Page 2: NIRPC Green Fleet: Funding Process for Transportation Projects

Today’s Topics

•1. Background

•2. Metropolitan Planning Organization (MPO)

•2. Federal-Aid Project Basics

•3. Release of NOFA 2014-2

Page 3: NIRPC Green Fleet: Funding Process for Transportation Projects

• Northwestern Indiana Regional Planning Commission

• Created in 1965

• Council of Governments

• Metropolitan Planning Organization

• Serves Lake, Porter, and LaPorteCounties and their 41 municipalities

What is NIRPC?

Page 4: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Basics

•All 53 NIRPC Board Members are

•Elected Officials

Page 5: NIRPC Green Fleet: Funding Process for Transportation Projects

•Metropolitan Planning

Organization (MPO)

Page 6: NIRPC Green Fleet: Funding Process for Transportation Projects

Metropolitan Transportation Planning Process

Continuing, Cooperative, and Comprehensive (3-C)

Multi-Modal Scope—All Surface Transportation

Fosters Economic Growth & Development

Minimizes Fuel Consumption & Air Pollution

Emphasizes System Preservation

Page 7: NIRPC Green Fleet: Funding Process for Transportation Projects

Metropolitan Transportation Planning and Programming

• Long Range Transportation Plan (LRP)• Multi-modal, Comprehensive • 20-Year Horizon or more• Guides Selection of Federal-Aid Projects for the TIP• Identifies Capacity-Increasing Projects

• Transportation Improvement Program (TIP)• Four-Year List of Surface Transportation Projects• Identifies Regionally Significant and Other Federally-

Funded Projects

• Unified Planning Work Program (UPWP)

Page 8: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Basics

•NIRPC’s 2014-2017 TIP Contains•978 Line-Item Entries

•427 INDOT-Sponsored Project Phases

•186 Local Highway-Related Project Phases

•71 Local Bicycle/Pedestrian Project Phases

•1 National Lakeshore Project

•293 Public Transit Projects

Page 9: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Basics

•NIRPC’s 2014-2017 TIP Contains

•$1.2 Billion (Total Spending)

•$770 Million (Federal Funds)

Page 10: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Basics

•We Have Two Urbanized Areas

•1. Chicago, IL/IN

•2. Michigan City-LaPorte, IN/MI

Page 11: NIRPC Green Fleet: Funding Process for Transportation Projects
Page 12: NIRPC Green Fleet: Funding Process for Transportation Projects
Page 13: NIRPC Green Fleet: Funding Process for Transportation Projects

•Federal Aid Project Basics

Page 14: NIRPC Green Fleet: Funding Process for Transportation Projects

Annual Federal-Aid Apportionments

• Federal Highway Administration (FHWA):

• Surface Transportation Program (STP)

• Congestion Mitigation/Air Quality Program

(CMAQ)

• Highway Safety Improvement Program (HSIP)

• Transportation Alternatives Program (TAP)

• Federal Transit Administration (FTA):

• Public Transit Formula Grants (5307)

• Bus Capital (5339)

• State of Good Repair (Commuter Rail)

Page 15: NIRPC Green Fleet: Funding Process for Transportation Projects

Annual Federal-Aid Apportionments – Eligiblity

• Federal Highway Administration (FHWA):

• Surface Transportation Program (STP)

• General purpose construction funds for highways, bridges,

Bike/Ped Facilities, Transit Capital, etc.

• Congestion Mitigation/Air Quality Program (CMAQ)

• Transportation projects that reduce emissions.

• Highway Safety Improvement Program (HSIP)

• Construction funds for improved highway safety.

• Transportation Alternatives Program (TAP)

• Construction funds for Bicycle/Pedestrian & Environmental

Mitigation Projects.

Page 16: NIRPC Green Fleet: Funding Process for Transportation Projects

Annual Federal-Aid Apportionments

• Federal Transit Administration (FTA):

• Public Transit Formula Grants (5307)• Transit Capital and Operating Assistance

• Bus Capital (5339)• Transit Capital Assistance for Bus Services

• State of Good Repair (Commuter Rail)• Capital Assistance for Commuter Rail

Page 17: NIRPC Green Fleet: Funding Process for Transportation Projects

Federal Aid Received (FHWA)• Chicago Urbanized Area (Indiana Portion) $17.9 M

• STP Funds: $10.9 M/year

• CMAQ Funds: $ 3.3 M/year

• HSIP Funds: $ 2.7 M/year

• TAP Funds: $ 1.0 M/year

• Michigan City-LaPorte Urbanized Area $2.0 M• STP Funds: $ 1.0 M/year

• CMAQ Funds: $ 0.6 M/year

• HSIP Funds: $ 0.3 M/year

• TAP Funds: $ 0.1 M/year

Page 18: NIRPC Green Fleet: Funding Process for Transportation Projects

Federal Aid Received (FTA)• Chicago Urbanized Area (Indiana Portion) $17.9 M

• 5307 Funds: $ 10.9 M/year

• 5339 Funds: $ 0.5 M/year

• SGR Funds: $ 12.5 M/year

• Michigan City-LaPorte Urbanized Area $1.0 M• 5307 Funds: $ 1.0 M/year

Page 19: NIRPC Green Fleet: Funding Process for Transportation Projects

Where does the money come from?Answer: Motor Fuel Excise Taxes

Gasoline: 18.3 cents per gallon

Diesel: 24.3 cents per gallon

Propane: 13.6 cents per gallon

1. US Treasury Places Funds in the Highway Trust Fund

2. Congress Appropriates HTF Proceeds to FHWA & FTA

3. FHWA & FTA Distribute Funds to States

4. States Sub-allocate funds to Urbanized Areas

5. MPO’s allocate funds to individual projects

Page 20: NIRPC Green Fleet: Funding Process for Transportation Projects

Stakeholder-Driven Project Selection Process• Four Primary Stakeholder Groups.

• Environmental Management Policy Committee (EMPC)• Ped, Pedal, & Paddle Committee (3-P)• Surface Transportation Committee (CST)• Transit Operators Roundtable (Transit Operators)• LaPorte County Stakeholder Group

• Each Group Establishes a process for selecting Federal-Aid projects within their area of expertise.

• Selection recommendations are made to the Transportation Policy Committee (TPC).

• NIRPC Board ratifies the list of projects selected.

Page 21: NIRPC Green Fleet: Funding Process for Transportation Projects

Stakeholder Jurisdictional Areas

• Environmental Management Policy Committee (EMPC)

• Non-Traditional CMAQ Projects (Non-Construction)

• Ped, Pedal, & Paddle Committee (3-P)

• Non-Motorized & Bike/Ped Projects (TAP, CMAQ, STP)

• Surface Transportation Committee (CST)

• Highway Construction Projects (STP, CMAQ, HSIP)

• Transit Operators Roundtable (Transit Operators)

• All Public Transit Projects, except LaPorte County CMAQ

• LaPorte County Stakeholders

• All Federal-Aid Projects within the LaPorte County

Page 22: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Board Approval of Projects

Two Common Methods:

• Inclusion of the New Project in the TIP• Inclusion of the Project in a New TIP or

• Amendment of the Project into an Existing TIP

• Board Approves the TIP or TIP Amendment

• Approval of a Specific List of New Projects• EMPC or TPC Submits List to Board

• Board Reviews and Approves the List of New Projects

Page 23: NIRPC Green Fleet: Funding Process for Transportation Projects

Once Your Project Has Been Selected & is in the TIP

For Most FHWA-Funded Projects

• NIRPC will Request a DES Number from INDOT• Your project is now within INDOT’s Production System

• Select your Employee in Responsible Charge (ERC)• Official Contact with INDOT (INDOT must Certify).

• For FHWA-funded projects, INDOT will then issue a Master Agreement. Execute & return as directed.• Note: For some CMAQ-funded non-construction projects, you

will be directed to submit your Agreement to NIRPC for execution.

Page 24: NIRPC Green Fleet: Funding Process for Transportation Projects

Selecting an Engineering Firm

For Most FHWA-Funded Construction Projects• If your project requires design services, you may then

begin the Consultant Procurement/Selection Process.• Use INDOT’s System: Preliminary Engineering (PE) Costs are

Eligible for Reimbursement with Federal Funds.

• Use Another System: PE Costs Covered at 100% Local.

• All Design Consultants must be INDOT-Pre-qualified.

• Negotiate contract terms with the chosen firm.

• Your chosen Consultant may not begin work on your project until: 1) A fully-executed, written contract is in place and 2) INDOT has issued a Notice to Proceed (NTP).

Page 25: NIRPC Green Fleet: Funding Process for Transportation Projects

Obtaining Reimbursements

For All FHWA-Funded Projects

• For all project-related expenses except the construction contract itself, the sponsor must pay 100% of all costs up front before seeking reimbursement from INDOT.• This includes CMAQ-funded equipment & motor fuel.

• Must submit copies of cancelled checks.

• No Exceptions.

Page 26: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Oversight

For All FHWA-Funded Projects

• Quarterly Tracking Meetings.• Sponsor meets face-to-face with INDOT & NIRPC.

• Project-by-Project Review.

• Participation Required as Condition of Funding.

• Meetings Spread Over Four-Five Days

• On-Line Quarterly Reporting (LQR).• Reviewed Prior to Tracking Meetings.

• Submission Required as Condition of Funding.

Page 27: NIRPC Green Fleet: Funding Process for Transportation Projects

NIRPC Basics

•LQR Reviews

•Reports Reviewed: 98

•Average Time per Report: 8.5 minutes

Page 28: NIRPC Green Fleet: Funding Process for Transportation Projects

•NOFA 2014-2Solicitation/Call for

Federal-Aid Transportation Projects

in

Lake, Porter, and LaPorte Counties, Indiana

Page 29: NIRPC Green Fleet: Funding Process for Transportation Projects

NOFA 2012-2

• For Lake & Porter Counties• 2017-2021 CMAQ Projects $13.4 Million

• 2017-2021 HSIP Projects $ 9.9 Million

• For LaPorte County• 2016-2021 CMAQ Projects $ 2.6 Million

• 2016-2021 HSIP Projects $ 1.5 Million

• 2016-2021 STP Projects $ 4.7 Million

Page 30: NIRPC Green Fleet: Funding Process for Transportation Projects

NOFA 2012-2

• Submission Deadline

•Monday, December 1, 2014• Eligible Applicants

• Counties, Cities, Towns

• Gary PTC, NICTD,

• State Agencies (including IU, Purdue, Ivy Tech)

• Other Entities (via written agreement with one of the above)

Page 31: NIRPC Green Fleet: Funding Process for Transportation Projects

NOFA 2012-2

• What to Submit• Application Form • Purpose/Need Statement• Required Programmatic Documentation

• CMAQ: Emissions Calculations• HSIP: Road Safety Audit & Cost-Benefit Analysis

• Transmittal Letter Executed by CEO• Chief Elected Official or Chief Executive Officer

• How to Submit• Via E-Mail, USPS, In-Person. • Hand-written applications accepted.

Page 32: NIRPC Green Fleet: Funding Process for Transportation Projects

NOFA 2012-2

• To Download Forms• Go to www.nirpc.org.

• Click on “Events” and follow instructions.

• Software You Will Need• Microsoft Excel (CMAQ Application Forms & Emissions

Worksheets).

• Adobe PDF Reader (Portions of HSIP Application).

• Microsoft Word (Portions of HSIP Application).

Page 33: NIRPC Green Fleet: Funding Process for Transportation Projects

NOFA 2012-2

• Purchases of CMAQ-Funded Alternative Fuels• FHWA extended the eligibility of these projects through

FFY 2017 (Sept 30, 2017).

• FHWA CMAQ Guidance• Required reading to learn what’s eligible.

Page 34: NIRPC Green Fleet: Funding Process for Transportation Projects

NOFA 2012-2

• NIRPC Contacts• HSIP: Stephen Sostaric [email protected]

• Bike/Ped: Mitch Barloga [email protected]

• STP/CMAQ: Gary Evers [email protected]

• Emissions: Kathy Luther [email protected]

• Transit: Belinda Petroskey [email protected]

• Solicitation, Deadlines, Document Formats, Meetings: Amanda Pollard [email protected]

• Telephone 219.763.6060

Page 35: NIRPC Green Fleet: Funding Process for Transportation Projects

By email: [email protected]

By telephone: (219)763-6060, ext. 160

By US Postal Service:6100 Southport Rd.

Portage, Indiana 46368

How to Contact NIRPC

Page 36: NIRPC Green Fleet: Funding Process for Transportation Projects

Find NIRPC Online

www.nirpc.org

facebook.com/nirpcmpo

twitter.com/nirpc