![Page 1: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/1.jpg)
North Strathfield Rail Underpass
Shallow Cover Driven Tunnel
Ted Nye
Tunnel Practice Leader
Sydney, Australia
Engineers Australia – South Coast - July 2015
![Page 2: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/2.jpg)
Buranda Busway Tunnel
![Page 3: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/3.jpg)
![Page 4: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/4.jpg)
Boggo Road Busway Tunnel
![Page 5: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/5.jpg)
Pink visitors centre building Aerial of Boggo Road Gaol 3 storey cell block building Tunnel alignment
![Page 6: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/6.jpg)
Boggo Road Tunnel – 14m excavated width
![Page 7: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/7.jpg)
Boggo Road Tunnel – Plan and Long Section
![Page 8: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/8.jpg)
Boggo Road Tunnel –
Section Under Buildings – 5m ground cover
![Page 9: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/9.jpg)
![Page 10: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/10.jpg)
![Page 11: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/11.jpg)
-15-14-13-12-11-10
-9-8-7-6-5-4-3-2-1012345
910 915 920 925 930 935 940 945 950 955 960 965 970 975 980 985 990
Settlement Under Buildings C and D
C D
![Page 12: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/12.jpg)
1. Introduction
2. Project Overview
3. Train Operations – Freight/Passenger
4. Clients Cut and Cover Proposal
5. Tunnelling Options
6. Selected Driven Tunnel Option
7. Shallow Cover Tunnel Case Studies
8. Settlement and Monitoring
9. Shotcrete as Permanent Lining
10. Conclusions/Questions
North Strathfield Rail Underpass
Shallow Cover Driven Tunnel
![Page 13: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/13.jpg)
Acknowledgements - Reference Design
Acknowledgements - Detailed Design
![Page 14: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/14.jpg)
Northern Sydney Freight Corridor
The North Strathfield Rail Underpass is
Stage 1 of 19 stages of the NFC Project
Sydney
Newcastle
North Strathfield
![Page 15: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/15.jpg)
NSRU – Scheme Plan
Project Overview
![Page 16: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/16.jpg)
NSRU – Scheme Plan
![Page 17: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/17.jpg)
Freight Trains
Up to 1.5 km long with diesel locomotives
20 plus trains per day
Dangerous goods transported including hydrocarbons
Special unique operation controlled by signalling system
Passenger Trains (secondary use, OHW)
Very limited number of special event trains e.g. major
sporting events1600 - 2000 passengers per train
Train Operations
![Page 18: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/18.jpg)
Train Operations – Freight/Passenger
![Page 19: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/19.jpg)
Train Operations – Freight/Passenger
![Page 20: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/20.jpg)
NSRU – Plan and Extent of Tunnel Option
(Cut and Cover Tunnel Shown)
![Page 21: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/21.jpg)
Outline Possession Programme – Cut and Cover Tunnel
No Type Down
Relief
Down
Main
Up
Main Works
1 72hrs Enabling Works, prepare piling platforms, temporary works
for supporting existing OHLE gantries, track works
2 48hrs 18 piles co-ordinated with dive structure
3 48hrs 28 piles
4 48hrs 14 piles + 55m pile cap
5 72hrs 28 piles + 35m pile cap
6 48hrs 13 piles + 55m pile cap
7 48hrs 37m pile cap + 30m plank laying
8 48hrs 37m plank laying
9 72hrs 35m pile cap + 75m plank laying, transfer OHLE on to new
gantries
10 48hrs Completion of the above
![Page 22: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/22.jpg)
Cut and Cover Construction Stages
![Page 23: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/23.jpg)
Tunnelling Options
Option 1 - Cut and cover tunnel
Option 2 - Hybrid cut and cover and driven tunnel
Option 2a - Interlocked horizontal steel tubes
and driven tunnel
Option 3 - Shallow driven tunnel with alignment
moved north
Final chosen - Option 3 Driven Tunnel
![Page 24: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/24.jpg)
Project Constraints
Parramatta Rd U/B (Transom Top)
Pomeroy St O/B (Opt 3)
widens this
Ausgrid 132kV cables 1.4m cover
2.5% (1 in 40) Exit Grade
2.8% (1 in 35) Entry Grade
![Page 25: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/25.jpg)
Project Overview
Pomery Street Bridge
![Page 26: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/26.jpg)
Plan
![Page 27: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/27.jpg)
Vertical Alignment - 2.5% grades
![Page 28: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/28.jpg)
Indicative Geological Profile
Siltstone,
Ashfield Shale
Formation
Weathered Shale
Shallow driven tunnel
Ballast and sub-base
Stiff Clay
![Page 29: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/29.jpg)
Driven Tunnel Canopy Tube Construction Method
Fresh Shale
Weathered Shale
Direction of tunnel drive
1. Tunnel Cross Section 2. Tunnel Long Section at Tunnel Face
350mm thick shotcrete
close to tunnel face
12m long 138mm dia. steel canopy tubes with 3m overlap
(required until shotcrete arched formed at tunnel face)
12m long fibre glass face
nails with 4m overlap
Max. 1.2m
![Page 30: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/30.jpg)
Reference Design Tunnel Section
![Page 31: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/31.jpg)
Detailed Design
Permanent Shotcrete Lining with Synthetic Fibres
![Page 32: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/32.jpg)
Comparing NSRU Driven Tunnel with Buranda and Boggo
3m
9m wide 14.5m
Pronounced Arch
Profile NSRU Tunnel
19m to 14m (tapered from portal)
5m 3m
Buranda
Case 1 Boggo
Case 2
Railway Lines Railway Lines
Buildings
![Page 33: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/33.jpg)
Road Header
![Page 34: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/34.jpg)
Site drilling during two track possessions
![Page 35: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/35.jpg)
Monitoring Apart from conventional displacement monitoring investigating
monitoring canopy tube deflections and stresses.
![Page 36: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/36.jpg)
2D and 3D Finite Element Analysis
![Page 37: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/37.jpg)
Permanent Shotcrete Lining
1. Safe Construction
2. Minimise settlement
3. Waterproof and Durable
4. High Fire Resistance (dangerous goods, hydrocarban fire)
![Page 38: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/38.jpg)
Shotcrete as permanent support “without” Lattice Girders
![Page 39: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/39.jpg)
Shotcrete Test Panels sections prior to construction. Consideration was given to shotcrete and lattice girders as permanent support but because of shallowing effects caused by the use of the required accelerator in the shotcrete a permanent concrete lining was installed. Using shotcrete alone at Boggo Road, where the tests were carried out was not an option at the time.
![Page 40: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/40.jpg)
![Page 41: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/41.jpg)
3 hrs 12 hrs 24 hrs 3 days 28 days
Shotcrete thicknesses
150mm
250mm
350mm
Age of Shotcrete
Ratio of Axial Stiffness
Relative to150mm thickness of Shotcrete at 24 hrs (per metre of tunnel length)
Rati
o o
f A
xia
l S
tiff
ness
250UC89
steel section
150UC37
Lattice Girder
15kg/m (Boggo)
![Page 42: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/42.jpg)
Arched Profile Permanent Shotcrete Lining with Synthetic Fibres
![Page 43: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/43.jpg)
![Page 44: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/44.jpg)
7 hours wait time - 6 MPa minimum
strength before next excavation cycle
![Page 45: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/45.jpg)
Small, reliable, portable
![Page 46: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/46.jpg)
1.3m and 1.5m Excavation Cycle Scenarios
![Page 47: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/47.jpg)
Record of actual
excavation cycles,
advance rates
and shotcrete mix
design.
![Page 48: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/48.jpg)
Geology
![Page 49: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/49.jpg)
Tunnel Plan – Geological Long Section
![Page 50: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/50.jpg)
![Page 51: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/51.jpg)
![Page 52: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/52.jpg)
![Page 53: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/53.jpg)
![Page 54: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/54.jpg)
![Page 55: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/55.jpg)
![Page 56: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/56.jpg)
Tunnel Face at 20m
![Page 57: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/57.jpg)
Tunnel Face at 40m
![Page 58: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/58.jpg)
Tunnel Face at 60m
![Page 59: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/59.jpg)
Tunnel Face at 80m
![Page 60: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/60.jpg)
![Page 61: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/61.jpg)
Tunnel Face at 100m
![Page 62: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/62.jpg)
Permit To Tunnel (PTT)
![Page 63: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/63.jpg)
Daily “Permit To Tunnel” meeting room
![Page 64: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/64.jpg)
PPT Process has Initiated the following
1. 1m, 1.3m and 1.5m excavation advances
2. Increased number of dowels from 3 to 5 in crown apex
3. Installation of reinforcement in the canopy tubes
4. Adapted to changed ground conditions – dyke and fault zone
5. Permanent fibreglass dowels in walls
6. Reduced excavation advance back to 1m, increased back to 1.5m
7. Increased tunnel lining thickness from 250mm to 300mm
8. Increased at two locations the number of face nails
9. Weep holes in side walls and in tunnel face
10. Shotcreting the tunnel face
11. Added additional monitoring on surface and in tunnel
12. Decreased and increased the number of canopy tubes where required
13. Reviewed shotcrete mix and improved progressively
![Page 65: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/65.jpg)
Canopy Tubes
![Page 66: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/66.jpg)
![Page 67: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/67.jpg)
Fibreglass Face Nails (for face stability)
![Page 68: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/68.jpg)
![Page 69: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/69.jpg)
![Page 70: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/70.jpg)
![Page 71: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/71.jpg)
![Page 72: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/72.jpg)
Monitoring Regime
![Page 73: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/73.jpg)
![Page 74: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/74.jpg)
![Page 75: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/75.jpg)
![Page 76: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/76.jpg)
Plan of Monitoring Surface Remote Access robotic scanned survey data 24hrs/days
via internet PC computer, iPAD or iPhone
![Page 77: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/77.jpg)
Tunnel Face at
101.7m
Ground Mark GM 024 one tunnel diameter back from face
- 5mm
![Page 78: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/78.jpg)
Predicted surface settlement 6mm
Actual range 5mm to 14mm
In tunnel crown settlement max. 1mm
In tunnel convergence max, 3.5mm (at dyke)
Excavation rate 5m/week
7 days 24hrs/day construction
![Page 79: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/79.jpg)
![Page 80: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/80.jpg)
Spray-on Waterproofing Membrane
![Page 81: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/81.jpg)
![Page 82: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/82.jpg)
![Page 83: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/83.jpg)
![Page 84: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/84.jpg)
![Page 85: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/85.jpg)
Near Completed Tunnel
with Track Slab
![Page 86: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/86.jpg)
![Page 87: North Strathfield Rail Underpass Shallow Cover Driven Tunnel · North Strathfield Rail Underpass Shallow Cover Driven Tunnel Ted Nye Tunnel Practice Leader Sydney, Australia edward.nye@mottmac.com.au](https://reader033.fdocuments.net/reader033/viewer/2022041717/5e4c7be1bc1efe04047b08e2/html5/thumbnails/87.jpg)