www.IH45northandmore.com NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017

Transcript of NORTH HOUSTON HIGHWAY IMPROVEMENT … HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview...

www.IH45northandmore.com

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)Project Overview Briefing Packet

March 2017

www.IH45northandmore.com

PROJECT OVERVIEW

Environmental Impact Statement (EIS)

Project divided into 3 Segments

– Segment 1: Beltway 8 to I-610 (9 mi)

– Segment 2: I-610 to I-10 (3 mi)

– Segment 3: Downtown Loop System (12.3 mi)

Goal: provide a safer facility with additional capacity for projected demand by incorporating transit opportunities, travel demand strategies, and flexible operations

One “Proposed Recommended Alternative” per segment = single corridor end to end (24 mi total)

2

10

69

10

45

45

610

45

69

610

69 59

59

www.IH45northandmore.com

NEED AND PURPOSE FOR PROPOSED PROJECT

Need for Proposed Project – Population and employment increases– Manage projected traffic growth– Bring to current design and safety standards– Move traffic efficiently, including evacuation events

Purpose of Proposed Project – Manage congestion– Enhance safety– Provide expanded transit and carpool opportunities

with 2-way, 24/7 operations– Improve mobility and operational efficiency

Houston Region has 6 of the Top 10 Most Congested Roadways in Texas; NHHIP project has 3 of the Top 10

3

6

21

1134

10

153

Top 100 Congested Roadway Segments

10

69

10

45

45

610

45

69

610

69 59

59

12

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 1: PROPOSED RECOMMENDED ALTERNATIVE

Segment 1 Features– New Capacity

• Add four (4) MaX lanes (HOV+Express)(2-way, 24/7 operations)

• Add one (1) frontage road lane in each direction

• Add full-width shoulders• Add bike/pedestrian features along

frontage roads

– Right-of-Way• North of Airline Dr – widen to the west• South of Airline Dr – widen to the east

4

10

69

10

45

45

610

45

69

610

69 59

59

10

69

10

45

45

610

45

69

610

69 59

59

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 1: EXISTING CONDITIONS

5

Reversible HOV/HOT

Lane

SOUTH SB Frontage Rd(2 Lanes)

NB Frontage Rd(2 lanes)

4 Lanes

NORTH

4 Lanes

NB Frontage Rd(3rd lane for intersection)

SB Frontage Rd(Ramp weave lane)

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 1: PROPOSED RECOMMENDED ALTERNATIVE

6PRELIMINARY-SUBJECT TO CHANGE

MaXLanes

MaXLanes

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 2: PROPOSED RECOMMENDED ALTERNATIVE

Segment 2 Features– New Capacity (same as Segment 1)

• Add four (4) MaX lanes (HOV+Express)(2-way, 24/7 operations)

• Add one (1) frontage road lane in each direction• Add full-width shoulders• Add bike/pedestrian features along frontage roads

– Constrained Existing Right-of-Way• Hollywood Cemetery• Germantown Historic District• Woodland Park

7

10

69

10

45

45

610

45

69

610

69 59

59

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 2: EXISTING CONDITIONS NEAR N. MAIN ST.

8PRELIMINARY-SUBJECT TO CHANGE

Houston Ave

SOUTH NORTH

Entrance ramp from

Houston Ave to SB I-45

Seg

men

t 2

Hollywood Cemetery

Germantown Historic District

Potential Open Space (Private Funding and

Development)

LOOKING NORTH

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

MaX Lanes

SEGMENT 2: PROPOSED OPEN SPACE NEAR N. MAIN ST.

9PRELIMINARY-SUBJECT TO CHANGE

Houston Ave

SOUTH NORTH

Entrance ramp from

Houston Ave to SB I-45

Seg

men

t 2

Hollywood Cemetery

Germantown Historic District

Potential Open Space (Private Funding and

Development)

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 2: EXISTING CONDITIONS NEAR PATTON ST.

10PRELIMINARY-SUBJECT TO CHANGE

Houston Ave

SOUTH NORTH

Entrance ramp from

Houston Ave to SB I-45

Seg

men

t 2

Hollywood Cemetery

Germantown Historic District

Potential Open Space (Private Funding and

Development)

LOOKING SOUTH (TOWARD DOWNTOWN)

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 2: PROPOSED OPEN SPACE NEAR N. MAIN ST.

11PRELIMINARY-SUBJECT TO CHANGE

SOUTH

NORTH

Seg

men

t 2

MaX Lanes

Potential Open Space (Private Funding and

Development)

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

12

“UNTANGLING THE DOWNTOWN FREEWAY SYSTEM”

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

SEGMENT 3: PROPOSED RECOMMENDED ALTERNATIVE

13PRELIMINARY-SUBJECT TO CHANGE

Potential Open Space(Lamar to Commerce)

(Private Funding and Development)

Realign I-10 & add new Express

Lanes (pass-thru)

Pierce Elevated no longer needed

Realign I-69 & depress from Commerce to

Spur 527

Downtown Connectors

replace Pierce Elevated

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

14

DOWNTOWN RENDERINGS

Existing vs. Proposed

West Side

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

EXISTING CONDITIONS

15

Allen Parkway

Jefferson

Pease

Walker

McKinney

Houston Ave

Sabine

Pierce Elevated

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

PROPOSED RECOMMENDED ALTERNATIVE

16PRELIMINARY-SUBJECT TO CHANGE

Allen Parkway

Jefferson

Pease

Walker

McKinney

Sabine

Downtown Connector

Seg

men

t 3

Houston Ave

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

17

DOWNTOWN RENDERINGS

Existing vs. Proposed

North Side

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

18

EXISTING CONDITIONS

Milam

TravisSmithLouisiana

EAST

WEST

SOUTH

Main

NORTH

HOV/HOT Lanes

Seg

men

t 3

Express Lanes

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

PROPOSED RECOMMENDED ALTERNATIVE

19PRELIMINARY-SUBJECT TO CHANGE

Downtown Connector

Milam

TravisSmithLouisiana

EAST

WEST

Express Lanes

SOUTH

NORTH

MaX Lanes

Main

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

20

DOWNTOWN RENDERINGS

Existing vs. Proposed

East Side

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

EXISTING CONDITIONS

21

GRB

Minute Maid

LeelandPease

Lamar

NORTHSOUTH

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

PROPOSED RECOMMENDED ALTERNATIVE

22PRELIMINARY-SUBJECT TO CHANGE

GRB

Minute Maid Park

SOUTH

NORTH

Leeland

Pease

Lamar

NORTH

SOUTH

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

POTENTIAL GREEN SPACE BEHIND THE GRB

23

NOTE: Green space option is conceptual only and would require separate development and funding.

PRELIMINARY-SUBJECT TO CHANGE

GRB OPERATIONS AREA

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

POTENTIAL GREEN SPACE BEHIND THE GRB

24

NOTE: Green space option is conceptual only and would require separate development and funding.

PRELIMINARY-SUBJECT TO CHANGE

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

POTENTIAL GREEN SPACE BEHIND THE GRB

25

NOTE: Green space option is conceptual only and would require separate development and funding.

PRELIMINARY-SUBJECT TO CHANGE

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

POTENTIAL GREEN SPACE BEHIND THE GRB

26

NOTE: Green space option is conceptual only and would require separate development and funding.

PRELIMINARY-SUBJECT TO CHANGE

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

GREEN SPACE EXAMPLE: KLYDE WARREN PARK – DALLAS

27

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

Minute Maid Park

Minute Maid Park

US 59 Elevated Section (current)Existing

Artist’s Rendering

Looking North from Capital Street

PROPOSED IMPROVEMENTS BEHIND THE GRB

28PRELIMINARY-SUBJECT TO CHANGE

Seg

men

t 3

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

29

“UNTANGLING THE DOWNTOWN FREEWAY SYSTEM”

TRANFORMATIONAL BENEFITS

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

BENEFITS OF THE PROPOSED PROJECT

30

• +20 mph = 55 mph free flow speed* (Year 2040 AM Peak)

• 50% reduction in delay during peak hour around downtown*

• Region-wide reduction in delay and increase to average speeds**Potential major air quality improvement for the region – positive overall impacts

PRELIMINARY-SUBJECT TO CHANGE

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

BENEFITS OF THE PROPOSED PROJECT

31

2040 Model Speed VHT DifferenceBuild vs. No-Build

PRELIMINARY-SUBJECT TO CHANGE

Downtown System

Over $200 million per year in user delay cost savings alone

• +20 mph = 55 mph free flow speed* (Year 2040 AM Peak)

• 50% reduction in delay during peak hour around downtown*

• Region-wide reduction in delay and increase to average speeds**Potential major air quality improvement for the region – positive overall impacts

www.IH45northandmore.com

Segment 1 Segment 2 Segment 3

BENEFITS OF THE PROPOSED PROJECT

32

2040 Model Speed Percent DifferenceBuild vs. No-Build

PRELIMINARY-SUBJECT TO CHANGE

• +20 mph = 55 mph free flow speed* (Year 2040 AM Peak)

• 50% reduction in delay during peak hour around downtown

• Region-wide reduction in delay and increase to average speeds* *Potential major air quality improvement for the region – positive overall impacts

Green = positive increase in average speed

www.IH45northandmore.com

PROPOSED SCHEDULE

33

2015-2017DRAFT ENVIRONMENTAL

IMPACT STATEMENT (DEIS)

SPRING 2017PUBLIC HEARING

2017-2018FINAL ENVIRONMENTAL

IMPACT STATEMENT (FEIS)

2018RECORD OF DECISION

(ROD)

2018-2020DESIGN / RIGHT OF WAY

(ROW) ACQUISITION

2020BEGIN CONSTRUCTION

PHASE 1 – I-69 FROMMONTROSE TO SH 288

WE ARE HERE

www.IH45northandmore.com 34

SEGMENT 3: CONCEPTUAL CONSTRUCTION PHASING

PRELIMINARY-SUBJECT TO CHANGE

Note: Procurement methods anticipated to be combination of traditional and innovative delivery.

www.IH45northandmore.com

Contact Info

35

Pat Henry, PEAdvanced Project Development Engineer

TxDOT Houston [email protected]

713-802-5241

Darrin Willer, PE, F. SAMEProgram Manager / Vice President

[email protected]

713-306-3501