  • PrivatisationofNigerDeltaPowerHoldingCompanyLimitedGenerationCompanies

    Lagos,NigeriaJune4,2013

  • NationalIntegratedPowerProject(NIPP) NigerDeltaPowerHoldingCompany(NDPHC) Transmission,DistributionandGasProjects GenerationProjects GenerationCompaniesandPowerPlants GenerationLicenses Supportinvestments TransmissionandDistribution

    2

    Outline

  • NationalIntegratedPowerProject(NIPP) wasconceivedin2004asafasttrackinitiativetoaddsignificantnewgenerationcapacitytoNigeriaselectricitysupplysystem.

    NIPPinvolvestheconstructionoftenpowerplantsalongwiththecomplementaryelectricitytransmissionanddistributioninfrastructure,aswellastheinfrastructurerequiredtodeliverthenaturalgasneededatthepowerplants.

    NIPPprojectshavebeenfundedfromtheExcessOilAccount,withapproximatelyUS$8.4billioncommitted.

    ProjectshavebeenconstructedbyreputableNigerianandinternationalengineeringfirmsandoverseenbyindependentconsultants.

    Allprojectswillbecommissionedbymid2014.

    3

    NIPP

  • NigerDeltaPowerHoldingCompanyLimited(NDPHC)wasestablishedin2005toserveasthelegalvehicletocontractfor,hold,manageandoperatetheNIPPassetsusingprivatesectorbestpractices.

    OwnedbythreetiersofGovernment: FederalGovernment(47%) 36StateGovernments(35%) 774LocalGovernments(18%)

    BoardofDirectorsappointedfromshareholders.Arch.Namadi Sambo,VicePresidentoftheFederalRepublicofNigeria,isChairman.

    Managementcomprises: Mr JamesOlotu (ManagingDirector); Engr LouisEdozien (ExecutiveDirector,EngineeringandTechnicalServices);and Mr AnthonyMuoneke (ExecutiveDirector,FinanceandAdministration).

    4

    NDPHC

  • Transmission 41separatecontractsincluding102projects. 10330kVand7132kVsubstations. Expansionof36existingsubstations. 5,590MVAof330/132kVand3,313MVAof132/33kV

    transformercapacity. 2,194kmof330kVlinesand809kmof132kVlines.

    Distribution 43separatecontractsincluding297projects. 29733/11kVsubstationswithacapacityof3,750MVA. 25,28125kVAand50kVAtransformers. 1,700kmof33kVlinesand2,600kmof11kVlines.

    Gas 5gaspipelineprojects,2projectsupervisioncontracts. Small(

  • 6

    GenerationProjects OverviewGeneration Company Plant Name Location Gas

    TurbinesSteamTurbines

    CapacityInMW

    AlaojiGenerationCo.NigeriaLtd. Alaoji AbiaState 4 1 831.3

    BeninGenerationCo.Ltd. Ihovbor EdoState 4 0 507.6

    CalabarGenerationCo.Ltd. Calabar CrossRiverState 5 0 634.5

    Egbema GenerationCo.Ltd. Egbema ImoState 3 0 380.7

    Gbarain GenerationCo.Ltd. Gbarain BayelsaState 2 0 253.8

    Geregu GenerationCo.Ltd. GereguII KogiState 3 0 506.1

    Ogorode GenerationCo.Ltd. SapeleII DeltaState 4 0 507.6

    OlorunsogoGenerationCo.Ltd. OlorunsogoII OgunState 4 2 754.0

    Omoku GenerationCo.Ltd. OmokuII RiversState 2 0 264.7

    Omotosho GenerationCo.Ltd. OmotoshoII OndoState 4 0 512.8

    Totals 35 3 5,153.1

    Allfiguresforcapacityarestatedat ISO

    The Alaoji plant has been developed as a CCGT project with a plant capacity of 1,131.4 MW. However it is expected that, by the handoverdate for this plant, only one of the steam turbines would have been installed and the plant will be available for commercial operation as an831.3 MW plant.

  • DesignCapacity: 1,131.4MW

    OperationMode:Combinedcyclegasturbineplant.

    Contractor:Rockson EngineeringLimited.

    MajorEquipment:4xGEFrame9Egasturbines,4xHRSGswithductfiringcapability,2xsteamturbines

    Status: GasturbinesscheduledtobecommissionedbyDecember2013.FirststeamturbinescheduledtobecommissionedbyMay2014.

    AlaojiGenerationCo.NigeriaLtd. AlaojiPowerPlant

  • DesignCapacity:507.6MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:MarubeniWestAfricaLimited.

    MajorEquipment:4xGEFrame9Egasturbines

    Status:AllunitsscheduledtobecommissionedbyAugust2013

    BeninGenerationCo.Ltd. Ihovbor PowerPlant

  • DesignCapacity:634.5MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:MarubeniWestAfricaLimited.

    MajorEquipment:5xGEFrame9Egasturbines

    Status:AllunitsscheduledtobecommissionedbyMay2014.

    CalabarGenerationCo.Ltd. CalabarPowerPlant

  • DesignCapacity:380.7MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:Rockson EngineeringLimited.

    MajorEquipment:3xGEFrame9Egasturbines

    Status:AllunitsscheduledtobecommissionedbyDecember2013.

    Egbema GenerationCo.Ltd. Egbema PowerPlant

  • DesignCapacity:253.8MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:Rockson EngineeringLimited.

    MajorEquipment:2xGEFrame9Egasturbines

    Status:AllunitsscheduledtobecommissionedbyNovember2013.

    Gbarain GenerationCo.Ltd. Gbarain PowerPlant

  • DesignCapacity: 506.1MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:Siemens

    MajorEquipment:3 xSiemensSGT52000Egasturbines.

    Status:Allunitscommissioned

    Geregu GenerationCo.Ltd. Geregu IIPowerPlant

  • DesignCapacity: 507.6MW

    OperationMode:Opencyclegasturbineplant.

    Contractor:MarubeniWestAfricaLimited.

    MajorEquipment:4xGEFrame9Egasturbines

    Status:Allunitscommissioned.

    Ogorode GenerationCo.Ltd. Sapele IIPowerPlant

  • DesignCapacity: 754.0MW

    OperationMode:Combinedcyclegasturbineplant.

    Contractor:SEPCOIII.

    MajorEquipment:4xGEFrame9Egasturbines,4xHRSGs,2xsteamturbines

    Status:Allunitscommissioned.

    OlorunsogoGenerationCo.Ltd. OlorunsogoIIPowerPlant

  • DesignCapacity: 264.7MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:Rockson EngineeringLimited.

    MajorEquipment:2xGEFrame9Egasturbines

    Status:AllunitsscheduledtobecommissionedbyDecember2013.

    Omoku GenerationCo.Ltd. Omoku IIPowerPlant

  • DesignCapacity: 512.8MW

    OperationMode:Opencyclegasturbineplantwithpossibilityforconversiontocombinedcycle.

    Contractor:CMEC

    MajorEquipment:4xGEFrame9Egasturbines

    Status:Allunitscommissioned.

    Omotosho GenerationCo.Ltd.Omotosho IIPowerPlant

  • GenerationLicenses

    Power Plant Status

    Calabar Available

    Egbema Available

    Ihovbor Available

    Gbarain Available

    Sapele II Available

    Omoku II Available

    Alaoji Available

    Olorunsogo II Available

    Omotosho II Available

    Geregu II Available

  • SupportInvestment Transmission

    Scope 103 projects in 43 lots Power station evacuation Closing the eastern flank of the

    national grid 5,590 MVA of 330/132kV

    transformer capacity 3,313 MVA of 132/33kV

    transformer capacity 2,194 km of 330kV lines 809 km of 132kV lines 10 new 330kV S/S 7 new 132kV S/S Expansion of 36 existing 330kV

    and 132kV S/S

    Achievements 2,370MVA of 330kV and

    132kV transformer capacity already in service in the national grid

    519km of transmission lines strung out of 2,903km

    346.7km of transmission lines already in service or energized awaiting full utilization

  • SupportInvestment Distribution

    Scope 43 contracts with 297 low loss

    High Voltage Distribution System distribution projects

    3,750 MVA of 33/11kV injection substation capacity

    1,700 km of 33kV lines 2,600 km of 11kV lines 25,281 completely self

    protected 25kVA and 50kVA customer transformers

    Achievements 72 injection substations

    commissioned

    3,517 completely self protected 25kVA and 50kVA customer transformers installed

    650MVA out of 3,750MVA of 33/11kV Injection substation already in service or awaiting full utilization

    Revalidated work schedules being followed with completion of the bulk of the projects before end of June 2013