North-West Elevation South-East Elevation

1
A B C D E F G Existing Pipebridge Dispensing & Packing Building Admin Block 3CR Refinery Western Roadway 2510 5685 7120 7115 2735 3190 A-LFA-FFL 53700 A-LFB-FFL 57200 A-LFC-FFL 60700 A-LFD-FFL 64200 A-LRA-FFL 67700 A-LRB-TOP 71700 Concrete sandwich panel 25-15-35/160 PPC galvanized aluminium flashing / coping. 25-80-50/105 Galvanized PFC metal profile between concrete sandwich panel and metal composite wall Metal composite wall cladding system 25-80-52/150 Stick curtain walling system 25-80-15/175 Stick curtain walling system 25-80-15/175 28355 45-65-40/335 Spandrel Toughened Glass P-LFA-FFL 53700 P-LFB-FFL 57800 P-LFC-FFL 61900 P-LFD-FFL 66000 P-LRA-FFL 70100 P-LRB-TOP 71700 17 15 13 12 11 10 8 7 6 4 3 2 5 Reagents Reagents Analytical Laboratory 3CR Refinery Admin Block Central Services Existing Pipebridge Concrete sandwich panel 25-15-35/160 Translucent panel system 25-50-95/170 PPC galvanized aluminium flashing / coping. 25-80-50/105 Galvanized PFC metal profile between concrete sandwich panel and metal composite wall Metal composite wall cladding system 25-80-52/150 Metal composite wall cladding system 25-80-52/150 Goods Entrance 10615 2860 6395 3375 4125 3815 3815 3360 3860 6410 5000 5000 5160 9980 4000 A-LFA-FFL 53700 A-LFB-FFL 57200 A-LFC-FFL 60700 A-LFD-FFL 64200 A-LRA-FFL 67700 A-LRB-TOP 71700 9 14 16 PU12 Translucent panel system 25-50-95/170 PPC galvanized aluminium flashing / coping. 25-80-50/105 1 P-TOC 80900 P-LRC-TOP 74600 20918 Main Entrance 75606 10515 88285 P-LFA-FFL 53700 P-LFB-FFL 57800 P-LFC-FFL 61900 P-LFD-FFL 66000 P-LRA-FFL 70100 P-LRB-TOP 71700 17 15 13 12 11 10 8 7 6 4 3 2 5 Analytical Laboratory PU12 Central Services 3CR Refinery Process Hall Admin Block 10615 2860 6395 3375 4125 3815 3815 3360 3860 6410 5000 5000 5160 9980 4000 A-LFA-FFL 53700 A-LFB-FFL 57200 A-LFC-FFL 60700 A-LFD-FFL 64200 A-LRA-FFL 67700 A-LRB-TOP 71700 9 14 16 Concrete sandwich panel 25-15-35/160 PPC galvanized aluminium flashing / coping. 25-80-50/105 Galvanized PFC metal profile between concrete sandwich panel and metal composite wall Metal composite wall cladding system 25-80-52/150 Stick curtain walling system 25-80-15/175 Translucent panel system 25-50-95/170 1 P-TOC 80900 P-LRC-TOP 74600 Metal composite wall cladding system 25-80-52/150 10515 Existing Pipebridge New Substation & Generator Service pipe shield, extent and rating to be confirmed by JM P-LFA-FFL 53700 P-LFB-FFL 57800 P-LFC-FFL 61900 P-LFD-FFL 66000 P-LRA-FFL 70100 P-LRB-TOP 71700 A B C D E F G 3190 2735 7115 7120 5685 2510 Western Roadway 3CR Refinery Process Hall PGMR Building To be demolished Concrete sandwich panel 25-15-35/160 PPC galvanized aluminium flashing / coping. 25-80-50/105 Galvanized PFC metal profile between concrete sandwich panel and metal composite wall Metal composite wall cladding system 25-80-52/150 Translucent panel system 25-50-95/170 Metal composite wall cladding system 25-80-52/150 P-TOC 80900 P-LRC-TOP 74600 Existing Pipebridge 28355 Drawings not to be scaled and used for construction. Drawings to be read and printed in colour in conjunction with: - Architectural Specification: 0303-TCR1-BWT-A1-XXX-SP-A-0201 - All GA's ending with -21xx - Fire strategy drawings ending with -23xx - Detail drawings ending with -24xx - Wall Scope drawings ending with -28xx - Finishes drawings ending with -29xx - RCP drawings ending with -30xx - Doors/ Schedules ending with -31xx - Stair drawings ending with -34xx - M&E and Structural Engineer's drawings Level Abbreviations Key . Level Floor X . Level Roof X . Floor Finish Level . Top of Parapet . Top of Chimney LFX LRX FFL TOP TOC 45-65-40/335 Spandrel Toughened Glass Scale: Paper Size: Drawing Number: Project: Drawing Title: Client: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawings. All discrepancies to be reported to Bryden Wood Technology Ltd. This drawing is to be read in conjunction with all related Consultants drawings and any other relevant information. This drawing is the copyright of Bryden Wood Technology Ltd. CONTROL AND MITIGATION MEASURES HAZARD IDENTIFICATION LEGEND: Revision: Key Plan: HAZARD IDENTIFICATION (if none state 'none relevant') NOTE: Hazards listed above are only those considered significant risks and: a) not likely to be obvious to a competent contractor or other designers; b) unusual; or c) likely to be difficult to manage effectively Status: A1 +44 (0)20-7253-4772 [email protected] brydenwood.co.uk Bryden Wood 100 Gray's Inn Road, London, WC1X 8AL, UK 0 1 5 10 1:200 3CR CONFIDENTIAL AND LEGALLY PRIVILEGED P04.01 0303-TCR1-BWT-A1-ZZZ-DR-A-2104 Elevations Johnson Matthey 3CR General Arrangement See Designers Risk Assessment 0303-TCR1-BWT-ZZ-XXX- HS-Z-0101 See Designers Risk Assessment 0303-TCR1-BWT-ZZ-XXX- HS-Z-0101 D2 1 : 200 South-East Elevation 2 1 : 200 North-East Elevation 3 1 : 200 South-West Elevation 4 1 : 200 North-West Elevation 1 1 2 3 4 REV DATE DESCRIPTION DWN CHK APP P01 2018-03-02 Preliminary Issue JLR JLR MW P02 2018-04-06 For Review & Comment JLR MW RG P03 2018-07-02 Issued for Planning CC MW PON P04.01 2018-11-16 Issued for Tender CC RA RY

Transcript of North-West Elevation South-East Elevation

Page 1: North-West Elevation South-East Elevation

ABCDEFG

ExistingPipebridge

Dispensing & PackingBuilding

Admin Block

3CR Refinery Western Roadway

2510 5685 7120 7115 2735 3190

A-LFA-FFL

53700

A-LFB-FFL

57200

A-LFC-FFL

60700

A-LFD-FFL

64200

A-LRA-FFL

67700

A-LRB-TOP

71700

Concrete sandwich panel25-15-35/160

PPC galvanized aluminium flashing / coping.25-80-50/105

Galvanized PFC metal profilebetween concrete sandwich panel andmetal composite wall

Metal composite wall cladding system25-80-52/150

Stick curtain walling system25-80-15/175

Stick curtain walling system25-80-15/175

28355

45-65-40/335

Spandrel Toughened Glass

P-LFA-FFL

53700

P-LFB-FFL

57800

P-LFC-FFL

61900

P-LFD-FFL

66000

P-LRA-FFL

70100

P-LRB-TOP

71700

17 15 13 12 11 10 8 7 6 4 3 25

ReagentsReagents

Analytical Laboratory 3CR Refinery

Admin Block

Central Services

ExistingPipebridge Concrete sandwich panel

25-15-35/160

Translucent panel system25-50-95/170

PPC galvanized aluminium flashing / coping.25-80-50/105

Galvanized PFC metal profilebetween concrete sandwichpanel and metal composite wall

Metal composite wall cladding system25-80-52/150

Metal composite wallcladding system

25-80-52/150

GoodsEntrance

1061528606395337541253815381533603860641050005000516099804000

A-LFA-FFL

53700

A-LFB-FFL

57200

A-LFC-FFL

60700

A-LFD-FFL

64200

A-LRA-FFL

67700

A-LRB-TOP

71700

91416

PU12

Translucent panel system25-50-95/170

PPC galvanized aluminiumflashing / coping.

25-80-50/105

1

P-TOC

80900

P-LRC-TOP

74600

20918

Main Entrance

75606

10515

88285

P-LFA-FFL

53700

P-LFB-FFL

57800

P-LFC-FFL

61900

P-LFD-FFL

66000

P-LRA-FFL

70100

P-LRB-TOP

71700

171513121110876432 5

AnalyticalLaboratoryPU12 Central Services 3CR Refinery

Process Hall Admin Block

10615 2860 6395 3375 4125 3815 3815 3360 3860 6410 5000 5000 5160 9980 4000

A-LFA-FFL

53700

A-LFB-FFL

57200

A-LFC-FFL

60700

A-LFD-FFL

64200

A-LRA-FFL

67700

A-LRB-TOP

71700

9 14 16

Concrete sandwich panel25-15-35/160

PPC galvanized aluminium flashing / coping.25-80-50/105

Galvanized PFC metal profilebetween concrete sandwich paneland metal composite wall

Metal composite wall cladding system25-80-52/150

Stick curtain walling system25-80-15/175

Translucent panel system25-50-95/170

1P-TOC

80900

P-LRC-TOP

74600

Metal composite wallcladding system

25-80-52/150

10515

ExistingPipebridge

New Substation &Generator

Service pipe shield, extent andrating to be confirmed by JM

P-LFA-FFL

53700

P-LFB-FFL

57800

P-LFC-FFL

61900

P-LFD-FFL

66000

P-LRA-FFL

70100

P-LRB-TOP

71700

A B C D E F G

3190 2735 7115 7120 5685 2510

Western Roadway 3CR Refinery

Process Hall

PGMR BuildingTo be demolished

Concrete sandwich panel25-15-35/160

PPC galvanized aluminiumflashing / coping.

25-80-50/105

Galvanized PFC metal profilebetween concrete sandwich panel

and metal composite wall

Metal composite wallcladding system

25-80-52/150

Translucent panel system25-50-95/170

Metal composite wallcladding system25-80-52/150

P-TOC

80900

P-LRC-TOP

74600

ExistingPipebridge

28355

Drawings not to be scaled and used for construction.Drawings to be read and printed in colour in conjunctionwith: - Architectural Specification: 0303-TCR1-BWT-A1-XXX-SP-A-0201 - All GA's ending with -21xx - Fire strategy drawings ending with -23xx - Detail drawings ending with -24xx - Wall Scope drawings ending with -28xx - Finishes drawings ending with -29xx - RCP drawings ending with -30xx - Doors/ Schedules ending with -31xx - Stair drawings ending with -34xx - M&E and Structural Engineer's drawings

Level Abbreviations Key

. Level Floor X

. Level Roof X

. Floor Finish Level

. Top of Parapet

. Top of Chimney

LFX

LRX

FFL

TOP

TOC

45-65-40/335

Spandrel Toughened Glass

Scale: Paper Size:

Drawing Number:

Project:

Drawing Title:

Client:

Do not scale from this drawing. All dimensions to be

verified on site prior to the commencement of any work

or the production of any shop drawings. All

discrepancies to be reported to Bryden Wood

Technology Ltd. This drawing is to be read in

conjunction with all related Consultant’s drawings and

any other relevant information. This drawing is the

copyright of Bryden Wood Technology Ltd.

CONTROL AND

MITIGATION

MEASURES

HAZARD IDENTIFICATION LEGEND:

Revision:

Key Plan:

HAZARD

IDENTIFICATION

(if none state 'nonerelevant')

NOTE:

Hazards listed above are only those considered

significant risks and:

a) not likely to be obvious to a competent contractor

or other designers;b) unusual; orc) likely to be difficult to manage effectively

Status:

A1

+44 (0)[email protected]

Bryden Wood

100 Gray's Inn Road,

London, WC1X 8AL, UK

0 1 5 10

1:200

3CR

CONFIDENTIAL AND LEGALLY PRIVILEGED

P04.01

0303-TCR1-BWT-A1-ZZZ-DR-A-2104

Elevations

Johnson Matthey 3CR

General Arrangement

See Designers RiskAssessment0303-TCR1-BWT-ZZ-XXX-HS-Z-0101

See Designers RiskAssessment0303-TCR1-BWT-ZZ-XXX-HS-Z-0101

D2

1 : 200

South-East Elevation2

1 : 200

North-East Elevation3

1 : 200

South-West Elevation4

1 : 200

North-West Elevation1

1 2

3

4

REV DATE DESCRIPTION DWN CHK APP

P01 2018-03-02 Preliminary Issue JLR JLR MW

P02 2018-04-06 For Review & Comment JLR MW RG

P03 2018-07-02 Issued for Planning CC MW PON

P04.01 2018-11-16 Issued for Tender CC RA RY