![Page 1: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/1.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
The Church Street (CR 579) over the Lehigh Valley Main Line bridge project proposes the replacement or rehabilitation of the existing functionally obsolete bridge in an effort to improve substandard sight distance and inadequate deck geometry.
/ CR 579Church Street Bridge
36.71RoutesSection
Mileposts: DBNUM: NS9806
LOPATCONGLOPATCONGLOPATCONGLOPATCONGLOPATCONGLOPATCONGLOPATCONGLOPATCONGLOPATCONG
BETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEM
BLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURY
NS9806NS9806NS9806NS9806NS9806NS9806NS9806NS9806NS9806NJ173US22I-78
CO579
CO519
T
ALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIA UNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLAND
ALPHAALPHAALPHAALPHAALPHAALPHAALPHAALPHAALPHA
FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICH
Counties:Hunterdon
Municipalities:Bloomsbury Boro / Bethlehem Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$4.725Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$4.725(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.525DESSTP-NJ $.400ROWSTP-NJ $3.800CON
$.525 $.400 $3.800
Hunterdon Page 1 of 15
![Page 2: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/2.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
County Route 519, Milford-Warren Glen Road, is located in Holland Township. This 1.3 mile stretch of roadway consists of a long, steep grade and has been the location of several runaway truck and vehicle accidents. Possible improvements to this roadway including the addition of shoulders, a climbing lane in the uphill direction, and a runaway truck ramp in the downhill direction will be studied.
/ CR 519Milford-Warren Glen Road
18.29 - 23.43RoutesSection
Mileposts: DBNUM: NS9703
CO579
I-78
BLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYBLOOMSBURYFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN
GREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICHGREENWICH
ALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIA
NS9703NS9703NS9703NS9703NS9703NS9703NS9703NS9703NS9703
NJ173US22
CO519
HOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLANDHOLLAND
ALPHAALPHAALPHAALPHAALPHAALPHAALPHAALPHAALPHA
POHATCONGPOHATCONGPOHATCONGPOHATCONGPOHATCONGPOHATCONGPOHATCONGPOHATCONGPOHATCONG
BETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEM
Counties:Hunterdon
Municipalities:Holland Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Road Enhancement
$5.300Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$5.300(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.350DESSTP-NJ $.250ROWSTP-NJ $4.700CON
$.350 $.250 $4.700
Hunterdon Page 2 of 15
![Page 3: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/3.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
New Project Addition Revision 1 As of 8/20/2008
The purpose of this project is system preservation. The limits are Hunterdon County Rt. 523 from 1000 feet south of I-78 to 1400 feet north of Rockaway Road in the Township of Tewksbury, approx. MP 21 to MP 22. System preservation is being addressed by a Hot Mix Asphalt Overlay with repair and replacement of existing guide rail. This project is subject to SAFETEA-LU earmark, line #2915, $400,000;(ID# NJ217, available 20% per year).
/ CR 523Readington - Tewksbury Transportation Improvement District
21.0 - 22.0RoutesSection
Mileposts: DBNUM: 08342
CO523CO517
US22 CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
BRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURG
BEDMINSTERBEDMINSTERBEDMINSTERBEDMINSTERBEDMINSTERBEDMINSTERBEDMINSTERBEDMINSTERBEDMINSTER
READINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTON
TEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURY
083420834208342083420834208342083420834208342
Counties:Hunterdon
Municipalities:Tewksbury Twp.
Project Type:System Preservation
Sponsor:Hunterdon County
RCIS Category:Road Preservation
Est. Total Project Cost:(Million) Not Available
20122008 2009 20112010SOURCEPHASE$0.340(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
HPP 20 $.272 $.068ERC$.272 $.068
Hunterdon Page 3 of 15
![Page 4: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/4.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
Bridge #C-88 Reformatory Road over the Beaver Brook in Clinton Township was built in 1926 and is comprised of a simple span concrete encased rolled steel beam superstructure. The county proposes to replace the bridge with a modern structure having adequate deck geometry, sidewalks, shoulders, improved vertical alignment and safety features. This project will investigate rehabilitation and replacement alternatives for this deteriorated structure.
Reformatory Road Bridge (C-88) over Beaver BrookN/ARoutes
SectionMileposts: DBNUM: NS0010
LEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEM
NS0010NS0010NS0010NS0010NS0010NS0010NS0010NS0010NS0010
CO513
NJ173 I-78US22
CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN
HIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGE
LEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNION
TEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURYTEWKSBURY
Counties:Hunterdon
Municipalities:Clinton Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$1.500Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$1.500(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.200ROWSTP-NJ $1.300CON
$.200 $1.300
Hunterdon Page 4 of 15
![Page 5: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/5.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
The purpose of this project is the historic preservation of a National Register Resource through structural rehabilitation, strengthening and safety improvements. The existing bridge, constructed in 1900, is a single-span, pinned, steel Pratt through truss having an overall length of 140 feet. The bridge is structurally deficient, functionally obsolete, and is posted for a three-ton weight restriction due to low inventory ratings. A sensitive rehabilitation and safety improvement is required to preserve the structure in service and will result in a 15-ton load rating while maintaining the historic character and function of the bridge. The upper chord will be strengthened with cover plates, damaged lower chord members will be replaced in kind as will vertical and diagonal members. Truss bearings will also be replaced. The deck, stringer and floor beams will be replaced with modern steel having greater structural capacity while being of similar size and shape. Traffic safety will be addressed by the regrading of an existing blind southbound approach, and the addition of vehicular railing designed to protect the bridge and its ornamental lattice railing from impact.
Rockafellows Mill Road Bridge over South Branch of Raritan River (RQ-164)N/ARoutes
SectionMileposts: DBNUM: NS0105
CO514
NJ31
NJ12
US202
CO523HILLSBOROUGHHILLSBOROUGHHILLSBOROUGHHILLSBOROUGHHILLSBOROUGHHILLSBOROUGHHILLSBOROUGHHILLSBOROUGHHILLSBOROUGH
BRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURGBRANCHBURG
READINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTONREADINGTON
RARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITAN
NS0105NS0105NS0105NS0105NS0105NS0105NS0105NS0105NS0105
FLEMINGTONFLEMINGTONFLEMINGTONFLEMINGTONFLEMINGTONFLEMINGTONFLEMINGTONFLEMINGTONFLEMINGTON
Counties:Hunterdon
Municipalities:Readington Twp. / Raritan Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$1.175Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$1.175(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $1.175CON$1.175
Hunterdon Page 5 of 15
![Page 6: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/6.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
The Rosemont-Raven Rock Road bridge over the Lockatong Creek was built in 1878 to service the community of Delaware Township. The bridge is functionally obsolete and structurally deficient, placing this historic structure in critical condition due to low inventory ratings. The county will investigate rehabilitation alternatives for the structure.
Rosemont-Raven Rock Road Bridge over Lockatong CreekN/ARoutes
SectionMileposts: DBNUM: NS0209
US202WEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELL
DELAWAREDELAWAREDELAWAREDELAWAREDELAWAREDELAWAREDELAWAREDELAWAREDELAWARE
NS0209NS0209NS0209NS0209NS0209NS0209NS0209NS0209NS0209
CO519
CO523KINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOOD
STOCKTONSTOCKTONSTOCKTONSTOCKTONSTOCKTONSTOCKTONSTOCKTONSTOCKTONSTOCKTON
Counties:Hunterdon
Municipalities:Delaware Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$1.530Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$1.530(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.280DESSTP-NJ $1.250CON
$.280 $1.250
Hunterdon Page 6 of 15
![Page 7: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/7.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
This project includes the replacement of the existing functionally obsolete Hunterdon County Bridge E166, which carries County Route 602 over the Back Brook. The existing structure, which carries two 10-foot, 10-inch lanes, will be replaced with a new structure carrying two 12-foot lanes and two six-foot shoulders. The project will also improve an existing culvert located to the west of Bridge E166, which carries County Route 602 over an unnamed Tributary to the Back Brook. This culvert will be replaced with a precast or rigid frame structure. The roadway approach work will be essentially on the same geometric alignment as the existing structure, while better defining the intersection of Dutch Lane, which falls between the bridge and the culvert.
/ CR 602Wertsville Road Bridge (E-166) over Back Brook
1.05RoutesSection
Mileposts: DBNUM: NS9907
CO514
NJ179
US202
RARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITAN
NS9907NS9907NS9907NS9907NS9907NS9907NS9907NS9907NS9907
CO579
EAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELL
WEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELL
Counties:Hunterdon
Municipalities:East Amwell Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$3.225Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$3.225(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.125ROWSTP-NJ $3.100CON
$.125 $3.100
Hunterdon Page 7 of 15
![Page 8: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/8.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
This project includes the replacement of the existing functionally obsolete Hunterdon County Bridge E174, which carries County Route 602 over a Tributary to the Back Brook. The existing structure, which carries two 12-foot lanes, will be replaced with a new structure carrying two 12-foot lanes and two six-foot shoulders. The project will also improve the substandard horizontal alignment of the roadway approaches.
/ CR 602Wertsville Road Bridge (E-174) over Tributary of Back Brook
0.96RoutesSection
Mileposts: DBNUM: NS9906
CO514US202
NJ179
CO579
WEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELLWEST AMWELL
RARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITAN
EAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELLEAST AMWELL
NS9906NS9906NS9906NS9906NS9906NS9906NS9906NS9906NS9906
Counties:Hunterdon
Municipalities:East Amwell Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$3.600Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$3.600(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.200ROWSTP-NJ $3.400CON
$.200 $3.400
Hunterdon Page 8 of 15
![Page 9: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/9.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
White Bridge Road bridge (F-45) over Cakepulin Creek in Franklin Township is a functionally obsolete structure. The county proposes to replace the structure with a modern bridge having adequate deck geometry, sidewalks, shoulders, vertical alignment, aesthetic suitability to the surrounding area, and safety features.
White Bridge Road BridgeN/ARoutes
SectionMileposts: DBNUM: NS9805
NJ31CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
NS9805NS9805NS9805NS9805NS9805NS9805NS9805NS9805NS9805
CO579
CO519
ALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIA
CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN
KINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOODKINGWOOD
RARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITANRARITAN
UNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNION
HunterdonHunterdonHunterdonHunterdonHunterdonHunterdonHunterdonHunterdonHunterdon
Counties:Hunterdon
Municipalities:Franklin Twp.
Project Type:Local Aid
Sponsor:Hunterdon County
RCIS Category:Bridges
$2.050Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$2.050(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STP-NJ $.325DESSTP-NJ $.125ROWSTP-NJ $1.600CON
$.325 $.125 $1.600
Hunterdon Page 9 of 15
![Page 10: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/10.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
The Rt. 31 Integrated Land Use & Transportation Study is for the completion of the South Branch Parkway (SBP) and other elements of the "plan" as needed. The South Branch Parkway is the two-lane, at-grade roadway on the alignment of the proposed Flemington Bypass. An EIS is underway for the SBP. The $2.2000 of FY 2007 PE DEMO funds was not intended for the SBP. It is intended for one of the "breakouts", such as the Flemington Circle to Roundabout project, or the South Main St, Circle to Roundabout project.
The following special Federal appropriations were allocated to this project. TEA-21/Q92 $11,839,898 (balance available $7,139,374); FY 2004/Section 115/H17 $150,000 (balance available $8,882); FY06 SAFETEA-LU, HPP $2,000,000 (available 20% per year).
31Integrated Land Use & Transportation Plan
22.02 - 25.30RoutesSection
Mileposts: DBNUM: 403A
DBNUM 403A
F L E M I N G T O NR A R I T A N
CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523CO523
NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12NJ12
NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31
US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202US202
Counties:Hunterdon
Municipalities:Flemington Boro / Raritan Twp.
Project Type:System Expansion
Sponsor:NJDOT
RCIS Category:Road Expansion
$5.841Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$2.200(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
DEMO $2.200FA$2.200
Hunterdon Page 10 of 15
![Page 11: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/11.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
Revision 1 As of 12/4/2007
The existing deficient bridge (sufficiency rating 28.9) will be replaced with a new bridge on the existing alignment, including safety upgrades. The new structure will carry two 12-foot travel lanes, two 12-foot climbing lanes, and 10-foot shoulders. Additional roadway work will provide for intersection improvements, climbing lanes and sidewalks.
31Raritan Valley Line Bridge Replacement and Operational Improvements (8P)
37.40 - 39.40RoutesSection
Mileposts: DBNUM: 9102
G L E N G A R D N E R
H A M P T O N
NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31
ProjectProjectProjectProjectProjectProjectProjectProjectProject
Counties:Hunterdon
Municipalities:Glen Gardner Boro / Hampton Boro
Project Type:System Preservation
Sponsor:NJDOT
RCIS Category:Road Preservation
Est. Total Project Cost:(Million) Not Available
20122008 2009 20112010SOURCEPHASE$16.550(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STATE $5.010ROWSTATE $11.540CON
$5.010 $11.540
Hunterdon Page 11 of 15
![Page 12: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/12.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
THIS PAGE HAS BEEN REPLACED BY REVISION 1
The existing deficient bridge (sufficiency rating 28.9) will be replaced with a new bridge on the existing alignment, including safety upgrades. The new structure will carry two 12-foot travel lanes, two 12-foot climbing lanes, and 10-foot shoulders. Additional roadway work will provide for intersection improvements, climbing lanes and sidewalks.
31Raritan Valley Line Bridge Replacement and Operational Improvements (8P)
37.40 - 39.40RoutesSection
Mileposts: DBNUM: 9102
G L E N G A R D N E R
H A M P T O N
NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31NJ31
ProjectProjectProjectProjectProjectProjectProjectProjectProject
Counties:Hunterdon
Municipalities:Glen Gardner Boro / Hampton Boro
Project Type:System Preservation
Sponsor:NJDOT
RCIS Category:Road Preservation
Est. Total Project Cost:(Million) Not Available
20122008 2009 20112010SOURCEPHASE$27.050(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STATE $5.010ROWSTATE $22.040CON
$5.010 $22.040
Hunterdon Page 12 of 15
![Page 13: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/13.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
Revision 1 As of 6/3/2008
This project consists of milling and resurfacing I-78 in the eastbound and westbound directions from milepost 10.0 to 18.00. No changes will be made between the existing and the proposed cross section. All lane widths, shoulder widths and right of way widths will remain the same.
78East of Tunnel Road to East of Beaver Brook, Resurfacing
10.00 - 18.00RoutesSection
Mileposts: DBNUM: 05398
I-78US22
CO579
CO513
053980539805398053980539805398053980539805398
NJ173
ALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIA
CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN
HIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGE
UNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNION
LEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANON
BETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEM
Counties:Hunterdon
Municipalities:Various
Project Type:System Preservation
Sponsor:NJDOT
RCIS Category:Road Preservation
$20.244Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$18.000(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
I-MAINT $10.600 $7.400CON$10.600 $7.400
Hunterdon Page 13 of 15
![Page 14: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/14.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
THIS PAGE HAS BEEN REPLACED BY REVISION 1
This project consists of milling and resurfacing I-78 in the eastbound and westbound directions from milepost 10.0 to 18.00. No changes will be made between the existing and the proposed cross section. All lane widths, shoulder widths and right of way widths will remain the same.
78East of Tunnel Road to East of Beaver Brook, Resurfacing
10.00 - 18.00RoutesSection
Mileposts: DBNUM: 05398
I-78US22
CO579
CO513
053980539805398053980539805398053980539805398
NJ173
ALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIA
CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN
HIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGE
UNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNION
LEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANONLEBANON
BETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEM
Counties:Hunterdon
Municipalities:Various
Project Type:System Preservation
Sponsor:NJDOT
RCIS Category:Road Preservation
$20.244Est. Total Project Cost:(Million)
20122008 2009 20112010SOURCEPHASE$15.827(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
STATE $15.827CON$15.827
Hunterdon Page 14 of 15
![Page 15: NJTPA Transportation Improvement Program Fiscal Years 2008 ... Archive... · Transportation Improvement Program Fiscal Years 2008 - 2011 New Project Addition Revision 1 As of 8/20/2008](https://reader036.fdocuments.net/reader036/viewer/2022090809/611937b04c799d67471ebc00/html5/thumbnails/15.jpg)
NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011
A graduate of the NJTPA Technical Studies Program, this project focuses on the congestion of the study area at interchange 15 on I-78. Queuing of traffic on the west-bound exit ramp onto the interstate creates a significant safety issue. Congestion issues also exist on CR 513 to the entrance of the Hunterdon Development Center. The county will scope alternatives developed by the consultant from the initial study.
The following Federal appropriations were allocated to this project. FY06 SAFETEA-LU/HPP $800,000 (available 20% per year)
78 / CR 513Pittstown Road (Exit 15), Interchange Improvements
16.06 - 16.10RoutesSection
Mileposts: DBNUM: NS0309
NJ173US22
I-78
NJ31
CO579
CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
BETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEMBETHLEHEM
NS0309NS0309NS0309NS0309NS0309NS0309NS0309NS0309NS0309
ALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIAALEXANDRIA
CLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTONCLINTON
FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN
HIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGEHIGH BRIDGE
UNIONUNIONUNIONUNIONUNIONUNIONUNIONUNIONUNION
Counties:Hunterdon
Municipalities:Union Twp.
Project Type:System Management
Sponsor:Hunterdon County
RCIS Category:Road Enhancement
Est. Total Project Cost:(Million) Not Available
20122008 2009 20112010SOURCEPHASE$0.640(Million)
Unconstrained Information FY 2008 - 2011 TIP Cost:
HPP20 $.640LPD$.640
Hunterdon Page 15 of 15