Pedro Antao | 7/NOV/2017 ITSF 2017 'The reality for Time and Phase synchronization within the Mobile Network Operator to address the LTE-A'

Transcript of NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port...

Page 1: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Pedro Antao | 7/NOV/2017

ITSF 2017'The reality for Time and Phase synchronizationwithin the Mobile Network Operator to address the LTE-A'

Page 2: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

'The reality for Time and Phase synchronization within the Mobile Network Operator to address the LTE-A'

NOS Synchronization Network

Plans to address the LTE-A +/- 1.5us phase requirements

Ongoing trials and network developments

Page 3: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,
Page 4: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

NOS Synchronization Network

NOS Radio Access Network footprint

3100 RAN sites (GSM, UMTS, LTE*)FDD

63% Gigabit-Ethernet

30% MW-Ethernet

5% leased ETH

2% EFM

… Fiber in major urban areas / MW in rural areas

FOMWLL Eth.EFM/SHDSL

Page 5: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

NOS Synchronization Network

NOS Mobile Backhaul

Wider variety of Backhaul solutions

P2P ETH Fiber Gigabit

P2P ETH Leased Ethernet

CSG within ring topology

MW-ETH tree topologies

Connected to a IP convergent network shared among Cable, FTTH, Mobile, Business, etc.

CMP RMD

SIBS TLV

PoP_1 PoP_N

MX960MX960

MX960MX960

MX960MX960

MX960MX960

MX960MX960

MX960MX960

MX960MX960

MX960MX960

PoP_1 PoP_N

CORE

EDGE

PreAgg

Mobile Backhauling

BTS

NodeB

ENodeB

SIU

E1 Port 0-1

Port 3

Port 2b

Port 0b

Port

CLOCKExt PPS

E1 Port 14

CLK 2Mbps

802.1Q

802.1Q

CSG

CSG CSG

CSG

CSG CSG

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

BTS

NodeB

ENodeB

SIU

E1 Port 0-1

Port 3

Port 2b

Port 0b

Port

CLOCKExt PPS

E1 Port 14

CLK 2Mbps

802.1Q

802.1Q

BTS

NodeB

ENodeB

SIU

E1 Port 0-1

Port 3

Port 2b

Port 0b

Port

CLOCKExt PPS

E1 Port 14

CLK 2Mbps

802.1Q

802.1Q

BTS

NodeB

ENodeB

SIU

E1 Port 0-1

Port 3

Port 2b

Port 0b

Port

CLOCKExt PPS

E1 Port 14

CLK 2Mbps

802.1Q

802.1Q

BTS

NodeB

ENodeB

SIU

E1 Port 0-1

Port 3

Port 2b

Port 0b

Port

CLOCKExt PPS

E1 Port 14

CLK 2Mbps

802.1Q

802.1Q

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

BTS

NodeB

ENodeB

802.1Q

802.1Q

802.1Q

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

IP CORE

RAN leverage on MBH for sync, no GPS

Page 6: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

NOS Synchronization Network

IP Network is the “Synchronization Distribution Network”

Convergent IP Network for Data & Sync

4 x L1 Centralized Synchronization POPs:GNSS GPS and Galileo

SyncE references for IP Network

PTP GMs G.8265.1; T-GM G.8275.X

SyncE distribution through IP network layers:

IP CORE , IP EDGE, IP PreAgregation, and

IP PreAGG-Lite, using Fiber or DWDM 100G,

10G, and 1G links

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

L1 EDGE

L1 EDGE

EDGE

L1 EDGE

EDGE

9001

PreAGGPreAGG

EDGE

L1 EDGE

EDGE

EDGE

EDGE

T-GM

GNSS

T-GM

GNSS

T-GM

GNSS

T-GM

GNSS

9001

PreAGGPreAGG

IP CORE

EDGE70 PoPs / 120 devices

PreAGG180 PoP / 182 devices

ASR920

PreAGGLitePreAGG

Lite

ASR920

PreAGGLitePreAGG

Lite

PreAGG-LITE120 PoPs / 130 devices

ASR920

PreAGGLitePreAGG

Lite

9001

PreAGGPreAGG

9001

PreAGGPreAGG

ASR920

PreAGGLitePreAGG

Lite

Page 7: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

NOS Synchronization Network

SyncE

PTP

G.8265.1

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

GNSS

SSU

GMG8265.1

T-GMG8275.2

T-GM

G8275.1

SingleRAN

EEC EEC EEC

PreAGG

PreAGG-LITE

EEC

MBHSolution

EECEEC

SOOC G8265.1

ETH-nx10G

IP-CORE

EEC

ETH-nx10G

ETH-100G

ETH-nx1G

ETH-nx10GETH-1G

ETH-1G

ETH-1GETH-nx10G

optional

RAN devices are usually bellow 6 hops from the sync reference, except where MBH use Microwave Ethernet Radios Links.

SyncE support in all the nodes within the Ethernet distribution chain

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

GNSS

SSU

GMG8265.1

T-GMG8275.2

T-GMG8275.1

SingleRAN

EECEEC EEC

PreAGG

PreAGG-LITE

EEC

MBHSolution

EECEEC

ETH-nx10GETH-nx10G

ETH-1GETH-nx1G

ETH-nx10GIP-CORE

EEC

ETH-nx10G

ETH-100GETH-1G

ETH-1G

optional

Page 8: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

NOS Synchronization Network

TIE measurements from live network using Synchronous Ethernet

Active probe in the EDGE (24h)

Field measurement in PreAGG-LITE 1,5h

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

L1 EDGE

L1 EDGEL1 EDGE

9001

PreAGGPreAGG

L1 EDGE

EDGE

EDGE

T-GM

GNSS

T-GM

GNSS

T-GM

GNSS

T-GM

GNSS

IP CORE

EDGE

PreAGG

PreAGGLite

PreAGG-LITE

Sync Measurement

Device

Sync probe

GNSS

GNSS

Page 9: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,
Page 10: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Plans to address the LTE-A phase requirements (+/- 1.5us TE)

Solutions to enable phase & time being considered in the RAN

PTP G.8275.1 T-TSC + SyncE

PTP G.8275.2 T-TSC-P

GNSS + SyncE , contingency.

GNSS

PTP G.8275.1

GNSS

PTP G.8275.1

PTP G.8275.2

GNSS

PTP G.8275.1

PTP G.8275.2

2015 2016 2017

eNB (LTE-A)

At the current being it is obviously that PTP ITU-T profile G.8275.2 is a seriously alternative

to the GNSS in the cell site, in the counterpart the G.8275.1 is loosing attractivity.

Page 11: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Plans to address the LTE-A phase requirements (+/- 1.5us TE)

PTP G.8275.1 ETH L2 MCAST + SyncE (RAN T-TSC)

• Standards finish in 2014

• Feasible to leverage on centralized T-GM

• Widely accepted by RAN vendors

• Well defined metrics by the ITU-T

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

SSU

GMG8265.1

T-GM

G8275.2

T-GM

G8275.1

Single

RAN

EECEEC EEC

PreAGG

PreAGG-LITE

EEC

MBH

Solution

EECEEC

ETH-nx10GETH-nx10G

ETH-1GETH-nx1G

ETH-nx10GIP-CORE

EEC

ETH-nx10G

ETH-100GETH-1G

ETH-1G

optional

T-BC G8275.1 T-BC G8275.1T-BC G8275.1 T-BC G8275.1 T-BC G8275.1 T-BC G8275.1

T-TSC G8275.1

• Requires full path support, not easy to

achieve due to HW/SW restrictions

• Legacy HW does not support

• Slow start to IP routers vendors to support

this profile

Page 12: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Plans to address the LTE-A phase requirements (+/- 1.5us TE)

• Despite being standardized two years later

than G.8275.1, it is already implemented

and supported by a wider variety of

equipment vendors

• Does not requires full time path support

• Asymmetry are more likely due to IP routing

issues among parallel paths

• Metrics are not well defined yet

• More risky to leverage within centralized T-

GM deployment

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

SSU

GMG8265.1

T-GMG8275.2

T-GM

G8275.1

SingleRAN

EECEEC EEC

PreAGG

PreAGG-LITE

EEC

MBHSolution

EECEEC

ETH-nx10GETH-nx10G

ETH-1GETH-nx1G

ETH-nx10GIP-CORE

EEC

ETH-nx10G

ETH-100GETH-1G

ETH-1G

T-TSC-P G8275.2

optional

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

SSU

GMG8265.1

T-GM

G8275.2

T-GMG8275.1

Single

RAN

EECEEC EEC

PreAGG

PreAGG-LITE

EEC

MBHSolution

EECEEC

ETH-nx10GETH-nx10G

ETH-1GETH-nx1G

ETH-nx10GIP-CORE

EEC

ETH-nx10G

ETH-100GETH-1G

ETH-1G

T-TSC-P G8275.2T-BC-P G8275.2

optional

PTP G.8275.2 IP L3 UNICAST + “SyncE” (RAN T-TSC-P)Distributed T-BC-P G.8275.2 (RAN T-TSC-P)

Page 13: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Plans to address the LTE-A phase requirements (+/- 1.5us TE)

PTP G.8275.2 APTS (RAN T-TSC-P)

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

SSU

GM

G8265.1

T-GM

G8275.2

T-GM

G8275.1

Single

RAN

EECEEC EEC

PreAGG

PreAGG-LITE

EEC

MBHSolution

EECEEC

ETH-nx10GETH-nx10G

ETH-1GETH-nx1G

ETH-nx10GIP-CORE

EEC

ETH-nx10G

ETH-100GETH-1G

ETH-1G

optional

T-TSC-P G8275.2

T-GM

GNSS

T-BC-A G8275.2

• Distributed Small/Mid size T-BC-A in the EDGE and/or Pre-AGG layers to provide

higher scalability

• APTS use the distributed GNSS reference, and centralized T-GM for backup with

real time asymmetry correctionAPTS

Page 14: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Plans to address the LTE-A phase requirements (+/- 1.5us TE)

GNSS receiver in the RAN

IP-EDGEIP-CORE

EPC

IP-EDGE

RNC

BSC

SSU

GM

G8265.1

T-GM

G8275.2

T-GM

G8275.1

Single

RAN

EECEEC EEC

PreAGG

PreAGG-LITE

EEC

MBH

Solution

EECEEC

ETH-nx10GETH-nx10G

ETH-1GETH-nx1G

ETH-nx10GIP-CORE

EEC

ETH-nx10G

ETH-100GETH-1G

ETH-1G

optional

GNSS

• Risk of jamming

• Installation and maintenance costs

• Does not require synchronization

features from IP/Transport Network

• Easier to achieve +/- 1.5 us TE

Page 15: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,
Page 16: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Ongoing trials and network developments to deploy phase within NOS network

PTP G.8275.1 trials, we have found a TE > +/- 1.5us versus GNSS, due to DWDM asymmetries

DWDW path T-GM#1<>COI2 TE=+2.9usDynamic asymmetry= 45ns

DWDW path T-GM#1<>COI1 TE=-4.1usDynamic asymmetry= 60ns

RAN site A and RAN Sites B,C,D have a 7us TE

Page 17: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Ongoing trials and network developments to deploy phase within NOS network

Challenges

How to minimize the asymmetries introduced by the DWDM � Re-engineer the DWDM non-coherent to coherent network, and use

HW with Sync Time-Stamp… to evaluate!

� Use asymmetry correction in the IP transport network , but requires asymmetry correction features within the T-BC

… requires field measurement in every hop, does not scale!

To workaround the DWDM asymmetries, a good approach seems to be: Deploy G.8275.2 T-BC-A where it is needed (when DWDM non-coherent links are used)

Page 18: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Ongoing trials and network developments to deploy phase within NOS network

PreAGG PreAGG10GE

PreAGG-LITEPreAGG-LITE

T-TSC-P G8275.2

GPS

T-GM#2

GNSS

T-GM#1

GNSS

PTP G.8275.2 Lab trials

� Good insights regarding the TE metrics achievementMax TE -500ns , max dynamic TE to be investigated

� Stability of the solutions implemented in the RAN

PTP results achieved using 128pps Sync Message rate

Page 19: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Ongoing trials and network developments to deploy phase within NOS network

PTP G.8275.2 Next Steps� Live deployments using centralised T-GM� Live deployments using distributed T-BC-A for asymmetry correction

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

(EDGE) (EDGE)

COI1(EDGE)

T-GM#2

BACKUP

GNSS

T-GM#1

PRIORITY

GNSS

IP CORE

COI2(EDGE)

Cell Site D

Cell Site C

Cell Site B

Cell Site A

T-BC-A

GNSS

T-TSC-P

T-TSC-P

T-TSC-P

T-TSC-P

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

MX9

60

(EDGE) (EDGE)

COI1(EDGE)

T-GM#2

BACKUP

GNSS

T-GM#1

PRIORITY

GNSS

IP CORE

COI2(EDGE)

Cell Site D

Cell Site C

Cell Site B

Cell Site A

T-TSC-P

T-TSC-P

T-TSC-P

T-TSC-P

Distributed G.8275.2 T-BC provides

• Dynamic asymmetry correction to compensate

DWDM or other existing asymmetries

• Enhance the PTP slave capacity within the

network;

Leverage in the centralized L1 T-GM for GNSS redundancy

Page 20: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

Ongoing trials and network developments to deploy phase within NOS network

RESUME

Deploy Phase & Time without GNSS receiver in RAN sites requires:

� Full understanding from the IP/Transport Network : synchronization features, synchronization accuracy, topology

� One solution does not fit all the use cases, example for NOS use cases:• Centralized T-GM G.8275.2 without T-BC-P for Lisbon and Oporto (mainly

fiber links without DWDM)• Centralized T-GM G.8275.2 plus T-BC-P for regions without DWDM

asymmetries;• Centralized T-GM G.8275.2 plus T-BC-A for regions with DWDM

asymmetries;• For the MW clusters, further analysis is required;

Page 21: NOS SYNC Phase 7NOV2017 - chronos.co.uk and... · NodeB ENodeB SIU E1 Port 0-1 Port 3 Port 2b Port 0b Port Ext PPSCLOCK ... Re-engineer the DWDM non-coherent to coherent network,

'The reality for Time and Phase synchronization

within the Mobile Network Operator to address the LTE-A’

Thank You!