Norela Constantinescu, European Commission: Maghrenov kickoff, barcelona Day 1
-
Upload
maghrenov -
Category
Technology
-
view
330 -
download
0
description
Transcript of Norela Constantinescu, European Commission: Maghrenov kickoff, barcelona Day 1
Energy
Energy Technologies and Innovation Integrated Roadmap
Norela Constantinescu European Commission, DG Energy Maghrenov project 16 December 2013
Energy
• Looking at the whole energy system
• Bridging research and innovation with energy policy
• Making better use of existing and increased financial resources
• Keep options open
• Connect endogenous resources
• Adding value at the EU level
Research and innovation challenges to support EU energy system post 2020
Key principles
Energy
• Energy efficiency - end use consumption
• Solutions for a competitive & sustainable energy system
• Flexibility and security
• Continuity of electricity supply and rationalise demand for infrastructure
• Active consumer participation
• Portfolio of cost effective and sustainable energy solutions
• Interfaces with other sectors
• Fostering innovation in real environments
• Market uptake measures
• Smart cities and communities
Key development INTEGRATION
Research
Demonstration
Market
Energy
Implementation I
• Strengthening the link with energy policy
• Making better use of
existing financial resources
Finance
EU
Member States
Private
Energy
Implementing Actions
• Integrated Roadmap
• Action Plan
• Robust reporting system
• A new coordination structure under the SET plan SG on energy efficiency
• New competences: e.g. non-technological barriers
• External Dimension – international cooperation
Key conclusions
Energy
VISION
STRUCTURAL CHANGES to meet the Vision
CHALLENGES seeking for solutions to the required Changes
RESEARCH & INNOVATION ACTIONS as solutions for the Challenges
Integrated Roadmap Key Building Bloks Blocks
6
üüü
Energy
Structure
I. Energy Efficiency
II. Competitive, Efficient, Secure, Sustainable & Flexible Energy System
III. Cities, Communities & Market Uptake
IV. S
ynerg
ies, Roles &
Tasks of A
ctors
V. M
onitorin
g &
R
eview
7
Energy
Three dimensions of Integration: • Energy system dimension – Integrated European Energy System • Technology lifecycle and product/service supply chain development dimension –integration along innovation chain • European , regional, local dimension – level of actions
Energy
Technology Readiness Level (TRL)
9
Integration: innovation chain –lifecycle technology development –eg wind I
Not ready
Ready
Evidence: new (Dec 2013) UK support levels show this difference: GBP/MWh 2014/15 2015/16 2016/17 2017/18 2018/19
Onshore wind 95 95 95 90 90
Tidal stream 305 305 305 305 305
Energy
0
500
1000
1500
2000
2500
EU Global EU Global EU Global EU Global EU Global
2012 2015 2020 2030 2050
101278 134
399182
665
232
1215
272
1940
5,0
5,411
13
33
50
118
250
228
550
2012 and projected cumultative installed capacity (GW)
Offshore
Onshore
Size of market uptake Manufacturers • Diversification: products, services
and business portfolio
• Supply chain: owned/outsourced
components, materials
• Strategic alliances: contract agreements
Public
• Social acceptance
• Spatial planning
• Minimising environmental impacts 10
Integration: innovation chain –lifecycle technology development –eg wind II
Market Readiness Level
Energy
Manufacturer Model MW Technology Status GE Energy 4.1-113 4.1 LS-PMG Prototype installed in H1, 2012 Gamesa G136-4.5 4.5 MS-PMG Prototype installed in 2011 Sinovel SL5000 5.0 HS-DFIG Commercially available Goldwind/Vensys GW5000 5.0 LS-PMG Prototype installed in 2010 REpower 5M 5.0 HS-DFIG Commercially available XEMC-Darwind XD115 5.0 LS-PMG Commercially available Areva Multibrid M5000 5.0 MS-PMG Commercially available Sinovel SL6000 6.0 HS-SCIG Prototype installed in 2011 Goldwind/Vensys GW6000 6.0 LS-PMG Prototype expected for late 2012 United Power UP6000 6.0 HS-DFIG Prototype installed in Nov. 2011 Siemens SWT-6.0-154 6.0 LS-PMG Prototype installed in 2012 Alstom Wind Haliade 150 6.0 LS-PMG Prototype installed in 2012 REpower 6M 6.15 HS-DFIG Commercially available Enercon E126-7.5 7.5 LS-EMG Commercially available Vestas V164-8.0 8.0 MS-PMG Prototype expected for 2014
11
Integration: innovation chain –lifecycle technology development –eg wind III
• Design of turbines: 4 - 8 MW introduced by many manufacturers
• Larger turbines : 10 -12 MW in the drawing board
• Industry strategies to reduce costs: delocalisation, regional structures , subsidiaries
Manufacturing Readiness Level
Energy
National and international supply-chain players in offshore wind
12
Integration: innovation chain –lifecycle technology development –eg wind IV
Energy
Getting all the pieces together
Thank you for your attention