North Fork Floating Surface Collector: Summary of Design and First 6 Months of Operation PGE’s Clackamas River Hydro Project Nick Ackerman Portland General Electric Willamette Science Review, 2016 1

Transcript of North Fork Floating Surface Collector -...

Page 1: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

North Fork Floating Surface Collector:Summary of Design and First 6 Months of Operation

PGE’s Clackamas River Hydro Project

Nick Ackerman

Portland General Electric

Willamette Science Review, 2016 1

Page 2: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Overview:

2

o Siting and Designo Hydraulic Evaluationo Operational Experienceo Pilot Fish Guidance Efficiency Test Results

Page 3: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Siting & Design:

3

Migrant Collector

Spillway Exclusion NetTainterGates

FSC and Exclusion Nets

Powerhouse Intakes

Tertiary Screen

Page 4: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Siting & Design – North Fork Dam:

4

o 54 MWo Hydraulic Head of 138 feeto Reservoir is 2.8 miles long and 735 feet wide in forebayo Forebay typically fluctuates < + 2 ft.

Page 5: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Siting & Design - FSC:

5

o 1,000 cfs pumped flow

o 18 submersible Flygt pumps

o Entrance is 17.3 feet wide by 20.3 feet deep

o No on board fish sampling facility

o Exclusion nets

o Design/build cost = $42 million

Page 6: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Siting & Design - FSC:

6

Page 7: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Hydraulic Evaluation:

7

o NMFS design criteria meto Entrance flow = 967 cfso Capture velocity = 6.3 fpso No hot spots

Facing downstream through

secondary screens

Flow at entrance (3.1 fps)

Page 8: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Operational Experience:

8

Page 9: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

War on Debris:

9

Grizzly rack at FSC entrance

Page 10: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

War on Debris:

10

Screen cleaning systems

Page 11: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

War on Debris:

11

Cattle Guards

Page 12: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

War on Debris:

12

Page 13: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

War on Debris:

13

Juvenile sampling

facility

Page 14: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

War on Debris:

14

Page 15: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Pilot Guidance Test:

15

Released 55 Wild Chinook Smolts outside of forebay

(0.4km from FSC)

Released Nov. 2nd

Fish Guidance

Efficiency = 0.873

Pr FSC = 0.917

Prolonged heavy spill

beginning on day 16

may have affected

FGE.

Page 16: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Record Downstream Migrant Counts:

16

Downstream Migrant Counts from 1958 – 2015:

• September 2015: Record count of Chinook juveniles

(3x previous record)

• October 2015: Record count of coho juveniles

• November 2015: Record count of coho juveniles

(4x previous record)

• November 2015: Record count of lamprey

macrothalmia

• November 2015: Record count of steelhead

juveniles

Page 17: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Acknowledgements

Sean Flak –PGE Engineer (formerly)

Tim Keller – PGE Construction Manager

Peter Christensen – R2 Resource Consultants, Inc.

Countless PGE Staff and contractors involved with design,

construction, and operation

17

Page 18: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Questions?

18

Page 19: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

19

Page 20: North Fork Floating Surface Collector - pweb.crohms.orgpweb.crohms.org/tmt/documents/FPOM/2010/Willamette_Coordination... · Siting & Design: 3 Migrant Collector Spillway Exclusion

Operations:

20

Operation % of Time

Normal 85.4

Reduced Flow 2.0

Off 12.5