Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’...

39
Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements Don Lintner (NHU) Eric Lynne (Donohue)

Transcript of Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’...

Page 1: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Not Your Typical

Turbo Blower New Holstein Utilities’ Blower Improvements

Don Lintner (NHU)

Eric Lynne (Donohue)

Page 2: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

New Holstein Utilities

Population (~3200)

Design

Flow (1.33 mgd)

Load (1600 ppd BOD)

Current

Flow (0.5 mgd)

Load (680 ppd BOD)

Page 3: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

Permit Requirements

BOD (20/30 mg/L)

TSS (20/30 mg/L)

TP (1.0 mg/L)

No disinfection

Operational Practices

Extended Air (Nitrification)

Septage Receiving (Slugs)

Page 4: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

Aeration Blowers

Type – Rotary Lobe

Function – Aeration and Digester

Condition – End of Useful Life

Reliability Concerns

Inefficient

Page 5: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

Aeration Blowers

Operational Limitations

Constant Speed

40HP / 30HP

Age

2 Failed

2 Used Units

40 HP

40 HP

30 HP

30 HP

30 HP

DIGESTER AERATION

Typically run 70 / 100 HP

for 1600 scfm / 2300 scfm

(mixing limited)

Page 6: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Facilities Plan

Blower Replacement

Ancillary Systems

Building

Decant Tanks

WAS Control

Sludge Pumps

Standby Generator

DO Control

Lab Temperature

Workshop/Garage Bay

Page 7: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Facilities Plan

Blower Replacement Alternatives

Replace In-Kind – Rotary Lobe Blowers

Single Stage Centrifugal (Turbo) Blowers

Efficiency

Life Cycle Cost Evaluation

Upgrade Electrical Service

230V vs. 480V Power

Recommended Further Consideration

Page 8: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Facilities Plan / Preliminary Design

Single Stage Centrifugal Blowers

High Speed Turbo (Sulzer/APG-Neuros)

Specialized Electronics

Cost

Integrally Geared with Sliding Vane (Turblex)

High Capacity / Cost

Integrally Geared with VFD (Inovair)

New

D.O. Control

Modulating Valve to Aerobic Digester

Page 9: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Inovair Blower

Concept

Advantages

Moderate Cost / Efficiency

Basic Components

Disadvantages

Not Best Efficiency

Limited Installations and Experience

Milwaukee Industrial Application

Rib Mountain (eternally almost complete)

Unclear lifespan

Page 10: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Design Concepts

Design:

A. Evaluated Blower Bid

B. D.O. Control

C. Modulating Valve

D. 3-D Model

Page 11: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

A) Blower Evaluation

Evaluated Bid:

Rotary Lobe Blowers

Inovair

Early Adopter=Attractive Pricing

(and random issues…)

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

0 5 10 15 20

PW Cumulative

Cost (2015$)

Years after Installation

HST - Inovair

PD - Aerzen

Assumed $0.10/kwh for two blowers operated 24 hours per day, total of 2000 scfm.

Page 12: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

B) Dissolved Oxygen Control

Page 13: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

C) Modulating Digester Valve

Concept

Throttle digester header when liquid

levels are lower to balance airflows

Less overall horsepower

(Note: can’t pinch both ends)

Allow flexibility to run a dedicated

blower(s) to each side

50 HP

50 HP

50 HP

DIGESTER AERATION

5-6 psi 1-6 psi

50 HP

M M

Page 14: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

D) 3-D Models

Design:

3-D Model

Pump Gallery – Operator Input allowed

ability to pull/push flow every direction

Page 15: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Funding

BIDS

Low Bidder:

$2,149,000

GRANTS

Aeration Blower:

Projected Energy Savings ($16,500)

Building Heat:

Electric Heat Gas Heat Savings ($7,500)

Grant Value

$ 33,976 WPPI

$ 68,165 Focus on Energy

$364,382 CWF Principal Forgiveness

$466,523 Total (22%)

$1,682,477 (net cost)

Page 16: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 17: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 18: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 19: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 20: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 21: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 22: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

(No trees were harmed on this portion of the project)

Page 23: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 24: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower
Page 25: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Valved

Flexibility

Design:

Eliminated 1 pump

Some flowpaths can flow

by gravity or pump

Rotary lobe pumps allow

multi-use

All three can really move

some sludge

Sacrificed Automation

Page 26: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower
Page 27: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Startup Plan

How to sequence blower demo/startup to

prove new units are fully functional?

(...Very Carefully)

Page 28: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

The Blowers Work!*

Designed to typically need 2 blowers

Now to Optimize

Reduce DO

Reduce Mixing Limited

Reduce Digester Airflow

Limitations:

Blower Turndown (Range 70-100%)

Inovair now offers wider-range units,

consider varying sizes (or rpms?)

Page 29: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Blower PLC Programming

Surge Protection Feature

Manual reset

Head rise to surge worse at VFDmin

Ramps up VFD, fights valve PID

Page 30: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Blower PLC Programming

Mass Airflow - Winter Operation

Adjusted PLC Temp Setting

Operation

Page 31: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Current

Operating smooth now

Maintenance Items:

Expensive Oil

Belt Tensioning

Air Filter

Observed Energy Savings

Average

Peak

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

J F M A M J J A S O N D

$ /

lb B

OD

Rem

oved

Electric Utility

3-YRS BEFORE

AFTER

Page 32: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Benchmarking

See Focus at Booth #136

Download Guide @

www.focusonenergy.com/guidebooks

Page 33: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Benchmark – Activated Sludge

5.4 MWh/MGD (average)

3.3 MWh/MGD (Top 25%)

3.0 MWh/MGD (Best Practice)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

J F M A M J J A S O N D

MW

h /

MG

D

Electric Utility

3-YRS BEFORE

AFTER

Benchmarking

How does it compare?

Data Crunch

Keep Updated

Page 34: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

J F M A M J J A S O N D

kW

h /

lb B

OD

Electric Utility

Operation

3-YRS BEFORE

AFTER

Benchmark – Extended Air

2.9 MWh/MGD

Normalized for Loading

Heating Impact

Summer

vs

Winter

Page 35: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0

200

400

600

800

1000

1200

1400

1600

1800

2000

$0.00 $2,000.00 $4,000.00 $6,000.00 $8,000.00 $10,000.00 $12,000.00

Heati

ng D

egre

e D

ays

(deg F

)

Electric and Natural Gas

Operation

3-YRS BEFORE AFTER

Heating Improvements

Cost:

$40,000

Benefit:

Reduced OPEX

Lab temp control

2-10 year payback without grants

Demand charge reductions

Page 36: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0 500 1000 1500 2000

$ /

lb B

OD

Heating Degree Days (deg F)

Electric and Natural Gas

Operation

Normalize for BOD

and Heating

Blower System Efficiency

34.6 % Reduction

Page 37: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0

50

100

150

200

250

Aug-1

2

Oct-

12

Dec-1

2

Feb-1

3

Apr-

13

Jun-1

3

Aug-1

3

Oct-

13

Dec-1

3

Feb-1

4

Apr-

14

Jun-1

4

Aug-1

4

Oct-

14

Dec-1

4

Feb-1

5

Apr-

15

Jun-1

5

Aug-1

5

Oct-

15

Dec-1

5

Feb-1

6

Apr-

16

Jun-1

6

Aug-1

6

Peak 1

5 m

in k

W

Demand Charge

Operation

3-YRS BEFORE

AFTER

Minimized Electric Heat

(some areas still have electric heat)

Page 38: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Summary

Blower Replacement

Blowers

Optimization 2.0

Control System

Heating System

- Come Visit!

INSERT Photo

Page 39: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Summary

More than Just a Blower Replacement Project

Blowers

Continued Optimization

Control System

Heating System

- Come Visit!