Northeast Ohio Regional Sewer District - Parma, Ohio
Transcript of Northeast Ohio Regional Sewer District - Parma, Ohio
Northeast Ohio Regional Sewer District
Regional Stormwater Management Program UpdateParma Water Summit
February 25, 2021
Regional Stormwater Management Program
Stormwater Master Planning
Inspection and Maintenance
Construct Stormwater
Projects
Community Cost-share Program
476 Miles of RSS
Recently Completed Project
West Creek Bank Stabilization by Sandpiper Drive
West Creek Bank Stabilization by Sandpiper Drive
West Creek
Parma Care Nursing Home
West Creek Bank Stabilization by Sandpiper Drive
Soldier pile wall system to support eliminate the erosion along the toe of Big Creek
Completed in the Fall of 2020
Stormwater Master Planning
Cuyahoga River North Stormwater Master Plan:
Watershed Study Area
Total Study Area99,000 acres 11 Subwatersheds 23 WAC Member
Communities
Budget: $8.02 Million
Completed and distributed to Communities
Rocky RiverStormwater Master Plan:
Watershed Study Area
Baldwin Creek shown in green Big Creek shown in
brown and dark green, Stickney Creek in blue, West Creek shown in yellow
Current and Upcoming Projects
Big Creek Stream Restoration by Ridge Road
Ridge Road is to the right, picture is facing north
Big Creek Stream Restoration by Ridge Road
Upper Ridgewood Lake (on Big Creek)
Culverted portion of Big
Creek
Big Creek Flood Reduction near Sprague Road
Parma
North Royalton
Big Creek Flood Reduction near Sprague Road
Picture is facing south, towards North Royalton. Vehicle is on Sprague Road.
Flood Mitigation at W. Pleasant Valley and York Roads on Baldwin Creek
Tri-C Campus
Relief Culvert by Stormes Drive on Baldwin Creek
Bonny Banks
Baldwin Creek
proposed relief culvert
Local Efforts:Community Cost Share in Parma, 2018-2021
• $130,000- Baldwin Creek Project, headwall repair• $300,000- Orchard Park culvert and headwall repair• $245,000- South Canterbury culvert repair• $827,773- Stormwater equipment • $750,000- Catch basin repair and replacement• $127,500- Storm Drainage on Lourdes Drive• $49,500- West Creek Restoration • $90,000- Stormwater Improvements on Hickory Hill Lane• $60,000- Meadow Lane Storm Improvement Design• $49,695- Rustic Trail Storm Sewer Improvements• $43,249- Fenway Storm Sewer Improvements• $40,000- Engineering Study for Dam at Hollenbeck Lake
Total: $2,712,717 spent on community stormwater infrastructure
Member Community Infrastructure Program*
NEORSD grant funding for local
sewer repairs and projects.
Targeted at reducing basement backups.
Parma has obtained these NEORSD
grants for 2017, 2018, 2019, 2020,
and 2021.
Total of $2,250,043 in funding over five
years.
Funding available for NEORSD 2022 grant
awards.
*Wastewater funded. Not part of the Regional Stormwater Management Program
Donna FriedmanWatershed Team Leader/ Parma community contact216-881-6600 Ext. [email protected]
Customer Service line: (216) 881-8247
Questions?