No Slide Title · Mission: Guide our Clients to improve Overall Reliability and Lowering...
Transcript of No Slide Title · Mission: Guide our Clients to improve Overall Reliability and Lowering...
Reliability Engineer –What should be your role
By
IDCON INC.
September 2018
WWW.IDCON.COM©IDOCN INC for use by Maintrain
IDCON INC
2
Mission:
Guide our Clients to improve
Overall Reliability and Lowering
Manufacturing and Maintenance
Costs
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Areas of Expertise
Public Seminars
In Plants/ Mills/ Mines
Reliability & Maintenance
for the Process Industry
▪ Advice
▪ Leadership & Organization
▪ Reliability Assessments
▪ Planning & Scheduling
▪ Shutdowns / Turnarounds
▪ Preventive Maintenance
▪ Operator Essential Care
▪ Root Cause Problem Elimination
▪ Spare Parts Management
▪ Technical Database
3
WWW.IDCON.COM©IDOCN INC for use by Maintrain 4
IDCON INC – International Presence
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Recent Clients ExamplesWood, Building products
• Norbord, USA, Canada, Belgium, U.K.
• TAMKO ( 12 Plants)
• St. Gobain/ CertainTeed
• Georgia Pacific, OSB
• Weyerhaeuser
• Potlatch (ongoing)
• Huber Engineered Woods (Ongoing)
• Arauco (North Carolina)
Steel and metals
• Swedish Steel (SSAB), Sweden
• Reynolds Aluminum Foil, USA
• Nucor Steel
• ELG Utica Alloys (Ongoing)
Pharmaceutical
• Abbott, USA and Europe
• Jansen
• Bayer Crop Science
• Novo Nordisk (Ongoing)
• Genentech Roche 16 plants worldwide
Corporate
Mining• Kazakhmys, Kazakhstan ( 3 mines)
• US Silica, 12 plants/ mines, USA
• Arch Coal, 15 mines, USA
• Xstrata Copper, Canada
• Nyrstar, TN 3 mines
• Iluka, VA
• Yan Coal, NSW, Australia
• Sydvaranger, Norway
• African Minerals, Sierra Leone
• Eldorado Gold (Kisladag, Turkey)
• Goldcorp, Borden (Ongoing)
Food• Tyson Foods 30 of 300 plants
• Portales, NM, USA
• Glanbia Foods, USA
• Fonterra, NZ.
• ConAgra Foods, NC, USA
• Liguria Food, IA
• Foremost Farms corporate 5 plants
• Pepsi
• Rio Mare (Bolton Group)
• Ingredion North America 9 Plants (Ongoing)
• Rotella’s Bakery (Ongoing)
• Treetop (Ongoing)
Chemical• Akzo Nobel, TX, USA
• ICL Dead Sea Works, Israel (Ongoing)
• Kraton, USA, France(Ongoing)
• Scotts, OH, USA
• Agrium, Canada
• ICL, USA
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Recent Client ExamplesOther
• Harley Davidson
• Boeing
• University of Miami
• University of Michigan
• Engineered Plastics
• Tacoma Water (ongoing)
• Birmingham Airport
• Petstar, Mexico
Oil and gas
• Calcasieu, LA
• Tesoro Refinery, CA, USA
• Marathon Oil, UK
• Colonial Pipe Line
• Syncrude, Canada
• Union Gas, Canada
• Delek Refining
• Union Gas Canada
Power Plants
• Nuclear Training Commission, Sweden
• Xcel Energy, MO, USA
• Grand Bahamas Power
• Minnesota Power
• Capital Power USA, Canada (12 plants)
• Swedish Nuclear Commission
Pulp and Paper
• Domtar corporate 13 mills (ongoing)
• Mondi Academy Corporate (Ongoing)
• Billerudkorsnäs 5 mills (Ongoing)
• Resolute Forest products (Ongoing)
• CMPC Tissue, S.A (all mills) (Ongoing)
• Catalyst Paper (Ongoing)
• Oji Paper, New Zealand (Ongoing)
• Atlantic Packaging
• CMPC Laja, Santa Fe, Pacifico
• Stora Enso, Gent, NL
• Kapstone, NC
• Georgia Pacific
• SCG, Thailand
• Tembec, USA, Canada and France (10 Mills)
• RockTenn (10 mills)
• Clearwater Paper Company
• Thilmany, WI, USA
• International Paper, USA (All Mills)
• PanPac, New Zealand
• Weyerhaeuser USA 5 Mills
• Aditya Birla, 3 mills
• Mondi, Syktyvkar, Russia
WWW.IDCON.COM©IDOCN INC for use by Maintrain
MAINTENANCE
PLANNING AND
SCHEDULING
DO
REACT
REPAIR
RETURN
REPEAT
TECHNICAL
DATABASE &
STORES
PRIORITIES,
CONDITION
MONITORING
PRODUCTION
PLAN
MARKET
CONTINUOUS
IMPROVEMENT
RCPE
RECORD
Prevention
+
Reliability Work Process
7
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Equipment Reliability Moving from X to Y
8
Equ
ipm
ent R
elia
bili
ty
Time
X
Y
What Physically Needs Done To Existing Equipment To Go From X to Y?
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Equipment Reliability Moving from X to Y
9
1. Repair known existing problems with the equipment
• Reactive
or
• Through: Prioritize - plan – schedule – repair
Remember: A Valid repair can never be avoided
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Options to Deal with the Backlog
10
ExecuteSchedulePlanPrioritize
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Equipment Reliability Moving from X to Y
11
1. Repair known existing problems with the equipment
• Reactive
or
• Through: plan – schedule – repair (prioritize and work through backlog)
2. Also, need to find/ prevent unknown & future problems with equipment
• Find: Inspections (Condition Monitoring)
• Find/ Prevent: Root Cause Problem Elimination (RCPE)
• Prevent: Design
• Prevent: Install
• Prevent: Operate equipment correctly
• Prevent: Lubricate
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Inspect & Prevent
12
ExecuteSchedulePlanPrioritize
Prevent
Inspect
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Life Cycle Cost (LCC) – A Study from the Army
100%
50%
20%
5%
70%
85%
95%
80%
Decisions deciding future cost
Actual Cost
LCC
Phase
Design Project Assembly of Eq. Operation
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Maintainability
14
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Hydraulic motor shelf for belt tightening
15
Reference: Gemex belt tightening
Weir Minerals: Gällivare, Sweden
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Maintainability
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Prevention - Lubrication: Example Storage
17
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Prevention - Lubrication: Example Storage
18
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Poorly aligned Probably Well Aligned
Other Signs:
• Hot bearings
• Hot Couplings
• Vibrating Equipment
Installation - Alignment
WWW.IDCON.COM©IDOCN INC for use by Maintrain
A
Wear
Replace worn wheel unit $900.
6 hours down time
B
Replace worn wheel $270
2 hours down time
Installation Example
20
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Set up a PM (on the run inspections and of line inspections)
A 125 HP, AC Motor Running 24/7
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Example: Motor Inspection
On-The-Run
• Cleanliness (fins, plugged airflows, etc)
• Fan with strobe
• Temperatures with (IR Temperature - Max? 170F (75C)
• Vibration (feel or with Pen – Alarm 0.25 in/sec 6.35 mm/sec?)
• Hold down bolts
• Base
• Condition of Junction Box and wires
• Noise
Shutdown
• Winding test
CMS 100R
WWW.IDCON.COM©IDOCN INC for use by Maintrain
PM/ECCM Example Centrifugal Fan
CMS 142R Fan – Air Centrifugal
CMS129R Bearings
+ Temp. & vib. limit
CMS 137R Belt Drive
CMS 100R Motor AC
+ Amp. & Temp. & vib. limit
WWW.IDCON.COM©IDOCN INC for use by Maintrain
COMPONENT INSPECTION WHILE COMPONET OPERATES
Freq.* SHUTDOWN/ OFF-LINE INSPECTION Freq.*
Belt – Vbelt Drive
CMS 137R
General Condition, Noise and Vibration, sheave
condition, Belt position
1-4
weeks
No scheduled preventive maintenance (PM) tasks
necessary for shutdowns. All PM’s can be done while equipment is running.
Motor - AC
CMS 100R
Air intake, Detailed Cleaning, Water/ Humidity,
Temperature, Noise and vibration, Motor Base, Electrical, Greasing
Vibration analysis
Greasing of bearings (if not sealed)
1-4
weeks
2-3
weeks
For critical motors, it’s suggested to run a winding
test. A winding test can be done with a number of different tools, use the mill standard tool.
If there is a maintenance opportunity, do detailed
cleaning of unit, remove junction box cover and inspect connections. Follow required safety
procedures.
3-12
months
Bearing - Pillow Block
CMS 129R
Detailed Cleaning, Bolts, Noise, Vibration, &
Temperature, Seals, Set Screw and Lock Ring.
Comment: Horizontal vibration is sufficient when using a vibration pen.
1-4
weeks
Cleaning as needed
Fan - Centrifugal
CMS142R
Noise. Leaks. Vibration. Blades. Belts.
Bearings. Housing. Bolts. Base
3-8
weeks
No scheduled preventive maintenance (PM) tasks
necessary for shutdowns. All PM’s can be done while equipment is running.
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Example: Measure Chain Wear 1.5-3%
25
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Example Inspection
26
Inspection of
Carbon ring
Wear.
Reference IDCON CMS 124R
WWW.IDCON.COM©IDOCN INC for use by Maintrain 27
RCPE - Find Issues: Do You See a Problem?
WWW.IDCON.COM©IDOCN INC for use by Maintrain 28
WWW.IDCON.COM©IDOCN INC for use by Maintrain 29
WWW.IDCON.COM©IDOCN INC for use by Maintrain 30
Morning meeting: Motor tripped out causing production loss!
Maintenance Operations
Mechanical E / I
Electrical Instrumentation
WHO
Root Cause Problem Elimination – Typical?
WWW.IDCON.COM©IDOCN INC for use by Maintrain
Our Typical Thinking Process
31
With little
information…Then we look for more
information to support
our decision
We create an opinion
or a solution…
Opinion/
“The Solution”
We lock our thoughts
….because we told others our opinion
Defend your opinion!!!
WWW.IDCON.COM©IDOCN INC for use by Maintrain 32
What the THINKING PROCESS Should Look Like
More
Information
Possible
Causes
Possible
Solutions
Pick
Solutions
1. Collect Information
2. Develop & consider possible causes
3. Select most likely causes
4. Develop and consider possible solutions
5. Select solution
Most Likely
Causes
WWW.IDCON.COM©IDOCN INC for use by Maintrain 33
WWW.IDCON.COM©IDOCN INC for use by Maintrain
MAINTENANCE
PLANNING AND
SCHEDULING
DO
REACT
REPAIR
RETURN
REPEAT
TECHNICAL
DATABASE &
STORES
PRIORITIES,
CONDITION
MONITORING
PRODUCTION
PLAN
MARKET
CONTINUOUS
IMPROVEMENT
RCPE
RECORD
Prevention
+
Reliability Engineer - Focus
34
▪ Lubrication
▪ Design
▪ Installation
▪ Storage procedure
▪ Filtration
▪ Alignment, Balancing
▪ Operating Practices
▪ Fixed Time Maintenance
▪ Basic Inspection
▪ Predictive
▪ Investigation
▪ Corrective Actions
Questions
35