NORDIC GERMAN LAW SEMINAR 2019 2007 BILL OF LADING To be used with charter parties Conditions of...
Transcript of NORDIC GERMAN LAW SEMINAR 2019 2007 BILL OF LADING To be used with charter parties Conditions of...
NORDIC GERMAN LAW SEMINAR 2019
Programme
15:00 – 15:05: Welcome and introductions
15:05 – 15.35: ”The Prague Rules”, by Hans Bagner, Morssing & Nycander
15:35 – 16:00: ”Delay damages in offshore logistics”, by Rósing Rasmussen and Bo Sandroos, WSCO
16:00 – 16:30: Break, with coffee and snacks
16:30 – 16.55: ”Bills of Lading in the tramp trade ”, by Jesper Windahl, WSCO
16:55 – 17.30: ”Insurance, contracting and claims experience in offshore wind projects”, by John Croucher and Miles Wakefield, The Standard Club UK Ltd
17:30 – 18:30: Beverages and canapés
2
Presentation by Hans Bagner in Hamburg on 10 April 2019
TAKING OF EVIDENCE IN INTERNATIONAL ARBITRATIONAND
THE PRAGUE RULES OF DECEMBER 2018
Background
• International Arbitration• Competition between two or more national procedural rules• Arbitration – not litigation
IBA Rules
• 1999 IBA Rules on the Taking of Evidence in International Arbitration (IBA Rules)
• 2010 Revised version of IBA Rules • IBA Rules: compromise of the common law and the civil law different
systems and procedures on the taking of evidence. • IBA Rules successfully influenced the practice of international arbitration• Critique of the IBA Rules : dominance of the common law traditions • Creeping Americanisation of international arbitration e.g. use of written
witness statements, lengthy cross examination of witnesses, extensive document production.
• Time and cost efficiency - has it been achieved?
Prague Rules
• The result of discussions since April 2017; a working group presented the new Rules – adopted in December 2019 in Prague (www.praguerules.com)
• “Rules of the Efficient Conduct of Proceedings in International Arbitration”• Favoring the civil law tradition• An inquisitorial approach (rather than an adversarial ) – proactive role of the
AT• Reducing time and costs• AT and the parties shall in principle avoid production of documents including
e-discovery (Art 4.2)
Summary
• Prague Rules bridge gaps• Parties from civil law countries (Continental Europe, Latin America,
Middle East, Asia) would feel more comfortable• Attractive to Disputes comprising a limited amount• One size does not fit all
Delay Damagesin Offshore Logistics
Nordic German Law SeminarHamburg 10 April 2019
Rósing Rasmussen & Bo Sandroos WSCO law firm
Introduction – delay damages
• Two legal constructs– “Delay”; and – “Damages”
• The purpose is to provide insight into some of the legal disputes and potential pitfalls regarding “Delay”, in particular
– the Programme and the significance of critical paths;
– Programme float; and
– and to highlight practical issues causing delays in offshore logistics, and illustrate how typical issues may be resolved in the contract
9
Introduction - Danish offshore markets
• Offshore oil and natural gas– Exploration since 1962, production since 1972;– Operators include Total, Ineos, Hess;– Awards in 8th oil and gas round imminent;– Denmark has been self-sufficient in oil and gas since 1994 (2018:
98%)
• Offshore wind– Production since 1991;– Operators include Ørsted, Vattenfall, Eon;– Horns Rev III and Kriegers Flak offshore wind parks being developed;– Ca. 50% of electricity production in Denmark is from wind
10
Danish construction law on delay
• Freedom of contract– Delay;– Float;– Damages
• Case law– Danish ordinary courts;– Danish Arbitration Board for Building and Construction
(Voldgiftsnævnet for Bygge- og Anlægsvirksomhed) deciding on standard onshore contracts, including especially
• AB 92 and AB 18• ABT 93
24/04/2019 11
Danish construction law on delay (cont.)• A delay will have occurred where works are not completed by the
contractually agreed delivery date– Completion date for the entirety of works;– Completion dates for milestones
• Different contract, different terms– Delivery Date (NEWBUILDCON, SAJ);– Time for Completion (FIDIC);– Completion Date (NEC, LOGIC)
• Contractual delay mechanisms– Extension of time;– Requirements to give notice in connection with request for extension
of time;– Obligation to progress the works prior to completion date;– Recovery of time-related cost in certain circumstances and associated
notice provisions24/04/2019 12
Delay and causal link requirements
• Danish law: right for an extension of time if the occurrence actually causes the works to exceed
– a date for the completion of the works or – a milestone on a critical path
• Pursuant to FIDIC, the Contractor is entitled to an extension of Time for Completion if delay caused by e.g.
– a Variation; – a cause of delay giving an entitlement to an extension of time under a
Sub-Clause of the Contract; or – a delay, impediment or prevention attributable to the Employer
• If an occurrence does not fall on a critical path or does not in itself cause a delay: no right for an extension of time
13
Float – definition and challenge
• Float defines – the period between the finalization of the works and the agreed upon
delivery date during which no works are scheduled to be performed; and
– The period between individual activities scheduled under the Programme, e.g. on a critical path.
• a prolongation of the execution of the works on a critical path caused by the Employer may not in itself affect the Taking Over of the Works or the agreed milestones.
“if all float is being consumed by the Employer and the Contractor has an incident that causes an actual delay exceeding the date for completion, the question of what party is entitled to consume (or revoke) the float arises“
14
Float – legal issues• Float may belong to:
– the Employer– the Contractor; or– the Project as such
• Enrichment considerations– Contractor entitled to consume the float for delays that he himself has
caused first– Contractor will not be entitled to an extension of time if the Employer
causes a prolonging of the Works that may covered by unconsumed float
• The legal position is therefore (probably) that unconsumed float belongs not to the Parties, but the project
• Exceptions?
15
What can cause a delay in offshore logistics and construction?
• Working methodology changed, by the Employer• Weight, dimensions of item to be transported/installed not
as agreed• Employer supplied items, e.g. barge, not available to
Contractor on time• Unforeseen circumstances, requirements, requests• Foundations, monopiles, transition pieces not available to
installation Contractor• Weather downtime
16
Contract clauses to govern causes of delay, for illustration
Weather Downtime Weather Downtime shall mean any situation, other than a Force Majeure event, where theMarine Spread is prevented to perform the Work in a safe manner due to weather conditions,such as swells, currents, waves, visibility (both underwater and above water) and wind.
17
The Compensation and Execution Plan are subject to the condition that Contractor is allowed to work twenty-four (24) hours per day and seven (7) days per week. Contractor shall be entitled to a Variation Order in accordance with Clause 30 of the Conditions of Contract for any deviation to these working practices due to decision(s)/instructions of Employer or in accordance with any applicable law, state, regulation or otherwise from an authority having jurisdiction.
5.0 LIMITED DURATIONS The Execution Plan and Compensation are subject to the limited duration(s) for time spent or lost for various activities as further detailed in this Clause 5.0. If the subject durations exceed(s) the time indicated for the applicable activity, Contractor shall be entitled to a Variation Order in accordance with Clause 30 of the Conditions of Contract.
(i) Nil (0) hours for delay due to permits, certificates, approvals, authorisations, consents, licences, interfacecoordination, etc., which shall all be provided by Employer.
(ii) Nil (0) hours for delays and cost associated with the removal of any debris or other obstructions, not caused byContractor. Removal of any debris, not caused by Contractor, may be removed at the applicable day rates,however can only be executed if within the capability of the ROV.
[ (iii) – (xii) ]
Damages
• Starting points– Contractual regulation– Danish law conditions for damages/calculation– Mitigation – limitation of losses
• Often liquidated damages– Milestones– Catch-up?
• Indirect and consequential damages
• ”Global” liability (?)
• ”Disruption” (?)
18
Recommendations
• Establish and update Schedule(s)/Programme(s)
• Set out provisions for what constitutes delay
• Set out provisions for what entitles the contractor to a variation order
• Regulate ”float” between the parties
19
20
Break
Bills of Lading in the tramp trade
Nordic German law seminar 22
Bills of Lading in the tramp-trade - The Nordic perspective
Jesper Windahl, advokat, partner
”Tramp Trade” and Bills of lading – Nordic perspective
• What is ”Tramp trade” (”Trampfahrt”, ”trampfart”) ?– Carriage of goods by ships not operating according to a fixed
schedule. – Contracts of carriage generally entered into as voyage charter parties.
• Bills of lading issued in the tramp trade generally include an ”incorporation clause” the purpose of which is to make the C/P-terms applicable also between the issuer and the holder of the B/L:
CONGENBILL 2007 BILL OF LADING To be used with charter parties Conditions of Carriage
(1) All terms and conditions, liberties and exceptions of the Charter Party, dated as overleaf, including the Law and Arbitration Clause/Dispute Resolution Clause, are herewith incorporated.
• Tramp trade pursuant to a C/P is, with a few exceptions, not governed by any mandatory provisions under Scandinavian law.
• The Merchant Shipping Act (“MSA”) includes in chapter 14 non-mandatory rules on charter-parties.
Nordic German law seminar 23
• Contract for the sale of 10,000 MT tons of Soyabean-meal on FOB-Buenos Aires-terms.
• B/L issued by Shipowner: • ”Cargo received clean on board”;• ”C/P dated as overleaf is incorporated into this B/L”;• ”All Disputes to be decided by arbitration in London”• Cargo contaminated with rust-flakes, pieces of coal and plastic-waste when
unloaded in Aarhus, Denmark.
Nordic German law seminar 24
Shipownerm/v
”Annette”
Voyage-charterers”Grain-experts A/S”
BUYER
V/C Gencon 94-form
SELLER
B/L
Tramp trade and Bills of Lading – FOB-sales
Nordic German law seminar 25
Nordic German law seminar 26
Nordic German law seminar 27
• B/L issued by Shipowner:
• ”Cargo received clean on board”: B/L is evidence of the condition of the cargo whenshipped only, MSA § 299.
• ”C/P dated as overleaf is incorporated into this B/L”: B/L does not alter or override the conditons of carriage set out in the C/P
• ”All Disputes to be decided by arbitration in London”: Arbitration clause binding on charterers
Nordic German law seminar 28
Shipownerm/v
”Annette”
Voyage-charterers”Grain-experts A/S”
BUYER
V/C Gencon 94-form
SELLER
B/L
Tramp trade and Bills of Lading – FOB-sales
MSA § 325: ”If the carrier [Danish: bortfragteren] issues a bill of lading for goods on the ship, the bill of lading shall govern the conditions for the carriage of and delivery of the goods as between the carrier [bortfragteren] and a third party holder of the bill of lading. Provisions of the chartering agreement which are not included in the bill of lading cannot be invoked against a third party unless the bill of lading includes a reference to them” MSA § 253”[…] if a bill of lading has been issued under a charterparty, the provisions of this Chapter shall nevertheless apply to the bill of lading if it governs the legal relationship between the carrier and the holder of the bill of lading.”
Nordic German law seminar 29
Shipownerm/v
”Annette”
Voyage-charterers”Grain-experts A/S”
SELLERS
V/C Gencon 94-form
BUYERS
B/L
CIF-sale
B/L
Tramp trade and Bills of Lading – CIF-sales
• B/L issued by Shipowner: • ”Cargo received clean on board”: B/L is evidence of the condition of the
cargo when shipped, MSA § 299.• ”C/P dated as overleaf is incorporated into this B/L”: Liability decided
pursuant to the mandatory regulation of the MSA.
Nordic German law seminar 30
Shipownerm/v
”Annette”
Voyage-charterers”Grain-experts A/S”
SELLERS
V/C Gencon 94-form
BUYERS
B/L
CIF-sale
B/L
Tramp trade and Bills of Lading – CIF-sales
31
Shipownerm/v
”Annette”
Time-charterersBulk-masters Ltd.
V/C Gencon 94-form
Voyage-charterers”Grain-experts A/S”
BUYERSSellers
Baltime T/C
• ”Grain-experts A/S” bound by Voyage-charter with Bulk-masters Ltd.
• B/L incorporates C/P – which C/P is incorporated?
• MSA § 325: Mandatory provisions maygive voyage-charterers a right to claimagainst owners as a ”third party”.
• Recourse from shipowner agaist Bulk-masters Ltd. and from Bulk-masters Ltd. against Grain-experts A/S ?
Nordic German law seminar
Tramp trade and Bills of Lading – FOB-sales revisited
B/L
32
Shipownerm/v
”Annette”
Time-charterersBulk-masters Ltd.
V/C Gencon 94-form
Voyage-charterers”Grain-experts A/S”
BUYERSSellers
Baltime T/C
• MSA S. 311: ”Arbitration
”The parties may agree in writing thatdisputes shall be settled by arbitration. It shall be regarded as part of the arbitration agreement that arbitrationproceedings can be instituted at the discretion of the plaintiff in one of the States where a place as mentioned in […] is located and that the arbitrationtribunal shall apply the provisions of the present Chapter.”
Nordic German law seminar
Tramp trade and Bills of Lading – FOB-sales revisited –Dispute resolution
B/L
33
Shipownerm/v
”Annette”
Time-charterersBulk-masters Ltd.
V/C Gencon 94-form
Voyage-charterers”Grain-experts A/S”
BUYERSSellers
Baltime T/C
• MSA S. 295 Master’s Bill of Lading
• ”A bill of lading signed by the master of the ship carrying the goods shallbe deemed to have been signed on behalf of the carrier”
• ”Carrier” is defined as ”the person who enters into a contract with a sender for the carriage of general cargo by sea”
Nordic German law seminar
Tramp trade and Bills of Lading – FOB-sales revisited –Master’s B/L
B/L
B/L issued “on behalf of the master”
Bills of Lading in the tramp trade
Nordic German law seminar 34
Bills of Lading in the tramp-trade - The Nordic perspective
Jesper Windahl, advokat, partnerThank you
Insurance, contracting and claims in offshore wind projects
John Croucher, Head of Division, Offshore – Standard Club
Miles Wakefield, Adjusting Manager – Renewables, Natural Resources
10th April 2019
Insurance and Contracting overview
37
Contents
1 Offshore wind – current market outlook
2 Key stakeholders
3 Insurance overview and role of P&I
4 Offshore Windfarm Contracting
Offshore wind – current market outlook
39
Current market outlook
40
Current market outlook
Key stakeholders
stakeholders
42
Who is involved?
Diagram provided by Aon UK Ltd
Insurance overview and role of P&I
44
Key insurances involved
Hull and Machinery Construction All Risk(or PD policy)
Protection and Indemnity
45
Key insurances involved
Hull and Machinery Construction All Risk(or PD policy)
Protection and Indemnity
Construction All Risk
What is WELCAR 2001?Insurance policy wordingWellington Syndicate at Lloyd’s [since purchased by Catlin, then XL Catlin] -Construction All RisksReleased in 2001
46
Construction All Risk
• Widespread adoption by both the insurance market (underwriters) and the offshore industry
• Wording is intended to cover:
Section I Physical DamageSection II Third Party Liabilities (NB Watercraft Exclusion and P&I deemed Primary)All participants in the project – joint venturers, contractors, sub-contractors, yardsAll activities in the project, from cradle to grave (e.g. design, engineering, procurement, fabrication, transits, installation, hook up and commissioning)
47
Standard P&I Poolable cover
Rules cover– Crew– Pollution from the ship– Wreck removal of ship– Collision / dock damage– Cargo
Limits– $7.9 billion (approx) – $2bn in respect of passengers– $3bn in respect of passengers and crew– $1bn oil pollution
Poolable cover governed by the POOLING AGREEMENT
48
Mutual Cover for mutual risks
49
Pooling Agreement
(a) Eligibility of ship types
(c) Contracting
(b) Eligibility of operation
Access to Mutual cover governed by Pooling Agreement (PA)
Type of Activity – Specialist Operations
50
Rule 5.11 – Non Exhaustive Definition
“including but not limited to dredging, blasting, pile driving, well stimulation, cable or pipe laying, construction, installation or maintenance work….”
Windfarm Installation
51
Cover during Specialist OperationsPoolable (Standard P&I cover)– Injury, illness or death p.o.b. – Wreck removal of the ship– Oil pollution from ship
Non poolable (Extended P&I cover)‘other’ 3rd party liabilities (i) during the course of performing specialist operations(ii) as a consequence of the specialist nature of the operation
Excluded – Failure to perform or fitness for purpose or quality of
member’s work– Loss of or damage to the contract works (e.g wind
turbine)
52
Offshore Windfarm Contracting
Offshore Windfarm Contracting
Not to contract for liabilities that would not have arisen either:
– at law– Knock for Knock
54
Offshore Windfarm Contracting
55
Fédération Internationale Des Ingénieurs – Conseils (the International Federation of Consulting Engineers)
Choice of FIDIC contracts
Green Book “Short Form” - straight forward, quick or cheap project
Red Book - employer design (the construction contract)
Yellow Book - contractor design (design/ build contract)
Pink Book - (Multilateral Development Banks providing finance)
Silver Book - EPC/Turnkey project
Gold Book - design, build, operate project (long-term operation and maintenance commitment is required )
56
Choice of FIDIC contracts
Green Book “Short Form” - straight forward, quick or cheap project
Red Book - employer design (the construction contract)
Yellow Book - contractor design (design/ build contract)
Pink Book - (Multilateral Development Banks providing finance)
Silver Book - EPC/Turnkey project
Gold Book - design, build, operate project (long-term operation and maintenance commitment is required )
57
Contracting Issues - FIDIC
Definitions (Clause 1.1.2 FIDIC yellow)
“Employer” means the person named as employer in the Appendix to Tender and the legal successors in title to this person”
Any indemnities will not apply in respect of customers or clients or any affiliates, parent or subsidiary companies of the Employer
58
Contracting Issues - FIDIC
Personal Injury / death (Clause 17.1 (a) FIDIC yellow)
“The Contractor shall indemnify and hold harmless the Employer.…in respect of bodily injury, sickness, disease or death of any person whatsoever arising out of or in the course of…the Works.”
“The Employer shall indemnify and hold harmless the Contractor .…in respect of bodily injury, sickness, disease or death…which is attributable to any negligence, wilful act or breach”
Unbalanced Indemnity that exposes the contractor to non negligence based liabilities
59
Contracting Issues - FIDIC
Care of the Works (Clause 17.2 FIDIC yellow)
“The Contractor shall take full responsibility for care of the Works and Goods from the Commencement Date until Taking-Over Certificate…not caused by Employers Risks listed in sub-clause 7.3 [war, rebellion, riot etc]”
Onerous exposure, almost blanket assumption
During Transportation P&I cover can respond
During Installation Contractor must have access to CAR cover as excluded as contract work
60
Contracting Issues - FIDIC
Damage to other property (Clause 17.1(b) FIDIC yellow)
“The Contractor shall indemnify and hold harmless the Employer….in respect of damage to any property…(other than the works) to the extent such damage or
loss… arises out of or in the course of the ..execution of the work and… is attributable to any negligence”
Fault based liability for all property other than the work.
During Transportation P&I cover can respond.
Query extent of contract work exclusion particularly during maintenance
Onerous exposure in respect of high value existing property.
61
Contracting Issues - FIDIC
Removal of wreck (Clause 11.11 FIDIC yellow)
“The Contractor shall remove any…surplus material, wreckage, rubbish and temporary works from the site….if all these items have not been removed within 28 days…employer may sell or otherwise dispose of any remaining items”
Intended as obligation to leave a clean site after completion of work, not to allocate liability following a casualty
Cover can respond to removal of wreck of the ship, but not debris per se that arises as a consequence of performing the work
Consider effect of company step in rights. 28 day target?
62
Contracting Issues - FIDIC
Pollution (Clause 4.18 FIDIC yellow)
“The Contractor shall take all reasonable steps to protect the environment (both on and offsite)”
Creates huge litigation risks compared to sources based allocations, for example under Supplytime 2017 wording:
63
Contracting Issues - FIDIC
Pollution (Clause 15 ST2017)
Owners shall be liable for, and agree to indemnify….the Charterers against allclaims….and liabilities whatsoever arising out of actual or threatened pollution…from the Vessel, except as may emanate from cargo thereon even if such claims…are caused wholly or partially by the act, neglect, breach of duty (whether statutory orotherwise) or default of the Charterers’ Group.
Charterers shall be liable for and agree to indemnify…the Owners from all claims….andliabilities…whatsoever arising out of or resulting from any other actual or threatenedpollution damage, even if such claims….are caused wholly or partially by the act,neglect, breach of duty (whether statutory or otherwise) or default of the Owners’ Group,and even if such loss, damage or liability is caused wholly or partially by theunseaworthiness of the Vessel.64
Contracting Issues - FIDIC
Consequential loss (Clause 17.6 FIDIC yellow)
“ Neither party shall be liable to the other Party for loss of use of any works,loss of any contract, or for any indirect or consequential loss or damage whichmay be suffered by the other party….other than under sub clause 17.1[Indemnities]”
Arguably covers both Direct and Indirect consequential loss but severelylimits its effect by excluding those liabilities following from damage toproperty other than the work.
65
Contracting Issues - general
– How effective is knock for knock as an alternative?
– Parties are free to contract on any terms they consider appropriate
– However, some jurisdiction can, in some circumstances, void terms in contracts that unreasonably disadvantage one party, including knock-for-knock indemnities, e.g German Unfair Terms Act
– Key question is whether contract terms have been individually negotiated or whether contract is on a standard form
66
Contracting Issues
– If knock-for-knock indemnities have been individually negotiated they will generally be upheld
– In such circumstances, German Unfair Terms Act will not step-in to override them
– ‘individually negotiated’ what does this mean?
– Relevant term needs to have been discussed and the party seeking to rely on the indemnity needs to show that, during negotiations, it was prepared to consider alternative allocation of liability if necessary
67
Contracting Issues
– However, if contract is on a standard form (including e.g. unamended LOGIC, BIMCO suite) there is a risk that German Unfair Terms Act will seek to void knock-for-knock indemnities
– Void unless party seeking to rely on k-f-k indemnity can show that terms of standard form were negotiated or if can show that term is not unreasonably disadvantageous to other party
– Only in rare circumstances have German Courts held that unamended terms of a standard form contract were individually negotiated
68
Offshore Wind in Europe
Miles Wakefield, Adjusting Manager –Renewables, Natural ResourcesApril 2019
A quick anatomy lesson…
70
71
Currently 90% installed global capacity is offshore Northern Europe
72
Why Europe?
- Politics?
- Economics?
- Resources?
- Geology?
- Water depth?
73
European Offshore Wind 2018
In 2018 European offshore wind capacity grew by 18%.
15 new wind farms were brought online.
Bringing 2.6GW of new offshore capacity.
UK – 49% (1.3GW) & Germany – 36% (969 MW) led the way bringing 85% of that new capacity.
The average size of a new turbine grew 15% from 2017 to 2018 to 6.8MW.
Europe is now home to 105 offshore wind farms (and counting).
Europe has a total of 18.5GW capacity.
1.2GW generates enough electricity to power approx. 1,000,000 homes.
A brief history of time… and how things have changed!
74
Foundations
75
2009 – UK North Sea – 450 tonnes 2017 – German Baltic Sea – 1000 tonnes
WTGs
76
2008 Vestas V90 – 3MW
2018 Vestas 8MW
Vessels
77
Vessels
78
At the forefront of making the industry cost competitive
79
Rapid technological developmentWind turbine rotor diameter, year of commissioning
80 m90 m
120 m107 m
154 m164 m
220 m
Boeing 747, 76m
Turbines and rotor size
Sites
Vessel size
Cable capacity
Foundation design (e.g.monopiles)
Electrical
Transition fromsingle supply tomultiple global suppliers
2002 2005 2007 2011 2014 2016 2021 1
1. In Mar. 2018 GE unveiled a 12 MW turbine. Each Haliade-X unit, will be capable of powering 16,000 homes and producing 67 GW/h per year, based on wind conditions on a typical German North Sea site
Source: Ørsted Wind Power, August 2018
Multiple levers to drive down cost in offshore wind1 2 3
Scale Innovation Industrialisation
Levelised cost of electricity for different technologies
80
The rapid cost reductions in the industry, have made offshore wind power competitive relative toconventional power generation based on fossil fuelsEUR/MWh 2016 prices
2017
165€Offshore*
65€Offshore**
55€Onshore
66€Solar PV
113€Nuclear***
70€Natural gas
72€Coal
-60%2012
Source: Bloomberg New Energy Finance (BNEF) for CCGT and Coal plants for Northwest Europe, Danish Energy Agency and BNEF for Offshore WInd.For offshore wind: Including cost of transmission – Calculated as Levelised revenue (subsidy and market price) of electricity over 25yrs lifetime as a proxy for the levelised cost of society. 3,5% real discount rate used. *GenericOffshore Wind, Northwest Europe, FID 2012. In 2012 our goal was to reduce offshore wind costs to 100 Euro/MWh in 2020, ** Hornsea 2, UK, *** Hinkley Point, UK. Same approach as for Offshore Wind. Strike price of 92,5£/MWh in 2012 real prices. Lifetime of 60yrs, 91% capacity factor.
Source: Ørsted Wind Power, August 2018
81
However…
There remains one common cause of claims through the history of offshore wind projects…
Cables!
Cable Losses vs Everything Else 2002-2017
82
69%
22%
9%
Losses
Cables WTG Others
What’s next?
Floating Offshore Wind Turbines
84
Hywind2 – Scotland – Equinor (Statoil)
85
Windfloat1 – Portugal - Principle Power
86
FLOATGEN – France – Ideol
87
Kitakyushu Demonstrator– Japan – Consortium
88
89
What does this all mean?
− Projects are now further offshore and in deeper water.
− Demand for suitable vessels (greater lifting and jacking capabilities).
− New technologies / untested components.
− Less is more – WTGs greater generating capacity means fewer foundations
− Shorter programme times.
− Greater expectation for early generation (staggered commissioning and take over).
90
Conclusions
It is clear that the offshore wind industry Europe has gone through a period of development.
Through the developments in WTG technology and industrialisation it has allowed the industry to grow and become competitive in a market focused on LCOE (Levelized Cost of Energy).
Potentially offshore wind would have fallen by the way side in favour of cheaper and more reliable forms of energy generation.
What does this mean to the rest of the world?
The learnings that have been made in Europe will allow projects in the newer emerging markets, such as the USA and Asia, to be built of such as size, that would have been unimaginable when at the same point of development in Europe.
Questions?
The Standard Club Ltd is regulated by the Bermuda Monetary Authority and is the holdingcompany of The Standard Club UK Ltd, The Standard Club Ireland DAC (both managed byCharles Taylor & Co. Limited) and The Standard Club Asia Ltd (managed by Charles TaylorMutual Management (Asia) Pte. Limited).The Standard Club UK Ltd is registered in England, No.17864, at The Minster Building, 21Mincing Lane, London EC3R 7AG, authorised by the Prudential Regulation Authority FRN202805 and is regulated by the Financial Conduct Authority and the Prudential RegulationAuthority.The Standard Club Ireland DAC is registered in Ireland, No. 631911, at Fitzwilliam Hall,Fitzwilliam Place, Dublin 2; authorised and regulated by the Central Bank of Ireland.The Standard Club Asia Ltd is incorporated in Singapore, No.199703224R, at 140 Cecil Street,#15-00 PIL Building, Singapore 06954; authorised and regulated by the Monetary Authority ofSingapore. Charles Taylor Mutual Management (Asia) Pte. Limited, registered in Singapore No.199703244C. Registered office: 140 Cecil Street, #15-00 PIL Building, Singapore 069540.Charles Taylor & Co. Limited. Registered in England No. 02561548 is authorised and regulatedby the Financial Conduct Authority FRN 785106. Registered Address: The Minster Building, 21Mincing Lane, London EC3R 7AG
92
Regulatory status
@StandardPandIThe Standard P&I Club
www.standard-club.com
@ctaylorplcCharles Taylor plc
www.ctplc.com