SALIENT FEATURESSALIENT FEATURESDIVISIONS 5

Delhi, Firozpur, Lucknow, Moradabad, Ambala

STATES / UT 8 / 1

Jammu & Kashmir, Himachal Pradesh, Punjab, Haryana, Delhi, Uttar Pradesh, Rajasthan, Uttarakhand and Chandigarh

ROUTE KM 7125

BG 6864, NG 261

RUNNING KM 9239

BG 8978, NG 261

ELEC RKM 2126

NORTHERN RAILWAY – AN OVERVIEWNORTHERN RAILWAY – AN OVERVIEW

3

Page 4: NORTHERN  RAILWAY

SALIENT FEATURESSALIENT FEATURESLOCOMOTIVES 894

ELECTRICAL 345, DIESEL 549

COACHES 5543

WAGONS 15511

WORKSHOPS 4 (JUDW, ASR, AMV & KLK)

DISASTER MANAGEMENT

16 ART, 15 ARMV, 8 CRANES (140 TONNES)

STAFF STRENGTH

SANCTIONED ON ROLL

OFFICER 1680 1424

STAFF 176449 155554(12572 recruited in 2012-13)

NORTHERN RAILWAY – AN OVERVIEWNORTHERN RAILWAY – AN OVERVIEW

4

Page 5: NORTHERN  RAILWAY

NORTHERN RAILWAY – PASSENGER SERVICESNORTHERN RAILWAY – PASSENGER SERVICES

AT A GLANCEAT A GLANCE

TRAINS 1569

Mail/Exp 847, Passenger 722

Rajdhani 11 daily

10 weekly

Shatabdi 13

Jan Shatabdi 04

Duranto 04 daily

09 weekly

3350 SPECIALS & 9299 COACHES AUGMENTED IN APR-Sept 2013

5

Page 6: NORTHERN  RAILWAY

NORTHERN RAILWAY – PASSENGER SERVICESNORTHERN RAILWAY – PASSENGER SERVICES

MAIN TERMINALSMAIN TERMINALS

S.N. TERMINAL TRAINS PER DAY

TYPE OF TRAINS PASSENGERS HANDLED(2012-13)(IN LACS)

PASSENGER EARNINGS(2012-13)

(RS. IN CR.)MAIL/EXP PASS.

1 NEW DELHI 313 208 105 341 1601

2 DELHI 243 112 131 201 361

3 NIZAMUDDIN 245 174 71 149 626

4 JAMMU TAWI 80 70 10 92 334

5 LUCKNOW 248 204 44 189 291

6

Page 7: NORTHERN  RAILWAY

EARNINGS OVER NORTHERN RAILWAY (in crores)

YEAR YEAR (APRIL-SEPT) (APRIL-SEPT)

RECORD RECORD ORIGINATING ORIGINATING

TOTAL TOTAL EARNINGS EARNINGS

RECORD RECORD FREIGHT FREIGHT

EARNINGS EARNINGS

PASSENGERPASSENGEREARNINGSEARNINGS

OTHER OTHER CHGCHG

SUNDRY SUNDRY

2012-13 6299.99 2744.10 3029.56 337.08 189.25

2013-14 7704.99 3681.35 3368.20 364.10 262.62

Improvement 22.30% 34.16% 11.18% 16.54% 38.77%

7

Page 8: NORTHERN  RAILWAY

8

FREIGHT OPERATIONS

YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) TOTAL FREIGHT LOADINGTOTAL FREIGHT LOADING2012-13 22.25 MT

2013-14 27.19 MT

Record incremental growth 22.20%

YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) TOTAL FOODGRAIN LOADINGTOTAL FOODGRAIN LOADING2012-13 9.65 MT

2013-14 13.65 MT

Improvement 43.23%

Freight loading of 27.19 MT during April to September 2013, is a new record.

Page 9: NORTHERN  RAILWAY

PUNCTUALITY OF MAIL/EXPRESS TRAINS

YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) OVERALL M/EXP PUNCTUALITY OVERALL M/EXP PUNCTUALITY % %

2012-13 82

2013-14 89 (Record)

YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) PUNCTUALITY % OF MR TRAINSPUNCTUALITY % OF MR TRAINS

2012-13 84

2013-14 93 (Record)

9

Page 10: NORTHERN  RAILWAY

PUNCTUALITY OF MAIL/EXPRESS TRAINS

PUNCTUALITY ABOVE 90% ACHIEVED FOR THE MONTHS OF MAY, AUGUST AND SEPTEMBER 2013.

A NEW RECORD OF 92.65% PUNCTUALITY OF MAIL/EXPRESS TRAINS WAS MADE IN THE MONTH OF SEPTEMBER 2013.

INTENSIVE MONITORING, SIGNIFICANT REDUCTION IN ASSET FAILURES AND RATIONALIZATION OF TRAIN MOVEMENT THROUGH TIME TABLING CHANGES, BROUGHT ABOUT THIS PERCEPTIBLE IMPROVEMENT IN PUNCTUALITY OF M/EXP TRAINS.

NR HAS THE HEAVIEST PASSENGER OPERATION OVER IR WITH 505 MAIL/EXPRESS TRAINS DAILY.

PASSENGER AND SUBURBAN PUNCTUALITY ALSO IMPROVED OVER LAST YEAR.

10

Page 11: NORTHERN  RAILWAY

NORTHERN RAILWAY – SAFETYNORTHERN RAILWAY – SAFETY

CONSEQUENTIAL ACCIDENTSCONSEQUENTIAL ACCIDENTS

YEAR COLLISION DERAILMENT LC FIRE IN TRAINS MISC. TOTAL

TRAIN ACCIDENTS

PER MILLION TRAIN KMS

2010-11 1 12 9* - 1 23 0.19

2011-12 - 12 14* - 1 22 0.17

2012-13 - 5 15* - - 20 0.16

(Apr-Sept)2013-14

- 5 4 1 - 10 0.14

(* includes 13 accidents at unmanned crossings each in 2011-12 & 2012-13 and 7 in 2010-11 due to negligence of road users.)

11

Page 12: NORTHERN  RAILWAY

12

ASSET RELIABILITY

ITEMITEMCumulative Cumulative

up to Sept’2012up to Sept’2012Cumulative Cumulative

up to Sept’2013up to Sept’2013% Variation% Variation

- Imp.- Imp. / / + Det.+ Det.

RAIL FAILURE 276 148 -46.37

DSL LOCO FAILURE 267 282 +5.61

ELEC LOCO FAILURE 29 26 -10.34

ROADSIDE WAGON DETACHMENTS

68 46 -32.35

COACH DETACHMENTS

4 3 -25.00

OHE FAILURES 4 7 +75.00

SIGNAL FAILURES 20284 17513 -13.66

Page 13: NORTHERN  RAILWAY

13

NEW LINES COMMISSIONED (IN 2012-13 AND 2013-14):

Qazigund – Banihal 18 Km ( Rs 1700 cr.)

Abohar – Fazilka 43 Km ( Rs 230 cr. )

Rewari – Rohtak 75 Km ( Rs 603 cr. )

Chandigarh – Ludhiana 68 Km ( Rs 680 cr. )

TOTALTOTAL 204 Km ( Rs 3,213 cr.)204 Km ( Rs 3,213 cr.)

DOUBLING COMPLETED:18 Km Doubling between Mansa - Maur Completed in 2013-14.

(Commissioning will be done after non-interlocking in Yards)

Page 14: NORTHERN  RAILWAY

NEW INITIATIVES

LARGEST UNDERPASS OF INDIA AT SARITA VIHAR – BY BOX PUSHING LENGTH 57 METERS (TOTAL LENGTH UNDERPASS IS 178 METERS IN

RAILWAY PORTION. COMPASSIONATE APPOINTMENTS – 1027 (BETWEEN APR TO SEPT’13) SETTLEMENT CASES – 4177 (BETWEEN APR TO SEPT’13) MACP – 6092 (BETWEEN APR TO SEPT’13) LIMS – LEGAL INFORMATION MANAGEMENT SYSTEM IMPLEMENTED FOR

EFFECTIVE MONITORING OF COURT CASES. LARGESS – 2446 WARDS RECRUITED (BETWEEN APR TO SEPT’13) IMPROVEMENT IN KALKA – SHIMLA RAILWAY – SPECIAL STOCK IMPROVEMENT IN REWARI STEAM LOCOMOTIVE SHED DEVELOPMENT OF YARD CLEANING MACHINE

14

Page 15: NORTHERN  RAILWAY

NEW INITIATIVES – Contd….

SELECTION CALENDER FINALISED COMPLETE SWITCH OVER TO E-AUCTION W.E.F. 01.06.2013 IMPLEMENTED JOINT PROCEDURE ORDER BETWEEN S&T, OPERATING

AND ENGINEERING REGARDING MACHINE PACKING OF TURNOUTS. CCTV MONITORING OF BOOKING, RESERVATION & OTHER SENSITIVE

AREAS. SIG INSPECTION BY SAG OFFICERS OF HEADQUARTER AND DIVISION

STARTED.

15