NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)Project Overview Briefing Packet
March 2017
www.IH45northandmore.com
PROJECT OVERVIEW
Environmental Impact Statement (EIS)
Project divided into 3 Segments
– Segment 1: Beltway 8 to I-610 (9 mi)
– Segment 2: I-610 to I-10 (3 mi)
– Segment 3: Downtown Loop System (12.3 mi)
Goal: provide a safer facility with additional capacity for projected demand by incorporating transit opportunities, travel demand strategies, and flexible operations
One “Proposed Recommended Alternative” per segment = single corridor end to end (24 mi total)
2
10
69
10
45
45
610
45
69
610
69 59
59
www.IH45northandmore.com
NEED AND PURPOSE FOR PROPOSED PROJECT
Need for Proposed Project – Population and employment increases– Manage projected traffic growth– Bring to current design and safety standards– Move traffic efficiently, including evacuation events
Purpose of Proposed Project – Manage congestion– Enhance safety– Provide expanded transit and carpool opportunities
with 2-way, 24/7 operations– Improve mobility and operational efficiency
Houston Region has 6 of the Top 10 Most Congested Roadways in Texas; NHHIP project has 3 of the Top 10
3
6
21
1134
10
153
Top 100 Congested Roadway Segments
10
69
10
45
45
610
45
69
610
69 59
59
12
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 1: PROPOSED RECOMMENDED ALTERNATIVE
Segment 1 Features– New Capacity
• Add four (4) MaX lanes (HOV+Express)(2-way, 24/7 operations)
• Add one (1) frontage road lane in each direction
• Add full-width shoulders• Add bike/pedestrian features along
frontage roads
– Right-of-Way• North of Airline Dr – widen to the west• South of Airline Dr – widen to the east
4
10
69
10
45
45
610
45
69
610
69 59
59
10
69
10
45
45
610
45
69
610
69 59
59
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 1: EXISTING CONDITIONS
5
Reversible HOV/HOT
Lane
SOUTH SB Frontage Rd(2 Lanes)
NB Frontage Rd(2 lanes)
4 Lanes
NORTH
4 Lanes
NB Frontage Rd(3rd lane for intersection)
SB Frontage Rd(Ramp weave lane)
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 1: PROPOSED RECOMMENDED ALTERNATIVE
6PRELIMINARY-SUBJECT TO CHANGE
MaXLanes
MaXLanes
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 2: PROPOSED RECOMMENDED ALTERNATIVE
Segment 2 Features– New Capacity (same as Segment 1)
• Add four (4) MaX lanes (HOV+Express)(2-way, 24/7 operations)
• Add one (1) frontage road lane in each direction• Add full-width shoulders• Add bike/pedestrian features along frontage roads
– Constrained Existing Right-of-Way• Hollywood Cemetery• Germantown Historic District• Woodland Park
7
10
69
10
45
45
610
45
69
610
69 59
59
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 2: EXISTING CONDITIONS NEAR N. MAIN ST.
8PRELIMINARY-SUBJECT TO CHANGE
Houston Ave
SOUTH NORTH
Entrance ramp from
Houston Ave to SB I-45
Seg
men
t 2
Hollywood Cemetery
Germantown Historic District
Potential Open Space (Private Funding and
Development)
LOOKING NORTH
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
MaX Lanes
SEGMENT 2: PROPOSED OPEN SPACE NEAR N. MAIN ST.
9PRELIMINARY-SUBJECT TO CHANGE
Houston Ave
SOUTH NORTH
Entrance ramp from
Houston Ave to SB I-45
Seg
men
t 2
Hollywood Cemetery
Germantown Historic District
Potential Open Space (Private Funding and
Development)
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 2: EXISTING CONDITIONS NEAR PATTON ST.
10PRELIMINARY-SUBJECT TO CHANGE
Houston Ave
SOUTH NORTH
Entrance ramp from
Houston Ave to SB I-45
Seg
men
t 2
Hollywood Cemetery
Germantown Historic District
Potential Open Space (Private Funding and
Development)
LOOKING SOUTH (TOWARD DOWNTOWN)
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 2: PROPOSED OPEN SPACE NEAR N. MAIN ST.
11PRELIMINARY-SUBJECT TO CHANGE
SOUTH
NORTH
Seg
men
t 2
MaX Lanes
Potential Open Space (Private Funding and
Development)
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
SEGMENT 3: PROPOSED RECOMMENDED ALTERNATIVE
13PRELIMINARY-SUBJECT TO CHANGE
Potential Open Space(Lamar to Commerce)
(Private Funding and Development)
Realign I-10 & add new Express
Lanes (pass-thru)
Pierce Elevated no longer needed
Realign I-69 & depress from Commerce to
Spur 527
Downtown Connectors
replace Pierce Elevated
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
14
DOWNTOWN RENDERINGS
Existing vs. Proposed
West Side
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
EXISTING CONDITIONS
15
Allen Parkway
Jefferson
Pease
Walker
McKinney
Houston Ave
Sabine
Pierce Elevated
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
PROPOSED RECOMMENDED ALTERNATIVE
16PRELIMINARY-SUBJECT TO CHANGE
Allen Parkway
Jefferson
Pease
Walker
McKinney
Sabine
Downtown Connector
Seg
men
t 3
Houston Ave
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
17
DOWNTOWN RENDERINGS
Existing vs. Proposed
North Side
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
18
EXISTING CONDITIONS
Milam
TravisSmithLouisiana
EAST
WEST
SOUTH
Main
NORTH
HOV/HOT Lanes
Seg
men
t 3
Express Lanes
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
PROPOSED RECOMMENDED ALTERNATIVE
19PRELIMINARY-SUBJECT TO CHANGE
Downtown Connector
Milam
TravisSmithLouisiana
EAST
WEST
Express Lanes
SOUTH
NORTH
MaX Lanes
Main
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
20
DOWNTOWN RENDERINGS
Existing vs. Proposed
East Side
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
EXISTING CONDITIONS
21
GRB
Minute Maid
LeelandPease
Lamar
NORTHSOUTH
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
PROPOSED RECOMMENDED ALTERNATIVE
22PRELIMINARY-SUBJECT TO CHANGE
GRB
Minute Maid Park
SOUTH
NORTH
Leeland
Pease
Lamar
NORTH
SOUTH
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
POTENTIAL GREEN SPACE BEHIND THE GRB
23
NOTE: Green space option is conceptual only and would require separate development and funding.
PRELIMINARY-SUBJECT TO CHANGE
GRB OPERATIONS AREA
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
POTENTIAL GREEN SPACE BEHIND THE GRB
24
NOTE: Green space option is conceptual only and would require separate development and funding.
PRELIMINARY-SUBJECT TO CHANGE
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
POTENTIAL GREEN SPACE BEHIND THE GRB
25
NOTE: Green space option is conceptual only and would require separate development and funding.
PRELIMINARY-SUBJECT TO CHANGE
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
POTENTIAL GREEN SPACE BEHIND THE GRB
26
NOTE: Green space option is conceptual only and would require separate development and funding.
PRELIMINARY-SUBJECT TO CHANGE
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
GREEN SPACE EXAMPLE: KLYDE WARREN PARK – DALLAS
27
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
Minute Maid Park
Minute Maid Park
US 59 Elevated Section (current)Existing
Artist’s Rendering
Looking North from Capital Street
PROPOSED IMPROVEMENTS BEHIND THE GRB
28PRELIMINARY-SUBJECT TO CHANGE
Seg
men
t 3
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
29
“UNTANGLING THE DOWNTOWN FREEWAY SYSTEM”
TRANFORMATIONAL BENEFITS
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
BENEFITS OF THE PROPOSED PROJECT
30
• +20 mph = 55 mph free flow speed* (Year 2040 AM Peak)
• 50% reduction in delay during peak hour around downtown*
• Region-wide reduction in delay and increase to average speeds**Potential major air quality improvement for the region – positive overall impacts
PRELIMINARY-SUBJECT TO CHANGE
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
BENEFITS OF THE PROPOSED PROJECT
31
2040 Model Speed VHT DifferenceBuild vs. No-Build
PRELIMINARY-SUBJECT TO CHANGE
Downtown System
Over $200 million per year in user delay cost savings alone
• +20 mph = 55 mph free flow speed* (Year 2040 AM Peak)
• 50% reduction in delay during peak hour around downtown*
• Region-wide reduction in delay and increase to average speeds**Potential major air quality improvement for the region – positive overall impacts
www.IH45northandmore.com
Segment 1 Segment 2 Segment 3
BENEFITS OF THE PROPOSED PROJECT
32
2040 Model Speed Percent DifferenceBuild vs. No-Build
PRELIMINARY-SUBJECT TO CHANGE
• +20 mph = 55 mph free flow speed* (Year 2040 AM Peak)
• 50% reduction in delay during peak hour around downtown
• Region-wide reduction in delay and increase to average speeds* *Potential major air quality improvement for the region – positive overall impacts
Green = positive increase in average speed
www.IH45northandmore.com
PROPOSED SCHEDULE
33
2015-2017DRAFT ENVIRONMENTAL
IMPACT STATEMENT (DEIS)
SPRING 2017PUBLIC HEARING
2017-2018FINAL ENVIRONMENTAL
IMPACT STATEMENT (FEIS)
2018RECORD OF DECISION
(ROD)
2018-2020DESIGN / RIGHT OF WAY
(ROW) ACQUISITION
2020BEGIN CONSTRUCTION
PHASE 1 – I-69 FROMMONTROSE TO SH 288
WE ARE HERE
www.IH45northandmore.com 34
SEGMENT 3: CONCEPTUAL CONSTRUCTION PHASING
PRELIMINARY-SUBJECT TO CHANGE
Note: Procurement methods anticipated to be combination of traditional and innovative delivery.
www.IH45northandmore.com
Contact Info
35
Pat Henry, PEAdvanced Project Development Engineer
TxDOT Houston [email protected]
713-802-5241
Darrin Willer, PE, F. SAMEProgram Manager / Vice President
713-306-3501