National Economic and Development Authority 28 March 2011 1
NORTH LUZON IRRIGATION PROJECT:
Philippine Country Report
Capacity Building Programme on the Economics of Climate Change AdaptationSupporting National/Sub-National Adaptation Planning and Action
2nd Regional Training WorkshopThe Grand Milleninum Sukhumvit Hotel, Bangkok, Thailand30 September – 4 October 2013
![Page 2: NORTH LUZON IRRIGATION PROJECT: Philippine Country Report](https://reader035.fdocuments.net/reader035/viewer/2022070410/568145db550346895db2ddf2/html5/thumbnails/2.jpg)
National Economic and Development Authority 28 March 2011 2
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 2
The NLIP generally intends to reduce the adverse effect of climate change and support enhanced water management in rural areas through the construction of water impounding facilities.
Specific objectives:
• Provide sustainable development in the rural areas by improving agricultural productivity;
• Increase agricultural production through the provision and improvement of irrigation and drainage infrastructure in the project area; and
• Increase farmers’ income.
Project Profile
![Page 3: NORTH LUZON IRRIGATION PROJECT: Philippine Country Report](https://reader035.fdocuments.net/reader035/viewer/2022070410/568145db550346895db2ddf2/html5/thumbnails/3.jpg)
National Economic and Development Authority 28 March 2011 3
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 3
Project Profile
Location: Isabela Province, Cagayan
Valley Beneficiaries: 685 to 933 families in five (5) barangays
Implementing Agency: National Government
Implementation Period: Four (4) Years
Project Cost: US$ 9.53 Million
![Page 4: NORTH LUZON IRRIGATION PROJECT: Philippine Country Report](https://reader035.fdocuments.net/reader035/viewer/2022070410/568145db550346895db2ddf2/html5/thumbnails/4.jpg)
National Economic and Development Authority 28 March 2011 4
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 3
Project Profile
Involves 4-year construction of:
•34-meter high earth-filled dam across the Pasa river
•Reservoir with an active storage of 4.28 mcm
•5.93 km main canal
•16.20 km lateral canals
Irrigates 980 has
![Page 5: NORTH LUZON IRRIGATION PROJECT: Philippine Country Report](https://reader035.fdocuments.net/reader035/viewer/2022070410/568145db550346895db2ddf2/html5/thumbnails/5.jpg)
National Economic and Development Authority 28 March 2011 5
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 4
Project Components
![Page 6: NORTH LUZON IRRIGATION PROJECT: Philippine Country Report](https://reader035.fdocuments.net/reader035/viewer/2022070410/568145db550346895db2ddf2/html5/thumbnails/6.jpg)
National Economic and Development Authority 28 March 2011 62nd Regional Training on ECCA 01 October 2013 5
Costs and Benefits
Environmental Costs
![Page 7: NORTH LUZON IRRIGATION PROJECT: Philippine Country Report](https://reader035.fdocuments.net/reader035/viewer/2022070410/568145db550346895db2ddf2/html5/thumbnails/7.jpg)
National Economic and Development Authority 28 March 2011 7
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 6
Thank you!
Salamat!