NOTES:1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS …
Transcript of NOTES:1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS …
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
2. BUS STOPS AND ASSOCIATED CROSSING LOCATIONS ARE INDICATIVEAND SUBJECT TO FURTHER DESIGN DEVELOPMENT. BUS STOPINFRASTRUCTURE TO BE PROVIDED BY OTHERS.
3. THIS IS A 2D LAYOUT AND AS SUCH EARTHWORKS EXTENTS AREINDICATIVE AND YET TO BE CONFIRMED.
4. REQUIRED TEMPORARY ACCESS RAMPS AT PRIORITY JUNCTIONS TOBE PROVIDED BY OTHERS.
5. DISTRIBUTOR ROAD AND LINK ROADS TO BE FULLY LIT.
ACCESS GATE FOR TEMPORARY ACCESS IF REQUIRED
PEDESTRIAN GATE
HIGHWAY BOUNDARY FENCING SHOWN INDICATIVELYWITH FENCING TYPE TO BE CONFIRMED
LEGEND:
INDICATIVE EXTENT OF ROAD RESTRAINT SYSTEMREQUIRED SUBJECT TO FURTHER DESIGNDEVELOPMENT. SITES ASSESSED TO BE OF 'MEDIUM'PRIORITY ACCORDING TO THE PROVISION OF ROADRESTRAINT SYSTEMS ON LOCAL AUTHORITY ROADS
RED LINE BOUNDARY (SWDR)
TRAFFIC SIGNAL
TACTILE PAVING
STAINLESS STEEL BOLLARD OR APPROVEDEQUIVALENT, SIZE TO BE CONFIRMED
BLOCK PAVING
Tony Gee and Partners LLPHardy House
140 High StreetEsher, Surrey
KT10 9QJTel: 01372 461600
DO NOT SCALE
APPROVED:
DRAWING No:
SCALE @ A1:
TITLE:
PROJECT:
DESIGNED:
CHECKED:
DATE:
REV:
DRAWING STATUS:
DRAWN:PROJECT NO:
Tel: (0118) 974 6000 Web: www.wokingham.gov.ukShute End, Wokingham, Berkshire RG40 1BN
CLIENT:
CONTRACTOR:
DESIGNER:
WOKINGHAM MAJOR HIGHWAYS PROGRAMME
KEYPLAN:
www.tonygee.comConsulting Civil, Structural and Geotechnical Engineers
File n
ame S
:\PRO
JECT
S\20
18\C
1180
47\B
IM\01
-WIP
\DRA
WIN
GS\W
MHP-
TG-S
RWG1
-DR-
HI-91
01.D
WG,
ed on
01 M
arch 2
021 1
5:05:1
2, by
Ben
Haw
kins
REV DATE BY DESCRIPTION CHK APP
SWDR - SPINE ROAD ANDWESTERN GATEWAY PHASE 1
WMHP-TG-SRWG1-DR-HI-9101 P04
SUITABLE FOR REVIEW & COMMENT S3
SPINE ROAD AND WESTERN GATEWAY PHASE 1
HIGHWAYSPLANNING
GENERAL ARRANGEMENT SHEET 1 OF 6
TCHBH
BH JC1:500
C118047 December 20
P02 02/12/2020 BH UPDATED FOLLOWING SCO COMMENTS
JC INDICATIVE FORMAL CROSSINGS AND PED ROUTES SHOWN01/03/2021P03
BH CROSSINGS AND PED ROUTES ANNOTATIONS AMENDED01/03/2021P04
JCBH
JCBH
JCJBM
SWDR - WESTERNGATEWAY PHASE 2
PLANSCALE 1:500
0 50m10m 20m 30m 40mSCALE 1:500
10m
RED LINE BOUNDARY
PROPOSED VARIED WIDTHCARRIAGEWAY
PROPOSED 3.0m VERGE
PROPOSED 3.0m FOOTWAY /CYCLEWAY
PROPOSED 1.0m VERGEPROPOSED EARTHWORK
SOUTH WOKINGHAMDISTRIBUTOR ROAD (SWDR)
PROPOSED TESCO ACCESS
CULVERT O
PROPOSED 3.0m VERGE
PROPOSED 3.0m FOOTWAY /CYCLEWAY
PROPOSED 1.5m VERGE
PROPOSED EARTHWORK
PROPOSED ACCESS TO TESCOCAR PARK AND STORE
FUTURE ARM TO SERVICEPERSIMMON HOMESDEVELOPMENT
MATCH LINE
MATCH LINE
FOR CONTINUATION REFER TO DRG No. WMHP-TG-SRWG1-DR-HI-9102
PROPOSED 9mCARRIAGEWAY
PROPOSED 5m CARRIAGEWAY
CULVERT N
DETENTION BASIN
DETENTION BASIN
ROAD MARKINGS TOTIE INTO EXISTING
ROAD MARKINGS TOTIE INTO EXISTING
ROAD MARKINGS TOTIE INTO EXISTING
ã Crown copyright and database rights 2018 OS 100005035. You are granted a non-exclusive,royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes forthe period during which Tony Gee and Partners LLP makes it available. You are not permitted tocopy, sub-license, distribute, sell or otherwise make available the Licensed Data to third parties inany form. Third party rights to enforce the terms of this licence shall be reserved to OS.
REALIGNED LUCKLEY BROOK
PROPOSED TESCO ACCESS FORPEDESTRIANS AND CYCLISTS
TESCO SUPERSTORE
CULVERT P
INDICATIVE LOCATION OFFORMAL PEDESTRIANCROSSING SUBJECT TOFURTHER INVESTIGATION
INDICATIVE LOCATION OFFORMAL PEDESTRIANCROSSING SUBJECT TOFURTHER INVESTIGATION
INDICATIVE POTENTIALPEDESTRIAN ROUTE SUBJECT TO
FURTHER INVESTIGATION ANDAGREEMENT WITH 3rd PARTIES
INDICATIVE POTENTIALPEDESTRIAN ROUTE SUBJECT TOFURTHER INVESTIGATION ANDAGREEMENT WITH 3rd PARTIES