NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies...

17
NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab, Technical Division RF Technology and Development Group

Transcript of NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies...

Page 1: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 1

Linac Girder Studies and Plans

C. Boffo – E. Borissov – H. CarterFermilab, Technical Division

RF Technology and Development Group

Page 2: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 2

OUTLINE

Strongbacks for NLCTA First delivery (FXB001/2) Near future plans (FXB003-12)

NLC Girders development Stability Measurements Vibrations – HLS – Movers –

FEM/FEA

Schedule & Budget

Page 3: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 3

Strongbacks For FXB002/3

SLAC Style Fit up to 2 structures or 1 structure +

instrumentation Maintain the same beam line length as SLAC

strongbacks in NLCTA

61.34

59.25

Page 4: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 4

Strongbacks For FXB002/3

Mockup

Instrumentation from SLAC

Shipping supports

Page 5: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 5

Strongbacks ->NEXT STEP

Extend the strongback to accommodate 3 structures with the minimum impact on the NLCTA setup

Reduce the length of the drift pipes; add bellows to compensate for thermal deformations (3 mm)

~94”

FXB004

FXB005

FXB006

eyelet

Available space 89”

Page 6: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 6

NLC Girder Development

Stability measurementsVibration measurementsMotors and gearsHLSFEM / FEA Simulations

Page 7: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 7

Stability measurements (SM)

Study the effect of thermal cycles on the girder assembly. (started in 1998 C. Adolphsen)

GOALS

Investigate about the sensitivity of the girder + structures complex to thermal variations due to the water cooling and heat generation.

Page 8: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 8

SM Single station test

Page 9: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 9

SM Mockup in MP8

In the process to:• Calibrate and align the sensors.• Connect the water system.• Test the electronics and DAQ.

Mockup in MP8

Wire connection

Water connections

PLANS

Reproduce SLAC measurements and improve the setup by substituting:

• actual tubes -> dummy structures with disks with the same Inertia as C type• actual 4.5 m support -> 6 m long girder

Page 10: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 10

Long term plan:Upgrade this mockup by steps in order to create a real girder “NLC style” fully instrumented to perform all needed tests

SM Mockup in MP8

Page 11: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 11

Vibrations

Collaborate with SLAC (Seryi, Le Pimpec) to: • Perform vibration measurements on theGirder complex. • Determine effect on stability due to water cooling system on FNAL structures.• Transmission of vibrations to quadsHardware:

GeophonesDAQ system

Software:SLAC Labview applications

Page 12: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 12

Motors and movers

Build a complex of 2 cams system to:• Understand the limits of the application• Perform tests on hardware• Perform tests and familiarize with controlsActual quote:• 2 stepper motors $ 5000 x 2• 2 gear boxes $ 2500 x 2• control system $ 1000

$ 16,000

Page 13: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 13

Hydrostatic Level System

• Contacts with groups at FNAL and SLAC that use HLS to monitor ground motion in tunnels.

• Need to build know-how in adapting the devices to work on girders

COSTS:• Sensors (4) $ 2,500 / each• Software $10,000

$20,000

Page 14: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 14

SIMULATIONS

• Create solid model of structure on strong back using TD resources• Involve FNAL PPD group for finite element analysis• Perform thermal and mechanical stress analysis• Perform vibration modes analysis

• As soon as we converge on a design for Girders extend simulations on the full complex• Verify FEA results with experimental data where possible

PLANS

No work as been pursued in this direction yet. Need to generate a solid model first in order to begin the process.

STATUS

Page 15: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 15

ACTIVITIES AND BUDGET

FY03 Budget for girders and strongbacks $50K

Stability measurements $ 10K (5K)Movers $ 20KHLS $ 20KStrongbacks production $ 10K (2K)Simulations ?

Spent

Page 16: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 16

SCHEDULENLCTA STRONGBACKS:

• Build and deliver strongback for FXB003 01/03• Design and build strongback for FXB004/5/6 04/03• Build and deliver strongback for FXB007/8/9 07/03• Build and deliver strongback for FXB010/11/12 10/03

SLABILITY MEASUREMENTS:• Complete calibration and start routine measur. 01/03• Implement FXB dummy structures 04/03• Implement 6m long “static” girder 07/03

VIBRATION MEASUREMENTS:• Start measurements on dummy structures 01/03

MOVERS – HLS – SIMULATIONS:• Depending on FUNDING and TIME availability

Page 17: NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

NLC MAC Meeting 6-8 Nov. 2002

Linac Girder Studies and PlansC. BoffoSlide 17

SUMMARY

Work on girder development has begun at FNAL Just as everyone else we are experiencing funding limitations.Time and engineering resources are limited due to the involvement in other projects. Future work on NLCTA strongbacks for the 8 pack test will not require significant engineering resources.