03: New development within OS lands shall be limited to the allowed land uses listed in Section D, Land Use for the Open Space land use designation. Consistent with the uses allowed within OS lands, future development within OS-designated lands may specifically include, but not be limited to the following, subject to other pertinent policies and provisions of the LRDP, and shall require a NOID: 1. Public coastal access parking at Coal Oil Point, North Campus Open Space - Ocean Meadows, and West Cam-

Not Applicable. The project is in an area designated Academic and Support and does not impact open space.

Page 61: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

44

2010 LRDP Policy Consistency Analysis

pus Mesa, including ADA-compliant links where feasible from the parking area at Coal Oil Point to the section of the California Coastal Trail along West Campus Bluffs. 2. A visitor or interpretive center on the North Campus Open Space – Ocean Meadows site pursuant to Policy LU-19. 3. Road widening or other road improvements, including the required bridging crossing of the wetlands between West Campus Mesa and North Knoll that is necessary to accommodate an alternative vehicular access on West Campus and implement the Slough Road conversion pur-suant to Policy TRANS-12. 4. The route from Parking Lot 38 to Los Carneros Road may be retained for bicycle and pedestrian use and nec-essary emergency vehicle access, provided that the con-nection through the open space is re-engineered to in-clude a bridge or alternative crossing that retains a natural open connection to provide wetland connectivity consistent with Policy LU-28. Policy OS-04: The University shall provide for the com-prehensive planning, tracking, management, and monitor-ing of the OS-designated lands in accordance with the fol-lowing: 1. To offset the increased intensity of development associ-ated with the build-out of the 2010 LRDP, the University shall fully restore the North Campus Open Space – Ocean Meadows site. The University’s responsibility to restore the site shall not preclude community involvement or commu-nity restoration projects on the site. Such restoration shall include habitat restoration, coastal access parking and trails, and potentially a visitor or interpretive center. The restoration shall be initiated prior to occupancy of the first campus housing project NOID approved subsequent to the 2010 LRDP and shall be fully installed by 2030, and moni-tored and maintained until successful. The restoration of the Ocean Meadows site shall begin prior to completion of the comprehensive LRDP Open Space Management Plan required in Policy OS-09 if the Plan is not complete prior to

Not Applicable. This is not a project specific policy. The Univer-sity continues to track Open Space lands. North Campus Open Spaces is currently under restoration.

Page 62: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

45

2010 LRDP Policy Consistency Analysis

the required initiation period (prior to occupancy of the first housing project). In this interim period, the University shall submit individual restoration projects as a Notice of Im-pending Development. 2. Open Space, other than the North Campus Open Space – Ocean Meadows and areas already subject to restora-tion, shall remain available for habitat conservation and public access purposes. Restoration of the remaining available open space may be implemented as project-driven mitigation or as voluntary restoration projects as funding becomes available and in accordance with the pri-orities for restoration projects that are set forth in the OS Plan required pursuant to Policy OS-09. Prior to comple-tion of the LRDP Open Space Management Plan, restora-tion projects may be implemented pursuant to individually approved NOIDs. 3. The University shall implement, in phases, the im-provements identified in the University’s portion of the Ellwood-Devereux Open Space regional planning effort consistent with the provisions of the LRDP. The improve-ments include maintenance of the Coastal and de Anza Trail formalization and development of a public coastal ac-cess trail system on North and West Campus consistent with Figure E.3, installation of designated public coastal access resources including parking, three beach access improvements, restrooms at Coal Oil Point, beach access improvement at “Jail House,” South Parcel Nature Park Enhancement Area, and West Campus Bluffs Nature Park Enhancement Area. 4. The status of the cumulative restoration of the Open Space shall be tracked and annually reported to the Exec-utive Director consistent with Policy OS-09. The tracking report shall include remaining restoration priorities and unmet funding requirements. 5. The University shall remediate and re-plant with appro-priate native species eroded or compacted areas that have resulted from unauthorized trails within Open Space and shall prevent further trespass.

Page 63: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

46

2010 LRDP Policy Consistency Analysis

Policy OS-05: Existing underground public service utilities such as water, sewer, electricity or natural gas service lines located within OS-designated lands may be repaired and maintained as needed. Existing overhead utility lines shall be removed or undergrounded at the earliest feasible opportunity utilizing the least environmentally damaging methods.

Not Applicable. The project does not include underground utili-ties except to connect with potable water for irrigation and elec-tricity to operate equipment.

Policy OS-06: Development undertaken on lands near OS-designated lands shall be sited and designed to mini-mize disturbance of Open Space, including noise and light pollution as perceived by wildlife, to the maximum extent feasible consistent with the provision of public safety.

Consistent. The student garden is within the vicinity of the open space lands on West Campus Mesa. The student garden will not have lighting or result in significant noise that would impact wild-life.

Policy OS-07: New outdoor lighting within Open Space shall be limited to the minimum necessary to protect public safety where Class I bikeways are developed on the pe-riphery of Open Space. Where existing Class I bicycle paths are currently lit inconsistent with this requirement, such lighting may be maintained. Other new outdoor light-ing within Open Space shall be prohibited unless author-ized pursuant to an amendment to this LRDP.

Not Applicable. There would be no lighting at the student gar-den.

Policy OS-08: Except for the purpose of habitat restora-tion and emergency vehicles responding to an emergency, motorized vehicles shall not be allowed on paths and trails located within OS-designated lands. New pedestrian or bicycle facilities within Open Space shall be located and designed in a manner to minimize potential impacts to en-vironmentally sensitive habitat areas to the maximum ex-tent feasible.

Not Applicable. The project is within Academic and Support land use designation and not Open Space.

Policy OS-09: Within three years after certification of the 2010 LRDP Update, the University shall prepare and sub-mit an LRDP Open Space Management Plan for certifica-tion as an LRDP amendment. A. The Open Space Management Plan shall, at a mini-mum, include the following components: 1. The primary purpose of the Plan shall be to achieve the permanent preservation, restoration, enhancement expan-sion, and ecological connectivity of a mosaic of sensitive coastal habitats, including wetlands, grasslands, and habi-

Not Applicable. This is not a project specific policy. The Univer-sity is preparing an Open Space Management Plan and will submit to the Coastal Commission as an LRDP Amendment.

Page 64: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

47

2010 LRDP Policy Consistency Analysis

tat for rare plant and wildlife species within all campus lands designated Open Space. The Plan shall articulate a comprehensive vision for all campus open space and its transition, and connection, to adjacent non-University open space lands. The vision shall be represented by detailed site plans that implement a comprehensive program of habitat restoration and carefully designed and managed public access within Open Space. In addition, the Plan shall include project-level habitat restoration and coastal access plans for the North Campus Open Space-Ocean Meadows site with measurable milestones to implement the full restoration of the site by 2030. In addition to im-plementing the Open Spaces policies of the LRDP, the Plan shall reflect, and be consistent with, all other relevant policies and provisions of the LRDP. 2. The Plan shall include a Baseline Assessment of the types of habitat linkages and wildlife corridors within Open Space designated lands. The Plan shall identify and map ESHA on the North Campus Open Space – Ocean Mead-ows Site. The Plan shall include the evaluation of the ex-isting level of disturbance or degradation of resources and the success of previous or on-going restoration projects within Open Space designated lands. The Plan shall in-corporate the plans and provisions of previously approved restoration and public access projects NOIDs/CDPs within OS-designated lands, including details such as planting palettes and locations, timing, success criteria, etc. The Baseline Assessment shall include a description of any existing vegetation management practices for fire reduc-tion/fuel modification or habitat restoration purposes. 3. The Plan shall identify Restoration Goals and Opportu-nities for restoration and enhancement of the open space habitats, including but not limited to, the location of habitat types targeted for restoration and the level and types of restoration/enhancement such as eradication of invasive species, planting or re-establishment of native species, sediment removal, and measures to ensure long term conservation of raptor habitat and to provide for the specif-ic habitat conservation measures necessary to protect

Page 65: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

48

2010 LRDP Policy Consistency Analysis

sensitive wildlife species such as the white-tailed kite and the western snowy plover. The Plan shall describe the cri-teria of success for the restoration goals and objectives. The Plan shall prioritize restoration projects and provide an anticipated/target time-line to incrementally implement the habitat restoration. The Restoration Goals and Oppor-tunities shall evaluate the need and effectiveness of exist-ing and proposed vegetation management practices for fire reduction/fuel modification or habitat restoration pur-poses. 4. The Plan shall require the full restoration of North Cam-pus Open Space – Ocean Meadows pursuant to Policy OS-04 and shall identify other restoration opportunities within the Open Space that may be achieved through fu-ture NOIDs. The Plan shall include measurable milestones to implement the North Campus Open Space – Ocean Meadows restoration by 2030. The restoration projects identified for Ocean Meadows lands shall be ranked in ac-cordance with the degree of ecological benefits provided by each project. The restoration identified within the ap-proved Plan for other OS lands shall be similarly ranked. However, the restoration of Ocean Meadows lands shall be required as mitigation for the overall increase in density and intensity approved in the LRDP Update. Other restora-tion projects on OS lands may be undertaken as other funding sources become available but shall not substitute for the required restoration of Ocean Meadows by the Uni-versity. 5. The Plan shall ensure that the tree masses serving as raptor habitat and/or monarch butterfly aggregations (e.g., near Storke Wetlands, West Campus, and the Ellwood Marine Terminal site) have a phased restoration that en-sures there is no interim loss of available habitat, serving the same habitat function, when the existing tree masses reach senescence or for any reason, including habitat management objectives, must be removed. Tree species adequate to replace the function of the existing trees shall be planted in and around the existing tree masses with the intended purpose of reaching maturity as the older trees

Page 66: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

49

2010 LRDP Policy Consistency Analysis

are lost. Locally native tree species such as the coastal live oak and sycamore that offer suitable nesting habitat upon maturation shall be preferentially planted in appro-priate locations, in an effort to gradually convert the non0native woodlands to native woodlands, using acorns and cuttings collected within twenty miles of UCSB. How-ever, other tree species that are native to other coastal California areas (such as Monterey cypress) may also be planted. Consideration shall also be given to including within the planting palette understory layers of locally na-tive species, such as elderberry and willow and herba-ceous species known to support native pollinators and other wildlife. Where existing trees are significantly pruned or removed within Open Space areas of campus, appro-priate native tree species and understory plantings shall be immediately planted. Volunteer seedlings of non-native tree species may be removed to support the gradual con-version of existing woodlands to predominantly locally na-tive tree species. Open space foraging areas located adja-cent to or near nesting trees are of particular importance for the conservation of white-tailed kites, and shall be con-sidered ESHA, and shall not be converted to other habitat types if the net area of similarly located white-tailed kite foraging habitat would be reduced. 6. The Plan shall include a full-sized map, prepared to scale, of all campus Open Space designated lands titled the Campus Habitat Restoration Map showing all restora-tion and/or enhancement project locations, including both voluntary and required as mitigation for impacts from ap-proved projects. The map shall also show the location and limits of existing authorized development including trans-portation features and utilities, in relation to all habitat res-toration or enhancement projects, including mitigation measures such as tree plantings previously required by the Commission or other regulatory agency. This map shall be updated after the approval of any NOID affecting OS designated lands as described below. 7. Where existing habitat management plans or approved mitigation measures or implementation of special condi-

Page 67: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

50

2010 LRDP Policy Consistency Analysis

tions imposed by the Commission have required or result-ed in particular habitat establishment or conservation measures within OS-designated lands, these shall be re-flected in the LRDP Open Space Management Plan and appended to the Plan for reference. 8. The Plan shall include the location and layout of essen-tial bike paths and pedestrian trails. 9. The Plan shall include measures to restore and en-hance disturbed areas used for unauthorized trails, roads and paths or other development within OS-designated lands that have not received past approval by the Com-mission. 10. The Plan shall include monitoring and adaptive man-agement provisions sufficient to ensure that the restoration goals and success criteria are ultimately achieved. Individ-ual restoration projects shall be monitored for a minimum of five consecutive years and until the restoration has been demonstrated to be a success. 11. To the extent feasible within the resources of the Uni-versity, the development of the Plan shall be advised by university and invited scientists with expertise in the range of habitats and sensitive plant and wildlife species that oc-cur within the campus Open Space lands, and the staff of the UCSB Cheadle Center for Biodiversity & Ecological Restoration (CCBER). B. Open Space Monitoring, Reports, and Adaptive Man-agement 1. The University shall track the Open Space Plan imple-mentation, and status of each restoration project, to en-sure that the restoration goals and success criteria are achieved. 2. The University shall submit an annual Open Space Tracking Report to the Executive Director of the Coastal Commission or its successor agency reporting on the sta-tus and success of the cumulative restoration of the Open Space. Where restoration goals are not being met, the University shall suggest additional measures to meet those goals. 3. At a minimum, the Campus Habitat Restoration Map

Page 68: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

51

2010 LRDP Policy Consistency Analysis

shall be updated subsequent to the approval of a new NOID that includes habitat restoration or other NOID that affects OS-designated lands. The Campus Habitat Resto-ration Map shall additionally be included as part of the an-nual Open Space Tracking Report. 4. The panel of expert advisors and CCBER staff will be convened periodically, as funding allows, to review and oversee the restoration and enhancement activities under-taken pursuant to the approved Plan and will report their findings in writing to the Executive Director in alternate years commencing two years after Commission approval of the Plan. The panel will provide recommendations to update the Open Space Plan as necessary to address problems in implementation or otherwise adapt to new knowledge of habitat or open space planning. Policy OS-10: Habitat of the western snowy plover, includ-ing resting, foraging, and nesting habitat, shall be pre-served and protected from disturbance. Access to trails near plover habitat may be managed to protect plover populations during nesting season.

Not Applicable. The project does not impact snowy plover habi-tat.

ESHA – GENERAL Policy ESH-01 – Except for public access improvements and habitat restoration, south-facing ocean bluffs on cam-pus lands shall remain in, or be restored to, natural condi-tions.

Not Applicable. The project is not near the ocean bluffs.

Policy ESH-02 – Pedestrians and bicyclists shall be en-couraged to remain within designated trails, corridors and bike lanes. Signs shall be located and maintained as nec-essary to encourage appropriate use of pedestrian and bicycle routes. Barriers shall additionally be installed if necessary to protect sensitive resources from trespass as authorized pursuant to a Notice of Impending Develop-ment.

Not Applicable. The project does not impact or add public trails.

Policy ESH-03 – Trails shall be sited, designed, con-structed, signed and maintained in a manner that limits disturbance of ESHA and open space to the maximum ex-tent feasible. Where necessary and no alternative exists, limited use of ESHA buffer areas may be authorized for

Not Applicable. This is a student garden project and does not impact or add public trails.

Page 69: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

52

2010 LRDP Policy Consistency Analysis

such trails provided the trail is aligned along the outermost area of the pertinent buffer and the intrusion of the trail route is minimized through design and landscaping fea-tures. Lighting shall be subject to Policy OS-7. Policy ESH-04 – Transportation corridors for bicyclists shall be sited, designed, constructed, signed and main-tained in a manner that encourages safe, multi-modal campus transportation and reduces motorized vehicle miles traveled while avoiding disturbance of open-space, ESHA, and ESHA buffers. Where a critical component of a proposed bicycle corridor would unavoidably encroach into an ESHA Buffer or Open Space, the extent of such en-croachment shall be minimized to the maximum extent feasible and unavoidable residual impacts shall be fully mitigated.

Not Applicable. This is a student garden project and does not include new transportation corridors.

Policy ESH-05 – Nature trails, intended for the passive enjoyment of the open space/ESHA resource, shall be re-stricted to pedestrian use and sited to afford the user an experience of the resource, provided that such trails are designed to protect the resource.

Not Applicable. The project does not impact or create trails.

Policy ESH-06 – Operational noise levels shall not exceed state standards. The following operational noise sources are not subject to the maximum sound levels: (a) Noise of safety signals, warning devices and emergen-cy pressure relief valves; and (b) Noise from moving sources such as tractors, automo-biles, trucks, airplanes, etc. For all special events where the proposed event or activity is expected to generate significant noise in close proximity to sensitive receptor locations, the campus shall impose limitations on the hours of the event or activity.

Consistent. There are no significant operational noise impacts. This is a student garden and operating the garden does not re-sult in excessive noise.

Policy ESH-07 – Construction noise levels shall not ex-ceed state standards of 65dB(A) at property lines except at Coal Oil Point Reserve where the maximum allowable construction sound levels shall be more restrictive and shall not exceed 60 decibels on the A-weighted scale.

Consistent. There would not be major grading or loud construc-tion noises from installing the student garden.

Policy ESH-08 – Orchards, vegetable, and other gardens should be incorporated into housing projects wherever

Not Applicable. This is not a housing project. The student gar-den will not support housing but will provide some food to stu-

Page 70: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

53

2010 LRDP Policy Consistency Analysis

practical, and existing legally-established gardens encour-aged to continue. Where orchards and gardening plots are proposed, these features shall be incorporated into the campus housing project landscape plans.

dents. The garden will be located in Academic and Support land use designation and will be incorporated into the curriculum of the adjacent Children’s Center.

Policy ESH-09 – Fencing and other types of barrier instal-lations on campus shall be wildlife-safe and wildlife-permeable, except where such barriers are necessary to restrict unauthorized human entry, the restricted area has no habitat value, and the placement of the barrier does not have an adverse impact on wildlife. Development in or ad-jacent to environmentally sensitive habitat areas or open space shall be designed and constructed to ensure the safe movement by wildlife (such as through the clustering structures and the installation of bridged crossings of wet-lands to replace culverts, etc.).

Consistent. The fence around the student garden will be built to keep wildlife out of the garden. Specifically raccoons. The Chil-dren’s Center has a bad history with a child becoming perma-nently ill (brain damage) after coming into contact with Racoon feces. Furthermore, it is not desirable to have raccoons, skunks, squirrels, and gofers in the garden area. In this case, the fence is required to keep wildlife out. The garden is not located in the middle of a wildlife corridor – it is adjacent to the Children’s Center play yard (share a fence). There would be no impact to wildlife.

Policy ESH-10 – The University shall use mosquito con-trol methods with the least effect upon non-target organ-isms and shall use environmentally sensitive pesticides (such as VectoBac®). Wetlands shall not be drained for this purpose, nor shall native wetland vegetation be re-moved, nor shall non-native larval predators be intro-duced.

Not Applicable. The project does not require the use of mosqui-to control methods.

Policy ESH-11 – The use of any noxious and/or invasive plant species listed as problematic, a ‘noxious weed’ and/or invasive by the California Native Plant Society, the California Exotic Pest Plant Council, the State of California or the U.S. Federal Government shall be prohibited in all campus landscaping.

Consistent. This is not a campus landscaping project. All of the plants and trees within the student garden will be edible and will not consist of exotic invasive plants.

Policy ESH-12 – Vegetation management activities may occur within Open Space and/or ESHA buffer areas, in-cluding mowing of native and non-native grasslands, when necessary to eradicate and control the spread of non-native species pursuant to a Commission-approved Habi-tat Restoration Plan. Surveys shall be conducted to identi-fy ESHA as well as isolated patches of native grassland and any other individual sensitive plant species that may be present in the managed area. The vegetation man-agement program shall ensure that measures are taken to

Consistent. The student garden project site is surrounded on three sides by paved road and on one side by the Children’s Center play yard. There will not be a need for vegetation man-agement within or around the garden.

Page 71: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

54

2010 LRDP Policy Consistency Analysis

avoid intrusion into ESHA, isolated patches of native grassland, and any other individual sensitive plant species that may be present. Vegetation management activities shall be the least intrusive and minimum necessary for restoration. The management of trees for any purpose, including restoration purposes, shall be subject to Policies ESH-28 and ESH-29 and Appendix 2, Tree Trimming and Removal Program. Policy ESH-13 – New development shall be sited to en-sure that vegetation management (including clearing, landscaping/irrigating, and thinning) associated with fire reduction/fuel modification activities (including mowing of grasslands) required by the Fire Department for long-term fire safety does not intrude within environmentally sensi-tive habitat areas (ESHA) or wetlands. Fire reduction/ fuel modification activities may occur within ESHA buffer or wetland buffer areas, provided that: (1) the fire reduc-tion/fuel modification activities are the minimum necessary to meet fire department requirements, and (2) the fire re-duction/fuel modification activities are implemented pursu-ant to a Commission-approved fire reduction/ fuel modifi-cation plan that ensures the long-term protection of habitat values. Where fuel modification intrudes into the ESHA buffer, the impact shall be mitigated pursuant to Policy ESH -23.

Consistent. The student garden project site is surrounded on three sides by paved road and on one side by the Children’s Center play yard. There will not be a need for vegetation man-agement within or around the garden.

Policy ESH-14 – Topsoil that is excavated, stored, or moved as part of an approved development shall be man-aged to preserve the viability of the mycorrhizae by being stockpiled no higher than 3 feet to protect the viability of the mycorrhizae. To the extent feasible, topsoil should be reused on site or for restoration.

Not Applicable. There would be no topsoil excavated and stored. Soil would be imported to the site to install the garden. Some hand excavated soil for fence posts and irrigation would be screened for archeological resources and placed back on the site.

Policy ESH-15 – The University shall replace and/or retro-fit all outdoor lighting within ten (10) years following the date of effective certification of the 2010 LRDP to minimize the campus lighting footprint/envelope consistent with the following: A. The University shall prepare a campus-wide Baseline Outdoor Lighting Assessment that:

Not Applicable. This is not a project specific policy. The Univer-sity has a CCC Lighting Plan and adheres to this policy.

Page 72: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

55

2010 LRDP Policy Consistency Analysis

1. Provides an inventory, map, and detailed description of existing outdoor lighting; 2. Identifies stand-alone (pole-mounted, bollards, etc.) Light fixtures that do not comply with the design and effi-ciency standards set forth in Subparagraph C below; and 3. Describes the lighting specifications used to measure compliance with the design and efficiency standards set forth in Subparagraph C below. B. The University shall prepare and submit an Outdoor Lighting Replacement and Retrofit Program as an LRDP Amendment for Commission approval within 18 months after the updated LRDP is certified. The Program shall: 1. Include the Baseline Assessment developed pursuant to Subparagraph A above; 2. Provide a replacement/retrofit map that identifies the location of all non-compliant outdoor lights and describes whether each light shall be replaced or retrofitted; 3. Identify a suite of target technologies and lighting speci-fications to meet the requirements of Subparagraph C. be-low. 4. Prioritize the replacement and/or retrofit of the identified lights with the highest priority assigned to the non-compliant outdoor sports and recreation facility lighting and the second highest priority assigned to non-compliant outdoor lights of any kind in closest in proximity to ESHA, wetlands, or open space; when replacement/retrofit is im-plemented in conjunction with a NOID for a new develop-ment, the highest priority may, alternately, be assigned to the nearest non-compliant lighting proximate to the pro-posed development; 5. Identify a proposed schedule to incrementally imple-ment the replacement/retrofit in the order prioritized as part of each campus construction project to ensure full re-placement/retrofit within ten years of the certification of the 2010 LRDP; this shall include measurable goals to be im-plemented with each NOID; and 6. Be implemented as part of each campus development that includes an outdoor lighting component; additionally, the Program may be implemented through a series of

Page 73: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

56

2010 LRDP Policy Consistency Analysis

separate projects as necessary to achieve full Program implementation in the given time-frame. C. All outdoor lighting shall be designed to avoid, or mini-mize to the maximum extent feasible, all forms of light pol-lution, including light trespass, glare, and sky glow, and shall at a minimum incorporate the following: 1. Best available visor technology to minimize light spill and direct/focalize lighting downward, toward the targeted area(s) only; 2. The minimum standard (pole) height and height of the light mounting necessary to achieve the identified lighting design objective; 3. The best available technology and a lighting spectrum designed to minimize lighting impacts on sensitive species and habitat; and 4. Measures to minimize light trespass onto ESHA and open space areas. D. As part of the routine maintenance and replacement of outdoor light fixtures and bulbs, including repair and maintenance of fixtures attached to buildings, the Universi-ty shall use new materials that meet or exceed the stand-ards set forth in Subparagraph C. E. New or retrofitted lighting of outdoor sports facilities shall be limited to the Recreation-designated lands at Harder Stadium, the two approved tennis courts on Storke Campus, and within the Main Campus recreational com-plex as it exists as of the date of certification of the 2010 LRDP within the area delineated on the “Limits of Outdoor Sports Lighting Map” in Appendix 4. New outdoor lighting for sports purposes outside of the limits shown on the “Limits of Outdoor Sports Lighting Map” shall be prohibit-ed. Existing night lighting of sports facilities elsewhere on campus shall be considered a non-conforming use/structure. New or retrofitted sports lighting shall re-quire a Commission-approved Notice of Impending Devel-opment, which shall not be processed until the Commis-sion certifies the Outdoor Lighting Replacement and Ret-rofit Program required pursuant to Subparagraph B above, and shall meet the standards set forth in Subparagraph C

Page 74: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

57

2010 LRDP Policy Consistency Analysis

above and the following additional requirements: 1. Shall not exceed the minimum level of power and brightness necessary for the proposed level of collegiate or intramural use; and 2. Shall mitigate the impact of new lighting by retrofitting or removing existing sports lighting and other outdoor lighting sources consistent with the identified priorities in Subpara-graph B above. F. Development with an outdoor lighting component shall comply with the standards set forth in Subparagraph C of this policy. In addition, the NOID for each development with an outdoor lighting component shall implement a por-tion of the Outdoor Lighting Replacement and Retrofit Program consistent with the provisions of Subparagraph B above. Prior to the approval of the Outdoor Lighting Re-placement and Retrofit Program, each NOID with an out-door lighting component shall include outdoor lighting retro fits/replacements in the nearest feasible location(s) to the proposed development. The NOID shall include a lighting plan and lighting specifications that identify the location of lights, the light fixture type, the light spectrum/bulb, the di-rection of light, and any special measures or treatments to control light spill for all on-site and off-site re-placed/retrofitted outdoor lighting. The replacement schedule/map shall be updated and submitted in support of each NOID to track the progress of the Program imple-mentation. G. The University shall submit to the Executive Director of the Commission an annual report tracking the incremental progress of the Outdoor Lighting Replacement and Retrofit Program. The report shall indicate the location, type, and specifications for outdoor lighting replacements and retro-fits that occurred in the previous year and priority areas for the subsequent year. Policy ESH-16 – Night lighting shall be prohibited in envi-ronmentally sensitive habitat areas (ESHA) buffer and wet-land buffer areas, except as required for public safety

Not Applicable. There will be no night time lighting at the pro-ject site.

Page 75: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

58

2010 LRDP Policy Consistency Analysis

where an approved Notice of Impending Development specifically authorizes development within buffer areas pursuant to Policy ESH-22. In such cases the lighting shall be the minimum necessary to ensure public safety and shall be designed and implemented consistent with the lighting requirements of Policy ESH-15. Where lighting in a buffer area is proposed pursuant to this policy, the Univer-sity shall submit a plan to screen nearby sensitive habitat from the effects of light pollution through landscaping with appropriate native plants or other measures. WETLANDS, ESHAS & TREES Policy ESH-17 – Environmentally sensitive habitat areas (ESHA) on campus shall be protected and, where feasible, enhanced and restored. Only uses dependent on such re-sources shall be allowed within such areas. Where ESHA has been degraded through habitat fragmentation, coloni-zation by invasive species, or other damage, such areas shall be restored.

Consistent. The project site is located on an Academic and Support land use designation. It is not within or adjacent to ESHA. There would be no impact.

Policy ESH-18 – Natural Open Space Areas and Envi-ronmentally Sensitive Habitat areas on campus shall be restored with native plant species of local genetic stock, appropriate to habitat type, such as riparian, wetland, and coastal sage scrub plant community.

Not Applicable. The project site is located on an Academic and Support land use designation. It is not within or adjacent to Natu-ral Open Space or ESHA.

Policy ESH-19 -Development adjacent to an ESHA shall be sited and designed to minimize impacts to habitat val-ues and sensitive species to the maximum extent feasible. A native vegetation buffer shall be required between the development and the ESHA to serve as transitional habitat and provide distance and physical barriers to human intru-sion. The buffer shall be of a sufficient size to ensure the biological integrity and preservation of the ESHA. The min-imum buffer (setback) from an Environmentally Sensitive Habitat Area or freshwater wetland shall be 100 feet from the outermost edge of the ESHA or wetland, except as specifically authorized by the Commission in Policy ESH-33 and Policy ESH-31. The minimum buffer from brackish marsh shall be 200 feet from the upland edge of the brack-ish marsh, except as specifically authorized in Policy ESH-

Not Applicable. The project site is located on an Academic and Support land use designation. It is not within or adjacent to ESHA.

Page 76: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

59

2010 LRDP Policy Consistency Analysis

31 The minimum buffer from coastal saltmarsh shall be 300 feet from the upland edge of the saltmarsh, except as specifically authorized in Policy ESH-31. The minimum buffer from eucalyptus raptor tree ESHA shall be 300 feet from the outer edge of the canopy, except as specifically authorized in Policy ESH-31. The required buffer areas shall be measured from the fol-lowing points: • The upland edge of a wetland. • The outer edge of the canopy of riparian vegetation, in-cluding additional area necessary to protect the root zones of trees. • The outer edge of the plants that comprise a rare plant community ESHA. For annual species and perennial spe-cies that periodically lie dormant, the rare plant community ESHA shall be determined as the maximum convex poly-gon that connects the known current and historical loca-tions of that species in order to capture the maximum habi-tat area, including dormant seed banks, bulbs, or rhizomes of rare plant species. The boundaries of rare plant com-munities shall include historic locations, within the past 20 years, of the subject habitat/species that are pertinent to the habitat under consideration. • The outer edge of any habitat used by mobile or difficult to survey sensitive species (such as ground nesting habi-tat or rare insects, seasonal upland refuges of certain am-phibians, etc.) within or adjacent to the lands under con-sideration based on the best available data. • The top of bank for streams where riparian habitat is not present. • The outer drip line of trees designated ESHA. Policy ESH-20 – New development sited adjacent to ESHA buffers shall include provisions for the enhance-ment of the buffer with appropriate native vegetation pur-suant to Policy ESH-32. Except for development that is otherwise consistent with the LRDP and approved pursu-

Consistent. The project site is located on an Academic and Support land use designation. It is not within or adjacent to ESHA.

Page 77: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

60

2010 LRDP Policy Consistency Analysis

ant to a NOID, existing development that is located within an ESHA buffer shall be removed and restored to an en-hanced natural area at the time of redevelopment. A buffer enhancement plan shall be submitted as part of the NOID that authorizes the adjacent development. Where restora-tion of a non-ESHA area within a required buffer area is restored pursuant to an approved NOID, additional devel-opment setbacks shall not be required from the area of restoration. Policy ESH-21 – Biological resources surveys shall be performed for all new development that is proposed where there is a potential for sensitive species, ESHA, or wet-lands to be present; within or adjacent to ESHA (where the proposed development is within 200 feet of ESHA); within or adjacent (within 200 feet) to wetlands; within or adjacent (within 200 feet) to designated Open Space or other natu-ral open space areas; or within 500 feet of trees suitable for nesting or roosting or significant foraging habitat is pre-sent. The results shall be presented in a biological report that shall include an analysis of the potential impacts of the proposed development on any identified habitat or species and recommendations for siting and design of the development to ensure protection of sensitive biological resources and habitat values. Where established public agency “protocols” exist for the survey of a particular spe-cies or habitat, the preparing biologist shall undertake the survey and subsequent analysis in accordance with the requirements of the protocol and shall be trained and cre-dentialed by the pertinent agency to undertake the subject protocol survey when such training and credentialing is available.

Not Applicable. The project site is located on an Academic and Support land use designation. It is not within or adjacent to ESHA. The project site is currently covered with mulch and sur-rounded by paved road on three sides and the Children’s Center play yard on one side. There would be no vegetation or trees removed for the project. A biological resources survey is not necessary.

Policy ESH-22 – Buffer areas from environmentally sensi-tive habitat areas (ESHA) and wetlands shall be main-tained in a natural condition, except for the following po-tential uses: A. Habitat restoration; B. Bio-swales or other bioengineered water quality fea-tures;

Not Applicable. The project site is located on an Academic and Support land use designation. It is not within or adjacent to ESHA Buffer or ESHA.

Page 78: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

61

2010 LRDP Policy Consistency Analysis

C. Discharge of clean water; D. Erosion control measures (e.g., energy dissipaters be-fore water is dispersed); E. Public access trails; F. Repair and maintenance of existing roads, trails, and utilities; G. Minimal fire hazard reduction necessary to meet the Fire Code Defensible Space requirements for existing development; or H. Flood control or sediment management activities. The potential uses listed above shall only be undertaken within buffer areas where the University has demonstrated, as part of the Notice of Impending Devel-opment submittal, that: 1. No other less environmentally damaging alternative ex-ists that would avoid the need to undertake the proposed development within a buffer area; 2. The intrusion of the development into the buffer is the minimum necessary; and 3. A qualified biologist has determined that: • The development will not adversely impact habitat values and that the remaining buffer will be sufficient to protect the adjacent coastal resources; and • The specific measures to be undertaken by the Universi-ty to mitigate the impacts of the development are sufficient to enhance the protective features of the remaining buffer area (such as, but not limited to, removal of non-native species, plantings of locally native species, removal or re-placement of nearby outdoor lighting contributing to light pollution). Policy ESH-23 – Where there are unavoidable impacts to ESHA, a restoration plan shall be required to mitigate ESHA at 4:1 ratio (area restored to area impacted) for wet-land, riparian, and open water or stream habitats and 3:1 for all other ESHA. Mitigation shall occur on site to the maximum extent feasible. Should restoration of impacted wetlands be feasible on the project site, restoration and enhancement of these habitats in place may be used to

Not Applicable. The project site is located on an Academic and Support land use designation. It is not within or adjacent to ESHA. There would be no impact to ESHA.

Page 79: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

62

2010 LRDP Policy Consistency Analysis

account for a proportional amount of the required habitat mitigation. Where on site mitigation is not feasible, mitiga-tion shall be provided at nearby off-site locations. Policy ESH-24 – All wetland, riparian, ESHA, and buffer areas shall be maintained by the University through the CCBER or, in the event CCBER no longer is responsible for maintaining the campus areas, a successor entity re-sponsible for such functions. The University shall maintain records of all biological surveys and studies for use by other biologists and the public. The records shall include survey data to determine potential dormant seed and bulb banks in order to plan for conservation of dormant seed and bulb banks when sites with potential seed/bulb banks are developed.

Not Applicable. This is not a project specific policy and the pro-ject does not include restoration that would be managed by CCBER.

Policy ESH-25 – The biological productivity and the quali-ty of Campus wetlands, including Storke Wetlands and Devereux Slough, shall be maintained and, where feasi-ble, restored.

Not Applicable. This is not a project specific policy. The biologi-cal productivity and quality of the Devereux Slough will not be impacted.

Policy ESH-26 – Motor vehicles and dogs shall be prohib-ited in campus wetlands. Motor vehicles (except for ser-vice and emergency vehicles) and unleashed dogs shall be prohibited on campus beaches; Dogs shall be leashed and kept on designated trails where such trails are routed through open space or environmentally sensitive habitat areas. Swimming shall be prohibited in the Campus La-goon and Devereux Slough. Signs restricting such access and activities shall be posted.

Not Applicable. The project site is not near the Campus La-goon.

Policy ESH-27 – Raptor habitat, including nesting trees, roosting trees, perching locations, and foraging habitat, shall be protected and preserved.

Consistent. There would be no trees removed for the project and the student garden project does not result in impact to rap-tor habitat.

Policy ESH-28 – A. The routine trimming and/or removal of trees on cam-pus necessary to maintain campus landscaping or to ad-dress potential public safety concerns shall be exempt from the requirement to obtain a Notice of Impending De-velopment (NOID), unless otherwise required pursuant to subparagraph B, below, and provided that the trimming and/or removal activities are carried out consistent with all

Not Applicable. No trees would be trimmed or removed for the proposed project.

Page 80: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

63

2010 LRDP Policy Consistency Analysis

provisions and protocols of the certified Campus Tree Trimming and Removal Program in Appendix 2, except that the following shall require a NOID: 1. Trimming and/or removal of trees located within ESHA or on lands designated Open Space as covered in Policy ESH-29, 2. The removal of any tree associated with new develop-ment, re-development, or renovation shall be evaluated separately through the NOID process as detailed in sub-paragraph C, below; 3. The removal of tree windrows, and 4. Trimming and/or removal of egret, heron, or cormorant roosting trees proximate to the Lagoon. B. All tree trimming and tree removal activities, including trimming or removal that is exempt from the requirement to obtain a Notice of Impending Development, shall be pro-hibited during the breeding and nesting season (February 15 to September 1) unless the University, in consultation with a qualified arborist, determines that: 1. Immediate tree trimming or tree removal action by the University is required to protect life and property of the University from imminent danger, authorization is required where such activity would occur in ESHA or Open Space through an emergency permit, 2. Trimming or removal of trees located outside of ESHA or Open Space areas during June 15 to September 1, pro-vided where a qualified biologist has found that there are no active raptor nests or colonial birds roosts within 500 feet of the trees to be trimmed or removed, or 3. Is part of a development or redevelopment approved pursuant to a Notice of Impending Development. C. To preserve roosting habitat for bird species and mon-arch butterflies, tree(s) associated with new development, re-development, or renovation that are either native or have the potential to provide habitat for raptors or other sensitive species shall be preserved and protected to the greatest extent feasible. Where native, or otherwise bio-logically significant, trees are retained, new development shall be sited a minimum of five feet from the outer edge of

Page 81: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

64

2010 LRDP Policy Consistency Analysis

that tree’s canopy drip-line. The removal of such trees shall be evaluated pursuant to the Notice of Impending Development for the new development. Prior to the re-moval of any native and/or sensitive tree for development purposes, the University shall conduct biological studies to show whether the tree(s) provide nesting, roosting, or for-aging habitat for raptors and sensitive bird species, aggre-gation or significant foraging sites for monarch butterflies, or habitat for other sensitive biological resources. The Commission may condition the subject Notice of Impend-ing Development to secure the seasonal timing restrictions and mitigation requirements otherwise set forth in the Campus Tree Trimming and Removal Program in Appen-dix 2. Policy ESH-29 – Trees located within ESHA or designat-ed Open Space shall not be trimmed or removed unless determined by a certified arborist to pose a substantial hazard to life or property and authorized pursuant to an emergency permit, or where the proposed removal is part of a Commission-approved habitat restoration plan, and shall require a Commission-approved Notice of Impending Development. All tree trimming and removal activities shall be consistent with the seasonal timing restrictions and mit-igation requirements set forth in the Campus Tree Trim-ming and Removal Program in Appendix 2. The following Open Space areas shall be subject to the requirements for routine campus tree trimming and removal practices and shall not be considered as “Open Space” for the purposes of this policy: Commencement Green, UCEN lawn, and Pearl Chase Garden.

Not Applicable. No trees would be trimmed or removed for the proposed project.

Policy ESH-30 – New development shall avoid all special-status plant species, including Southern tarplant, to the greatest extent feasible. This policy applies to isolated in-dividual plants that do not meet the definition of ESHA. Special-status species that are ESHA shall be afforded full protection under the ESHA provisions of the LRDP. Where the individual(s) do not meet the definition of ESHA and cannot be feasibly avoided, then it may be relocated pro-

Consistent. The project site is currently mulched and complete-ly devoid of vegetation. The site is surrounded on three sides by a paved road and on one side by the Children’s Center fenced play yard.

Page 82: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

65

2010 LRDP Policy Consistency Analysis

vided that the impact to individual species shall be fully mitigated. Policy ESH-31 (as amended LRDP-Amendment No. LRDP-4-UCS-16-0001-1 Part A)– A. In light of the significant benefits of clustering LRDP de-velopment in specific locations on Main Campus, Storke Campus, and West Campus; of enhancing and restoring ESHA, ESHA buffers, and compensatory off-site ESHA/Wetland habitat restoration to provide valuable hab-itat connections in accordance with Policy OS-04; of mini-mizing vehicle miles traveled by locating housing, ser-vices, and campus facilities in areas easily accessible via walking, biking, or bus service; of providing a permanent open space connection from Goleta Slough, Storke Wet-lands, and Devereux Slough to ensure long-term protec-tion of habitat values; of restoring the habitats on the ap-proximately 64-acre North Campus Open Space – Ocean Meadows site while providing coastal access pursuant to Policies OS-04 and LU-19; and of providing adequate housing stock to accommodate all future student, faculty, and staff, the University may construct development with an ESHA buffer or Wetland buffer width less than required in Policy ESH-19 consistent with the following: 1. In lieu of the 100-foot buffer from freshwater marsh and oak woodland ESHA, the Facilities Management project (see Policy LU-10) on Main Campus may be constructed with a minimum 50-foot buffer from the adjacent freshwa-ter wetland and ESHA oak woodland habitat, and a 40-foot to 70-foot buffer on a portion of the southern boundary to accommodate an existing road where there is no potential for its relocation, as approximately delineated on Figure F.5. 2. In lieu of the 200-foot buffer from brackish marsh, the Central Stores project (see Policy LU-26) on Storke Cam-pus may be constructed with a minimum 100-foot buffer from the adjacent brackish marsh, as approximately delin-eated on Figure F.5. 3. In lieu of the 300-foot buffer from eucalyptus raptor tree

Not Applicable. This project is not within or adjacent to ESHA and will not impact ESHA or ESHA buffers.

Page 83: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

66

2010 LRDP Policy Consistency Analysis

ESHA, the existing recreation footprint for Harder Stadium, Parking Lot 38 and Storke Field may be maintained on Storke Campus, as approximately delineated on Figure F.5. The minimum 200-foot buffer from Storke Wetlands brackish marsh shall not be reduced in these locations. 4. In lieu of the 300-foot buffer from coastal salt-marsh (Devereux Slough) and the 300 foot buffer from eucalyptus raptor EHSA, the coastal salt-marsh buffer and raptor ESHA buffer may be integrated to coincide with a 100-foot buffer from the eucalyptus raptor tree ESHA in the location of the Devereux North Knoll project (see Policy LU-31) on West Campus, as approximately delineated on Figure F.5. 5. In lieu of the 300-foot buffer from the Devereux Slough South Finger coastal salt-marsh and the 300 ft. buffer from eucalyptus raptor ESHA, the coastal salt-marsh buffer and raptor ESHA buffer may be integrated to coincide with a 100-foot buffer from the eucalyptus raptor tree ESHA in the location of the Devereux South Knoll (see Policy LU-30) on West Campus, as approximately delineated on Fig-ure F-5. The 300-foot buffer from the edge of Devereux Slough, to the west of the South Knoll site, shall not be reduced, as reflected in Figure F.5. 6. In lieu of the 300-foot buffer from eucalyptus raptor tree ESHA, new development on West Campus Mesa may be constructed with a minimum 100-foot buffer from the from eucalyptus raptor tree ESHA, as approximately delineated on LRDP Figure F.5, provided that vehicular use of Slough Road is restricted as required in Policy TRANS-12 and the minimum 300-foot buffer from Devereux Slough is main-tained. 7. In lieu of the 100-foot buffer from the restored Southern Dune Scrub ESHA immediately adjacent to the west side of the Field Station, the existing Coal Oil Point Reserve Field Station (see Policy LU-34) footprint may be main-tained on West Campus, as approximately delineated on Figure F.5. The minimum 100-foot buffer from Southern Coastal Bluff Scrub to the south and east side of the Field Station shall not be eliminated or reduced, as reflected in Figure F.5.

Page 84: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

67

2010 LRDP Policy Consistency Analysis

8. Where no other feasible siting and design alternatives exist, West Campus roadway improvements and a new road alignment may intrude within ESHA buffers provided that the road is designed to be the minimum necessary to accommodate a two-lane road that meets Fire Department standards. B. Buffers that are less than the required widths place sensitive resources at risk of significant degradation caused by the adjacent development. The University shall mitigate the adverse impacts of reduced buffers by provid-ing mitigation for all ESHA and wetlands consistent with Policy ESH-22. Policy ESH-32 – ESHA buffers and wetland buffers shall be planted with locally native species that are appropriate to protect and enhance the adjacent ESHA or wetland.

Not Applicable. This project is not within or adjacent to ESHA and will not impact ESHA or ESHA buffers.

Policy ESH-33 – Buffers to existing wetland, riparian, and environmentally sensitive habitat areas on the North Par-cel, including those identified in the 2006 North Parcel wet-land delineation for the North Parcel/Ocean Walk Faculty Housing Development shall be provided in substantial ac-cordance with the site plan for North Parcel/Ocean Walk development as follows: Buildings shall be required to be set as far back from wetland, riparian, and environmentally sensitive habitat areas as far as possible. Buffers from the wetland area located near the southwest corner of the North Parcel/Ocean Walk Site (within and near Devereux Creek), as delineated on the 2006 North Parcel Wetland Delineation, shall be a minimum of 100 feet. Buffers from the riparian area bordering Phelps Creek, as shown in the 2006 North Parcel Wetland Delineation, shall be a mini-mum of 50 feet from the edge of the riparian canopy. Buff-ers from all other existing wetlands and riparian areas (edge of canopy) shall be a minimum of 25 feet. Buffers to eucalyptus areas on site that support monarch butterflies shall be a minimum of 25 feet. Buffers to existing native grasslands on site shall be 10 feet, except for the limited amount of removal of grasslands allowed pursuant to this

Not Applicable. This project is not within the North Parcel or adjacent to ESHA and will not impact ESHA or ESHA buffers.

Page 85: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

68

2010 LRDP Policy Consistency Analysis

policy. The scattered, small patches of purple needlegrass on the north side of the North Parcel may be removed and reestablished on the South parcel at a mitigation ratio 3:1. No other portions of native grassland on the North Par-cel/Ocean Walk shall be removed. The approximately 600 square feet of riparian scrub on the northeast side of the North parcel may be removed and reestablished at alter-nate locations on the North Parcel/Ocean Walk at a mitiga-tion ratio of 3:1. No other portions of riparian habitat on the North Parcel/Ocean Walk site shall be removed. Policy ESH-34 – The wetland and riparian areas within the faculty and student housing developments on North and West Campuses shall be interconnected with Natural Open Space Areas to the maximum extent feasible. Grad-ing to connect the wetland areas within or near buffer are-as shall be permitted; however, any such grading shall be limited to the dry season and approved by the University through the CCBER or, in the event CCBER no longer is responsible for maintaining campus wetland areas, a suc-cessor entity.

Not Applicable. This project is not within a housing develop-ment or adjacent to ESHA or ESHA buffers and will not impact ESHA or ESHA buffers.

MAIN CAMPUS STORKE CAMPUS NORTH AND WEST CAMPUSES Policy ESH-43 – Pets may be allowed in campus housing developments where the housing is designed and man-aged to minimize conflicts and keep pets out of the natural open spaces areas. Pedestrians and their pets shall use designated trails, consistent with Policy ESH-02. Dogs shall be leashed as required in Policy ESH-26. Pets that require outside movement, such as dogs and cats, shall only be allowed in units with a fenced yard. Only indoor cats are allowed.

Not Applicable. The project is not within a campus housing ar-ea and will not include pets.

Policy ESH-44 – The wetland, riparian, and environmen-tally sensitive habitat areas on the North Parcel and the Storke-Whittier property shall be permanently retained and restored or enhanced pursuant to the approved restoration plan. The restoration and/or enhancement shall be imple-mented concurrently with the construction of the Sierra

Not Applicable. The project is not with the North Parcel or Storke-Whittier parcels.

Page 86: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

69

2010 LRDP Policy Consistency Analysis

Madre and North Parcel Housing projects (NOID 1-06). Subsequent to successful completion of the restoration plan, these areas shall be maintained to ensure biological and hydrological functions and habitat value. Policy ESH-45 – The University shall provide, on an ongo-ing basis, for one full-time equivalent (FTE) steward for the South Parcel nature park area, and an FTE Coal Oil Point Reserve Snowy Plover Coordinator position.

Not Applicable. This is not a project specific policy. A FTE steward for the South Parcel nature park and the Coal Oil Point Reserve have been hired.

Policy ESH-46 – The Ellwood Marine Terminal (EMT) Fa-cilities shall be removed and the site shall be restored to maximize habitat values. The EMT site shall be evaluated for soil and groundwater contamination, and a remediation plan shall be prepared and submitted to campus Environ-mental Health and Safety that complies with all federal and state regulations to clean and/or remove the contaminated soil or groundwater. A Notice of Impending Development shall be required for all development on the EMT site, in-cluding any necessary soil or groundwater remediation and habitat restoration activities. The white tailed kite habi-tat, including white-tailed kite nesting trees, shall be pre-served and enhanced. A portion of the southern extent of the eucalyptus trees east of the tanks may be removed where a phased restoration is implemented, pursuant to a Restoration Plan, to ensure that there is no interim loss of available habitat, serving the same habitat function, when the existing tree masses reach senescence. Locally native tree species, such as coast live oak, or tree species that are native to other coastal California areas, such as Mon-terey Cypress, that offer suitable nesting habitat upon maturation shall be planted in and around the existing tree masses with the intended purpose of reaching maturity as the older trees are lost. Biological surveys shall demon-strate that the replacement trees have been successfully used for nesting by raptors prior to removing the currently existing southern portion of eucalyptus trees at the EMT site.

Not Applicable. The project is not near the Ellwood Marine Terminal.

DEVEREUX CAMPUS AND COAL OIL POINT ARCHEOLOGICAL RESOURCES – 30244

Page 87: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

70

2010 LRDP Policy Consistency Analysis

Policy ARC-01 - New development that requires ground disturbance shall be evaluated for its potential to impact archaeological resources. Site research, records reviews and archaeological surveys shall be undertaken by a Reg-istered Professional. This documentation shall be submit-ted with the Notice of Impending Development.

Consistent. An archeological resources survey was conducted at the project site and is attached. The project site is within an identified archeological site and will be monitored during any ground disturbance in the event resources are discovered.

Policy ARC-02 - The Department of Anthropology and Native American tribal groups approved by the Native American Heritage Commission for the area shall be con-sulted when development may adversely impact archeo-logical resources.

Consistent. The Department of Anthropology and Native Amer-ican tribal groups have been consulted.

Policy ARC-03 - A mitigation plan shall be prepared by a Registered Professional Archaeologist when development may adversely impact archaeological resources. The miti-gation plan shall be prepared in consultation with Native American tribal groups approved by the Native American Heritage Commission for the area, and the State Historic Preservation Officer, as applicable. Mitigation shall be de-signed in accordance with guidelines of the State Office of Historic Preservation and the State of California Native American Heritage Commission and shall, as the first pri-ority, preserve the resources in place. Where in-situ preservation is not feasible, partial or total recovery of ar-chaeological resources shall be undertaken.

Consistent. A mitigation plan has been prepared by a Regis-tered Professional Archeologist and is included within the arche-ological survey report.

Policy ARC-04 - Archaeological monitors shall be on-site during all earth moving activities and/or other ground dis-turbances that have the potential to uncover or otherwise disturb archaeological resources. A Registered Profes-sional Archaeological consultant and a Native American representative shall both be present.

Consistent. Archeological monitors (including a Native Ameri-can) will be on the project site during all ground disturbance.

Policy ARC-05 - If archaeological or paleontological re-sources are discovered in the course of construction, all activity which could damage or destroy these resources shall be immediately halted. A Registered Professional Archaeologist, or paleontologist as applicable, shall exam-ine the site and provide an evaluation of the nature and significance of the resources. Mitigation measures shall be developed and implemented to address the impacts of the

Consistent. These protective measures are in place. Monitors will be on site and the excavated soil will be screened for arche-ological resources.

Page 88: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

71

2010 LRDP Policy Consistency Analysis

development on the resources. The Office of Campus Planning and Design shall determine whether the devel-opment or mitigation measures require a new Notice of Impending Development and shall notify Coastal Commis-sion staff that archaeological or paleontological resources were discovered during construction. Activities that may adversely impact these resources shall not resume without written authorization from the University Office of Planning & Design that construction may proceed. Policy ARC-06 - Vehicle use, unauthorized collecting of artifacts, or other activities that have the potential to de-stroy or disturb archaeological resources shall be prohibit-ed.

Consistent. This policy will be followed.

Policy ARC-07 - Work shall be halted immediately when suspected human bone is discovered, regardless of con-text, until the coroner and a qualified archaeologist can examine the remains. University staff shall notify Coastal Commission staff of the nature of the discovery and that all work has been halted on the site. Activities shall not re-sume without written authorization from the Office of Cam-pus Planning and Design that construction may proceed. Where Native American remains are discovered, further activities may require a Notice of Impending Development.

Consistent. This policy will be followed.

Policy ARC-08 - New development shall be sited and de-signed to avoid adverse impacts to archaeological and paleontological resources to the maximum extent feasible. If there is no feasible alternative that eliminates all impacts to these resources, then the alternative that would result in the fewest or least significant impacts to resources shall be selected. Impacts to archaeological or paleontological resources that cannot be avoided through siting and de-sign alternatives shall be fully mitigated.

Consistent. The project site is within a known archeological site however any potential resources at the project site will be pro-tected in place. Fill will be brought to the site and there will be extremely minimal excavation within the sensitive areas.

MARINE ENVIRONMENT 30230, -31 and 36 GENERAL POLICIES Policy MAR-01 - The University shall coordinate with and encourage action by the County of Santa Barbara, City of Santa Barbara, City of Goleta, and the Regional Water Quality Control Board to see that adjacent land uses are

Not Applicable. This is not a project specific policy. The Univer-sity continues to coordinate with these jurisdictions.

Page 89: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

72

2010 LRDP Policy Consistency Analysis

developed and operated in a manner that will sustain the biological productivity of campus marine resources. Policy MAR-02 - The University shall work with the City of Santa Barbara and other interested parties to evaluate the benefits and feasibility of reestablishing tidal influx from Goleta Slough into the Storke Wetlands through the City of Santa Barbara’s tidal gates. Where feasible and beneficial, restore the tidal connection.

Not Applicable. This policy is not relevant to the project.

Policy MAR-03 – Lagoon Berm Road may be maintained in the approved road prism consistent with typical repair and maintenance practices such as replenishing the fill and re-compacting the fill slopes. Lagoon Berm Road shall not utilize rock revetments or seawalls to maintain the road prism. The road may be removed to adapt to rising sea level. Placement of sandbags or other temporary stability measures shall require a NOID or Emergency Permit.

Not Applicable. This policy is not relevant to the project.

Policy MAR-04 - Channelizations or other substantial al-terations of streams shall be prohibited except for: A. Necessary water supply projects where no feasible al-ternative exists; B. Flood protection for existing development where there is no other feasible alternative; or C. The improvement of fish and wildlife habitat. Any channelization or stream alteration permitted for one of these three purposes shall minimize impacts to coastal resources, including the depletion of groundwater, and shall include maximum feasible mitigation measures to mitigate unavoidable impacts. Bioengineering alternatives shall be preferred for flood protection over “hard” solutions such as concrete or riprap channels.

Not Applicable. There will be no channelization or alteration of streams for the project.

NORTH AND WEST CAMPUSES Policy MAR-05 - Wetland and riparian vegetation en-hancement shall be conducted, to the maximum extent feasible, along Devereux Creek and Devereux Slough, in-cluding the areas known as the North and South “Fingers” of the slough.

Not Applicable. This policy is not relevant to the project.

Policy MAR-06 - The Phelps Creek bridge, and a paved roadway comprised of permeable paving materials, may

Not Applicable. This policy is not relevant to the project.

Page 90: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

73

2010 LRDP Policy Consistency Analysis

continue to be located across the Phelps Creek Riparian Area and within the buffer area for pedestrian/bicycle and flood control and emergency access, provided that the bridge is no wider than 20 feet, however, the bridge may be expanded if necessary to provide fire access to all resi-dential units. Policy MAR-07 - The County of Santa Barbara Flood Control District shall continue to maintain Phelps Creek as a floodway and a maintenance easement to that effect will be granted by the University. The primary function of Phelps Creek will continue to remain as a floodway and the channel will be maintained to ensure proper flood con-veyance capacity. Necessary permits will be obtained by County Flood Control with oversight by UCSB. The University shall not install a concrete channel in the Phelps Creek Riparian Area. All pads adjacent to the Phelps Creek Riparian Area will be located two (2) feet above the 100-year flood elevation. The Santa Barbara County Flood Control District will follow the general guide-lines outlined in Policy MAR-08.

Not Applicable. This policy is not relevant to the project.

Policy MAR-08 - The Santa Barbara County Flood Control District shall use a GradAll, or similar piece of equipment and work from the existing access road along the west bank of Phelps Creek when the District conducts mainte-nance of the portion of the creek on University property. Sediment in Phelps Creek shall be removed from several different areas within the portion owned by the University. Up to 350 cubic yards of sediment shall be removed from approximately 500 feet of the creek at a time. Sediment may be stockpiled on the adjacent open field/access road until it has dewatered sufficiently to be hauled to a suitable upland disposal site. Sediment shall not be stockpiled on any site containing wetland, riparian, or environmentally sensitive habitat areas and shall be placed so as to main-tain public access to the creek and riparian area. Flood control activities will be performed outside of the breeding season of any known sensitive species that have been ob-

Not Applicable. This policy is not relevant to the project.

Page 91: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

74

2010 LRDP Policy Consistency Analysis

served in the Creek. Necessary permits will be obtained by County Flood Control with oversight by the University. Policy MAR-09 - The Phelps Creek Riparian Area may be reconstructed in accordance with all applicable LRDP poli-cies. Any plans for reconstruction of the Phelps Creek res-toration area shall include provisions and restoration of riparian habitat along the creek and shall minimize the use of concrete, pavement, and other impermeable surfaces for armoring of the creek banks. The bed of Phelps Creek shall remain as natural sediment. The Phelps Creek Ripar-ian Area and native vegetation shall be maintained by the University through the CCBER or, in the event CCBER no longer is responsible for maintaining campus wetland are-as, a successor entity responsible for such functions.

Not Applicable. This policy is not relevant to the project.

Policy MAR-10 - A road limited to flood control mainte-nance activities, emergency access, and pedestrian and bicycle purposes only may be provided to the Phelps Creek Riparian Area through the Buffer Area provided that the road is no more than 16 feet in width, is not paved, and situated away from the Phelps Creek top of bank to the maximum extent feasible while still providing adequate flood control access. If necessary, vegetated spurs are acceptable from the road to the top of bank, to provide ac-cess for flood control.

Not Applicable. This policy is not relevant to the project.

COASTAL WATERS 30231 and -36 WATER QUALITY (EROSION AND SEDIMENTATION) Policy WQ-01 - New development shall be sited, de-signed, and managed to prevent adverse impacts from stormwater or dry weather runoff to coastal waters and environmentally sensitive habitat areas. Sources of inflow to coastal wetlands shall be maintained so that the quality, volume and duration of flows do not diminish wetland hy-drology.

Consistent. The student garden is primarily permeable with ex-tremely minimal impermeable surfaces. Storm water runoff would largely remain on site and excess will sheet flow off the site to the north, west, and east. Water would not flow into the adjacent to the Children’s Center play yard and not flow into ESHA.

Policy WQ-02 – A. Proposed campus development shall be sited, de-signed, constructed, operated and managed in accord-ance with the water quality protection requirements set forth in this LRDP, including Appendix 3, Water Quality

Consistent. The student garden site is less than one acre (0.35 acres and 16,026 square feet) and will be primarily permeable with very minimal impermeable surfaces. Construction Pollution Prevention and Post Development Runoff Plans are not re-quired.

Page 92: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

75

2010 LRDP Policy Consistency Analysis

Protection, which is hereby incorporated in full, by refer-ence as part of this policy. Appendix 3 requires new de-velopment, which entails construction or other activities or land uses that have the potential to release pollutants into coastal waters, to submit a water quality protection plan (see Appendix 3 for Construction Pollution Prevention Plan, Post Development Runoff Plan, Water Quality and Hydrology Plan, as applicable) with the NOID. Appendix 3 provides implementation-level requirements to develop each type of water quality protection plan that may be necessary depending on the size and nature of the pro-posed development. Unless the Executive Director deter-mines that future proposed changes to the contents of Ap-pendix 3 are de minimis, such changes shall require an LRDP amendment. All revisions of Appendix 3 shall be timely published, including the date of the specific revision. B. Development shall be sited and designed consistent with the following runoff control priorities, and implemented through the water quality protection plans in compliance with Appendix 3 (Water Quality Protection Program): 1. First, where drainage from campus lands may directly or indirectly flow into coastal waters, the first priority for the plans and designs of proposed campus development shall be the prevention of an increase in post-construction stormwater runoff volume or velocity compared with exist-ing site conditions. 2. Second, where despite the inclusion of all feasible measures to achieve the first priority an increase in site runoff cannot be fully avoided, the project plans and de-signs shall include all feasible additional drainage man-agement measures necessary to slow, capture, treat, infil-trate, and detain stormwater runoff on site to the maximum extent feasible, and in the manner that best protects coastal resources, including wetlands, environmentally sensitive habitat areas, and coastal waters. 3. Third, where despite the inclusion of all feasible measures to avoid offsite discharge of stormwater and dry weather runoff, the interconnected nature of existing and future campus development locations or site-specific phys-

Page 93: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

76

2010 LRDP Policy Consistency Analysis

ical conditions (such as the presence of relatively impervi-ous clay soils) limit the effectiveness of on-site retention options, the University may allow runoff to be discharge, including as necessary piping of runoff under roadways or sidewalks, to a permitted offsite drainage management facility where the runoff is treated to remove pollutants and is retained and/or discharged in a non-erosive manner. C. To maximize the protection of water quality, the Univer-sity shall prioritize the use of earthen-based, bioengi-neered runoff treatment facilities such as bioswales or vegetated filter strips. Bioengineered runoff treatment facil-ities may incorporate energy dissipaters, sand filters, re-tention basins and engineered soils and substrates if war-ranted by site conditions. Drainage features may include vegetation as an intentional component of the design (such as swales planted with grass species) or in some cases a non-vegetated structure may support volunteer vegetation. In either case, regular management of the vegetation associated with the subject drainage feature, and/or of the feature itself (such as sediment removal), is necessary (1) to ensure the optimal performance of the structure, and (2) to limit the establishment or overgrowth of vegetation. Therefore, the University shall submit a de-tailed monitoring and low impact, non-chemical mainte-nance plan (relying on mowing, hand weeding, or confined short-term grazing) designed to prevent the overgrowth of vegetation in drainage management structures, and for periodic maintenance activities in addition to vegetation management, such as sediment removal and disposal. This maintenance plan shall include a schedule for pro-posed maintenance and a monitoring program to ensure that the required maintenance achieves the prescribed standard of vegetation control. D. Where the University demonstrates that a permitted drainage facility that was created from dry land has been diligently managed and monitored in accordance with the requirements of the pertinent permit, the facility will not be considered a “wetland” for the purpose of interpreting the LRDP when future maintenance, modification, or removal

Page 94: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

77

2010 LRDP Policy Consistency Analysis

of the structure is proposed. As such, the Commission will not require compensatory mitigation for acreage affected by the proposed activity. However, measures will be re-quired to limit or avoid impacts to coastal resources when such activities are proposed (such as setbacks from near-by habitat, seasonal restrictions on timing of work, reloca-tion of sensitive species, etc.). E. Site plans and designs for new development shall in-clude source control measures which can be structural features or operational actions, to control pollutant sources, minimize runoff, and keep pollutants segregated from stormwater. Site plans and designs for new develop-ment shall concurrently emphasize runoff management, integrating existing site characteristics that affect runoff (such as topography, drainage, vegetation, soil conditions, and infiltration properties) with strategies that minimize post-project runoff, control pollutant sources, and where necessary remove pollutants. Site plans and designs shall be in compliance with the water quality protection plans required in Appendix 3, Water Quality Protection Program. The plans and designs for all drainage facilities proposed by the University on lands that may directly or indirectly drain to coastal waters shall be designed by a California-licensed professional in consultation with a qualified biolo-gist, and shall include detailed information that supports the finding that the proposed development is sited, de-signed, constructed, operated, and maintained in the manner most protective of coastal resources including wetlands, environmentally sensitive habitat, and coastal waters. Sufficient evidence to demonstrate compliance of the proposed project with the requirements of Policy WQ-02 shall be submitted in support of the Notice of Impend-ing Development and the NOID may be conditioned by the Commission to ensure that these requirements are met. Policy WQ-03 - Stormwater and dry weather runoff man-agement shall be addressed early in site design planning and alternatives analyses, taking into account existing site

Consistent. The student garden site is less than one acre (0.35 acres and 16,026 square feet) and will be primarily permeable with very minimal impermeable surfaces. A 234 square foot area

Page 95: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

78

2010 LRDP Policy Consistency Analysis

characteristics that affect runoff, (such as topography, drainage, vegetation, soil conditions, natural hydrologic features, and infiltration conditions) in designing strategies that minimize post-development changes in the runoff flow regime, control pollutant sources, and, where necessary, remove pollutants. The University shall within a reasona-ble amount of time, develop a comprehensive surface wa-ter quality monitoring program for all discharges from campus. Properties and/or discharges with the highest levels of water pollution will be evaluated and water quality problems addressed, beginning with discharge deemed unhealthful or unsafe for human contact.

would be impermeable.

Policy WQ-05 - The University shall site, design, construct and manage development to preserve or enhance vegeta-tion that provides water quality benefits such as transpira-tion, vegetative interception, pollutant uptake, shading of waterways, and erosion control. Native vegetation shall be prioritized for use in water-quality treatment facilities such as bioswales and vegetated filter strips. Removal of exist-ing vegetation on campus shall be minimized and limited to a pre-approved area required for construction opera-tions. The construction area shall be fenced to define pro-ject boundaries. When vegetation must be removed, the method shall be one that will minimize the erosive effects from the removal. Temporary mulching or other suitable interim stabilization measures shall be used to protect ex-posed areas during construction or other land disturbance activities.

Not Applicable. The project does not result in the removal of any vegetation and would not construct water quality treatment features on the site. The student garden site is less than one acre (0.35 acres and 16,026 square feet) and will be primarily permeable with very minimal impermeable surfaces.

Policy WQ-06 - The University shall design, construct and manage campus development to minimize the introduction of pollutants, including trash and sediment, into coastal waters. Pollutants shall not be allowed to enter coastal wa-ters through drainage systems. Low Impact Development (LID) strategies shall be used to emphasize an integrated system of decentralized, small-scale control measures that minimize alteration of the site’s natural hydrologic condi-tions through infiltration, evapotranspiration, filtration, de-tention, and retention of runoff close to its source. Traps

Page 96: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

79

2010 LRDP Policy Consistency Analysis

and filters for roadway contaminants shall be provided as part of all drainage structures. Policy WQ-07 -New development shall be designed to minimize the extent of new impervious surface area, espe-cially directly-connected impervious surfaces, and where feasible to increase the area of pervious surfaces, to re-duce runoff.

Consistent. The student garden site is less than one acre (0.35 acres and 16,026 square feet) and will be primarily permeable with very minimal impermeable surfaces.

Policy WQ-08 -If implementing site design, source control, and LID strategies is not sufficient to minimize adverse post-development changes in runoff volume, flow rate, tim-ing, and duration, use runoff controls sized for the appro-priate design storm, to protect coastal waters, habitat, and property.

Not Applicable. There would be no adverse post development changes in runoff volume. The student garden site is less than one acre (0.35 acres and 16,026 square feet) and will be pri-marily permeable with very minimal impermeable surfaces.

Policy WQ-09 - Minimize water quality impacts from con-struction by implementing best management practices, in compliance with Appendix 3, Water Quality Protection Program, including: A. Construction shall be planned and managed to mini-mize impacts by such measures as limiting the project footprint, phasing grading activities to avoid rainy-season soil disturbance, implementing soil stabilization and pollu-tion prevention measures, and preventing soil compaction unless required for structural support; B. Whenever practical, land on the North and West Cam-pus where there is a risk of erosion that may affect ESHAs, plan the project in increments of workable size which can be completed during a single construction sea-son; C. Erosion and sediment control measures are to be coor-dinated with the sequence of grading. Sediment basins, sediment traps, or similar sediment control measures shall be installed before extensive clearing and grading opera-tions begin for campus development; and D. Fill areas shall have suitable protection against erosion and shall not encroach on Devereux Slough, Storke Cam-pus Wetlands, Campus Lagoon or any other natural wa-tercourses or constructed channels on campus.

Consistent. The project requires minimal grading and excava-tion and would not create a situation where sediment would run off the site. An erosion control plan was prepared and is at-tached.

Policy WQ-10 - Grading operations that have the potential Consistent. Grading and excavation on the site would be mini-

Page 97: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

80

2010 LRDP Policy Consistency Analysis

to deliver sediment to wetlands, environmentally sensitive habitat areas, or coastal waters shall be scheduled during the dry months of the year (May through October). The construction timeline may be extended into the rainy sea-son for a specific, limited length of time, based on an in-spection of the site, and a determination that conditions at the project site are suitable for. Continuation of work may be allowed if appropriate erosion and sedimentation con-trol measures are in place and will be maintained during the activity. If grading occurs during the rainy season (No-vember through April), sediment traps, barriers, covers or other methods shall be used to reduce erosion and sedi-mentation in compliance with Appendix 3, Water Quality Protection Program.

mal and does not have the potential to result in the transfer of sediment off site to wetlands or ESHA. The site is not adjacent t ESHA. An erosion control plan has been prepared and is at-tached.

Policy WQ-11 - Excavated materials shall not be deposit-ed or stored where the material can be washed away by storm water runoff. Topsoil removed from the surface in preparation for grading and construction is to be stored on or near the site, where the stockpile area(s) will not impact natural vegetation, and protected from erosion while grad-ing operations are underway, provided that the topsoil is also managed consistent with Policy ESH-14. Appropriate measures shall be taken to protect the preserved topsoil from erosion and runoff through such measures as tarping, jute netting, silt fencing, and sandbagging soil. After com-pletion of such grading, topsoil is to be restored to ex-posed cut and fill embankments of building pads so as to provide a suitable base for seeding and planting. These requirements shall be incorporated into applicable water quality protection plans (Construction Pollution Prevention Plan, Post-Development Runoff Plan, and/or Water Quality and Hydrology Plan as applicable) for processing during the NOID process as described in Appendix 3, Water Quality Protection Program.

Consistent. There will be very minimal excavated soil. All exca-vated soil will be screened by an archeologist and placed back on the garden site.

Policy WQ-12 - Drainage facilities, BMPs, or other water quality design features required for new development shall be inspected, maintained, operated and managed in a manner that ensures that the intended water quality pro-

Not Applicable. There are no drainage facilities or water quality design features on the site. The site is primarily permeable. Construction BMPs would be in place during garden installation. An erosion control plan has been prepared and is attached.

Page 98: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

81

2010 LRDP Policy Consistency Analysis

tection performance requirements are met for the life of the development. This shall be reflected in the applicable water quality protection plan in compliance with Appendix 3, Water Quality Protection Program. Policy WQ-13 - Stormwater outfalls shall be sited, de-signed and managed to minimize the adverse impacts of discharging concentrated flows of stormwater or dry weather runoff into coastal waters, intertidal areas, beach-es, bluffs, or stream banks.

Not Applicable. This policy is not relevant to the project.

Policy WQ-14 - Runoff from parking areas and from Mesa Road on the Main Campus shall be directed to drainage structures such as traps, filters and earth drainage swales with high pollutant-uptake native vegetation. The drainage structures shall be designed to reduce the introduction of roadway and parking lot contaminants into ESHAs and wetlands.

Not Applicable. This policy is not relevant to the project.

Policy WQ-15 - At Coal Oil Point, if percolation is deter-mined through tests to be inadequate to prevent bluff top erosion, alternative methods to direct stormwater to elimi-nate the erosion hazard, shall be evaluated based on the water quality protection priorities outlined in the LRDP pol-icies and Appendix 3, Water Quality Protection Program. The revisions to drainage shall require a Commission-approved water quality protection plan.

Not Applicable. This policy is not relevant to the project.

Policy WQ-16 - Siltation of the Campus Lagoon shall be minimized. Chemical wastes, sewage effluent or wastewaters shall be prohibited from entering the Lagoon. The quality of water entering the Lagoon shall be moni-tored and measures taken to remediate the source(s) con-tributing to the water quality threshold that was exceeded.

Not Applicable. This policy is not relevant to the project.

Policy WQ-17 - All sewage from campus development shall be disposed of in sanitary sewer lines or approved septic tank system subject to design and performance re-quirements of the Regional Water Quality Control Board.

Not Applicable. This policy is not relevant to the project. There would be no sewage wastewater generated from the project. There would be a sink in the greenhouse with potable water connected to an existing wastewater line.

HAZARDOUS MATERIALS POLICIES Policy HAZ-1 -The University shall comply with hazardous material and hazardous waste laws and regulations, in-cluding storage, handling, transport, disposal, and spills.

Not Applicable. This policy is not relevant to the project. There are no hazardous materials associated with the project.

Page 99: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

82

2010 LRDP Policy Consistency Analysis

Policy HAZ-2 -The University shall maintain and upgrade its resources for chemical spill response in order to mini-mize the risk of any hazardous materials release or threat-ened release.

Not Applicable. This policy is not relevant to the project.

Policy HAZ-3 - The Environmental Health & Safety EH&S Office will appropriately dispose of hazardous materials.

Not Applicable. This policy is not relevant to the project.

Policy HAZ-4 The University shall maintain and strength-en its hazardous waste minimization program. Waste min-imization efforts by the EH&S Office will give particular consideration to monitoring of hazardous materials storage and handling procedures; recycling (onsite and offsite); source reduction goals; implementation procedures; and informational and educational programs.

Not Applicable. This policy is not relevant to the project.

Policy HAZ-5 - If contaminated soil and/or contaminated groundwater are encountered during excavation and/or grading activities, except where such activities are imple-menting a Commission-approved remediation plan, the following steps shall be taken: (a) The construction contractor(s) shall stop work and im-mediately inform Environmental Health and Safety (EH&S); (b) An on-site assessment shall be conducted to deter-mine if the discovered materials pose a significant risk to the public or construction workers; (c ) If the materials are determined to pose such a risk, a remediation plan shall be prepared and submitted to EH&S to comply with all federal and state regulations nec-essary to clean and/or remove the contaminated soil and/or groundwater; (d) Soil remediation methods could include, but are not necessarily limited to, excavation and on-site treatment, excavation and off-site treatment and/or disposal, and/or treatment without excavation; (e) Remediation alternatives for contaminated groundwa-ter could include, but are not necessarily limited to, on-site treatment, extraction and off-site treatment, and/or dispos-al; and (f) The construction schedule shall be modified or delayed

Not Applicable. There would be extremely limited excavation on the project site and contact with groundwater will not be an issue and there are no known contaminated soils at the project site.

Page 100: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

83

2010 LRDP Policy Consistency Analysis

to ensure that construction will not obstruct remediation activities and will not expose the public or construction workers to significant risks associated with hazardous conditions. The Ellwood Marine Terminal Facility has a known contamination risk and shall be subject to Policy ESH-46. Policy HAZ - 6 - UC Santa Barbara shall continue to de-velop and implement campus programs that minimize use of pesticides, which may include the use of Integrated Pest Management strategies.

Not Applicable. This policy is not relevant to the project.

Policy HAZ-7 - Integrated pest management practices shall be used in all private landscape areas (not including buffers) and community open space areas on the Storke, North, and West Campuses. Rodenticides containing any anticoagulant compounds (including but not limited to War-farin, Brodifacoum, Bromadiolone, or Dipancinone) shall be prohibited.

Consistent. No pesticides, rodenticides, or herbicides will be used at the student garden.

FILL POLICIES Policy FIL-1 - The diking, filling, or dredging of open coastal waters, wetlands, or estuaries may be allowed only where there is no feasible less environmentally damaging alternative and limited to only the following types of devel-opment: incidental public services; mineral extraction ex-cept in ESHA; restoration purposes; nature study, aqua-culture, and similar resource dependent activities. Impacts associated with such development shall be fully mitigated.

Not Applicable. This policy is not relevant to the project. There would be no diking, filling, or dredging of wetlands.

Policy FIL-2 – Where restoration of Devereux Slough in-cludes dredging, then sediment removal and spoils dis-posal activities shall be planned.

Not Applicable. This policy is not relevant to the project.

Policy FIL-3 – If no other alternative exists, fill may be used to address potential 100-year flooding impacts con-sistent with federal law, with the exception of areas that are within or adjacent to tidally influenced areas and/or potentially subject to inundation due to sea level rise un-less approved through an LRDP Amendment that allows this measure as adaptation strategy based on the Com-prehensive Sea Level Rise Hazards Assessment in Policy SH-01.

Not Applicable. Fill would be brought to the student garden with the purpose of building the site to avoid excavation into a poten-tially sensitive archeological area and not for the purpose of ad-dressing flooding impacts. The project is not within a flood zone or a tidally influenced area subject to sea level rise. .

Page 101: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

84

2010 LRDP Policy Consistency Analysis

SHORELINE PROTECTION POLICIES Policy SH-01 - Within five years of certification of the 2010 LRDP, the University shall prepare a Comprehensive Sea Level Rise Hazards Assessment for submittal to the Coastal Commission as an amendment to the LRDP that addresses the anticipated impacts of sea level rise on the Campus along the Goleta Slough and Pacific Ocean shoreline. The Plan shall be available prior to submitting a NOID for development or redevelopment that is located along the north boundary of the Storke Campus or at the Facilities Management site. The Plan shall: A. Identify the most vulnerable areas, structures, facilities, and resources; specifically areas with priority uses such as beaches, public access and recreation resources, ESHA and wetlands, wetland restoration areas, open space are-as where future wetland or habitat migration would be possible, and existing and planned sites for critical infra-structure. B. Include a detailed sea level rise vulnerability and risk assessment, either as an independent effort, or in conjunc-tion with other assessments, such as the Goleta Slough multi-jurisdictional planning effort, that includes a specific analysis of the vulnerable areas and coastal resources in subsection “a” above. The vulnerability and risk assess-ment shall use best available science and multiple scenar-ios including best available scientific projections of ex-pected sea level rise, such as by the Ocean Protection Council [e.g. 2013 OPC Guidance on Sea Level Rise], Na-tional Research Council, Intergovernmental Panel on Cli-mate Change, and the West Coast Governors Alliance. C. Based on the vulnerability analysis, identify campus ar-eas that are potentially subject to the effects of sea level rise for the purpose of determining whether a detailed site-specific coastal hazards D. Recommend adaptation management strategies that would minimize risks to coastal resources and develop-ment to due to hazards associated with sea level rise. Ad-aptation management strategies may include:

Not Applicable. This policy is not relevant to the project.

Page 102: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

85

2010 LRDP Policy Consistency Analysis

• Relocating existing development to safer locations • Siting new development to avoid areas vulnerable to flooding, inundation, and erosion; • Modifying land use designations and individual campus uses, and developing siting and design standards for new development, to avoid and minimize risks; • Establishing conservation areas to allow wetland and habitat migration; • Creating an adaptive public access plan that maximizes access to and along the shore as the effects of sea level rise are realized. E. Analyze sea-level rise impacts at both the site-specific and regional scales. The Plan must evaluate how sea-level rise impacts from the littoral cell or watershed (such as expected changes in sediment supply, increases or re-ductions in stream flows, post-fire sediment pulses, etc.) could affect the campus. Additionally, the Plan must eval-uate how options to adapt to sea-level rise could result in cumulative impacts to other areas in the littoral cell or wa-tershed, and should recommend actions to minimize any impacts. F. The Assessment shall identify the recommendations that will require processing through an LRDP Amendment to be effectuated. Policy SH-02 - New development shall be sited to avoid potential flooding, inundation, and erosion hazards created or exacerbated by long-range SLR. New development that is potentially subject to the effects of sea level rise shall require a current (prepared within the past 2 years) coastal hazards assessment as described in Policy SH-04. Based on the coastal hazards assessment, new development and redevelopment shall be sited: to avoid any hazards antici-pated during the life of the structure and to avoid the need for bluff retaining or shoreline protection devices. Hazard avoidance efforts shall not result in impacts to coastal re-sources or encroachment into coastal habitats and shall not undermine broader ecosystem sustainability, for ex-

Not Applicable. This project site is not in an area subject to sea level rise.

Page 103: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

86

2010 LRDP Policy Consistency Analysis

ample, siting and design of new development must not on-ly avoid sea-level rise hazards, but also ensure that the development does not have unintended adverse conse-quences that impact sensitive habitats or species in the area. The assessment must also consider the potential need for larger setbacks near ESHA and natural open spaces to allow for habitat sustainability and migration. Policy SH-03 - After completing the Comprehensive Sea Level Rise Hazards Assessment required pursuant to Pol-icy SH-01, the University shall continue to research and respond to the impacts of sea level rise on the Campus along the Goleta Slough and Pacific Ocean shoreline. On-going efforts to respond to SLR-related hazards may in-clude: A. Continue to gather information on the effects of sea level rise on the shoreline, particularly the most vulnerable areas identified in the Comprehensive Sea Level Rise Hazards Analysis. Participate, as possible, in regional as-sessments of sea level rise vulnerability, risk and adaption planning efforts to ensure compatible treatment for sea level rise across jurisdictional boundaries; B. Updating the Best Available Science, consistent with regional policy efforts, as new, peer-reviewed studies on sea level rise become available and as agencies such as the OPC or the CCC issue updates to their guidance re-ports; and C. Amending the LRDP to add policies and provisions that address the impacts of sea level rise based on information gathered over time. Modifications to address SLR may in-clude: relocating proposed development envelopes, changes to land use designations, relocating utilities, up-dates to the public access plan to ensure long-term protec-tion of the function and connectivity of existing public ac-cess and recreation resources.

Not Applicable. This policy is not relevant to the project.

Policy SH-04 - A site-specific coastal hazards study shall be prepared by technical experts (e.g., geologic, geo-technical, hydrologic, and engineering professionals, as appropriate) in combination with planning professionals to

Not Applicable. The project site is not within an area subject to sea level rise.

Page 104: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

87

2010 LRDP Policy Consistency Analysis

address the potential hazards from erosion, flooding, wave attack, scour and other conditions created or exacerbated by SLR. The study shall use the best available science and consider multiple SLR scenarios including best avail-able scientific projections of SLR such as by the Ocean Protection Council, National Research Council, Intergov-ernmental Panel on Climate Change, and the West Coast Governors Alliance. All input parameters for hazard analy-sis shall be clearly described in the analysis and, if judg-ment was used to choose between a range of values, the basis for the selection should be provided. The study shall identify the anticipated economic life of the structure(s), assess the ease of removal or adaptation, and recom-mend applicable adaptation management strategies, in-cluding siting and design measures, that eliminate or re-duce hazards and that are consistent with all policies and provisions of the certified LRDP. Policy SH-05 - The University will coordinate vulnerability assessments and adaptation planning with other regional jurisdictions that face common threats from sea-level rise, including the Goleta Slough management planning efforts, and will participate in regional studies of sea level rise vul-nerability, and adaptation, and in shoreline monitoring to identify sea level rise concerns.

Not Applicable. This policy is not relevant to the project.

Policy SH-06 - Shoreline structures, including revetments, seawalls, cliff retaining walls, or other such construction that alters natural shoreline processes shall be prohibited except where there is no less environmentally-damaging alternative for the protection of existing development or to serve coastal dependent uses, or to protect public beach-es in danger from erosion. Any such structures shall be sited to avoid sensitive resources and designed to mini-mize, to the maximum extent feasible, the alteration of natural land forms, and eliminate or mitigate adverse im-pacts on public access and on local shoreline sand supply. Visual impacts shall be minimized through siting the struc-tures as far inland as possible, using a narrow profile or small footprint structure if possible, inclusion of living

Not Applicable. This policy is not relevant to the project.

Page 105: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

88

2010 LRDP Policy Consistency Analysis

shoreline or bioengineering techniques, and the use of ap-propriate colors and materials. Structures shall be re-moved at such time as the structure is no longer needed for its permitted purpose. Policy SH-07 - No new permanent above-ground devel-opment shall be permitted on the dry sandy beach except for temporary recreational structures such as volleyball poles and nets.

Not Applicable. This policy is not relevant to the project.

Page 106: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

WW

WW

W W WW W W

W WW

WW

WW

WW

WW W W

W WW W

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS

FW

FW

3"

3"

1" CITRUS8" CITRUS

POST (TYP.)

12" MULBERRY

8" AMBER8" AMBER

12" AMBER

44

44

44

45

44

44

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

12" MA

8" L

IQ

8" L

IQ

12" L

IQ

12" MA

44

ONE WAY

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GAS GASGAS

GASGAS

GASGAS

GAS GAS

E

EE

W

W

W

W

W

45 FG

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

43.83'

AC

44.04'

CONC

44.17'

AC

44.46'

AC

44.64'

SWS

44.63'

AC

44.99'

AC

45.18'

SWS

45.28'

SWS

45.16'

AC

SIGN

45.21'

AC

SIGN

4

3

.

9

8

'

C

O

N

C

4

4

.

0

0

'

C

O

N

C

45.13'

AC

45.22'

AC

4

4

.

0

0

'

C

O

N

C

G

A

T

E

4

4

.

0

0

'

C

O

N

C

G

A

T

E

45.25'

AC

GV

45.18'

AC

4

4

.

0

5

'

C

O

N

C

44.10'

CONC

45.10'

AC

45.02'

AC

44.93'

AC

44.71'

AC

44.32'

AC

SIGN

44.98'

UCSB MARKER WL

SIGN

44.51'

WOOD BD

44.74'

WOOD BD

44.34'

AC LP

44.15'

AC

43.62'

AC

4

3

.

1

5

'

S

W

4

2

.

9

5

'

S

W

4

2

.

9

0

'

S

W

43.35'

TC

4

2

.

8

3

'

F

L

42.92'

FL

42.93'

TC DAY

43.42'

SIGN

4

3

.4

1

'

L

S

4

2

.

8

9

'

S

Y

S

4

2

.

9

8

'

S

Y

S

4

2

.

9

2

'

S

Y

S

42.76'

SYS

42.94'

BSW

43.03'

BSW

4

3

.

3

4

'

B

S

W

4

3

.

2

5

'

B

S

W

AGAVE

4

2

.

7

9

'

T

C

D

A

Y

43.08'

TC

4

3

.

0

8

'

T

C

42.62'

FL

4

2

.

5

6

'

F

L

43.11'

TC

4

3

.

1

9

'

T

C

42.57'

FL

42.79'

AC

43.77'

EP

43.72'

EP

44.00'

EP44.05'

EP

44.40'

EP

44.39'

EP

44.74'

EP

44.64'

EP

44.53'

EP

44.90'

EP

45.05'

EP

45.33'

EP

45.36'

EP

4

5

.

2

5

'

E

P

4

4

.

9

5

'

E

P

4

4

.

8

3

'

E

P

4

5

.

2

4

'

E

P

4

5

.

2

8

'

E

P

4

4

.

9

0

'

E

P

4

4

.

9

6

'

E

P

4

5

.

3

6

'

E

P

4

5

.

4

2

'

E

P

4

4

.

9

8

'

E

P

4

4

.

8

2

'

E

P

4

5

.

2

5

'

E

P

4

4

.

7

6

'

E

P

4

5

.

1

6

'

E

P

44.51'

EP

45.00'

EP

44.80'

EP

44.34'

EP

44.25'

EP

44.15'

EP

44.10'

EP

44.03'

EP

43.36'

EP

4

3

.

5

4

'

E

P

4

3

.

5

4

'

G

N

D

43.67'

G

N

D

44.52'

GND

43.89'

GND

44.42'

GND

44.63'

GND

44.57'

GND

44.81'

GND

45.00'

GND

44.81'

GND

45.12'

GND

44.94'

GND

44.92'

GND

45.11'

GND

45.03'

GND

45.03'

GND

45.20'

GND

45.49'

GND

45.08'

GND

44.85'

GND

44.79'

GND

44.87'

GND

44.39'

GND

44.60'

GND

44.87'

GND

44.57'

GND

44.80'

GND

44.80'

GND

44.62'

GND

44.23'

GND

43.83'

GND

44.74'

GND

44.53'

GND

43.75'

GND

43.10'

GND

5

44.04'

CP/PK

7

44.74'

CP/PK

E

E

EE

EE

NEW PEDESTRIANGATE BETWEENCHILDREN'S CENTERAND FARM

RAMP28'-3"DN

RAM

P7'-9

"D

N

NEW ELECTRICALLINE - PULL FROM EX.PANEL ON EX. POLENORTHEAST OF SITE

EX GAS LINE PER CAMPUSATLAS; CONTRACTOR SHALLVERIFY LOCATION ON SITE

EX. WATER LINE.REFERENCE CIVILENGINEER'S PLANS

RELOCATE EX.PLASTIC SHED

EX. GATEEX. FENCE

EX. CHAIN LINKFENCE ATCHILDREN'S CENTER

NEW WATER LINE.REFERENCE IRRIGATIONPLANS & CIVIL PLANS

EX. GAS VALVE PERCAMPUS ATLAS; NOTOBSERVED.CONTRACTOR TOPOTHOLE AND VERIFY.

EX. CONCRETE CURBUNDER EX. CHAINLINK FENCE ATCHILDREN'S CENTER

5'CLR

LANDING

EX 3" GALVANIZED STEELWATER LINE PER CAMPUSATLAS; CONTRACTOR SHALLVERIFY LOCATION ON SITE

FUTURE PERGOLAN.I.C.

EX. SHED

WES

T CA

MPU

S PO

INT

LAN

E

FUTUREGREENHOUSEN.I.C.

NEW SHED

3' TALL RAISEDPERMACULTURETREE PLANTER

GAS VALVEOBSERVED ON SITE

CONCRETEPATIO

PRE-FABRICATEDMETAL RAMP(PERFORATEDMETAL SURFACE)

CLASS II BASE PATHRAISED BEDS, TYP. CLASS II BASE PATHSAND UTILITY AREA

ELECTRIC CART ENTRYPERIMETER FENCE

NEW DOUBLE GATESFOR FACILITIESACCESS TOCHILDREN'S CENTER

NEW PERIMETERFENCE

EXISTING ORFALEAFAMILY CHILDREN'SCENTER (OFCC)UNIVERSITYDAYCARE CENTER

NOTE: SEE SHEET L-1 LAYOUT PLANFOR DETAILED DESCRIPTION OF ALLSITE ELEMENTS AND REFERENCES TOCONSTRUCTION DETAILS.

EX. CHAIN LINK FENCE; FABRIC TO BEREMOVED AND REPLACED WITH NEWFENCING PER LAYOUT PLAN.COORDINATE TIMING WITH OFCC STAFF.SEE OFCC COORDINATION NOTES.TYPICAL SOUTHERN FENCELINE.

WOODCHIP MULCH

WOODCHIP MULCH

NEW WATER LINEW W

NEW ELECTRICAL LINEE E

EXISTING GAS LINEGAS

EXISTING WATER LINEW W

UTILITY LEGEND

EXISTING SEWER LINES S

ACL

SCALE: 1/8" =1'-0"

16'8'4'0

L-0

SITE PLAN & EROSION CONTROL PLAN

TITL

E SH

EET

AN

DER

OSI

ON

CO

NTR

OL

PLA

N

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

7

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

VICINITY MAP

DESIGN TEAM

SHEET INDEX

LANDSCAPE ARCHITECT:TRUE NATURE DESIGN5266 HOLLISTER AVE. STE. 230GOLETA, CA 931111CONTACT: KIMBERLY TRUEPHONE: 805-770-2100

CIVIL ENGINEER:MAC DESIGN ASSOCIATES1933 CLIFF DR. #6SANTA BARBARA, CA 93109CONTACT: DALE WEBERPHONE: 805-957-4748

ELECTRICAL ENGINEER:ALAN NOELLE ENGINEERING1616 ANACAPA ST.SANTA BARBARA, CA 93101CONTACT: ALAN NOELLEPHONE: 805-563-5444

LANDSCAPE:L-0 TITLE SHEET & EROSION

CONTROL PLANL-1 LAYOUT & DIMENSION PLANL-2 IRRIGATION PLANL-3 CONSTRUCTION DETAILSL-4 CONSTRUCTION DETAILSL-5 IRRIGATION DETAILS

CIVIL ENGINEER:C-1 GRADING PLANC-2 DETAILS

ELECTRICAL ENGINEER:E-1 ELECTRICAL PLAN

PROJECT SITE

EL COLEGIO RD

STORKE RD

HOLLISTER AVE.

PACIFIC OCEAN

ISLA VISTA

UCSB

UCSBWESTCAMPUS

STORKE RD

UCSB

PROJECT SITE

CONSTRUCTION STAGING MAP

STAGING AREA- APPROX. 40x80

1. ADJUST ANY VALVES CANS, VAULT FRAMES AND COVERS, MANHOLE FRAMES AND COVERSTO FINISH GRADE (TYP. FOR ALL UTILITY SURFACE FEATURES FOR THIS PROJECT.) SEE LAYOUT& GRADING PLAN THIS SET. NOTE THAT GAS VALVE IN PROPOSED CENTRAL BED APPEARS TOBE LOCATED IN ROAD AND WAS NOT ENCOUNTERED ON SITE. CONTRACTOR SHALL VERIFYDISPOSITION OF GAS VALVE.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR BEING FAMILIAR WITH ALL UNDERGROUNDUTILITIES, PIPES, AND STRUCTURES, AND MARK LOCATION ON SITE WHERE TRENCHING OREXCAVATION IS TO OCCUR AND PROTECT ALL UTILITIES WITHIN SCOPE OF WORK AREA.CONTRACTOR SHALL TAKE SOLE RESPONSIBILITY FOR COST INCURRED DUE TO DAMAGE ANDREPLACEMENT OF SAID UTILITIES. CONFIRM LOCATION WITH UNIVERSITY REPRESENTATIVE ANDCOORDINATE WITH GRADING AND LAYOUT PLAN THIS SET.

3. CONTRACTOR SHALL CONSTRUCT AND MAINTAIN PERIMETER EROSION CONTROL FOR THISSCOPE OF WORK PER EROSION CONTROL PLANS AND PROJECT SPECIFICATIONS.

4. ALL CONSTRUCTION AND INSTALLATION OF LANDSCAPE AND HARDSCAPE ITEMS SHALL BEPER LOCAL CODES AND ORDINANCES.

5. ALL PAVED AREAS AND FINISH GRADE AREAS SHALL SLOPE TO DRAIN.6. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS. ALL DIMENSIONS SHALL

BE VERIFIED AGAINST EXISTING CONDITIONS AND ALL DISCREPANCIES REPORTED TO THEUNIVERSITY REPRESENTATIVE.

7. CONTRACTOR SHALL READ AND UNDERSTAND THE PROJECT SPECIFICATIONSACCOMPANYING THESE PLANS PRIOR TO BIDDING. FAILURE TO ADHERE TO THESPECIFICATIONS DURING CONSTRUCTION MAY RESULT IN A DELAY OF THE PROJECT AT THECONTRACTOR'S EXPENSE. CONTRACTOR IS RESPONSIBLE FOR ANY LOSS DUE TO A DECISIONTO ALTER THE DESIGN OR LAYOUT OF THIS PROJECT IN ANY WAY WITHOUT THE CONSENT OFTHE UNIVERSITY REPRESENTATIVE.

UNIVERSITY OF CALIFORNIA SANTA BARBARA EDIBLE CAMPUS PROJECT STUDENT FARM

GENERAL NOTES

1. FUELS, OILS, SOLVENTS, AND OTHER TOXIC MATERIALS MUST BE STORED INACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOILAND SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BEPROTECTED FROM THE WEATHER. SPILLS MAY NOT BE WASHED INTO THEDRAINAGE SYSTEM.

2. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITEDINTO A COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATERAND DISPERSAL BY WIND.

3. CONTRACTOR SHALL SUBMIT CONSTRUCTION STAGING AND MATERIALSTORAGE DRAWINGS TO THE UNIVERSITY FOR APPROVAL, UNLESS OTHERWISEAPPROVED BY UNIVERSITY REPRESENTATIVE.

4. CONTRACTOR SHALL CONSTRUCT A CONCRETE WASHOUT AREA PER UCSB ANDCALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD FIELD MANUAL.LOCATION TO BE COORDINATED WITH AND APPROVED BY THE UNIVERSITYREPRESENTATIVE.

CONSTRUCTION BEST MANAGEMENT PRACTICES

EROSION CONTROL LEGEND

#

1. CONTRACTOR SHALL CONSTRUCT ADEQUATE EROSION CONTROL MEASURES TOPREVENT SILT AND CONSTRUCTION DEBRIS FROM EXITING THE CONSTRUCTIONSITE AND/OR ENTERING THE STORM DRAIN SYSTEM.

2. ALL EROSION CONTROL DEVICES SHALL BE CONSTRUCTED AND MAINTAINEDMEETING ALL UCSB AND CALIFORNIA REGIONAL WATER QUALITY CONTROLBOARD STORM WATER BEST MANAGEMENT PRACTICES REQUIREMENTS.

3. CONTRACTOR SHALL ROUTINELY INSPECT AND MAINTAIN ALL EROSION CONTROLDEVICES IN WORKING CONDITION AND MAINTAIN RECORD IN ACCORDANCE WITHTHE UCSB AND CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARDREQUIREMENTS.

4. ERODED SEDIMENT AND OTHER POLLUTANTS MUST BE RETAINED ON SITE ANDMAY NOT BE TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREADRAINS, NATURAL DRAINAGE COURSES, OR WIND.

5. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUSTBE PROTECTED FROM BEING TRANSPORTED FORM THE SITE BY THE FORCES OFWIND OR WATER.

6. EROSION CONTROL PLAN SUGGESTS MINIMUM REQUIREMENTS TO PREVENTSEDIMENT FROM LEAVING SITE EITHER BY WIND OR WATER, ETC. , BUT NOT ALLPOSSIBLE BMP'S TO CONTROL SEDIMENT. CONTRACTOR SHALL ADJUSTMEASURES AS REQUIRED TO CONTROL EROSION. COORDINATE SITESTABILIZATION PLANS WITH UNIVERSITY REPRESENTATIVE. REFERENCE DIVISION 1SPECIFICATIONS FOR UNIVERSITY STANDARD REQUIREMENTS.

7. INSTALL WOOD CHIPS PROVIDED BY UNIVERSITY AS SOON AS POSSIBLE AFTERSITE CLEARING AND GRADING TO PROVIDE SITE STABILIZATION FOR EROSIONCONTROL PURPOSES.

EROSION CONTROL GENERAL NOTES

1. GRADING AND EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DESIGNED TO MINIMIZEEROSION AND SHALL INCLUDE THE FOLLOWING:A. METHODS SUCH AS GEOTEXTILE FABRICS, EROSION CONTROL BLANKETS, RETENTION

BASINS, DRAINAGE DIVERSION STRUCTURES, SILTATION BASINS AND SPOT GRADINGSHALL BE USED TO REDUCE EROSION AND SILTATION INTO STORM DRAINS DURINGGRADING AND CONSTRUCTION ACTIVITIES.

B. ANY SEDIMENT OR OTHER MATERIALS TRACKED OFF SITE SHALL BE REMOVED THE SAMEDAY AS THEY ARE TRACKED USING DRY CLEANING METHODS.

C. STORM DRAIN INLETS SHALL BE PROTECTED FROM SEDIMENT-LADEN WATERS BY THE USEOF INLET PROTECTION DEVICES SUCH AS GRAVEL BAG BARRIERS, FILTER FABRIC FENCES,BLOCK AND GRAVEL FILTERS, AND EXCAVATED INLET SEDIMENT TRAPS.

2. BEST AVAILABLE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTEDDURING GRADING AND CONSTRUCTION ACTIVITIES. THESE MEASURES MAY INCLUDE BUT ARENOT LIMITED TO THE USE OF SEDIMENT BASINS, GRAVEL BAGS, SILT FENCES, GEO-BAGS ORGRAVEL AND GEOTEXTILE FABRIC BENNS, EROSION CONTROL BLANKETS, COIR ROLLS, JUTENET, AND STRAW BALES. STORM DRAIN INLETS SHALL BE PROTECTED FROM SEDIMENT-ANDPOLLUTANT-LADEN WATERS BY USE OF INLET PROTECTION DEVICES SUCH AS GRAVEL BAGBARRIERS, FILTER FABRIC FENCES, BLOCK AND GRAVEL FILTERS, AND EXCAVATED INLETSEDIMENT TRAPS. SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED FOR THE DURATIONOF THE GRADING PERIOD AND UNTIL GRADED AREAS HAVE BEEN STABILIZED BY STRUCTURESOR VEGETATION.

3. DURING CONSTRUCTION, WASHING OF CONCRETE TRUCKS, PAINT, EQUIPMENT, OR SIMILARACTIVITIES SHALL OCCUR ONLY IN AREAS WHERE POLLUTED WATER AND MATERIALS CAN BECONTAINED FOR SUBSEQUENT REMOVAL FROM THE SITE. WASH WATER SHALL NOT BEDISCHARGED TO THE STORM DRAINS, STREET, DRAINAGE DITCHES, CREEKS, OR WETLANDS.AREAS DESIGNATED FOR WASHING FUNCTIONS SHALL BE AT LEAST 100 FEET FROM ANYSTORM DRAIN, WATERBODY, OR SENSITIVE BIOLOGICAL RESOURCES, INCLUDING OAK TREESAND DRAINAGE CHANNELS. THE LOCATION(S) OF THE WASHOUT AREA(S) SHALL BE CLEARLYNOTED AT THE CONSTRUCTION SITE WITH SIGNS. REVIEW PROPOSED WASHOUT LOCATIONWITH UNIVERSITY REPRESENTATIVE FOR APPROVAL PRIOR TO START OF CONSTRUCTION.

4. ALL EXPOSED SLOPES SHALL BE MULCHED AND STABILIZED PRIOR TO FINAL OBSERVATION.5. IF NOT DIMENSIONED, LOCATION OF FINISH GRADE ELEVATIONS AND FEATURES SUCH AS

SWALES, RIDGE LINES, ETC. SHALL BE DETERMINED BY SCALE FROM KNOWN POINTS SHOWNON THE PLANS. REFERENCE GRADING PLANS.

6. ALL MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE HEALTH ANDSAFETY LAWS, ORDINANCES, REGULATIONS, RULES, AND STANDARDS INCLUDING ALLREQUIREMENTS OF THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY AND OFCAL-OSHA.

7. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VEHICULAR AND PEDESTRIAN TRAFFICCONTROL AND SAFETY AND SHALL FURNISH, INSTALL, AND MAINTAIN SUCH FENCING, SIGNS,LIGHTS, TRENCH PLATES, BARRICADES, AND/OR OTHER PROTECTION AS IS NECESSARY FORSAID CONTROL AND SAFETY.

8. DURING THE COURSE OF WORK, CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOROBSERVATION AND TESTING AS STIPULATED PURSUANT TO COUNTY OR OTHER JURISDICTIONSAND AS OUTLINED IN THE PROJECT SPECIFICATIONS.

9. ALL UNSUITABLE CONSTRUCTION MATERIALS AND RUBBISH AND DEBRIS SHALL BE REMOVEDFROM THE JOB SITE, BE TRANSPORTED TO A SUITABLE LOCATION, AND BE DISPOSED OF IN APROPER AND LEGAL MANNER.

10. ARCHAEOLOGICAL MONITOR SHALL BE PRESENT ON SITE TO OBSERVE ANY CONSTRUCTIONACTIVITIES REQUIRING EXCAVATION OR GROUND DISTURBANCE SUCH AS GRADING,TRENCHING, INSTALLATION OF CURB FORMS AND FOOTINGS, ETC. CONTRACTOR SHALLSCHEDULE SUCH WORK SO AS TO

GENERAL CONDITIONS NOTES

SITE COVERAGESITE AREA: 15,026 SFPERVIOUS SURFACES EXISTING: 15,026 SFPROPOSED PERVIOUS COVER: 14,792 SFPROPOSED IMPERVIOUS COVER: 234 SF

PROJECT SITE IS LESS THAT ONE ACRE.PROJECT PROPOSES LESS THAN 2,500 SF OFIMPERMEABLE SURFACE AND THUS IS NOT REQUIRED TOSUBMIT A SMALL PROJECT STORMWATER PLAN TO THEUNIVERSITY (PER UNIVERSITY SWMP PERMIT).

UNIVERSITY REPRESENTATIVE:CONTACT: JENNIFER PIERCE, P.E.UNIVERSITY OF CALIFORNIADESIGN & CONSTRUCTION SERVICESSANTA BARBARA, CA 93106-1030PHONE: (805)[email protected]

6L-4

1. ELECTRIC FENCE: CONTRACTOR SHALL BE AWAREOF ELECTRIFIED PERIMETER FENCE, COORDINATEWITH OFCC STAFF. FENCE SHALL BE ELECTRIFIEDAT THE END OF EACH WORK DAY.

2. CONTRACTOR SHALL COORDINATE WORK ENTAILINGLOUD NOISES WITH OFCC STAFF. CHILDREN'SCENTER NAP TIME IS FROM 12;30-3:00; OFCCSTAFF PREFER LOUD ACTIVITIES BE PERFORMEDOUTSIDE OF NAP TIME IF POSSIBLE.

3. COORDINATE TIMING FOR REMOVAL OF EX.SECTION OF FENCE WITH INSTALLATION OF NEWGATE. COORDINATE WORK TIMELINE WITHUNIVERSITY REPRESENTATIVE. YARDS SHALL NOTBE LEFT UNSECURED & UN-ELECTRIFIED OVERNIGHT. TEMPORARY SOLID BARRICADE MAY BEACCEPTABLE -VERIFY WITH UNIVERSITYREPRESENTATIVE.

OFCC COORDINATION NOTES

AutoCAD SHX Text
S T O P
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GFI
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
GFI
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
Page 107: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

WW

WW

W WW W W

W W WW

WW

WW

WW

W W WW W

W W WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS

FW

FW

FW

3"

3"

6"

1.5

"

6" FIG

1" CITRUS8" CITRUS

POST (TYP.)

12" MULBERRY

8" AMBER8" AMBER

12" AMBER

12" AMBER

18" PINE

44

44

44

45

44

44

44

HB

18

" PIN

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

8" CIT1" CIT

6" FC

12" MA

18

" PIN

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

8" CIT1" CIT

6" FC

12" MA

44

ONE WAY

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GASGAS

GASGAS

GASGAS

GASGAS GAS GAS

E

EE

W

W

W

W

W

45 FG

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

43.83'

AC

44.04'

CONC

44.17'

AC

44.46'

AC

44.64'

SWS

44.63'

AC

44.99'

AC

45.18'

SWS

45.28'

SWS

45.16'

AC

SIGN

45.21'

AC

SIGN

4

3

.

9

8

'

C

O

N

C

4

4

.

0

0

'

C

O

N

C

45.13'

AC

45.22'

AC

4

4

.

0

0

'

C

O

N

C

G

A

T

E

4

4

.

0

0

'

C

O

N

C

G

A

T

E

45.25'

AC

GV

45.18'

AC

4

4

.

0

5

'

C

O

N

C

44.10'

CONC

45.10'

AC

45.02'

AC

44.93'

AC

44.71'

AC

44.32'

AC

SIGN

44.98'

UCSB MARKER WL

SIGN

44.51'

WOOD BD

44.74'

WOOD BD

44.34'

AC LP

44.15'

AC

43.62'

AC

4

3

.

1

5

'

S

W

4

2

.

9

5

'

S

W

4

2

.

9

0

'

S

W

43.12'

SW

42.79'

FL

43.35'

TC

4

2

.

8

3

'

F

L

42.92'

FL

42.93'

TC DAY

43.42'

TC

SIGN

4

3

.4

1

'

L

S

4

2

.

8

9

'

S

Y

S

4

2

.

9

8

'

S

Y

S

4

2

.

9

2

'

S

Y

S

42.76'

SYS

42.94'

BSW

43.03'

BSW

4

3

.

3

4

'

B

S

W

4

3

.

2

5

'

B

S

W

4

3

.

0

3

'

B

S

W

AGAVE

AGAVE

42.51'

SWS

42.29'

SWS

4

2

.

7

9

'

T

C

D

A

Y

43.08'

TC

4

3

.

0

8

'

T

C

42.62'

FL

4

2

.

5

6

'

F

L

43.11'

TC

4

3

.

1

9

'

T

C

42.57'

FL

42.79'

AC

4

2

.

3

9

'

S

B

S

43.77'

EP

43.72'

EP

44.00'

EP44.05'

EP

44.40'

EP

44.39'

EP

44.74'

EP

44.64'

EP

44.53'

EP

44.90'

EP

45.05'

EP

45.44'

EP

45.33'

EP

45.36'

EP

4

5

.

2

5

'

E

P

4

4

.

9

5

'

E

P

4

4

.

8

3

'

E

P

4

5

.

2

4

'

E

P

4

5

.

2

8

'

E

P

4

4

.

9

0

'

E

P

4

4

.

9

6

'

E

P

4

5

.

3

6

'

E

P

4

5

.

4

2

'

E

P

4

4

.

9

8

'

E

P

4

4

.

8

2

'

E

P

4

5

.

2

5

'

E

P

4

4

.

7

6

'

E

P

4

5

.

1

6

'

E

P

44.51'

EP

45.00'

EP

44.80'

EP

44.34'

EP

44.25'

EP

44.15'

EP

44.10'

EP

44.03'

EP

43.36'

EP

4

3

.

5

4

'

E

P

4

3

.

5

4

'

G

N

D

43.67'

G

N

D

44.52'

GND

43.89'

GND

44.42'

GND

44.63'

GND

44.57'

GND

44.81'

GND

45.00'

GND

44.81'

GND

45.12'

GND

44.94'

GND

44.92'

GND

45.11'

GND

45.03'

GND

45.03'

GND

45.20'

GND

45.49'

GND

45.08'

GND

44.85'

GND

44.79'

GND

44.87'

GND

44.39'

GND

44.60'

GND

44.87'

GND

44.57'

GND

44.80'

GND

44.80'

GND

44.62'

GND

44.23'

GND

43.83'

GND

44.74'

GND

44.53'

GND

43.75'

GND

43.10'

GND

43.57'

GND

5

44.04'

CP/PK

8

43.21'

CP CHS X ON TC

7

44.74'

CP/PK

E

E

EE

EE

RAMP28'-3"DN

RAM

P7'-9

"D

N

NEW ELECTRICALLINE - PULL FROM EX.PANEL ON EX. POLENORTHEAST OF SITE

4'

4'

6'

EX GAS LINE PER CAMPUSATLAS; CONTRACTOR SHALLVERIFY LOCATION ON SITE

EX. WATER LINE.REFERENCE CIVILENGINEER'S PLANS

RELOCATE EX.KNOX BOX

EX. FENCE

27'

4'

GFI ELECTRICAL OUTLET PERELECTRICAL ENGINEER'SPLANS

NEW WATER LINE.REFERENCE IRRIGATIONPLANS

2

12

13

17

22

10 9

14

2 2 2

20

20

3 3

20

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4

12

13

10

8

8

7

4

8

65

3 3 3 3201

1

1

1

9

9

12 13 14

13

12

16

9

9

9

20

15

EX. UTILITY GASVALVE (TYP.).REFERENCE CIVILENGINEER'S PLANS

12'8'

-9"

1'-9"

4'

4'

4'

4'-6

"

6'-9

"2'

-7"

12'-6

"8'

8'8'

4'-6

"11

'

8'-3" 8'-3" 8'-3" 5'-9"

5'-5

"

36' 5' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8'-3" 12'-6"1'-9"

11'-3"

202'-9"

5'-8"

5'-6

"

51'-4

"

63'-9

"

7'-3

"8'

8'4'

4'-6

"4'

-3"

8'8'

11'-3

"

22'-3"

4'-6"

4'-3

"

ALIGNA

LIG

N

80'

16'

6'

9'-3"

8' 14'-2"

4'

±19' 4' 2' 4' 4' 4' 2' 4' 4'

6'-9"

5'-7

"

4'-6

"

4' 2' 5'

21

±19' 4' 2' 4' 4' 2' 4' 4' 4' 2' 4' 5' 4' 2' 4' 4' 4' 2' 4' 4' 4' 2' 4' 4' 4' 2' 4' 4' 4' 2' 4' 4' 4' 2' 4' 5' 4' 2' 4' 4' 4' 2' 4'

16'

4'16

'

2'19

'

2' 4' 4' 4' 2' 4'

10

4'16

'4'

27'

11'

±11''

62'

5' 4'-6

"

4'6'

4'6'

4'6'

4'

7'-3

"

11'-3

"

10

2020

20

10'

12'

EX. CONCRETE CURBAT CHILDREN'SCENTER

20

4'-6

"

10

5'-8

"

2'

4'

ALIGN GATE WITHCENTER OF PATH

℄ ℄

4'

12 13

POINT OF BEGINNING (P.O.B.)AT CORNER OF EX. CONCRETECURB. ALIGN NEW FENCE POSTWITH EXISTING CHAIN LINKFENCE. REFERENCE DETAILS

NOTE: ALL FENCE POSTDIMENSIONS ARE FROMCENTER OF POSTS

NOTE: ALL FENCE POSTDIMENSIONS ARE FROMCENTER OF POSTS

21

7'-5"9'-6"

7'-3

"

7'-5" 7'-5"

P.O.B.

4

4

9 9

115

5

23 23

5'CLR

LANDING

15

24

2424

8' M

IN.

22'-4"

25

26

18

NEW WATER LINEW W

NEW ELECTRICAL LINEE E

EXISTING GAS LINEGAS

EXISTING WATER LINEW W

UTILITY LEGEND

EXISTING SEWER LINES S

SYMBOL DESCRIPTION DETAIL

6`L X 36" H RAISED PLANTER BED, TYP. 1/L-3

16`L X 21"H RAISED PLANTER BED, TYP. 2/L-3

27`L X 21" H. RAISED PLANTER BED, TYP. 5/L-3

3`H GRAVITY STACKED RAISED PLANTER WALL, TYP. ANGELUS 13/L-3PLANTER WALL 12 INCH BLOCK (12"X9"X4"), FAWN COLOR,CONTRACTOR TO INSTALL BASE COURSE W/ GRAVEL BACKFILLONLY. FINAL PLANTER HEIGHT TO BE 3` ABOVE ADJACENT FINISHGRADE. ALL COURSES BEYOND BASE COURSE TO BECONSTRUCTED BY UNIVERSITY.

4" THICK CONCRETE PAVING, TYP. STANDARD GREY. 1/L-4

ALUMINUM ADA RAMP

36"H RAISED PATIO, TYP. 12/L-3

METAL HANDRAIL, TYP.

CLASS II BASE PATH OR UTILITY AREA, TYP. 4" THICK 11/L-3

2X4 RECYCLED PLASTIC HEADER, TYP. 3/L-4

12` X 10` KIT WOOD STORAGE SHED - BEST BARNS CYPRESS; KIT TO BE SUPPLIED BY UNIVERSITY, CONTRACTOR TO ASSEMBLESHED & PAINT.

6"X6" CONCRETE MOW CURB, TYP. 10/L-3

4`H CORRUGATED METAL PERIMETER FENCE, TYP. 6/L-3

4`H DOUBLE SWING GATE, TYP. 7/L-3

4`H PEDESTRIAN GATE 8/L-3

FUTURE PERGOLA BY UNIVERSITY (N.I.C.)

FUTURE GREENHOUSE BY UNIVERSITY (N.I.C.)

ELECTRICAL SUB-METER. INSTALL IN STAINLESS STEEL BOX MOUNTED TO SHED. REFERENCE ELECTRICAL ENGINEER`S PLANS.

WOODCHIP MULCH PATH, TYP. WOOD CHIPS TO BE PROVIDED BY THE UNIVERSITY AND SPREAD BY CONTRACTOR.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

20

REFERENCE NOTES SCHEDULESYMBOL DESCRIPTION DETAIL

TRASH AND COMPOST BINS, TYP. TO BE SUPPLIED BY UNIVERSITY. (N.I.C.)

FUTURE 50/50 GARDEN SOIL MIX BY UNIVERSITY (N.I.C.)

SOUTHERN PERIMETER FENCE. REMOVE EX. CHAIN LINK FABRIC, EX. POSTS TO REMAIN. CONSTRUCT NEW FENCE PANELS WITHWOOD FRAME AND CORRUGATED METAL ATTACHED TO EXISTINGPOSTS AND RAISED CONCRETE CURB/FOOTING PER DETAIL. CUTPANEL DESIGNS PER DETAIL WHERE INDICATED. SUBMIT SHOPDRAWINGS. RE-INSTALL EXISTING ELECTRIFIED FENCE.

EX. CHAIN LINK GATE. REMOVE CHAIN LINK FABRIC AND RE-CLAD WITH CORRUGATED METAL PER DETAILS.

STACKING BLOCK RETAINIGN WALL. INSTALL SIMILAR TO RAISED PLANTER. CONTRACTOR TO INSTALL BASE COURSE AND ALLCOURSES REQUIRED TO OBTAIN WALL HEIGHT INDICATED ONCIVIL ENGINEER`S GRADING PLAN.

22

23

24

25

26

ACL

SCALE: 1/8" =1'-0"

16'8'4'0

L-1

LAYOUT PLAN

LAYO

UT

PLA

N

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

7

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

NOTE:ARCHAEOLOGICAL MONITOR SHALL BEPRESENT TO OBSERVE INSTALLATION OFTRENCHES OR ANY OTHER OPERATIONSWHICH DISTURB NATIVE SOIL ORREQUIRE EXCAVATION OF SOIL

1. ELECTRIC FENCE: CONTRACTOR SHALL BE AWAREOF ELECTRIFIED PERIMETER FENCE, COORDINATEWITH OFCC STAFF. FENCE SHALL BE ELECTRIFIEDAT THE END OF EACH WORK DAY.

2. CONTRACTOR SHALL COORDINATE WORK ENTAILINGLOUD NOISES WITH OFCC STAFF. CHILDREN'SCENTER NAP TIME IS FROM 12;30-3:00; OFCCSTAFF PREFER LOUD ACTIVITIES BE PERFORMEDOUTSIDE OF NAP TIME IF POSSIBLE.

3. COORDINATE TIMING FOR REMOVAL OF EX.SECTION OF FENCE WITH INSTALLATION OF NEWGATE. COORDINATE WORK TIMELINE WITHUNIVERSITY REPRESENTATIVE. YARDS SHALL NOTBE LEFT UNSECURED & UN-ELECTRIFIED OVERNIGHT. TEMPORARY SOLID BARRICADE MAY BEACCEPTABLE -VERIFY WITH UNIVERSITYREPRESENTATIVE.

OFCC COORDINATION NOTES

AutoCAD SHX Text
S T O P
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GFI
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
GFI
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
Page 108: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

WW

WW

W WW W W

W W WW

WW

WW

WW

W W WW W

W W WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS

FW

FW

FW

3"

3"

6"

1.5

"

6" FIG

1" CITRUS8" CITRUS

POST (TYP.)

12" MULBERRY

8" AMBER8" AMBER

12" AMBER

12" AMBER

18" PINE

44

44

44

45

44

44

44

HB

BARN

PLAY

HO

USE

BEN

CH

18

" PIN

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

8" CIT1" CIT

6" FC

12" MA

18

" PIN

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

8" CIT1" CIT

6" FC

12" MA

44

ONE WAY

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GASGAS

GASGAS

GASGAS

GASGAS GAS GAS GAS

E

EE

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

43.83'

AC

44.04'

CONC

44.17'

AC

44.46'

AC

44.64'

SWS

44.63'

AC

44.99'

AC

45.18'

SWS

45.28'

SWS

45.16'

AC

SIGN

45.21'

AC

SIGN

4

3

.

9

8

'

C

O

N

C

4

4

.

0

0

'

C

O

N

C

45.13'

AC

45.22'

AC

4

4

.

0

0

'

C

O

N

C

G

A

T

E

4

4

.

0

0

'

C

O

N

C

G

A

T

E

45.25'

AC

GV

45.18'

AC

4

4

.

0

5

'

C

O

N

C

44.10'

CONC

45.10'

AC

45.02'

AC

44.93'

AC

44.71'

AC

44.32'

AC

SIGN

44.98'

UCSB MARKER WL

SIGN

44.51'

WOOD BD

44.74'

WOOD BD

44.34'

AC LP

44.15'

AC

43.62'

AC

43.40'

SW

4

3

.

1

5

'

S

W

4

2

.

9

5

'

S

W

4

2

.

9

0

'

S

W

43.12'

SW

43.37'

SW

43.20'

TC

42.65'

FL

42.79'

FL

43.35'

TC

4

2

.

8

3

'

F

L

42.92'

FL

42.93'

TC DAY

43.42'

TC

SIGN

4

3

.4

1

'

L

S

4

2

.

8

9

'

S

Y

S

4

2

.

9

8

'

S

Y

S

4

2

.

9

2

'

S

Y

S

42.76'

SYS

42.94'

BSW

43.03'

BSW

4

3

.

3

4

'

B

S

W

4

3

.

2

5

'

B

S

W

4

3

.

0

3

'

B

S

W

AGAVE

AGAVE

42.51'

SWS

42.29'

SWS

4

2

.

7

9

'

T

C

D

A

Y

43.08'

TC

4

3

.

0

8

'

T

C

42.62'

FL

4

2

.

5

6

'

F

L

43.11'

TC

4

3

.

1

9

'

T

C

42.57'

FL

42.79'

AC

4

2

.

3

9

'

S

B

S

43.77'

EP

43.72'

EP

44.00'

EP44.05'

EP

44.40'

EP

44.39'

EP

44.74'

EP

44.64'

EP

44.53'

EP

44.90'

EP

45.05'

EP

45.44'

EP

45.33'

EP

45.36'

EP

4

5

.

2

5

'

E

P

4

4

.

9

5

'

E

P

4

4

.

8

3

'

E

P

4

5

.

2

4

'

E

P

4

5

.

2

8

'

E

P

4

4

.

9

0

'

E

P

4

4

.

9

6

'

E

P

4

5

.

3

6

'

E

P

4

5

.

4

2

'

E

P

4

4

.

9

8

'

E

P

4

4

.

8

2

'

E

P

4

5

.

2

5

'

E

P

4

4

.

7

6

'

E

P

4

5

.

1

6

'

E

P

44.51'

EP

45.00'

EP

44.80'

EP

44.34'

EP

44.25'

EP

44.15'

EP

44.10'

EP

44.03'

EP

43.36'

EP

4

3

.

5

4

'

E

P

4

3

.

5

4

'

G

N

D

43.67'

G

N

D

44.52'

GND

43.89'

GND

44.42'

GND

44.63'

GND

44.57'

GND

44.81'

GND

45.00'

GND

44.81'

GND

45.12'

GND

44.94'

GND

44.92'

GND

45.11'

GND

45.03'

GND

45.03'

GND

45.20'

GND

45.49'

GND

45.08'

GND

44.85'

GND

44.79'

GND

44.87'

GND

44.39'

GND

44.60'

GND

44.87'

GND

44.57'

GND

44.80'

GND

44.80'

GND

44.62'

GND

44.23'

GND

43.83'

GND

44.74'

GND

44.53'

GND

43.75'

GND

43.10'

GND

43.57'

GND

5

44.04'

CP/PK

8

43.21'

CP CHS X ON TC

7

44.74'

CP/PK

E

E

EE

EE

SHED

RELOCATEEX. SHED &KNOX BOX

WS

12" PVC LATERALSBETWEEN PAIRSOF BEDS, TYP.

HOSE BIBB IN GARDEN BED, TYP;ONE TO EVERY OTHER BED

IRRIGATION STUB UPFOR FUTURE USE

IRRIGATION STUB UPFOR FUTURE USE

WATER SUB-METER

BACKFLOW DEVICE

INSTALL MAINLINE12" DEEP INUTILITY AREA, TYP.

TIE INTO EX. WATER LINE W/ NEW11

2" COPPER LINE AND EXTEND TOFARM PER CIVIL ENGINEER'SPLANS

EX. 3" GALVANIZEDWATER LINE, TYP.

WEATHER STATION BYUNIVERSITY (N.I.C.)

EX. CHAIN LINKFENCE, TYP.

EX. CHAIN LINK FENCE EX. CHAIN LINKFENCE

NOTE: INSTALL ALL MAINLINEWITH METALLIC TAPE 2"ABOVE MAINLINE, TYP. NOTE: PLAN IS DIAGRAMMATIC -

RUN MAINLINE ADJACENT TO THESOUTHERN ROW OF RAISEDPLANTER BEDS

INSTALLMAINLINE12" DEEPIN UTIL.AREA

INSTALL MAINLINE12" DEEP IN UTILITY AREA

NOTE: IRRIGATION LINES TO BE12" DEEP IN CLASS II BASE INUTILITY AREA. RUN MORESHALLOW, APPROX. 9" DOWNCENTER PATH

FUTU

RE

PERG

OLA

FUTUREGREENHOUSE

NEW 112" COPPER

LINE PER CIVILENGINEER'S PLANS

NEW ELECTRICAL LINE PERELECTRICAL ENGINEER, TYP;REFERENCE ELECTRICALDRAWINGSINSTALL MAINLINE

9" DEEP, TYP.

1L-5

2L-5

5L-5

8L-5

7L-5

5L-5

5L-5

INSTALL MAINLINE9" DEEP, TYP.

INSTALL MAINLINE 9"DEEP STARTING ATTHIS LOCATION, TYP.

5L-5

SLV

SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY

BUCKNER-SUPERIOR B401 21BENT NOSE GARDEN VALVE. 3/4" X 3/4" FEMALE NPT HOSEBIBB, RED BRASS.

NIBCO T-580-S6-R-66-LL 1STAINLESS STEEL BALL VALVE SHUT OFF VALVE

FEBCO 825YA 1-1/2" 1REDUCED PRESSURE BACKFLOW PREVENTER

CAP FOR FUTURE USE 2CAP AT THE MAINLINE OR LATERAL LINE FOR FUTURE USE.THE PRESSURE AND FLOW PROVIDED TO THAT LOCATIONARE INDICATED NEXT TO THE CAP SYMBOL. THIS WILL BE

WEATHER STATION - BY UNIVERSITY 1

WATER METER 1" 1RAINBIRD ICWM SERIES WATER SUB-METER

IRRIGATION LATERAL LINE: PVC SCHEDULE 40 85.1 L.F.PVC SCHEDULE 40 IRRIGATION PIPE.

IRRIGATION MAINLINE: PVC SCHEDULE 40 AND CLASS 315 300.6 L.F.PVC SCHEDULE 40 TO 1-1/2", PVC CLASS 315 SDR 13.5FOR PIPES 2" AND LARGER.

PIPE SLEEVE: PVC CLASS 160 SDR 26 34.3 L.F.TYPICAL PIPE SLEEVE FOR IRRIGATION PIPE. PIPE SLEEVESIZE SHALL ALLOW FOR IRRIGATION PIPING AND THEIRRELATED COUPLINGS TO EASILY SLIDE THROUGHSLEEVING MATERIAL. EXTEND SLEEVES 18 INCHESBEYOND EDGES OF PAVING OR CONSTRUCTION.

XX

WS

#"

#

Valve Number

Valve Size

Valve Flow

Valve Callout

#

IRRIGATION SCHEDULE

W W

E E

GAS

W W

UTILITY LEGEND

NEW WATER LINE

NEW ELECTRICAL LINE

EXISTING GAS LINE

EXISTING WATER LINE

ACL

SCALE: 1/8" =1'-0"

16'8'4'0

L-2

IRRIGATION PLAN

IRRI

GA

TIO

N P

LAN

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

7

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

1. SYSTEM DESIGN BASED ON THE FOLLOWING:A. 62 PSI STATIC PRESSURE ASSUMED - CONTRACTOR TO VERIFY (56 PSI STATIC PRESSURE AT ORFAELA CHILDREN'S

CENTER ACCORDING TO UNIVERSITY GROUNDS DEPARTMENT, ADJUSTED UP TO 62 TO ACCOUNT FOR PRESSURE LOSSFROM BACKFLOW DEVICE, AS PRESSURE READING WAS TAKEN AFTER ORFALEA BACKFLOW)

B. 1 12" COPPER SERVICE LINE PER CIVIL ENGINEER.

C. 1-1/2" IRRIGATION SUB-METERD. AVAILABLE FLOW = 37.5 GPM

2. IRRIGATION LINES DIAGRAMMATIC. FIELD CONDITIONS PREVAIL. CONTRACTOR SHALL SURVEY PROPOSED LINE TRENCH LOCATIONSAND SUGGEST ALTERNATE LAYOUT TO ACHIEVE DESIGN INTENT AS FIELD CONDITIONS DICTATE.

3. LOCATION OF LINES AND EQUIPMENT IS DIAGRAMMATIC ONLY.4. VERIFY DIMENSIONS AND MAKE ADJUSTMENTS IN SYSTEM AS REQUIRED.5. CONTRACTOR SHALL VERIFY POINT OF CONNECTION WITH UNIVERSITY REPRESENTATIVE. 1-1/2" WATER SUB-METER AS SPECIFIED.

INSTALL LINE SIZE BALL VALVE JUST PRIOR TO SUB-METER AS INDICATED ON PLANS. INSTALL NEW BACKFLOW PREVENTER AFTERIRRIGATION SUB-METER SHOWN. REFERENCE CIVIL ENGINEER'S PLANS THIS SET FOR WATER SERVICE LINE EXTENSION TO SITE.

6. CONTRACTOR SHALL CONTINUOUSLY MAINTAIN A CLEAN JOB SITE. SWEEP HARDSCAPE AT THE END OF EACH DAY. DISPOSE OFTRASH IN TRASH CANS - NO LITTERING SHALL OCCUR ON JOB SITE.

7. ALL RISERS SHALL BE SCHEDULE 80 PVC. ALL PIPE FITTINGS SHALL BE SCHEDULE 40 PVC. ANY PIPE OR FITTINGSNOT BURIED SHALL BE UV BROWN PVC, SCH 80 RISERS, OR COPPER AS NOTED ON PLANS.

8. ALL PRESSURE MAINLINES SHALL BE EITHER 12" OR 9" DEEP AS INDICATED ON IRRIGATION PLAN, AND ALL LATERALSSHALL BE 9" DEEP. TRENCH BACKFILL SHALL BE FREE OF ANY MATERIAL THAT MAY DAMAGE IRRIGATION EQUIPMENT.IN THE EVENT OF BACKFILL SETTLEMENT, CONTRACTOR SHALL PERFORM REQUIRED REPAIRS AT THEIR OWN COST INPLANTER AREAS. REFERENCE SPECIFICATIONS.

9. ALL MAINLINE SHOWN AS SLEEVED ON PLANS SHALL BE BURIED MINIMUM 12" DEEP AND SHALL BE SLEEVED WITHCLASS 160 PVC TWICE THE DIAMETER OF SLEEVED LINES.

10. ALL AUTOMATIC HOSE-END TIMER VALVES SHALL BE INSTALLED BY UNIVERSITY (NOT IN CONTRACT).11. PRIOR TO BACKFILLING IRRIGATION TRENCHES:

a. ALL MAINLINES IN THE SYSTEM SHALL BE CAPPED AND PRESSURE TESTED AT 125 PSI FOR A PERIOD OF FOURHOURS. ANY LEAKS FOUND SHALL BE CORRECTED BY REMOVING THE LEAKING PIPE OR FITTINGS AND INSTALLINGNEW MATERIAL IN ITS PLACE.

b. ALL LATERALS SHALL BE PRESSURE TESTED AT DESIGN PRESSURE FOR ONE HOUR.c. THE CONTRACTOR SHALL NOT ALLOW NOR CAUSE ANY OF HIS WORK TO BE COVERED UNTIL IT HAS BEEN

INSPECTED, TESTED, AND APPROVED BY THE BUILDER/OWNER'S AUTHORIZED REPRESENTATIVE.21. THE CONTRACTOR SHALL FURNISH TO THE OWNER A COMPLETE 'AS BUILT DRAWING' PER SPECIFICATIONS SHOWING

EXACT LOCATIONS OF ALL ITEMS INSTALLED. THESE ARE TO BE DELIVERED ON OR BEFORE FINAL INSPECTION.22. IRRIGATION CONTRACTOR SHALL MAINTAIN THE SYSTEM FOR A PERIOD OF 90 DAYS PER SPECIFICATIONS.23. CONTRACTOR SHALL GUARANTEE THE ENTIRE IRRIGATION SYSTEM TO BE FREE OF DEFECTS IN WORKMANSHIP AND

MATERIALS FOR A PERIOD OF 1 YEAR FROM FINAL ACCEPTANCE.24. CONTRACTOR IS RESPONSIBLE FOR PLUMBING PERMITS AND INSPECTIONS REQUIRED FROM THE BUILDING

INSPECTOR FOR INSTALLATION OF THE IRRIGATION SYSTEMS SHOWN ON THIS DRAWING.25. REFER TO WRITTEN SPECIFICATIONS ACCOMPANYING THESE PLANS.

IRRIGATION NOTES

EQUIPMENT QUANTITY NOTE:IRRIGATION EQUIPMENT QUANTITY COUNTS ARE PROVIDED FOR CONVENIENCE ONLY.CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL EQUIPMENT QUANTITIES ANDREQUIRED ACCESSORY MATERIALS PRIOR TO FINAL BID AND INSTALLATION.

NOTE:ARCHAEOLOGICAL MONITOR SHALL BEPRESENT TO OBSERVE INSTALLATION OFIRRIGATION TRENCHES OR ANY OTHEROPERATIONS WHICH DISTURB NATIVESOIL OR REQUIRE EXCAVATION OF SOIL

AutoCAD SHX Text
S T O P
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GFI
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
GFI
AutoCAD SHX Text
M
AutoCAD SHX Text
BF
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
BF
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
Page 109: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

CONSTRUCTION DETAILS

CJH

L-3

CON

STRU

CTIO

N D

ETA

ILS

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

7

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

6'-0"

1'-2

"1

'-3"

1'-3

"

1'-11" 1'-11" 1'-11"

6'L PLANTER1/2" = 1'-0"

3L-3

2"x6" REDWOOD CAP, TYP.

2"x4" REDWOOD VERTICALS, TYP.

2'x6' CORRUGATED GALVANIZEDSHEETS, TYP; OVERAP AS REQ'D4"x4" REDWOOD POST, TYP.

2"x6" REDWOOD CAP, TYP.(DASHED LINE) - MITER ATCORNER OR PLANTERS

2'x6' CORRUGATEDGALVANIZED SHEETS, TYP.

2"x4" REDWOOD VERTICALS, TYP.

2"x4" REDWOOD HORIZ.FRAME BASE, TYP.

36

"

2"x4" REDWOOD HORIZ. FRAME BASE,TYP; MITER CORNER UNDER POSTSFINISH GRADE

4'-0

"

4"x4" REDWOOD POST @CORNERS, TYP.

PLANTINGSOIL

1"OVERHANG

TYP.

ELEVATION

PLAN VIEW

4x4 RDWD POST INPLANTER FOR HOSEBIBB/STUB-UP PER IRRPLAN/DTLS

24"L FLAT STEELFORMING STAKES @CORNERS & VERTICAL2X4'S, TYP.

1P-UCCF-HAR-19

4'-0

"2

1"

1'-2

"1

'-3"

1'-3

"

16'L RAISED PLANTER1/2" = 1'-0"

2"x6" REDWOODCAP, TYP.

2"x4" REDWOODVERTICALS, TYP.

2'x6' CORRUGATEDGALVANIZED SHEETS, TYP.

2"x6" REDWOOD CAP, TYP.(DASHED LINE) - MITER ATCORNER OR PLANTERS

2'x6' CORRUGATEDGALVANIZED SHEETS, TYP.

2"x4" REDWOODVERTICALS, TYP.

2"x4" REDWOOD HORIZ.FRAME BASE, TYP.

2"x4" REDWOOD VERTICAL, TYP.

4"x4" REDWOOD POST, TYP.

4"x4" REDWOOD POST& CORNERS, TYP.

4L-3

PLANTINGSOIL

1'-11" 1'-11" 1'-11" 1'-11" 1'-11" 1'-11"±1'-11" ±1'-11"7'-10" 7'-10"

2"x4" REDWOOD HORIZ.FRAME BASE, TYP; MITERCORNER UNDER POSTS

1" OVERHANG,TYP.

ADDITIONAL 4x4 REDWOODPOST INSIDE PLANTER TOMOUNT HOSE BIBB/SUTB-UP PERIRRIGATION PLANS & DETAILS

24"L FLAT STEELFORMING STAKES @CORNERS & EVERY OTHERVERTICAL 2x4, TYP.

16'-0"

2P-UCCF-HAR-15

27'-0"

4'-0

"2

1"

27`L RAISED PLANTER1/2" = 1'-0"

4L-3

PLANTINGSOIL 1

'-2"

1'-3

"1

'-3"

2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" ±2'-312" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0"

ADDITIONAL 4x4 REDWOODPOST INSIDE PLANTER TOMOUNT HOSE BIBB/SUTB-UP PERIRRIGATION PLANS & DETAILS

4"x4" REDWOOD POST& CORNERS, TYP.2'x6' CORRUGATED

GALVANIZED SHEETS, TYP.

2"x4" REDWOODVERTICALS, TYP.

2"x4" REDWOOD HORIZ.FRAME BASE, TYP.

2"x6" REDWOOD CAP, TYP.(DASHED LINE) - MITER ATCORNER OR PLANTERS

24"L FLAT STEEL FORMING STAKES @CORNERS & EVERY OTHER VERTICAL 2x4, TYP.

2"x4" REDWOOD VERTICAL, TYP.4"x4" REDWOOD POST, TYP.

2"x4" REDWOOD HORIZ.FRAME BASE, TYP; MITERCORNER UNDER POSTS

1" OVERHANG,TYP.

2"x6" REDWOODCAP, TYP.

2"x4" REDWOOD VERTICALS, TYP.2'x6' CORRUGATEDGALVANIZED SHEETS, TYP.

5P-UCCF-HAR-14

36"H RAISED PLANTER1" = 1'-0"

2"x6" REDWOODCAP, TYP.

4"x4" REDWOODPOST, TYP.

2'x6'CORRUGATEDGALVANIZEDSHEETS, TYP;OVERLAP ASREQ'D

2"x4" REDWOODHORIZ. TYP.

36

"

3"

FINISH GRADE OF PLANTING MIX

ADJACENT MULCH,TYP; LOCATIONSPER LAYOUT PLAN

CLA

SS II

BASE

TO S

IT 1

" ABO

VE

BO

TTO

M O

FHO

RIZ

ONTA

L 2

"X4

"

36

"

2'-9

" DEP

TH P

LANTI

NG

MIX

1" OVERHANG, TYP.

24"L FLAT STEEL FORMINGSTAKE MOUNTED TO EVERYOTHER VERTICAL 2X4, TYP;EMBED 12" INTO SUBGRADESUBGRADE, TYP.

12

"

P-UCCF-HAR-173

21"H RAISED PLANTER1" = 1'-0"

2"x6" REDWOODCAP, TYP.

4"x4" REDWOODPOST, TYP.

2'x6' CORRUGATEDGALVANIZED SHEETS, TYP.

2"x4" REDWOODHORIZONTALS, TYP.

FINISH GRADE OFPLANTING MIX

ADJACENT MULCH,TYP; LOCATIONSPER LAYOUT PLAN

24"L FLAT STEEL FORMINGSTAKE MOUNTED TO EVERYOTHER VERTICAL 2X4, TYP;EMBED 12" INTO SUBGRADE

SUBGRADE, TYP.

21

"

CLA

SS II

BASE

TO S

IT 1

" ABO

VE

BO

TTO

M O

FHO

RIZ

ONTA

L 2

"X4

"

21

"

18

" DEP

THPL

ANTI

NG

MIX

12

"

1" OVERHANG, TYP.

4P-UCCF-HAR-16

4'H PERIMETER FENCE1/2" = 1'-0"

PER PLAN

2'X6' CORRUGATED GALVANIZED PANELS, TYP;ATTACH PANELS TO OUTSIDE TO CREATE ASOLID FENCE4X4 PTDF POST, TYP.2X4 PTDF FRAME, TYP;SECURE TO CONCRETE W/EXTERIOR-RATED TAPCONS

2X4 PTDF, TYP.

2X4 PTDF FRAME, TYP.

2'x6' CORRUGATED GALVANIZED PANELS, TYP. ATTACH PANELS TOOUTSIDE TO CRETE A SOLID FENCE. OVERLAP PANELS MINIMUM 2". OUTSIDE

INSIDE

PLAN VIEW - SCALE:1"=1'-0"

6"X6" CONCRETESTRIP2X4 PTDF FRAME

4X4 PTDF POST INFOOTING, TYP.

6",

TYP.

2X4 PTDF. INSTALL MIDWAY BETWEEN POSTS, TYP.

6"X6" CONCRETEMOW CURB, TYP.

EQUAL EQUAL

6"

9"

6"

SUBGRADE, TYP.

SECTION/ ELEVATION - VIEW FROM INSIDE

ELEVATION - VIEW FROM OUTSIDE

FINISHGRADE OFCONCRETE

4'-0

"

EXTERIOR-RATEDFASTENERS THRU TOWOOD MEMBERS, TYP.

#4 CONT.REBAR, TYP.

10L-3

4X4 PTDF POST INFOOTING, TYP.

9L-3

9L-3

10L-3

1'-3

"

PTDF MEMBERSON INSIDE(DASHED), TYP.

3'-6

" EQ.

EQ.

6P-UCCF-HAR-09

6"X6" CONCRETE MOW CURB1 1/2" = 1'-0"

FENCE 2X4 SECURED TO CONCRETE CURB PER FENCE DETAILS

6"

6"

6" SQ. CONCRETE CURB; EXPANSION JOINTS @ 10' MAX. O.C.SPACING#3 OR #4 MESH HARDWARE CLOTH; FOLD ENDS BELOW GRADEAND SECURE TO CONCRETE W/ TAPCONS @ 12" O.C.FINISH GRADE OF MULCH

COMPACTED SUBGRADE, TYP.

HARDWARE CLOTH CONTINUOUS THROUGHOUT ENTIRE SITE;OVERLAP ENDS OF ROLLS 2" MIN.#4 CONTINUOUS REBAR

3"

±1"

FENCE 2X4 SECURED TO CONCRETE CURB PER FENCE DETAILS6" SQ. CONCRETE CURB; EXPANSION JOINTS @ 10' MAX. O.C.SPACING#3 OR #4 MESH HARDWARE CLOTH; FOLD ENDS BELOW GRADEAND SECURE TO CONCRETE W/ TAPCONS @ 12" O.C.FINISH GRADE OF CLASS II BASE

COMPACTED SUBGRADE, TYP.

HARDWARE CLOTH CONTINUOUS THROUGHOUT ENTIRE SITE;OVERLAP ENDS OF ROLLS 2" MIN.#4 CONTINUOUS REBAR

4"

±1"

6"

6"

10P-UCCF-HAR-21

6" X 6" PERIMETERCONCRETE STRIPPER DETAIL

WOODCHIP MULCH(SEE SPECS)

4"

CLASS II BASE. COMPACT TO 95% R.C.CROWN TOP & SLOPE 2% MIN. TO DRAIN

6L-3

1 4"

4"

2-PLATED DECK SCREWSOR RING SHANKED NAILS(DO NOT SCREWTHROUGH SLIP JOINTS.)

18" METAL STAKE (FLAT NAIL CONCRETEFORMING STAKES). STAKE PER MFG. SPECS.

PLASTIC BEND-A-BOARDSEE NOTES BELOW

NOTES:1. USE 2X4 HEADER-COLOR-BROWN INSTALL ACCORDING TO MANUFACTURER'S INSTRUCTIONS.2. SLIP JOINT: ALLOW FOR THERMAL EXPANSION AT SLIP JOINTS - LEAVE 3/4" TO 1" GAP.

SECURE WITH 7 GA. GALV. STEEL HAIRPIN, 1 1/2" ID x 13"

CLASS II BASE PATHN.T.S.

NATIVE SOIL

SCARIFY SUBGRADE, TYP; MOISTEN& COMPACT TO 90% R.C.

3 OR 4 MESH HARDWARE CLOTH, TYP;FOLD ENDS TO AVOID SHARP EDGES

11P-UCCF-HAR-13

12

" MIN

. @

FEN

CE

(24

" MIN

. @

PED

ESTR

IAN

GATE

ONLY

)3

"C

LR.

1'-0"

3"MIN.CLR.

3" CLR.

1'-0"

4"X4" PTDF POSTSIMPSON CB44 COLUMNBASE W/ FULL STIRRUP

6"X6" CONCRETEMOW CURB, TYP.

SOIL COMPACTEDTO 95% R.C. ORUNDISTURBEDNATIVE SOIL

(2) #4 HAIR PINS W/12" LEGS, TYP

CONCRETE FOOTING -EXTEND BEYOND CURBING

FINISH GRADE (BEYOND)

FENCE POST W/ CONCRETE FOOTING1" = 1'-0"

6"3" 3"

6"

9" M

IN.

@ F

ENC

E(2

1" M

IN.

@PE

DES

TRIA

NG

ATE

ONLY

)

10L-3

#4 REBAR FROMCONCRETE MOWCURB, TYP.

HARDWARECLOTH PERDETAIL

10L-3

9P-UCCF-HAR-22

PER PLAN

4",

TYP.

RAISED CONCRETE PATIO3/4" = 1'-0"

1

3'-0

" MAX.

1'-0

"

1'-0"

NOTES:1. #4 REBAR @ 16" O.C. SPACING - EACH WAY, TYP.2. #4 REBAR @ 16" O.C. HORIZONTAL, TYP.3. (2) x #4 REBAR AT TOP & BOTTOM, TYP.4. COMPACTED SOIL TO 95% RELATIVE COMPACTION5. 4" DEPTH OF SAND6. NATIVE FINISH GRADE7. 1" CHAMFER, TYP.8. 50

50 GARDEN SOIL BY UNIVERSITY, TYP. (FUTURE - N.I.C.)

2

31

4

5

4"

6

3" C

LEAR,

TYP.

7

6

88

P-UCCF-HAR-2312

12`-6"W DOUBLE SWING GATE1/2" = 1'-0"

NOTES:1. CONTRACTOR SHALL MODIFY EXISTING ELECTRIFIED FENCE TO

ALLOW FOR GATE OPENING TO MATCH EXISTING GATES. FENCESHALL BE ELECTRIFIED AT THE END OF EACH WORK DAY.

2. COORDINATE TIMING OF GATE INSTALLATION PER NOTES ONDEMOLITION & LAYOUT PLANS.

3. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR APPROVALPRIOR TO FABRICATION. VERIFY ALL MEASUREMENTS.

6"

4'-0

"

3'-6

"

12'-6"

12'-6"

6"x6" CONC.MOW CURB, TYP.

10L-3 COMPACTED

SUBGRADE, TYP.

#4 REBAR. TYP.

18"L BLACK STEEL CANE BOLT ON EACH SIDE, TYP; CORE DRILL1" DEPTH HOLES IN CONC. MOW CURB. LOCATE HOLES WHENBOLT IS ATTACHED AND GATE IS CLOSED & ALIGNED

3.5" SQ. TUBE STEEL POST

HEAVY DUTY STEEL BARREL HINGES;WELD TO POST & GATE FRAME

1.5" SQ. TUBE STEEL GATE FRAME

2'-0

"

GAP @ HINGES SHOWN FOR GRAPHICCLARITY ONLY; CARRY CORRUGATED METALPAST GAP TO CONCEAL GAP FROM OUTSIDE

±112"

ENLARGEMENT - N.T.S.

SEE ENLARGEMENT (RIGHT)

1"

EXTERIOR-RATED METALPULLS ON INSIDE &OUTSIDE OF GATES

P-UCCF-HAR-247

4'H PEDESTRIAN GATE1/2" = 1'-0"

24

" MIN

.

4'-6"

9L-3

4"x4" POST IN CONC.FOOTING, TYP.

3" C

LR.

1'-0"

4'-0

"

6"

10L-3

6"x6" CONCRETEMOW CURB, TYP.

2'X6' CORRUGATED GALVANIZEDPANELS, TYP; ATTACH PANELS TOOUTSIDE TO CREATE A SOLID PANEL.OVERLAP GAPS AT OUTSIDE OF GATE.4X4 PTDF POST, TYP.2X4 PTDF FRAME & CROSSBAR, TYP.

HIDDEN EXTERIOR-RATEDHINGES, TYP; PLACE FOR GATETO SWING IN TOWARD GARDEN

3'-6

"

9L-3

4"x4" POST IN CONC.FOOTING, TYP.

10L-3

6"x6" CONCRETEMOW CURB, TYP.

2X4 PTDF FRAME

4'-112"

POST POST

EXTERIOR-RATEDGATE LATCH &PULL-CORD

HIDDEN EXTERIOR-RATEDHINGES, TYP; PLACE FOR GATETO SWING IN TOWARD GARDEN

8P-UCCF-HAR-25

BASE COURSE PERCONTRACTOR

12" X 4" X 9" MODULEANGELUS BLOCK, TYP.FAWN COLOR; INSTALLPER MANUFACTURER'SSPECS

FINISH GRADE OF CLASSII BASE OR MULCH

WELL-GRADEDGRANULAR DRAINROCK, TYP; 0.25 in to1.5 in (5 mm to 38 mm)LESS THAN 10% FINES

NATIVE SOIL, TYP.COMPACT SUBGRADE TO 95% R.C.

GRAVITY-STACKED PLANTER WALLNOT TO SCALE

BASE

CO

URSE

&ASSO

CIA

TED

GRAVEL

BAC

KFIL

LLTO

BE

INSTA

LLED

BY

CO

NTR

AC

TOR

WALL

HEI

GHT

PER P

LAN -

36

" MAX.

HEI

GHT

(FUTU

RE

N.I.

C.

- TO

BE

FURNIS

HED

AND

INSTA

LLED

BY

UNIV

ERSIT

Y)4"

6"

4"

9"

13P-UCCF-HAR-30

AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
AutoCAD SHX Text
AutoCAD SHX Text
Page 110: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

CONSTRUCTION DETAILS

CJH

L-4

CON

STRU

CTIO

N D

ETA

ILS

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

7

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

COMPACTED SUBGRADE @ 90%RELATIVE COMPACTION

2" DEPTH YELLOW SAND

#3 BARS EACH WAY, 12" O.C.

FINISH GRADEOF PLANTINGAREA, TYP.

4" THICK CONCRETE PAVING1" = 1'-0"

12" RADIUS, TYP.

4" THICK PEDESTRIAN CONCRETEPAVING W/ MED. BROOM FINISH, TYP.STANDARD GREY COLOR. THICKENEDEDGES AS SHOWN. REFER TODIMENSION PLAN FOR SCORE LINEPATTERN.

4"

8"THICKENEDEDGES, TYP.

1"

#3 BAR CONTINUOUS, TYP.

3"CLRTYP.

WIDTHS PER PLAN

CONNCTION TO ADJACENTCONDITIONS PER PLANS,DETAILS, & SPECIFICATIONS

EXPANSION JOINT ASREQ'D PER SPECS

6"

P-UCCF-HAR-261

18"1

"1"

SCORE JOINT DETAIL

SAWCUT JOINT DETAIL

12" 12"

CONCRETE PAVING PER DETAILPER LAYOUT PLAN & DETAILS.

14" RADIUS NOSE ALL EDGES, TYP.

38" THICK ASPHALT IMPREGNATED

FIBER EXPANSION JOIN WITHH-CAP. FILL JOINT WITHPOLYSULFIDE IMPREGNATEDCAULKING. CAULKING COLOR TOMATCH ADJACENT PAVING.RECESS 18" FROM FINISH SURFACE

#4 SLIP DOWEL @ 18" O.C.EMBEDED 12" EACH WAY. SLEEVEONE END ONLY

AGGREGATE BASE

COMPACTED SUBGRADE

1

2

3

4

5

6

1

1

1

4

5

5

6

6

18"

12" MIN.EXPANSION JOINT DETAIL

NOTES:

1. SAMPLES OF EXPANSIONJOINTS & SCORE LINES SHALLBE REPRESENTED IN ON-SITEFLAT WORK SAMPLES

2. STEEL REINFORCING PERDETAILS

3. CONTROL/SCORE JOINTS,COLD JOINTS, ANDEXPANSION JOINTS OCCURAS INDICATED ON PLANS ORAS NOTED IN PROJECTSPECIFICATIONS

4. DEPTH OF SCORE LINES &SAW CUT JOINTS SHALL BE 1"MIN. OR THE THICKNESS OFCONCRETE DIVIDED BY 4,TYPICAL

5. REFERENCE STRUCTURALENGINEER'S DRAWINGS.STRUCTURAL ENGINEER'SDRAWINGS & DETAILS SHALLSUPERCEDE. BRING ANYDISCREPANCIES TO THEATTENTION OF THELANDSCAPE ARCHITECTIMMEDIATELY.

6. REFER TO SPECIFICATIONS

6

5

6

25

2

2

3

1

COLD JOINT DETAIL

CONCRETE JOINTS1"=1'-0"

4"

REFERENCE NOTE LEGEND:

4"

4"

4"

2P-UCCF-HAR-27

2x4 PLASTIC BEND-A-BOARDHEADER (OR APPROVEDEQUAL) SEE NOTES BELOW

2-PLATED DECK SCREWSOR RING SHANKED NAILS(DO NOT SCREWTHROUGH SLIP JOINTS.)

PLANTER SIDE

FINISH GRADE,SHRUB BED

PLASTIC STAKES BYBEND-A-BOARD @3' O.C. MAX.

PLATED DECKSCREWS ONPLANTING SIDE

GRAVEL, LAWNOR OTHER

1"

NOTES :1. USE 2X4 HEADER-COLOR-BROWN INSTALL ACCORDING TO MANUFACTURER'S INSTRUCTIONS.2. CONTRACTOR SHALL LAYOUT HEADER BOARDS W/GYPSUM AND CALL UNIVERSITY

REPRESENTATIVE FOR REVIEW.3. ALLOW FOR THERMAL EXPANSION; DO NOT SCREW THROUGH SLIP JOINT.4. USE COARSE WOODWORKING TOOLS FOR CUTTING AND DRILLING.

ELEVATION - CROWN DIMENSIONS

20' MAX. CROWN LENGTH

16" MAX. CROWN HEIGHT

SLIP JOINT DETAIL

2"

PLAN

SECTION

7 GA. 112" I.D. x

13" GALVANIZEDSTEEL HAIRPIN

2" 12" -

34" GAP

36" MAXIMUMRADIUS

FACTORY CUTTHERMAL EXPANSIONSLIP JOINT

HEADER - BEND-A-BOARD 2X4 N.T.S. P-UCCF-HAR-28

3

ADA RAMP1/2" = 1'-0"

12'-0"

5' MIN. CLEAR WIDTH

3'-0

"

3'-0

34",

TYP.

METAL HANDRAIL, TYP.

GRAVITY STAKED GARDEN WALL, TYP;BASE COURSE TO BE INSTALLED BYCONTRACTOR - ADDITIONAL FUTURECOURSES TO BE INSTALLED BYUNIVERSITY

FREE-STANDING ADA METAL RAMP PLACEDON FINISH GRADE OF CLASS II BASE, TYP.

3'-0

"

12L-3

RAISED CONCRETE PATIO

FINISH GRADE OF CLASS II BASE, TYP.

13L-3

8"

2'-4

"4

P-UCCF-HAR-29

ISOMETRIC

SEDIMENT IS CAPTUREDBEHIND ROLLS. DIG ROLLS INTOGRADE 3". CLEAN SEDIMENTBUILD UP WHEN SEDIMENT HEIGHTREACHES 1/2 THE HEIGHT OF THEFIBER ROLL. INSPECT, ADJUST,AND CLEAN WEEKLY.

1"x1" x 18" LONGSTAKES

FIBER ROLL / RICESTRAW WATTLES

ROADWAY

CURB

NOT TO SCALE 3-4' O.C.

INSTALL FIBER ROLLIN 3-5" TRENCH.

PLACE EXCAVATEDMATERIAL ON UPHILLSIDE OF FIBER ROLL

NOTES:1. Runoff must not be allowed

to run under or around rolls.2. Smooth any fill soil into

erosion gullies prior toinstallation of rolls.

3. Install and maintain perRegional Water QualityControl Board requirements.

FIBER ROLL PERIMETER CONTROL

N.T.S. P-UCCF-HAR-316

AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
Page 111: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

IRRIGATION DETAILS

ACL

L-5

IRRI

GA

TIO

N D

ETA

ILS

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

6

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

FLOW

FINISH GRADE

LEGEND FOR SPECIFICATION

BALL VALVE, SEE

SCHEDULE 40 FEMALEADAPTER

SCH 80 PVC NIPPLE (TYP)

SCH 80 PVC UNION

LANDSCAPE FABRIC

3/4" ROCK,

BRICKSUPPORTS

2 CU. FT.

FOR TURF AREAS

FOR SHRUB AREASFINISH GRADE

PVC MAINLINE

2" M

IN

4" MIN

3"

FLOW

19"x12"x12" CONCRETETRAFFIC-RATED VALVE BOX WITHCAST IRON DIAMOND PLATE COVER,IRRIGATION STAMP ON LID

POLYURETHANE TAG LABELED"SOV AND METER"

NOTE:VALVE BOX TO BE INSTALLEDAS TO ALLOW FOR PROPEROPERATION OF BALL VALVEAND READING OF METER.

SEALED METERREGISTER CAP

1" PMM WATER METER, SEELEGEND FOR SPECIFICATION

NO SCALEBALL VALVE & IRRIGATION SUB-METER1 1/2" = 1'-0" P-UCCF-IRR-05

1

12"

BALL VALVE

COPPER RISER

COPPER ELL

FINISH GRADE

BRASS UNIONSBALL VALVEAPPROVED REDUCED

PRESSURE BACKFLOWPREVENTER

CONCRETE PIPESUPPORTS (WRAPPIPE IN 10 MILPLUMBING TAPE)

GRAVEL (3"DEEP)

ABOVE GRADE ASREQ'D BY CODE

RP BACKFLOW PREVENTERN.T.S.

18"

-ZURN WILKINS MODEL 600XL-HLRWITH UNION, FOR LINE SIZE 1/2"-2".

-ZURN WILKINS MODEL 500XL-HLRFOR LINE SIZE 2 1

2"-3". INSTALLBRASS UNION ON INLET SIDE. -CONTRACTOR TO SUPPLY UNION.

-NOTE: PRESSURE REGULATORHAS 10 PSI TO 125 PSI SPRINGRANGE, FACTORY SET AT 50 PSI.FIELD SET TO 80 PSI OR AS NOTEDON CRITICAL ANALYSIS

BALL VALVE

BRASS UNIONSPRESSURE REGULATOR-(REQUIRED IF PSI IS OVER 80 PSI)

BRASS UNIONS

2P-UCCF-IRR-04

FLOW

BRASS NIPPLE (TYP)

BRASS UNIONPVC MAINLINE

GREEN, PLASTIC, ROUNDVALVE BOX W/ LOCKINGCOVER. HEAT BRAND "BV"ONTO LID.

FINISH GRADE FORTURF AREAS

PVC BALL VALVE,SEE LEGEND FORSPECIFICATION

SCHEDULE 40 FEMALEADAPTER

NOTE:VALVE BOX TO BE INSTALLED AS TOALLOW FOR PROPER OPERATION OFBALL VALVE.

FINISH GRADE FORSHRUB AREAS

BRICKSUPPORTS

[" ROCK, 2CU. FT.

BALL VALVEN.T.S.

LANDSCAPE FABRIC OVER14" MESH GALVANIZEDHARDWARE CLOTH

P-UCCF-IRR-023

COPPER MALE ADAPTER

TEE OR ELL ON SUPPLY LINE

3/4"x6" COPPER NIPPLE & ELL

3/4' COPPER TYPE 'L' RISER

WALK OR CURB

FINISH GRADE

2-PIPE CLAMPS

4x4x36" REDWOOD POST

3/4" HOSE BIBBPOINT TOWARDSACCESSIBLE AREA

HOSE BIBBN.T.S. P-UCCF-IRR-01

4

BEDDING4" MIN.

MAINLINEN.T.S.

FINISH GRADE

NATIVE SOIL BACKFILL.COMPACT TO 95% RELATIVECOMPACTION

PVC MAINLINE ASSPECIFIED, SIZE PER PLAN

METALLIC TAPE PERSPECIFICATIONS (WHERECONTROL WIRES ARE NOT INTRENCH WITH MAINLINE)

BACKFILL WITH 100% COARSE SAND,WATER JET & MECHANICALLY COMPACT TO90% OPTIMUM DENSITY. ALLOW 48 HOURSTO SETTLE, AND BACKFILL AND COMPACTWITH NATIVE SOIL AFTER PRESSURETESTING (REFERENCE SPECIFICATIONS).

WIDTH VARIES

DEP

TH A

S N

OTE

D O

N P

LANS

4" M

IN.

4" MIN. 4" MIN.

TRENCH, SEESPECIFICATIONS

P-UCCF-IRR-035

DETECTABLE WARNING TAPE 12"

ABOVE MAINLINE, MINIMUM,WHERE CONTROL WIRES ARE NOTIN TRENCH WITH MAINLINE

FINISH GRADE OR FINISH SURFACE

LATERAL LINE PER LEGEND &

SPECIFICATIONSMAINLINE PER LEGEND &

SPECIFICATIONS

UNDISTURBED SOIL

TAPE CONTROL WIRES TOMAINLINE @ 12' O.C., MINIMUM.

BACKFILL, PLACED IN 6" LIFTS AND

TAMPED

POTABLE SYSTEM PIPE INSTALLATION

12

"

18

"6

"

6"

6"

DETECTABLE WARNINGTAPE 12" ABOVEMAINLINE, MINIMUM,WHERE CONTROL WIRESARE NOT IN TRENCH WITHMAINLINE

FINISHGRADE ORFINISHSURFACE

LATERAL LINE PER LEGEND &SPECIFICATIONS

MAINLINE PER LEGEND &SPECIFICATIONS

UNDISTURBEDSOIL

TAPE CONTROL WIRES TOMAINLINE @ 12' O.C.,MINIMUM.

BACKFILL, PLACED IN 6" LIFTSAND TAMPED

NOT TO SCALE

P-UCCF-IRR-066

RAISED BED PER DETAILS

HEIGH

T PER

DETAIL

ADJACENT MULCH, TYP;LOCATIONS PER LAYOUT PLAN SCH. 40 PVC

HOSE BIBB PER DETAIL

SCH. 40 PVC-UVRBROWN 1

2" PIPE

PIPE CLAMPS TO 4X4 POST,STAINLESS STEAL

4X4 POST TACKED TO 4X4RAISED PLANTER BED FRAME;TYP.

NOTE:: REFERENCE RAISEDPLANTER DETAIL FOR RAISEDBED DEMENSSIONS ANDCONSTRUCTION SPECIFICATIONS

1/2" PIPE LATERALS1" = 1'-0"

6"

SCH. 40 PVC, 1/2 "

SUBGRADE, TYP.

ADJACENT MULCH, TYP;LOCATIONS PER LAYOUT PLAN

COMPRESSION PVCCOUPLER STUB PERDETAIL

WIDTH PER DETAIL

9"

9"

5L-3

4L-3

9L-5

MAINLINE PER DETAIL5

L-5

9"

EXTEND PIPE UNDER GRADE

4' PATH WIDTHPER LAYOUT

3L-3

2L-3

7L-5

8P-UCCF-IRR-08

COMPRESSION PVC COUPLER STUBN.T.S.

58" COMPRESSION PVCCOUPLER STUB

COMPRESSION INSERT,BLUE, GLUE IN PLACE

12" UVR BROWN PVC SLIPSLIP COUPLER, GLUE TOPIPE

PIPE CLAMPS TO4X4 POST,STAINLESS STEAL

4X4 POST TACKED TO 4X4RAISED PLANTER BED FRAME;TYP.

RAISED BED PER DETAIL

4L-3

3L-3

9P-UCCF-IRR-10

HOSE BIBB IN GARDEN BED1" = 1'-0"

RAISED BEDPER DETAILs

ADJACENT MULCH,TYP; LOCATIONSPER LAYOUT PLAN

PIPE CLAMPS TO 4X4 POST,STAINLESS STEAL

4X4 POST TACKED TO 4X4RAISED PLANTER BED FRAME;TYP.

PVC EL, SCH. 40

9"

4L-3

PVC MAINLINE, 9"DEEP AT CENTRALPATH, 12" ELSEWHERE

BRASS HOSE BIBB±8-9" ABOVE SOIL

COPPER PIPE, 1'/2"

SCH. 40 PVC

SUBGRADE, TYP.

CLASS II BASEPATH PERLAYOUT PLAN

3L-3

7P-UCCF-IRR-09

AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
AutoCAD SHX Text
18"
AutoCAD SHX Text
15"
AutoCAD SHX Text
18"
Page 112: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot
Page 113: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot
Page 114: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

WW

WW W W

W W WW W

WW

WW

WW

WW

W WW W W

W WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS

FW

FW

FW

FW

3"

3"

2"

6"

1"

1.5

"

2"

1"

2"

6" FIG

1" CITRUS8" CITRUS

POST (TYP.)

12" MULBERRY

8" AMBER8" AMBER

12" AMBER

12" AMBER

18" PINE

44

44

44

45

44

44

44

HB

BARN

PLAY

HO

USE

BEN

CH

18

" PIN

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

8" CIT1" CIT

6" FC

12" MA

18

" PIN

12

" LIQ

8" L

IQ

8" L

IQ

12

" LIQ

8" CIT1" CIT

6" FC

12" MA

44

ONE WAY

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS GASGAS

GASGAS

GASGAS

GASGAS GAS GAS GAS

E

EE

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

43.83'

AC

44.04'

CONC

44.17'

AC

44.46'

AC

44.64'

SWS

44.63'

AC

44.99'

AC

45.18'

SWS

45.28'

SWS

45.16'

AC

45.32'

AC

45.35'

SWS

SIGN

45.21'

AC

SIGN

4

3

.

9

8

'

C

O

N

C

4

4

.

0

0

'

C

O

N

C

45.13'

AC

45.22'

AC

4

4

.

0

0

'

C

O

N

C

G

A

T

E

4

4

.

0

0

'

C

O

N

C

G

A

T

E

45.25'

AC

GV

45.18'

AC

4

4

.

0

5

'

C

O

N

C

44.10'

CONC

45.10'

AC

45.02'

AC

44.93'

AC

44.71'

AC

44.32'

AC

SIGN

44.98'

UCSB MARKER WL

SIGN

44.51'

WOOD BD

44.74'

WOOD BD

44.34'

AC LP

44.15'

AC

43.62'

AC

43.40'

SW

4

3

.

1

5

'

S

W

4

2

.

9

5

'

S

W

4

2

.

9

0

'

S

W

43.12'

SW

43.37'

SW

43.20'

TC

42.65'

FL

42.79'

FL

43.35'

TC

4

2

.

8

3

'

F

L

42.92'

FL

42.93'

TC DAY

43.42'

TC

SIGN

4

3

.4

1

'

L

S

4

2

.

8

9

'

S

Y

S

4

2

.

9

8

'

S

Y

S

4

2

.

9

2

'

S

Y

S

42.76'

SYS

42.94'

BSW

43.03'

BSW

4

3

.

3

4

'

B

S

W

4

3

.

2

5

'

B

S

W

4

3

.

0

3

'

B

S

W

AGAVE

AGAVE

42.51'

SWS

42.29'

SWS

4

2

.

7

9

'

T

C

D

A

Y

43.08'

TC

4

3

.

0

8

'

T

C

42.62'

FL

4

2

.

5

6

'

F

L

43.11'

TC

4

3

.

1

9

'

T

C

42.57'

FL

42.79'

AC

4

2

.

3

9

'

S

B

S

43.77'

EP

43.72'

EP

44.00'

EP44.05'

EP

44.40'

EP

44.39'

EP

44.74'

EP

44.64'

EP

44.53'

EP

44.90'

EP

45.05'

EP

45.08'

EP

45.30'

EP

45.44'

EP

45.33'

EP

45.36'

EP

4

5

.

2

5

'

E

P

4

4

.

9

5

'

E

P

4

4

.

8

3

'

E

P

4

5

.

2

4

'

E

P

4

5

.

2

8

'

E

P

4

4

.

9

0

'

E

P

4

4

.

9

6

'

E

P

4

5

.

3

6

'

E

P

4

5

.

4

2

'

E

P

4

4

.

9

8

'

E

P

4

4

.

8

2

'

E

P

4

5

.

2

5

'

E

P

4

4

.

7

6

'

E

P

4

5

.

1

6

'

E

P

44.51'

EP

45.00'

EP

44.80'

EP

44.34'

EP

44.25'

EP

44.15'

EP

44.10'

EP

44.03'

EP

43.36'

EP

4

3

.

5

4

'

E

P

4

3

.

5

4

'

G

N

D

43.67'

G

N

D

44.52'

GND

43.89'

GND

44.42'

GND

44.63'

GND

44.57'

GND

44.81'

GND

45.00'

GND

44.90'

GND

44.81'

GND

45.12'

GND

44.94'

GND

44.92'

GND

45.11'

GND

45.03'

GND

45.03'

GND

45.20'

GND

45.49'

GND

45.08'

GND

44.85'

GND

44.79'

GND

44.87'

GND

44.39'

GND

44.60'

GND

44.87'

GND

44.57'

GND

44.80'

GND

44.80'

GND

44.62'

GND

44.23'

GND

43.83'

GND

44.74'

GND

44.53'

GND

43.75'

GND

43.10'

GND

43.57'

GND

5

44.04'

CP/PK

8

43.21'

CP CHS X ON TC

7

44.74'

CP/PK

E

E

EE

EE

SHED

RELOCATEEX. SHED &KNOX BOX

WS

WEATHER STATION BYUNIVERSITY (N.I.C.)

EX. CHAIN LINKFENCE, TYP.

EX. CHAIN LINK FENCE EX. CHAIN LINKFENCE

FUTU

RE

PERG

OLA NEW ELECTRICAL LINE

TIE INTO EX. NEW ELECTRICALPANEL ON EX. POWER POST.COORDINATE WITH JIM MORRISONUNIVERISTY ELECTRICIAN VIAUNIVERSITY PROJECTREPRESENTATIVE FOR TIE IN.

PROVIDE GFCIELECTRICAL OUTLETWITH BUBBLE COVERAND JUNCTION BOX ON4X4 PTDF POST FORFUTURE WEATHERSTATION. VERIFYLOCATION OF POST ONSITE WITH UNIVERSITYREPRESENTATIVE,

EX. POWERPOLE

NEW ELECTRICAL LINE

PULL BOX

LEVITON MINI-METER KIT INNEMA 4X RATED OUTDOORENCLOSURE 120/240V WITHOUTDOOR ENCLOSURE AND 2X200A SOLID-CORE CT'S OREQUAL. MOUNT TO SHEDWALL. PAINT CONDUIT TOMATCH SHED.

PROVIDE GFCI ELECTRICALOUTLET WITH USB CHARGINGPORT AND BUBBLE COVER,ONE ON INTERIOR AND ONEON EXTERIOR OF SHED

NOTE: NO EXTERIOR LIGHTINGIS PROPOSED ON THISPROJECT. ELECTRICALOUTLETS PROVIDED FOR USEOF SMALL FARM TOOLS ANDTO CHARGE STUDENTELECTRONIC DEVICES.

W W

E E

GAS

W W

UTILITY LEGEND

NEW WATER LINE

NEW ELECTRICAL LINE

EXISTING GAS LINE

EXISTING WATER LINE

KJT

SCALE: 1/8" =1'-0"

16'8'4'0

E-1

ELECTRICAL PLAN

ELEC

TRIC

AL

PLA

N

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

B

ID

D

IN

G

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Of

o.Job N

Sheet

Drawn By

Sant

a Ba

rbar

a, C

alifo

rnia

Edib

le C

ampu

s Pr

ojec

t Stu

dent

Far

m

7

1604

Uni

vers

ity o

f Ca

lifor

nia

Date

Revisions

TRUE NATURELANDSCAPE ARCHITECTURE

KIMBERLY TRUE, MLA5266 Hollister Ave. Suite 230

Goleta, CA 93111TrueNatureDesign.com

805-770-2100

11-27-2017

50% CD's 12-22-201750% CD's 01-05-2018

AutoCAD SHX Text
S T O P
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GFI
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
44
AutoCAD SHX Text
GFI
AutoCAD SHX Text
HB
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
EXP. DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
NO. 5596
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
C
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
L
AutoCAD SHX Text
Y
AutoCAD SHX Text
J
AutoCAD SHX Text
.
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
E
Page 115: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

UNIVERSITY OF CALIFORNIA, SANTA BARBARA UCSB OFFICE OF CAMPUS PLANNING AND DESIGN DESIGN, FACILITIES, & SAFETY SERVICES SANTA BARBARA, CALIFORNIA 93106-1030 Tel: (805) 893-3796 Fax: (805) 893-3870

BERKELEY • DAVIS • IRVINE • LOS ANGELES • MERCED • RIVERSIDE • SAN DIEGO • SAN FRANCISCO SANTA BARBARA • SANTA CRUZ

February 2018

NOTICE OF IMPENDING DEVELOPMENT

UNIVERSITY CALIFORNIA SANTA BARBARA EDIBLE CAMPUS PROGRAM STUDENT GARDENPROJECT

Pursuant to the California Coastal Act the University of California, Santa Barbara (UCSB) has prepared a Notice of Impending Development for the Edible Campus Program Student Garden Project. The Santa Barbara campus proposes to install a student garden on an approximately 16,026 square foot area on the West Campus adjacent to the north side of the Orfalea Family Children’s Center. The garden would provide healthy food for distribution through the Associated Student’s Food Bank and provide education in sustainable food production. The Notice of Impending Development can be reviewed at the Campus Planning and Design website: http://www.facilities.ucsb.edu/departments/campus-planning-design/current-projects under the “West Campus” tab. For more information call 893-3796, send e-mail to [email protected], or send correspondence to:

Shari Hammond, Principal Planner Campus Planning and Design (1030)

University of California, Santa Barbara Santa Barbara CA 93106

Page 116: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

The Santa Barbara Independent 122 W. Figueroa Street

Santa Barbara, CA 93101

Environmental Affairs Board 6081 University of California, Santa Barbara

Santa Barbara, CA 93106

Roger Lagerquist Isla Vista Association

6826 Pasado Road Isla Vista, CA 93117

Andrea Estrada Public Affairs 2100

University of California, Santa Barbara Santa Barbara, CA 93106

Dianne Black SB County Planning and Development

123 East Anapamu St. Santa Barbara, CA 93101

Kirsten Deshler Government Relations

University of California, Santa Barbara Santa Barbara, CA 93106

Connie Hannah League of Women Voters 328 E. Carrillo Street #A Santa Barbara, CA 93101

Craig Geyer IV Business Associates

6555 Pardall Road Isla Vista, CA 93117

Josh Schmiel Environmental Studies Department

University of California, Santa Barbara Santa Barbara, CA 93106

Surfrider Foundation Santa Barbara Chapter

P.O. Box 21703 Santa Barbara, CA 93121

Ken Oplinger Santa Barbara Chamber of Commerce

104 West Anapamu Street Santa Barbara, CA 93101

Marell Brooks Citizens Planning Association

916 Anacapa Street Santa Barbara, CA 93101

Linda Krop Environmental Defense Center

906 Garden Street Santa Barbara, CA 93101

Joel Michealson Administrative Services

University of California, Santa Barbara Santa Barbara, CA 93106

Brian Harrington UCOP Planning, Design, and Construction

1111 Franklin St., 6th Floor Oakland, CA 94607

Lisa Stratton CCBER MC-9615 UC Santa Barbara

Santa Barbara, CA 93106

Anne Wells City of Goleta Planning Department

130 Cremona Drive Suite B Goleta, CA 93117

Jon Cook Facilities Management

University of California, Santa Barbara Santa Barbara, CA 93106

Renee Bahl Campus Design and Facilities 1030

University of California, Santa Barbara Santa Barbara, CA 93106

Santa Barbara County Fire Department

4410 Cathedral Oaks Road Santa Barbara, CA 93110

Sarah Rains California Department of Fish & Game

1933 Cliff Drive #9 Santa Barbara, CA 93109

Goleta Valley Chamber of Commerce P.O. Box 781

Goleta, CA 93116

Katie Maynard Geography Department

University of California, Santa Barbara Santa Barbara, CA 93106

Anagha Clifford UC General Council

1111 Franklin St., 8th Floor Oakland, CA 94607

Frank Arredondo P.O. Box 161

Santa Barbara, CA 93102

Peter Neushul Isla Vista Association

915 Camino Lindo Isla Vista, CA 93117

Martin Shumaker Housing & Residential Services

University of California, Santa Barbara Santa Barbara, CA 93106

Paula Richter Regional Water Quality Control Board

895 Aerovista Place 101 Sant Luis Obispo, CA 93401

Jodi Switzer Environmental Health & Safety

University of California, Santa Barbara Santa Barbara, CA 93106

City of Santa Barbara Community Development Department

P.O. Box 1990 Santa Barbara, CA 93102-1990

Page 117: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Jennifer Pierce Design and Construction Services

University of California, Santa Barbara Santa Barbara, CA 93106

Sarah Siedschlag Associated Students

University of California, Santa Barbara Santa Barbara, CA 93106

Goleta Sanitary District 1 William Moffitt Place

Goleta, CA 93117

Joan Hartmann Third District, SB Co. Bd. Of Supervisors

105 East Anapamu Street Santa Barbara, CA 93101

Santa Ynez Tribal Elders Council Antonio Flores P.O. Box 365

Santa Ynez, CA 93460

Jodi Switzer Environmental Health & Safety

University of California, Santa Barbara Santa Barbara, CA 93106

Gina Fischer Third District, SB Co. Bd. Of Supervisors

123 East Anapamu Street Santa Barbara, CA 93101

Kathleen Pappo Barbareno/Ventureno

Band of Mission Indians 2762 Vista Mesa Drive

Rancho Pales Verdes, CA 90275

Henning Bohn Academic Senate 1233 Girvetz Hall

University of California, Santa Barbara Santa Barbara, CA 93106

Richard Watts Chancellor’s Office 5130 Cheadle Hall

University of California, Santa Barbara Santa Barbara, CA 93106

Mark Nocciolo Budget and Planning

University of California, Santa Barbara Santa Barbara, CA 93106

Crystal Baker Coastal Band of the Chumash Nation

P.O. Box 723 Atascadero, CA 93423

Santa Barbara News Press P.O. Box 1359

Santa Barbara, CA 93102

Cherie Topper Audubon Society

5679 Hollister Ave., Ste. 5B Santa Barbara, CA 93117

Goleta Water District 4699 Hollister Avenue

Santa Barbara, CA 93117

Janet Darlene Garcia Coastal Band of the Chumash Nation

P.O. Box 4464 Santa Barbara, CA 93140

Nestor Covarrubias Transportation and Parking Services

University of California, Santa Barbara Santa Barbara, California 93106

Matthew O’Carroll Facilities Management

University of California, Santa Barbara Santa Barbara, California 93106

Freddie Romero Santa Ynez Tribal Elders Council

P.O. Box 517 Santa Ynez, CA 93460

Manuel Herrera Housing and Residential Services

University of California, Santa Barbara Santa Barbara, CA 93106

Annette Muse Orfalea Family Children’s Center

University of California, Santa Barbara Santa Barbara, CA 93106

Page 118: Notice of Impending - UCSB€¦ · Student’s Food Bank and provide education in sustainable food production. ... Support Shed and Greenhouse A 100 square-foot (10 by10), 8-foot

Student Garden Email list

Kathryn O'Brien West Campus Point Home Owners Assoc. [email protected]

Cris Sandoval Coal Oil Point [email protected]

Annette Suding MuOFCC [email protected]

Tamara ThompsonOFCC [email protected]

Jolie Colby [email protected] 

Chris C IV Youth Projects [email protected]

Scott Gove  West Campus Family Student Housing [email protected]

WC Family HousingWest Campus Student Family Apartments [email protected] 

Jenny Dugan UCSB Horse Boarders Association [email protected]

Hank Pitcher UCSB Art Faculty [email protected]

Kim Yasuda UCSB Art Faculty [email protected]

Dan Connally UCSB Art Faculty [email protected] 

Colin Gardener UCSB Art Faculty [email protected]

Jane Mulfinger UCSB Art Faculty [email protected]

Gabe Runte [email protected] 

Adory Khandaker [email protected]

Olivia Locatelli [email protected]

UCSB Dept Public Worms [email protected]

Sarah Siedschlag Associated Students [email protected]

Jessica Schmitt Associated Students [email protected]

Mathew Norton [email protected]

Shannon Hinrichs EH&S [email protected]

Nocolas Bruce EH&S [email protected] 

Matthew O'CarrollPhysical Faciltiies [email protected]

Mo Lovegreen Sustainability [email protected]

Joe Harkins EH&S [email protected]

Jon Cook Physical Faciltiies [email protected]

Nestor Covarrubia Transportation and Parking Services [email protected]

Chris Zbinden Transportation and Parking Services [email protected]

Barry Collwell Transportation and Parking Services [email protected]

Katie Maynard Sustainability [email protected]