Nice-Pak, Westwood Park, Wigan Green Remediation Ltd Case Study 10317 Nice Pak, Westwood Park, Wigan www.greenremediation.co.uk

Transcript of Nice-Pak, Westwood Park, Wigan - Green Remediation...Case Study – 10317 – Westwood Park, Wigan 3...

Page 1: Nice-Pak, Westwood Park, Wigan - Green Remediation...Case Study – 10317 – Westwood Park, Wigan 3 Demolition The building was constructed in the early 1990s to provide a new computer

Nice-Pak, Westwood Park, Wigan

Green Remediation Ltd

Case Study 10317

Nice Pak, Westwood Park, Wigan

www.greenremediation.co.uk

Page 2: Nice-Pak, Westwood Park, Wigan - Green Remediation...Case Study – 10317 – Westwood Park, Wigan 3 Demolition The building was constructed in the early 1990s to provide a new computer

Green Remediation Ltd, HQ Building, 2 Atherton Street, Manchester, M3 3GS www.greenremediation.co.uk

Tel: 0161 775 5393

1 Case Study – 10317 – Westwood Park, Wigan

Project Overview Green Remediation Ltd were employed to carry

out the demolition of the existing former

Santander building, followed by an earthworks

and stabilization package. To be constructed on

this site was a 38,000 m2 warehouse and 41,000 m2

of access roads, yards and car parking.

Client: Vinci Construction UK

Date: May to November 2015

Duration: 30 Weeks

Location: Westwood Park, Wigan

Contents

Project Overview & Contents 1

Service & Utility Detection / Disconnection 2

Demolition 3

Earthworks, Remediation & Stabilisation 4

SWakefield
Text Box
Page 3: Nice-Pak, Westwood Park, Wigan - Green Remediation...Case Study – 10317 – Westwood Park, Wigan 3 Demolition The building was constructed in the early 1990s to provide a new computer

Green Remediation Ltd, HQ Building, 2 Atherton Street, Manchester, M3 3GS www.greenremediation.co.uk

Tel: 0161 775 5393

2 Case Study – 10317 – Westwood Park, Wigan

Service & Utility Detection / Disconnection This 80,000 m2 former Power Station site, was occupied by many

live services, before works could commence, these had to be

located, traced and recorded. These were then either

disconnected and proved dead, or diverted outside of the works.

All excavation near or around were carried out following the

strict guidance as determined by HSG47: Avoiding danger from

underground services.

Page 4: Nice-Pak, Westwood Park, Wigan - Green Remediation...Case Study – 10317 – Westwood Park, Wigan 3 Demolition The building was constructed in the early 1990s to provide a new computer

Green Remediation Ltd, HQ Building, 2 Atherton Street, Manchester, M3 3GS www.greenremediation.co.uk

Tel: 0161 775 5393

3 Case Study – 10317 – Westwood Park, Wigan

Demolition The building was constructed in the early 1990s to provide a new computer processing centre for

Girobank, subsequently Alliance and Leicester and Santander. The existing building was steel framed

comprising:

Single storey open plan office

2 storey plant rooms to both the north and south

Link building with another plant room in the roof space

All waste was segregated, and disposed of offsite using a licensed waste carrier. Over 95% of waste was

recycled.

Page 5: Nice-Pak, Westwood Park, Wigan - Green Remediation...Case Study – 10317 – Westwood Park, Wigan 3 Demolition The building was constructed in the early 1990s to provide a new computer

Green Remediation Ltd, HQ Building, 2 Atherton Street, Manchester, M3 3GS www.greenremediation.co.uk

Tel: 0161 775 5393

4 Case Study – 10317 – Westwood Park, Wigan

Gaskets containing asbestos, removed from

site to a licensed facility.

Left: Building

down to slab

level