25
Northern Wood Power Boiler Re-Powering: Coal to Biomass William Smagula Director of Generation EBC- NH Chapter Meeting June 19, 2007 A Positive Step Toward Reducing Climate Change and Achieving Energy Independence

description

Northern Wood Power Boiler Re-Powering: Coal to Biomass. William Smagula Director of Generation. A Positive Step Toward Reducing Climate Change and Achieving Energy Independence. EBC- NH Chapter Meeting June 19, 2007. PSNH Is NH’s Largest Electric Utility. - PowerPoint PPT Presentation

Transcript of Northern Wood Power Boiler Re-Powering: Coal to Biomass

Page 1: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Northern Wood PowerBoiler Re-Powering: Coal to Biomass

William SmagulaDirector of Generation

EBC- NH Chapter Meeting

June 19, 2007

A Positive Step Toward Reducing Climate Change and Achieving Energy Independence

Page 2: Northern Wood Power Boiler Re-Powering: Coal to Biomass

PSNH Is NH’s Largest Electric Utility

Founded in 1926. Serves about 75 percent of the residents in NH, or about 475,000 homes and businesses in more than 212 communities

PSNH-owned generation serves 70% of customer needs. Fleet includes hydro, oil, gas, coal, and now wood-fired generation

2.

Page 3: Northern Wood Power Boiler Re-Powering: Coal to Biomass

PSNH Generating Plants

• 31 Generating Units

• Capacity Rating of 1,150 Megawatts

3.

Page 4: Northern Wood Power Boiler Re-Powering: Coal to Biomass

PSNH’s Generation Position in New England is Unique

PSNH deregulated in 2001. Customers have choices of suppliers

Only regulated utility in New England still owning generation

Divestiture was planned since the 1990s, but did not occur

In 2002, NH Legislature formally deferred the sale of stations:

Concerns raised by supply problems in CA and elsewhere

Our low energy costs vs. market prices

Fuel diversity of the fleet

High reliability of our plants

Cost advantages from depreciated assets

4.

Page 5: Northern Wood Power Boiler Re-Powering: Coal to Biomass

The Genesis of NWP wasDriven by Several Factors:

A need to comply with regulations requiring reduced air emissions

An emerging market for “green power” in the region

NH forest products industry assessment

80 percent of the state is forest (only ME is higher)

Covers 5.7 million acres

Forestry represents $3.9 billion in economic activity statewide, roughly 11% of the gross state product

An existing infrastructure for harvesting low-grade wood,which declined drastically in recent years

5.

Page 6: Northern Wood Power Boiler Re-Powering: Coal to Biomass

NWP Driving Factors (continued)

Synergies with the existing coal-fired facility at the site

Benefits of using wood as fuel in meeting emissions targets and clean air laws

Passage of enabling legislation

A 2002 law allowing PSNH to retain its generation

An April 2003 law enacted to enable PSNH to modify its generation upon NHPUC approval

6.

Page 7: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Northern Wood Power – Key Facts

50-MW wood boiler installed to replace existing, coal-fired unit at Schiller Station in Portsmouth, NH

New boiler design and technology implemented to maximize efficiency and minimize environmental impact

Project will use 450,000 tons of clean wood annually

No demolition or construction debris

Primarily whole-tree chips

Supply is coming primarily from forests in NH and ME

Project cost: $75 million

7.

Page 8: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Project Is Providing Significant Benefits to NH and the Seacoast Region

Provides substantial environmental benefits, particularly in lowering air emissions

Provides needed, long-term wood market for the forest industry

Estimated regional impact of approximately $20 million annually

Accomplished without state subsidies

Local tax benefits

8.

Page 9: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Wood Procurement Facts

Annual fuel usage 450,000 tons

Primary source NH, backup MA, ME, VT

Over 12,000 deliveries a year

Over 60 suppliers contribute to inventory

10 + day inventory maintained on-site

Wood yard is working well, minimizing truck unloading times

Maintaining Good Forest Management Standards9.

Page 10: Northern Wood Power Boiler Re-Powering: Coal to Biomass

10.

Northern Wood Power is Designed to Have No Negative Impact on PSNH Customer Rates

NWP creates a new revenue stream to help support this investment

Page 11: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Status of REC Sales

NWP expected to generate at least 315,000 RECs a year

We are actively marketing 2007 – 2008 RECs

Forward REC marketing negatively influenced by market’s six-month lag in reconciling purchases

REC prices are currently in the $50 range

11.

Page 12: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Comparison of Emissions: NWP Boiler (Max Potential) vs. Former Unit (Actual)

0

200400

600800

1,000

1,2001,400

1,6001,800

2,000

Emissions

To

ns P

er

Year

Former Unit #5 NWP - Wood

Former Unit #5 113.2 1950.5 583.6

NWP - Wood 31.5 63.1 150

PM/PM10 SO2 NOx

12.

Reductions on Wood 70% 95% 75%

Schiller 5 is now one of the cleanest emitting units in New England

Page 13: Northern Wood Power Boiler Re-Powering: Coal to Biomass

The NWP “Generates” Results with Reduce, Reuse, Recycle

Reduces the use of fossil fuels

Recycles low-grade wood fuel

Reuses existing auxiliary plant equipment

Reduces air emissions

Reduces the amount of landfilled coal flyash

Reuses wood ash to benefit agriculture

Reduces customer rates

13.

Page 14: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Schiller Station – Before Northern Wood Power

Page 15: Northern Wood Power Boiler Re-Powering: Coal to Biomass

The new boiler building, as viewed from across the Piscataqua River.

Page 16: Northern Wood Power Boiler Re-Powering: Coal to Biomass

The wood storage area for NWP has three truck-lifts.

16.

Page 17: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Wood truck backed onto dumper.

Page 18: Northern Wood Power Boiler Re-Powering: Coal to Biomass

A wood chip delivery being unloaded.

18.

Page 19: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Conveyor to storage.

Page 20: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Wood being deposited into storage building.

Page 21: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Interior of wood storage facility.

21.

Page 22: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Conveyor to boiler

Page 23: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Conveyor to boiler

Page 24: Northern Wood Power Boiler Re-Powering: Coal to Biomass

Schiller Station Today

Page 25: Northern Wood Power Boiler Re-Powering: Coal to Biomass

NWP Success Positions Us Well for Future Wood Burning Plant Opportunities

We’ve demonstrated our ability to successfully permit and build the largest coal-to-wood conversion project in the country

We’ve established solid partnerships with key state, environmental, and forest industry leaders

We’ve shown that market-based rates can work for wood-fired plants

25.