North Second Street Multimodal Project Design OCTOBER 2017

Transcript of North Second Street Multimodal Project Design · PennDOT Technical Assistance State Multimodal Fund...

  • North Second Street Multimodal Project Design

    OCTOBER 2017

  • Agenda Project Description Master Agreement Task Orders

    Comprehensive Multimodal Network Evaluation

    Grant Writing & Support Services

    NACTO Early Action

    Division Street Bridge Study

    4th & Maclay Intersection Improvements

    7th Street – Herr Street to Reily Street

    Future Design Tasks

  • Project Description

    Goal 1: Convert N. Second Street to two-way operation Comprehensive traffic study required by PennDOT

    Off Second Street Improvements

    Second Street Improvements

    Goal 2: Advance Division Street Bridge concept Develop feasible concepts & cost estimates

    HATS Tip

    Goal 3: Multimodal improvements – Uptown & Midtown Goal 4: Incorporate Green Stormwater Infrastructure (GSI)

  • Project Timeline

    Short-Range Tactical Interim Improvements

    Workshops & Outreach, Identify Priorities &Develop Concepts

    Implement Phase 1Low-Cost Solutions,Tactical Urbanism

    Continue with Low-Cost Solutions

    StudyLong-Range Improvements, Build Vision

    Begin Regional Traffic & Division Street Bridge Studies

    Complete Study,ID Infrastructure Needs,ID Funding Needs,Obtain Grants,Begin Design

    Complete Design, Begin Phase 1 Construction

    Begin Phase 2Design,Complete Phase 1 Construction

    2017 2018 2019 2020

    Phased Implementation PlanAdvance short-term improvements to build momentum while completing

    studies and design for longer term improvements

    Short-Range

    Tactical Interim Improvements

    Workshops & Outreach,

    Identify Priorities &

    Develop Concepts

    Implement Phase 1

    Low-Cost Solutions,

    Tactical Urbanism

    Continue with

    Low-Cost

    Solutions

    Study

    Long-Range Improvements, Build Vision

    Begin Regional Traffic & Division Street Bridge Studies

    Complete Study,

    ID Infrastructure Needs,

    ID Funding Needs,

    Obtain Grants,

    Begin Design

    Complete Design, Begin Phase 1 Construction

    Begin Phase 2

    Design,

    Complete Phase 1 Construction

    2017201820192020

    Phased Implementation Plan

    Advance short-term improvements to build momentum while completing studies and design for longer term improvements

    1

  • Master Agreement Master agreement with Task Order assignments

    5-year term $1.5M upset limit

    Task Order (TO) Assignments TO’s issued to coincide with approved FY budgets FY17-18 TO’s

    Comprehensive Multimodal Network Study (~$250k) Grant Writing & Support (~$50k) NACTO Early Action (~$75k) Division Street Bridge Study (~$125k) 7th Street: Herr to Reily (~$300k)

  • Agreement Team

  • TO1: Multimodal Network Study

  • TO2: Grant Writing & Support Identify funding opportunities

    Transportation Alternatives Set-Aside, TAP Transportation Enhancements Regional Connections Grants PennDOT Technical Assistance State Multimodal Fund Grant (PennDOT & DCED) Green-Light Go, ARLE, SPR Funding NACTO Other State/Federal/Private sources

    Assist with research & grant writing Develop supporting materials (e.g. cost estimates, schedules, etc.)

  • TO3: NACTO Early Action Public Workshops for NACTO/GSI Determine spot locations for low cost multi-modal improvements North 6th Street Improvements Potential Division Street Bike lanes prior to full multimodal

    improvements

  • TO4: Division Street Bridge Study Feasibility Study for a

    new bridge Extends Division Street

    from 7th to Industrial Road

  • TO4: Division Street Bridge Study

  • TO5: 4th Street at Maclay Street Intersection improvements

    ADA compliant pedestrian ramps

    Traffic signal improvements

    Signing & marking improvements

  • TO6: 7th Street – Herr St to Reily St Roadway Improvements between Reily Street and Herr Street

    Improved Multimodal Accommodations at the PHEAA Building

    Potential Roundabout at 7th & Reily

    Opportunity for large areas of Green Stormwater Infrastructure

  • Future Task: Forster St. Signal Retiming

    Funded by Green-Light Go grant (~$495k) City waiting on executed grant agreement Update Coordination Plan dating from 1963 8 Signals

    6 on Forster Street

    1 on 6th Street

    1 on 7th Street

  • Future Task : Division St. Multimodal Road diet to reduce traffic speeds and provide multimodal

    infrastructure Potential for GSI within median or on outside shoulders Potential to reconfigure 3rd and 4th Street Intersections Reconfigure Division St and Front St Intersection

  • Future Task: 7th Street Multimodal Multimodal improvements between Maclay & Division Streets Green Stormwater Infrastructure improvements

  • Future Task: 2nd Street Two-Way Convert North 2nd Street to two-way operation Remove up to 5 traffic signals Potential for two roundabouts Green stormwater infrastructure Multimodal enhancements

    Bumpouts

    Curb ramps & crosswalks

    Transit improvements

    Signal improvements

    North Second Street Multimodal Project DesignAgendaProject DescriptionProject TimelineMaster AgreementAgreement TeamTO1: Multimodal Network StudyTO2: Grant Writing & SupportTO3: NACTO Early ActionTO4: Division Street Bridge StudyTO4: Division Street Bridge StudyTO5: 4th Street at Maclay StreetTO6: 7th Street – Herr St to Reily StFuture Task: Forster St. Signal RetimingFuture Task : Division St. MultimodalFuture Task: 7th Street MultimodalFuture Task: 2nd Street Two-Way