Niagara Mohawk Power Corporation d/b/a National Grid PROCEEDING ON MOTION OF THE COMMISSION AS TO THE RATES, CHARGES, RULES AND REGULATIONS OF NIAGARA MOHAWK POWER CORPORATION FOR ELECTRIC AND GAS SERVICE
Testimony and Exhibits of:
Information Services Panel
Book 3
April 2012
Submitted to: New York State Public Service Commission Case 12-E-____ Case 12-G-____
Submitted by: Niagara Mohawk Power Corporation
Testim
ony of
IS Panel
Before the Public Service Commission
NIAGARA MOHAWK POWER CORPORATION d/b/a NATIONAL GRID
Direct Testimony
of
The Information Services Panel
1
Testimony of Information Systems Panel
Table of Contents
I. Introduction and Qualifications ...................................................................1 II. Purpose of Testimony ..................................................................................5 III. Services Provided by National Grid IS........................................................7 IV. Rate Year IS Projects and Initiatives ...........................................................8 V. IS Transformation ......................................................................................11 VI. US Foundation Program ............................................................................21 VII. Cyber Security ...........................................................................................37 VIII. Other IS Costs and Investments.................................................................44
2
Testimony of the Information Services Panel
Page 1 of 47
I. Introduction and Qualifications 1
Q. Please introduce the members of the Information Services (“IS”) 2
Panel. 3
A. The Panel consists of Matthew Guarini and Michael Kyle. 4
5
Q. Mr. Guarini, please state your name and business address. 6
A. My name is Matthew Guarini. My business address is 40 Sylvan Road, 7
Waltham, Massachusetts 02451. 8
9
Q. By whom are you employed and in what capacity? 10
A. I am employed by National Grid USA Service Company, Inc., a 11
subsidiary of National Grid plc, as Vice President of US Information 12
Services. 13
14
Q. Please briefly describe your educational background. 15
A. I received a Bachelor of Science degree from the University of Virginia 16
in 1990, and a Master of Business Administration degree from George 17
Mason University in 1996. 18
19
Q. What is your professional background? 20
3
Testimony of the Information Services Panel
Page 2 of 47
A. From 1990 – 1999, I held various positions of increasing responsibility 1
with Bechtel, Columbia Gas, and PG&E Generating Company. These 2
roles focused on the development and implementation of growth 3
strategies in areas such as nuclear, coal, and natural gas. In 1999, I 4
joined McKinsey and Company focusing on energy and technology 5
issues for Fortune 500 firms. In 2003, I moved to a position developing 6
strategy for Nalco, a global leader in water treatment chemicals. In 2004, 7
I moved to Infosys, where I worked developing technology and 8
technology services strategy. During this time, I worked across multiple 9
areas including SAP and business intelligence. In 2006, I joined Bridge 10
Strategy as a principal in its consulting practice, where my primary focus 11
was technology and energy. I worked on projects involving mergers and 12
acquisitions, distributed generation, technology strategy, energy 13
efficiency, Smart Grid, and alternative fuel vehicles. I joined National 14
Grid in 2010 as Vice President of US Business Relationship Management 15
as a member of the Global IS leadership team. My initial focus has been 16
on transforming the IS operations. In 2011, I was appointed Vice 17
President of US Information Services, my current position. 18
19
Q. Mr. Kyle, please state your name and business address. 20
4
Testimony of the Information Services Panel
Page 3 of 47
A. My name is Michael Kyle. My business address is 300 Erie Boulevard 1
West, Syracuse, New York, 13202. 2
3
Q. By whom are you employed and in what capacity? 4
A. I am employed by National Grid USA Service Company, Inc. I am 5
Director of the US Foundation Program (“USFP”). 6
7
Q. Please describe your educational background. 8
A. In 1980, I graduated from LeMoyne College in Syracuse, New York with 9
a Bachelor of Science degree in Industrial Relations. 10
11
Q. What is your professional background? 12
A. In 1981, I was hired by Niagara Mohawk Power Corporation. I have 13
more than 30 years of utility experience in various roles, which have 14
included regulatory and financial management positions, including an 15
assignment in 2000 as the lead for accounting and finance for Niagara 16
Mohawk in the merger with National Grid. In 2002, I served as the 17
Director of the Enterprise Resource Planning (“ERP”) and work 18
management system implementation. In 2004, I was promoted to Vice 19
President of Supply Chain for National Grid USA Service Company, 20
responsible for procurement, warehousing, materials management, 21
5
Testimony of the Information Services Panel
Page 4 of 47
investment recovery, and accounts payable. In 2007, I was assigned as 1
Vice President, Global Information Services for Finance, Corporate, and 2
Shared Services responsible for National Grid’s US business 3
applications. In 2008, I was responsible for work stream initiatives for 4
delivery of the global ERP system. In January 2009, I was appointed 5
Vice President, US Foundation Program – Strategic Design/Business 6
Architecture, responsible for maximizing process efficiency within the 7
SAP technical solution; and, in April 2011, I became Director, USFP, 8
which is my current position. 9
10
Q. Does the Panel sponsor any exhibits as part of its testimony in this 11
proceeding? 12
A. Yes. We sponsor the following exhibits, which were prepared or 13
compiled under our supervision and direction: 14
(i) Exhibit __ (ISP-1) presents the IS projects and investments 15
planned for the twelve months ending March 31, 2014 (“Rate Year”) and 16
for the twelve months ending March 31, 2015 (“Data Year 1”) and 17
March 31, 2016 (“Data Year 2”); 18
(ii) Exhibit __ (ISP-2) presents a Conceptual Application Diagram 19
identifying the scope of the US Foundation Program; 20
6
Testimony of the Information Services Panel
Page 5 of 47
(iii) Exhibit __ (ISP-3) presents a December 2009 US Systems and 1
Strategy Roadmap evaluating various US systems strategy options by IS 2
and concluding that SAP would best support the US businesses; 3
(iv) Exhibit __ (ISP-4) presents the June 29, 2011 SAP Benefits 4
Validation report prepared by Capgemini. 5
6
II. Purpose of Testimony 7
Q. What is the purpose of the Panel’s testimony? 8
A. The purpose of our testimony is to describe National Grid’s IS function, 9
specifically as it relates to Niagara Mohawk Power Corporation d/b/a 10
National Grid (“Niagara Mohawk” or “Company”). We will describe 11
how National Grid is transforming the IS function to improve the ability 12
to deliver services. We will also describe major IS investments and 13
initiatives during the Rate Year, including the US Foundation Program. 14
In addition, we will describe National Grid’s investments to address 15
issues related to cyber security. 16
17
Q. How is the Panel’s testimony organized? 18
A. First, the Panel describes the services provided by the IS function in the 19
US and the approach used to deliver those services. Next, the Panel 20
discusses the efforts by IS to enhance the services provided to Niagara 21
7
Testimony of the Information Services Panel
Page 6 of 47
Mohawk (and other National Grid companies) through the introduction 1
of a new operating model. This “IS Transformation” initiative involves a 2
redesign of the IS organization as well as the partnering with several key 3
vendors on the delivery of IS services. The initiative is designed to 4
update and improve the delivery of those services to meet the increasing 5
needs of the organization in a manner that is in line with the rapid 6
changes in the technology industry. The Panel also describes a major 7
new system IS will deliver: the US Foundation Program. The USFP will 8
consolidate National Grid’s US Human Resources, Supply Chain and 9
Finance (Enterprise Resource Planning) processes onto a single systems 10
platform, thereby eliminating the multiple systems that currently exist. 11
The USFP will also form the base for a suite of integrated systems to 12
handle both asset management and office and field work scheduling and 13
management, and eliminate the need for complicated interfaces and 14
costly special purpose applications. This will enhance the Company’s 15
ability to operate effectively and efficiently and ultimately improve the 16
ability to serve customers. Finally, the Panel describes steps National 17
Grid IS is taking with respect to cyber security and introduces other IS 18
initiatives being undertaken. 19
20
21
8
Testimony of the Information Services Panel
Page 7 of 47
III. Services Provided by National Grid IS 1
Q. What services does IS provide? 2
A. National Grid IS provides, maintains, and manages the computer 3
hardware, computer software, cyber security, telecommunications and 4
other related infrastructure, systems and services across all of National 5
Grid’s service territories. National Grid IS delivers three primary 6
categories of services: Development/Delivery Services, Support & 7
Maintenance Services, and End User Services. 8
• Development/Delivery Services pertain to identifying new 9
computer and communications technology trends and developing 10
relevant innovative solutions for the business. 11
• Support & Maintenance Services include the ongoing support 12
for business applications and infrastructure. 13
• End User Services refer to products and services including, but 14
not limited to, desktop services and office productivity, email 15
services, collaboration services, communications media, and 16
printer/fax support. 17
18
Q. How do the services provided by National Grid IS benefit Niagara 19
Mohawk and its customers? 20
9
Testimony of the Information Services Panel
Page 8 of 47
A. Services provided within the above-mentioned categories range from 1
critical electric and gas transmission/distribution support systems to 2
standard office desktop applications. These services underpin the safe, 3
reliable and secure physical and commercial operation of the Niagara 4
Mohawk electric and gas businesses. National Grid IS owns and 5
maintains (including updating and replacing as necessary) a suite of 6
software applications that serves the needs of customers and allows the 7
effective management and operation of Niagara Mohawk. National Grid 8
IS operates these applications on hardware systems that are centrally 9
located as well as distributed to employees in the form of personal 10
computers and other devices. IS also provides Niagara Mohawk with 11
asset and work management systems, as well as management systems 12
that provide the administrative support required to manage electric and 13
gas service. 14
15
IV. Rate Year IS Projects and Initiatives 16
Q. Please describe how National Grid IS identifies the projects and 17
investments necessary to serve Niagara Mohawk customers. 18
A. On an annual basis, National Grid identifies required investments over a 19
ten year period. IS Business Relationship Managers work closely with 20
business leadership, including leadership of each operating company and 21
10
Testimony of the Information Services Panel
Page 9 of 47
corporate business leadership, on an ongoing basis to understand business 1
strategy. The Business Relationship Managers then work with business 2
leadership to determine the IS needs of the business for the period and the 3
cost and timing for each of the required investments. These investments 4
are then gathered and prioritized against overall expenditure targets. 5
6
In recent years, National Grid IS has undertaken a number of significant 7
initiatives to improve the way it provides services. Chief among these is 8
the IS Transformation initiative, which the Panel describes in more detail 9
later in the testimony. National Grid is also making a significant 10
investment in the US Foundation Program, which will help consolidate 11
Back Office (HR, Supply Chain, and Finance) functions across National 12
Grid’s US business, and provide a platform for implementing consistent 13
and improved Front Office (asset and work management, scheduling and 14
dispatch) functionality. The USFP is also described in more detail below. 15
The new Energy Management System (“EMS”) and Outage Management 16
System (“OMS”) are designed to improve electric delivery service for 17
Niagara Mohawk customers. The EMS and OMS investments are 18
described briefly in our testimony, and described in more detail in the 19
testimony of the Electric Infrastructure and Operations Panel. National 20
Grid IS is also investing to address issues related to cyber security. 21
11
Testimony of the Information Services Panel
Page 10 of 47
The complete list of IS projects planned for the Rate Year and the Data 1
Years is provided in Exhibit __ (ISP-1). 2
3
Q. What are the costs of IS projects and investments to Niagara 4
Mohawk? 5
A. IS capital projects and investments that are shared investments are 6
implemented and owned at the service company level, and allocated to 7
Niagara Mohawk in the form of an annual rent expense. As shown in 8
Exhibit __ (RRP-3), Schedule 8, the annual rental expense to be assessed 9
to Niagara Mohawk in the Rate Year is $25,431,804 million for the 10
electric business and $4,387,703 for the gas business. The forecast IS 11
rent expense to Niagara Mohawk for Data Year 1 and Data Year 2 is also 12
presented in Exhibit __ (RRP-3), Schedule 8. 13
14
IS projects and investments that serve only Niagara Mohawk are direct 15
capital investments by Niagara Mohawk. These projects and associated 16
costs are presented in the testimony and exhibits of the Electric 17
Infrastructure and Operations Panel. 18
19
20
21
12
Testimony of the Information Services Panel
Page 11 of 47
V. IS Transformation 1
Q. Please explain the IS approach to service delivery and any changes it 2
has undertaken to improve its effectiveness. 3
A. Traditionally, National Grid IS delivered its services primarily using in-4
house resources, with external providers providing support in selective 5
technical areas and during periods of high demand. While previously 6
effective, increases in business demand (such as the need for significant 7
capital expenditures to address aging infrastructure, as well as the need to 8
staff major application development efforts and overall technical support 9
for applications and infrastructure with skilled resources); rapid 10
acceleration of technology; and a changing security landscape have 11
recently challenged this model. 12
13
To address the above-mentioned challenges, IS sought to develop a 14
service delivery model that was fit to serve the business demand, current 15
and future, and to do so in a cost effective manner. National Grid IS 16
recognized that the information technology (“IT”) market was rapidly 17
changing, and that presented potential opportunities for addressing 18
National Grid’s IS needs using a model different from its traditional 19
service model. National Grid IS decided to pursue a new delivery model 20
that: 21
13
Testimony of the Information Services Panel
Page 12 of 47
• retains an internal IS organization, including IS Strategy and 1
Architecture, Digital Risk and Security and Business Relationship 2
Management functions with a focus on direction-setting for IS 3
policy and architecture; 4
• evaluates through competitive bidding the market for commodity-5
based IS services, such as data center services and email. The 6
rapid expansion in this market indicated that many IS services 7
could potentially be delivered by third-party providers 8
specializing in these services more effectively than National Grid 9
could deliver using internal resources; 10
• introduces innovative techniques and solutions with third-party 11
specialty providers; 12
• retains ownership and control of processes and systems that 13
directly affect National Grid’s core energy delivery infrastructure; 14
and 15
• develops a common and improved approach to digital risk and 16
security to protect confidential customer information and 17
proprietary Company information, and ensure the integrity and 18
reliability of Niagara Mohawk’s critical electric and gas delivery 19
systems. The approach would be applied consistently across 20
14
Testimony of the Information Services Panel
Page 13 of 47
National Grid’s US business, and align with legal and regulatory 1
requirements. 2
3
The above-mentioned effort within National Grid IS is referred to as IS 4
Transformation. 5
6
The new delivery model provides IS the ability to more effectively meet 7
business demand for application development and support staff. The 8
increasing scale of required investments necessitated a different approach 9
to secure the capacity and flexibility to deliver required services than the 10
IS traditional approach of supplementing staff with contract resources to 11
obtain special skill sets or address periods of high demand. The new 12
model allows IS to access a broad pool of resources that can be flexibly 13
scaled up and down as business demand changes, while at the same time 14
containing the costs of an increasingly technical and specialized IS 15
workforce needed to meet peaks of demand. 16
17
Infrastructure requirements are addressed with the purchase of 18
infrastructure as a service rather than making capital investments. This 19
arrangement allows National Grid to use only the services it needs, rather 20
than to invest in infrastructure to meet peak demand. 21
15
Testimony of the Information Services Panel
Page 14 of 47
Q. Who are the third-party delivery partners that are supporting the 1
new model under IS Transformation, and what services are they 2
providing? 3
A. The third-party delivery partners include: Hewlett Packard (“HP”) as 4
Service Management Integrator, Computer Sciences Corporation for data 5
center and client services (enterprise services), Verizon for networks and 6
communications, IBM for internet, collaboration, and e-mail, Xerox for 7
managed print services, and IBM and Wipro for application development 8
and maintenance. The new partners were selected for delivery of 9
services in their areas of specialization. 10
11
Q. What is the role of the Service Management Integrator? 12
A. The role of the Service Management Integrator (“SMI”) is to drive end-to-13
end service delivery in the multi-vendor model, coordinating the activities 14
of the other partners to ensure that all delivery partners work 15
collaboratively to achieve effective end-to-end processes. In addition, the 16
SMI manages the service desk (the help desk for employees). 17
18
HP was selected as the initial SMI following a procurement process in 19
which HP emerged as the most competitive bidder to manage a multiple 20
vendor environment. The term of the SMI arrangement with HP is seven 21
16
Testimony of the Information Services Panel
Page 15 of 47
years, with an option to extend for a further two years. The initial term of 1
the arrangement is longer than the other vendor contracts in the new IS 2
operating model because the SMI is the function that ensures the other 3
providers work collaboratively to achieve effective end-to-end processes. 4
This provides continuity of service integration and process even though 5
other providers may change over time. 6
7
Q. What services are provided by the enterprise services provider? 8
A. The enterprise services delivery partner provides data center services (e.g., 9
servers, data storage), as well as the management of hardware, software, 10
and storage located in data centers that provide security, back-up 11
capability, and disaster recovery services. Ownership and operation of the 12
physical data centers and the infrastructure contained therein has shifted to 13
the service provider. The enterprise services provider is also responsible 14
for client services, such as the provision and support of end user devices 15
(e.g., laptops), and for deploying and maintaining the operating systems 16
and applications that run on those devices. 17
18
One of the advantages of the enterprise services arrangement is 19
consumption-based billing, where National Grid pays only for the 20
resources it utilizes. The enterprise services arrangement allows computer 21
17
Testimony of the Information Services Panel
Page 16 of 47
resources, such as servers and storage, to be rapidly deployed and utilized 1
as they are needed, with payment just for the period utilized. In addition, 2
a virtual desktop service enables a mobile workforce by making 3
applications available remotely. 4
5
Computer Sciences Corporation was selected as the initial enterprise 6
services delivery partner based on a competitive procurement. The initial 7
contract term is five years, given the complexity involved and time 8
required to establish the new environment, with the option for two one-9
year extensions. 10
11
Q. What services are provided by the networks and telecommunications 12
provider? 13
A. The networks and telecommunications delivery partner arrangement 14
provides for managed network service that consolidates National Grid’s 15
Local Area Network (“LAN”), Wide Area Network (“WAN”), telephony, 16
and video and audio conferencing. Under the networks and 17
telecommunications arrangement, National Grid is moving from a multi-18
vendor environment with numerous contracts to a single network solution 19
that will provide improved services and security. 20
18
Testimony of the Information Services Panel
Page 17 of 47
Verizon was selected following a competitive procurement. The initial 1
contract term is five years, with the option for three one-year extensions. 2
This term was selected to allow time to move to the new environment and 3
to operate the equipment for its useful life. 4
5
Q. What services are provided by the internet, collaboration and email 6
provider? 7
A. Internet, collaboration and email (“ICE”) services are hosted infrastructure 8
services for Microsoft product-based email, web conferencing, instant 9
messaging and collaboration tools such as SharePoint. These services are 10
operated on vendor-owned and -hosted infrastructure. The initial contract 11
includes transition to the new vendor-owned service from existing 12
National Grid-owned infrastructure. 13
14
The initial provider of the ICE services is IBM, which was selected 15
following a competitive procurement. The term of the initial agreement is 16
three years, with the option for two one year extensions. This is a swiftly 17
changing technology and service area and the three-year term was 18
considered appropriate to maintain access to technology and service 19
advances. 20
19
Testimony of the Information Services Panel
Page 18 of 47
Q. What services are provided by the managed document services 1
provider? 2
A. The managed document services delivery partner provides a managed 3
support service for existing standard printers and photocopiers and a 4
transition to a refreshed and standardized fleet of print devices enabling 5
increased security for printing, copying, faxing and scanning. Among the 6
new services and capabilities provided under the managed document 7
services arrangement is implementation of a print management system to 8
optimize the numbers of printers and monitor usage, thus reducing 9
National Grid’s carbon footprint. 10
11
Xerox was selected to provide the managed document services service 12
following a competitive procurement. The initial term is five years, with 13
the option for two one-year extensions. 14
15
Q. What services are provided by the application maintenance and 16
delivery providers? 17
A. Application development and maintenance services for National Grid IS 18
(with the exception of critical electricity and gas network systems) are 19
provided by IBM and Wipro. The selected suppliers are accountable for 20
20
Testimony of the Information Services Panel
Page 19 of 47
the full range of application service, including development of new 1
applications as well as for the day-to-day support of existing applications. 2
3
IBM and Wipro were selected through a competitive procurement process. 4
They were deemed best qualified in capacity and capability to deliver the 5
lifecycle services, including innovative techniques and solutions, for their 6
defined set of business applications. The term of the arrangements is five 7
years, with the option for two one-year extensions. The term is designed 8
to balance providing the suppliers with a timeframe sufficient to invest in 9
the relationship and to drive service improvements, with the flexibility for 10
National Grid to take advantage of improved market rates for the service 11
should they occur in the future. 12
13
Q. Please describe how the provision of IS services under these new 14
arrangements benefits Niagara Mohawk customers. 15
A. The third-party delivery partner framework provides, among other 16
things: market based pricing, access to new skills, services, and 17
capabilities, and the flexibility that comes with buying of services rather 18
than assets. 19
20
21
Testimony of the Information Services Panel
Page 20 of 47
Through a competitive procurement process, National Grid IS is able to 1
provide services at costs that are in line with the overall IT industry 2
market, which is becoming ever more sophisticated and competitive. 3
Under the new framework, National Grid has access to skills and 4
capabilities that can be difficult to retain when relying solely on in-house 5
resources. The delivery partners specialize in their respective areas, 6
providing access to leading edge technologies and innovation, as well as 7
to economies of scale in the delivery of these specialized services. To 8
remain aligned with the evolving market for IT services, as the initial 9
contracts expire, National Grid IS will again put these services to 10
competitive bid, thus ensuring the services continue to be delivered at 11
competitive pricing. 12
13
Another significant benefit of the third-party delivery arrangement is the 14
service flexibility provided under the framework where National Grid 15
can purchase IS resources as a service from the vendor on an as-needed 16
basis. Such a feature is key in managing the changing needs of the 17
business and customers. In a major storm situation, in which increased 18
use of service restoration systems puts pressure on performance of those 19
systems, as an example, the enterprise services arrangement allows for 20
increased capacity during the high-use period to ensure adequate system 21
22
Testimony of the Information Services Panel
Page 21 of 47
performance. Another benefit is that as part of the monthly invoicing 1
process, vendors segregate costs by service type and invoice each entity 2
based on its usage. This provides each entity, including Niagara 3
Mohawk, with better cost transparency and improves business decisions 4
regarding the requested services. 5
6
Q. Is the Company proposing to recover costs to achieve for IS 7
Transformation? 8
A. No. The Company is not proposing to recover costs to achieve related to 9
IS Transformation. 10
11
Q. Are there any efficiency and productivity savings associated with IS 12
Transformation? 13
A. Yes. As explained in more detail in the testimony of the Revenue 14
Requirements Panel, IS Transformation was one of many initiatives that 15
contributed to the Company’s US Restructuring Program savings. These 16
savings are fully reflected in the Rate Year, as shown in Exhibit __ 17
(RRP-3), Schedule 48. 18
19
VI. US Foundation Program 20
Q. What is the US Foundation Program? 21
23
Testimony of the Information Services Panel
Page 22 of 47
A. The US Foundation Program is one of the major first steps in a multi-1
year process to update and rationalize National Grid’s system 2
applications. The primary objective of the USFP is the integration of 3
National Grid’s US Human Resources (“HR”), Supply Chain and 4
Finance (Back Office/Enterprise Resource Planning) processes that 5
continue to operate across a patchwork of disparate applications and 6
infrastructure since National Grid’s acquisition of KeySpan in 2007. The 7
USFP will consolidate systems onto a single SAP ERP platform to 8
replace and improve the functionality delivered in the US today by the 9
Oracle and PeopleSoft ERP Suites and associated applications. USFP 10
will enable National Grid to redesign business processes, provide 11
additional functionality and address recommendations from the 12
Commission-directed Management Audit of Niagara Mohawk and 13
Liberty Consulting Group’s independent affiliate relationship and 14
transaction review relating to: 15
• consistent and robust financial/regulatory reporting and 16
business planning capability, and improved controls; 17
• simplification of business processes and the associated 18
systems landscape (e.g., single ERP, fleet, sales tax, fixed 19
asset and time entry systems); 20
24
Testimony of the Information Services Panel
Page 23 of 47
• support for delivery of future Front Office/work management 1
rollout; 2
• a single set of allocation methods available for service 3
company costs to be shared among affiliate companies and 4
separate coding specifically for each overhead/burden type; 5
• treatment of direct assigned service company costs that are 6
directly reported on affiliate company financial ledgers; 7
• consolidation of the US service companies; 8
• automated Delegation of Authority to streamline the process 9
and facilitate control of expenditures; 10
• an integrated investment portfolio and improved project 11
management capabilities to enable work order ownership to 12
become a “cradle to grave” process, with work breakdown 13
structures as well as more accurate reporting of assets and the 14
timely close out of work orders; 15
• enhanced vendor and product functionality and stability; and 16
• one HR system using a single organization structure that 17
provides better workforce reporting. 18
19
Q. Why is the US Foundation Program needed? 20
25
Testimony of the Information Services Panel
Page 24 of 47
A. Following National Grid’s acquisition of KeySpan in 2007, the US 1
business has been challenged in supporting multiple and complex business 2
processes that span multiple and complex technology platforms. The 3
fragmented business processes and systems that exist in the current US 4
Systems landscape result in: 5
• complexity and risk across accounting closes, local and 6
jurisdictional financial and regulatory reporting, financial 7
planning and budgeting, and financial analysis and controls; 8
• multiple HR hierarchies needing significant workarounds to 9
address misalignment between organizational structure and 10
how employees are organized in their respective HR systems; 11
• functions requiring reporting across two ERP Suites (Oracle 12
and PeopleSoft); and 13
• data analysts across all business units using spreadsheets for 14
data consolidation and reporting, introducing additional 15
inefficiencies. 16
17
The USFP is of critical importance in addressing the financial reporting 18
and business efficiency challenges inherent in the multiple processes and 19
systems that currently exist across the US landscape following the 20
26
Testimony of the Information Services Panel
Page 25 of 47
KeySpan merger. Furthermore, it is fundamental to reducing the technical 1
risk associated with operating business critical systems on aged 2
infrastructure that in some cases has limited vendor support and presents 3
an increased risk of failure. 4
5
Q. What are the elements of the US Foundation Program? 6
A. From a systems perspective, the scope of the US Foundation Program is 7
largely the consolidation of the current US ERP Suites, (Oracle Finance 8
and Supply Chain, PeopleSoft Finance and Supply Chain and two 9
instances of PeopleSoft HR), onto a single SAP ERP platform. In 10
addition, the project will: 11
• consolidate time entry applications onto SAP and retire both 12
of the current time entry systems, which are no longer 13
supported by their respective vendors; 14
• consolidate Fleet Management Systems for both Legacy 15
National Grid and Legacy KeySpan onto SAP, resulting in the 16
retirement of two Fleet Anywhere applications; 17
• carry forward Powerplant for accounting, recording, and 18
reporting of fixed assets because of its industry-specific focus 19
and recognition as a “best in breed” application, and 20
27
Testimony of the Information Services Panel
Page 26 of 47
consolidate the current two PowerPlant applications onto a 1
single upgraded PowerPlant platform; 2
• consolidate the Manhattan Warehouse Management System 3
onto SAP; 4
• integrate SAP with National Grid’s current work and asset 5
management systems (Storms, Maximo and Cascade), with 6
improvements to the work order lifecycle that include 7
activities based costing; and 8
• upgrade a number of associated non-SAP applications, 9
including BSI/Tax Factory, Plateau Learning Management 10
System, Reval Treasury Management System, Sabrix Sales 11
and Use Tax and BizApps. 12
13
The Conceptual Application Diagram (“CAD”), attached as Exhibit __ 14
(ISP-2), provides a comprehensive depiction and description of the scope 15
of the USFP. As illustrated in the CAD, the scope of the USFP includes 16
SAP ERP applications (components 1-15, 17-28, 30-31, 85, and 91 in the 17
CAD) and upgrades to new non-SAP system (components 29, 71, 82, 86, 18
and 96 in the CAD). In addition, the SAP ERP applications will 19
interface with legacy applications (components 33-35, 37-60, 62-64, 66-20
69, 72-77, 79-81, 83-84, 87-90, 92-95 in the CAD such as the current 21
28
Testimony of the Information Services Panel
Page 27 of 47
work and asset management systems, Storms, Maximo and Cascade) and 1
third party system applications (shown along the top of the CAD and 2
including interfaces to banks, external vendors, state and federal 3
agencies, and document management providers). Validation of the CAD 4
is an iterative process that identifies the scope of the project. The 5
Development Objects (“RICEFWs”) that are required by the business 6
also provide an indication of the scope of the USFP. RICEFWs 7
associated with the USFP are comprised of Reports (111), Interfaces 8
(190), Conversions (68), Enhancements (151), Forms (44) and 9
Workflows (31). Approximately 595 RICEFWs are planned to be 10
delivered as part of the USFP. 11
12
The integration of SAP with National Grid’s current work and asset 13
management systems (Storms, Maximo and Cascade) provides a further 14
illustrative example of the complex scope of the USFP. A range of major 15
cost and asset information required for financial reporting under the SAP 16
ERP platform, including requisitions for materials, external costs such as 17
contractor spend and fleet usage, internal labor hours, customer 18
contributions and asset installations and retirements are derived from 19
work orders actually produced by National Grid’s current work and asset 20
management systems. As such, the USFP also addresses elements of the 21
29
Testimony of the Information Services Panel
Page 28 of 47
work and asset management system that require replication and 1
integration with the SAP ERP system. 2
3
Q. Why did National Grid select SAP for the US Foundation Program? 4
A. The decision to utilize SAP as the target platform for US systems 5
consolidation was evaluated at numerous points in the history of the effort 6
to consolidate systems. Prior to initiating the US Foundation Program, 7
key decision points on the use of SAP as a target platform occurred: 8
• as National Grid began to finalize KeySpan merger IS 9
integration recommendations (P Projects), with concerns 10
about the long-term viability and fitness for use in an 11
integrated gas and electric operating model, of existing and 12
planned application consolidations; 13
• with the evaluation of various US systems strategy options 14
by IS and the business, culminating in a December 2009 15
US Systems Strategy and Routemap (“Roadmap”), attached 16
as Exhibit __ (ISP-3), validating that SAP would best 17
support the US operating model, address business issues 18
and enable targeted business process capabilities. 19
20
30
Testimony of the Information Services Panel
Page 29 of 47
After the US Foundation Program commenced in early 2010, validation of 1
the scope and proposed SAP design occurred: 2
• under the High Level Design phase of the USFP that 3
identified the process groups, application categories, and 4
legacy systems to be replaced and key interfaces and bolt-5
on applications to the SAP solution; 6
• with the validation of the CAD attached as Exhibit __ 7
(ISP-2), identifying the total scope of any additional 8
functional Development Objects, including reports, 9
interfaces, conversions, enhancements, forms and 10
workflows (“RICEFWs”); 11
• with the revisiting of the Roadmap phasing and 12
assumptions in light of the completion of high level design 13
and initial progress on detailed design; and 14
• as a result of the Liberty Consulting Group report and 15
recommendations in March 2011, which validated 16
convergence onto a single system platform and provided a 17
template against which to validate the proposed SAP 18
design, avoid inconsistencies and fix areas that have 19
undermined data integrity. 20
21
31
Testimony of the Information Services Panel
Page 30 of 47
In early 2011, prior to seeking sanctioning for significant funding for the 1
development and implementation phase of the US Foundation Program, 2
National Grid engaged Capgemini to conduct an independent Benefits 3
Validation, attached as Exhibit __ (ISP-4). The Benefits Validation 4
compared the SAP solution against two potential alternatives 5
(PeopleSoft/Maximo Work and Enterprise Asset Management System and 6
Oracle E Business Suite), providing an evaluation over a ten year 7
timeframe and considering: 8
• the current scope of US Foundation 9
• future integration of Work and Enterprise Asset Management 10
Systems 11
• future integration of Geospatial Information Systems (“GIS”) 12
• a major upgrade within 5 years 13
• ongoing maintenance costs 14
15
In addition, other important considerations that Capgemini took into 16
account in its report that reinforced its view that SAP was the best option 17
included: 18
• Magnitude of Change - the organizational and employee 19
change impact that National Grid would be required to 20
accommodate for each option; 21
32
Testimony of the Information Services Panel
Page 31 of 47
• Technical Risk – whether the product set is commercially 1
available and there is a significant installed utility base from 2
which to draw best practices; 3
• Implementation Risk – whether there is ample supply of skilled 4
resources to draw from in the market place; and 5
• Solution Complexity – the extent to which an option was 6
integrated with an ERP system that requires less custom 7
integration with other best of breed solutions. 8
9
Capgemini’s report concluded that, while other technologies could deliver 10
many of the same business functions, the maturity of the SAP product and 11
the range of potential business capability improvements were beyond 12
those enabled by either of the alternatives considered. 13
14
Q. When does the USFP go into service? 15
A. The planned implementation date for the USFP is October 2012. 16
17
Q. What is the cost of the US Foundation Program? 18
A. The costs for the US Foundation Program are currently estimated at 19
$365.8 million. Of this amount, approximately $282.5 million comprise 20
capital costs, and $83.3 million comprise operating expense. Through 21
33
Testimony of the Information Services Panel
Page 32 of 47
March of 2012, National Grid has invested $172.3 of the total estimated 1
capital cost of $282.5 million. In addition, although, as of the same date, 2
in total, National Grid has incurred $33 million of operation expenses of 3
the total estimated operating costs of $83.3 million through the in-service 4
date of the USFP, the Company is not requesting recovery of what would 5
have been its share of these expenses in this case. 6
7
Because the US Foundation Program is a shared investment, only a 8
portion of the total investment would be allocated to Niagara Mohawk in 9
the form of an annual rent expense as part of the overall IS service rent 10
expense allocated to Niagara Mohawk. The portion of the annual rent 11
expense attributable to the US Foundation Program investment is 12
$11,876,982 million for the electric business and $2,572,446 for the gas 13
business in the Rate Year, as shown in Exhibit __ (RRP-3), Schedule 8. 14
Exhibit __ (RRP-3), Schedule 8 also shows the forecast rent expense for 15
the USFP to Niagara Mohawk for the Data Years. 16
17
Q. Are there incremental costs associated with supporting the USFP 18
after the implementation date? 19
A. Yes, there are incremental costs associated with an Enduring Business 20
Support (“EBS”) Organization after the USFP implementation date that 21
34
Testimony of the Information Services Panel
Page 33 of 47
are incremental to the current support structure reflected in the Historic 1
Test Year. After the USFP go-live, important functions of the EBS will be 2
supporting business functions in use of the new system, designing new 3
processes to take full advantage of the new system, monitoring business 4
controls imbedded in the system, and ensuring compliance with, and 5
prompt response to, regulatory and internal audits. The EBS will begin 6
functioning when responsibility for the system transfers from the project 7
team to the ongoing support organization following the go-live date of 8
October 2012. The EBS will be in place for the entire Rate Year and 9
through the Data Years. 10
11
Q. Were the services to be provided by the Enduring Business Support 12
functions also provided in the Historic Test Year? 13
A. Although the current organizational structure provides some of these 14
proposed services within the IS Process and Systems group, services 15
within the EBS will address the additional system enhancements under 16
the USFP, support knowledge continuity with the design and 17
maintenance of non-technical training (Finance, Supply Chain, HR, etc.), 18
document business solutions and controls, and deliver incremental 19
training as required for new employees and job/role changes. The EBS 20
functions will maintain the integrity and quality of information on the 21
35
Testimony of the Information Services Panel
Page 34 of 47
new systems through the implementation of data governance framework 1
and a centralized group that manages new ways to use reporting tools to 2
support business operations/analytics. These incremental support 3
functions result in operating costs incremental to what was incurred in 4
the Historic Test Year. RRP-11, Workpapers for Exhibit __ (RRP-3), 5
Schedule 31 details the incremental costs associated with these additional 6
support functions. 7
8
Q. What are the costs associated with the incremental EBS staffing 9
requirements in the Rate Year and Data Years? 10
A. As shown in RRP-11, Workpapers for Exhibit __ (RRP-3), Schedule 31, 11
an incremental cost of $3,617,648 relating to 26 additional FTEs to 12
provide the above-mentioned business support functions is needed in the 13
Rate Year. Niagara Mohawk’s allocated share of those costs is 14
$1,063,118 for Niagara Mohawk electric and $181,642 for Niagara 15
Mohawk gas and is included in the Company’s revenue requirement. 16
Niagara Mohawk’s allocated share of these costs in the Data Years is 17
provided RRP-11, Workpapers for Exhibit __ (RRP-3), Schedule 31. 18
19
Q. Are there any efficiency and productivity savings associated with the 20
US Foundation Program? 21
36
Testimony of the Information Services Panel
Page 35 of 47
A. Not directly. As explained in the testimony of the Revenue 1
Requirements Panel, the USFP has enabled certain US Restructuring 2
savings. Those savings are fully reflected in the Rate Year as shown in 3
Exhibit __ (RRP-3), Schedule 48. 4
5
Q. What are the next steps after the implementation of the USFP? 6
A. The SAP for Utilities solution portfolio comprises an integrated set of 7
solution components that tie together with the SAP ERP system, which 8
comprises the base of the USFP. The USFP will provide the foundation 9
for the implementation of the work and asset management components of 10
the SAP solution (“US SAP Front Office”) and other solutions discussed 11
below that will be implemented later as part of the larger IS strategic 12
Roadmap. In addition, with the next phase (“Front Office”), National 13
Grid will evaluate and design the appropriate work management and 14
scheduling applications, field mobile solution and a recommendation on 15
a GIS platform that will complement the overall US field operating 16
processes. In general, the Front Office solution will support the business 17
processes that manage the assets, and plan, manage and execute the work 18
on the transmission and distribution networks. 19
20
21
37
Testimony of the Information Services Panel
Page 36 of 47
Q. What is the timing of the implementation of Front Office? 1
A. National Grid anticipates commencing preliminary planning of the Front 2
Office phase in the Fall of 2012. The complete Front Office solution will 3
not be implemented within the Rate Year or Data Years in this 4
proceeding. Certain components of Front Office are currently anticipated 5
to occur within the Data Years as shown in Exhibit __ (ISP-1) and 6
discussed below. The sequence and timing of the identified components 7
in Exhibit __ (ISP-1) remains subject to the preliminary planning 8
anticipated to begin in the Fall of 2012. The timing of the remainder of 9
the Front Office solution is also subject to analysis on optimal timing and 10
order of components as part of the preliminary planning discussed above. 11
12
Q. Does the Company have a preliminary forecast for the Front Office 13
project costs? 14
A. Yes. The current, preliminary view of the scope of Front Office includes 15
the following projects, which are listed on Exhibit __ (ISP-1): 16
a. US SAP Front Office 17
b. US Mobile Gas & Meter Services Strategic 18
Implementation 19
c. US SAP Minor/Major Application Releases 20
d. US Electric GIS consolidation to strategic platform 21
38
Testimony of the Information Services Panel
Page 37 of 47
e. GIS Integration Program 1
Preliminary cost estimates for these projects are reflected in Exhibit __ 2
(ISP-1); the portion of the annual rent expense derived from these 3
estimates is presented in Exhibit __ (RRP-3), Schedule 8. The 4
preliminary estimates have been developed without the completion of 5
detailed design that produces the conceptual application diagram (“Front 6
Office CAD”). After completion of the Front Office CAD, National Grid 7
will be able to identify the total scope of the Front Office and prepare 8
revised estimates. The Company proposes to update Staff with the scope 9
and forecast as it completes its analysis. As explained earlier, it is not 10
anticipated that the entirety of the Front Office solution will be 11
completed before the end of the Rate Year or Data Years in this case, and 12
the timing of the implementation of the above-mentioned projects could 13
also change based upon the detailed design. 14
15
VII. Cyber Security 16
Q: How is National Grid addressing cyber security? 17
A National Grid IS recognizes the threats that exist regarding unauthorized 18
access to its systems, both those that control critical electric and gas 19
delivery systems, as well as to business systems that contain confidential 20
customer and proprietary Company information. In late 2010, National 21
39
Testimony of the Information Services Panel
Page 38 of 47
Grid IS formed the Digital Risk and Security department, with its primary 1
focus on the protection of National Grid systems and information. In 2
2009, an enterprise-wide security assessment was conducted to determine 3
the current security readiness state, provide a future target security 4
readiness level to meet the increasing demands on National Grid’s digital 5
security, and provide findings and potential impact to the business. The 6
assessment identified key security threats in the areas of risk assessment, 7
security organization, access control, critical electric and gas delivery 8
systems, shared information, and network security. The assessment also 9
included both strategic and tactical recommendations that formed the basis 10
for digital security investments in both the short and long term. The 11
recommendations were organized around a number of major themes: 12
• Identity Access Management – focuses on the process of 13
assigning user 14
accounts, administration of roles and access privileges, periodic 15
review of user rights, control of information access by third 16
parties, authorization and authentication, single sign-on 17
capability, and password/directory management; and addresses 18
compliance with all regulatory and legal obligations. 19
• Critical Delivery System Enhancements – focuses on National 20
Grid’s critical electric and gas delivery systems, including third 21
40
Testimony of the Information Services Panel
Page 39 of 47
party access; direct communication between critical and non-1
critical systems; and authorization and authentication of devices 2
and encryption. 3
• Data Loss Prevention – focuses on reducing the risk of 4
disclosure of customer information and personnel records, with 5
emphasis on compliance with regulatory and legal requirements. 6
• Full Disk Encryption and Managed End Point Protection – 7
focuses on encryption and end point protection from 8
unauthorized access related to theft or loss of laptops, desktops, 9
servers, and other devices. 10
• Intrusion Detection and Prevention – focuses on protecting 11
networks; reducing the impact of intrusion incidents by 12
initiating timely and appropriate responses to attacks and 13
improving the effectiveness of preventive controls by 14
accelerating the response time to major critical events. 15
• Electronic Discovery – focuses on the identification, collection, 16
and preservation of information in support of business 17
investigations, legal actions, and regulatory requirements. 18
• Security Awareness – focuses on promoting communication 19
within National Grid to ensure awareness of important security 20
41
Testimony of the Information Services Panel
Page 40 of 47
concerns, promoting strong security technical controls across all 1
business areas, and creating a strong security culture. 2
• Transport Layer Security – focuses on protecting the privacy 3
and integrity of information which, for various business reasons, 4
must be transferred to trusted business partners. 5
6
Q. What projects or new data security initiatives has the Company 7
included in the Rate Year and Data Years? 8
A. The complete list of incremental IS digital risk and security projects 9
included in the Rate Year and Data Year forecasts is provided in Exhibit 10
__ (ISP-1) and Exhibit __ (RRP-3), Schedule 8. 11
12
Q. Please describe the more significant projects included in the Rate 13
Year forecast. 14
A. The more significant projects included in the Rate Year forecast that 15
support the above-mentioned strategic themes for digital security 16
investments are described below. 17
• Identity Management / Access Control for Data Management – 18
With these projects, National Grid IS is addressing the provision 19
of user accounts, including administration of roles and access 20
privileges, periodic review of user rights, control of information 21
42
Testimony of the Information Services Panel
Page 41 of 47
access by third parties, authorization and authentication, single 1
sign-on, virtualization, and password/directory management. 2
• Data Loss Prevention End Point Fine Grained – National Grid IS 3
is seeking to safeguard sensitive and proprietary information on 4
portable devices such as laptops and mobile telephones. 5
• Incident and Event Management – Under this project, National 6
Grid will focus on the identification, collation, analysis and 7
reporting of security incident data, including the capture of 8
security events from operational systems and dedicated security 9
tools as well as input from external risk and threat assessment 10
sources. Inappropriate definitions of incidents may impact 11
operational functionality and can lead to a reduced ability to 12
distinguish more serious events from problems of less 13
importance. This project will enable a centralized view of 14
security events and provide a system for security incident 15
management. Whereas National Grid currently has distributed 16
security event monitoring through various partners and internal 17
teams, the aims of National Grid IS with this project is a 18
centralized and correlated view, as well as an incident tracking 19
system to speed up the response time, support incident 20
43
Testimony of the Information Services Panel
Page 42 of 47
resolution, and facilitate the regulatory reporting requirements 1
for security incidents. 2
• CNI (Critical National Infrastructure) Separation from Business 3
Local Area Network – CNI infrastructure and applications are 4
crucial to delivering reliable electric and gas service to 5
customers. With this project, National Grid IS seeks to improve 6
controls on unrestricted third-party access to critical systems, 7
and address communication data flow between CNI and non-8
CNI systems, authentication of devices, and encryption. 9
• ESM Server / Desktop Security – The focus of this project is 10
reduction of the threat of foreign software (malware) to the 11
servers and workstations in the network control rooms. The 12
malware targeted can be introduced through peripheral devices 13
or external transmissions, and has the potential to seriously 14
disrupt operations. Security software will prevent any software 15
from executing unless previously approved to run on identified 16
critical devices. 17
18
Q. Please describe the more significant projects included in the Data 19
Year forecasts. 20
44
Testimony of the Information Services Panel
Page 43 of 47
A. The more significant projects included in the Data Years as shown in 1
Exhibit __ (ISP-1) and Exhibit __ (RRP-3), Schedule 8 are described 2
below. 3
• Single Point of Failure – A number of security controls within 4
National Grid were originally implemented with a single-5
threaded design, meaning that failure of that one thread could 6
cause failure of the control. National Grid IS will implement 7
redundancy for key controls in the security architecture. 8
• Digital Risk and Security Program Improvements (Maturity 9
Driven) – A series of strategic and tactical investments will be 10
made to improve National Grid’s security maturity/readiness 11
and capability position. 12
• Digital Risk and Security Program Improvements (Compliance 13
Driven) – This project relates to National Grid’s compliance 14
with critical infrastructure protection requirements of the North 15
American Electric Reliability Corporation and the Northeast 16
Power Coordinating Council, Inc., Payment Card Industry Data 17
Security Standards, and state and federal data privacy 18
requirements. National Grid IS will also address oversight and 19
monitoring to maintain accuracy in compliance and auditing. 20
21
45
Testimony of the Information Services Panel
Page 44 of 47
VIII. Other IS Costs and Investments 1
Q. Please describe the planned investments in the Outage Management 2
System and the Energy Management System. 3
A. The OMS and EMS are described in the testimony of the Electric 4
Infrastructure and Operations Panel. The existing system assets are near 5
the end of their useful lives. In the case of the existing EMS, the vendor 6
of that system is no longer in business, and vendor support and updates are 7
not available. The OMS system has not been updated in many years, and 8
is no longer fully supported by its vendor. However, reliable operation of 9
these systems is important to the operation of the electric system. 10
11
The OMS asset will be implemented and owned by National Grid USA 12
service company as a shared system, providing outage and distribution 13
management services to Niagara Mohawk as well as other National Grid 14
electric utility affiliates in the US. The Service Company will assess the 15
Company its share of the costs of providing those services based on the 16
relevant allocator. The total capital cost of the OMS is estimated to be 17
approximately $48.2 million. OMS is expected to be in service in New 18
York in June 2013, followed with integration to the EMS by the end of 19
2013, and upgraded integration functionality in late 2015/early 2016. 20
Niagara Mohawk’s share of OMS expense beginning in the Rate Year will 21
46
Testimony of the Information Services Panel
Page 45 of 47
be approximately $3.682 million. Derivation of these costs and the 1
allocation to Niagara Mohawk is addressed in the Revenue Requirement 2
Panel’s Exhibit __ (RRP-3), Schedule 8. 3
4
The new EMS asset will only serve Niagara Mohawk, and therefore will 5
be a direct capital investment by Niagara Mohawk. Total project costs are 6
estimated at $29.7 million, and are described in the testimony of the 7
Electric Infrastructure and Operations Panel. 8
9
Q. Please describe the US Gas and Electric Critical National 10
Infrastructure (“CNI”) Data Center project. 11
A. Under the CNI Data Center Project, National Grid IS will evaluate the 12
condition and maintenance of the seven US CNI Data Center facilities and 13
recommend a strategic plan for hosting CNI applications. CNI Data 14
Centers host control and affiliated systems that are necessary to ensure 15
National Grid’s ability to securely maintain the reliability of its critical 16
electric and gas delivery systems. Increasing use of automation and higher 17
security requirements created a need for a strategic review of how to 18
provide this capability for Niagara Mohawk and across the US business. 19
National Grid IS will report on the condition of the existing facilities, and 20
recommend an optimum number of data center facilities, the level of 21
47
Testimony of the Information Services Panel
Page 46 of 47
resilience and security that is needed for the infrastructure, and the 1
investments in infrastructure capacity and site management and operations 2
that are needed to sustain the resiliency of the centers. 3
4
Preliminary work enabled National Grid IS to identify five strategic 5
options, each using a primary CNI Data Center in each operating area, 6
including Upstate NY. The current options differ on considerations of: 7
• making minimal upgrades to the existing configuration that 8
requires ongoing maintenance of seven sites; 9
• making upgrades to the existing sites and leveraging existing 10
capacity to maximize CNI’s use of the most resilient sites to 11
provide geographic diversity, and to decommission minor CNI 12
Data Centers; 13
• consolidating Downstate New York CNI systems and business 14
groups; and 15
• building out additional space to accommodate dual backups for 16
each CNI system (each CNI system would be hosted in its own 17
region and have a backup in the other two regions). 18
19
48
Testimony of the Information Services Panel
Page 47 of 47
In the CNI Data Center project, National Grid IS will comprehensively 1
evaluate each option, determine the most cost effective solution aligned 2
with the EMS and OMS projects, and implement that solution. 3
4
Q. What is the projected in-service date of the CNI Data Center project? 5
A. The projected in-service date of the CNI Data Center project is April 2014 6
as shown in Exhibit __ (ISP-1). 7
8
Q. What are the projected costs of the CNI Data Center project? 9
A. The CNI Data Center project is estimated to cost approximately $16 10
million, as shown in Exhibit __ (ISP-1). The Company’s rent expense 11
forecast for the CNI Data Center project is shown in Exhibit ___ (RRP-3), 12
Schedule 8. 13
14
Q. Does this conclude your testimony? 15
A. Yes.16
49
Exhibits of
IS Panel
Testimony of the Information Services Panel
Index of Exhibits Exhibit __ (ISP-1) Planned IS Projects and Investments for the Twelve
Months Ending March 31, 2014, March 31, 2015, and March 31, 2016
Exhibit __ (ISP-2) US Foundation Program Conceptual Application Diagram Exhibit __ (ISP-3) December 2009 US Systems and Strategy Roadmap Exhibit __ (ISP-4) June 29, 2011 SAP Benefits Validation Report Prepared By
Capgemini
50
Exhibit __ (ISP-1)
Testimony of the Information Services Panel
Exhibit __ (ISP-1)
Planned IS Projects and Investments for the Twelve Months Ending March 31, 2014, March 31, 2015, and March 31, 2016
51
Exhi
bit _
_ (I
SP-1
)Pa
ge 1
of 5
Nia
gara
Moh
awk
Pow
er C
orpo
ratio
n d/
b/a
Nat
iona
l Grid
Info
rmat
ion
Serv
ices
(IS)
Pro
ject
s
IS E
xec
Inve
stm
ent
Nam
eIN
VP
#B
ill P
ool
In S
ervi
ce
Dat
eA
mor
tiza
tion
P
erio
dIn
cep
tion
to
Dat
e $
FY
12(J
an-M
ar 1
2)F
Y13
(12/
13)
FY
14(1
3/14
)F
Y15
(14/
15)
FY
16(1
5/16
)F
Y17
(16/
17)
Tot
al U
S S
pen
d
190
0009
6140
Cap
italiz
ed S
oftw
are
- Wor
k O
rder
Add
ition
0023
9M
ar-1
184
$1,6
86,4
10$1
,686
,410
290
0009
6375
Cap
italiz
ed S
oftw
are
- Wor
k O
rder
Add
ition
0038
2M
ar-1
184
$294
,053
$294
,053
390
0010
4109
Cap
italiz
ed S
oftw
are
- Wor
k O
rder
Add
ition
0038
2M
ar-1
184
$208
,232
$208
,232
490
0010
2450
Cas
cade
Pha
se I
proj
ect 1
of 2
0023
3Ju
l-10
84$3
92,5
15$3
92,5
155
9000
1024
51C
asca
de P
hase
I pr
ojec
t 2 o
f 200
231
Oct
-10
84$5
88,7
73$5
88,7
736
9000
1040
55C
IS C
onso
lidat
ion
0024
7Ja
n-08
84$2
8,90
0,77
1$2
8,90
0,77
17
9000
0963
85C
onta
ct C
ente
rs C
all R
ecor
ding
0038
2M
ar-1
084
$361
,473
$361
,473
890
0010
4123
DEC
US0
5-A
utom
for M
ng R
eq00
231
Oct
-11
84$1
,914
,655
$1,9
14,6
559
9000
0963
90Eq
uip
Com
pute
rs -
Wor
k O
rder
Add
ition
0038
2D
ec-1
184
$1,6
76,1
02$1
,676
,102
1090
0009
8663
Equi
p C
ompu
ters
- W
ork
Ord
er A
dditi
on00
231
Sep-
1112
0$6
92,6
18$6
92,6
1811
9000
0987
10Eq
uip
Com
pute
rs -
Wor
k O
rder
Add
ition
0038
5Se
p-11
120
$1,2
31,0
84$1
,231
,084
1290
0009
8936
Equi
p C
ompu
ters
- W
ork
Ord
er A
dditi
on00
382
Jul-1
112
0$2
3,21
3$2
3,21
313
9000
0993
22Eq
uip
Com
pute
rs -
Wor
k O
rder
Add
ition
0038
2D
ec-1
060
$1,5
10,9
91$1
,510
,991
1490
0009
9323
Equi
p C
ompu
ters
- W
ork
Ord
er A
dditi
on00
601
Dec
-10
120
$872
,089
$872
,089
1590
0010
4123
Equi
p C
ompu
ters
- W
ork
Ord
er A
dditi
on00
231
Oct
-11
120
$6,6
80$6
,680
1690
0010
4180
Equi
p C
ompu
ters
- W
ork
Ord
er A
dditi
on00
231
Oct
-11
120
$4,6
59$4
,659
1790
0010
5262
Equi
p C
ompu
ters
- W
ork
Ord
er A
dditi
on00
601
Sep-
1112
0$3
,334
,420
$3,3
34,4
2018
9000
0963
81Eq
uip
Com
pute
rs -
Wor
k O
rder
Add
ition
0038
2Ju
l-10
120
$794
,589
$794
,589
1990
0010
4063
Equi
p C
ompu
ters
- IN
VP
1389
0060
1Ju
l-11
120
$1,9
58,2
22$1
,958
,222
2090
0010
0683
Gen
. Mis
c Eq
uip
- Wor
k O
rder
Add
ition
0023
3N
ov-1
084
$37,
114
$37,
114
2190
0009
6494
Gen
Pla
nt $
20k
or m
ore
- Wor
k O
rder
Add
ition
0023
8D
ec-1
084
$110
,181
$110
,181
2290
0010
4230
Gen
Pla
nt le
ss th
an $
20k
-Wor
k O
rder
Add
ition
0023
6Ju
l-11
264
$55,
182
$55,
182
2390
0010
4115
IN03
09-S
CM
-EN
GA
GE
VEN
DO
R00
382
Mar
-11
120
$312
,721
$312
,721
2490
0009
6383
IN08
23 S
ecur
ity E
nhan
ce P
roje
ct00
382
Sep-
1126
4$3
13,2
44$3
13,2
4425
9000
1041
13IN
1588
-21S
T C
ENT
FOR
SY
RA
C00
382
Sep-
1084
$273
,401
$273
,401
2690
0009
6381
INN
/A-N
ERC
CIP
Com
plia
nce
0023
3Ju
l-10
84$1
,155
,595
$1,1
55,5
9527
9000
1040
60IN
VP
0845
- D
ata
Upg
rade
0038
2Se
p-10
84$4
64,1
35$4
64,1
3528
9000
1041
01IN
VP
1224
- TO
A00
233
Oct
-11
84$6
01,5
62$6
01,5
6229
9000
1041
79IN
VP
1242
- D
ECU
S05
0023
1O
ct-1
184
$253
,998
$253
,998
3090
0010
4180
INV
P 12
42TB
- K
PI M
etric
s00
231
Oct
-11
84$6
22,5
92$6
22,5
9231
9000
1040
68IN
VP
1391
- W
inte
l Life
cycl
e00
601
Sep-
1184
$523
,093
$523
,093
3290
0010
4080
INV
P 14
01 -
LAN
/WIN
0038
2Se
p-10
84$5
27,7
01$5
27,7
0133
9000
1041
22IS
P01-
Inte
grat
ed S
trat P
lan
0023
1D
ec-1
084
$1,1
05,7
06$1
,105
,706
3490
0010
4116
JBC
RD
01I-
Who
lesa
le R
e-D
es00
231
Oct
-11
84$4
36,3
85$4
36,3
8535
9000
0978
57LI
M/Z
EMA
Pro
ject
0038
2M
ar-1
184
$402
,988
$402
,988
3690
0009
6379
One
Net
0038
2Ju
n-10
84$4
,475
,489
$4,4
75,4
8937
9000
0963
74S&
M D
ata
War
ehou
se E
xpan
sion
0038
2M
ar-1
184
$981
,583
$981
,583
3890
0010
4189
UH
F Sp
ectru
m P
urch
ase
Proj
ect
0023
2O
ct-1
184
$2,1
16,6
24$2
,116
,624
3990
0009
6376
Vid
eo C
onfe
renc
ing
0038
2O
ct-1
184
$1,2
07,4
79$1
,207
,479
4090
0010
4151
WC
OR
09 -
AV
LS In
tegr
atio
n00
231
Oct
-11
84$3
13,5
23$3
13,5
2341
9000
0963
73W
eb In
itiat
ives
FY
09 -
Phas
e 1
0038
2Se
p-10
84$2
,010
,464
$2,0
10,4
6442
9000
0989
36W
ire &
Cab
le -
Wor
k O
rder
Add
ition
0038
2Ju
l-11
84$2
53$2
5343
9000
0963
20IN
1242
D-I
SP-I
nteg
rate
d St
rat P
lan
0023
1D
ec-1
060
$276
,275
$276
,275
4490
0010
4121
SHO
RT0
4-Pr
ima
P6 U
pgra
de00
231
Dec
-10
84$1
,443
,524
$1,4
43,5
2445
9000
1042
31C
ombi
ne M
eter
Rea
ding
Rou
tes
0023
0M
ay-1
184
$364
,462
$364
,462
4690
0011
6201
Cas
cade
Pha
se II
pro
ject
1 o
f 200
203
Dec
-11
84$1
,550
,857
$1,5
50,8
5747
9000
1162
02C
asca
de P
hase
II p
roje
ct 2
of 2
0023
3D
ec-1
184
$1,0
33,9
05$1
,033
,905
48D
igita
l Ris
k &
Sec
urity
Secu
rity
Enha
nce
Proj
ect
INV
P 08
23a
0038
2A
pr-1
284
$26,
594
$523
$0$0
$0$0
$0$2
7,11
749
Dig
ital R
isk
& S
ecur
ityD
ata
Loss
Pre
vent
ion
INV
P 08
23b
0038
2Se
p-12
84$1
11,8
66$1
,937
$131
,197
$0$0
$0$0
$245
,000
50D
igita
l Ris
k &
Sec
urity
US
Full
Dis
k En
cryp
tion
INV
P 08
23c
0038
2Se
p-12
84$1
85,4
45$4
08,9
74$6
20,5
81$0
$0$0
$0$1
,215
,000
51D
igita
l Ris
k &
Sec
urity
Smal
lwor
ld G
IS U
pgra
deIN
VP
0953
0023
1A
pr-1
284
$4,2
80,7
59$1
46,5
60$0
$0$0
$0$0
$4,4
27,3
1952
Cus
tom
erC
SS (C
usto
mer
Ser
vice
Sys
tem
) Fou
ndat
ion
Upg
rade
INV
P 10
0000
229
Mar
-14
60$0
$0$0
$450
,000
$0$0
$0$4
50,0
0053
Tran
smis
sion
NE
EMS
Rep
lace
men
tIN
VP
1043
0023
7D
ec-1
384
$9,7
46,7
95$8
14,2
86$3
,300
,000
$500
,000
$0$0
$0$1
4,36
1,08
154
Serv
ice
Del
iver
yEn
terp
rise
Con
tent
Man
agem
ent a
nd D
ata
Arc
hiva
l Pro
gram
INV
P 11
3400
380
Apr
-15
60$0
$0$0
$800
,000
$1,6
00,0
00$0
$0$2
,400
,000
55F,
SS
& C
AM
AG
INV
P 11
7200
382
Apr
-13
60$8
6,70
9$4
50,6
86$1
,200
,000
$0$0
$0$0
$1,7
37,3
9556
Cus
tom
erG
as T
rans
porta
tion
Syst
emIN
VP
1182
0039
9A
ug-1
284
$88,
157
$768
,100
$2,2
15,0
00$0
$0$0
$0$3
,071
,257
57N
etw
ork
Stra
tegy
Out
age
Man
agem
ent S
yste
mIN
VP
1185
0023
1Ju
n-13
84$1
5,72
9,00
8$4
,747
,241
$17,
526,
707
$6,2
66,0
37$3
,897
,285
$0$0
$48,
166,
278
58Tr
ansm
issi
onN
ERC
CIP
Com
plia
nce
INV
P 12
2700
233
May
-12
84$3
37,7
50$1
,516
$0$0
$0$0
$0$3
39,2
6559
Tran
smis
sion
NER
C C
IP C
ompl
ianc
eIN
VP
1227
0023
3A
pr-1
384
$0$0
$500
,000
$0$0
$0$0
$500
,000
60Tr
ansm
issi
onN
ERC
CIP
Com
plia
nce
INV
P 12
2700
233
Apr
-14
84$0
$0$0
$300
,000
$0$0
$0$3
00,0
0061
Tran
smis
sion
NER
C C
IP C
ompl
ianc
eIN
VP
1227
0023
3A
pr-1
584
$0$0
$0$0
$150
,000
$0$0
$150
,000
62O
pera
tions
EDO
(Ene
rgy
Dis
tribu
tion
Ope
ratio
ns) T
rans
form
atio
n - M
TA C
once
ptua
lIN
VP
1242
C00
231
Apr
-13
84$8
67,6
84$6
8,92
4$1
5,00
0$0
$0$0
$0$9
51,6
0863
Net
wor
k St
rate
gyED
O (E
nerg
y D
istri
butio
n O
pera
tions
) Tra
nsfo
rmat
ion
- MTA
Inte
grat
ed S
INV
P 12
42D
0023
1Ju
l-12
84$1
3,30
2$9
,437
$0$0
$0$0
$0$2
2,73
964
Cus
tom
erU
S R
etai
l Web
INV
P 13
56A
0022
9Ja
n-12
84$6
,327
,665
$0$0
$0$0
$0$0
$6,3
27,6
6565
Serv
ice
Del
iver
yD
eskt
op R
efre
sh (C
omm
odity
- C
OF)
INV
P 14
0700
382
Apr
-13
84$0
$0$5
60,0
00$0
$0$0
$0$5
60,0
0066
Serv
ice
Del
iver
yD
eskt
op R
efre
sh (C
omm
odity
- C
OF)
INV
P 14
0700
382
Apr
-14
84$0
$0$0
$560
,000
$0$0
$0$5
60,0
0067
Serv
ice
Del
iver
yD
eskt
op R
efre
sh (C
omm
odity
- C
OF)
INV
P 14
0700
382
Apr
-15
84$0
$0$0
$0$5
60,0
00$0
$0$5
60,0
00
Exhibit __ (ISP-1) Page 1 of 5
52
Exhi
bit _
_ (I
SP-1
)Pa
ge 2
of 5
Info
rmat
ion
Serv
ices
(IS)
Pro
ject
s
IS E
xec
Inve
stm
ent
Nam
eIN
VP
#B
ill P
ool
In S
ervi
ce
Dat
eA
mor
tiza
tion
P
erio
dIn
cep
tion
to
Dat
e $
FY
12(J
an-M
ar 1
2)F
Y13
(12/
13)
FY
14(1
3/14
)F
Y15
(14/
15)
FY
16(1
5/16
)F
Y17
(16/
17)
Tot
al U
S S
pen
d
68O
pera
tions
Rem
ote
Acc
ess T
o Fa
ult R
ecor
ders
INV
P 14
8800
233
Jul-1
284
$397
,436
$5,6
56$0
$0$0
$0$0
$403
,092
69O
pera
tions
Rem
ote
Acc
ess T
o Fa
ult R
ecor
ders
INV
P 14
8800
233
Apr
-15
84$0
$0$0
$0$1
50,0
00$0
$0$1
50,0
0070
Cus
tom
erN
on-I
nter
val C
olle
ctio
ns S
yste
ms C
onso
lidat
ion
(ITR
ON
/PP4
/MV
RS)
INV
P 15
4900
388
May
-12
84$1
,415
,493
$0$0
$0$0
$1,4
15,4
9371
Cus
tom
erN
on-I
nter
val C
olle
ctio
ns S
yste
ms C
onso
lidat
ion
(ITR
ON
/PP4
/MV
RS)
INV
P 15
4900
388
Apr
-13
84$8
00,0
00$8
00,0
0072
Cus
tom
erN
on-I
nter
val C
olle
ctio
ns S
yste
ms C
onso
lidat
ion
(ITR
ON
/PP4
/MV
RS)
INV
P 15
4900
388
Apr
-14
84$1
,000
,000
$1,0
00,0
0073
Tran
smis
sion
Tran
smis
sion
Inve
stm
ent M
gmt S
yste
m (T
IMS)
INV
P 15
7300
233
Apr
-14
84$0
$0$0
$738
,000
$0$0
$0$7
38,0
0074
Ope
ratio
nsR
adio
Con
sole
Sta
ndar
diza
tion
INV
P 16
4200
382
Apr
-12
84$3
,521
,223
$0$0
$0$0
$0$0
$3,5
21,2
2375
Cus
tom
erC
usto
mer
Sys
tem
Man
date
sIN
VP
1643
0038
8A
ug-1
284
$0$0
$564
,000
$0$0
$0$0
$564
,000
76C
usto
mer
Cus
tom
er S
yste
m M
anda
tes
INV
P 16
4300
388
Apr
-14
84$0
$0$0
$1,5
00,0
00$0
$0$0
$1,5
00,0
0077
Cus
tom
erC
usto
mer
Sys
tem
Man
date
sIN
VP
1643
0038
8A
pr-1
584
$0$0
$0$0
$1,5
00,0
00$0
$0$1
,500
,000
78O
pera
tions
Rel
ocat
ion
of C
NI M
etro
tech
to H
icks
ville
INV
P 16
53G
0900
Apr
-14
84$0
$0$4
92,0
00$3
00,0
00$0
$0$0
$792
,000
79F,
SS
& C
US
Tran
sact
ion
Del
iver
y C
ente
rIN
VP
1671
0038
2Ju
n-12
84$5
09,8
55$0
$0$0
$0$0
$0$5
09,8
5580
Cus
tom
erC
usto
mer
Cho
ice
EDI E
nhan
cem
ents
INV
P 21
3300
388
Sep-
1284
$82,
165
$1,0
00$4
25,0
00$0
$0$0
$0$5
08,1
6581
Cus
tom
erC
usto
mer
Cho
ice
E-m
ail T
rack
ing
INV
P 21
3500
388
Oct
-12
84$2
33,2
50$4
88,5
00$2
70,0
00$0
$0$0
$0$9
91,7
5082
Ope
ratio
nsM
obile
- El
ectri
c D
istri
butio
n Le
gacy
Grid
Mob
ile E
xpan
sion
INV
P 21
5500
203
Apr
-14
84$0
$0$0
$1,0
00,0
00$0
$0$0
$1,0
00,0
0083
Ope
ratio
nsPr
imav
era
- Pro
ject
Man
agem
ent E
xten
sion
sIN
VP
2162
0023
1M
ay-1
284
$130
,600
$0$1
18,0
00$0
$0$0
$0$2
48,6
0084
Tran
smis
sion
IDS
Rel
iabi
lity
Rep
ortin
g &
Ana
lysi
s (In
terr
uptio
n an
d D
istu
rban
ce S
yste
mIN
VP
2172
0023
1D
ec-1
284
$508
,822
$86,
725
$215
,000
$0$0
$0$0
$810
,547
85O
pera
tions
UN
Y /
NE
Fiel
d D
evic
e R
epla
cem
ents
INV
P 21
78D
0038
8A
pr-1
360
$0$2
09,7
00$0
$0$0
$0$0
$209
,700
86C
usto
mer
Cus
tom
er S
elf S
ervi
ce v
ia IV
R -
Cus
tom
er E
xper
ienc
eIN
VP
2202
0038
8A
pr-1
484
$0$0
$0$1
,000
,000
$0$0
$0$1
,000
,000
87C
usto
mer
Cus
tom
er S
elf S
ervi
ce v
ia IV
R -
Cus
tom
er E
xper
ienc
eIN
VP
2202
0038
8A
pr-1
584
$0$0
$0$0
$1,0
00,0
00$0
$0$1
,000
,000
88C
usto
mer
Con
tact
Cen
ter O
pera
tiona
l Eff
icie
ncie
sIN
VP
2204
0038
8A
pr-1
484
$0$0
$1,0
00,0
00$1
,250
,000
$0$0
$2,0
00,0
00$4
,250
,000
89C
usto
mer
Con
tact
Cen
ter O
pera
tiona
l Eff
icie
ncie
sIN
VP
2204
0038
8A
pr-1
584
$0$0
$0$0
$1,0
00,0
00$0
$0$1
,000
,000
90C
usto
mer
Cus
tom
er C
onta
ct C
ente
r Hom
e A
gent
INV
P 22
04B
0038
9N
ov-1
284
$0$0
$1,8
00,0
00$0
$0$0
$0$1
,800
,000
91W
eb S
olut
ions
Intra
net D
esig
nIN
VP
2210
0038
2A
pr-1
260
$2,1
25,2
86$9
,592
$0$0
$0$0
$0$2
,134
,878
92Tr
ansm
issi
onTr
ansm
issi
on C
usto
mer
Sys
tem
Upg
rade
INV
P 22
7000
233
Apr
-14
84$0
$0$0
$250
,000
$0$0
$0$2
50,0
0093
Tran
smis
sion
Tran
smis
sion
Cus
tom
er S
yste
m U
pgra
deIN
VP
2270
0023
3A
pr-1
584
$0$0
$0$0
$250
,000
$0$0
$250
,000
94Tr
ansm
issi
onN
E C
onve
rsio
n to
MPL
S (T
elem
etry
Mod
erni
zatio
n)-F
Y11
INV
P 22
7500
237
Apr
-14
84$0
$0$0
$150
,000
$0$0
$0$1
50,0
0095
Tran
smis
sion
NE
Con
vers
ion
to M
PLS
(Tel
emet
ry M
oder
niza
tion)
-FY
11IN
VP
2275
0023
7A
pr-1
584
$0$0
$0$0
$150
,000
$0$0
$150
,000
96W
eb S
olut
ions
Web
Too
ls U
pgra
de fo
r Int
erne
tIN
VP
2295
0020
0A
pr-1
484
$0$0
$0$1
12,5
00$0
$0$0
$112
,500
97W
eb S
olut
ions
Web
Too
ls U
pgra
de fo
r Int
erne
tIN
VP
2295
0020
0A
pr-1
584
$0$0
$0$0
$112
,500
$0$0
$112
,500
98W
eb S
olut
ions
Web
Site
Ref
resh
- In
tern
et/In
trane
tIN
VP
2296
0038
2A
pr-1
584
$0$0
$0$0
$2,2
50,0
00$0
$0$2
,250
,000
99F,
SS
& C
Nuc
leus
201
0 up
grad
e (E
nerg
y Tr
adin
g Sy
stem
)IN
VP
2330
0038
8Fe
b-13
84$3
,698
,927
$0$7
43,5
13$0
$0$0
$0$4
,442
,440
100
Tran
smis
sion
Tran
smis
sion
Out
age
App
licat
ion
Mod
icat
ions
Ph
IIIN
VP
2482
0023
3A
pr-1
484
$0$0
$0$5
50,0
00$0
$0$0
$550
,000
101
Tran
smis
sion
Tran
smis
sion
Out
age
App
licat
ion
Mod
icat
ions
Ph
IIIN
VP
2482
0023
3A
pr-1
584
$0$0
$0$0
$550
,000
$0$0
$550
,000
102
Tran
smis
sion
Perf
orm
ance
and
con
ditio
n D
atam
art
INV
P 24
8400
233
Apr
-14
84$0
$0$0
$200
,000
$100
,000
$0$0
$300
,000
103
Ope
ratio
nsG
as S
CA
DA
Life
span
Ext
ensi
onIN
VP
2495
0020
0Ju
l-12
84$0
$84,
255
$1,2
00,0
00$0
$0$0
$0$1
,284
,255
104
Ope
ratio
nsG
as S
CA
DA
Life
span
Ext
ensi
onIN
VP
2495
0020
0A
pr-1
484
$0$0
$0$7
00,0
00$0
$0$0
$700
,000
105
Ope
ratio
nsG
as S
CA
DA
Life
span
Ext
ensi
onIN
VP
2495
0020
0A
pr-1
584
$0$0
$0$0
$700
,000
$0$0
$700
,000
106
Ope
ratio
nsC
NI (
Crit
ical
Nat
iona
l Inf
rast
ruct
ure)
SC
AD
A -
Secu
rity
enha
ncem
ents
an
INV
P 24
95A
0020
0Ju
l-12
84$0
$52,
588
$0$0
$0$0
$0$5
2,58
810
7O
pera
tions
CN
I (C
ritic
al N
atio
nal I
nfra
stru
ctur
e) S
CA
DA
- G
MS
Telv
ent S
yste
m C
onIN
VP
2495
B00
200
May
-12
84$0
$21,
939
$0$0
$0$0
$0$2
1,93
910
8O
pera
tions
Gas
AM
R M
etre
tek
Syst
em C
onso
lidat
ion
(NY
)IN
VP
2495
C00
395
May
-12
84$5
8,19
1$1
4,67
9$0
$0$0
$0$0
$72,
870
109
Ope
ratio
nsG
AS
Met
rete
k C
onso
lidat
ion
INV
P 24
95D
0039
0D
ec-1
384
$0$0
$35,
000
$0$0
$0$0
$35,
000
110
Serv
ice
Del
iver
ySe
pato
n U
pgra
de H
CB
And
ER
CC
("V
TL")
INV
P 25
2200
382
Sep-
1284
$711
,464
$2,8
95$5
25,6
50$0
$0$0
$0$1
,240
,009
111
F, S
S &
C (B
ack
Off
ice)
US
SAP
ERP
Bac
k O
ffic
eIN
VP
2574
0038
2O
ct-1
212
0$1
36,3
82,0
00$3
4,92
1,45
0$1
11,1
96,5
50$0
$0$0
$0$2
82,5
00,0
0011
2F,
SS
& C
(Fro
nt O
ffic
e)U
S SA
P Fr
ont O
ffic
eIN
VP
2575
0038
9A
pr-1
484
$0$0
$0$2
6,00
0,00
0$5
2,00
0,00
0$3
2,50
0,00
0$1
9,50
0,00
0$1
30,0
00,0
0011
3O
pera
tions
US
Mob
ile G
as &
Met
er S
ervi
ces s
trate
gic
impl
emen
tatio
nIN
VP
2576
0020
0A
pr-1
484
$0$0
$0$1
6,00
0,00
0$3
2,00
0,00
0$2
0,00
0,00
0$1
2,00
0,00
0$8
0,00
0,00
011
4N
etw
ork
Stra
tegy
US
GA
S G
IS c
onso
lidat
ion
INV
P 25
7700
200
May
-13
84$6
09,3
76$3
83,9
17$3
,000
,000
$0$0
$0$0
$3,9
93,2
9311
5N
etw
ork
Stra
tegy
US
Elec
tric
GIS
(Geo
grap
hic
Info
rmat
ion
Syst
em) c
onso
lidat
ion
to st
rate
gIN
VP
2580
0020
3A
pr-1
484
$0$0
$0$4
,000
,000
$11,
000,
000
$2,0
00,0
00$0
$17,
000,
000
116
Cus
tom
erIn
telli
gent
Mai
l Bar
Cod
eIN
VP
2630
0038
8Ju
l-12
84$8
17,3
38$1
83,0
00$6
0,00
0$0
$0$0
$0$1
,060
,338
117
Net
wor
k St
rate
gyG
IS B
usin
ess E
nhan
cem
ents
INV
P 28
2800
233
Apr
-14
84$0
$0$0
$750
,000
$0$0
$750
,000
$1,5
00,0
0011
8O
pera
tions
Rem
ote
Acc
ess t
o D
igita
l Fau
lt R
ecor
ders
Pha
se 2
IN
VP
2830
0023
3Ju
n-13
60$0
$400
,000
$670
,000
$0$0
$0$0
$1,0
70,0
0011
9O
pera
tions
AC
IS –
Alli
ance
Con
tract
s, M
anag
emen
t and
Sup
port
INV
P 28
3200
231
Apr
-13
84$1
44,6
25$1
47,5
15$1
3,00
0$0
$0$0
$0$3
05,1
4012
0O
pera
tions
US
Elec
tric
Dis
tribu
tion
Sust
aini
ng In
vest
men
tsIN
VP
2844
0023
1M
ar-1
584
$0$0
$0$0
$4,0
00,0
00$0
$0$4
,000
,000
121
Ope
ratio
nsU
S El
ectri
c D
istri
butio
n Su
stai
ning
Inve
stm
ents
INV
P 28
4400
231
Mar
-16
84$0
$0$0
$0$0
$4,0
00,0
00$0
$4,0
00,0
0012
2O
pera
tions
US
Elec
tric
Dis
tribu
tion
Syst
em U
pgra
des
INV
P 28
4500
231
Mar
-14
84$0
$0$0
$1,0
00,0
00$0
$0$0
$1,0
00,0
0012
3O
pera
tions
US
Elec
tric
Dis
tribu
tion
Syst
em U
pgra
des
INV
P 28
4500
231
Mar
-15
84$0
$0$0
$0$1
,000
,000
$0$0
$1,0
00,0
0012
4O
pera
tions
US
Elec
tric
Dis
tribu
tion
Syst
em U
pgra
des
INV
P 28
4500
231
Mar
-16
84$0
$0$0
$0$0
$6,0
00,0
00$0
$6,0
00,0
0012
5O
pera
tions
US
Elec
tric
Dis
tribu
tion
Mis
cella
neou
s Sys
tem
Upg
rade
sIN
VP
2846
0039
7A
pr-1
484
$0$0
$0$1
,000
,000
$0$0
$0$1
,000
,000
126
Ope
ratio
nsU
S El
ectri
c D
istri
butio
n M
isce
llane
ous S
yste
m U
pgra
des
INV
P 28
4600
397
Apr
-15
84$0
$0$0
$0$1
,000
,000
$0$0
$1,0
00,0
0012
7C
usto
mer
US
EPM
(Ene
rgy
Portf
olio
Man
agem
ent)
Unp
lann
ed P
roje
cts -
Ann
ual C
aIN
VP
2855
0023
9M
ar-1
484
$0$0
$0$1
,000
,000
$0$0
$0$1
,000
,000
128
Cus
tom
erU
S EP
M (E
nerg
y Po
rtfol
io M
anag
emen
t) U
npla
nned
Pro
ject
s - A
nnua
l Ca
INV
P 28
5500
239
Apr
-15
84$0
$0$0
$0$1
,000
,000
$0$0
$1,0
00,0
0012
9C
usto
mer
US
EPM
(Ene
rgy
Portf
olio
Man
agem
ent)
Rec
urrin
g A
nnua
l App
licat
ion
RIN
VP
2856
G12
00M
ar-1
484
$0$0
$0$1
,000
,000
$0$0
$0$1
,000
,000
130
Cus
tom
erU
S EP
M (E
nerg
y Po
rtfol
io M
anag
emen
t) R
ecur
ring
Ann
ual A
pplic
atio
n R
INV
P 28
56G
1200
Apr
-15
84$0
$0$0
$0$1
,000
,000
$0$0
$1,0
00,0
0013
1O
pera
tions
Impl
emen
tatio
n of
NER
C C
IP C
yber
Sta
ndar
ds to
EF
Bar
rett
PS.
INV
P 28
58G
1200
Dec
-13
84$0
$0$2
50,0
00$3
50,0
00$0
$0$0
$600
,000
132
Net
wor
k St
rate
gyIm
plem
enta
tion
of N
ERC
CIP
Cyb
er S
tand
ards
to P
ort J
effe
rson
PS.
INV
P 28
59G
1200
Dec
-13
84$0
$0$2
50,0
00$3
50,0
00$0
$0$0
$600
,000
133
Ope
ratio
nsN
orth
port
NER
C C
IP Im
prov
emen
tsIN
VP
2860
G12
00M
ar-1
384
$0$0
$250
,000
$0$0
$0$0
$250
,000
134
Net
wor
k St
rate
gyC
onso
lidat
ion
of M
eter
Inve
ntor
y an
d A
sset
Sys
tem
sIN
VP
2863
0020
0M
ar-1
484
$0$0
$0$2
,835
,000
$0$0
$0$2
,835
,000
135
Net
wor
k St
rate
gyG
IS D
ata
Con
vers
ion
and
Ass
et D
ata
Cle
anup
- U
S Sy
stem
Stra
tegy
Rea
diIN
VP
2864
0039
5A
pr-1
484
$0$0
$4,9
08,0
00$0
$0$0
$0$4
,908
,000
Exhibit __ (ISP-1) Page 2 of 5
53
Exhi
bit _
_ (I
SP-1
)Pa
ge 3
of 5
Info
rmat
ion
Serv
ices
(IS)
Pro
ject
s
IS E
xec
Inve
stm
ent
Nam
eIN
VP
#B
ill P
ool
In S
ervi
ce
Dat
eA
mor
tiza
tion
P
erio
dIn
cep
tion
to
Dat
e $
FY
12(J
an-M
ar 1
2)F
Y13
(12/
13)
FY
14(1
3/14
)F
Y15
(14/
15)
FY
16(1
5/16
)F
Y17
(16/
17)
Tot
al U
S S
pen
d
136
Ope
ratio
nsU
S G
as U
npla
nned
Pro
ject
s - A
nnua
l Cap
ex N
orm
als
INV
P 28
6800
200
Mar
-14
84$0
$0$0
$500
,000
$0$0
$0$5
00,0
0013
7O
pera
tions
US
Gas
Unp
lann
ed P
roje
cts -
Ann
ual C
apex
Nor
mal
sIN
VP
2868
0020
0M
ar-1
584
$0$0
$0$0
$1,0
00,0
00$0
$0$1
,000
,000
138
Ope
ratio
nsU
S G
as U
npla
nned
Pro
ject
s - A
nnua
l Cap
ex N
orm
als
INV
P 28
6800
200
Mar
-16
84$0
$0$0
$0$0
$1,0
00,0
00$0
$1,0
00,0
0013
9O
pera
tions
US
Gas
Rec
urrin
g A
nnua
l App
licat
ion
Ref
resh
- A
nnua
l Sys
tem
Hea
lthIN
VP
2869
0020
0M
ar-1
484
$0$0
$0$1
,000
,000
$0$0
$0$1
,000
,000
140
Ope
ratio
nsU
S G
as R
ecur
ring
Ann
ual A
pplic
atio
n R
efre
sh -
Ann
ual S
yste
m H
ealth
INV
P 28
6900
200
Mar
-15
84$0
$0$0
$0$1
,000
,000
$0$0
$1,0
00,0
0014
1O
pera
tions
US
Gas
Rec
urrin
g A
nnua
l App
licat
ion
Ref
resh
- A
nnua
l Sys
tem
Hea
lthIN
VP
2869
0020
0M
ar-1
684
$0$0
$0$0
$0$1
,000
,000
$0$1
,000
,000
142
Ope
ratio
nsU
S Fr
ont O
ffic
e SA
P R
efre
shIN
VP
2870
0038
8M
ar-1
684
$0$0
$0$0
$0$3
,000
,000
$0$3
,000
,000
143
Ope
ratio
nsU
S M
eter
Ass
et S
yste
m R
efre
shIN
VP
2873
0038
8M
ar-1
684
$0$0
$0$0
$0$2
,000
,000
$2,0
00,0
00$4
,000
,000
144
Tran
smis
sion
Infr
astru
ctur
e U
pgra
des (
rout
ers/
switc
hes/
firew
alls
/ser
vers
/Wor
ksta
tions
)IN
VP
2881
0023
3A
pr-1
484
$0$3
0,24
6$5
0,00
0$1
00,0
00$0
$0$0
$180
,246
145
Tran
smis
sion
Infr
astru
ctur
e U
pgra
des (
rout
ers/
switc
hes/
firew
alls
/ser
vers
/Wor
ksta
tions
)IN
VP
2881
0023
3A
pr-1
584
$0$0
$0$0
$750
,000
$0$0
$750
,000
146
Tran
smis
sion
PSP
Phys
ical
Acc
ess l
oggi
ng sy
stem
impl
emen
tatio
n (N
ew re
quire
men
ts d
INV
P 28
8800
233
Mar
-13
84$0
$0$1
00,0
00$0
$0$0
$0$1
00,0
0014
7Tr
ansm
issi
onSi
ngle
Doc
umen
t, C
hang
e, a
nd C
yber
Ass
et P
latfo
rmIN
VP
2889
0023
7M
ar-1
384
$0$0
$275
,000
$275
,000
$0$0
$0$5
50,0
0014
8Tr
ansm
issi
onU
S Tr
ansm
issi
on R
ecur
ring
Ann
ual A
pplic
atio
n R
efre
sh -
Ann
ual S
yste
m
INV
P 28
9500
233
Mar
-16
84$0
$0$0
$0$0
$1,0
00,0
00$1
,000
,000
$2,0
00,0
0014
9Tr
ansm
issi
onEl
ectro
nic
Logg
ing
for C
ontro
l Roo
m N
E/N
YIN
VP
2897
0038
2M
ar-1
384
$0$0
$0$2
00,0
00$0
$0$0
$200
,000
150
Serv
ice
Del
iver
yU
S G
as &
Ele
ctric
CN
I (C
ritic
al N
atio
nal I
nfra
stru
ctur
e) D
ata
Cen
treIN
VP
2909
0024
0A
pr-1
484
$0$0
$8,0
00,0
00$8
,000
,000
$0$0
$0$1
6,00
0,00
015
1W
eb S
olut
ions
Intra
net W
eb S
ite S
ervi
ce D
evel
opm
ent
INV
P 29
3800
382
Apr
-13
84$0
$0$5
62,5
00$0
$0$0
$0$5
62,5
0015
2W
eb S
olut
ions
Intra
net W
eb S
ite S
ervi
ce D
evel
opm
ent
INV
P 29
3800
382
Apr
-14
84$0
$0$0
$375
,000
$0$0
$0$3
75,0
0015
3W
eb S
olut
ions
Inte
rnet
Web
Site
Ser
vice
Dev
elop
men
tIN
VP
2939
0038
2M
ar-1
484
$0$0
$0$7
50,0
00$0
$0$0
$750
,000
154
Web
Sol
utio
nsIn
tern
et W
eb S
ite S
ervi
ce D
evel
opm
ent
INV
P 29
3900
382
Mar
-16
84$0
$0$0
$0$0
$750
,000
$0$7
50,0
0015
5F,
SS
& C
Ris
k M
anag
men
t Sys
t IN
VP
2940
0038
2A
ug-1
384
$192
,037
$0$1
,149
,000
$125
,000
$0$0
$0$1
,466
,037
156
F, S
S &
CU
S SA
P M
inor
/Maj
or A
pp R
elea
ses (
Cap
ex)
INV
P 29
4700
382
Apr
-14
84$0
$0$0
$1,0
00,0
00$0
$0$0
$1,0
00,0
0015
7F,
SS
& C
US
SAP
Min
or/M
ajor
App
Rel
ease
s (C
apex
)IN
VP
2947
0038
2A
pr-1
584
$0$0
$0$0
$1,0
00,0
00$0
$0$1
,000
,000
158
Web
Sol
utio
nsM
obile
Acc
ess
INV
P 29
5000
382
Apr
-14
84$0
$0$0
$300
,000
$750
,000
$0$7
50,0
00$1
,800
,000
159
F, S
S &
CLe
gal H
old
Impl
emen
tatio
nIN
VP
2951
0038
2A
pr-1
384
$0$0
$500
,000
$0$0
$0$0
$500
,000
160
F, S
S &
CD
ocum
ent M
anag
emen
t Sys
tem
(US)
INV
P 29
5600
388
Apr
-14
84$0
$0$1
50,0
00$0
$0$0
$0$1
50,0
0016
1C
usto
mer
Cus
tom
er E
nerg
y So
lutio
ns -
CR
M (C
usto
mer
Rel
atio
nshi
p M
anag
emen
t)IN
VP
2960
0038
8M
ar-1
484
$0$0
$0$3
,000
,000
$0$0
$0$3
,000
,000
162
Dig
ital R
isk
& S
ecur
ityD
ata
Loss
Pre
vent
ion
End
Poin
t Fin
e G
rain
ed (E
PS)
INV
P 29
6600
382
Mar
-13
84$0
$0$1
,995
,000
$0$0
$0$0
$1,9
95,0
0016
3D
igita
l Ris
k &
Sec
urity
ESM
Ser
ver/D
eskt
op S
ecur
ity (E
PS) -
CN
IIN
VP
2967
0038
2M
ar-1
484
$0$0
$0$9
90,0
00$0
$0$0
$990
,000
164
Dig
ital R
isk
& S
ecur
ityD
igita
l Rig
hts M
anag
emen
t (SI
)IN
VP
2968
0038
2M
ar-1
484
$0$0
$0$3
80,0
00$0
$0$0
$380
,000
165
Dig
ital R
isk
& S
ecur
ityTa
pe &
Sto
rage
Enc
rypt
ion
(SI)
INV
P 29
6900
382
Mar
-13
84$0
$0$5
00,0
00$0
$0$0
$0$5
00,0
0016
6D
igita
l Ris
k &
Sec
urity
Inci
dent
& E
vent
Man
agem
ent (
NS)
INV
P 29
7000
382
Mar
-13
84$0
$0$1
,630
,000
$0$0
$0$0
$1,6
30,0
0016
7D
igita
l Ris
k &
Sec
urity
Net
wor
k A
cces
s Con
trol (
NS)
-CN
IIN
VP
2972
0038
2M
ar-1
484
$0$0
$0$5
00,0
00$0
$0$0
$500
,000
168
Dig
ital R
isk
& S
ecur
ityA
cces
s Rig
hts M
anag
emen
t (A
C) -
CN
IIN
VP
2979
0038
2M
ar-1
384
$0$0
$946
,500
$0$0
$0$0
$946
,500
169
Dig
ital R
isk
& S
ecur
ityA
cces
s Con
trol f
or D
ata
Man
agem
ent (
AC
)IN
VP
2980
0038
2M
ar-1
484
$0$0
$0$2
,010
,000
$0$0
$0$2
,010
,000
170
Dig
ital R
isk
& S
ecur
itySe
curit
y A
war
enes
s Pro
gram
INV
P 29
8100
382
Sep-
1284
$0$0
$129
,500
$0$0
$0$0
$129
,500
171
Dig
ital R
isk
& S
ecur
ityId
entit
y M
anag
emen
t (A
A)
INV
P 29
8200
382
Apr
-13
84$0
$0$2
,515
,000
$0$0
$0$0
$2,5
15,0
0017
2D
igita
l Ris
k &
Sec
urity
CN
I (C
ritic
al N
atio
nal I
nfra
stru
ctur
e) S
ecur
e Se
para
tion
from
BLA
N (A
A)
INV
P 29
8300
382
Apr
-13
84$0
$0$1
,188
,000
$0$0
$0$0
$1,1
88,0
0017
3D
igita
l Ris
k &
Sec
urity
Sing
le P
oint
of F
ailu
re (A
A)
INV
P 29
8400
382
Apr
-15
84$0
$0$0
$3,0
00,0
00$3
,000
,000
$0$0
$6,0
00,0
0017
4D
igita
l Ris
k &
Sec
urity
DR
&S
Prog
ram
Impr
ovem
ents
- C
ompl
ianc
e D
riven
INV
P 29
8500
382
Mar
-15
84$0
$0$0
$0$3
,000
,000
$0$0
$3,0
00,0
0017
5D
igita
l Ris
k &
Sec
urity
DR
&S
Prog
ram
Impr
ovem
ents
- M
atur
ity D
riven
INV
P 29
8600
382
Mar
-16
84$0
$0$0
$0$0
$3,0
00,0
00$3
,000
,000
176
Ope
ratio
nsEx
pand
Aux
iliar
y O
ps A
utom
atio
n Pi
lot
INV
P 29
9900
382
Jun-
1284
$0$0
$88,
000
$0$0
$0$0
$88,
000
177
Tran
smis
sion
Con
trol R
oom
– S
andy
Pon
d H
VD
C R
enov
atio
nIN
VP
3001
0023
3M
ar-1
584
$0$0
$0$0
$250
,000
$250
,000
$0$5
00,0
0017
8Tr
ansm
issi
onC
ontro
l Roo
m R
adio
Sys
tem
upg
rade
INV
P 30
0200
233
Mar
-14
84$0
$0$0
$250
,000
$0$0
$0$2
50,0
0017
9Tr
ansm
issi
onEv
alua
tion/
Inte
grat
ion
of L
NS
Fina
ncia
l Bill
ing
Proc
ess
INV
P 30
0400
233
Mar
-15
84$0
$0$0
$0$1
50,0
00$1
50,0
00$0
$300
,000
180
Tran
smis
sion
Inte
grat
ion
of T
SA/T
SC/D
ecom
mis
sion
TSA
/TSC
INV
P 30
0900
233
Mar
-14
84$0
$0$0
$3,0
00,0
00$3
,000
,000
$0$0
$6,0
00,0
0018
1Tr
ansm
issi
onIn
tegr
atio
n of
US
Syst
em S
trate
gy –
Sin
gle
Ass
et R
egis
ter R
epos
itory
INV
P 30
1000
233
Mar
-13
84$0
$0$2
00,0
00$0
$0$0
$0$2
00,0
0018
2Tr
ansm
issi
onIn
tegr
atio
n of
US
Syst
em S
trate
gy –
Sin
gle
Ass
et R
egis
ter R
epos
itory
INV
P 30
1000
233
Mar
-14
84$0
$0$0
$200
,000
$0$0
$0$2
00,0
0018
3Tr
ansm
issi
onIn
tegr
atio
n of
US
Syst
em S
trate
gy –
Sin
gle
Ass
et R
egis
ter R
epos
itory
INV
P 30
1000
233
Mar
-15
84$0
$0$0
$0$2
00,0
00$0
$0$2
00,0
0018
4Tr
ansm
issi
onIn
tegr
atio
n of
US
Syst
em S
trate
gy –
Sin
gle
Ass
et R
egis
ter R
epos
itory
INV
P 30
1000
233
Mar
-16
84$0
$0$0
$0$0
$200
,000
$0$2
00,0
0018
5Tr
ansm
issi
onG
IS In
tegr
atio
n C
onso
lidat
ion
to S
trate
gic
Plat
form
INV
P 30
1100
233
Mar
-14
84$0
$0$0
$250
,000
$250
,000
$2,0
00,0
00$0
$2,5
00,0
0018
6Tr
ansm
issi
onO
nlin
e an
d C
ondi
tion
Mon
itorin
gIN
VP
3014
0023
3M
ar-1
484
$0$0
$0$2
50,0
00$1
50,0
00$0
$0$4
00,0
0018
7Tr
ansm
issi
onSo
lar S
torm
Act
ivity
– S
UN
BU
RST
Con
trol C
ente
r to
EMS
INV
P 30
1500
238
Mar
-16
84$0
$0$0
$0$0
$2,0
00,0
00$0
$2,0
00,0
0018
8Se
rvic
e D
eliv
ery
US
CN
I (C
ritic
al N
atio
nal I
nfra
stru
ctur
e) M
onito
ring
INV
P 30
1700
239
Apr
-13
84$0
$0$1
,280
,000
$0$0
$0$0
$1,2
80,0
0018
9Se
rvic
e D
eliv
ery
US
CN
I DK
MS
(Doc
umen
t Kno
wle
dge
Man
agem
ent S
yste
m)
INV
P 30
19a
0023
9A
pr-1
384
$0$0
$249
,000
$0$0
$0$0
$249
,000
190
Web
Sol
utio
nsW
eb T
ools
Upg
rade
for I
ntra
net
INV
P 30
2600
382
Mar
-14
84$0
$0$0
$112
,500
$0$0
$0$1
12,5
0019
1W
eb S
olut
ions
Web
Too
ls U
pgra
de fo
r Int
rane
tIN
VP
3026
0038
2M
ar-1
584
$0$0
$0$0
$112
,500
$0$0
$112
,500
192
Web
Sol
utio
nsW
eb T
ools
Upg
rade
for I
ntra
net
INV
P 30
2600
382
Mar
-16
84$0
$0$0
$0$0
$112
,500
$0$1
12,5
0019
3C
usto
mer
QA
S A
ddre
ss H
ygie
neIN
VP
3076
0038
8M
ar-1
284
$260
,525
$0$0
$0$0
$0$0
$260
,525
194
Ope
ratio
nsU
S Lo
ne W
orke
r Saf
ety
Dev
ice
INV
P 31
0100
388
Apr
-12
60$1
34,6
32$1
7,76
7$0
$0$0
$0$0
$152
,400
195
Ope
ratio
nsU
S Lo
ne W
orke
r Saf
ety
Dev
ice
Phas
e II
INV
P 31
01b
0038
8Se
p-12
84$0
$0$1
50,0
00$0
$0$0
$0$1
50,0
0019
6Se
rvic
e D
eliv
ery
Bus
ines
s Cap
ture
Sof
twar
e (iR
ise)
INV
P 31
0300
382
Apr
-12
84$2
69,8
05$4
,348
$0$0
$0$0
$0$2
74,1
5319
7F,
SS
& C
Impl
emen
tatio
n of
HR
Sof
twar
e as
Ser
vice
(Saa
S)IN
VP
3124
0035
4A
pr-1
384
$0$0
$1,5
00,0
00$7
50,0
00$0
$0$0
$2,2
50,0
0019
8O
pera
tions
New
Eng
land
Gas
Lea
k R
eche
cks
INV
P 31
3600
397
Jun-
1284
$0$2
17,0
00$3
40,0
00$0
$0$0
$0$5
57,0
0019
9O
pera
tions
STO
RM
S A
rchi
ve S
oftw
are
Impl
emen
tatio
nIN
VP
3195
0023
6Ju
l-12
84$4
76,5
87$1
67,5
00$0
$0$0
$0$0
$644
,087
200
Cus
tom
erC
usto
mer
Ord
er F
ulfil
men
t & C
usto
mer
Web
Cap
abili
ties
INV
P 32
2500
382
Mar
-13
84$0
$0$2
,800
,000
$0$0
$0$0
$2,8
00,0
0020
1C
usto
mer
Mob
il Ti
me
Entry
& R
elat
ed F
ield
Dat
a C
aptu
reIN
VP
3226
0024
0M
ar-1
384
$0$0
$2,2
50,0
00$0
$0$0
$0$2
,250
,000
202
Net
wor
k St
rate
gyU
S El
ectri
c Tr
ansm
issi
on G
IS C
onve
rsio
n to
ESR
IIN
VP
3230
0020
3A
pr-1
484
$0$0
$150
,000
$0$0
$0$0
$150
,000
203
Cus
tom
erTa
llym
an &
Pap
erle
ss B
illin
g/Tr
ansa
ctio
n e-
mai
lIN
VP
3232
0038
8Ju
l-12
84$0
$0$2
00,0
00$0
$0$0
$0$2
00,0
00
Exhibit __ (ISP-1) Page 3 of 5
54
Exhi
bit _
_ (I
SP-1
)Pa
ge 4
of 5
Info
rmat
ion
Serv
ices
(IS)
Pro
ject
s
IS E
xec
Inve
stm
ent
Nam
eIN
VP
#B
ill P
ool
In S
ervi
ce
Dat
eA
mor
tiza
tion
P
erio
dIn
cep
tion
to
Dat
e $
FY
12(J
an-M
ar 1
2)F
Y13
(12/
13)
FY
14(1
3/14
)F
Y15
(14/
15)
FY
16(1
5/16
)F
Y17
(16/
17)
Tot
al U
S S
pen
d
204
Ope
ratio
nsU
S E-
2-E
(End
-To-
End)
Mai
nten
ance
and
Con
stru
cton
Dep
loym
ent
INV
P 32
3600
203
Mar
-13
84$0
$0$9
00,0
00$0
$0$0
$0$9
00,0
0020
5O
pera
tions
Stre
et L
ight
Tra
ckin
g Im
prov
emen
tsIN
VP
3237
0020
3A
pr-1
484
$0$0
$0$2
50,0
00$0
$0$0
$250
,000
206
F, S
S &
CU
S R
ecru
itmen
t / U
S A
pplic
ant T
rack
ing
INV
P 33
1000
382
Jul-1
284
$0$0
$319
,000
$0$0
$0$0
$319
,000
207
F, S
S &
C (B
ack
Off
ice)
Arc
hivi
ng T
ools
et -
USF
PIN
VP
3312
0038
2A
pr-1
384
$0$0
$5,7
00,0
00$0
$0$0
$0$5
,700
,000
208
Serv
ice
Del
iver
yTe
leco
ms M
inor
Wor
ksIN
VP
3357
0038
2A
pr-1
384
$0$0
$80,
000
$0$0
$0$0
$80,
000
209
Serv
ice
Del
iver
yTe
leco
ms M
inor
Wor
ksIN
VP
3357
0038
2A
pr-1
484
$0$0
$0$3
20,0
00$0
$0$0
$320
,000
210
Serv
ice
Del
iver
yTe
leco
ms M
inor
Wor
ksIN
VP
3357
0038
2A
pr-1
584
$0$0
$0$0
$320
,000
$0$0
$320
,000
211
Serv
ice
Del
iver
yC
NI O
rgan
ic S
tora
ge G
row
thIN
VP
3360
0038
2A
pr-1
384
$0$0
$320
,000
$0$0
$0$0
$320
,000
212
Serv
ice
Del
iver
yC
NI O
rgan
ic S
tora
ge G
row
thIN
VP
3360
0038
2A
pr-1
484
$0$0
$0$3
20,0
00$0
$0$0
$320
,000
213
Serv
ice
Del
iver
yC
NI O
rgan
ic S
tora
ge G
row
thIN
VP
3360
0038
2A
pr-1
584
$0$0
$0$0
$320
,000
$0$0
$320
,000
214
Web
Sol
utio
nsG
loba
l Web
Impl
emen
tatio
nIN
VP
TBA
0022
9Ja
n-12
84$4
,127
,071
$0$0
$0$0
$0$0
$4,1
27,0
7121
5Se
rvic
e D
eliv
ery
(Ent
erpr
ise
Serv
ice
Inte
grat
ion
INV
P 25
59B
0038
2Ja
n-12
60$1
0,31
7$1
03,1
69$0
$113
,486
216
Serv
ice
Del
iver
y (E
nter
pris
e M
ainf
ram
e M
igra
tions
INV
P 25
59B
0038
2Ja
n-12
60$7
89,8
08$3
,949
,039
$0$4
,738
,846
217
Serv
ice
Del
iver
y (E
nter
pris
e D
isas
ter r
ecov
ery
(DR
)IN
VP
2559
B00
382
Jan-
1260
$47,
647
$238
,237
$0$2
85,8
8521
8Se
rvic
e D
eliv
ery
(Ent
erpr
ise
Serv
er T
rans
form
atio
nIN
VP
2559
B00
382
Jan-
1260
$980
,041
$5,8
80,2
43$4
,900
,203
$11,
760,
486
219
Serv
ice
Del
iver
y (N
etw
orks
)W
AN
Tra
nsfo
rmat
ion
Tech
nica
l Des
ign
docu
men
tIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
122
0Se
rvic
e D
eliv
ery
(Net
wor
ks)
LAN
Tra
nsfo
rmat
ion
Tech
nica
l Des
ign
docu
men
tIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
122
1Se
rvic
e D
eliv
ery
(Net
wor
ks)
Fixe
d V
oice
Tra
nsfo
rmat
ion
Tech
nica
l Des
ign
docu
men
tIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
122
2Se
rvic
e D
eliv
ery
(Net
wor
ks)
Con
tact
Cen
tre A
sses
smen
t Com
plet
edIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
122
3Se
rvic
e D
eliv
ery
(Net
wor
ks)
Glo
bal D
ial P
lan
desi
gn c
ompl
eted
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
224
Serv
ice
Del
iver
y (N
etw
orks
)Se
curit
y / R
AS
Tran
sfor
mat
ion
Tech
nica
l Des
ign
docu
men
tIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
122
5Se
rvic
e D
eliv
ery
(Net
wor
ks)
Aud
io U
ser G
uide
doc
umen
t (po
st tr
ansf
orm
atio
n)IN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
122
6Se
rvic
e D
eliv
ery
(Net
wor
ks)
Dat
acen
tre S
ites -
WA
N P
ilot t
est c
ompl
eted
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
227
Serv
ice
Del
iver
y (N
etw
orks
)M
ediu
m S
ites -
WA
N P
ilot t
est c
ompl
eted
INV
P 25
59A
0038
2A
pr-1
260
$0$7
7,99
1$7
7,99
122
8Se
rvic
e D
eliv
ery
(Net
wor
ks)
Smal
l 1 S
ites -
WA
N P
ilot t
est c
ompl
eted
INV
P 25
59A
0038
2A
pr-1
260
$0$7
7,99
1$7
7,99
122
9Se
rvic
e D
eliv
ery
(Net
wor
ks)
Smal
l 2 S
ites -
WA
N P
ilot t
est c
ompl
eted
INV
P 25
59A
0038
2A
pr-1
260
$0$7
7,99
1$7
7,99
123
0Se
rvic
e D
eliv
ery
(Net
wor
ks)
Fixe
d V
oice
Pilo
t Tria
ls in
clud
ing
glob
al d
ial p
lan
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
231
Serv
ice
Del
iver
y (N
etw
orks
)A
udio
Pilo
t Tria
lsIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
123
2Se
rvic
e D
eliv
ery
(Net
wor
ks)
WA
N T
rans
form
atio
n A
ccep
tanc
e Te
stin
g cr
iteria
dev
elop
edIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
123
3Se
rvic
e D
eliv
ery
(Net
wor
ks)
LAN
Tra
nsfo
rmat
ion
Acc
epta
nce
Test
ing
crite
ria d
evel
oped
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
234
Serv
ice
Del
iver
y (N
etw
orks
)Fi
xed
Voi
ce T
rans
form
atio
n A
ccep
tanc
e Te
stin
g cr
iteria
dev
elop
edIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
123
5Se
rvic
e D
eliv
ery
(Net
wor
ks)
Aud
io T
rans
form
atio
n A
ccep
tanc
e Te
stin
g cr
iteria
dev
elop
edIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
123
6Se
rvic
e D
eliv
ery
(Net
wor
ks)
WA
N T
rans
form
atio
n Tr
aini
ng c
ompl
eted
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
237
Serv
ice
Del
iver
y (N
etw
orks
)W
AN
Ser
vice
Com
men
cem
ent D
ate
into
Tra
nsfo
rmed
stat
eIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
123
8Se
rvic
e D
eliv
ery
(Net
wor
ks)
LAN
Tra
nsfo
rmat
ion
Trai
ning
com
plet
ed
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
239
Serv
ice
Del
iver
y (N
etw
orks
)LA
N S
ervi
ce C
omm
ence
men
t Dat
e in
to T
rans
form
ed st
ate
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
240
Serv
ice
Del
iver
y (N
etw
orks
)Fi
xed
Voi
ce S
ervi
ce C
omm
ence
men
t Dat
e in
to T
rans
form
ed st
ate
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
241
Serv
ice
Del
iver
y (N
etw
orks
)A
udio
Ser
vice
Pac
kage
Tes
ting,
UA
T co
mpl
eted
for T
rans
form
atio
nIN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
124
2Se
rvic
e D
eliv
ery
(Net
wor
ks)
Aud
io T
rans
form
atio
n Tr
aini
ng c
ompl
eted
IN
VP
2559
A00
382
Apr
-12
60$7
7,99
1$7
7,99
124
3Se
rvic
e D
eliv
ery
(Net
wor
ks)
Aud
io S
ervi
ce C
omm
ence
men
t Dat
e in
to T
rans
form
ed st
ate
INV
P 25
59A
0038
2A
pr-1
260
$77,
991
$77,
991
244
Serv
ice
Del
iver
y (E
nter
pris
e Se
rver
SO
E D
evel
opm
ent
INV
P 25
59B
0038
2A
pr-1
260
$46,
830
$23,
415
$0$7
0,24
524
5Se
rvic
e D
eliv
ery
(Net
wor
ks)
Vid
eo T
rans
form
atio
n Te
chni
cal D
esig
n do
cum
ent
INV
P 25
59A
0038
2M
ay-1
260
$77,
991
$77,
991
246
Serv
ice
Del
iver
y (N
etw
orks
)Tr
ansf
orm
atio
n Te
chni
cal D
esig
n do
cum
ents
(all
Serv
ice
pack
ages
)IN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
124
7Se
rvic
e D
eliv
ery
(Net
wor
ks)
Com
plex
Site
s - W
AN
Pilo
t tes
t com
plet
edIN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
124
8Se
rvic
e D
eliv
ery
(Net
wor
ks)
Larg
e 2
Site
s - W
AN
Pilo
t tes
t co
mpl
eted
INV
P 25
59A
0038
2M
ay-1
260
$77,
991
$77,
991
249
Serv
ice
Del
iver
y (N
etw
orks
)So
ho S
ites -
WA
N P
ilot t
est c
ompl
eted
INV
P 25
59A
0038
2M
ay-1
260
$77,
991
$77,
991
250
Serv
ice
Del
iver
y (N
etw
orks
)LA
N P
ilot T
rials
com
plet
ed b
y al
l Site
Typ
eIN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
125
1Se
rvic
e D
eliv
ery
(Net
wor
ks)
Secu
rity
/ RA
S Pi
lot T
rials
INV
P 25
59A
0038
2M
ay-1
260
$77,
991
$77,
991
252
Serv
ice
Del
iver
y (N
etw
orks
)V
ideo
Pilo
t Tria
lsIN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
125
3Se
rvic
e D
eliv
ery
(Net
wor
ks)
Secu
rity
/ RA
S Tr
ansf
orm
atio
n A
ccep
tanc
e Te
stin
g cr
iteria
dev
elop
edIN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
125
4Se
rvic
e D
eliv
ery
(Net
wor
ks)
Vid
eo T
rans
form
atio
n A
ccep
tanc
e Te
stin
g cr
iteria
dev
elop
edIN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
125
5Se
rvic
e D
eliv
ery
(Net
wor
ks)
Tran
sfor
mat
ion
Ope
ratio
nal R
eadi
ness
com
plet
ed fo
r all
Serv
ice
pack
ages
INV
P 25
59A
0038
2M
ay-1
260
$77,
991
$77,
991
256
Serv
ice
Del
iver
y (N
etw
orks
)V
ideo
Ser
vice
Pac
kage
Tes
ting,
UA
T co
mpl
eted
for T
rans
form
atio
nIN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
125
7Se
rvic
e D
eliv
ery
(Net
wor
ks)
Vid
eo T
rans
form
atio
n Tr
aini
ng c
ompl
eted
IN
VP
2559
A00
382
May
-12
60$7
7,99
1$7
7,99
125
8Se
rvic
e D
eliv
ery
(Net
wor
ks)
Vid
eo S
ervi
ce C
omm
ence
men
t Dat
e in
to T
rans
form
ed st
ate
INV
P 25
59A
0038
2M
ay-1
260
$77,
991
$77,
991
259
Serv
ice
Del
iver
y (E
nter
pris
e D
eplo
ymen
t Too
ls (R
API
D) I
mpl
emen
tatio
nIN
VP
2559
B00
382
May
-12
60$3
5,31
9$3
5,31
9$0
$70,
638
260
Serv
ice
Del
iver
y (E
nter
pris
e V
irtua
l Des
ktop
Dep
loym
ent a
nd P
hysi
cal R
efre
shIN
VP
2559
B00
382
Jun-
1260
$1,0
76,6
06$6
,459
,638
$1,6
14,9
09$9
,151
,154
261
Serv
ice
Del
iver
y (N
etw
orks
)W
AN
Pilo
t Tria
ls c
ompl
eted
by
Site
type
INV
P 25
59A
0038
2Ju
l-12
60$7
7,99
1$7
7,99
126
2Se
rvic
e D
eliv
ery
(Net
wor
ks)
Larg
e 1
Site
s - W
AN
Pilo
t tes
t co
mpl
eted
INV
P 25
59A
0038
2Ju
l-12
60$7
7,99
1$7
7,99
126
3Se
rvic
e D
eliv
ery
(Net
wor
ks)
Secu
rity/
RA
S Se
rvic
e Pa
ckag
e Te
stin
g, U
AT
com
plet
ed fo
r Tra
nsfo
rmat
ioIN
VP
2559
A00
382
Jul-1
260
$77,
991
$77,
991
264
Serv
ice
Del
iver
y (N
etw
orks
)Se
curit
y/R
AS
Tran
sfor
mat
ion
Trai
ning
com
plet
ed
INV
P 25
59A
0038
2Ju
l-12
60$7
7,99
1$7
7,99
126
5Se
rvic
e D
eliv
ery
(Net
wor
ks)
Secu
rity/
RA
S Se
rvic
e C
omm
ence
men
t Dat
e in
to T
rans
form
ed st
ate
INV
P 25
59A
0038
2Ju
l-12
60$7
7,99
1$7
7,99
126
6Se
rvic
e D
eliv
ery
(Ent
erpr
ise
Secu
rity
Tool
s Tra
nsfo
rmat
ion
INV
P 25
59B
0038
2Ju
l-12
60$1
60,7
30$3
21,4
59$0
$482
,189
267
Serv
ice
Del
iver
y (E
nter
pris
e C
lient
App
licat
ions
Cer
tific
atio
nIN
VP
2559
B00
382
Jul-1
260
$100
,414
$200
,828
$0$3
01,2
4226
8Se
rvic
e D
eliv
ery
(Ent
erpr
ise
Virt
ual D
eskt
op In
fras
truct
ure
INV
P 25
59B
0038
2Ju
l-12
60$6
4,00
5$1
28,0
10$0
$192
,014
269
Serv
ice
Del
iver
y (E
nter
pris
e V
irtua
l Ser
ver
INV
P 25
59B
0038
2Ju
l-12
60$6
9,41
3$1
38,8
26$0
$208
,238
270
Serv
ice
Del
iver
y (E
nter
pris
e A
rchi
ve D
eplo
ymen
tIN
VP
2559
B00
382
Jul-1
260
$138
,810
$277
,619
$0$4
16,4
2927
1Se
rvic
e D
eliv
ery
(Ent
erpr
ise
Encr
yptio
n D
eplo
ymen
tIN
VP
2559
B00
382
Jul-1
260
$0$1
83,8
74$0
$183
,874
Exhibit __ (ISP-1) Page 4 of 5
55
Exhi
bit _
_ (I
SP-1
)Pa
ge 5
of 5
Info
rmat
ion
Serv
ices
(IS)
Pro
ject
s
IS E
xec
Inve
stm
ent
Nam
eIN
VP
#B
ill P
ool
In S
ervi
ce
Dat
eA
mor
tiza
tion
P
erio
dIn
cep
tion
to
Dat
e $
FY
12(J
an-M
ar 1
2)F
Y13
(12/
13)
FY
14(1
3/14
)F
Y15
(14/
15)
FY
16(1
5/16
)F
Y17
(16/
17)
Tot
al U
S S
pen
d
272
Serv
ice
Del
iver
y (E
nter
pris
e St
anda
rd O
pera
ting
Envi
ronm
ent (
SOE)
Dev
elop
men
tIN
VP
2559
B00
382
Aug
-12
60$1
4,49
2$7
2,46
0$0
$86,
952
273
Serv
ice
Del
iver
y (E
nter
pris
e M
idra
nge
Bac
kup
& R
esto
reIN
VP
2559
B00
382
Aug
-12
60$1
22,8
43$3
07,1
09$0
$429
,952
274
Serv
ice
Del
iver
y (E
nter
pris
e M
ainf
ram
e En
gine
erin
g Pr
oces
s Im
plem
enta
tion
INV
P 25
59B
0038
2Se
p-12
60$4
1,22
6$1
23,6
79$0
$164
,906
275
Serv
ice
Del
iver
y (E
nter
pris
e U
NIX
Mid
rang
e Sy
stem
s Mgm
t. To
ol Im
plem
enta
tion
INV
P 25
59B
0038
2Se
p-12
60$8
,246
$24,
738
$0$3
2,98
427
6Se
rvic
e D
eliv
ery
(Ent
erpr
ise
SAN
Dep
loym
ent,
Dis
k St
orag
e C
onso
lidat
ion
INV
P 25
59B
0038
2O
ct-1
260
$1,2
26,6
75$4
,293
,362
$0$5
,520
,037
277
Serv
ice
Del
iver
y (E
nter
pris
e D
eskt
op S
yste
ms M
anag
emen
t Sol
utio
nIN
VP
2559
B00
382
Nov
-12
60$3
5,25
5$2
82,0
39$0
$317
,294
278
Serv
ice
Del
iver
y (N
etw
orks
)W
AN
Ser
vice
Pac
kage
Tes
ting,
UA
T co
mpl
eted
for T
rans
form
atio
nIN
VP
2559
A00
382
Dec
-12
60$7
7,99
1$7
7,99
127
9Se
rvic
e D
eliv
ery
(Net
wor
ks)
LAN
Ser
vice
Pac
kage
Tes
ting,
UA
T co
mpl
eted
for T
rans
form
atio
nIN
VP
2559
A00
382
Dec
-12
60$7
7,99
1$7
7,99
128
0Se
rvic
e D
eliv
ery
(Net
wor
ks)
Fixe
d V
oice
Ser
vice
Pac
kage
Tes
ting,
UA
T co
mpl
eted
for T
rans
form
atio
nIN
VP
2559
A00
382
Dec
-12
60$7
7,99
1$7
7,99
128
1Se
rvic
e D
eliv
ery
(Net
wor
ks)
Fixe
d V
oice
Tra
nsfo
rmat
ion
Trai
ning
com
plet
ed
INV
P 25
59A
0038
2D
ec-1
260
$77,
991
$77,
991
282
Serv
ice
Del
iver
y (N
etw
orks
)C
ompl
etio
n of
Tra
nsfo
rmat
ion
Proj
ect (
all S
ervi
ce P
acka
ges c
ompl
eted
in
INV
P 25
59A
0038
2D
ec-1
260
$1,0
69,5
85$1
,069
,585
Exhibit __ (ISP-1) Page 5 of 5
56
Exhibit __ (ISP-2)
Testimony of the Information Services Panel
Exhibit __ (ISP-2)
US Foundation Program Conceptual Application Diagram
57
SAP
FIN
AN
CE
CO
FI
Lega
cy S
yste
ms
Inte
rface
s
Con
cept
ual A
pplic
atio
n D
iagr
am (C
AD
) –B
uild
& U
nit T
est F
inal
Ver
sion
30. S
AP
BW
29. B
SI/
PY T
ax
Fact
ory
6. C
ash
Mgm
t /B
anks
/ Tr
easu
ry
28. T
ime
Eval
uatio
n
24. P
ayro
ll
13. M
ater
ials
M
anag
emen
t
22. N
on-U
tility
B
illin
g21
. MD
MC
usto
mer
M
aste
r Dat
a
SAP
SD
Third
Par
ty In
terfa
ces
3. C
ost
Elem
ent
Acc
ount
ing
2. C
ost C
ente
r A
ccou
ntin
g
5. P
rofit
Cen
ter
Acc
ount
ing
4. In
tern
al
Ord
ers
10.P
roje
ct
Syst
ems
9. A
ccou
nts
Paya
ble
1. G
ener
al
Ledg
er
Vend
ors
E. J
. War
d
Flee
t W
arra
nty
Ban
ks
PR /
Ben
efits
Surv
eys
Stat
e G
ovFe
d G
ov
PHH
NTS
HC
L
Doc
umen
t M
anag
emen
t
LEX
86. R
eval
27. C
ATS
/Tim
e en
try
US
Fou
ndat
ion
Pro
gram
Sco
pe 56. G
PCS
77. R
emed
y
80. S
afet
y /
IMS
72. P
AIR
S
73. P
avin
g
TSA
62. M
axim
o
83. S
torm
s
71.
Pow
erPl
ant
68. M
MA
79. E
TRM
67. O
pen
Text
75.
Prim
aver
a
51. E
MIT
57. G
SHO
P
33. A
CIS
55. E
PIQ
81. S
EAL
53. E
MS
59. H
RM
I
58. H
R1
60. L
DA
P
76. R
AC
F
52. E
mer
genc
y Pr
epar
edne
ss64
. Med
ical
D
B
74. P
ost &
B
id
38.B
usin
ess
Obj
ects
49. D
SM
45. C
SA
41. C
asca
de
40. C
AS
44. C
RIS
42. C
CH
34.
Adv
anta
ge
39. C
arou
sel
54. E
OER
35. A
dobe
43.C
MS
Web
47.
Cus
tom
er
I&A
48. D
iam
ond
37. A
MA
G
50. D
W63
. MD
SI66
. ON
YX69
. NA
KIS
A
31. S
AP
BPC
70. P
late
au
SAP
HC
M
12. W
areh
ouse
M
anag
emen
t11
. Pla
nt
Mai
nten
ance
18. S
uppl
ier
Rel
atio
nshi
p M
anag
emen
t
7. R
egul
ator
y R
epor
ting
8. N
on U
tility
A
ccou
nts
Rec
eiva
bles
19. M
DM
C
atal
og
SAP
Supp
ly
Cha
in /
P2P
20. P
urch
asin
g (E
CC
)
15. T
rave
l &
Expe
nse
17. F
leet
M
anag
emen
t
14. I
nven
tory
M
anag
emen
t
46. C
SS
Pro-
Unl
imite
d
Hub
woo
85. S
uppl
ier S
elf
Serv
ice
(SU
S)
87.
Act
ive
Dire
ctor
y
Rig
ht
Now
89. U
I Pl
anne
r90
. UK
H
yper
ion
82. S
abrix
In S
cope
91. L
imite
d B
enef
its
SAP
ECC
84. S
ucce
ss
92. S
iebe
l
93.
CD
R88
. Alle
gro
94.
PRM
96.
Biz
App
s
Upg
rade
d of
new
non
-SA
P
syst
em a
nd in
terfa
ces
in s
cope
95.
Cor
p Ta
x
Exhibit __ (ISP-2) Page 1 of 51
58
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
1
The
cent
ral t
ask
of G
/L a
ccou
ntin
g is
to p
rovi
de a
com
preh
ensi
ve p
ictu
re fo
r ext
erna
l acc
ount
ing
and
acco
unts
.
Rec
ordi
ng a
ll bu
sine
ss tr
ansa
ctio
ns (p
rimar
y po
stin
gs a
s w
ell a
sse
ttlem
ents
from
inte
rnal
acc
ount
ing)
in th
e
syst
em th
at is
fully
inte
grat
ed w
ith a
ll th
e ot
her o
pera
tiona
l are
as o
f a c
ompa
ny e
nsur
es th
at th
e ac
coun
ting
data
is a
lway
s co
mpl
ete
and
accu
rate
.
For t
he U
SFP
, the
new
Gen
eral
Led
ger w
ill b
e im
plem
ente
d. T
he n
ew G
/L p
rovi
des
a un
ified
stru
ctur
e th
at
incl
udes
indi
vidu
al le
dger
s, s
uch
as th
e co
st-o
f-sal
es le
dger
, pro
fit c
ente
r acc
ount
ing,
and
the
cons
olid
atio
n
stag
ing
ledg
er. A
s a
resu
lt, it
spe
eds
reco
ncili
atio
n, e
nsur
es tr
ansp
aren
cy a
nd a
udit-
abili
ty, a
nd e
nabl
es b
oth
inte
rnal
and
ext
erna
l rep
ortin
g re
quire
men
ts.
This
“New
”Gen
eral
Led
ger S
uppo
rts:
•Leg
al re
quire
men
ts
•Man
agem
ent a
nd s
egm
ent r
epor
ting
•Ext
ensi
bilit
y by
indu
strie
s
•Ext
ensi
bilit
y by
cus
tom
ers
•Bal
ance
d bo
ok b
y an
y di
men
sion
•Par
alle
l set
s of
boo
ks
•Fas
t clo
se
•TC
O re
duct
ion
•Inte
rnat
iona
l acc
ount
ing
stan
dard
s
•Com
plia
nce
and
trans
pare
ncy
1. G
ener
al
Ledg
er
Exhibit __ (ISP-2) Page 2 of 51
59
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
2
2. C
ost C
ente
r A
ccou
ntin
gC
ost C
ente
rs a
re b
asic
ally
div
isio
ns b
y w
hich
cos
ts a
re re
cord
ed a
s in
curr
ed d
urin
g th
e co
mpa
ny o
pera
tions
.
By
assi
gnin
g th
ese
deta
iled
cost
s to
cos
t cen
ters
, man
ager
s ca
n co
ntro
l cos
ts th
at a
re a
ssig
ned
to th
em.
Cos
t Cen
ter A
ccou
ntin
gpr
ovid
es in
form
atio
n on
the
cost
s in
curre
d by
the
busi
ness
(ope
ratio
ns,
adm
inis
tratio
n, c
entra
l ser
vice
s, e
tc.).
With
in S
AP
, the
abi
lity
exis
ts to
ass
ign
Cos
t Cen
ters
to d
epar
tmen
ts a
nd /o
r
Man
ager
s re
spon
sibl
e fo
r cer
tain
are
as o
f the
bus
ines
s as
wel
l as
func
tiona
l are
as w
ithin
you
r org
aniz
atio
n. C
ost
Cen
ters
can
be
crea
ted
for s
uch
func
tiona
l are
as a
s M
arke
ting,
Pur
chas
ing,
Hum
an R
esou
rces
, Fin
ance
,
Faci
litie
s, In
form
atio
n S
yste
ms,
Adm
inis
trativ
e S
uppo
rt,Le
gal,
Shi
ppin
g/R
ecei
ving
, or e
ven
Qua
lity
. Som
e of
the
bene
fits
of C
ost C
ente
r Acc
ount
ing
:
(1)
Man
ager
s ca
n se
t Bud
get /
Cos
t Cen
ter t
arge
ts;
(2)
Cos
t Cen
ter v
isib
ility
of f
unct
iona
l dep
artm
ents
/are
as o
f you
r bus
ines
s;
(3)
Pla
nnin
g (p
lan
vs a
ctua
l ana
lysi
s)
(4)
Ava
ilabi
lity
of C
ost a
lloca
tion
met
hods
;
(5)
Ass
essm
ents
/Dis
tribu
tion
of c
osts
to o
ther
cos
t obj
ects
.
Exhibit __ (ISP-2) Page 3 of 51
60
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
3
3. C
ost E
lem
ent
Acc
ount
ing
Ent
ry a
nd o
rgan
izat
ion
of c
osts
incu
rred
dur
ing
a se
ttlem
ent p
erio
d. It
is th
us n
ot a
n ac
coun
ting
syst
em a
s
such
, but
rath
er a
det
aile
d re
cord
ing
of d
ata
that
form
s th
e ba
sis
for c
ost a
ccou
ntin
g.
The
Cos
t Ele
men
t Acc
ount
ing
com
pone
nt p
rovi
des
info
rmat
ion
whi
chin
clud
es th
e co
sts
and
reve
nue
for a
n
orga
niza
tion.
The
se p
ostin
gs a
re a
utom
atic
ally
upd
ated
from
FI (F
inan
cial
Acc
ount
ing)
to C
O (C
ontro
lling
). Th
e
cost
ele
men
ts a
re th
e ba
sis
for c
ost a
ccou
ntin
g an
d en
able
s th
e U
ser t
he a
bilit
y to
dis
play
cos
ts fo
r eac
h of
the
acco
unts
that
hav
e be
en a
ssig
ned
to th
e co
st e
lem
ent.
Exa
mpl
es o
f acc
ount
s th
at c
an b
e as
sign
ed a
re:
•Cos
t Cen
ters
•Int
erna
l Ord
ers
•WB
S(w
ork
brea
kdow
n st
ruct
ures
).
Cos
t Ele
men
ts a
re b
asic
ally
car
riers
of c
osts
. P
rimar
y co
st e
lem
ents
are
like
mat
eria
l cos
ts, p
erso
nnel
cos
ts,
ener
gy c
osts
, etc
. with
an
exis
ting
corr
espo
ndin
g G
L ac
coun
t in
FI (a
s op
pose
d to
a C
ost C
ente
r whi
ch is
basi
cally
a d
ivis
ion)
.
Sec
onda
ry c
ost e
lem
ents
are
like
pro
duct
ion
cost
s, m
ater
ialo
verh
eads
, pro
duct
ion
over
head
s. T
hese
are
crea
ted
and
mai
ntai
ned
only
in C
O. T
hese
are
use
d in
inte
rnal
cos
t allo
catio
ns, o
verh
ead
calc
ulat
ions
, set
tlem
ent
trans
actio
ns a
nd d
o no
t flo
w to
Fin
ance
.
Exhibit __ (ISP-2) Page 4 of 51
61
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
4
4. In
tern
al
Ord
ers
Inte
rnal
Ord
ers
prov
ide
a m
eans
of t
rack
ing
cost
s of
a s
peci
fic jo
b , s
ervi
ce, o
r tas
k. In
tern
al O
rder
s ar
e us
ed a
s a
met
hod
to c
olle
ct c
osts
and
bus
ines
s tra
nsac
tions
rela
ted
to th
ejo
b, ta
sk, o
r ser
vice
. Thi
s le
vel o
f mon
itorin
g ca
n be
very
det
aile
d bu
t allo
ws
man
agem
ent t
he a
bilit
y to
revi
ew In
tern
al O
rder
act
ivity
for b
ette
r-dec
isio
n m
akin
g
purp
oses
.
Follo
win
g ar
e so
me
exam
ples
:
•Mon
itorin
g th
e co
sts
of s
hort-
term
jobs
•Mon
itorin
g th
e co
sts
and
reve
nues
of a
spe
cific
ser
vice
•Ong
oing
cos
t con
trol
•Inte
rnal
ord
ers
can
be d
ivid
ed in
to th
e fo
llow
ing
cate
gorie
s:
•Ove
rhea
d or
ders
-Fo
r sho
rt-te
rm m
onito
ring
of th
e in
dire
ct c
osts
aris
ing
from
jobs
. The
y ca
n al
so b
e
used
for c
ontin
uous
mon
itorin
g of
sub
area
s of
indi
rect
cos
ts. O
verh
ead
orde
rs c
an c
olle
ct p
lan
and
actu
al c
osts
inde
pend
ently
of o
rgan
izat
iona
l cos
t cen
ter s
truct
ures
and
bus
ines
s pr
oces
ses,
ena
blin
g
cont
inuo
us c
ost c
ontro
l in
the
ente
rpris
e.
•Inve
stm
ent o
rder
s -M
onito
r inv
estm
ent c
osts
that
can
be
capi
taliz
ed a
nd s
ettle
d to
fixed
ass
ets.
•Acc
rual
ord
ers
-Mon
itor p
erio
d-ba
sed
accr
ual b
etw
een
expe
nses
pos
ted
in F
inan
cial
Acc
ount
ing
and
accr
ual c
osts
in C
ontro
lling
.
•Ord
ers
with
reve
nues
-M
onito
r the
cos
ts a
nd re
venu
es a
risin
g fro
m a
ctiv
ities
for p
artn
ers
outs
ide
the
orga
niza
tion,
or f
rom
act
iviti
es n
ot b
elon
ging
to th
e co
re b
usin
ess
of th
e or
gani
zatio
n.
Exhibit __ (ISP-2) Page 5 of 51
62
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
5
5. P
rofit
Cen
ter
Acc
ount
ing
Pro
fit C
ente
r is
an o
rgan
izat
iona
l uni
t whi
ch is
par
t of t
he G
rid C
ode
Blo
ck.
In a
ccou
ntin
g it
refle
cts
a
man
agem
ent-o
rient
ed s
truct
ure
of th
e or
gani
zatio
n fo
r the
pur
pose
of i
nter
nal c
ontro
l. O
pera
ting
resu
lts fo
r pro
fit
cent
ers
can
be a
naly
zed
usin
g ei
ther
the
cost
-of-s
ales
app
roac
h or
the
perio
d ac
coun
ting
appr
oach
. By
anal
yzin
g
the
fixed
cap
ital a
s w
ell,
you
can
expa
nd p
rofit
cen
ters
for u
seas
inve
stm
ent c
ente
rs.
Pro
fit C
ente
r Acc
ount
ing
prov
ides
a c
ompr
ehen
sive
pic
ture
for e
xter
nal a
ccou
ntin
g an
d m
anag
emen
t
acco
untin
g. It
reco
rds
all b
usin
ess
trans
actio
ns (p
rimar
y po
stin
gs a
s w
ell a
s se
ttlem
ents
from
inte
rnal
acc
ount
ing)
in th
e sy
stem
that
is fu
lly in
tegr
ated
with
all
the
othe
r ope
ratio
nal a
reas
of t
he c
ompa
ny to
ens
ure
that
the
acco
untin
g da
ta is
alw
ays
com
plet
e an
d ac
cura
te.
Pro
fit C
ente
rs c
an b
e se
t-up
to id
entif
y pr
oduc
t lin
es, d
ivis
ions
, geo
grap
hica
l reg
ions
, offi
ces,
pro
duct
ion
site
s
or b
y fu
nctio
ns.
Pro
fit C
ente
rs a
re u
sed
for I
nter
nal C
ontro
l pur
pose
s en
ablin
g m
anag
emen
tth
e ab
ility
to re
view
area
s of
resp
onsi
bilit
y w
ithin
the
Grid
org
aniz
atio
n.
At U
SFP
, Pro
fit C
ente
rs a
re d
efin
ed a
s “li
nes
of b
usin
ess”
whi
ch is
alig
ned
with
seg
men
t in
the
SA
P
Org
aniz
atio
nal H
iera
rchy
stru
ctur
e.
Exhibit __ (ISP-2) Page 6 of 51
63
6
6. C
ash
Mgm
t /B
anks
/ Tr
easu
ry
This
incl
udes
the
man
agem
ent o
f ban
k m
aste
r dat
a, c
ash
bala
nce
man
agem
ent (
chec
k an
d bi
ll of
exc
hang
e
man
agem
ent),
and
the
crea
tion
and
proc
essi
ng o
f inc
omin
g an
d ou
tgoi
ng p
aym
ents
. It i
s po
ssib
le to
free
ly d
efin
e
all c
ount
ry-s
peci
fic c
hara
cter
istic
s, s
uch
as th
e sp
ecifi
catio
ns fo
r man
ual a
nd e
lect
roni
c pa
ymen
t pro
cedu
res,
paym
ent f
orm
s, o
r dat
a m
edia
.
For t
he U
SFP
, we
will
be
dete
rmin
ing
wha
t com
pone
nts
liste
dbe
low
will
be
impl
emen
ted
to s
uppo
rt al
l the
proc
esse
s (Q
uote
to C
ash
for n
on-u
tility
bill
ing;
Pro
cure
to P
ay; B
udge
t to
Clo
se; S
uppl
y C
hain
with
Fle
et; H
CM
)
as tr
easu
ry /
cash
man
agem
ent i
s in
volv
ed in
all
aspe
cts
of d
aily
Grid
act
iviti
es.
Com
pone
nts
of th
e fo
llow
ing
appl
icat
ions
/ co
mpo
nent
s of
Tre
asur
y ar
e de
emed
to b
e in
sco
pe a
t som
e le
vel,
the
leve
l to
be d
eter
min
ed d
urin
g
Det
ail D
esig
n:
SA
P C
ash
and
Liqu
idity
Man
agem
ent
Hel
ps m
onito
r and
man
age
cash
flow
and
liqu
idity
G
ener
ates
com
preh
ensi
ve a
nd ti
mel
y ca
sh fo
reca
sts
and
plan
s S
AP
In-H
ouse
Cas
h E
nabl
es c
entra
lized
con
trol o
f ban
king
bal
ance
s, c
ash
man
agem
ent,
and
paym
ents
R
educ
es c
osts
of i
nter
-uni
t pay
men
ts, t
rans
fers
, and
ban
k fe
es
SA
P T
reas
ury
and
Ris
k M
anag
emen
t M
odel
s ris
k sc
enar
ios
and
exec
utes
miti
gatio
n st
rate
gies
R
educ
es th
e or
gani
zatio
n's
finan
cial
risk
leve
ls a
nd e
nsur
es re
gula
tory
com
plia
nce
AP
Inte
grat
ion
Pac
kage
for S
WIF
T E
nabl
es d
irect
con
nect
ion
to S
WIF
Tnet
, the
sec
ure
bank
pay
men
ts n
etw
ork
Red
uces
com
plex
ity b
y pr
ovid
ing
a si
ngle
poi
nt o
f con
nect
ivity
to m
ultip
le b
anks
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
Exhibit __ (ISP-2) Page 7 of 51
64
7. R
egul
ator
y R
epor
ting
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
7
SAP
cont
ains
an
Util
ities
Indu
stry
Sol
utio
ns m
odul
e (IS
-U/F
ERC
) tha
t fac
ilitat
es th
e tra
nsla
tion
of th
e ne
eded
fina
ncia
l
info
rmat
ion
from
a n
atur
al a
ccou
nt to
a F
ERC
bas
ed a
ccou
nt u
sing
a m
appi
ng a
nd tr
ace
tabl
e to
sup
port
the
prep
arat
ion
of
the
FER
C F
orm
-1 &
60.
Pro
babl
y 80
-90%
of t
he w
ork
conf
igur
ing
the
IS-U
/FER
C m
odul
e oc
curs
with
in th
e FI
and
CO
mod
ules
, but
out
side
of t
he F
ERC
mod
ule;
suc
h w
ork
mai
nly
cons
ists
of m
appi
ng th
e co
sts
repo
rted
to F
ERC
thro
ugh
SAP’
s
Con
trollin
g (C
O) m
odul
e vi
a pr
imar
y co
st e
lem
ents
and
cos
t obj
ects
. D
ue to
this
relia
nce
on C
O a
ctiv
ities
for t
he m
ajor
ity o
f
FER
C c
onfig
urat
ion,
FER
C re
quire
men
ts m
ust b
e ad
dres
sed
early
inth
e pr
ojec
t, ty
pica
lly a
t the
sam
e tim
e C
O
requ
irem
ents
are
bei
ng d
eter
min
ed.
Afte
r the
CO
des
ign
has
bee
n in
itiat
ed, i
t mus
t con
tinua
lly b
e co
mpa
red
to th
e FE
RC
desi
gn.
SAP’
s IS
-U/F
ERC
find
s al
l bal
ance
s in
the
Fina
ncia
ls a
nd C
ontro
lling
mod
ules
map
s th
em to
regu
lato
ry a
ccou
nts.
It
will
popu
late
thes
e FE
RC
acc
ount
s on
ly if
eve
ry b
alan
ce in
FI a
nd C
O c
an b
e tra
ced
to a
FER
C a
ccou
nt.
This
saf
egua
rd
mak
es s
ure
that
all
bala
nces
/cos
ts a
re a
ccou
nted
for,
but u
nder
lines
the
need
for t
he F
ERC
gro
up to
wor
k w
ith th
e FI
and
CO
dep
artm
ents
as
early
as
poss
ible
.
•Nat
iona
l Grid
has
ele
cted
to re
cord
all
finan
cial
tran
sact
ions
in
acco
rdan
ce w
ith IF
RS
repo
rting
sta
ndar
ds.
•FER
C M
odul
e w
ill tra
nsla
te fr
om N
atur
al to
FER
C A
ccou
nt o
n pe
riodi
c ba
sis
•Bus
ines
s In
tellig
ence
use
d fo
r Reg
ulat
ory
Rep
ortin
g An
alys
is (
Rat
e C
ase
Supp
ort )
•The
“as
is “
at N
atio
nal G
rid is
to re
cord
tran
sact
ions
by
FER
C A
ccou
nt b
ased
on
GAA
P
•The
mod
ule
is u
tiliz
ed to
sup
port
finan
cial
sta
tem
ent p
repa
ratio
n ba
sed
on a
FER
C c
hart
of a
ccou
nts
•The
func
tion
of th
e re
gula
tory
repo
rting
mod
ule
is to
ass
ign
alla
mou
nts
in n
atur
al G
L ac
coun
ts to
regu
lato
ry G
L ac
coun
ts.
Bala
nce
shee
t, re
venu
e, a
nd s
ome
expe
nse
acco
unts
are
map
ped
dire
ctly
to th
e co
rresp
ondi
ng re
gula
tory
acc
ount
.
•Oth
er S
AP e
xpen
se a
ccou
nts
like
O&M
are
ass
igne
d to
regu
lato
ry a
ccou
nts
base
d on
the
tabl
e cr
iteria
def
ined
in th
e
regu
lato
ry re
porti
ng m
odul
e. T
his
logi
c ge
nera
lly u
ses
the
SAP
expe
nse
acco
unts
com
bine
d w
ith th
e co
st o
bjec
ts in
the
SAP
CO
mod
ule
(e.g
., or
ders
, WBS
ele
men
t, co
st c
ente
r) to
ass
ign
the
regu
lato
ry a
ccou
nts.
The
regu
lato
ry re
porti
ng
proc
ess
will
incl
ude
map
ping
all
amou
nts
in th
e ch
art o
f acc
ount
s to
regu
lato
ry g
ener
al le
dger
acc
ount
s.
Exhibit __ (ISP-2) Page 8 of 51
65
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
8
8. N
on U
tility
A
ccou
nts
Rec
eiva
bles
Rec
ords
and
man
ages
mis
cella
neou
s cu
stom
er b
illin
g ac
coun
ting
data
via
the
Acc
ount
s R
ecei
vabl
e (A
R)
com
pone
nt. C
onne
cts
AR
dire
ctly
to th
e G
/L u
sing
a s
peci
al re
conc
iliat
ion
acco
unt.
•The
Acc
ount
s R
ecei
vabl
eap
plic
atio
n co
mpo
nent
reco
rds
and
man
ages
acc
ount
ing
data
for a
ll no
n-ut
ility
cust
omer
s at
Grid
.
•A
ll po
stin
gs (
invo
ices
and
cas
h) in
Acc
ount
s R
ecei
vabl
e w
ill a
lso
be re
cord
ed d
irect
ly in
the
Gen
eral
Ledg
er. D
iffer
ent G
/L a
ccou
nts
are
upda
ted
depe
ndin
g on
the
trans
actio
n in
volv
ed (f
or e
xam
ple,
rece
ivab
les,
dow
n pa
ymen
ts, a
nd b
ills
of e
xcha
nge)
.
•The
sys
tem
con
tain
s a
rang
e of
tool
s th
at y
ou c
an u
se to
mon
itor o
pen
item
s, s
uch
as a
ccou
nt a
naly
ses,
alar
m re
ports
, due
dat
e lis
ts, a
nd a
flex
ible
dun
ning
pro
gram
.
•Inc
omin
g pa
ymen
ts c
an b
e as
sign
ed to
due
rece
ivab
les
usin
g us
er-fr
iend
ly s
cree
n fu
nctio
ns o
r by
elec
troni
c
mea
ns, s
uch
as E
DI.
The
paym
ent p
rogr
am c
an a
utom
atic
ally
car
ry o
ut d
irect
deb
iting
and
dow
n pa
ymen
ts. T
here
are
a ra
nge
of to
ols
avai
labl
e fo
r doc
umen
ting
the
trans
actio
ns th
at o
ccur
in A
ccou
nts
Rec
eiva
ble,
incl
udin
g ba
lanc
e lis
ts, j
ourn
als,
bala
nce
audi
t tra
ils, a
nd o
ther
sta
ndar
d re
ports
. Whe
n dr
awin
g up
fina
ncia
l sta
tem
ents
, the
item
s in
fore
ign
curr
ency
are
reva
lued
, cus
tom
ers
who
are
als
o ve
ndor
s ar
e lis
ted,
and
the
bala
nces
on
the
acco
unts
are
sor
ted
by re
mai
ning
life. A
ccou
nts
Rec
eiva
ble
is n
ot m
erel
y on
e of
the
bran
ches
of a
ccou
ntin
g th
at fo
rms
the
basi
s of
ade
quat
e an
d or
derly
acco
untin
g. It
als
o pr
ovid
es th
e da
ta re
quire
d fo
r effe
ctiv
e cr
edit
man
agem
ent,
(as
a re
sult
of it
s cl
ose
inte
grat
ion
with
the
Sal
es a
nd D
istri
butio
n co
mpo
nent
), as
wel
l as
impo
rtant
info
rmat
ion
for t
he o
ptim
izat
ion
of li
quid
ity p
lann
ing,
(thro
ugh
its li
nk to
Cas
h M
anag
emen
t).
Exhibit __ (ISP-2) Page 9 of 51
66
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
9
9. A
ccou
nts
Paya
ble
Acc
ount
s P
ayab
le re
cord
s an
d m
anag
es v
endo
r acc
ount
ing
data
, con
nect
ing
dire
ctly
with
oth
er c
ompo
nent
s
of S
AP
suc
h as
G/L
usi
ng a
spe
cial
reco
ncili
atio
n ac
coun
t, C
ash
Man
agem
ent,
Pur
chas
ing,
etc
.
Invo
ices
from
ven
dors
are
pos
ted
n A
ccou
nts
Pay
able
., an
d al
l int
egra
ted
trans
actio
ns a
re a
utom
atic
ally
upda
ted
(suc
h as
FI,
CO
, Pro
ject
s, T
reas
ury,
Cas
h M
anag
emen
t, et
c.).
Fro
m th
ere,
the
data
is s
orte
d by
ven
dor
and
mad
e av
aila
ble
to o
ther
are
as s
uch
as th
e pu
rcha
sing
sys
tem
.Whe
n yo
u po
st d
ata
in A
ccou
nts
Pay
able
, the
syst
em c
reat
es a
doc
umen
t and
pas
ses
the
data
ent
ered
to th
e ge
nera
l led
ger.
Gen
eral
ledg
er a
ccou
nts
are
then
upda
ted
acco
rdin
g to
the
trans
actio
n co
ncer
ned
(pay
able
, dow
n pa
ymen
t, an
d so
on)
.
Sin
ce th
e in
divi
dual
app
licat
ions
(gen
eral
ledg
er a
nd s
ub-le
dger
s) a
ll ex
chan
ge d
ata,
indi
vidu
al b
usin
ess
trans
actio
ns o
nly
have
to b
e en
tere
d on
ce. P
ostin
gs a
re a
utom
atic
ally
trig
gere
d fro
m th
e op
erat
ive
trans
actio
ns in
Acc
ount
s P
ayab
le. I
nvoi
ce v
alue
s ar
e pr
ovid
ed fo
r cas
h m
anag
emen
t, in
ord
er to
opt
imiz
e liq
uidi
ty p
lann
ing.
SA
P p
rovi
des
two
varia
nts
for c
arry
ing
out b
usin
ess
trans
actio
nsin
Acc
ount
s P
ayab
le:
The
syst
em c
arrie
s ou
t con
sist
ency
che
cks
befo
re s
avin
g th
eda
ta. W
hen
the
debi
ts e
qual
the
cred
its, a
nd th
e
data
is c
ompl
ete,
the
docu
men
t is
post
ed.
If er
rors
exi
st, t
he d
ata
is n
ot s
aved
, and
the
syst
em p
ropo
ses
adju
stm
ents
.
The
syst
em u
pdat
es th
e do
cum
ent f
ile a
nd th
e G
/L a
ccou
nt b
alan
ces.
Thi
s is
par
t of t
he a
utom
ated
mat
chin
g
and
appr
oval
pro
cess
(tw
o, th
ree,
or f
our-w
ay m
atch
ing
proc
ess)
. Th
is is
als
o in
tegr
ated
with
SR
M –
SU
S.
Exhibit __ (ISP-2) Page 10 of 51
67
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
10
10. P
roje
ct
Syst
ems
Mon
itors
pre
cise
pla
nnin
g of
the
deta
iled
activ
ities
invo
lved
in b
oth
larg
e an
d sm
all s
cale
pro
ject
s. E
nsur
es
that
the
proj
ect i
s ex
ecut
ed e
ffici
ently
, on
time,
and
with
in b
udge
t –by
ens
urin
g th
at th
e re
quire
d re
sour
ces
and
fund
s ar
e av
aila
ble
as a
nd w
hen
need
ed.
SA
P P
roje
ct S
yste
ms
will
be
inte
grat
ed w
ith P
ower
Pla
nt.
The
proc
esse
s of
bud
get,
plan
ning
, and
repo
rting
on
proj
ects
will
be
man
aged
in P
ower
Pla
nt a
nd S
AP
Pro
ject
Sys
tem
s. B
ased
on
the
inte
grat
ion
of P
roje
ct S
yste
ms
and
Grid
bus
ines
s pr
oces
ses
the
follo
win
g co
mpo
nent
s w
ill b
e in
sco
pe fo
r thi
s ph
ase
of th
e pr
ojec
t. W
ith th
e
impl
emen
tatio
n of
the
Grid
Fro
nt O
ffice
in th
e ne
xt p
hase
the
use
of o
ther
Pro
ject
Sys
tem
s de
taile
d sc
hedu
ling
and
plan
ning
com
pone
nts
may
incr
ease
. Le
vel o
f use
of t
hese
obj
ects
will
be
dete
rmin
ed d
urin
g de
taile
d de
sign
.
SA
P P
roje
ct D
efin
ition
Hig
h le
vel w
ay o
f ide
ntify
ing
the
type
of p
roje
ct.
Driv
es a
spec
ts o
f the
low
er le
vel d
ata
(WB
S) u
se a
nd id
entif
y or
gani
zatio
nal i
nfor
mat
ion
.S
AP
Wor
k B
reak
dow
n S
truct
ure
(WB
S)
Rep
rese
nts
an in
divi
dual
pro
ject
as
a w
hole
or p
art o
f a p
roje
ctth
at c
an b
e su
bdiv
ided
.U
sed
to s
et a
nd p
erfo
rm a
naly
sis
of b
udge
t and
pla
nned
cos
t, re
venu
e, a
nd p
erfo
rm o
vera
ll pr
ojec
t pl
anni
ng a
nd m
anag
emen
t .Th
ere
will
be
a di
rect
tie
betw
een
the
Pow
erP
lant
Fun
ded
Pro
ject
and
the
SA
P W
BS
Ele
men
tS
AP
Pla
nt M
aint
enan
ce In
tegr
atio
nW
ork
Ord
ers
are
requ
ired
to b
e as
sign
ed to
a F
unde
d P
roje
ct in
Pow
erP
lant
and
a W
BS
Ele
men
t in
SA
P.
For m
ore
info
rmat
ion
on w
ork
orde
r pro
cess
es s
ee n
ext s
lide
on P
lant
Mai
nten
ance
.
Exhibit __ (ISP-2) Page 11 of 51
68
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
11
11. P
lant
M
aint
enan
ceE
nabl
es e
ffici
ent p
lann
ing
of p
rodu
ctio
n an
d ge
nera
tion
sche
dule
s an
d ab
ility
for c
ompa
nies
to p
erfo
rm
deta
iled
asse
t man
agem
ent.
Sup
ports
cos
t-effi
cien
t mai
nten
ance
met
hods
, suc
h as
risk
-bas
ed m
aint
enan
ce o
r
prev
entiv
e m
aint
enan
ce, a
nd p
rovi
des
com
preh
ensi
ve o
utag
e pl
anni
ng a
nd w
ork
orde
r life
cycl
e m
anag
emen
t.
SA
P P
lant
Mai
nten
ance
will
be
utili
zed
to s
uppo
rt w
ork
man
agem
ent a
nd fi
nanc
e re
late
d pr
oces
ses.
Pla
nt
Mai
nten
ance
will
inte
grat
e w
ith S
torm
s, M
AXI
MO
, and
Pow
erP
lant
to s
uppo
rt re
late
d pr
oces
ses
of W
ork
Ord
er
Life
cycl
e, In
vent
ory
Man
agem
ent,
Tim
e M
anag
emen
t, an
d w
ill b
e th
e di
rect
rece
iver
of a
ll co
sts
asso
ciat
ed w
ith
the
wor
k pe
rform
ed.
With
the
impl
emen
tatio
n of
the
Grid
Fro
nt O
ffice
in th
e ne
xt p
hase
the
use
of o
ther
Pla
nt
Mai
nten
ance
func
tiona
lity
will
incr
ease
. Le
vel o
f use
of t
hese
obj
ects
will
be
dete
rmin
ed d
urin
g de
taile
d de
sign
.
SA
P W
ork
Ord
er Use
d fo
r det
aile
d pl
anni
ng a
nd s
ched
ulin
g of
act
iviti
es, m
ater
ials
, and
cos
t ass
ocia
ted
with
wor
k
to b
e pe
rform
ed. Use
d to
cap
ture
act
ual c
ost o
f mat
eria
l, tim
e, a
nd a
ll ac
tiviti
es a
ssoc
iate
d w
ith th
e w
ork
perfo
rmed
.
SA
P W
ork
Ord
er In
tegr
atio
n
Wor
k or
ders
in th
is p
hase
of t
he p
roje
ct w
ill b
e cr
eate
d ba
sed
on th
e cr
eatio
n of
wor
k or
ders
in
Sto
rms,
MA
XIM
O, a
nd P
ower
Pla
nt.
Est
imat
es o
f wor
k, m
ater
ials
, and
oth
er d
ata
from
Sto
rms,
MA
XIM
O, a
nd P
ower
Pla
nt w
ill b
e se
nt
to S
AP
.
Cos
ts w
ill b
e ap
plie
d to
the
SA
P w
ork
orde
r and
then
sen
t to
Pow
erP
lant
to p
erfo
rm c
ost
Exhibit __ (ISP-2) Page 12 of 51
69
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
12. W
areh
ouse
M
anag
emen
tW
areh
ouse
man
agem
ent e
ffici
ently
man
ages
mat
eria
ls a
nd p
roce
sses
in a
com
plex
war
ehou
se e
nviro
nmen
t.
Goo
ds m
ovem
ents
and
all
logi
stic
pro
cess
es w
ithin
the
war
ehou
se a
re p
lann
ed a
nd e
xecu
ted
effe
ctiv
ely.
Thi
s
incl
udes
con
firm
ing
war
ehou
se o
rder
s vi
a th
e de
skto
p or
usi
ng ra
dio
frequ
ency
, as
wel
l as
the
optio
nal p
roce
sses
of s
lotti
ng, w
areh
ouse
rear
rang
emen
t, re
sour
ce m
anag
emen
t, la
borm
anag
emen
t and
mon
itorin
g.
The
SA
P W
areh
ouse
Man
agem
ent (
WM
) app
licat
ion
prov
ides
flex
ible
, aut
omat
ed s
uppo
rt to
ass
ist i
n
proc
essi
ng a
ll go
ods
mov
emen
ts a
nd in
mai
ntai
ning
cur
rent
sto
ck in
vent
orie
s in
the
war
ehou
sing
com
plex
.
Grid
will
:
•Def
ine
and
man
age
com
plex
war
ehou
sing
stru
ctur
es
•O
ptim
ize
mat
eria
l flo
w u
sing
adv
ance
d pu
t-aw
ay a
nd p
icki
ng te
chni
ques
•P
roce
ss g
oods
rece
ipts
, goo
ds is
sues
and
sto
ck tr
ansf
ers
quic
kly
and
easi
ly
Alth
ough
it is
pos
sibl
e fo
r you
to m
anag
e w
areh
ouse
inve
ntor
ies
usin
g th
e In
vent
ory
Man
agem
ent (
IM)
appl
icat
ion
com
pone
nt, t
he p
rimar
y di
ffere
nce
betw
een
man
agin
g st
ock
in W
M a
nd in
IM is
that
in IM
, the
sys
tem
can
only
dis
play
the
tota
l sto
ck o
f a m
ater
ial f
or a
sto
rage
loca
tion.
WM
, on
the
othe
r han
d, o
ffers
the
capa
bilit
y to
man
age
stoc
k qu
antit
ies
in e
ach
indi
vidu
al s
tora
ge b
in in
hig
hly
com
plex
sto
rage
faci
litie
s. G
rid w
ill o
ptim
ize
the
use
of a
ll st
orag
e bi
ns
The
War
ehou
se M
anag
emen
t app
licat
ion
is fu
lly in
tegr
ated
into
the
SA
P E
CC
sys
tem
. Tra
nsac
tions
that
are
initi
ated
in o
ther
SA
P c
ompo
nent
s re
sult
in c
orre
spon
ding
task
s in
WM
whi
ch a
ctiv
ate
the
actu
al p
hysi
cal
trans
fers
with
in th
e w
areh
ouse
.
12
Exhibit __ (ISP-2) Page 13 of 51
70
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
13. M
ater
ials
M
anag
emen
tM
ater
ials
Man
agem
ent i
s th
e m
ain
inte
grat
ion
poin
t for
Pro
cure
men
t, W
ork
Ord
er In
vent
ory,
Pro
ject
s, e
tc. T
he
Mat
eria
l Mas
ter c
onta
ins
info
rmat
ion
on a
ll th
e m
ater
ials
pro
cure
d, u
tiliz
ed, o
r pro
duce
d, s
tore
d, a
nd /o
r sol
d. I
t is
the
com
pany
's c
entra
l sou
rce
for r
etrie
ving
mat
eria
l-spe
cific
dat
a th
at i
s st
ored
in th
e in
divi
dual
mat
eria
l mas
ter
reco
rds.
The
mat
eria
l mas
ter i
s us
ed a
cros
s S
AP
com
pone
nts
(Pro
cure
men
t, In
vent
ory,
Sal
es, W
ork
Ord
er
Man
agem
ent,
and
inte
grat
ed w
ithin
SR
M C
atal
ogs,
etc
.). T
he in
tegr
atio
n of
all
mat
eria
l dat
a in
a s
ingl
e da
taba
se
obje
ct e
limin
ates
redu
ndan
t dat
a st
orag
e.
13
Exhibit __ (ISP-2) Page 14 of 51
71
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s14
. Inv
ento
ry
Man
agem
ent
All
trans
actio
ns th
at b
ring
abou
t a c
hang
e in
sto
ck a
re e
nter
ed re
al ti
me,
sto
ck u
pdat
es a
s w
ell a
s fin
anci
al
upda
tes
are
mad
e re
al ti
me.
Mat
eria
ls a
re m
anag
ed r
eal t
ime,
bot
h qu
antit
ies
and
valu
es, a
nd s
ub-le
dger
s ar
e
auto
mat
ical
ly k
ept i
n sy
nc w
ith F
inan
cial
pos
tings
.
•G
oods
Mov
emen
ts a
re c
arrie
d ou
t –pi
ckin
g, p
acki
ng, s
hipp
ing,
rece
ivin
g, e
tc.
•V
alua
tions
of i
nven
tory
•S
peci
al s
tock
han
dlin
g
•C
onsi
gnm
ent
Inve
ntor
y M
anag
emen
t is
inte
grat
ed w
ith a
ll th
e ot
her S
AP
com
pone
nts,
suc
h as
ava
ilabi
lity
chec
king
,
plan
ned
re-o
rder
ing,
pur
chas
ing,
del
egat
ion
of a
utho
rity
auto
mat
ed a
ppro
vals
, etc
.
14
Exhibit __ (ISP-2) Page 15 of 51
72
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s15
. Tra
vel &
Ex
pens
eS
AP
Tra
vel M
anag
emen
t acc
ompa
nies
all
the
proc
esse
s in
volv
ed in
han
dlin
g tri
ps. I
t pro
vide
s in
tegr
ated
func
tions
and
links
thes
e to
the
settl
emen
t, ta
xatio
n an
d pa
ymen
t pro
cess
es. T
rave
l man
agem
ent c
over
s th
e re
ques
t, pl
anni
ng
and
book
ing
of tr
ips,
as
wel
l as
the
settl
emen
t of t
rave
l exp
ense
s an
d th
e tra
nsfe
r of s
ettle
men
t res
ults
to o
ther
busi
ness
func
tion
area
s. T
he in
tegr
atio
n of
SA
P T
rave
l Man
agem
ent g
uara
ntee
s th
e be
nefit
s of
syn
ergi
es th
at
incr
ease
effi
cien
cy a
nd re
duce
pro
cess
cos
ts.
15
Exhibit __ (ISP-2) Page 16 of 51
73
16
17. F
leet
M
anag
emen
tTh
e S
AP
Fle
et S
olut
ion
is b
ased
on
the
intri
nsic
inte
grat
ion
of s
ever
al S
AP
mod
ules
: P
lant
Mai
nten
ance
,
Mat
eria
ls M
anag
emen
t, P
rocu
rem
ent,
Fina
nce,
Con
trolli
ng, e
tc…
The
Flee
t Sol
utio
n co
ntai
ns a
ll th
e to
ols
to
man
age
Flee
t tas
ks fr
om in
itial
veh
icle
spe
cific
atio
n an
d pr
ocur
emen
t thr
ough
the
entir
e V
ehic
le L
ife-C
ycle
.
This
ena
bles
flee
t man
agem
ent p
roce
ssin
g in
a s
ingl
e fo
rmat
with
dire
ct a
nd im
med
iate
inte
grat
ion
to N
atio
nal
Grid
sys
tem
s w
ith d
irect
logi
stic
s an
d fin
anci
al d
ata
flow
sup
porti
ng th
e pr
imar
y Fl
eet M
anag
emen
t goa
l of
faci
litat
ing
proc
esse
s su
ch a
s:
1)V
ehic
le R
epla
cem
ents
2)V
ehic
le P
rocu
rem
ent
3)V
ehic
le C
orre
ctiv
e M
aint
enan
ce4)
Veh
icle
Pre
vent
ive
Mai
nten
ance
5)Fl
eet T
echn
icia
n Ti
me
Con
firm
atio
ns6)
Veh
icle
Fue
ling
& B
ulk
Fuel
Pro
cure
men
t7)
PC
AR
D in
tegr
atio
n to
Fle
et M
aint
enan
ce W
ork
Ord
ers
8)W
arra
nty
Rei
mbu
rsem
ent P
roce
ssin
g9)
Flee
t Man
agem
ent R
epor
ting
10)L
OB
Veh
icle
Ava
ilabi
lity
Rep
ortin
g
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
Exhibit __ (ISP-2) Page 17 of 51
74
17
18. S
uppl
ier
Rel
atio
nshi
p M
anag
emen
t
The
SA
P S
uppl
ier R
elat
ions
hip
Man
agem
ent (
SA
P S
RM
) app
licat
ion
is b
uilt
on th
e S
AP
Net
Wea
ver
tech
nolo
gy p
latfo
rm, e
nabl
ing
mul
tiple
leve
ls o
f sup
plie
rs, p
artn
ers,
and
man
ufac
ture
rs to
wor
k to
geth
er o
n a
fully
inte
grat
ed s
ourc
e-to
-pay
pro
cess
.
SA
P S
RM
ena
bles
key
bus
ines
s pr
oces
ses,
incl
udin
g: p
rocu
re to
pay
, cat
alog
man
agem
ent,
cent
raliz
ed
sour
cing
, cen
traliz
ed c
ontra
ct m
anag
emen
t, su
pplie
r col
labo
ratio
n, s
uppl
ier e
valu
atio
n, e
tc.
This
will
ena
ble
smoo
ther
, lea
ner p
roce
sses
with
in p
rocu
re to
pay
suc
h as
:1)
Req
uisi
tioni
ng o
f goo
ds a
nd s
ervi
ces
2)M
anag
ing
purc
hase
ord
ers
3)A
ppro
ving
with
ele
ctro
nic
wor
kflo
w a
ppro
vals
util
izin
g th
e U
SFP
Del
egat
ion
of A
utho
rity
4)C
onfir
min
g go
ods
rece
ipt o
r ser
vice
ent
ry s
heet
s5)
Man
agin
g ca
talo
gs6)
Cen
traliz
ed S
ourc
ing
7)C
entra
lized
con
tract
man
agem
ent,
8)S
uppl
ier c
olla
bora
tion,
9)S
uppl
ier e
valu
atio
n10
)Aut
omat
ed in
voic
e en
try11
)A/P
aut
omat
ion
of in
voic
e ap
prov
als
12)A
bilit
y to
take
dis
coun
ts fo
r bes
t pay
men
t ter
ms.
SR
M a
lso
incl
udes
a c
ompo
nent
, SU
S (S
uppl
ier S
elf S
ervi
ces)
, whi
ch i
s a
host
ed s
olut
ion
for s
uppl
iers
that
prov
ides
the
infra
stru
ctur
e fo
r rea
l-tim
e el
ectro
nic
exch
ange
of b
usin
ess
docu
men
ts s
uch
as P
urch
ase
Ord
ers,
Pur
chas
e O
rder
Res
pons
e/A
ckno
wle
dgem
ent,
Goo
ds C
onfir
mat
ion
or S
ervi
ce E
ntry
She
ets
and
Invo
ices
.
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
19. M
DM
C
atal
ogM
DM
(Mas
ter D
ata
Man
agem
ent )
is a
requ
ired
tech
nolo
gy c
ompo
nent
to s
uppo
rt an
d m
anag
e in
tern
al c
atal
ogs
in
SR
M..
Exhibit __ (ISP-2) Page 18 of 51
75
18
20. P
urch
asin
g P
urch
asin
g is
a c
ompo
nent
of M
ater
ials
Man
agem
ent (
MM
). M
M P
urch
asin
g co
mpo
nent
incl
ude:
Ext
erna
l
proc
urem
ent o
f mat
eria
ls a
nd s
ervi
ces;
Det
erm
inat
ion
of p
ossi
ble
sour
ces
of s
uppl
y fo
r a re
quire
men
t ide
ntifi
ed
by th
e m
ater
ials
pla
nnin
g an
d co
ntro
l sys
tem
or a
risin
g di
rect
lyw
ithin
a u
ser d
epar
tmen
t; M
onito
ring
of d
eliv
erie
s
from
and
invo
ice
mat
chin
g an
d pa
ymen
t app
rova
ls to
ven
dors
.
This
is fu
lly in
tegr
ated
with
Sup
plie
r Rel
atio
nshi
p M
anag
emen
t (S
RM
) and
Sup
plie
r Sel
f Ser
vice
(SU
S).
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
Exhibit __ (ISP-2) Page 19 of 51
76
19
21. M
DM
Cus
tom
er
Mas
ter D
ata
MD
M (M
aste
r Dat
a M
aint
enan
ce) f
or C
usto
mer
s is
a c
ompo
nent
of S
AP
that
sup
ports
the
man
agem
ent o
f
cust
omer
s ac
ross
mul
tiple
lega
cy s
yste
ms,
acr
oss
mul
tiple
line
s of
bus
ines
s, a
cros
s le
gal e
ntiti
es, e
tc.
The
cust
omer
s ar
e m
aste
r rec
ords
in S
AP
that
are
util
ized
in S
ales
&D
istri
butio
n fo
r sel
ling
and
Fina
nce
for p
ostin
g of
reve
nues
and
rece
ipts
.
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
22. N
on-U
tility
B
illin
gB
illin
g re
pres
ents
the
final
pro
cess
ing
stag
e fo
r a b
usin
ess
trans
actio
n in
Sal
es a
nd D
istri
butio
n. It
incl
udes
the
crea
tion
of In
voic
es b
ased
on
deliv
erie
s or
ser
vice
s (w
ork
orde
r int
egra
tion)
; cre
dit a
nd d
ebit
mem
os ;
pro
form
a
invo
ices
, etc
., an
d au
tom
ated
tran
sfer
of b
illin
g da
ta to
Fin
anci
al A
ccou
ntin
g (F
I) an
d C
ontro
lling
(CO
). T
he U
SFP
scop
e in
clud
es:
•C
usto
mer
Ser
vice
pric
ing;
det
erm
ine
pric
e of
ser
vice
•C
usto
mer
Ser
vice
bill
ing:
gen
erat
e bi
lls b
ased
on
quot
atio
nsof
ser
vice
or f
lat r
ate
•S
ales
doc
umen
ts: g
ener
ate
sale
s or
ders
for s
ervi
ces
•S
ales
Invo
ice:
gen
erat
e in
voic
es b
ased
on
bills
.
Exhibit __ (ISP-2) Page 20 of 51
77
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
ES
S -
Em
ploy
ee S
elf S
ervi
ce is
a w
eb e
nabl
ed to
ol u
sed
by e
mpl
oyee
s to
upd
ate
thei
r ow
n da
ta –
nam
e an
d
addr
ess,
pay
roll
data
, etc
.
MS
S –
Man
ager
Sel
f Ser
vice
is a
web
ena
bled
tool
use
d by
Man
ager
s to
app
rove
, mon
itor a
nd re
port
empl
oyee
activ
ities
with
in th
eir d
omai
n.
For t
he N
atio
nal G
rid, E
SS
and
MS
S w
ill b
e ut
ilize
d la
rgel
yto
sup
port
Tim
e M
anag
emen
t (E
ntry
, App
rova
ls,
etc)
. W
e w
ill b
e de
term
inin
g w
hat a
dditi
onal
sta
ndar
d de
liver
ed E
SS
/MS
S fu
nctio
nalit
y fro
m c
ompo
nent
s lis
ted
belo
w w
ill b
e im
plem
ente
d to
sup
port
HC
M p
roce
sses
in g
ener
al. T
he fo
llow
ing
ES
S/M
SS
com
pone
nts
are
deem
ed to
be
in s
cope
at s
ome
leve
l, th
e le
vel t
o be
det
erm
ined
dur
ing
Det
ail D
esig
n:
SA
P E
SS
Acc
essi
ng g
ener
al in
form
atio
n su
ch a
s ad
dres
s or
oth
er c
onta
ct d
etai
ls, o
r per
sona
l dat
a
Mon
itorin
g c
ompe
nsat
ion
info
rmat
ion
such
as
pays
tubs
, W-2
info
rmat
ion,
W-4
exe
mpt
ion,
etc
.
Mai
ntai
ning
Ban
k D
etai
ls (c
heck
and
EFT
S in
form
atio
n)
Ver
ifica
tion
of e
mpl
oym
ent
Tim
e E
ntry
(Abs
ence
s an
d A
ttend
ance
s)
Trav
el a
nd E
xpen
se E
ntry
SA
P M
SS Tim
e E
ntry
and
App
rova
l
DO
A A
ppro
vals
(inc
ludi
ng T
rave
l and
Exp
ense
)
Initi
atin
g/M
anag
ing
Pro
mot
ions
and
Tra
nsfe
rs
Vie
win
g Te
am M
embe
rs (H
eadc
ount
)20
Exhibit __ (ISP-2) Page 21 of 51
78
21
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
sTh
is c
ompo
nent
allo
ws
you
to p
roce
ss p
ayro
ll fo
r em
ploy
ees,
usi
ng d
ata
from
SA
P P
erso
nnel
Adm
inis
tratio
n an
d B
enef
its u
nder
a w
ide
varie
ty o
f con
figur
atio
ns. T
he S
AP
Pay
roll
syst
em a
lso
offe
rs a
num
ber o
f sta
ndar
d pa
yrol
l re
ports
. The
Tax
Rep
orte
r com
pone
nt a
llow
s yo
u to
gen
erat
e al
l sta
tuto
ry s
tate
and
fede
ral t
ax fo
rms,
suc
h as
SU
I an
d W
-2s.
Lis
ted
belo
w a
re S
AP
Pay
roll’
s m
ain
feat
ures
:
C
alcu
late
Gro
ss P
ay
R
ead
empl
oyee
dat
a fo
r pay
rate
and
add
ition
al p
ay o
r ded
uctio
ns
R
ead
time
and
leav
e da
ta
C
alcu
late
Net
Pay
C
alcu
late
tax
amou
nts
(usi
ng B
SI T
ax F
acto
ry)
R
etro
-cal
cula
tions
for p
ast p
ay p
erio
ds in
clud
ing
dedu
ctio
ns &
tax
adju
stm
ents
Tr
ack
and
man
age
empl
oyee
gar
nish
men
t
Fi
nal P
ay P
roce
ssin
g
G
ener
ate
dire
ct d
epos
its
C
reat
e 3r
d pa
rty re
mitt
ance
s
G
ener
ate
earn
ings
sta
tem
ents
C
reat
e le
gal r
epor
ting
Po
st to
fina
ncia
l acc
ount
ing/
cont
rollin
g in
clud
ing
mon
th-e
nd a
ccru
als
Tr
ansf
er to
Fin
anci
als
and
Con
trollin
g
Au
dit f
inan
cial
pos
ting
resu
lts
R
evie
w la
bor c
osts
at o
rg u
nit l
evel
and
agg
rega
te le
vels
Pe
rform
per
iod-
end
clos
ing
activ
ities
24. P
ayro
ll
Exhibit __ (ISP-2) Page 22 of 51
79
22
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
The
orga
niza
tion
of e
mpl
oyee
s, th
eir a
ssig
ned
role
s an
d hi
erar
chic
al re
spon
sibi
litie
s (r
epor
ting
stru
ctur
e) is
dep
icte
d by
Org
aniz
atio
nal M
anag
emen
t (O
M).
OM
can
als
o be
util
ized
for:
Func
tiona
l and
/or l
ocat
ion
rela
ted
hier
arch
y (d
epar
tmen
t to
depa
rtmen
t, lin
e of
bus
ines
s, e
tc)
Secu
rity
Infra
stru
ctur
e
Com
plia
nce
Rep
ortin
g
Wor
kflo
ws
(incl
udin
g D
eleg
atio
n of
Aut
horit
y)
Hea
dcou
ntin
g
The
follo
win
g O
rgan
izat
iona
l Man
agem
ent c
ompo
nent
s ar
e de
emed
tobe
in s
cope
at s
ome
leve
l, th
e le
vel t
o be
det
erm
ined
durin
g D
etai
l Des
ign:
SAP
Org
aniz
atio
nal O
bjec
ts
Org
aniz
atio
nal U
nit –
a de
partm
ent o
r oth
er c
usto
mer
def
ined
bus
ines
s ar
ea
Cos
t Cen
ter –
an o
bjec
t ow
ned
and
mai
ntai
ned
by F
inan
ce, b
ut u
sed
by H
CM
to li
nk to
Org
aniz
atio
nal U
nits
or P
ositi
ons
Posi
tion
-a p
ositi
on is
hel
d by
an
empl
oyee
Job-
a gr
oupi
ng o
f Pos
ition
s w
ith c
omm
on e
lem
ents
suc
h as
gra
des,
ban
ds, s
alar
y ra
nges
, etc
.
Job
Fam
ily –
a gr
oupi
ng o
f lik
e Po
sitio
ns
SAP
Obj
ect A
ttrib
utes
Iden
tific
atio
n of
man
ager
ial p
ositi
ons
and
DO
A lim
its
Equa
l Opp
ortu
nity
and
Affi
rmat
ive
Actio
n Id
entif
iers
Ente
rpris
e an
d Pe
rson
nel S
truct
ure
info
rmat
ion
(HR
def
ined
“bui
ldin
g bl
ocks
”)
Em
ploy
ee H
ome
Cos
t Cen
ter i
nfor
mat
ion
Exhibit __ (ISP-2) Page 23 of 51
80
23
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
The
Per
sonn
el A
dmin
istra
tion
task
s ap
plic
atio
n co
mpo
nent
, man
ages
all
func
tions
ass
ocia
ted
with
an
empl
oyee
from
hire
to re
tire.
Em
ploy
ee d
ata
is a
lway
s co
untry
spe
cific
, driv
en in
par
t by
the
uniq
ue re
gula
tory
and
legi
slat
ive
requ
irem
ents
from
cou
ntry
to c
ount
ry.
This
com
pone
nt is
tigh
tly in
tegr
ated
with
all
othe
r HR
com
pone
nts.
Per
sonn
el A
dmin
istra
tion
is u
tiliz
ed fo
r Tr
acki
ng e
mpl
oyee
spe
cific
dat
a th
roug
hout
the
empl
oym
ent l
ife c
ycle
Pay
roll
Cal
cula
tion
and
Pay
men
tS
ecur
ity In
frast
ruct
ure
Com
plia
nce
Rep
ortin
g H
eadc
ount
ing
Pos
ting
HC
M c
osts
to th
e Fi
nanc
e G
ener
al L
edge
r
The
follo
win
g P
erso
nnel
Adm
inis
tratio
n co
mpo
nent
s ar
e de
emed
to b
e in
sco
pe a
t som
e le
vel,
the
leve
l to
be
dete
rmin
ed d
urin
g D
etai
l Des
ign:
SA
P P
erso
nnel
Act
ions
and
/or t
rack
ed in
form
atio
nH
ires
Reh
ires
Tran
sfer
s or
Pro
mot
ion
Pay
Cha
nges
Leav
es o
f Abs
ence
D
eath
of a
n em
ploy
ee (
Sur
vivo
r tra
ckin
g if
appl
icab
le)
Ret
irem
ent
Term
inat
ions
Mai
ntai
ning
elig
ibili
ty a
nd o
ther
indi
cativ
e da
ta (s
ervi
ce, l
ocat
ion,
age
, uni
on p
rovi
sion
s, e
tc)
Dis
cipl
inar
y an
d G
rieva
nce
track
ing
Exhibit __ (ISP-2) Page 24 of 51
81
24
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s27
. CA
TS /
Tim
e En
try
The
SA
P C
ross
-App
licat
ion
Tim
e S
heet
(CA
TS) i
s yo
ur s
ingl
e po
int o
f ent
ry fo
r all
busi
ness
pro
cess
es
requ
iring
info
rmat
ion
on e
mpl
oyee
s’ac
tiviti
es. U
tiliz
ing
a ce
ntra
l tim
e an
d da
ta e
ntry
met
hod
acro
ss th
e en
terp
rise
mea
ns e
nsur
ing
info
rmat
iona
l int
egrit
y an
d in
crea
sing
ope
ratio
nal e
ffici
enci
es.
Dat
a co
llect
ed th
roug
h a
dive
rse
rang
e of
inte
ract
ion
tech
nolo
gies
is m
ade
avai
labl
e in
man
y m
odul
es o
f
SA
P th
roug
h C
ATS
. A fr
ont-e
nd d
ata
colle
ctio
n so
lutio
n fo
r CA
TS e
nsur
es th
at th
e da
ta p
asse
d ac
ross
your
ent
erpr
ise
is a
ccur
ate.
Pre
cise
wor
kfor
ce d
ata
in y
our b
usin
ess
syst
ems
will
stre
amlin
e bu
sine
ss
proc
esse
s an
d fa
cilit
ate
the
accu
rate
cal
cula
tion
of p
ayro
ll.
Fo
nt e
nd d
evic
es/ m
etho
ds in
put d
ata
into
CA
TS
N
atio
nal G
rid’s
cur
rent
ly u
sed
MD
SI d
evic
e
P
orta
l: E
nter
ed o
n E
SS
/ A
ppro
ved
on M
SS
D
irect
ly o
n S
AP
EC
C u
sing
tran
sact
ion
code
C
ATS
Pro
cess
Ti
me
entry
for o
ne o
r mor
e pe
rson
s
R
elea
se fo
r App
rova
l and
App
rova
l pro
cess
are
can
be
optio
ns
Tr
ansf
er C
ATS
dat
a to
HR
(Abs
ence
, Atte
ndan
ce, R
emun
erat
ion)
Tr
ansf
er C
ATS
S to
CO
(Sen
der &
Rec
eive
r cos
t cen
ter a
nd a
lloca
tion
activ
ity)
Exhibit __ (ISP-2) Page 25 of 51
82
25
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
28. T
ime
Eval
uatio
nTi
me
eval
uatio
n ev
alua
tes
the
atte
ndan
ce a
nd a
bsen
ce ti
mes
that
hav
e be
en re
cord
ed fo
r or b
y yo
ur e
mpl
oyee
s. T
he
syst
em u
ses
the
resu
lts o
f tim
e ev
alua
tion
to fo
rm ti
me
bala
nces
and
time
wag
e ty
pes,
and
to u
pdat
e at
tend
ance
and
abse
nce
quot
as, b
ased
on
rule
s an
d co
nfig
urat
ion
defin
ed fo
r var
ious
labo
r gro
ups/
empl
oyee
s. L
iste
d be
low
are
SAP
Tim
e
Eval
uatio
n’s
mai
n fe
atur
es:
Ti
me
Entry
cap
ture
d fro
m v
ario
us s
ourc
es
C
ross
-App
licat
ion
Tim
e Sh
eets
(CAT
S)
SA
P EC
C T
ime
Man
ager
’s W
ork
Plac
e
Po
rtal E
SS /
Appr
oved
on
MS
S
M
obile
Dev
ices
and
oth
er
C
alcu
latio
n of
stra
ight
tim
e an
d va
rious
OT
hour
s ba
sed
on e
mpl
oyee
s w
ork
sche
dule
and
rule
s fo
r con
figur
ed e
mpl
oyee
grou
ping
s
U
sing
Pul
ic H
olid
ay C
alen
dar,
Wor
k sc
hedu
le,
conf
igur
ed u
nion
con
tract
rule
s ba
sed
on e
mpl
oyee
gro
upin
gs
C
alcu
late
s Au
tom
atic
Lea
ve a
ccru
als
and
dedu
ctio
ns
U
sing
spe
cifie
d co
nfig
ured
leav
e ac
crua
l rul
es fo
r diff
eren
t em
ploy
ee g
roup
ings
R
etro
activ
e en
tere
d tim
e is
aut
omat
ical
ly p
icke
d up
to S
AP P
ayro
ll fo
r pro
cess
ing
and
upda
ting
empl
oyee
’s p
ay
St
anda
rd T
ime
Shee
ts a
nd o
ther
tim
e re
ports
ava
ilabl
e
Exhibit __ (ISP-2) Page 26 of 51
83
26
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
29. B
SI/ T
ax
Fact
ory
BS
I Tax
Fact
ory™
offe
rs th
e m
ost c
ompr
ehen
sive
and
cos
t effe
ctiv
e pa
yrol
l tax
sol
utio
n in
the
indu
stry
.
C
alcu
late
em
ploy
ee a
nd e
mpl
oyer
-pai
d ta
xes
incl
udin
g w
ithho
ldin
g, u
nem
ploy
men
t and
dis
abilit
y
Su
ppor
t cov
erag
e fo
r U.S
. fed
eral
, sta
te, a
nd lo
cal t
ax ju
risdi
ctio
ns
El
imin
ate
the
burd
en o
f tra
ckin
g re
gula
tory
rule
s
In
tegr
ates
with
SAP
pay
roll,
def
erre
d in
com
e or
hum
an re
sour
ces
syst
em
In
crea
ses
prod
uctiv
ity a
nd re
duce
s ov
eral
l cos
ts
En
sure
com
plia
nce
with
tax
regu
latio
ns
Sc
alab
le to
com
pany
siz
e
30. S
AP
BW
31. S
AP
BPC
SA
P B
W -
SA
P’s
Bus
ines
s In
form
atio
n W
areh
ouse
(BW
) pro
vide
s a
com
plet
e in
form
atio
n fa
ctor
y so
lutio
n. B
W
is th
e ce
ntra
l com
pone
nt in
the
SA
P s
uite
of a
pplic
atio
ns w
ith a
n ad
ded
adva
ntag
e of
bei
ng a
sof
twar
e pa
ckag
e
that
can
be
used
in b
oth
SA
P a
nd n
on-S
AP
env
ironm
ents
. Thi
s sy
stem
app
roac
h co
nsol
idat
es th
e ex
tern
alan
d
the
inte
rnal
sou
rces
of d
ata
into
a s
ingl
e re
posi
tory
and
pro
vide
s pr
econ
figur
ed d
ata
that
aid
s th
e or
gani
zatio
ns
and
ente
rpris
es in
dea
ling
with
the
data
man
agem
ent a
nd a
rchi
ving
.
SA
P B
PC
-S
AP
Bus
ines
sObj
ects
Pla
nnin
g an
d C
onso
lidat
ion
(BP
C) a
pplic
atio
n un
ifies
and
stre
amlin
es th
e
plan
ning
, bud
getin
g, fo
reca
stin
g an
d co
nsol
idat
ion
proc
ess.
Exhibit __ (ISP-2) Page 27 of 51
84
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
33. A
CIS
NG
: Aut
omat
ed C
ontra
ctor
Inv
oice
Sys
tem
. Con
tract
and
Invo
icin
gS
yste
m fo
r NG
Ele
ctric
Dis
tribu
tion
and
NG
Veg
etat
ion
Man
agem
ent P
asse
s ap
prov
ed in
voic
es in
to S
AP
for p
aym
ent.
RIC
EFW
: Y
es
34. A
dvan
tage
NG
: R
hode
Isla
nd G
as R
etai
l Bill
ing
syst
em –
will
be
repl
aced
by
CS
S
35. A
dobe
NG
/KS
E:
Ado
be In
tera
ctiv
e Fo
rms
for C
usto
mer
/Invo
ice
Req
uest
s. R
educ
es th
e ne
ed fo
r man
ual p
roce
ssin
g an
d
incr
ease
s ap
prop
riate
leve
ls o
f con
trols
. To
day
thes
e re
ques
ts a
re m
ade
thro
ugh
a ha
rd c
opy
requ
est f
orm
and
a
bill
is th
en m
anua
lly c
reat
ed in
Mis
c B
illin
g us
ing
the
info
rmat
ion
on th
e fo
rm in
Peo
ples
oft.
27
NG
/KS
E:
Faci
lity
Intru
sion
Det
ectio
n (E
nter
pris
e W
ide)
, Fac
ility
Acc
ess
Con
trol (
Ent
erpr
ise
Wid
e), V
ideo
Sur
veill
ance
(E
nter
pris
e W
ide)
Sec
urity
sys
tem
-no
t sur
e if
need
ed s
ince
Dia
mon
d is
als
o on
the
list.
Thi
s
wou
ld b
e fo
r em
ploy
ee d
ata
so th
at th
e ap
prop
riate
sec
urity
can
be
assi
gned
. Th
ere
is n
o m
odul
e w
ithin
SA
P th
at
allo
ws
for d
eter
min
ing
secu
rity
acce
ss fo
r bad
ges.
Will
bot
h be
requ
ired
in th
e fu
ture
? A
bsol
utel
y Y
ES
-if
this
was
goi
ng to
be
cons
olid
ated
with
Dia
mon
d –
Dia
mon
d w
ould
lik
ely
be c
onso
lidat
ed in
to A
MA
G.
37. A
MA
G
Exhibit __ (ISP-2) Page 28 of 51
85
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
38.B
usin
ess
Obj
ects
NG
: U
sed
for r
epor
ting
–D
ATA
MA
RT
40. C
AS
KS
E :
Lon
g Is
land
Pow
er A
utho
rity
(LIP
A) a
nd L
ong
Isla
nd G
as (L
IG) R
etai
l Com
mod
ity B
illin
g S
yste
mC
usto
mer
Acc
ount
ing
Sys
tem
-C
ore
syst
em u
sed
to m
anag
e cu
stom
ers’
(res
iden
tial,
com
mer
cial
, ind
ustri
al)
finan
cial
, ser
vice
and
con
tact
exp
erie
nce,
incl
udin
g ac
coun
ts, b
illin
g, p
aym
ent,
and
cred
it an
d co
llect
ions
tra
nsac
tions
(inc
ludi
ng a
ll re
venu
e re
porti
ng),
as w
ell a
s cu
stom
er p
artic
ipat
ion
in re
gula
ted
(low
inco
me,
spe
cial
ne
eds,
etc
.) pr
ogra
ms/
serv
ices
, cus
tom
er a
nd m
arke
ter p
artic
ipat
ion
in re
tail
choi
ce, a
nd c
ompa
ny d
iscr
etio
nary
an
d m
arke
ting
prog
ram
s/in
itiat
ives
for g
as o
nly
cust
omer
s on
Lon
g Is
land
and
und
er th
e S
MA
to L
ong
Isla
nd
Pow
er A
utho
rity’
s el
ectri
c on
ly c
usto
mer
s. I
nclu
des
Gas
& E
lect
ric B
illin
g, C
olle
ctio
ns, C
harg
e O
ffs, D
epos
its,
Cor
resp
onde
nce,
etc
.
39. C
arou
sel
NG
: A
pplic
atio
n th
at is
in th
e w
areh
ouse
.
28
42. C
CH
KS
E: C
ontra
ctor
Cha
rges
: C
onta
ins
a re
posi
tory
of c
onst
ruct
ion
cont
ract
s de
fined
by
the
clie
nt a
rea,
whi
ch a
re
used
to p
rice-
out a
ctua
l con
stru
ctio
n w
ork.
Afte
r the
app
ropr
iate
app
rova
ls h
ave
been
mad
e, c
ost d
ata
is p
asse
d
to th
e ac
coun
ts p
ayab
le s
yste
m fo
r pay
men
t. O
nly
supp
orts
Lon
g Is
land
and
New
Yor
k G
as.
41. C
asca
deN
G :
Ass
et M
anag
emen
t & M
aint
enan
ce M
anag
emen
t sys
tem
for E
lect
ric S
ubst
atio
n, H
VD
C, R
elay
& T
elec
omm
A
sset
s
Exhibit __ (ISP-2) Page 29 of 51
86
29
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
44. C
RIS
KS
E:
NY
C G
as C
usto
mer
Bill
ing.
Cus
tom
er R
elat
ed In
form
atio
n S
yste
m -
Cor
e sy
stem
use
d to
man
age
cust
omer
s’(re
side
ntia
l, co
mm
erci
al,
indu
stria
l) fin
anci
al, s
ervi
ce a
nd c
onta
ct e
xper
ienc
e, in
clud
ing
acco
unts
, bill
ing,
pay
men
t, an
d cr
edit
and
colle
ctio
ns
trans
actio
ns (i
nclu
ding
all
reve
nue
repo
rting
), an
d fie
ld s
ervi
ce o
rder
s, a
s w
ell a
s cu
stom
er p
artic
ipat
ion
in
regu
late
d (lo
w in
com
e, s
peci
al n
eeds
, etc
.) pr
ogra
ms/
serv
ices
, cus
tom
er a
nd m
arke
ter p
artic
ipat
ion
in re
tail
choi
ce
, as
wel
l as
com
pany
dis
cret
iona
ry a
nd m
arke
ting
prog
ram
s/in
itiat
ives
for g
as o
nly
cust
omer
s in
thre
e re
gula
tory
and
6 fra
nchi
se a
reas
of n
ew Y
ork
(Bro
okly
n, Q
ueen
s, a
nd S
tate
n Is
land
), M
assa
chus
etts
(Bos
ton
Gas
, Col
onia
l
Cap
e, C
olon
ial L
owel
l and
Ess
ex G
as fr
anch
ises
), an
d E
nerg
y no
rth (n
ew H
amps
hire
) fra
nchi
se.
Kee
ps tr
ack
of a
ll
cust
omer
attr
ibut
es, i
nclu
ding
ser
vice
ord
ers,
cas
h, c
redi
t, bi
lling
, and
met
er re
adin
g.
43. C
MS
Web
NG
/ K
SE
: R
etire
e M
edic
al D
rug
–E
nrol
lmen
t –E
mpl
oyee
Dat
a.
Ret
iree
Med
ical
is h
andl
ed o
utsi
de o
f SA
P a
nd
this
will
pro
vide
em
ploy
ee in
dica
tive
data
in o
rder
to d
eter
min
eth
e en
rollm
ent i
nto
the
drug
pla
n fo
r ret
irees
.
Ben
efits
is o
ut o
f sco
pe fo
r SA
P.
Che
ck to
see
if th
is in
clud
es K
SE
? P
er, B
ill G
eer’s
RIC
EFW
list
, it i
s lis
ted
as a
mus
t hav
efo
r KS
E
Exhibit __ (ISP-2) Page 30 of 51
87
30
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
47. C
usto
mer
I&
AK
SE
: C
usto
mer
Insi
ght a
nd A
naly
tics
Em
ploy
ee d
ata
extra
ct
48. D
iam
ond
NG
: H
R B
adge
ext
ract
dow
nloa
d . T
his
wou
ld b
e fo
r em
ploy
ee d
ata
so th
at th
e ap
prop
riate
sec
urity
can
be
assi
gned
. Th
ere
is n
o m
odul
e w
ithin
SA
P th
at a
llow
s fo
r det
erm
inin
g se
curit
y ac
cess
for b
adge
s.
46. C
SSN
G:
Full
billi
ng a
pplic
atio
n in
clud
ing
upst
ate
New
Yor
k an
d M
ass
Ele
ctric
, and
soo
n to
be
for L
ong
Isla
nd G
as
(rep
laci
ng A
dvan
tage
)
45. C
SAN
G:
Mar
ket B
illin
g S
yste
m (c
ompo
nent
of C
SS
). Th
e C
usto
mer
Ser
vice
Sys
tem
(CS
S/C
SA
) is
used
to fe
ed
paym
ent E
DI-8
20 A
CH
pay
men
t file
for E
SC
O in
voic
es to
SA
P A
/P.
SA
P A
/P w
illth
en is
sue
the
paym
ents
to th
e E
nerg
y S
ervi
ce C
ompa
ny p
er a
gree
d up
on c
ontra
ct a
nd R
egul
ator
y ru
les.
All
ES
CO
pro
vide
rs a
re p
aid
elec
troni
cally
.
Exhibit __ (ISP-2) Page 31 of 51
88
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
50. D
WK
SE
: D
ata
War
ehou
se.
Ther
e ar
e ap
prox
imat
ely
22 d
ata
war
ehou
sein
stan
ces.
For
exa
mpl
e, D
W_C
CH
,
DW
_Col
lect
ions
,
DW
_Eng
, DW
_GE
BB
, DW
_GLA
CT,
DW
_MD
SI_
EL,
DW
_MD
SI_
Gas
, DW
_Met
rics,
DW
_MY
Quo
tes,
DW
_ON
YX,
DW
_PS
,
DW
_RN
S, D
W_S
LS_I
NV
ST,
DW
_SO
M, D
W_S
uppl
yCha
in, D
W_I
EM
DM
, DW
_IS
O,D
W_L
ipaf
dm, D
W_R
TBco
st,
DW
_NC
S,
DW
_Pro
ject
s,
Mic
ro S
trate
gy T
echn
olog
y
(Lab
or d
ata
war
ehou
se?)
Lab
or e
xtra
ct, O
T an
d pa
y da
ta.
31
49. D
SM
NG
: D
MS
is D
eman
d S
ide
Man
agem
ent (
DS
M )a
llow
s m
anag
emen
t of M
A, N
H a
nd R
I Sta
te re
gula
ted
ener
gy
effic
ienc
y pr
ogra
ms,
trac
king
pro
gram
impl
emen
tatio
n w
orkf
low
, con
stru
ctio
n tra
ckin
g, re
cycl
ing
vend
ors
and
clie
nt/v
endo
r pay
men
ts th
roug
h P
eopl
esof
t. S
uppo
rt fo
r reg
ulat
ory
repo
rting
.
Exhibit __ (ISP-2) Page 32 of 51
89
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
53. E
MS
KS
E:
EM
S -
Ene
rgy
Man
agem
ent S
yste
m u
sed
by E
lect
ric S
yste
m O
pera
tors
to m
onito
r and
con
trol L
IPA
's
elec
tric
syst
em. T
he E
MS
sup
ports
Sup
ervi
sory
Con
trol a
nd D
ata
Acq
uisi
tion
(SC
AD
A),
Gen
erat
or D
ispa
tch
and
Con
trol (
GD
C),
Pow
er S
yste
m A
naly
sis
func
tions
, Loa
d S
hed
and
VO
ltage
CO
ntro
l, an
d a
DIs
patc
her T
rain
ing
Sim
ulat
or.
Inte
rface
Id
532
–da
ta e
xtra
ct
32
51. E
MIT
52. E
mer
genc
y Pr
epar
edne
ss
NG
: E
lect
ric M
eter
Sys
tem
is a
n in
vent
ory
and
track
ing
of e
lect
ric m
eter
s. T
his
syst
em in
terfa
ces
to P
ower
Pla
nt,
CS
S &
CIS
.
KS
E: S
trohl
Sys
tem
s (L
DR
PS
) sof
twar
e -
Sof
twar
e us
ed to
cre
ate
and
prin
t bus
ines
s co
ntin
uity
pla
ns fo
r the
orga
niza
tion.
Inc
lude
s di
sast
er re
cove
ry p
lann
ing,
reso
urce
s, lo
catio
ns, a
nd o
ther
per
tinen
t inf
orm
atio
n in
the
time
of c
risis
.
Exhibit __ (ISP-2) Page 33 of 51
90
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
56. G
PCS
Glo
bal P
erfo
rman
ce C
ompe
nsat
ion
-Man
agem
ent
Per
form
ance
and
Com
pens
atio
n to
ol. U
sed
for m
anag
emen
t
empl
oyee
s fo
r per
form
ance
revi
ew p
roce
ss a
nd to
det
erm
ine
com
pens
atio
n, b
onus
, sto
ck o
ptio
ns.
The
SA
P
Ent
erpr
ise
Com
pens
atio
n M
anag
emen
t and
Per
form
ance
Man
agem
ent M
odul
e is
out
sco
pe.
33
54. E
OER
KS
E:
Intra
net b
ased
em
erge
ncy
rest
orat
ion
assi
gnm
ents
, has
sub
sta
tion
rost
ers
and
map
s. T
he E
OE
R s
yste
m
prov
ides
Ele
ctric
Ser
vice
with
the
abili
ty to
mai
ntai
n in
form
atio
n fo
r the
Em
erge
ncy
Res
pons
e P
roce
dure
use
d
durin
g hu
rrica
nes
and
ice
stor
ms.
Mai
nfra
me
base
d em
erge
ncy
rest
orat
ion.
Con
tain
s ro
ster
and
sub
stat
ion
data
for r
epor
ting.
Mos
t of d
ata
and
func
tiona
lity
exis
ts in
intra
net a
pplic
atio
n bu
t som
e re
porti
ng s
till d
one
from
this
dat
a.
Ele
ctric
Ope
ratio
ns E
mer
genc
y R
espo
nse
55. E
PIQ
NG
: A
uctio
ning
web
app
licat
ion
for i
nves
tmen
t rec
over
y to
be
inte
grat
ed to
SA
P S
D
Exhibit __ (ISP-2) Page 34 of 51
91
34
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
60. L
DA
PK
SE
: Use
r Aut
hent
icat
ion
/ Sin
gle
sign
on
Em
ploy
ee s
ign
on v
alid
atio
n. L
DA
P v
erifi
es th
at th
e pe
rson
logs
on h
as th
e ap
prop
riate
sec
urity
. Th
ere
is n
o
mod
ule
with
in S
AP
to d
o th
is ty
pe o
f ver
ifica
tion.
58. H
R1
KS
E/N
G: O
rg h
iera
rchy
for a
ppro
val i
n H
R1
–le
gacy
sys
tem
requ
iring
an
inte
ract
ive
form
59. H
RM
IK
SE
/NG
/UK
: In
terfa
ce to
HR
MI b
usin
ess
obje
cts
for r
emov
al H
R R
epor
ting.
Em
ploy
ee d
ata,
HR
MI t
able
s fo
r rep
ortin
g
UK
Inte
rface
–co
mbi
ning
UK
and
US
dat
a
57. G
SHO
PN
G:
Gas
Met
er S
yste
m is
an
inve
ntor
y an
d tra
ckin
g of
gas
met
ers.
Thi
s sy
stem
inte
rface
s to
Pow
erP
lant
, CS
S &
CIS
.
Exhibit __ (ISP-2) Page 35 of 51
92
35
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
62. M
axim
oK
SE
: 5
Inst
ance
s -
Max
imo
Cor
pora
te:
Cor
pora
te in
stan
ce to
faci
litat
e O
racl
e in
tegr
atio
n.
Max
imo
T&D
: T&
D W
ork
Man
agem
ent f
or e
lect
ric/G
as L
I & N
YC
Max
imo
(Fac
ilitie
s): B
uild
ing
Mai
nten
ance
Sys
tem
MA
XIM
O (G
enco
, Sub
Sta
tion,
LN
G):
Fos
sil P
lant
s, L
NG
Pla
nts,
Sub
stat
ion
Mai
nten
ance
Sys
tem
Max
imo
NE
: N
E G
as W
ork
Man
agem
ent
KS
E:
Cor
pora
te in
stan
ce to
faci
litat
e O
racl
e in
tegr
atio
n., i
s al
so in
dica
ted
to b
e re
tired
on
the
Appl
icat
ions
Inte
rface
Dat
a w
ith L
egac
y D
efin
ition
s.
Exhibit __ (ISP-2) Page 36 of 51
93
36
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
63. M
DSI
KS
E:
3 In
stan
ces
-
MD
SI E
lect
ric:
Fiel
d D
ata
Cap
ture
Sys
tem
(FD
C) u
sed
by L
IPA
cre
ws
Prio
ritiz
es a
nd D
ispa
tche
s jo
b to
mob
ile
devi
ces
via
Ver
izon
's C
DM
A c
omm
unic
atio
ns n
etw
ork
Ther
e is
an
offic
e co
mpo
nent
(Win
Dis
p) a
nd a
fiel
d
com
pone
nt (M
obile
Pen
App
l).
MD
SI G
as:
Fiel
d D
ata
Cap
ture
Sys
tem
(FD
C)u
sed
by N
Y &
LI g
as c
rew
s. P
riorit
izes
and
Dis
patc
hes
job
to m
obile
devi
ces
via
Ver
izon
's C
DM
A c
omm
unic
atio
ns n
etw
ork.
Ther
e is
an
offic
e co
mpo
nent
(Win
Dis
p) a
nd a
fiel
d
com
pone
nt (M
obile
Pen
App
l).
MD
SI N
E:
Fiel
d D
ata
Cap
ture
Sys
tem
(FD
C)u
sed
by N
E g
as c
rew
s. P
riorit
izes
and
Dis
patc
hes
job
to m
obile
devi
ces
via
Ver
izon
's C
DM
A c
omm
unic
atio
ns n
etw
ork.
Ther
e is
an
offic
e co
mpo
nent
(Win
Dis
p) a
nd a
fiel
d
com
pone
nt (M
obile
Pen
App
l).
Tim
e en
try to
CA
TS. T
his
is a
Tim
e E
ntry
sys
tem
that
will
con
tinue
to b
e ut
ilize
d by
em
ploy
ees.
The
time
ente
red
will
be
uplo
aded
into
SA
P fo
r Tim
e E
valu
atio
n an
d P
ayro
ll us
e.
Exhibit __ (ISP-2) Page 37 of 51
94
37
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
65. M
edic
are
Med
icar
e D
cha
nges
(CM
S w
ebsi
te in
itiat
es).
R
etire
e M
edic
al is
han
dled
out
side
of S
AP
and
this
will
pro
vide
empl
oyee
indi
cativ
e da
ta in
ord
er to
det
erm
ine
the
enro
llmen
t int
o th
e dr
ug p
lan
for r
etire
es.
Lim
ited
Ben
efits
are
in
scop
e fo
r SA
P.
(i.e.
Life
Insu
ranc
e)
66. O
NYX
NG
: ON
YX
is a
Cus
tom
er R
elat
ions
hip
Man
agem
ent (
CR
M) a
pplic
atio
nbu
ilt o
n M
icro
soft
Win
dow
s an
d W
eb
appl
icat
ion
tech
nolo
gies
. Ony
x C
orpo
ratio
n is
the
deve
lope
r of t
his
softw
are.
Ony
x is
a s
ales
forc
e au
tom
atio
n
softw
are
pack
age
used
by
Gas
Sal
es &
Mar
ketin
g to
trac
k sa
les
lead
s an
d cr
eate
Max
imo
wor
k or
ders
for n
ew g
as
serv
ice
inst
alla
tions
. Ony
x in
terfa
ces
to M
axim
o an
d S
AP
SD
.
64.
Med
ical
DB
Med
ical
App
licat
ion
–Tr
acks
inci
dent
s on
em
ploy
ees
–us
ed b
y th
e S
afet
y an
d H
ealth
Ser
vice
s gr
oups
. It
is u
sed
for t
he in
put a
nd tr
acki
ng o
f Med
ical
exa
ms,
Med
ical
Dic
tatio
n, v
ario
us h
ealth
exa
m t
estin
g (A
udio
, etc
) Dru
g an
d
Alc
ohol
func
tiona
lity
incl
udes
Dru
g S
pins
and
follo
w-u
p.
Exhibit __ (ISP-2) Page 38 of 51
95
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
67. O
pen
Text
NG
–D
ocum
ent m
anag
emen
t sys
tem
68. M
MA
KS
E:
Han
d H
eld
App
licat
ion
for t
he S
tore
Roo
ms
69. N
AK
ISA
Suc
cess
ion
Pla
nnin
g To
ol –
The
UK
is c
urre
ntly
util
izin
g N
AK
ISA
to d
o th
eir s
ucce
ssio
n pl
anni
ng.
SA
P C
aree
r
and
Suc
cess
ion
Pla
nnin
g to
ol w
as d
eter
min
ed to
be
out o
f sco
pe s
ince
the
UK
has
alre
ady
impl
emen
ted
NA
KIS
A
and
the
US
is c
urre
ntly
pro
vidi
ng a
feed
. Th
is is
an
outb
ound
inte
rface
onl
y.
Rao
will
che
ck m
ay h
ave
to s
end
in C
hang
e re
ques
t as
it is
sho
wn
as s
houl
d ha
ve /
not m
ust h
ave
38
Exhibit __ (ISP-2) Page 39 of 51
96
39
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
71.
Pow
erPl
ant
NG
& K
SE
: P
lant
Acc
ount
ing
uses
Pow
erP
lant
to m
anag
e pr
ojec
t cos
t acc
ount
ing
and
the
finan
cial
life
cyc
le o
f all
NG
US
A's
ass
ets.
The
re is
a k
ey in
terfa
ce b
etw
een
Pow
erP
lant
and
Sto
rms
& M
axim
o, w
here
Pow
erP
lant
prov
ides
new
Wor
k O
rder
num
bers
.
Pow
erP
lant
Sui
te:
Pow
erTa
x: T
ax d
epre
ciat
ion
and
defe
rred
tax
syst
em fo
r the
util
ity in
dust
ry. D
efer
red
taxe
s ar
e m
aint
aine
d fo
r
defe
rral a
ccou
ntin
g an
d FA
S10
9 lia
bilit
y ac
coun
ting.
Pow
erTa
x pr
oces
ses
tax
depr
ecia
tion,
boo
k ta
x ba
sis
reco
ncili
atio
n, a
nd d
efer
red
inco
me
taxe
s.
Pro
perty
Tax:
Use
d to
cal
cula
te R
eal E
stat
e pr
oper
ty ta
x an
d ve
rify
inco
min
g re
al e
stat
e ta
x bi
lls. W
ill a
lso
repl
ace
PTA
RS
to s
uppo
rt N
Y's
Pro
perty
Tax
Cha
lleng
e pr
ogra
m.
70. P
late
auLe
arni
ng S
olut
ion
Dat
abas
e to
trac
k/en
roll
in c
lass
es.
Pla
teau
will
be
the
LSO
tool
for
trac
king
edu
catio
n. S
AP
does
pro
vide
a le
arni
ng to
ol (L
SO
) and
a g
ap a
naly
sis
has
been
con
duct
ed.
Exhibit __ (ISP-2) Page 40 of 51
97
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
72. P
AIR
SN
G:
The
appl
icat
ion
is u
sed
for i
ncid
ent r
epor
ting
and
perfo
rman
ce m
etric
ana
lysi
s. S
imila
r to
the
# 80
Inci
dent
Man
agem
ent S
yste
m (K
SE
)
73. P
avin
gK
SE
: P
avin
g -K
SE
: Tr
acks
and
reco
rds
the
pavi
ng re
ques
ts th
at a
re a
ssoc
iate
d to
gas
con
stru
ctio
n an
d
mai
nten
ance
wor
k in
NY
C &
LI.
Con
tract
s ar
e de
fined
and
item
s ar
e pr
iced
-out
for e
ach
wor
k or
der.
Onc
e
appr
oved
, pay
men
t req
uest
s ar
e pa
ssed
to th
e A
ccou
nts
Pay
able
ora
ccru
als
are
pass
ed to
Fin
ance
.
NG
: P
avin
g D
B, P
ave
See
d R
esto
ratio
n: R
esto
ratio
n on
ly -
track
s w
hat w
ork
need
s to
be
done
in a
n E
xcel
spre
adsh
eet.
Invo
icin
g an
d ac
crua
ls a
re d
one
man
ually
.
NG
: Pav
ing
RI:
An
Acc
ess
appl
icat
ion
that
reco
rds
perti
nent
des
crip
tive
data
for s
treet
and
sid
ewal
k re
stor
atio
n.
Mos
t im
port
is th
e pa
ving
con
tract
or n
ame
and
code
, and
the
dim
ensi
ons
of th
e ar
ea to
be
pave
d an
d th
e m
ater
ial
used
. Whe
n an
invo
ice
is re
ceiv
ed fr
om th
e co
ntra
ctor
it is
reco
ncile
d ag
ains
t the
dat
abas
e an
d a
repo
rt is
sen
t to
Acc
ount
s P
ayab
le. I
nvoi
cing
and
acc
rual
s ar
e do
ne m
anua
lly.
40
Exhibit __ (ISP-2) Page 41 of 51
98
41
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
74. P
ost &
Bid
Job
bidd
ing.
Uni
on b
ased
job
pos
tings
for l
ocal
97.
List
ed a
s co
uld
have
–ne
ed a
cha
nge
cont
rol r
eque
st –
if th
is is
a m
ust h
ave
75. P
rimav
era
KS
E/ N
G:
Pro
ject
Pla
nnin
g &
Sch
edul
ing
Tool
Nee
d to
sen
d E
mpl
oyee
dat
a –
to P
rimav
era
goin
g in
to E
CC
for c
apita
l pla
nnin
g P
ower
plan
t
P6
wou
ld g
o in
to S
AP
–w
aitin
g fo
r the
GD
app
rova
l –th
en d
eter
min
e if
we
have
iden
tifie
d al
l int
erfa
ces.
Wor
king
Pla
n To
ol. N
atio
nal G
rid h
as a
requ
irem
ent f
or a
tool
toco
llate
pro
ject
repo
rting
bot
h w
ithin
the
busi
ness
, and
acr
oss
Alli
ance
Par
tner
s. P
rimav
era,
a p
roje
ct m
anag
emen
t too
l is
used
to
achi
eve
this
pur
pose
.
Exhibit __ (ISP-2) Page 42 of 51
99
42
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
76. R
AC
FN
G/K
SE
: M
ainf
ram
e se
curit
y sy
stem
to a
cces
s E
mpl
oyee
dat
a fo
r lim
iting
mai
nfra
me
syst
em a
cces
s. D
eter
min
es
if th
e em
ploy
ee is
allo
wed
acc
ess
to th
eir c
urre
nt m
ainf
ram
e sy
stem
s. T
here
is n
o m
odul
e w
ithin
SA
P th
at a
llow
s
for d
eter
min
ing
secu
rity
acce
ss fo
r the
mai
nfra
me
syst
ems.
No
inte
rface
to o
r fro
m S
AP
?? D
oesn
’t ge
t HR
dat
a to
day
so d
on’t
thin
k so
.
77. R
emed
yN
G/K
SE
: S
ervi
ce d
esk
softw
are
-m
anag
es T
roub
le T
icke
ts a
nd IT
ass
ets
Em
ploy
ee d
ata
to R
emed
y is
the
syst
em c
urre
ntly
in u
se b
yN
atio
nal G
rid to
trac
k is
sues
whe
n em
ploy
ees
call
into
the
help
des
k. T
he S
AP
mod
ule
was
nev
er in
sco
pe. I
S A
sset
man
agem
ent t
ool.
78. R
ight
Now
This
is a
Hos
ted
3rd
Par
ty a
pplic
atio
n so
it w
as m
oved
to a
gra
y bo
x –
per G
lenn
Mal
linso
n. T
DC
use
s it
for t
heir
track
ing
and
esca
late
issu
es.
Req
uire
s th
e lis
t of e
mpl
oyee
s w
ith p
ertin
ent d
ata.
The
SA
P m
odul
e w
as n
ever
in
scop
e.
Exhibit __ (ISP-2) Page 43 of 51
100
43
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
79. R
MS
Nuc
leus
/ B
eing
re
plac
ed b
y ET
RM
NG
/KS
E:
The
risk
syst
em (N
ucle
us, A
naly
tics,
Wea
ther
Del
ta a
nd re
late
d in
terfa
ces)
sup
ports
hed
ging
act
iviti
es
(fina
ncia
l der
ivat
ives
) an
d th
e pu
rcha
se/s
ale
of p
hysi
cal c
omm
oditi
es.
The
sys
tem
is u
sed
for f
inan
cial
repo
rting
,
invo
icin
g, d
eter
min
ing
cost
of g
as. A
s of
Jan
. 200
6 N
ucle
us is
use
d to
cap
ture
all
LI a
nd N
Y p
hysi
cal g
as
trans
porta
tion
and
to p
erfo
rm m
onth
end
set
tlem
ent.
App
licat
ion
to m
onito
r ris
k &
exp
osur
e in
com
mod
ity tr
adin
g
syst
ems.
RM
S (S
tart)
em
ploy
ee d
ata,
KS
-Abs
and
cla
ims
man
agem
ent.
SA
P M
odul
e is
not
in s
cope
.
ETR
M –
Ele
ctro
nic
Ris
k M
anag
emen
t
Sin
ce it
won
’t be
read
y un
til N
ovem
ber 2
011,
is th
is in
sco
pe fo
r us
to in
terfa
ce to
.
80. S
afet
y / I
MS
NG
/KS
E:
Mon
thly
hou
rs w
orke
d, d
ept d
ata
hier
arch
y –
now
glo
bal
Exhibit __ (ISP-2) Page 44 of 51
101
44
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
81. S
EAL
NG
: S
EA
L (S
torm
Em
erge
ncy
Ass
ignm
ent L
ist)
-Cap
ture
s st
orm
trai
ning
dat
a us
ed fo
r ass
ignm
ents
on
stor
ms
-int
erfa
ces
with
SA
P E
mer
genc
y re
stor
atio
n –
Req
uire
s Tr
aini
ng re
cord
s ex
tract
and
em
ploy
ee e
xtra
ct.
82. S
abrix
Sal
es &
Use
Tax
Sys
tem
–re
plac
ing
curr
ent S
TS
Exhibit __ (ISP-2) Page 45 of 51
102
45
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
83. S
torm
sN
G:
Trac
k cu
stom
er o
rder
s an
d pr
ojec
ts, r
epor
t on
stat
uses
, PS
Cre
porti
ng, p
erfo
rman
ce re
porti
ng, E
SC
O's
,
GS
O's
, Pal
's, M
eter
Ord
ers
and
mis
cella
neou
s or
ders
. In
clud
es b
oth
capi
tal a
nd m
aint
enan
ce (l
imite
d ca
pabi
lity)
wor
k fo
r Ele
ctric
and
Gas
.
Isch
edul
er p
rovi
des
sche
dulin
g ca
pabi
lity.
84. S
ucce
ss
Ente
rpris
eS
ucce
ss E
nter
pris
e is
a p
roje
ct e
stim
atin
g to
ol th
at w
ill in
terfa
ce w
ith P
ower
Pla
nt fo
r Pla
nnin
g da
ta.
Exhibit __ (ISP-2) Page 46 of 51
103
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
85. S
uppl
ier
Self
Serv
ice
(SU
S)
SU
S is
the
cent
ral c
ompo
nent
for t
he S
uppl
ier E
nabl
emen
t sce
nario
in S
RM
. Sup
plie
r Ena
blem
ent c
onsi
sts
of
Doc
umen
t Exc
hang
e, S
uppl
ier N
etw
ork,
Sup
plie
r Por
tal a
nd S
uppl
ier C
olla
bora
tion.
SU
S is
a s
olut
ion
that
re
duce
s th
e co
sts
of p
rocu
rem
ent c
ycle
s by
impr
ovin
g th
e ex
chan
ge o
f bus
ines
s do
cum
ents
and
sho
rteni
ng th
e tim
e it
take
s to
pro
cess
the
cont
ent o
f the
se d
ocum
ents
.
86. R
eval
NG
/KS
E:
Glo
bal T
reas
ury
Wor
k S
tatio
n -
help
s dr
ive
inte
grat
ion,
aut
omat
ion,
vis
ibili
ty a
nd c
olla
bora
tion
whi
le a
lso
offe
ring
mod
elin
g an
d an
alys
is to
ols
to h
elp
man
age
risk,
max
imiz
e liq
uidi
ty, a
nd d
rive
grow
th.
46
Exhibit __ (ISP-2) Page 47 of 51
104
47
87.
Act
ive
Dire
ctor
y
File
Shar
e
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
used
for a
ctiv
e di
rect
ory
listin
g fo
r HR
)
NG
#6
32 -
Em
ploy
ee d
irect
ory
look
up
and
cont
rols
acc
ess
to a
pplic
atio
ns.
NG
/KS
E:
Ris
k M
anag
emen
t & E
nerg
y Tr
adin
g so
ftwar
e -t
he A
llegr
o 8
plat
form
man
ages
NG
RID
’s p
ower
, nat
ural
gas
,
lique
fied
natu
ral g
as (L
NG
), na
tura
l gas
liqu
ids
(NG
L) a
nd re
new
able
s tra
ding
ope
ratio
ns in
the
Uni
ted
Sta
tes.
Alle
gro
supp
orts
all
aspe
cts
of N
GR
ID’s
mul
ti-co
mm
odity
bus
ines
s, in
clud
ing
deal
cap
ture
, pro
cure
men
t,
sche
dulin
g, ri
sk a
nd c
redi
t man
agem
ent,
repo
rting
and
invo
icin
g.
(not
on
CA
D, b
ut o
n la
ndsc
ape
–us
ed fo
r act
ive
dire
ctor
y lis
ting)
–th
is is
Mid
dlew
are
softw
are
not a
n ap
plic
atio
n
#885
Per
form
ance
App
rais
al e
xtra
ct -
88.A
llegr
o
Flee
t Veh
icle
Em
ploy
ee fu
el c
ard
pin
num
ber a
ssig
nmen
t. P
er M
icha
el R
obin
ette
-The
fuel
car
ds w
ill n
ow b
e as
sign
ed to
the
vehi
cle
and
not t
he e
mpl
oyee
and
that
the
info
rmat
ion
will
be
stor
ed in
the
equi
pmen
t rec
ord
and
not i
n H
R.
So
this
item
will
no
long
er b
e ap
plic
able
goi
ng fo
rwar
d.
Exhibit __ (ISP-2) Page 48 of 51
105
48
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
89. U
I Pla
nner
NG
/KS
E:
Stra
tegi
c R
egul
ator
y To
ol -
Use
d fo
r Rat
e C
ase
Ana
lysi
s in
the
US
UI P
lann
er c
urre
ntly
take
s da
ta o
ut o
f Peo
pleS
oft a
nd H
yper
ion.
90. U
K H
yper
ion
NG
/KS
E:
Cor
pora
te in
stan
ce o
f Hyp
erio
n. T
here
are
two
occu
renc
es o
f Hyp
erio
n. T
his
inst
ance
is u
sed
as th
e
stra
tegi
c fin
anci
al c
onso
lidat
ion
tool
for N
atio
nal G
rid a
t a c
orpo
rate
gro
up le
vel.
Thi
s sy
stem
will
be
requ
este
d
until
the
mul
tiple
ER
P s
yste
ms
used
glo
bally
are
repl
aced
with
asi
ngle
glo
bal E
RP
.
Hub
woo
NG
/KS
E:
Hos
ted
Ser
vice
–E
xter
nal C
atal
og
91. L
imite
d B
enef
itsN
G/K
SE
: mos
tly fo
r Life
Insu
ranc
e/Im
pute
d In
com
e, S
tock
Pur
chas
e, a
nd p
ossi
bly
som
e m
acro
leve
l elig
ibili
ty fo
r
the
new
Pen
sion
ven
dor
92. S
iebe
lK
SE
: Th
ere
are
thre
e oc
curre
nces
of S
iebe
l (C
RM
, KE
D &
LIP
A).
CR
M a
llow
s E
lect
ric M
arke
ting
to tr
ack
cust
omer
con
tact
info
, lea
ds, a
nd p
rogr
am p
artic
ipat
ion
.
KE
D a
llow
s K
eyS
pan
(KS
E) c
usto
mer
s to
per
form
var
ious
sel
f acc
ount
ser
vice
s on
line
on th
e w
eb
(eS
ervi
ce).
Lic
ense
d fo
r 80
conc
urre
nt u
sers
.
LIP
A a
llow
s LI
PA
cus
tom
ers
to p
erfo
rm v
ario
us s
elf a
ccou
nt s
ervi
ces
on th
e w
eb (e
Ser
vice
).
Lice
nsed
for 8
0 co
ncur
rent
eS
ervi
ce u
sers
.
Exhibit __ (ISP-2) Page 49 of 51
106
49
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
93. C
DR
KS
E:
The
CD
R (C
all D
etai
l Rep
ortin
g) s
yste
m p
erfo
rms
the
func
tion
of p
rovi
ding
det
aile
d ch
arge
back
to th
e
dow
nsta
te le
gacy
Key
Spa
n O
rgan
izat
ions
by
Ora
cle
Pro
ject
/Act
ivity
for t
he d
eskt
op c
arrie
r cha
rges
. Th
ese
char
ges
are
inte
rface
d to
Ora
cle
Pro
ject
s ea
ch m
onth
(RIC
EFW
Inte
rface
ID 5
05).
CD
R ru
ns a
n al
gorit
hm to
calc
ulat
e th
e ca
rrie
r cha
rges
by
desk
top
phon
e ba
sed
on a
rate
per
min
ute.
It u
tiliz
es d
ata
that
it c
aptu
res
for e
very
call,
by
ever
y ex
tens
ion
from
the
dow
nsta
te T
elep
hone
sys
tem
s pl
us th
e as
soci
ated
acc
ount
ing
info
rmat
ion
linke
d
to e
ach
desk
top
phon
e th
at it
rece
ives
thro
ugh
an in
terfa
ce fr
omR
emed
y. R
emed
y re
ceiv
es th
e de
faul
t acc
ount
ing
for e
ach
empl
oyee
from
a d
aily
inte
rface
with
KS
Peo
pleS
oft H
R (R
ICE
FW In
terfa
ce ID
612
) and
atta
ches
it to
the
asse
t reg
istry
ass
ocia
ted
with
eac
h em
ploy
ee re
cord
.
KS
E –
Per
mits
Sys
tem
–N
Y:
Trac
ks a
nd re
cord
s co
nstru
ctio
n pe
rmit
requ
ests
that
are
ass
ocia
ted
to g
as
cons
truct
ion
and
mai
nten
ance
wor
k. A
dire
ct li
nk to
NY
C D
OT
exis
ts fo
r req
uest
ing
and
rece
ivin
g pe
rmit
data
.
Func
tions
for t
rack
ing
perm
it co
sts
are
incl
uded
.
94. P
RM
95. C
orpT
axC
orpT
ax S
oftw
are
solu
tion
to b
e us
ed b
y th
e Ta
x D
epar
tmen
t to
calc
ulat
e th
e m
onth
ly T
ax p
rovi
sion
and
to a
ssis
t
in th
e pr
epar
atio
n of
the
Cor
pora
te In
com
e Ta
x R
etur
n.
96. B
izA
pps
Biz
App
s S
oftw
are
solu
tion
to b
e us
ed in
con
junc
tion
with
P-C
ard
Sol
utio
n -
prov
ides
reco
ncili
atio
n to
ols
and
valid
atio
ns.
Exhibit __ (ISP-2) Page 50 of 51
107
50
Hig
h Le
vel D
efin
ition
s of
CA
D C
ompo
nent
s
PR /
Ben
efits
List
of T
hird
Par
ty In
terfa
ces:
AFL
AC
NB
T (S
bond
s)
BO
NY
(Sto
ck P
urch
ase)
AD
P
Cer
idia
n (F
SA
Mgm
t)H
SB
C
CN
AH
yatt
Lega
l
Futu
re A
ssoc
iate
s (L
TD fo
r Loc
al 1
01)
Moo
re –
W2
Hay
Gro
upG
PC
S (M
gmt C
ompe
nsat
ion)
John
Han
cock
(LTC
for K
S)
Bar
nett
Ass
ocia
tes
Med
icar
e (M
edic
are
Dru
g)
Mer
cer (
H &
W In
sura
nce)
Met
Life
(Life
, Hom
e, A
uto
Insu
ranc
e)
Mat
rix
Pw
ater
hous
e
T. R
owe
Pric
e
Sca
rbor
ough
Alli
ance
(Uni
on)
Van
guar
d (4
01K
Sav
ings
)
Wat
son
Wya
tt (P
ensi
on)
Pen
sion
Pat
h
Cha
se (C
heck
Rec
on)
Exhibit __ (ISP-2) Page 51 of 51
108
Exhibit __ (ISP-3)
Testimony of the Information Services Panel
Exhibit __ (ISP-3)
December 2009 US Systems and Strategy Roadmap
109
Dec
embe
r 200
9 v1
.0
US
Syst
ems
Stra
tegy
and
Rou
tem
apFi
nal R
epor
t
Exhibit __ (ISP-3) Page 1 of 84
110
-2-
Con
tent
s
Exe
cutiv
e S
umm
ary
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
Dep
loym
ent S
cena
rio A
naly
sis
App
licat
ion
Mig
ratio
n Im
pact
Ana
lysi
s
Gov
erna
nce
Rou
tem
apIn
itiat
ives
Indi
cativ
e Fi
nanc
ial I
mpa
cts
Bur
ning
Pla
tform
App
licat
ions
App
endi
x
Exhibit __ (ISP-3) Page 2 of 84
111
-3-
Obj
ectiv
es a
nd O
utco
mes
D
evel
opm
ent o
f stra
tegi
c co
nsid
erat
ions
and
bus
ines
s im
pera
tives
P
riorit
ized
bus
ines
s ca
pabi
litie
s re
quire
d to
add
ress
bu
sine
ss im
pera
tives
and
top
prio
ritie
s
S
trate
gy fo
r del
iver
ing
Bac
k O
ffice
, Cus
tom
er, F
ront
O
ffice
, Mob
ile a
nd D
ispa
tch
capa
bilit
ies
to G
as a
nd
Ele
ctric
LoB
s
U
S S
yste
ms
Stra
tegy
rout
emap
–in
itiat
ives
, sco
pe a
nd
sequ
ence
E
stim
ated
cos
t im
pact
s of
the
rout
emap
G
loba
l pro
ject
gov
erna
nce
& d
esig
n au
thor
ity fr
amew
ork
to fa
cilit
ate
deci
sion
-mak
ing
for t
he ro
utem
apan
d ba
ck
offic
e pr
ogra
m
D
evel
op U
S S
yste
ms
Stra
tegy
and
rout
emap
driv
en b
y N
atio
nal G
rid’s
bus
ines
s st
rate
gy a
nd p
riorit
ies
D
evel
op h
igh-
leve
l cos
t est
imat
es fo
r the
rout
emap
Id
entif
y an
d in
tegr
ate
impa
cts
of th
e ro
utem
apw
ith
curr
ent
IS in
vest
men
t pla
n an
d pr
ojec
ted
oper
atio
nal
spen
d
Obj
ectiv
esO
utco
mes
Exhibit __ (ISP-3) Page 3 of 84
112
-4-
Key
Mes
sage
s
Th
e U
S s
trate
gic
rout
emap
wor
k ha
s en
gage
d ex
tens
ivel
y ac
ross
the
busi
ness
Th
ere
is b
road
agr
eem
ent o
n bo
th th
e bu
sine
ss is
sues
and
the
prio
ritie
s–
Back
offi
ce n
eeds
to b
e ur
gent
ly a
ddre
ssed
–R
hode
Isla
nd g
as h
as s
igni
fican
t cus
tom
er is
sues
and
ver
y lim
ited
IT to
ols
for A
sset
and
Wor
k m
anag
emen
t–
The
Gas
bus
ines
s ha
s a
high
ly fr
agm
ente
d se
t of I
T so
lutio
ns th
at is
inhi
bitin
g bu
sine
ss p
erfo
rman
ce–
The
Ele
ctric
bus
ines
s is
alre
ady
cons
olid
ated
(with
exc
eptio
n of
LIPA
) and
look
ing
long
er te
rm fo
r fur
ther
effi
cien
cies
fro
m s
yste
m c
hang
es–
Cus
tom
er a
nd m
arke
ts a
re im
pact
ed b
y ha
ving
mul
tiple
cus
tom
er p
latfo
rms,
par
ticul
arly
with
gas
cus
tom
ers
A
num
ber o
f bus
ines
s ca
pabi
lity
deliv
ery
scen
ario
s ha
ve b
een
deve
lope
d w
ith a
pre
ferre
d sc
enar
io
iden
tifie
d
Th
e E
xecu
tive
are
invi
ted
to s
uppo
rt th
e fu
rther
dev
elop
men
t of t
he p
refe
rred
scen
ario
and
the
impl
icat
ions
and
cho
ices
that
it p
rese
nts.
Th
e pl
anni
ng a
nd m
obilis
atio
nfo
r the
US
Bac
k O
ffice
Pro
gram
me
is u
nder
way
. A S
anct
ion
Pap
er fo
r th
e ne
xt p
hase
of d
esig
n w
ill be
pre
sent
ed in
Dec
embe
r with
the
prog
ram
me
com
men
cing
in J
anua
ry
2010
.
Exhibit __ (ISP-3) Page 4 of 84
113
-5-
Our
wor
k re
flect
s a
colla
bora
tive
proc
ess
that
invo
lved
the
busi
ness
from
initi
al
exec
utiv
e in
terv
iew
s th
roug
h ex
tens
ive
func
tiona
l tea
m a
naly
sis
Step
1 -
Und
erst
and
NG
Str
ateg
ic D
irect
ion
–U
nder
stan
d st
rate
gic
cons
ider
atio
ns &
de
velo
p bu
sine
ss im
pera
tives
–D
efin
e bu
sine
ss c
apab
ilitie
s–
Pro
file
curre
nt N
G IS
env
ironm
ent
–D
efin
e B
ack
Offi
ce s
cope
Step
2 –
IT Im
plic
atio
ns &
App
licat
ion
Arc
hite
ctur
e
–D
evel
op ta
rget
app
licat
ion
arch
itect
ure
–D
efin
e ke
y m
anag
emen
t dec
isio
ns /
depl
oym
ent s
cena
rios
–D
evel
op IS
impl
icat
ions
for e
ach
scen
ario
Step
3 –
Def
ine
Initi
ativ
es a
nd A
lign
–P
erfo
rm g
ap a
naly
sis
betw
een
exis
ting
initi
ativ
es a
nd re
quire
d ca
pabi
litie
s–
Dev
elop
ini
tiativ
es to
add
ress
the
gaps
–D
evel
op B
ack
Offi
ce s
anct
ion
pape
r
Step
4 -
Rou
tem
apan
d C
omm
unic
atio
n –
Dev
elop
dep
loym
ent r
oute
map
–R
evie
w th
e de
ploy
men
t rou
tem
apw
ith k
ey
stak
ehol
ders
Oct
‘09
Sep
‘09
Aug
’09
Toda
y
Mile
ston
e
Rou
tem
ap
Gro
up
Exec
Maj
or P
roje
ct A
ctiv
ities
Exhibit __ (ISP-3) Page 5 of 84
114
-6-
Key
The
mes
U
S b
usin
ess
com
plex
ity is
hig
h–
Mul
ti-st
ate,
mul
ti-bu
sine
ss–
23 o
pera
ting
com
pani
es–
Ove
rlapp
ing
LOB
sup
port
rela
tions
hips
–Ba
lanc
ing
geog
raph
ic a
nd L
OB
man
agem
ent f
ocus
P
ost M
erge
r int
egra
tion
was
not
fully
com
plet
ed–
Mul
tiple
way
s of
doi
ng th
ings
(pro
cess
es) a
nd a
ssoc
iate
d IT
sys
tem
s–
Sign
ifica
nt is
sues
with
get
ting
key
man
agem
ent r
epor
ting
info
rmat
ion
(dat
a)
R
egul
ator
y ag
enda
is in
crea
sing
in c
ompl
exity
and
freq
uenc
y
W
e ne
ed to
get
goi
ng w
ith b
ack
offic
e
S
ever
al IT
sys
tem
s ar
e ol
d, u
nsup
porte
d an
d in
nee
d of
upg
rade
or r
epla
cem
ent
G
as is
sues
are
mor
e pr
essi
ng th
an E
lect
ric
In
tere
st is
get
ting
LOB
syn
ergi
es fi
rst,
then
cro
ss L
OB
syn
ergi
es (a
nd fi
crit
ical
func
tions
in p
aral
lel)
Le
vera
ge a
nd le
arn
from
the
UK
Exhibit __ (ISP-3) Page 6 of 84
115
-7-
The
exec
utiv
e in
terv
iew
s al
so id
entif
ied
a hi
erar
chy
of b
usin
ess
prio
ritie
s
Gas
Ass
et a
nd W
ork
Man
agem
ent
Elec
tric
A
sset
and
Wor
k M
anag
emen
tB
ack
Offi
ce
Cus
tom
er
RI G
asLI
Gas
LIPA
Gas
GIS
NY/
NE
Elec
tO
ther
KS
Gas
Hig
hest
Low
est
TBD
Bac
k O
ffice
Elim
inat
e cu
rrent
bus
ines
s ris
ks re
gard
ing
finan
cial
/ re
gula
tory
repo
rting
P
rovi
de re
quire
d in
form
atio
n to
effe
ctiv
ely
man
age
the
busi
ness
M
ost c
ritic
al n
eed
W
ill be
the
first
are
a to
des
ign
and
impl
emen
t
Oth
er p
aral
lel w
ork
scop
e sh
ould
not
impa
ct th
e ab
ility
to d
eliv
er b
ack
offic
e
Elec
tric
GIS
Cus
tom
er
Stra
tegy
is to
pro
vide
lead
ing
cust
omer
ser
vice
th
roug
h st
anda
rdis
edpr
oces
ses
and
cons
olid
atio
n of
cu
stom
er s
yste
ms
onto
com
mon
pla
tform
A
ddre
ssin
g G
as C
usto
mer
issu
es in
Rho
de Is
land
is
criti
cal a
nd m
ay ru
n in
par
alle
l with
Bac
k O
ffice
with
an
y sc
enar
io
Reg
ulat
ory
ince
ntiv
es c
ontri
bute
to n
eed
for L
I Gas
m
igra
tion
Cus
tom
er L
IPA
D
ecis
ion
need
ed o
n w
heth
er to
m
igra
te L
IPA
Cus
tom
ers
(dep
endi
ng o
n co
ntra
ct re
new
al).
GIS
G
as c
onso
lidat
ion
of G
IS p
latfo
rm p
art o
f AW
M
alig
nmen
t
Furth
er la
yer o
f bu
sine
ss e
ffici
enci
es th
roug
h st
anda
rdis
atio
nof
a G
IS p
latfo
rm a
cros
s G
as
and
Ele
ctric
Tim
ing
of a
com
mon
pla
tform
rollo
ut s
houl
d co
inci
de w
ith F
ront
Offi
ce e
nhan
cem
ents
Elec
tric
Fro
nt O
ffice
Im
plem
entin
g tra
nsfo
rmat
ion
B
enef
iting
from
inte
grat
ed to
olse
t with
ex
cept
ion
of L
IPA
(pen
ding
MSA
de
cisi
ons)
Fu
rther
effi
cien
cy fr
om s
yste
m c
hang
es
and
inte
grat
ion
with
gas
a lo
nger
term
ob
ject
ive
N
eeds
are
less
crit
ical
than
Gas
and
pr
opos
ed to
be
deliv
ered
late
r in
the
rele
ase
cycl
e of
eac
h sc
enar
ioB
usin
ess
capa
bilit
y de
ploy
men
t prio
rity
Gas
Fro
nt O
ffice
S
trate
gy is
to e
nabl
e co
mm
on p
roce
sses
acr
oss
the
busi
ness
for e
ffici
ency
and
impr
oved
cus
tom
er
perfo
rman
ce
Exte
nded
and
com
mon
mob
ile s
olut
ion
need
ed to
im
prov
e pe
rform
ance
in M
eter
Ser
vice
s
Ena
ble
com
mon
fron
t offi
ce p
roce
sses
C
aptu
re fu
ture
syn
ergi
es a
cros
s ga
s an
d el
ectri
c th
roug
h sy
stem
s an
d da
ta
Leve
rage
UK
GFO
exp
erie
nce
A
fter b
ack
offic
e, G
as h
as n
ext m
ost s
igni
fican
t nu
mbe
r of p
ain
poin
ts a
nd c
ritic
al n
eeds
Exhibit __ (ISP-3) Page 7 of 84
116
-8-
RI/G
DG
as
Dis
trib
utio
n
NG
/GD
Gas
D
istr
ibut
ion
NG
/ED
Elec
tric
D
istr
ibut
ion
NG
/ET
Tran
smis
sion
KS/
GD
Gas
D
istr
ibut
ion
Cus
tom
erC
SS
Wor
k M
anag
emen
tS
AP
Ass
et
Man
agem
ent
SA
P
Bac
k O
ffice
SC/F
I/HR
SA
P/P
ower
Pla
nt
GIS
ES
RI
OU
TAG
E-
-A
BB
-
Fiel
d D
ispa
tch/
M
obile
SyC
lo/ C
lickS
W
LIPA
*TB
D –
Pend
ing
Con
trac
tual
Dec
isio
ns
KS/
Gen
Key
Span
G
ener
atio
n
CA
S-
MA
XIM
O
MA
XIM
O
SA
P/P
ower
Pla
nt
ES
RI
-
CA
RE
SG
OM
S
MD
SI
-
Targ
et A
pplic
atio
n A
rchi
tect
ure
–M
igra
tion
to S
tand
ards
As
a re
sult,
ther
e is
gen
eral
con
sens
us a
roun
d th
e en
d-st
ate
targ
et a
pplic
atio
n ar
chite
ctur
e th
at w
ill d
eliv
er th
e ca
pabi
litie
s ne
eded
by
the
busi
ness
Exhibit __ (ISP-3) Page 8 of 84
117
-9-
The
depl
oym
ent r
oute
map
strik
es a
bal
ance
bet
wee
n m
axim
izin
g bu
sine
ss v
alue
and
m
anag
ing
impl
emen
tatio
n ris
k/co
st
Func
tiona
l Sco
peStra
tegi
c C
onsi
dera
tions
Bus
ines
s Va
lue
Impl
emen
tatio
n R
isk
Cos
t
Dec
isio
n
Pre
ssur
e to
Incr
ease
Sco
peP
ress
ure
to R
educ
e S
cope
Max
imiz
e sp
eed
to v
alue
giv
en
the
cons
train
ts o
f dep
loym
ent
The
rout
emap
sets
a s
trat
egic
dire
ctio
n. E
ach
maj
or re
leas
e w
ill b
e ap
prov
ed b
efor
e ex
ecut
ion.
Exhibit __ (ISP-3) Page 9 of 84
118
-10
-
We
redu
ced
seve
ral s
cena
rios
to fo
ur b
est a
ltern
ativ
es a
nd a
re re
com
men
ding
one
Initi
al s
et o
f 7
scen
ario
s
65
47
1 1A3
2A3
41
1A2
2A
41
2
56
31A
23
4
2
2A1
2
4
Itera
tion
1Ite
ratio
n 2
Itera
tion
3
Sc
enar
ios
cove
red
rang
e fro
m v
ery
larg
e sc
ope
(“bi
g ba
ng”)
to B
ack
Offi
ce o
nly
(for f
irst
rele
ase)
Sc
enar
io 5
was
elim
inat
ed
due
to e
xces
sive
com
plex
ity
Scen
ario
6 w
as e
limin
ated
du
e to
add
ress
ing
cust
omer
is
sues
too
late
in th
e re
leas
e cy
cle
El
imin
ated
an
optio
n th
at
impl
emen
ted
disp
atch
and
mob
ile
capa
bilit
ies
early
in c
ycle
(to
o m
uch
com
plex
ity v
ersu
s va
lue)
El
imin
ated
a la
rge
scop
e sc
enar
io
(full
Gas
rollo
ut in
par
alle
l with
Bac
k O
ffice
) due
to b
usin
ess
riskR
efin
emen
ts to
a fe
w o
f the
bas
e sc
enar
ios
that
rem
aine
d
Adde
d ne
w s
cena
rio th
at h
ad a
C
usto
mer
and
FO
pilo
t for
Gas
in
para
llel w
ith B
ack
Offi
ce The
rem
aini
ng s
cena
rios
wer
e fu
rther
ev
alua
ted
and
anal
yzed
to b
ette
r ass
ess:
Sp
ecifi
c bu
sine
ss/tr
ansa
ctio
n im
pact
s
IT c
ompl
exiti
es in
volv
ed
Stra
nded
/thr
ow a
way
cos
ts
Indi
cativ
e co
sts
Pref
erre
d
Exhibit __ (ISP-3) Page 10 of 84
119
-11
-
Four
prim
ary
scen
ario
s w
ere
cons
ider
ed .
. .
Scen
ario
Nam
e:B
ack
Offi
ce F
ocus
R
elea
se 1
-Ba
ck O
ffice
Onl
y
Rel
ease
2 -
Gas
Fro
nt O
ffice
and
Cus
tom
er
Rel
ease
3 -
Elec
tric
Fron
t Offi
ce a
nd L
IPA
Elec
tric
Cus
tom
er
Scen
ario
Nam
e:Fu
lly In
tegr
ated
Pilo
t in
Rho
de Is
land
and
Lo
ng Is
land
Gas
Cus
tom
er
Rel
ease
1 -
Back
Offi
ce; G
as F
ront
Offi
ce a
nd C
usto
mer
(Rho
de
Isla
nd) a
nd L
ong
Isla
nd G
as C
usto
mer
R
elea
se 2
–G
as F
ront
Offi
ce a
nd C
usto
mer
for R
est o
f Geo
grap
hies
R
elea
se 3
–El
ectri
c Fr
ont O
ffice
and
LIP
A El
ectri
c C
usto
mer
Scen
ario
Nam
e:Fu
lly In
tegr
ated
Pilo
t in
Rho
de Is
land
R
elea
se 1
-Ba
ck O
ffice
; Rho
de Is
land
Gas
Fro
nt O
ffice
and
C
usto
mer
R
elea
se 2
–G
as F
ront
Offi
ce a
nd C
usto
mer
For
Res
t of
Geo
grap
hies
R
elea
se 3
–El
ectri
c Fr
ont O
ffice
and
LIP
A El
ectri
c C
usto
mer
Scen
ario
Nam
e:Pa
ralle
l Cus
tom
er
Rel
ease
1a
–Ba
ck O
ffice
R
elea
se 1
b –
Rho
de Is
land
Gas
Cus
tom
er in
Par
alle
l with
R1a
R
elea
se 2
-G
as F
ront
Offi
ce S
tarti
ng w
ith R
I Pilo
t
Rel
ease
3 -
Elec
tric
Fron
t Offi
ce
Rel
ease
4 –
Rem
aind
er o
f Gas
Cus
tom
ers
and
LIPA
Ele
ctric
Scen
ario
2A
Scen
ario
4
Scen
ario
1Sc
enar
io 2
R-1
R-2
R-3
BOG
as
FO*
Gas
C
ust
Elec
FO*
Elec
Cus
t
R-1
BOG
as
FO*
Gas
C
ust
Elec
FO*
Elec
Cus
t
RI
Gas
FO
*
RI G
as
Cus
t
LI
Gas
C
ust
R-1
BOG
as
FO*
Gas
C
ust
Elec
FO*
Elec
Cus
tR
I G
as
FO*
RI G
as
Cus
t
BO
Elec
FO*
RI G
as
Cus
t
R-3
R-3
R-3
R-2
R-2
R-2
R-1
Rel
ease
1R
-2R
elea
se 2
R-3
Rel
ease
3R
-4R
elea
se 4
R-4
R-1
Gas
Cus
tEl
ecC
ust
RI
Pilo
t* G
as
FO*
*Not
e: F
ront
Offi
ce in
clud
es a
sset
, wor
k, d
ispa
tch
and
mob
ile in
all s
cena
rios
Exhibit __ (ISP-3) Page 11 of 84
120
-12
-
. . .
And
sce
nario
4 h
ad th
e be
st b
alan
ce o
f val
ue, r
isk
and
cost
Scen
ario
Ana
lysi
s: V
alue
-Ris
k-C
ost S
corin
g
S
cena
rios
2 an
d 2A
incr
ease
del
iver
y ris
k by
exp
andi
ng s
cope
of i
nitia
l Bac
k O
ffice
S
cena
rio 2
A h
as th
e hi
ghes
t val
ue b
ut re
quire
s si
gnifi
cant
ear
lycu
stom
er in
vest
men
t
S
cena
rio 4
del
iver
s hi
gher
val
ue th
an s
cena
rio 1
by
addr
essi
ng h
igh
prio
rity
cust
omer
issu
es
S
cena
rio 4
giv
es m
ore
scop
e fo
r opt
imis
ing
deliv
ery
prog
ram
me
byde
coup
ling
cust
omer
stra
nd
Exhibit __ (ISP-3) Page 12 of 84
121
-13
-
US
Syst
ems
Rou
tem
ap:
Our
Vie
w –
Sequ
entia
l Wor
k St
ream
s*
Des
ign
Plan
ning
&
Mob
ilisa
tion
Des
ign
2013
2012
Q4
Q3
Q2
Q1
Q4
Q3
Q2
Q1
2014
Des
ign
Q4
Q3
Des
ign
Des
ign
Des
ign
Des
ign RI G
as A
dvan
tage
Mig
ratio
n to
CSS
RI G
as F
ront
Offi
ceR
emai
nder
Gas
Fro
nt
Offi
ce
Elec
tric
parti
cipa
tion
in G
as F
O D
esig
n
LI G
as C
AS M
igra
tion
to C
SS
Bac
k O
ffice
Go-
live
Dat
e pe
ndin
g ev
alua
tion
of b
usin
ess
and
regu
lato
ry c
onst
rain
ts
Rel
ease
1
Rel
ease
2
Rel
ease
3
Rel
ease
4
*Not
e: R
oute
map
base
d on
Sce
nario
4
Con
firm
:Lon
g-te
rm
Stra
tegi
c C
usto
mer
S
olut
ion
for C
RIS
and
C
SS
(con
side
ring
Smar
t G
rid p
ilot o
utco
mes
, etc
.)
2009
2010
2011
SM
AR
T P
ilots
CR
IS M
igra
tion
Gas
GIS
con
verg
ence
Rel
ated
act
iviti
es th
at n
eed
to c
ontin
ue
C
usto
mer
Age
nt D
esk
Top
G
loba
l Web
for c
usto
mer
sel
f ser
vice
Rel
ated
act
iviti
es th
at n
eed
to s
top
R
hode
Isla
nd A
dvan
tage
upg
rade
Act
iviti
es th
at n
eed
to b
e in
itiat
ed
Ad
vant
age
and
LCD
M d
ecom
mis
sion
ing
El
ectri
c Sm
allw
orld
upg
rade
E
SR
I con
verg
ence
pla
ns fo
r Gas
M
obile
exp
ansi
on/m
igra
tion
plan
s
C
ritic
al S
yste
ms
repl
acem
ent n
eeds
Impa
ct o
f Pre
ferr
ed S
cena
rio -
Prel
imin
ary
Ass
essm
ent
Elec
tric
Cus
tom
er
Bac
k O
ffice
Gas
Fro
nt O
ffice
(Wor
k, A
sset
, GIS
, Dis
patc
h, M
obile
)
Elec
tric
Fro
nt O
ffice
(Wor
k, A
sset
, GIS
, Dis
patc
h, M
obile
)
Gas
Cus
tom
er
Pot
entia
l ear
ly c
omm
on m
obile
Full
asse
ssm
ent o
f cu
rrent
pro
ject
s to
be
com
plet
ed
Des
ign
end
Go-
live
Inte
rmed
iate
mile
ston
e
Exhibit __ (ISP-3) Page 13 of 84
122
-14
-
Cap
abili
ties
-Str
ateg
ic
Man
agem
ent /
Reg
ulat
ory
Rep
ortin
g
Cap
abili
ties
-Ope
ratio
ns
Flee
t
Gas
fron
t offi
ce
Elec
tric
front
offi
ce
Cus
tom
er
Cap
abili
ties
-Ris
k
Fina
nce
H
R/P
ayro
ll
Supp
ly c
hain
The
road
map
’s in
itial
focu
s w
ill b
e to
lay
a fo
unda
tion
that
can
be
built
upo
n ov
er ti
me
M
eets
bas
ic b
usin
ess/
cust
omer
nee
ds
Red
uces
/elim
inat
es b
usin
ess
risk
Au
tom
ates
tran
sact
iona
l pro
cess
es
En
able
s pr
oduc
tivity
impr
ovem
ents
Ex
tend
s se
rvic
e of
ferin
gsIn
crea
ses
cust
omer
sat
isfa
ctio
n an
d
build
s cu
stom
er lo
yalty
En
hanc
es b
usin
ess
flexi
bilit
y
C
reat
es n
ew b
usin
ess
valu
e
Allo
ws
entry
/exi
t fro
m
mar
kets
/bus
ines
ses
Ac
hiev
es o
pera
tiona
l exc
elle
nce
Value
Foun
datio
n
Ope
ratio
nal/
Enha
nced
Stra
tegi
c/A
dvan
ced
Exhibit __ (ISP-3) Page 14 of 84
123
-15
-
US
Syst
ems
Rou
tem
ap:
Bus
ines
s C
apab
ility
Rel
ease
Pla
n Deg
ree
of E
nabl
emen
t
Key
Pr
ogra
ms
and
Initi
ativ
es
Elec
tric
C
apab
ility
En
able
men
t
2010
Gas
C
apab
ility
En
able
men
t
2011
2012
2013
2014
Back Office
Gas Front Office
Gas Customer
Reporting
Back Office
Electric Front Office
Reporting
Gas Front Office
Gas Customer
Electric Front Office
Gas Front Office
Electric Front Office
Electric Front Office
B
ack
Offi
ce
Des
ign
S
tart
of b
ack
offic
e de
taile
d de
sign
&
test
ing
M
igra
tion
of
Rho
de Is
land
cu
stom
ers
from
A
dvan
tage
to
CS
S
“G
o Li
ve”f
or b
ack
offic
e S
AP
sys
tem
in o
ne
rele
ase
(2nd
half
of 2
011)
D
eliv
ery
of B
ack
Offi
ce
repo
rting
/ana
lytic
al
capa
bilit
ies
–fin
anci
al
and
regu
lato
ry
Del
iver
y of
Cus
tom
er
repo
rting
/ana
lytic
al
capa
bilit
ies
–R
hode
Is
land
Gas
and
Ele
ctric
M
igra
tion
of L
ong
Isla
nd
Gas
cus
tom
ers
from
CA
S
to C
SS
D
eliv
ery
of C
usto
mer
re
porti
ng/a
naly
tical
ca
pabi
litie
s –
Long
Isla
nd
Gas
and
Ele
ctric
M
igra
tion
of G
as
cust
omer
s (r
emai
ning
ge
ogra
phie
s) fr
om C
RIS
to
CS
S
“Go
Live
”for
Gas
Fro
nt
Offi
ce in
Rho
de Is
land
D
eliv
ery
of G
as F
ront
O
ffice
repo
rting
/ana
lytic
al
capa
bilit
ies
“G
o Li
ve”f
or G
as F
ront
O
ffice
(rem
aini
ng
geog
raph
ies)
D
eliv
ery
of E
lect
ric F
ront
O
ffice
repo
rting
/ana
lytic
al
capa
bilit
ies
“G
o Li
ve”f
or E
lect
ric
Fron
t Offi
ce
Reporting Reporting
Reporting Reporting
Reporting
Back Office
Gas Customer
Back Office
Gas Front Office
Reporting
Gas Customer
Back Office
Back Office
Back Office
Back Office
Exhibit __ (ISP-3) Page 15 of 84
124
-16
-
Impl
emen
ting
the
rout
emap
over
tim
e w
ill le
ad to
a fu
lly in
tegr
ated
ope
ratin
g m
odel
Back
Offi
ceC
usto
mer
Gas
Elec
tric
Lead
ersh
ipLe
vel 1
:En
terp
rise-
wid
e IT
En
able
men
t
Lead
ersh
ip
Leve
l 3:
Indi
vidu
al C
apab
ility
Enab
lem
ent
Lead
ersh
ipLe
vel 2
:Bu
sine
ss
Func
tiona
l En
able
men
t
Billi
ng
Cre
dit/C
olle
ctio
ns
Mar
ketin
g/S
ales
Cus
tom
er S
ervi
ce
Sup
ply
Cha
in
Rep
ortin
g
Fina
nce
HR
Wor
k M
gmt.
Ass
et M
gmt.
GIS
Mob
ile/D
ispa
tch
Valu
e C
reat
ion
Opp
ortu
nity
TodayImplemented Roadmap
IT E
nabl
ed
Bus
ines
s P
erfo
rman
ce
Wor
k M
gmt.
Ass
et M
gmt.
GIS
Mob
ile/D
ispa
tch
Exhibit __ (ISP-3) Page 16 of 84
125
-17
-
Stan
dard
ized
dat
a su
ppor
ts th
e bu
sine
ss b
asic
s fo
r effe
ctiv
ely
and
effic
ient
ly ru
nnin
g th
e in
tern
al c
ore
proc
esse
s an
d pr
oduc
ing
requ
ired
exte
rnal
repo
rtin
g/in
form
atio
n
The
end
resu
lt is
elim
inat
ion
of s
igni
fican
t com
plex
ity a
cros
s th
e bu
sine
ss a
nd g
reat
ly re
duce
d w
ork.
Ass
et T
rack
ing,
Mai
nten
ance
Wor
k S
ched
ulin
g , D
ispa
tch
Pro
cure
men
t, In
vent
ory
Tale
nt M
anag
emen
t
HR
Ser
vice
s
Fina
nce
Clo
ses
and
Sta
tem
ents
Cha
rt of
Acc
ount
s
Exhibit __ (ISP-3) Page 17 of 84
126
Dep
loym
ent S
cena
rio A
naly
sis
Exhibit __ (ISP-3) Page 18 of 84
127
-19
-
The
depl
oym
ent r
oute
map
strik
es a
bal
ance
bet
wee
n m
axim
izin
g bu
sine
ss v
alue
and
m
anag
ing
impl
emen
tatio
n ris
k/co
st
Func
tiona
l Sco
peStra
tegi
c C
onsi
dera
tions
Bus
ines
s Va
lue
Impl
emen
tatio
n R
isk
Cos
t
Dec
isio
n
Pre
ssur
e to
Incr
ease
Sco
peP
ress
ure
to R
educ
e S
cope
Max
imiz
e sp
eed
to v
alue
giv
en
the
cons
train
ts o
f dep
loym
ent
The
rout
emap
sets
a s
trat
egic
dire
ctio
n. E
ach
maj
or re
leas
e w
ill b
e ap
prov
ed b
efor
e ex
ecut
ion.
Exhibit __ (ISP-3) Page 19 of 84
128
-20
-
Four
prim
ary
scen
ario
s w
ere
cons
ider
ed
Scen
ario
Nam
e:B
ack
Offi
ce F
ocus
R
elea
se 1
-Ba
ck O
ffice
Onl
y
Rel
ease
2 -
Gas
Fro
nt O
ffice
and
Cus
tom
er
Rel
ease
3 -
Elec
tric
Fron
t Offi
ce a
nd L
IPA
Elec
tric
Cus
tom
er
Scen
ario
Nam
e:Fu
lly In
tegr
ated
Pilo
t in
Rho
de Is
land
and
Lo
ng Is
land
Gas
Cus
tom
er
Rel
ease
1 -
Back
Offi
ce; G
as F
ront
Offi
ce a
nd C
usto
mer
(Rho
de
Isla
nd) a
nd L
ong
Isla
nd G
as C
usto
mer
R
elea
se 2
–G
as F
ront
Offi
ce a
nd C
usto
mer
for R
est o
f Geo
grap
hies
R
elea
se 3
–El
ectri
c Fr
ont O
ffice
and
LIP
A El
ectri
c C
usto
mer
Scen
ario
Nam
e:Fu
lly In
tegr
ated
Pilo
t in
Rho
de Is
land
R
elea
se 1
-Ba
ck O
ffice
; Rho
de Is
land
Gas
Fro
nt O
ffice
and
C
usto
mer
R
elea
se 2
–G
as F
ront
Offi
ce a
nd C
usto
mer
For
Res
t of
Geo
grap
hies
R
elea
se 3
–El
ectri
c Fr
ont O
ffice
and
LIP
A El
ectri
c C
usto
mer
Scen
ario
Nam
e:Pa
ralle
l Cus
tom
er
Rel
ease
1a
–Ba
ck O
ffice
R
elea
se 1
b –
Rho
de Is
land
Gas
Cus
tom
er in
Par
alle
l with
R1a
R
elea
se 2
-G
as F
ront
Offi
ce S
tarti
ng w
ith R
I Pilo
t
Rel
ease
3 -
Elec
tric
Fron
t Offi
ce
Rel
ease
4 –
Rem
aind
er o
f Gas
Cus
tom
ers
and
LIPA
Ele
ctric
Scen
ario
2A
Scen
ario
4
Scen
ario
1Sc
enar
io 2
R-1
R-2
R-3
BOG
as
FO*
Gas
C
ust
Elec
FO*
Elec
Cus
t
R-1
BOG
as
FO*
Gas
C
ust
Elec
FO*
Elec
Cus
t
RI
Gas
FO
*
RI G
as
Cus
t
LI
Gas
C
ust
R-1
BOG
as
FO*
Gas
C
ust
Elec
FO*
Elec
Cus
tR
I G
as
FO*
RI G
as
Cus
t
BO
Elec
FO*
RI G
as
Cus
t
R-3
R-3
R-3
R-2
R-2
R-2
R-1
Rel
ease
1R
-2R
elea
se 2
R-3
Rel
ease
3R
-4R
elea
se 4
R-4
R-1
Gas
Cus
tEl
ecC
ust
RI
Pilo
t* G
as
FO*
*Not
e: F
ront
Offi
ce in
clud
es a
sset
, wor
k, d
ispa
tch
and
mob
ile in
all s
cena
rios
Exhibit __ (ISP-3) Page 20 of 84
129
-21
-
Pr
ovid
es B
ack
Offi
ce fu
nctio
nalit
y on
ly
Del
ays
addr
essi
ng c
ritic
al c
usto
mer
issu
es
Req
uire
s si
gnifi
cant
initi
al e
ngag
emen
t of
the
Fron
t Offi
ce G
as a
nd E
lect
ric b
usin
ess
with
del
ayed
real
isat
ion
of c
apab
ilitie
s
Tem
pora
ry d
isco
nnec
t of s
hare
d op
erat
ions
(e
.g.,
met
er s
ervi
ces)
H
as h
igh
num
ber o
f “th
row
aw
ay”
inte
rface
s th
at w
ill ha
ve to
be
redo
ne
Parti
al fo
rfeit
of r
egul
ator
y in
cent
ives
due
to
lack
of i
mpl
emen
ting
new
Cus
tom
er
syst
em in
LI
Scen
ario
1* –
Bac
k O
ffice
Foc
us
#
of A
pplic
atio
ns R
etire
d =
36
#
of In
terfa
ces
Ret
ired
= 14
1
#
Thro
w A
way
Inte
rface
s =
0
Ad
dres
ses
criti
cal f
inan
cial
and
regu
lato
ry
repo
rting
issu
es
H
as s
mal
lest
des
ign
and
impl
emen
tatio
n sc
ope
whi
ch re
duce
s ef
fort
and
risk
Pr
ovid
es E
lect
ric b
usin
ess
time
to
assi
mila
te p
roce
ss a
nd s
yste
m c
hang
es
requ
ired
G
IS s
trate
gy a
nd ti
min
g
#
of A
pplic
atio
ns R
etire
d =
59
#
of In
terfa
ces
Ret
ired
= 14
1
#
Thro
w A
way
Inte
rface
s =
55
#
of A
pplic
atio
ns R
etire
d =
32
#
of In
terfa
ces
Ret
ired
= 1
26
#
Thro
w A
way
Inte
rface
s =
67
R-1
Back
Offi
ceG
as F
ront
O
ffice
Gas
C
usto
mer
Elec
tric
Fron
t Offi
ce
Pros
Con
sK
ey C
onsi
dera
tions
/ D
ecis
ions
R-2
R-3
R-1
Rel
ease
1R
-2R
elea
se 2
R-3
Rel
ease
3R
-4R
elea
se 4
*Not
e: A
ll ap
plic
atio
n an
d in
terfa
ce n
umbe
rs a
re p
relim
inar
y an
d be
ing
furth
er v
alid
ated
for a
ccur
acy.
Som
e of
the
retir
ed in
terfa
ces
may
nee
d to
be
rebu
ilt to
SA
P fo
r fut
ure
rele
ases
.
Ele
ctric
C
usto
mer
(LIP
A)
Exhibit __ (ISP-3) Page 21 of 84
130
-22
-
La
rger
sco
pe ri
sk th
an S
cena
rio 1
H
igh
num
ber o
f “th
row
aw
ay”i
nter
face
s
Mob
ile in
terfa
ces
with
mul
tiple
Fro
nt O
ffice
sy
stem
s
Con
tinue
to lo
se re
gula
tory
ince
ntiv
e du
e to
la
ck o
f im
plem
entin
g ne
w c
usto
mer
sys
tem
in
Lon
g Is
land
Te
mpo
rary
dis
conn
ect o
f sha
red
oper
atio
ns
(e.g
., m
eter
ser
vice
s)
Gas
bus
ines
s w
ill ha
ve to
pro
vide
si
gnifi
cant
reso
urce
s to
des
ign,
bui
ld, t
est
and
train
peo
ple
for t
he P
ilot,
but w
ill ha
ve
to r
un o
ut o
f tw
o sy
stem
s fo
r som
e tim
e un
til fu
ll Fr
ont O
ffice
and
Cus
tom
er a
re
impl
emen
ted
in tw
o fo
llow
ing
rele
ases
Scen
ario
2* -
Fully
Inte
grat
ed P
ilot i
n R
hode
Isla
nd
Ad
dres
ses
criti
cal f
inan
cial
and
regu
lato
ry
repo
rting
issu
es
Prov
ides
sta
ndar
d Fr
ont O
ffice
and
C
usto
mer
cap
abilit
ies
to m
ost u
rgen
t are
a (R
hode
Isla
nd) i
n fir
st re
leas
e
Miti
gate
s ris
k of
futu
re d
eplo
ymen
t thr
ough
us
e of
a p
ilot
Pr
ovid
es E
lect
ric b
usin
ess
time
to
assi
mila
te p
roce
ss a
nd s
yste
m c
hang
es
requ
ired
G
IS s
trate
gy a
nd ti
min
g
Ab
ility
to m
anag
e a
full
Fron
t Offi
ce a
nd
cust
omer
pilo
t in
para
llel w
ith B
ack
Offi
ce
R-1
Back
O
ffice
Gas
Fro
nt
Offi
ceG
as
Cus
tom
erEl
ectri
c Fr
ont O
ffice
Elec
tric
Cus
tom
erR
I Gas
Fr
ont
Offi
ce
RI
Gas
C
usto
mer
R-3
R-2
R-1
Rel
ease
1R
-2R
elea
se 2
R-3
Rel
ease
3R
-4R
elea
se 4
Pros
Con
sK
ey C
onsi
dera
tions
/ D
ecis
ions
*Not
e:S
ome
of th
e re
tired
inte
rface
s m
ay n
eed
to b
e re
built
to S
AP
for f
utur
e re
leas
es.
Ele
ctric
C
usto
mer
(LIP
A)
#
of A
pplic
atio
ns R
etire
d =
36
#
of In
terfa
ces
Ret
ired
= 14
1
#
Thro
w A
way
Inte
rface
s =
0
#
of A
pplic
atio
ns R
etire
d =
52
#
of In
terfa
ces
Ret
ired
= 13
6
#
Thro
w A
way
Inte
rface
s =
54
#
of A
pplic
atio
ns R
etire
d =
39
#
of In
terfa
ces
Ret
ired
= 13
1
#
Thro
w A
way
Inte
rface
s =
67
Exhibit __ (ISP-3) Page 22 of 84
131
-23
-
In
crea
sed
busi
ness
, del
iver
y an
d te
chni
cal
risk
com
pare
d w
ith S
cena
rio 1
and
2
Impl
emen
tatio
n co
mpl
exiti
es a
cros
s se
vera
l cu
stom
er s
yste
ms
invo
lved
in m
ovin
g to
a
com
mon
stra
tegi
c pl
atfo
rm fo
r bot
h R
I and
LI
Gas
(CAS
, CR
IS, A
dvan
tage
, CSS
)
Req
uire
s in
itial
Bac
k O
ffice
pro
cess
es a
nd
syst
ems
to c
onsi
der i
nteg
ratio
n of
thre
e se
ts
of b
usin
ess
requ
irem
ents
(RI/L
I, re
mai
nder
of
Gas
, all
of E
lect
ric) –
sign
ifica
nt e
ffort
requ
ired
from
bus
ines
s re
sour
ces
but f
ull
capa
bilit
ies
will
be
dela
yed
La
rges
t im
pact
of t
empo
rary
dis
conn
ects
of
shar
ed o
pera
tions
(e.g
., m
eter
ser
vice
s)
#
of A
pplic
atio
ns R
etire
d =
36
#
of In
terfa
ces
Ret
ired
= 14
1
#
Thro
w A
way
Inte
rface
s =
0
#
of A
pplic
atio
ns R
etire
d =
45
#
of In
terfa
ces
Ret
ired
= 13
2
#
Thro
w A
way
Inte
rface
s =
37
#
of A
pplic
atio
ns R
etire
d =
46
#
of In
terfa
ces
Ret
ired
= 13
5
#
Thro
w A
way
Inte
rface
s =
88
Ad
dres
ses
criti
cal f
inan
cial
and
regu
lato
ry
repo
rting
issu
es
Prov
ides
sta
ndar
d FO
and
cus
tom
er
capa
bilit
ies
to m
ost u
rgen
t are
as (R
I) in
fir
st re
leas
e
Reg
ulat
ory
ince
ntiv
e fro
m m
ovin
g LI
PA
cust
omer
s fro
m C
AS to
ano
ther
cus
tom
er
syst
em
Miti
gate
s ris
k of
futu
re d
eplo
ymen
t thr
ough
us
e of
pilo
ts
Prov
ides
Ele
ctric
bus
ines
s tim
e to
as
sim
ilate
pro
cess
and
sys
tem
cha
nges
re
quire
d
G
IS s
trate
gy a
nd ti
min
g
Ab
ility
to m
anag
e an
eve
n la
rger
sco
pe -
full
Fron
t Offi
ce a
nd C
usto
mer
pilo
ts th
an
Scen
ario
2 in
par
alle
l with
Bac
k O
ffice
R-1
Back
O
ffice
Gas
Fro
nt
Offi
ceG
as
Cus
tom
erEl
ectri
c Fr
ont O
ffice
RI G
as
Fron
t O
ffice
RI
Gas
C
usto
mer
LI Gas
C
usto
mer
R-3
R-2
R-1
Rel
ease
1R
-2R
elea
se 2
R-3
Rel
ease
3R
-4R
elea
se 4
Pros
Con
sK
ey C
onsi
dera
tions
/ D
ecis
ions
*Not
e:S
ome
of th
e re
tired
inte
rface
s m
ay n
eed
to b
e re
built
to S
AP
for f
utur
e re
leas
es.
Ele
ctric
C
usto
mer
(LIP
A)
Scen
ario
2A
* -Fu
lly In
tegr
ated
Pilo
t in
Rho
de Is
land
and
Lon
g Is
land
Gas
Cus
tom
er
Exhibit __ (ISP-3) Page 23 of 84
132
-24
-
C
reat
es s
igni
fican
t cha
lleng
es in
tegr
atin
g cu
rrent
Fro
nt O
ffice
app
licat
ions
to n
ew B
ack
Offi
ce a
nd c
usto
mer
pla
tform
s/so
lutio
ns
D
elay
in m
igra
ting
non
-Rho
de Is
land
Ele
ctric
an
d G
as c
usto
mer
s to
sam
e pl
atfo
rm
Tem
pora
ry d
isco
nnec
t of s
hare
d op
erat
ions
(e
.g.,
met
er s
ervi
ces)
Si
gnifi
cant
bus
ines
s an
d te
chni
cal c
ompl
exity
re
late
d to
tem
pora
ry G
as p
roce
sses
and
sy
stem
s in
terfa
ces
#
of A
pplic
atio
ns R
etire
d =
18
#
of In
terfa
ces
Ret
ired
= 11
5
#
Thro
w A
way
Inte
rface
s =
0
#
of A
pplic
atio
ns R
etire
d =
46
#
of In
terfa
ces
Ret
ired
= 45
#
Thro
w A
way
Inte
rface
s =
58
#
of A
pplic
atio
ns R
etire
d =
35
#
of In
terfa
ces
Ret
ired
= 12
8
#
Thro
w A
way
Inte
rface
s =
71
Ad
dres
ses
criti
cal f
inan
cial
and
regu
lato
ry
repo
rting
issu
es
Del
iver
s so
lutio
n to
crit
ical
Cus
tom
er
issu
es in
Rho
de Is
land
in p
aral
lel w
ith b
ack
offic
e
Smal
ler a
nd le
ss c
ompl
ex s
cena
rio th
an
Scen
ario
s 2
and
2A
Prov
ides
Ele
ctric
bus
ines
s tim
e to
as
sim
ilate
pro
cess
and
sys
tem
cha
nges
re
quire
d
Pote
ntia
l for
regu
lato
ry in
cent
ive
from
m
ovin
g LI
PA
cust
omer
s fro
m C
AS
to
anot
her c
usto
mer
sys
tem
G
IS s
trate
gy a
nd ti
min
g
D
elay
s in
tegr
atio
n of
evo
lvin
g S
mar
t Grid
ca
pabi
litie
s un
til la
te in
Rel
ease
cyc
le
#
of A
pplic
atio
ns R
etire
d =
28
#
of In
terfa
ces
Ret
ired
= 12
0
#
Thro
w A
way
Inte
rface
s =
14
Elec
tric
Fron
t Offi
ce
Back
Offi
ce
RI G
as C
usto
mer
Gas
Fro
nt O
ffice
R-1
a
R-1
b
R-3
R-2
R-1
Rel
ease
1R
-2R
elea
se 2
R-3
Rel
ease
3R
-4R
elea
se 4
Pros
Con
sK
ey C
onsi
dera
tions
/ D
ecis
ions
*Not
e: S
ome
of th
e re
tired
inte
rface
s m
ay n
eed
to b
e re
built
to S
AP
forf
utur
e re
leas
es.
Ele
ctric
Cus
tom
erG
as C
usto
mer
R-4
Scen
ario
4* -
Para
llel C
usto
mer
Exhibit __ (ISP-3) Page 24 of 84
133
-25
-
Scen
ario
Ana
lysi
s: V
alue
-Ris
k-C
ost S
corin
g M
odel
Scor
e 5
= G
ood
Scor
e 1
= B
ad
Exhibit __ (ISP-3) Page 25 of 84
134
-26
-
Cor
e A
ssum
ptio
ns fo
r the
Rou
tem
apTi
mel
ines
Thes
e pl
anni
ng a
ssum
ptio
ns n
eed
to b
e va
lidat
ed a
nd/o
r adj
uste
d to
ens
ure
viab
le ti
mel
ines
are
es
tabl
ishe
d
A
suf
ficie
nt n
umbe
r of p
eopl
e w
ith th
e rig
ht s
kills
will
be a
vaila
ble
thro
ugho
ut th
e pr
opos
ed ro
utem
aptim
elin
e (N
G b
usin
ess
and
IS, 3
rdpa
rty)
R
educ
ing
wor
k st
ream
ove
rlap
low
ers
risk,
but
sig
nific
antly
ext
ends
the
impl
emen
tatio
n tim
e
A
PM
O fu
nctio
n w
ill gu
ide
the
over
all r
oute
map
–C
oord
inat
e w
ork
stre
ams
–En
sure
righ
t res
ourc
es a
re m
obiliz
ed a
nd re
ady
whe
n ne
eded
Th
ere
will
be a
“sin
gle
drop
”of B
ack
Offi
ce c
apab
ilitie
s de
liver
ed (d
etai
led
desi
gn w
ill co
nfirm
this
as
sum
ptio
n)
Fi
nal t
imel
ine
will
refle
ct im
pact
s of
rate
cas
e fil
ing
sche
dule
and
othe
r key
repo
rting
requ
irem
ents
(ana
lysi
s cu
rrent
ly u
nder
way
)
R
esou
rce
plan
ning
ass
umes
a 3
-6 m
onth
sta
bilis
atio
npe
riod
follo
win
g ea
ch re
leas
e “g
o liv
e”da
te
E
lect
ric a
nd G
as w
ill w
ork
join
tly o
n in
itial
pla
nnin
g fo
r Fro
ntO
ffice
Exhibit __ (ISP-3) Page 26 of 84
135
-27
-
Ther
e m
ay b
e te
mpo
rary
dis
-inte
grat
ion
of s
ome
exis
ting
proc
esse
s / a
pplic
atio
ns in
th
e ou
tline
d sc
enar
ios
–an
d in
terim
sta
ge c
hoic
es to
be
mad
e.
1. W
ork
orde
rs a
re s
hare
d be
twee
n el
ectri
c an
d ga
s on
the
wor
k m
anag
emen
t sup
port
syst
em (S
TOR
MS
/iSch
edul
e) in
Nat
iona
l Grid
(NYS
).
2. S
hare
d m
eter
ser
vice
sys
tem
s M
ITS
/AM
S in
NG
(NYS
) and
AM
S/E
RT/
ME
TRE
TEK
in K
SE(L
I) be
twee
n el
ectri
c an
d ga
s w
ith p
lans
for f
urth
er e
xpan
sion
.
3. S
hare
d R
UD
(Res
iden
tial u
nder
grou
nd d
iggi
ng/d
evel
opm
ent)
pro
cess
on
MAX
IMO
bet
wee
n el
ectri
c an
d ga
s in
KSE
(LI).
4. T
he L
ong
Isla
nd G
as w
ork
man
agem
ent p
roce
ss w
ill be
sep
arat
ed o
ut o
f exi
stin
g K
eySp
an G
as a
pplic
atio
ns a
nd th
e sc
hedu
ling
will
be o
n tw
o w
ork
man
agem
ent s
yste
ms
inst
ead
of o
ne C
WQ
sys
tem
.
5. I
f co
ntra
ctor
man
agem
ent i
s no
t rol
led
out f
or b
oth
lines
of b
usin
ess
at th
e sa
me
time,
the
cont
ract
or m
anag
emen
t will
be o
n tw
o co
ntra
ctor
man
agem
ent s
yste
ms
inst
ead
of o
ne
CC
H s
yste
m.
.
C
erta
in G
as a
nd E
lect
ric p
roce
sses
are
inte
grat
ed in
Ups
tate
NY
and
Long
Isla
nd; m
igra
ting
Gas
to a
new
pla
tform
inde
pend
ent o
f Ele
ctric
may
di
srup
t syn
ergi
es o
n th
ese
com
bine
d pr
oces
ses/
syst
ems.
M
igra
ting
Long
Isla
nd G
as o
nto
a ne
w p
latfo
rm w
ithou
t the
rest
of K
eySp
an w
ill te
mpo
raril
y in
crea
se th
e nu
mbe
r of s
yste
ms
bein
gm
anag
ed b
y Ke
ySpa
n fo
r cer
tain
func
tions
.
Scen
ario
R
I/GD
Gas
D
istr
ibut
ion
NG
/GD
Gas
D
istr
ibut
ion
NG
/ED
Elec
tric
D
istr
ibut
ion
NG
/ET
Tran
smis
sion
KS/
GD
Gas
D
istr
ibut
ion
LIPA
El
ectr
icK
S/G
enK
eySp
an
Gen
erat
ion
Scen
ario
1Ba
ck O
ffice
Foc
us
Scen
ario
2Fu
lly In
tegr
ated
Pilo
t in
RI
Scen
ario
2A
Fully
Inte
grat
ed P
ilot i
n R
I + L
I Gas
Cus
tom
er
Scen
ario
4Pa
ralle
l Cus
tom
er
RU
D 3
MAX
IMO
Wor
k M
anag
emen
t 4 C
WQ
Con
tract
Man
agem
ent 5
CC
H
Wor
k M
anag
emen
t 1 ST
OR
MS/
iSch
edul
e
Met
er S
ervi
ces
2M
ITS/
AMS
Wor
k M
anag
emen
t 1 ST
OR
MS/
iSch
edul
e
Wor
k M
anag
emen
t 1 ST
OR
MS/
iSch
edul
e
Wor
k M
anag
emen
t 1 ST
OR
MS/
iSch
edul
e
Met
er S
ervi
ces
2M
ITS/
AMS
Met
er S
ervi
ces
2M
ITS/
AMS
Met
er S
ervi
ces
2M
ITS/
AMS
Met
er S
ervi
ces
2 A
MS/
ERT/
MET
RET
EK
RU
D 3
MAX
IMO
RU
D 3
MAX
IMO
RU
D 3
MAX
IMO
Met
er S
ervi
ces
2 A
MS/
ERT/
MET
RET
EK
Met
er S
ervi
ces
2 A
MS/
ERT/
MET
RET
EK
Met
er S
ervi
ces
2 A
MS/
ERT/
MET
RET
EK
Exhibit __ (ISP-3) Page 27 of 84
136
-28
-
No.
App
licat
ion
Nam
e /
Des
crip
tion
Des
crip
tion
Impa
ct o
n bu
sine
ss
Arc
hite
ctur
e/ t
echn
olog
y fit
issu
e
Prod
uctio
n st
abili
ty
Lim
ited
skill
s av
aila
bilit
y
SW v
endo
r su
ppor
t is
sues
Doe
s no
t m
eet
busi
ness
ne
eds
Lim
ited
flexi
bilit
yO
vera
ll Pr
iorit
y
Ope
ratio
nal
Cos
t($
‘000
)
1A
dvan
tage
(aka
-Ban
ner)
-RI
The
purp
ose
of th
is a
pplic
atio
n is
to
mai
ntai
n al
l cus
tom
er in
form
atio
n.
This
sys
tem
is re
ally
the
hub
for a
ll cu
stom
er in
form
atio
n. A
ll of
the
cust
omer
billi
ng, m
eter
read
ing,
ord
er
proc
essi
ng…
..etc
is c
ontro
lled
thro
ugh
this
app
licat
ion.
Hig
h
H
igh
47.8
2N
ucle
us
The
risk
syst
em (N
ucle
us, A
naly
tics,
W
eath
erD
elta
and
rela
ted
inte
rface
s)
supp
orts
hed
ging
act
iviti
es (f
inan
cial
de
rivat
ives
) and
the
purc
hase
/sal
e of
ph
ysic
al c
omm
oditi
es.
The
sys
tem
is
used
for f
inan
cial
repo
rting
, inv
oici
ng,
dete
rmin
ing
cost
of g
as. A
s of
Jan
. 20
06 N
ucle
us is
use
d to
cap
ture
all
LI
and
NY
phys
ical
gas
tran
spor
tatio
n an
d to
per
form
mon
th e
nd s
ettle
men
t. A
pplic
atio
n to
mon
itor r
isk
& e
xpos
ure
in c
omm
odity
trad
ing
syst
ems.
Hig
h
H
igh
780.
5
3TE
STi
me
entry
sys
tem
for N
G U
SH
igh
Hig
h59
.6
4C
AS
-LI
LI G
as a
nd E
lect
ric C
usto
mer
Billi
ngH
igh
H
igh
N/A
5M
axim
o C
orpo
rate
Cor
pora
te in
stan
ce to
faci
litat
e O
racl
e in
tegr
atio
n.H
igh
H
igh
11.2
6M
axim
o N
EN
E G
as W
ork
Man
agem
ent
Hig
h
Hig
h30
1.5
7M
axim
o T&
DT&
D W
ork
Man
agem
ent f
or
elec
tric/
Gas
LI &
NYC
Hig
h
Hig
h65
2.5
8LM
S-N
Y
A T
&D
leak
trac
king
sys
tem
that
re
cord
s th
e lif
e cy
cle
of a
leak
. Fu
nctio
ns in
clud
e w
ork
gene
ratio
n,
wor
k sc
hedu
ling,
PSC
and
inte
rnal
co
mpl
ianc
e re
porti
ng a
nd a
repo
sito
ry
of re
adin
g hi
stor
y.
Hig
h
Hig
h10
6.5
9LM
S-L
ILe
ak M
anag
emen
t Sys
tem
-Lon
g Is
land
Hig
h
Hig
h11
5.8
10P
eopl
eSof
t HR
N
GC
ompl
ete
HR
, Adm
in, b
enef
its –
NG
Hig
h
Hig
h10
41.9
We
iden
tifie
d 38
bur
ning
pla
tform
app
licat
ions
-10
of t
hese
are
hig
h pr
iorit
y to
ad
dres
s an
d m
ost w
ill b
e m
igra
ted
as th
e ch
osen
sce
nario
is im
plem
ente
d
Exhibit __ (ISP-3) Page 28 of 84
137
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
Exhibit __ (ISP-3) Page 29 of 84
138
-30
-
Stra
tegi
c C
onsi
dera
tions
/ B
usin
ess
Impe
rativ
es
Po
rtfo
lio M
anag
emen
t:C
reat
e a
portf
olio
of b
usin
esse
s th
at c
onsi
sten
tly d
eliv
er s
com
pellin
g IR
R p
erfo
rman
ce.
Div
est a
nd a
cqui
re a
s ne
cess
ary
C
usto
mer
: Cre
ate
indu
stry
lead
ing
cust
omer
sat
isfa
ctio
n by
opt
imiz
ing
the
cust
omer
exp
erie
nce
with
in a
nd a
cros
s G
as a
nd E
lect
ric
R
ate
Filin
gs /
Rev
enue
: Opt
imiz
e th
e ef
fect
iven
ess
and
effic
ienc
y of
rate
filin
gs–
Effi
cien
cy/p
rodu
ctiv
ity :
Rat
e fil
ing
cycl
e im
prov
emen
t, C
ost a
lloca
tion
capa
bilit
ies,
Wor
k pr
oduc
tivity
to p
repa
re a
cas
es–
Effe
ctiv
enes
s; R
egul
ator
y R
elat
ions
hips
, Qua
lity
of in
form
atio
n,st
rate
gic
timin
g of
filin
gs, p
eopl
e sk
ills
R
elia
bilit
y &
Saf
ety:
Impr
ove
relia
bilit
y le
vels
and
saf
ety
leve
ls
C
ompl
ianc
e: O
ptim
ize
Reg
ulat
ory
and
Fina
ncia
l Com
plia
nce
incl
udin
g IF
RS
com
plia
nce
alig
nmen
t with
GAA
P–
Effi
cien
t, au
dits
, reg
ulat
ory
revi
ews
–S
tabl
e cr
edit
ratin
gs–
Ban
king
/ B
ond
cove
nant
s
O
pera
ting/
Man
agem
ent:
Driv
e ef
fect
iven
ess
and
effic
ienc
y th
roug
h a
LOB
stru
ctur
e an
d co
mm
on o
pera
ting
mod
el.
–Le
vera
ge c
omm
on w
hene
ver p
ossi
ble.
–
Est
ablis
h tra
nspa
renc
y to
cos
t and
ope
ratio
nal d
ata
to s
uppo
rt ef
fect
ive
man
agem
ent a
nd c
ontin
uous
impr
ovem
ent
–O
pera
tiona
l effe
ctiv
enes
s an
d ef
ficie
ncy
thro
ugh
com
mon
pro
cess
,sta
ndar
diza
tion
and
polic
ies
to e
nabl
e th
e op
erat
ing
mod
el
Pe
ople
: Effi
cien
tly s
ourc
e, tr
ack
and
deve
lop
tale
nt to
sup
port
the
busi
ness
’abi
lity
to o
pera
te a
nd d
eliv
er s
ervi
ces
C
ost:
Con
side
r alte
rnat
ive
Sour
cing
to c
reat
e m
ore
varia
ble
cost
s an
d ta
ke a
dvan
tage
of s
cale
C
apita
l Man
agem
ent:
Opt
imiz
e C
apita
l Inv
estm
ents
to m
aint
ain/
enha
nce
relia
bilit
y an
dpl
an fi
nanc
ial p
roje
ctio
ns a
nd p
erfo
rman
ce m
etric
s
A
sset
& W
ork
Man
agem
ent:
Opt
imiz
e ut
ilizat
ion/
perfo
rman
ce, t
rans
ition
and
repl
acem
ent o
f ass
ets
and
enab
le e
ffici
ent,
seam
less
del
iver
y of
w
ork
in th
e fie
ld
Fu
ndin
g A
ltern
ativ
es: E
ffect
ivel
y le
vera
ge re
gula
tory
and
fede
ral o
ptio
ns fo
r fur
ther
cap
ital i
nves
tmen
ts (e
.g. S
mar
t Grid
, Ene
rgy
Effic
ienc
y,
Alte
rnat
ive
Ener
gy, e
tc.)
Thes
e st
rate
gic
bus
ines
s im
pera
tives
and
driv
ers
wer
e de
velo
ped
from
the
exec
utiv
e in
terv
iew
s an
d us
ed to
dev
elop
the
targ
et a
rchi
tect
ure
and
depl
oym
ent s
cena
rios
Exhibit __ (ISP-3) Page 30 of 84
139
-31
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–Fi
nanc
e
Pl
anni
ng &
Dec
isio
n su
ppor
t–
Glo
bal c
hart
of a
ccou
nts/
code
blo
ck a
cros
s al
l the
lega
l ent
ities
in li
ne w
ith H
yper
ion
Ent
erpr
ise
and
myS
AP
for c
onso
lidat
ed g
loba
l rep
ortin
g–
Pla
nnin
g to
ol w
hich
can
be
oper
ated
in p
aral
lel f
or p
lann
ing,
bud
getin
g, fo
reca
stin
g a
nd
in o
ne s
yste
m to
aid
acc
eler
ated
dec
isio
n m
akin
g an
d fo
reca
stin
gw
ith c
entra
l poi
nt o
f ac
cess
for g
loba
l pla
nnin
g–
Reg
ulat
ory
view
of p
lann
ing
–A
bilit
y to
aut
omat
ical
ly re
port
on m
ultip
le d
imen
sion
s to
sup
port
man
ager
ial d
ecis
ion
mak
ing
–e.
g. c
ompa
ny c
ode,
regi
on, g
roup
, dep
artm
ent,
cost
cen
ter,
segm
ent e
tc.
R
egul
ator
y in
form
atio
n–
Tran
spar
ency
and
vis
ibili
ty o
f der
ived
regu
lato
ry in
form
atio
n fo
r reg
ulat
ory
com
plia
nce.
In
clud
ing
allo
catio
ns m
eetin
g re
gula
tory
and
man
agem
ent r
epor
ting
requ
irem
ents
–S
tand
ardi
zed
and
com
mon
allo
catio
n pr
oces
s to
ens
ure
accu
racy
, aud
itabi
lity
and
trace
abili
ty o
f allo
catio
ns a
nd d
irect
cha
rges
bac
k to
initi
al s
ourc
e (re
tail
& s
ervi
ce
com
pani
es)
Ex
tern
al re
port
ing
and
com
plia
nce
–A
bilit
y to
run
finan
cial
repo
rts a
pply
ing
varie
ty o
f acc
ount
ing
prin
cipl
es, G
AA
P, I
FRS
, etc
.–
Opt
imiz
e ef
fect
iven
ess
and
effic
ienc
y of
rate
filli
ngs
–Le
gal e
ntity
fina
ncia
l rep
ortin
g . F
inan
cial
s re
porti
ng p
rodu
ced
for e
ach
indi
vidu
al le
gal
entit
ies
(ban
ks, l
easi
ng c
ompa
nies
, etc
–S
ingl
e so
urce
cen
tral r
epos
itory
of q
ualit
y in
form
atio
n fo
r ext
erna
l rep
ortin
g
Tr
easu
ry &
Ass
et–
In-h
ouse
cas
h m
anag
emen
t with
long
-term
inve
stm
ent a
nd d
ebt m
anag
emen
t in
clud
ing
deriv
ativ
es, c
apita
l mar
kets
, etc
. App
licat
ion
seam
less
ly in
tegr
ated
with
ene
rgy
com
mod
ity tr
adin
g sy
stem
–S
ingl
e as
set r
egis
ter w
ith p
ortfo
lio m
anag
emen
t
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et M
anag
emen
t
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s Sh
ared
Ser
vice
s –
Fina
nce
Exhibit __ (ISP-3) Page 31 of 84
140
-32
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–Su
pply
Cha
in
Pr
ocur
emen
t–
Auto
mat
ed m
ater
ial r
eple
nish
men
t driv
en b
y ac
cura
te u
pdat
ed w
ork
and
asse
t m
anag
emen
t dem
ands
, ex
–Ap
prov
ed w
ork
orde
r (W
O) c
reat
es d
eman
d fo
r br
eake
rs to
be
deliv
ered
nex
t wed
at r
emot
e st
agin
g si
te X
YZ.
Safe
ty S
tock
in
vent
ory
setti
ng tr
igge
rs re
orde
r of m
inim
um q
ty o
f bre
aker
s –
Abilit
y to
fore
cast
and
pla
n m
ater
ial r
equi
rem
ents
for w
ork
orde
rs a
nd c
onst
ruct
ion
proj
ects
in th
e sh
ort,
med
ium
and
long
term
, ex-
Long
lead
/hig
h do
llar s
ubst
atio
n tra
nsfo
rmer
s or
dere
d ag
ains
t cap
ital p
roje
ct w
ork
orde
r–
Inte
grat
ed in
vest
men
t rec
over
y pr
oces
s –
ex. ‘
Dis
man
tled’
asse
ts a
re tr
acke
d an
d st
ored
for a
fterm
arke
t res
ale.
Pro
cess
is li
nked
to e
nd o
f life
fina
ncia
l ass
et
depr
ecia
tion
proc
ess
–Se
amle
ss o
pera
tion,
allo
catio
n an
d re
char
ges
for s
ervi
ce c
ompa
nies
, ex
–W
O c
ost
allo
catio
ns p
ush
cost
of i
ssue
d m
ater
ials
to th
e W
O, t
hen
allo
cate
cos
t to
resp
onsi
ble
busi
ness
uni
t tha
t ini
tiate
d th
e w
ork
requ
est
–Ac
cura
te id
entif
icat
ion
and
track
ing
of m
eter
s, e
x-Se
rializ
ed m
eter
s ar
e en
tere
d in
to
the
syst
em w
hen
rece
ipt o
ccur
s at
the
war
ehou
se a
nd a
re tr
acke
d vi
a W
Os
thru
to
the
inst
alla
tion
and
activ
atio
n at
the
prem
ise
–Ti
mel
y ve
ndor
pay
men
t to
max
imiz
e di
scou
nts,
ex
–O
n a
WO
requ
iring
con
tract
or
serv
ices
, con
tract
or u
pdat
es s
yste
m th
at w
ork
has
been
per
form
ed(2
0 po
les
set),
fo
rem
an a
ckno
wle
dges
in th
e sy
stem
that
wor
k is
sat
isfa
ctor
y, s
ow
hen
bill
arriv
es if
al
l mat
ches
, pay
men
t in
initi
ated
aut
omat
ical
ly a
nd d
isco
unt a
gree
men
t met
–Ef
fect
ive
repo
rting
and
ben
chm
arki
ng o
f ven
dor p
erfo
rman
ce, e
x –
Ship
men
t qua
ntity
an
d qu
ality
var
iatio
ns to
ord
er a
re n
oted
, tra
cked
per
inci
dent
and
repo
rted
back
to
vend
or fo
r rel
ief,
disc
ount
s or
ven
dor p
lace
men
t on
disa
llow
ed li
st –
proa
ctiv
e m
anag
emen
t of v
endo
r per
form
ance
is s
tand
ard
–G
loba
l vie
w o
f con
tract
or m
anag
emen
t, ex
-Dur
ing
an o
utag
e or
maj
or c
onst
ruct
ion
job,
Con
tract
ors
are
fully
inte
grat
ed in
to th
e pr
oces
s of
pla
nnin
g an
d ex
ecut
ing
wor
k.
They
follo
w s
tand
ard
proc
esse
s, a
cces
s to
NG
sys
tem
s ar
e co
ntro
lled,
repo
rting
of
wor
k pr
ogre
ss is
con
sist
ent a
nd p
erfo
rman
ce o
f con
tract
or is
con
sist
ently
vis
ible
ac
ross
NG
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et M
anag
emen
t
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s Sh
ared
Ser
vice
s –
Supp
ly C
hain
Exhibit __ (ISP-3) Page 32 of 84
141
-33
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–Su
pply
Cha
in
In
vent
ory
–St
anda
rd M
ater
ial M
aste
r rec
ords
acr
oss
NG
US,
ex
–a
50hp
Gou
ld p
ump
is th
e sa
me
Mat
eria
l ID
acr
oss
all o
f NG
US
–Ac
cura
te tr
acki
ng o
f new
vs.
refu
rbis
hed
equi
pmen
t / in
vent
ory,
ex-
man
age
visi
bilit
y of
new
vs
a re
furb
ishe
d pi
ece
of e
quip
men
t, so
whe
re a
pplic
able
a
Wor
k M
anag
emen
t pla
nner
can
use
a p
ump
that
is re
built
, vs
an a
pplic
atio
n th
at
may
nee
d a
mor
e re
liabl
e ‘N
ew’p
iece
of e
quip
men
t –th
is a
lso
mus
t be
able
to
show
diff
eren
ces
in v
alua
tion
for d
epre
ciat
ion
purp
oses
–Ab
ility
to v
iew
par
ts in
vent
ory
and
avai
labi
lity
in a
sin
gle
syst
em ,
ex –
Wor
k M
anag
emen
t pla
nner
s w
ill ne
ed to
see
an
accu
rate
cou
nt o
f ‘Av
aila
ble’
mat
eria
ls
they
nee
d fo
r a jo
b. I
f tha
t spe
cific
tran
sfor
mer
is n
ot a
vaila
ble
in th
e w
areh
ouse
an
d is
acc
urat
ely
refle
cted
in in
vent
ory
that
he
can
see
in th
e sy
stem
, the
n th
e jo
b m
ay b
e pu
shed
bac
k to
a la
ter d
ate,
or h
e m
ay n
eed
to m
ake
phon
e ca
lls to
tra
ck d
own
wha
t is
real
ly a
vaila
ble
–C
ompl
ete
visi
bilit
y to
inve
ntor
y av
aila
bilit
y an
d ab
ility
to tr
ansf
er b
etw
een
Lega
cy
Com
pani
es, e
x-le
gacy
Key
span
may
nee
d a
part
from
lega
cy G
ris –
the
rese
rvat
ion,
tran
sfer
and
fina
ncia
l rec
onci
liatio
n of
this
mus
t be
fully
def
ined
and
en
able
d by
the
appl
icat
ion
–Au
tom
atio
n of
cre
w b
arn
stoc
k re
plen
ishm
ent (
PAR
) , e
x –
‘Van
Sto
ck’i
s an
im
porta
nt c
apab
ility
of s
ervi
cing
our
cus
tom
ers
whi
le o
ut in
the
field
–th
e co
nsum
ptio
n an
d re
plen
ishm
ent o
f thi
s in
vent
ory
mus
t be
wel
l con
trolle
d to
mak
e su
re n
eede
d pa
rts a
re re
adily
ava
ilabl
e –
Inte
lligen
t Inv
ento
ry m
anag
emen
t is
requ
ired
in a
ll st
orag
e lo
catio
ns, e
x –
only
th
ose
parts
that
are
nee
ded
to b
e on
han
d sh
ould
eve
n be
set
up
in th
e w
areh
ouse
–sa
fety
sto
ck le
vel w
ould
be
man
aged
to m
inim
ize
carr
ying
cos
t of
inve
ntor
y an
d re
orde
r log
ic is
bas
ed o
n ec
onom
ic o
rder
qua
ntiti
es, o
rder
del
iver
y an
d st
ocki
ng le
ad ti
mes
, etc
–Fu
lly in
tegr
ated
mob
ile te
chno
logy
, ex
–M
obile
tech
nolo
gy n
eede
d to
effe
ctiv
ely
man
age
cycl
e co
untin
g an
d al
l mat
eria
l mov
emen
ts
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et M
anag
emen
t
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s Sh
ared
Ser
vice
s –
Supp
ly C
hain
Exhibit __ (ISP-3) Page 33 of 84
142
-34
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
-HR
/Pay
roll
Ta
lent
–E
ffect
ive
supp
ort
of L
OB
sby
HR
Cen
ters
of E
xcel
lenc
e (C
OE
s) re
gard
ing
bus
ines
s C
ompe
nsat
ion,
Org
D
esig
n an
d Ta
lent
issu
es/p
rogr
ams
thro
ugh
effe
ctiv
e an
d ef
ficie
nt p
roce
sses
, sys
tem
s an
d da
ta–
Effe
ctiv
e P
artn
erin
g of
LO
B’s
with
HR
Bus
ines
s P
artn
ers
to e
nabl
e H
R’s
supp
ort o
f crit
ical
bus
ines
s im
pera
tives
–
Del
iver
y of
effi
cien
t and
com
preh
ensi
ve G
loba
l Suc
cess
ion
supp
orte
d by
con
sist
ent d
ata
capt
ure
and
anal
ysis
pro
vidi
ng th
e bu
sine
ss th
e ab
ility
to b
e ag
ile a
nd re
spon
sive
to c
hang
es in
Lea
ders
hip
–D
eliv
ery
of e
ffici
ent a
nd c
ompr
ehen
sive
Glo
bal P
erfo
rman
ce M
anag
emen
t en
able
d by
con
sist
ent d
ata
capt
ure
and
effic
ient
pla
tform
ena
blin
g co
mm
unic
atio
n be
twee
n em
ploy
ees,
man
ager
s, a
nd H
R.
Ass
ist i
n bu
ildin
g so
lid p
latfo
rm fo
r int
egra
ted
Glo
bal T
alen
t Man
agem
entp
rogr
ams
and
linka
ge to
Rew
ards
and
C
ompe
nsat
ion
–E
ffect
ive
Com
pens
atio
n an
d R
ewar
ds P
rogr
am to
sup
port
Glo
bal T
alen
t Man
agem
ent i
nitia
tives
incl
udin
g lin
kage
to P
erfo
rman
ce M
anag
emen
t–
Inte
grat
ed re
crui
tmen
t pro
cess
es a
cros
s lin
es o
f bus
ines
s to
spe
ed ti
me
to h
ire a
nd s
uppo
rt re
gula
tory
re
porti
ng.
Pro
vide
Tal
ent t
o or
gani
zatio
n in
mor
e tim
ely,
effi
cien
t man
ner.
–G
loba
l Lea
rnin
g M
anag
emen
t -D
eliv
ery
of t
rain
ing
to o
rgan
izat
ion
such
as
Tech
nica
l Tra
inin
g,
Lead
ersh
ip a
nd E
xecu
tive
Dev
elop
men
t and
Per
sona
l Effe
ctiv
enes
s
H
R S
ervi
ces
–E
nabl
e an
effi
cien
t and
effe
ctiv
e H
R T
rans
actio
nal S
ervi
ce C
ente
r to
supp
ort e
mpl
oyee
s an
d th
e LO
Bs
and
redu
ce re
dund
anci
es in
Pay
roll,
Tim
e, B
enef
its p
roce
ssin
g an
d H
R R
epor
ting
–E
ffici
ent
and
cons
iste
nt T
ime
& P
ayro
ll P
roce
sses
tha
t red
uce
adm
inis
tratio
n an
d su
ppor
t reg
ulat
ory
and
va
rious
labo
r req
uire
men
ts–
Bui
ld a
foun
datio
n to
sup
port
bene
fit a
dmin
istra
tion
outs
ourc
ing
–E
mpl
oyee
and
Man
ager
Sel
f -S
ervi
ces
allo
win
g m
anag
ers
to v
iew
and
man
age
staf
f dat
a an
d al
low
ing
empl
oyee
s to
mai
ntai
n th
eir p
erso
nal a
nd c
aree
r dat
a–
Con
sist
ent W
orkf
orce
Tra
inin
g Tr
acki
ng e
stab
lishi
ng c
lear
pro
cess
es e
nabl
ing
cour
se b
ooki
ng a
nd
track
ing.
Fou
ndat
iona
l ele
men
t to
build
ing
a w
orld
-cla
ss L
earn
ing
Sol
utio
n–
Effe
ctiv
e C
ase
Man
agem
ent
prov
idin
g ca
pabi
lity
to m
anag
e, tr
ack,
rout
e an
d es
cala
te c
ases
repo
rted
to
new
ly c
onso
lidat
ed H
R T
rans
actio
n hu
b–
Abi
lity
to s
uppo
rt La
bor R
elat
ions
reg
ardi
ng t
he tr
acki
ng a
nd re
porti
ng o
f em
ploy
ee g
rieva
nces
and
in
cide
nts
–E
ffect
ive
Kno
wle
dge
and
Doc
umen
t Man
agem
ent
–G
loba
l pos
ition
man
agem
ent
–A
bilit
y to
sup
port
Hea
lth a
nd S
afet
y th
roug
h sa
fety
inci
dent
s tra
ckin
g an
d re
porti
ng, c
onso
lidat
ion
of
med
ical
reco
rds,
dru
g te
stin
g sc
hedu
les
and
resu
lts, M
SD
S -
safe
ty d
ata
shee
ts fo
r mat
eria
l, ha
zmat
re
late
d in
form
atio
n
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et M
anag
emen
t
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s Sh
ared
Ser
vice
s –
HR
/Pay
roll
Exhibit __ (ISP-3) Page 34 of 84
143
-35
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–Fl
eet
Fl
eet
–Vi
sibi
lity
of F
leet
ava
ilabi
lity
for w
ork
man
agem
ent ,
ex
–it’
s cr
itica
l tha
t wor
k m
anag
emen
t pla
nner
s an
d fo
rem
an k
now
on
a da
ily b
asis
wha
t tru
cks
are
avai
labl
e fo
r cre
ws
to u
se a
nd w
hat s
peci
fic e
quip
men
t the
se tr
ucks
hav
e on
them
(tw
o m
an
buck
et tr
uck,
etc
..).
Thes
e tru
cks
mus
t be
visi
ble
in th
e w
ork
orde
r pla
nnin
g sy
stem
to
ena
ble
assi
gnm
ent t
o sp
ecifi
c jo
bs
–Si
ngle
poi
nt o
f cap
ture
for F
leet
mai
nten
ance
tim
e re
porti
ng,
ex –
Inte
grat
e tim
e ch
arge
s fo
r fle
et u
sage
into
the
‘One
tim
e da
ta e
ntry
’of w
ork
hour
s on
the
job
, so
that
cha
rgin
g of
flee
t cos
ts a
re c
onsi
sten
tly in
curre
d by
the
job
that
use
d th
e ve
hicl
e–
Con
sist
ent a
ppro
ach
for "
Flee
t Billi
ng" ,
ex
–al
l veh
icle
cos
ts a
lloca
ted
to th
e jo
b th
at
used
them
incl
udin
g ac
tual
hou
rly/d
aily
rate
plu
s ov
erhe
ads
–co
st w
ill flo
w to
the
wor
k or
der t
hen
settl
ed to
the
proj
ect o
r cos
t cen
ter t
hat i
nitia
ted
the
wor
k re
ques
t–
Sing
le F
leet
ass
et re
gist
er, e
x –
all F
leet
ass
ets
are
cons
iste
ntly
def
ined
in a
cen
tral
syst
em in
clud
ing
equi
pmen
t cla
ss, s
ubcl
ass
and
attri
bute
dat
a, li
ke to
nnag
e, e
ngin
e ty
pe, w
orki
ng v
olta
ge ra
ting,
one
/two
man
buc
ket,
4/6
whe
els,
lift
reac
h, e
tc.
–C
omm
on F
leet
bud
getin
g pr
oces
s, e
x-in
tegr
ated
Cap
ital a
nd O
&M b
udge
ts fo
r fle
et
grou
p de
fined
and
mea
sure
d vi
a w
ork
orde
r set
tlem
ents
and
pro
ject
cos
ts–
Inte
grat
ed d
ata
from
out
sour
ced
fleet
sys
tem
s (fu
el, b
ody
wor
k, re
pairs
und
er
war
rant
ee, e
tc) ,
ex
–Al
l fue
l and
ext
erna
l mai
nten
ance
cha
rges
allo
cate
d to
spe
cific
asse
t, to
ena
ble
accu
rate
vie
w o
f tot
al c
ost o
f ow
ners
hip
of v
ehic
le–
Cap
ture
all
mai
nten
ance
his
tory
on
the
vehi
cle,
ex-
wor
k or
ders
initi
ated
and
pla
nned
ag
ains
t a s
peci
fic v
ehic
le to
ena
ble
capt
urin
g of
all
hist
ory
ofw
ork
perfo
rmed
and
re
late
d co
sts
–C
ompr
ehen
sive
Pre
v/Pr
edm
aint
enan
ce s
trate
gies
, ex
–pl
an a
nd p
erfo
rm ro
utin
g m
aint
enan
ce o
n ve
hicl
es in
clud
ing
oil c
hang
es, t
une
ups,
tire
repl
acem
ents
, sea
sona
l ad
just
men
ts, e
tc.,
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et M
anag
emen
t
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s Sh
ared
Ser
vice
s –
Flee
t
Exhibit __ (ISP-3) Page 35 of 84
144
-36
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–M
anag
emen
t / R
egul
ator
y R
epor
ting
St
rate
gic
Plan
ning
/ Fi
nanc
ial R
epor
ting*
–St
rate
gic
Plan
ning
Pro
cess
Sup
port
Ab
ility
to e
ffici
ently
cre
ate
a co
nsol
idat
ed g
roup
leve
l pla
n w
ithou
t exc
essi
ve
com
plex
ity a
nd m
anua
l wor
k. (E
.g. f
our r
uns
at th
e pl
an la
st y
ear)
N
eed
to s
uppo
rt a
two
year
pla
n th
at li
nks
to 5
yea
r stra
tegi
c pl
an e
nabl
ed
by “b
ridge
s”be
twee
n sy
stem
s–
Cos
t Allo
catio
n C
apab
ility
Ef
ficie
nt a
nd re
peat
able
set
up
of c
ost a
lloca
tions
Ab
ility
to e
asily
mak
e on
goin
g ad
just
men
ts to
bac
k of
fice
cost
allo
catio
ns
assu
mpt
ions
with
out d
elay
(e.g
. wag
es, t
imin
g, e
tc.)
Ad
just
Pen
sion
rate
s to
sup
port
reco
very
C
apita
l rat
iona
lizat
ion
deci
sion
sup
port
R
egul
ator
y R
epor
ting
–St
ate
Leve
l Reg
ulat
ory
filin
g/fin
anci
al re
porti
ng
Accu
racy
and
abi
lity
to m
ove
into
a re
gula
tory
filin
g.
Abilit
y to
“dro
p”th
e fin
anci
al re
porti
ng in
to th
e re
gula
tory
env
ironm
ent-
Ris
k th
at N
G m
isse
s a
Stat
e le
vel g
as d
istri
butio
n ra
te fi
ling
In
form
atio
n/Pe
rfor
man
ce M
anag
emen
t–
Basi
c M
anag
emen
t Rep
ortin
g, R
econ
cilia
tion
and
Tran
spar
ency
:
Hea
dcou
nt--
Cor
rela
te F
TE s
tatis
tics
to O
p Ex
and
bills
C
osts
tran
spar
ency
-IT
cost
s, o
pera
tiona
l cos
ts e
tc.
D
rill d
own
capa
bilit
y to
con
duct
bas
ic b
usin
ess
anal
ysis
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
* S
peci
fic re
porti
ng re
quire
d by
func
tiona
l are
as/L
OB
sis
incl
uded
in th
ose
capa
bilit
y gr
oups
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -M
anag
emen
t / R
egul
ator
y R
epor
ting
Exhibit __ (ISP-3) Page 36 of 84
145
-37
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–G
as F
ront
Offi
ce
W
ork
Man
agem
ent
–A
bilit
y to
pla
n an
d m
anag
e al
l req
uire
d re
sour
ces
for a
job
in o
ne c
entra
lized
sys
tem
, inc
ludi
ng
–In
tern
al/E
xter
nal L
abor
, Mat
eria
ls, V
ehic
les,
Eng
inee
ring,
Ope
ratio
ns, E
nviro
nmen
tal,
Saf
ety,
Per
mits
, Spe
cial
Equ
ipm
ent,
Tool
s, W
ork
Cle
aran
ces,
etc
.–
Com
mon
wor
k P
lann
ing,
App
rova
l, S
ched
ulin
g, E
xecu
tion
and
Clo
se o
ut b
usin
ess
proc
esse
s ,
ex –
Sta
ndar
d or
der t
ypes
, prio
ritie
s, s
tatu
s m
anag
emen
t, w
orkf
low
s,ap
prov
al li
mits
, etc
–C
usto
mer
focu
sed
proc
esse
s in
tegr
ated
with
the
Cus
tom
er s
yste
m a
nd G
IS p
roce
sses
, ex
–D
evel
oper
requ
este
d de
sign
est
imat
e op
tions
vis
ible
to C
SR
whe
n bu
ilder
cal
ls fo
r sta
tus
upda
te–
Inte
grat
ed T
ime
repo
rting
sys
tem
, ex
–E
nter
hrs
wor
ked
on W
O o
ne ti
me
–sy
stem
upd
ates
W
M s
yste
m a
nd P
ayro
ll at
the
sam
e tim
e
–M
obile
ena
bled
bus
ines
s pr
oces
ses,
ex
–E
nter
hrs
rem
otel
y, c
lose
jobs
, doc
umen
t his
tory
, st
art n
ext j
ob, e
tc..
–W
ork
Ord
er c
ost c
olle
ctio
n an
d se
ttlem
ent f
ully
inte
grat
ed w
ith fi
nanc
ial s
yste
m, e
x –
Per
wor
k ty
pe, a
ctiv
ity, t
ime
of d
ay, c
usto
mer
type
, loc
atio
n, e
tc.,
appl
y sp
ecifi
c la
bor,
vehi
cle,
co
ntra
ctor
, too
l, et
c..c
osts
, rel
ated
ove
rhea
d al
loca
tions
and
set
tlem
ent t
o co
st c
ente
rs o
r pr
ojec
t WB
S in
the
finan
cial
sys
tem
–C
omm
on G
as P
erfo
rman
ce M
easu
rem
ent K
PIs
, ex
–La
te s
tarts
, Pla
n vs
. Act
ual c
ost v
aria
nts,
%
Pla
nned
vs.
Rea
ctiv
e M
aint
enan
ce, e
tc–
Inte
grat
ed C
apita
l Spe
nd P
rogr
am ,
ex –
Cap
ital P
roje
ct re
view
and
app
rova
l pro
cess
that
co
ntro
ls a
ll ca
pita
l wor
k, u
sing
con
sist
ent a
ppro
val c
riter
ia, f
undi
ng g
ates
, var
ianc
e re
porti
ng
and
prov
ides
det
aile
d co
st v
isib
ility
of a
ll pl
anne
d co
mm
itmen
tsan
d ac
tual
sre
al ti
me
–Fu
lly in
tegr
ated
Res
ourc
e S
ched
ulin
g ap
plic
atio
n , e
x -
Cre
ws/
Cra
fts a
nd tr
uck
pairi
ng a
bilit
y id
entif
ied
in th
e sy
stem
with
spe
cific
trai
ning
and
cer
tific
atio
ns ,
equi
pmen
t –av
aila
bilit
y is
in
tegr
ated
to H
R w
ork
sche
dule
s, le
ave,
etc
. and
Fle
et m
gnts
yste
m to
sho
w tr
ue re
cour
se
avai
labi
lity
each
day
for a
ssig
nmen
t to
shor
t dur
atio
n w
ork
–S
tand
ardi
zed
Rep
etiti
ve w
ork
job
plan
s, e
x –
Pum
p ov
erha
ul c
an b
e ‘P
re-p
lann
ed’,
then
co
pied
into
the
wor
k or
der w
hene
ver i
t is
need
ed
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s –
Gas
Fro
nt O
ffice
Exhibit __ (ISP-3) Page 37 of 84
146
-38
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–G
as F
ront
Offi
ce .
. . c
ontin
ued
A
sset
Man
agem
ent
–St
anda
rd L
ocat
ion
and
Asse
t Hie
rarc
hy d
efin
ition
s, e
x –
Hie
rarc
hica
l re
pres
enta
tion
of lo
catio
ns w
here
equ
ipm
ent i
s in
stal
led.
Log
ical
bre
akdo
wn
of
stor
age
faci
litie
s, p
umpi
ng s
tatio
ns, t
rans
mis
sion
line
s, d
istri
butio
n lin
es a
nd
met
er to
the
prem
ise
–st
anda
rd re
pres
enta
tion
of e
quip
men
t lin
ked
to
suba
ssem
blie
s an
d sp
are
parts
list
s–
Com
mon
Loc
atio
n an
d Eq
uipm
ent d
ata
reco
rds,
ex
–Lo
catio
ns s
how
com
mon
ge
ospa
tial c
oord
inat
es s
hare
d w
ith G
IS s
yste
m a
nd c
usto
mer
reco
rds,
co
ntai
ning
requ
ired
data
fiel
ds li
ke d
escr
iptio
n, m
ain
ID, e
tc.
Equi
pmen
t rec
ords
al
so h
ad re
quire
d da
ta fi
elds
like
mak
e, m
odel
, man
ufac
ture
, cla
ss, s
ubcl
ass
and
attri
bute
spe
cific
det
ails
(mat
eria
ls o
f con
stru
ctio
ns, s
ize
para
met
ers,
etc
)–
Inte
grat
ed A
sset
and
Wor
k M
anag
emen
t his
tory
, ex
–W
ork
orde
rs a
re w
ritte
n ag
ains
t a p
rimar
y Eq
uipm
ent r
ecor
d (m
anda
tory
des
ign
setti
ng),
thus
link
ing
all
wor
k hi
stor
y to
that
equ
ipm
ent r
ecor
d –
incl
udin
g sp
ecifi
cs re
late
d to
cos
ts,
failu
re ty
pe c
ause
cod
es, p
arts
repl
aced
, etc
.–
Stan
dard
ized
Pre
v/Pr
edM
aint
enan
ce p
lans
per
crit
ical
Equ
ipm
ent C
lass
and
Su
b-C
lass
, ex
–R
elia
bilit
y En
gine
ers
defin
e ‘C
ritic
al’e
quip
men
t and
the
spec
ific
mai
nten
ance
ste
ps th
at n
eed
to b
e pe
rform
ed o
n re
gula
r bas
is –
they
then
m
onito
r per
form
ance
of t
hese
per
iodi
c w
ork
orde
rs a
nd a
naly
ze re
sults
of
repa
ir/m
aint
enan
ce tr
ends
to in
sure
hig
hest
relia
bilit
y of
thes
eas
sets
–In
tegr
ated
GIS
, Ass
et a
nd W
ork
Man
agem
ent p
roce
sses
, ex
–D
efin
e sh
ared
da
ta re
quire
d to
be
cons
iste
nt in
all
thre
e of
thes
e sy
stem
s to
ena
ble
clea
r vi
sibi
lity
of fa
ilure
s oc
curr
ing
and
activ
ities
per
form
ed a
cros
sal
ass
ets
–As
set M
anag
emen
t Stra
tegy
driv
en -
Equi
pmen
t tre
nd a
naly
sis,
ex
–St
rate
gy
deve
lope
d to
mov
e en
tire
fleet
of a
sset
s to
a m
ore
relia
ble
mod
e.
Shou
ld d
efin
e ho
w th
e or
gani
zatio
n w
ill m
ove
away
from
‘Rea
ctiv
e’m
aint
enan
ce in
to m
ore
of a
m
ode
of p
lann
ed, c
ontro
lled
and
muc
h le
ss c
ostly
mai
nten
ance
of a
ll as
sets
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s –
Gas
Fro
nt O
ffice
Exhibit __ (ISP-3) Page 38 of 84
147
-39
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–El
ectr
ic F
ront
Offi
ce
W
ork
Man
agem
ent
–A
bilit
y to
pla
n an
d m
anag
e al
l req
uire
d re
sour
ces
for a
job
in o
ne c
entra
lized
sys
tem
, inc
ludi
ng
–In
tern
al/E
xter
nal L
abor
, Mat
eria
ls, V
ehic
les,
Eng
inee
ring,
Ope
ratio
ns, E
nviro
nmen
tal,
Saf
ety,
Per
mits
, Spe
cial
Equ
ipm
ent,
Tool
s, W
ork
Cle
aran
ces,
etc
.–
Com
mon
wor
k P
lann
ing,
App
rova
l, S
ched
ulin
g, E
xecu
tion
and
Clo
se o
ut b
usin
ess
proc
esse
s ,
ex –
Sta
ndar
d or
der t
ypes
, prio
ritie
s, s
tatu
s m
anag
emen
t, w
orkf
low
s,ap
prov
al li
mits
, As-
Bui
lt up
date
s, e
tc–
Com
mon
and
con
sist
ent e
xper
ienc
e fo
r cus
tom
ers
(from
cal
l to
exec
utio
n in
the
field
).
Cus
tom
er fo
cuse
d pr
oces
ses
inte
grat
ed w
ith th
e C
usto
mer
sys
tem
,G
IS ,
Out
age
man
agem
ent a
nd W
ork
Man
agem
ent p
roce
sses
, ex
–R
oad
wid
enin
g jo
b, in
tegr
ates
pla
nnin
g w
ith D
OT,
des
igne
rs, J
oint
use
par
tner
s, G
IS c
hang
es if
requ
ired,
wor
k cr
ews
disp
atch
ed a
nd
pote
ntia
l OM
S a
djus
tmen
ts, w
hile
all
cost
for t
his
wor
k ar
e ca
ptur
ed a
nd e
ffici
ently
bill
ed to
D
OT
–E
nabl
emen
t of O
pera
ting
Mod
el –
Incl
udin
g co
nsol
idat
ion
of D
esig
n ce
nter
s (3
loca
tions
), O
der f
ulfil
lmen
t fun
ctio
n an
d sc
hedu
ling
shor
t cyc
le w
ork
–M
obile
ena
bled
bus
ines
s pr
oces
ses,
ex
–E
nter
hrs
rem
otel
y, c
lose
jobs
, doc
umen
t his
tory
, st
art n
ext j
ob, e
tc..
–W
ork
Ord
er c
ost c
olle
ctio
n an
d se
ttlem
ent f
ully
inte
grat
ed w
ith fi
nanc
ial s
yste
m, e
x –
Per
wor
k ty
pe, a
ctiv
ity, t
ime
of d
ay, c
usto
mer
type
, loc
atio
n, e
tc.,
appl
y sp
ecifi
c la
bor,
vehi
cle,
co
ntra
ctor
, too
l, et
c..c
osts
, rel
ated
ove
rhea
d al
loca
tions
and
set
tlem
ent t
o co
st c
ente
rs o
r pr
ojec
t WB
S in
the
finan
cial
sys
tem
–Fr
ee u
p an
alys
ts to
per
form
‘Ana
lysi
s’an
d no
t dat
a cr
unch
ing
and
man
ipul
atio
n -C
omm
on
ED
&G
Per
form
ance
Mea
sure
men
t KP
Is, e
x –
Late
sta
rts, P
lan
vs. A
ctua
l cos
t s,
% P
lann
ed
vs. R
eact
ive
Mai
nten
ance
, cre
w u
tiliz
atio
n, p
oles
set
per
day
, etc
–Fu
lly in
tegr
ated
Res
ourc
e S
ched
ulin
g ap
plic
atio
n , e
x -
Cre
ws/
Cra
fts a
nd tr
uck
pairi
ng a
bilit
y id
entif
ied
in th
e sy
stem
with
spe
cific
trai
ning
and
cer
tific
atio
ns ,
equi
pmen
t –av
aila
bilit
y is
in
tegr
ated
to H
R w
ork
sche
dule
s, le
ave,
etc
. and
Fle
et m
gnts
yste
m to
sho
w tr
ue re
cour
se
avai
labi
lity
each
day
for a
ssig
nmen
t to
shor
t dur
atio
n w
ork
–C
onso
lidat
ion
of c
ontro
l sys
tem
s (E
MS
, DM
S, O
MS
)–
Goa
l of u
nloc
king
val
ue a
nd re
leas
e of
pro
duct
ivity
, und
erst
andi
ng B
arga
inin
g U
nit
agre
emen
ts a
nd th
eir i
mpa
cts
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -E
lect
ric F
ront
Offi
ce
Exhibit __ (ISP-3) Page 39 of 84
148
-40
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–El
ectr
ic F
ront
Offi
ce .
. . c
ontin
ued
A
sset
Man
agem
ent
–St
anda
rd L
ocat
ion
and
Asse
t Hie
rarc
hy d
efin
ition
s, e
x –
Hie
rarc
hica
l re
pres
enta
tion
of lo
catio
ns w
here
equ
ipm
ent i
s in
stal
led.
Log
ical
bre
akdo
wn
of
stor
age
faci
litie
s, p
umpi
ng s
tatio
ns, t
rans
mis
sion
line
s, d
istri
butio
n lin
es a
nd
met
er to
the
prem
ise
–st
anda
rd re
pres
enta
tion
of e
quip
men
t lin
ked
to
suba
ssem
blie
s an
d sp
are
parts
list
s–
Com
mon
Loc
atio
n an
d Eq
uipm
ent d
ata
reco
rds,
ex
–Lo
catio
ns s
how
com
mon
ge
ospa
tial c
oord
inat
es s
hare
d w
ith G
IS s
yste
m a
nd c
usto
mer
reco
rds,
co
ntai
ning
requ
ired
data
fiel
ds li
ke d
escr
iptio
n, v
olta
ge, c
ircui
t ID
, etc
. Eq
uipm
ent r
ecor
ds a
lso
have
requ
ired
data
fiel
ds li
ke m
ake,
mod
el,
man
ufac
ture
, cla
ss, s
ubcl
ass
and
attri
bute
spe
cific
det
ails
(mat
eria
ls o
f co
nstru
ctio
ns, s
ize
para
met
ers,
etc
)–
Inte
grat
ed A
sset
and
Wor
k M
anag
emen
t his
tory
, ex
–W
ork
orde
rs a
re w
ritte
n ag
ains
t a p
rimar
y Eq
uipm
ent r
ecor
d (m
anda
tory
sys
tem
des
ign
setti
ng),
thus
lin
king
all
wor
k hi
stor
y to
that
equ
ipm
ent r
ecor
d –
incl
udin
g sp
ecifi
cs re
late
d to
co
sts,
failu
re ty
pe c
ause
cod
es, p
arts
repl
aced
, etc
.–
Stan
dard
ized
Pre
v/Pr
edM
aint
enan
ce p
lans
per
crit
ical
Equ
ipm
ent C
lass
and
Su
b-C
lass
, ex
–R
elia
bilit
y En
gine
ers
defin
e ‘C
ritic
al’e
quip
men
t and
the
spec
ific
mai
nten
ance
ste
ps th
at n
eed
to b
e pe
rform
ed o
n re
gula
r bas
is –
they
then
m
onito
r per
form
ance
of t
hese
per
iodi
c w
ork
orde
rs a
nd a
naly
ze re
sults
of
repa
ir/m
aint
enan
ce tr
ends
to in
sure
hig
hest
relia
bilit
y of
thes
eas
sets
–In
tegr
ated
GIS
, Ass
et a
nd W
ork
Man
agem
ent p
roce
sses
, ex
–D
efin
e sh
ared
da
ta re
quire
d to
be
cons
iste
nt in
all
thre
e of
thes
e sy
stem
s to
ena
ble
clea
r vi
sibi
lity
of fa
ilure
s oc
curri
ng a
nd a
ctiv
ities
per
form
ed a
cros
sal
ass
ets
–As
set M
anag
emen
t Stra
tegy
driv
en -
Equi
pmen
t tre
nd a
naly
sis,
ex
–St
rate
gy
deve
lope
d to
mov
e en
tire
fleet
of a
sset
s to
a m
ore
relia
ble
mod
e.
Shou
ld d
efin
e ho
w th
e or
gani
zatio
n w
ill m
ove
away
from
‘Rea
ctiv
e’m
aint
enan
ce in
to m
ore
of a
m
ode
of p
lann
ed, c
ontro
lled
and
muc
h le
ss c
ostly
mai
nten
ance
of a
ll as
sets
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s –
Elec
tric
Fro
nt O
ffice
Exhibit __ (ISP-3) Page 40 of 84
149
-41
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–Tr
ansm
issi
on
W
ork
Man
agem
ent
–A
bilit
y to
pla
n an
d m
anag
e al
l req
uire
d re
sour
ces
for a
job
in o
ne c
entra
lized
sys
tem
, inc
ludi
ng
–In
tern
al/E
xter
nal L
abor
, Mat
eria
ls, V
ehic
les,
Eng
inee
ring,
Ope
ratio
ns, E
nviro
nmen
tal,
Saf
ety,
Per
mits
, Spe
cial
Equ
ipm
ent,
Tool
s, W
ork
Cle
aran
ces,
etc
.–
Com
mon
wor
k P
lann
ing,
App
rova
l, S
ched
ulin
g, E
xecu
tion
and
Clo
se o
ut b
usin
ess
proc
esse
s ,
ex –
Sta
ndar
d or
der t
ypes
, prio
ritie
s, s
tatu
s m
anag
emen
t, w
orkf
low
s,ap
prov
al li
mits
, etc
–In
tegr
ated
Tim
e re
porti
ng s
yste
m, e
x –
Ent
er h
rs w
orke
d on
WO
one
tim
e –
syst
em u
pdat
es
WM
sys
tem
and
Pay
roll
at th
e sa
me
time
–
Cap
ital P
roje
ct M
anag
emen
t pro
cess
es fi
lly in
tegr
ated
with
the
Cor
pora
te B
udge
ting,
In
vest
men
t Man
agem
ent p
rogr
am a
nd P
roje
ct W
BS
/Wor
k O
rder
life
cycl
e pr
oces
ses,
ex
App
rove
d fu
ndin
g fo
r tra
nsm
issi
on li
ne e
xten
sion
pro
ject
has
pha
sed
budg
et a
mou
nt w
hich
is
cons
umed
as
wor
k pr
ogre
sses
–al
l vis
ible
in o
ne s
yste
m–
Mob
ile e
nabl
ed b
usin
ess
proc
esse
s, e
x –
Per
form
insp
ectio
n re
mot
ely,
ent
er h
rs, c
lose
jobs
, do
cum
ent h
isto
ry ,
star
t nex
t job
, etc
..–
Wor
k O
rder
cos
t col
lect
ion
and
settl
emen
t ful
ly in
tegr
ated
with
fina
ncia
l sys
tem
, ex
–P
er w
ork
type
, act
ivity
, tim
e of
day
, cus
tom
er ty
pe, l
ocat
ion,
etc
., ap
ply
spec
ific
labo
r, ve
hicl
e,
cont
ract
or, t
ool,
etc.
.cos
ts, r
elat
ed o
verh
ead
allo
catio
ns a
nd s
ettle
men
t to
cost
cen
ters
or
proj
ect W
BS
in th
e fin
anci
al s
yste
m–
Com
mon
Tra
nsm
issi
on P
erfo
rman
ce M
easu
rem
ent K
PIs
, ex
–La
te s
tarts
, Pla
n vs
. Act
ual c
ost
varia
nts,
% P
lann
ed v
s. R
eact
ive
Mai
nten
ance
, etc
–In
tegr
ated
Cap
ital S
pend
Pro
gram
, ex
–C
apita
l Pro
ject
revi
ew a
nd a
ppro
val p
roce
ss th
at
cont
rols
all
capi
tal w
ork,
usi
ng c
onsi
sten
t app
rova
l crit
eria
, fun
ding
gat
es, v
aria
nce
repo
rting
an
d pr
ovid
es d
etai
led
cost
vis
ibilit
y of
all
plan
ned
com
mitm
ents
and
actu
als
real
tim
e–
Fully
inte
grat
ed R
esou
rce
Sche
dulin
g ap
plic
atio
n , e
x -
Cre
ws
and
helic
opte
r pa
iring
abi
lity
iden
tifie
d in
the
syst
em w
ith s
peci
fic tr
aini
ng a
nd c
ertif
icat
ions
(bird
on
a w
ire in
spec
tions
) ,
equi
pmen
t –av
aila
bilit
y is
inte
grat
ed to
HR
wor
k sc
hedu
les,
leav
e, e
tc. a
nd F
leet
mgn
tsys
tem
to
sho
w tr
ue re
cour
se a
vaila
bilit
y
–S
tand
ardi
zed
Rep
etiti
ve w
ork
job
plan
s, e
x –
Insu
lato
r rep
lace
men
t job
can
be
‘Pre
-pla
nned
’, th
en c
opie
d in
to th
e w
ork
orde
r whe
neve
r it i
s ne
eded
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -T
rans
mis
sion
Exhibit __ (ISP-3) Page 41 of 84
150
-42
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–Tr
ansm
issi
on .
. . c
ontin
ued
A
sset
Man
agem
ent
–St
anda
rd L
ocat
ion
and
Asse
t Hie
rarc
hy d
efin
ition
s, e
x –
Hie
rarc
hica
l re
pres
enta
tion
of lo
catio
ns w
here
equ
ipm
ent i
s in
stal
led.
Log
ical
bre
akdo
wn
of
stor
age
faci
litie
s, p
umpi
ng s
tatio
ns, t
rans
mis
sion
line
s, d
istri
butio
n lin
es a
nd
met
er to
the
prem
ise
–st
anda
rd re
pres
enta
tion
of e
quip
men
t lin
ked
to
suba
ssem
blie
s an
d sp
are
parts
list
s–
Com
mon
Loc
atio
n an
d Eq
uipm
ent d
ata
reco
rds,
ex
–Lo
catio
ns s
how
com
mon
ge
ospa
tial c
oord
inat
es s
hare
d w
ith G
IS s
yste
m a
nd d
istri
butio
n su
bsta
tion
re
cord
s, c
onta
inin
g re
quire
d da
ta fi
elds
like
des
crip
tion,
vol
tage
, circ
uit I
D, e
tc.
Equi
pmen
t rec
ords
als
o ha
d re
quire
d da
ta fi
elds
like
mak
e, m
odel
, man
ufac
ture
, cl
ass,
sub
clas
s an
d at
tribu
te s
peci
fic d
etai
ls (m
ater
ials
of c
onst
ruct
ions
, siz
e pa
ram
eter
s, e
tc)
–In
tegr
ated
Ass
et a
nd W
ork
Man
agem
ent h
isto
ry, e
x –
Wor
k or
ders
are
writ
ten
agai
nst a
prim
ary
Equi
pmen
t rec
ord
(man
dato
ry d
esig
n se
tting
), th
us li
nkin
g al
l w
ork
hist
ory
to th
at e
quip
men
t rec
ord
–in
clud
ing
spec
ifics
rela
ted
to c
osts
, fa
ilure
type
cau
se c
odes
, par
ts re
plac
ed, e
tc.
–St
anda
rdiz
ed P
rev/
Pred
Mai
nten
ance
pla
ns p
er c
ritic
al E
quip
men
t Cla
ss a
nd
Sub-
Cla
ss, e
x –
Rel
iabi
lity
Engi
neer
s de
fine
‘Crit
ical
’equ
ipm
ent a
nd th
e sp
ecifi
c m
aint
enan
ce s
teps
that
nee
d to
be
perfo
rmed
on
regu
lar b
asis
–th
ey th
en
mon
itor p
erfo
rman
ce o
f the
se p
erio
dic
wor
k or
ders
and
ana
lyze
resu
lts o
f re
pair/
mai
nten
ance
tren
ds to
insu
re h
ighe
st re
liabi
lity
of th
ese
asse
ts–
Inte
grat
ed G
IS, A
sset
and
Wor
k M
anag
emen
t pro
cess
es, e
x –
Def
ine
shar
ed
proc
ess
and
data
requ
ired
to b
e co
nsis
tent
in a
ll th
ree
of th
ese
syst
ems
to
enab
le c
lear
vis
ibilit
y of
failu
res
occu
rrin
g an
d ac
tiviti
es p
erfo
rmed
acr
oss
al
asse
ts–
Asse
t Man
agem
ent S
trate
gy d
riven
-Eq
uipm
ent t
rend
ana
lysi
s, e
x –
Stra
tegy
de
velo
ped
to m
ove
entir
e fle
et o
f ass
ets
to a
mor
e re
liabl
e m
ode
. Sh
ould
def
ine
how
the
orga
niza
tion
will
mov
e aw
ay fr
om ‘R
eact
ive’
mai
nten
ance
into
mor
e of
a
mod
e of
pla
nned
, con
trolle
d an
d m
uch
less
cos
tly m
aint
enan
ce o
f al
l ass
ets
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -T
rans
mis
sion
Exhibit __ (ISP-3) Page 42 of 84
151
-43
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–C
usto
mer
C
ross
Cus
tom
er O
pera
tions
–Pr
ovid
e gr
eate
r abi
lity
for f
irst c
onta
ct re
solu
tion
and
shor
terc
ycle
tim
es.
Ach
ieve
vis
ibilit
y of
wor
k to
faci
litat
e co
mm
unic
atio
n w
ith c
usto
mer
s
–St
abiliz
e th
e cu
stom
er in
form
atio
n sy
stem
in R
hode
Isla
nd G
as. F
or th
e la
st
coup
le o
f yea
rs R
hode
Isla
nd G
as c
usto
mer
ser
vice
hav
e be
en s
uffe
ring
amon
g ot
her r
easo
ns d
ue to
the
inst
abilit
y of
the
CIS
"Adv
anta
ge".
Late
ly a
num
ber o
f fix
es h
ave
been
app
lied
to th
e sy
stem
, but
in a
vera
ge th
e sy
stem
keep
s fa
iling
two
to th
ree
times
per
mon
th
–En
sure
that
the
skills
to o
pera
te a
nd m
aint
ain
the
cust
omer
sys
tem
s pl
atfo
rm
exis
t in
the
futu
re.
The
com
pany
sho
uld
mai
ntai
n a
supp
ort o
rgan
izat
ion
and
mak
e su
re th
at th
ere
will
be fu
ture
gen
erat
ions
ava
ilabl
e to
mai
ntai
n an
d op
erat
e th
e cu
stom
er p
latfo
rms
B
illin
g
–Pr
oact
ive
coor
dina
tion
of ra
te c
ases
–eq
uita
ble
cost
reco
very
and
indu
stry
le
ader
ship
.
–Ab
ility
to a
dopt
and
impl
emen
t cha
nges
to ra
tes
(Pric
e, W
eath
er u
sage
, etc
..)
and
com
ply
with
rate
cas
es
–Ac
hiev
e co
mm
on b
ill pr
esen
tmen
t / h
ouse
hold
cap
abilit
y to
hel
p in
crea
se
cust
omer
sat
isfa
ctio
n
–Ac
hiev
e au
tom
atio
n in
billi
ng th
e la
rges
t acc
ount
s to
avo
id e
rrors
and
incr
ease
pr
oduc
tivity
–Pr
ovid
e th
e ab
ility
to p
erfo
rm S
umm
ary
Billi
ng fo
r all
lines
of b
usin
ess
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -C
usto
mer
Exhibit __ (ISP-3) Page 43 of 84
152
-44
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–C
usto
mer
. . .
con
tinue
d
C
usto
mer
Car
e
–Pr
ovid
e a
cons
iste
nt C
usto
mer
exp
erie
nce
refle
ctin
g th
e N
atio
nalG
rid b
rand
. Pr
ovid
e cr
oss
LoB
colla
bora
tion
to d
eliv
er e
nhan
ced
cust
omer
ser
vice
. Bei
ng
able
to tr
ack
a cu
stom
er th
ru th
eir e
ntire
life
cycl
e w
ith N
G
–Pr
ovid
e m
ultip
le c
hann
els
avai
labl
e to
impr
ove
acce
ss a
nd c
usto
mer
ser
vice
and
to
redu
ce c
osts
. D
evel
op a
nd im
plem
ent m
echa
nism
s th
at w
ill al
low
NG
'scu
stom
ers
to e
stab
lish
a cl
oser
rela
tions
hip
with
the
com
pany
and
als
o so
they
ca
n pe
rform
mor
e ac
tiviti
es in
depe
nden
tly (i
.e. C
usto
mer
sel
f ser
vice
, IVR
/ C
TI,
elec
troni
c bi
ll pr
esen
tmen
t, et
c.)
–Pr
ovid
e ac
cess
to a
nd fr
eque
ncy
of O
utag
e in
form
atio
n up
date
s. M
ake
it ea
sy fo
r C
usto
mer
Age
nts
to v
iew
and
use
info
rmat
ion
and
mak
e su
re th
at th
e in
form
atio
n is
alig
ned
for p
hone
and
web
use
.
–In
tegr
ate
outb
ound
not
ifica
tion
calls
into
out
age
upda
te c
omm
unic
atio
ns (b
oth
for
plan
ned
and
unpl
anne
d)
–Bu
ild a
robu
st K
now
ledg
e M
anag
emen
t sys
tem
to in
crea
se e
ffici
ency
of c
onta
ct
cent
er s
taff
and
to in
crea
se c
onsi
sten
cy o
f inf
orm
atio
n an
d tre
atm
ent w
ith
cust
omer
s
–D
evel
op a
n e-
busi
ness
pla
tform
cap
able
of p
rovi
ding
all
arou
nd e
-ser
vice
s th
at
incl
udes
all
of N
atio
nal G
rid s
take
hold
ers
(e.g
. cus
tom
ers,
con
tract
or
elec
trici
ans,
plu
mbe
rs, e
tc) t
o be
abl
e to
do
busi
ness
with
NG
mor
e ef
ficie
ntly
–Pr
ovid
e th
e ab
ility
for N
G’s
cust
omer
s to
onl
y ha
ve to
do
busi
ness
with
one
co
ntac
t cen
ter f
or g
as a
nd e
lect
ric
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -C
usto
mer
Exhibit __ (ISP-3) Page 44 of 84
153
-45
-
Bus
ines
s Im
pera
tives
and
Cap
abili
ties
–C
usto
mer
. . .
con
tinue
d
A
ccou
nt M
anag
emen
t–
Impr
ove
and
incr
ease
the
mec
hani
sms
for c
usto
mer
s to
mak
e pa
ymen
ts
–El
imin
ate
or g
reat
ly re
duce
the
oper
atio
nal i
ssue
s ca
usin
g cu
stom
er
diss
atis
fact
ion
in th
e ar
ea o
f pay
men
t pro
cess
ing
(mis
s-ap
plie
d pa
ymen
ts)
–Ad
dres
s ba
d de
bt m
itiga
tion.
Hav
ing
the
tool
s an
d pr
oces
ses
to c
orre
ctly
fo
reca
st, r
epor
t and
con
trol b
ad d
ebt i
n al
l CIS
s
A
MI –
Smar
t Met
erin
g–
Ensu
re th
at th
e C
usto
mer
Ope
ratio
ns b
usin
ess
proc
esse
s an
d te
chno
logi
cal
plat
form
s su
ppor
t NG
in b
ecom
ing
a le
ader
in th
e Sm
art G
rid a
rena
. –Pe
ndin
g co
nver
satio
n w
ith A
MI G
roup
M
arke
ting
–Ac
hiev
e an
effi
cien
t cus
tom
er m
anag
emen
t cap
abilit
y fo
r Mar
ketin
g
R
epor
ting
/ Ana
lytic
s–
Hav
e th
e ab
ility
to p
erfo
rm b
asic
bus
ines
s an
alys
is b
y be
ing
able
to d
rill d
own
to
the
deta
ils o
f bus
ines
s tra
nsac
tions
–Pr
ovid
e ab
ility
to m
anag
e pe
rform
ance
. Cur
rent
ly u
nabl
e du
e to
diff
eren
t sy
stem
s ho
ldin
g al
l mas
ter a
nd tr
ansa
ctio
nal d
ata,
als
o du
e to
dat
a in
tegr
ity
issu
es–
Achi
eve
cons
iste
ncy
in th
e fin
anci
al re
porti
ng a
nd c
ontro
ls
Port
folio
Man
agem
ent
Rat
e Fi
lings
/ R
even
ue
Com
plia
nce
Rel
iabi
lity
& S
afet
y
Ope
ratin
g / M
anag
emen
t
Peop
le
Cos
t
Ass
et a
nd W
ork
Man
agem
ent
Cap
ital M
anag
emen
t
Cus
tom
er
Fund
ing
Alte
rnat
ives
Bus
ines
s Im
pera
tives
Bus
ines
s C
apab
ilitie
s -C
usto
mer
Exhibit __ (ISP-3) Page 45 of 84
154
App
licat
ion
Mig
ratio
n Im
pact
Ana
lysi
s
Exhibit __ (ISP-3) Page 46 of 84
155
-47
-
US
App
licat
ion
Land
scap
e -C
urre
nt S
tate
Met
ers
HR
SHES
(inc
iden
t m
gmt /
bus
. con
tinui
ty,
emer
genc
y pl
anni
ng)
Mar
ket P
lann
ing
and
Mar
ketin
g
Sal
es
Ene
rgy
Pur
chas
ing
Ris
k M
anag
emen
t (T
radi
ng /
Mar
kete
rs)
Ris
k M
anag
emen
t (C
usto
mer
Cre
dit)
Mar
kete
r Billi
ng
Cus
tom
er B
illing
Dat
a W
areh
ouse
/R
epor
ting
Fina
ncia
l C
onso
lidat
ion
Con
tract
M
anag
emen
t
OM
S
Wor
k M
anag
emen
t
Flee
t and
Fa
cilit
ies
Asse
t M
anag
emen
t
Wor
k Sc
hedu
ling
Asse
t R
epos
itory
GIS
Mob
ile
Bac
k O
ffice
(P
rocu
rem
ent,
Sto
res,
Fi
nanc
ials
)
RI
Dis
trib
utio
nG
asE
lect
ricity
Gas
Ele
ctric
ityLI
PA
Gas
US
T&D
US
KSE
CH
I VM
S LN
G
PC
AD
N/A
Vis
ion
FMFl
eetA
nyw
here
Max
imo
Com
puta
pole
Syc
lo
STO
RM
S
iSch
edul
e Bas
sTrig
on
Mw
ork
(FFE
)
Max
imo
Flee
t Any
whe
re
Ora
cle/
Pow
erP
lant
/ Man
hatta
n
ES
RI
Max
imo
MD
SI
Max
imo
FIS
CH
I VM
S
Max
imo
CW
Q
LMS
CA
RE
SLT
SP
ower
On
TOA
GE/
SW
ES
RI N
RG
DIS
SPI
PE
GE/
SWG
ASC
AR
GE/
SW
ES
RI (
NE
) N
RG
(LI/N
YC)
GE/
SW
Peo
pleS
oft /
Pow
erP
lant
/ Man
hatta
n
Bass
Trig
onBa
ssTr
igon
(1.L
I, 2.
NE
, 3.N
YC)
RI
RI,
NH
MA
, NYS
NYS
LI
NH
, MA
NY
C, L
I
Sha
red
with
U
S T
&D
?
Max
imo
Pla
nnin
gS
ched
ulin
g
CH
I -->
NE
, RI
FIS
--> L
I
LDC
ME
nerg
y V
isio
nV
ario
us
Peo
ples
oft
Ene
rgy
Vis
ion
BM
S C
MC
SM
BS
CR
IS/C
AS
CA
S/E
BOC
SS
Adv
anta
ge
ON
YX D
WH
M
yQuo
tes
Sie
bel
ON
YX
N/A
ON
YX
MS
SM
ETR
ETE
KE
RT
MIT
SM
DB
ON
YXS
iebe
liA
venu
e
Mic
rost
rate
gies
Bob
j
LIM
S / E
MIS
N/A
N/A
PC
S
Nuc
leus
OSS
/Cou
gar
CD
W/IS
OG
SA/T
SAE
AS
iGM
S
Nuc
leus
N/A
Hyp
erio
n (E
ssba
se/ P
illar)
AM
S
AM
S
AM
S
Peo
pleS
oft (
Mai
nfra
me)
RM
SST
AR
S
Hyp
erio
n (E
ssba
se/ P
illar)
Ora
cle
Peo
pleS
oft
AC
IS
Out
sour
ced
Max
imo
(NE
)C
CH
(LI,
NYC
)
IMS
/ Stro
hl
RI
Dis
trib
utio
nG
asE
lect
ricity
Gas
Ele
ctric
ityLI
PA
Gas
US
T&D
US
KSE
Lege
nd:
Sha
red
serv
ice
capa
bilit
ies
Exhibit __ (ISP-3) Page 47 of 84
156
-48
-
Fron
t Offi
ce -
Gas
Sc
hedu
le P
roce
ss a
nd S
yste
m d
esig
n ef
fort
as c
lose
as
poss
ible
on
the
front
end
of th
is ti
mel
ine
Th
e us
e of
mis
sion
s cr
itica
l, sp
ecia
lized
bus
ines
s re
sour
ces
will
need
to b
e co
ordi
nate
d ca
refu
lly
with
the
busi
ness
to m
inim
ize
adve
rse
effe
ct to
dai
ly G
as O
pera
tions
Si
mpl
ified
, Com
mon
and
Sta
ndar
dize
d Pr
oces
ses
and
Syst
ems
Des
ign
mus
t be
quic
kly
defin
ed,
agre
ed u
pon
and
docu
men
ted
M
eter
Ser
vice
s th
at a
re c
urre
ntly
m
anag
ed u
sing
one
pro
cess
es, b
y th
e G
as g
roup
Po
tent
ial d
iffer
ence
s in
how
GIS
is
inte
grat
ed in
to R
I Gas
Cus
tom
er
proc
esse
s w
hen
mig
rate
d to
CSS
Fi
nanc
ial A
sset
Man
agem
ent
proc
esse
s an
d in
tegr
ated
sys
tem
s m
ay b
e ef
fect
ed b
y th
e ch
ange
s in
the
Gas
Fro
nt O
ffice
gro
up
Dis
-inte
grat
ion
IS C
onsi
dera
tions
Scen
ario
-Spe
cific
C
onsi
dera
tions
Cur
rent
Sta
te
Scen
ario
Det
ails
Sce
nario
1
Sig
nific
ant i
nter
face
des
ign
reso
urce
s ne
eded
from
Gas
Sce
nario
2
Ear
lier r
ealiz
atio
n of
ben
efits
for
RI G
as
Sce
nario
2A
R
I and
LI G
as C
usto
mer
s be
nefit
so
oner
Sce
nario
4
Gas
reso
urce
requ
irem
ents
m
ore
dist
ribut
ed, b
ut b
enef
its w
ill
take
long
er
Met
ers
OM
S
Wor
k M
anag
emen
t
Asse
t M
anag
emen
t
Wor
k Sc
hedu
ling
Asse
t R
epos
itory
GIS
Mob
ile
RI
Dis
trib
utio
nG
asG
asG
as
US
T&D
US
KSE
CH
I VM
S LN
G
PC
AD
N/A
STO
RM
S
iSch
edul
e
Bas
sTrig
on
Mw
ork
(FFE
)M
DS
I
Max
imo
FIS
CH
I VM
S
Max
imo
CW
Q
LMS
LTS
GE/
SW
ES
RI N
RG
DIS
SPI
PE
GE/
SWG
ASC
AR
ES
RI (
NE
) N
RG
(LI/N
YC)
GE/
SW
Bass
Trig
onBa
ssTr
igon
(1.L
I, 2.
NE
, 3.N
YC)
RI
NYS
NH
, MA
NY
C, L
I
MS
SM
ETR
ETE
KM
ITS
MD
BA
MS
A
MS
M
eter
s
OM
S
Wor
k M
anag
emen
t
Asse
t M
anag
emen
t
Wor
k Sc
hedu
ling
Asse
t R
epos
itory
GIS
Mob
ile
RI
Dis
trib
utio
nG
asG
asG
as
US
T&D
US
KSE
SA
P –
Wor
k M
gmt.
Com
mon
GIS
RI
NYS
NH
, MA
NY
C, L
I
Targ
et S
tate
SA
P –
EA
M
AB
B
SyC
lo/ C
lickS
W
Exhibit __ (ISP-3) Page 48 of 84
157
-49
-
Fron
t Offi
ce -
Elec
tric
El
ectri
c FO
and
Cus
tom
er p
roce
ss a
nd s
yste
m in
tegr
atio
n is
crit
ical
to th
e su
cces
s of
this
effo
rt –
coor
dina
tion
of th
is d
esig
n w
ill re
quire
FTE
reso
urce
s fro
m b
oth
area
s
GIS
, Clic
k, S
yclo
, SAP
and
CSS
sys
tem
con
figur
atio
n an
d M
aste
r Dat
a de
sign
will
requ
ire n
ew
stan
dard
s to
be
deve
lope
d an
d fo
llow
ed in
man
y ar
eas
D
ue d
iligen
ce o
f the
det
ails
beh
ind
how
lega
cy s
yste
ms
are
wor
king
and
the
full
unde
rsta
ndin
g of
th
e ‘T
rue’
busi
ness
requ
irem
ents
will
driv
e ho
w q
uick
ly th
ese
com
mon
pro
cess
es a
nd s
yste
ms
can
be d
efin
ed a
nd b
uilt
EF
O p
roce
sses
and
sys
tem
s w
ill ne
ed
to fu
lly in
tegr
ate
with
the
new
ABB
O
MS
durin
g th
ese
rele
ases
In
-flig
ht G
IS (G
ESW
) enh
ance
men
ts
will
need
to b
e co
nsid
ered
dur
ing
the
proc
ess
and
syst
em d
esig
n re
quire
men
ts
M
obile
‘Ini
tiativ
es’w
ill ne
ed to
co
ordi
nate
effo
rts w
ith th
is p
roje
ct a
s st
anda
rds
for i
dent
ifyin
g m
ater
ials
, co
ntra
ctor
s, s
tora
ge lo
catio
ns,
timek
eepi
ng, e
tc w
ill be
rede
sign
ed
Dis
-inte
grat
ion
IS C
onsi
dera
tions
Cur
rent
Sta
te
Scen
ario
Det
ails
Sce
nario
1
Sig
nific
ant i
nter
face
des
ign
reso
urce
s ne
eded
from
Ele
ctric
Sce
nario
2
Ele
ctric
invo
lved
ear
ly in
des
ign,
bu
t ben
efits
late
r
Sce
nario
2A
E
lect
ric in
volv
ed e
arly
in d
esig
n,
but b
enef
its la
ter
Sce
nario
4
Sm
art G
rid e
fforts
can
pro
ceed
w
ith in
tegr
atin
g to
CS
S
Met
ers
OM
S
Wor
k M
anag
emen
t
Asse
t M
anag
emen
t
Wor
k Sc
hedu
ling
Asse
t R
epos
itory
GIS
Mob
ile
Elec
trici
tyEl
ectri
city
LIPA
US
T&D
US
KSE
STO
RM
S
iSch
edul
e
Max
imo
Com
puta
pole
Mw
ork
(FFE
)M
DS
I
Max
imo
Pla
nnin
gS
ched
ulin
g
CA
RE
SP
ower
On
TOA
GE/
SW
ES
RI
GE/
SW
RI,
NH
MA
, NYS
LI ER
TM
ITS
AM
S
AM
S
Met
ers
OM
S
Wor
k M
anag
emen
t
Asse
t M
anag
emen
t
Wor
k Sc
hedu
ling
Asse
t R
epos
itory
GIS
Mob
ile
Elec
trici
tyEl
ectri
city
LIPA
US
T&D
US
KSE
Max
imo
Com
mon
GIS
RI,
NH
MA
, NYS
NH
, MA
NY
C, L
I
Targ
et S
tate
SA
P –
EA
M
Pow
erO
n/O
ther
SyC
lo/ C
lickS
WS
yclo
Max
imo
CA
RE
S
MD
SI
Com
mon
GIS
SA
P W
ork
Mgm
t. Sc
enar
io-S
peci
fic
Con
side
ratio
ns
Exhibit __ (ISP-3) Page 49 of 84
158
-50
-
Cus
tom
er
Be
fore
dec
idin
g to
mig
rate
CR
IS a
dec
isio
n sh
ould
be
mad
e on
whi
ch C
usto
mer
pla
tform
will
the
long
-term
cho
ice
(CSS
or S
AP)
AM
I (Sm
art m
eter
ing)
sho
uld
be c
oord
inat
ed w
ith th
e C
IS m
igra
tions
to a
void
com
petin
g pr
iorit
ies
for r
esou
rces
The
com
pany
wid
e e-
busi
ness
pla
tform
initi
ativ
e sh
ould
be
alig
ned
to m
inim
ize
rew
ork
Lo
ng Is
land
Gas
and
LIP
A sh
are
the
use
of C
AS. I
f ope
ratio
ns re
mai
n un
der N
G, a
dec
isio
n w
ill ne
ed to
be
mad
e to
avo
id d
isin
tegr
atio
n of
op
erat
ions
by
tem
pora
rily
havi
ng tw
o C
IS p
latfo
rms
for o
ne s
uppo
rting
gr
oup.
Th
e de
cisi
on o
f whi
ch C
IS w
ill be
com
e th
e lo
ng te
rm p
latfo
rm m
ight
impa
ct
the
sele
ctio
n an
d de
ploy
men
t effo
rt of
th
e C
RM
App
licat
ion
A
num
ber o
f cap
abilit
ies
impa
ctin
g th
e El
ectri
c lin
e of
bus
ines
s m
ight
be
post
pone
d to
cov
er th
e ur
genc
ies
in
the
gas
cust
omer
ope
ratio
ns
Dis
-inte
grat
ion
IS C
onsi
dera
tions
Cur
rent
Sta
te
Scen
ario
Det
ails
Scen
ario
1D
oes
not a
ddre
ss th
e ur
genc
y of
re
plac
ing
RI-G
as C
IS (A
dvan
tage
)
Scen
ario
2E
arly
inte
grat
ed C
usto
mer
pla
tform
to
pro
vide
the
base
line
for f
utur
e de
ploy
men
ts
Scen
ario
2A
Add
ress
ing
tech
nica
l (R
I) an
d re
gula
tory
(LI)
requ
irem
ents
, but
de
man
ds b
ig e
ffort
in te
rms
of
reso
urce
s
Scen
ario
4A
ddre
sses
tech
nica
l urg
enci
es a
s w
ell a
s in
tegr
ated
dep
loym
ents
with
FO
Targ
et S
tate
SH
ES
(in
cide
nt m
gmt /
bu
s. c
ontin
uity
, em
erge
ncy
plan
ning
)
Cus
tom
er B
illin
g
RI
Dis
tribu
tion
Gas
Elec
trici
tyG
asEl
ectri
city
LIPA
Gas
US
T&D
US
KSE
CR
IS/C
AS
CA
S/E
BOC
SS
Adv
anta
ge
LIM
S / E
MIS
N/A
N/A
PC
S
RI
RI,
NH
MA
, NYS
NYS
LI
NH
, MA
NY
C, L
I
IMS
/ Stro
hl
SH
ES
(in
cide
nt m
gmt /
bu
s. c
ontin
uity
, em
erge
ncy
plan
ning
)
Cus
tom
er B
illin
g
RI
Dis
tribu
tion
Gas
Elec
trici
tyG
asEl
ectri
city
LIPA
Gas
US
T&D
US
KSE
CA
SC
SS
or S
AP
Targ
et S
tate
RI
RI,
NH
MA
, NYS
NYS
LI
NH
, MA
NY
C, L
I
CS
S o
r SA
P
Scen
ario
-Spe
cific
C
onsi
dera
tions
Exhibit __ (ISP-3) Page 50 of 84
159
-51
-
Bac
k O
ffice
H
R -
Tem
pora
ry in
terfa
ces
will
need
to b
e de
sign
ed a
nd b
uilt
to re
ceiv
e w
ork
orde
r tim
e ch
arge
s fro
m
lega
cy E
AM s
yste
ms
as w
ell a
s ex
porti
ng s
kills
dat
a to
lega
cy s
yste
ms.
FI
–M
igra
tion
path
for c
onso
lidat
ion
/ rep
lace
men
t of P
ower
Plan
tdep
enda
nt o
n im
pact
on
lega
cy w
ork
orde
r sys
tem
s an
d de
velo
pmen
t of S
AP fu
nctio
nalit
y.
All –
Sign
ifica
nt m
odifi
catio
ns to
lega
cy s
yste
ms
durin
g m
igra
tion
tosu
ppor
t SAP
cod
e bl
ock
desi
gn,
cons
olid
atio
n of
mat
eria
l and
inve
ntor
y sy
stem
s as
wel
l as
HR
Em
ploy
ee d
ata
BI
–N
eed
to c
onsi
der m
igra
tion
to a
sin
gle
Ente
rpris
e da
ta w
areh
ouse
and
repo
rting
pla
tform
SC
–Se
lect
ion
of a
com
mon
har
dwar
e fo
r mob
ile /
hand
held
ope
ratio
nsin
sup
ply
chai
n
N
o an
ticip
ated
issu
es
Dis
-inte
grat
ion
IS C
onsi
dera
tions
Scen
ario
-Spe
cific
C
onsi
dera
tions
Cur
rent
Sta
te
Scen
ario
Det
ails
Scen
ario
1
Hig
hest
regr
et c
ost
pote
ntia
l
Scen
ario
2
C
halle
nges
with
ru
nnin
g a
fully
-in
tegr
ated
BO
/ FO
/Cus
tom
er fo
r RI
and
lega
cy in
tegr
atio
n re
st o
f Gas
Scen
ario
2A
M
ost u
p-fro
nt d
esig
n co
ordi
natio
n (B
O,
Cus
tom
er, F
O)
Scen
ario
4
Mos
t thr
ow-a
way
BO
in
terfa
ces
Targ
et S
tate
HR
Dat
a W
areh
ouse
/R
epor
ting
Fina
ncia
l C
onso
lidat
ion
Con
tract
M
anag
emen
t
Flee
t and
Fa
cilit
ies
Bac
k O
ffice
(P
rocu
rem
ent,
Sto
res,
Fi
nanc
ials
)
RI
Dis
trib
utio
nG
asE
lect
ricity
Gas
Ele
ctric
ityLI
PA
Gas
US
T&D
US
KSE
Flee
tAny
whe
reFl
eet A
nyw
here
Ora
cle/
Pow
erP
lant
/ Man
hatta
nP
eopl
eSof
t / P
ower
Pla
nt/ M
anha
ttan
RI
RI,
NH
MA
, NYS
NYS
LI
NH
, MA
NY
C, L
I
Sha
red
with
US
T&
D?
Peo
ples
oft
Mic
rost
rate
gies
Bob
j
Hyp
erio
n (E
ssba
se/ P
illar)
Peo
pleS
oft (
Mai
nfra
me)
Hyp
erio
n (E
ssba
se/ P
illar)
Ora
cle
Peo
pleS
oft
AC
ISM
axim
o (N
E)C
CH
(LI,
NYC
)
HR
Dat
a W
areh
ouse
/R
epor
ting
Fina
ncia
l C
onso
lidat
ion
Con
tract
M
anag
emen
t
Flee
t and
Fa
cilit
ies
Bac
k O
ffice
(P
rocu
rem
ent,
Sto
res,
Fi
nanc
ials
)
RI
Dis
trib
utio
nG
asE
lect
ricity
Gas
Ele
ctric
ityLI
PA
Gas
US
T&D
US
KSE
RI
RI,
NH
MA
, NYS
NYS
LI
NH
, MA
NY
C, L
I
Mic
rost
rate
gies
Bob
j
SA
P –
SR
MS
AP
–S
RM
AC
ISM
axim
o (N
E)C
CH
(LI,
NYC
)
SA
P –
Flee
t Man
agem
ent
SA
P –
EC
C
SA
P –
EC
C
SA
P –
BP
C
Exhibit __ (ISP-3) Page 51 of 84
160
Rou
tem
apIn
itiat
ives
Exhibit __ (ISP-3) Page 52 of 84
161
-53
-
A s
et o
f IS
impe
rativ
es h
ave
been
dev
elop
ed th
at re
flect
bus
ines
s im
pera
tives
/ pr
iorit
ies
and
IS d
river
s th
at im
pact
ser
vice
del
iver
y ef
ficie
ncy
and
effe
ctiv
enes
s
Bus
ines
s Im
pera
tives
Port
folio
Man
agem
ent:
Cre
ate
a po
rtfol
io o
f bus
ines
ses
that
con
sist
ently
del
iver
s co
mpe
lling
IRR
per
form
ance
. D
ives
t and
acq
uire
as
nece
ssar
y
Cus
tom
er: C
reat
e in
dust
ry le
adin
g cu
stom
er s
atis
fact
ion
by o
ptim
izin
g th
e cu
stom
er e
xper
ienc
e w
ithin
and
acr
oss
Gas
and
Ele
ctric
Rat
e Fi
lings
/ R
even
ue: O
ptim
ize
the
effe
ctiv
enes
s an
d ef
ficie
ncy
of ra
te fi
lings
Rel
iabi
lity
& S
afet
y: Im
prov
e re
liabi
lity
leve
ls a
nd s
afet
y le
vels
Com
plia
nce:
Opt
imiz
e R
egul
ator
y an
d Fi
nanc
ial C
ompl
ianc
e in
clud
ing
IFR
S
com
plia
nce
alig
nmen
t with
GA
AP
Ope
ratin
g/M
anag
emen
t:D
rive
effe
ctiv
enes
s an
d ef
ficie
ncy
thro
ugh
a LO
B
stru
ctur
e an
d co
mm
on o
pera
ting
mod
el
Peop
le: E
ffici
ently
sou
rce,
trac
k an
d de
velo
p ta
lent
to s
uppo
rt th
e bu
sine
ss’a
bilit
y to
ope
rate
and
del
iver
ser
vice
s
Cos
t: C
onsi
der a
ltern
ativ
e S
ourc
ing
to c
reat
e m
ore
varia
ble
cost
s an
d ta
ke
adva
ntag
e of
sca
le
Cap
ital M
anag
emen
t: O
ptim
ize
Cap
ital I
nves
tmen
ts to
mai
ntai
n/en
hanc
e re
liabi
lity
and
plan
fina
ncia
l pro
ject
ions
and
per
form
ance
met
rics
Ass
et &
Wor
k M
anag
emen
t: O
ptim
ize
utili
zatio
n/pe
rform
ance
, tra
nsiti
on a
nd
repl
acem
ent o
f ass
ets
and
enab
le e
ffici
ent,
seam
less
del
iver
y of
wor
k
Fund
ing
Alte
rnat
ives
: Effe
ctiv
ely
leve
rage
regu
lato
ry a
nd fe
dera
l opt
ions
for
furth
er c
apita
l inv
estm
ents
(e.g
. Sm
art G
rid, E
nerg
y E
ffici
ency
,Alte
rnat
ive
Ene
rgy)
Rou
tem
apIS
Impe
rativ
es
Cre
ate
flexi
ble
IT a
rchi
tect
ures
that
faci
litat
e ra
pid
acqu
isiti
on o
r div
estit
ure
of
busi
ness
es
Pro
vide
a s
tand
ard,
com
preh
ensi
ve c
usto
mer
app
licat
ion
plat
form
that
ena
bles
a
sing
le v
iew
of t
he c
usto
mer
and
ena
bles
hig
h va
lue
inte
ract
ions
acr
oss
the
cust
omer
life
cycl
e
Cre
ate
a st
anda
rdiz
ed b
ack
offic
e so
lutio
n th
at m
inim
izes
bus
ines
s ris
k,
auto
mat
es m
anua
l pro
cess
es, a
nd in
tegr
ates
with
com
mon
bus
ines
s pr
oces
ses
for f
inan
ce, H
R a
nd s
uppl
y ch
ain
Cre
ate
a co
mm
on fr
ont o
ffice
sol
utio
n (a
sset
, wor
k, m
obile
, dis
patc
h, G
IS) t
hat
leve
rage
s sy
nerg
ies
acro
ss th
e ga
s an
d el
ectri
c bu
sine
sses
Cre
ate
a st
anda
rdiz
ed s
et o
f m
aste
r dat
a fro
m a
com
mon
sou
rce
that
su
ppor
ts k
ey re
quire
men
ts fo
r reg
ulat
ory,
fina
ncia
l and
ope
ratio
nal r
epor
ting
Cre
ate
an e
nhan
ced
data
gov
erna
nce
stru
ctur
e an
d pr
oces
ses
whi
chen
able
de
velo
pmen
t and
exe
cutio
n of
a m
aste
r dat
a ar
chite
ctur
e th
at p
rovi
des
high
qu
ality
, sta
ndar
dize
d an
d cl
eans
ed d
ata
acro
ss a
pplic
atio
ns
Cre
ate
an e
nhan
ced
appl
icat
ion
gove
rnan
ce s
truct
ure
and
proc
esse
s th
at
man
age
the
deve
lopm
ent a
nd im
plem
enta
tion
of a
n ap
plic
atio
n po
rtfol
io
stra
tegy
and
sta
ndar
ds a
cros
s N
G
Dev
elop
a s
ourc
ing
stra
tegy
to le
vera
ge th
e sc
ale,
and
com
pete
ncie
s of
third
pa
rties
whi
ch c
an e
nabl
e lo
wer
IS o
pera
ting
expe
nse
and
high
er q
ualit
y se
rvic
e de
liver
y
Dev
elop
com
preh
ensi
ve p
rogr
am m
anag
emen
t cap
abili
ties
to e
nsur
e su
cces
sful
del
iver
y an
d va
lue
real
izat
ion
for t
he m
ajor
rout
emap
stra
tegi
c pr
ogra
ms
IS E
ffici
ency
Driv
ers
Gov
erna
nce:
Pro
vide
end
-to-e
nd o
vers
ight
on
ensu
ring
high
est v
alue
rout
emap
appl
icat
ions
and
dat
a ar
e de
liver
ed to
the
busi
ness
Red
uced
Com
plex
ity: R
educ
e/el
imin
ate
redu
ndan
t sys
tem
s, d
ata,
and
man
ual
proc
esse
s
Low
er S
ervi
ce D
eliv
ery
Cos
ts: S
tream
line
core
NG
IS c
apab
ilitie
s an
d ut
ilize
so
urci
ng o
ptio
ns fo
r non
-cor
e ca
pabi
litie
s
Exhibit __ (ISP-3) Page 53 of 84
162
-54
-
The
busi
ness
impe
rativ
es a
nd c
apab
ility
requ
irem
ents
, alo
ng w
ithth
e IS
impe
rativ
es
have
led
iden
tific
atio
n of
the
follo
win
g ne
w ro
utem
apin
itiat
ives
*
No.
Rou
tem
apG
roup
Nam
eD
escr
iptio
n
1B
ack
Offi
ceH
R, f
inan
cial
,sup
ply
chai
n an
d fle
et m
igra
tion
to s
trate
gic
SA
P
plat
form
Mig
ratio
n to
a s
tand
ard,
sin
gle
SA
P E
CC
pla
tform
; w
ill in
tegr
ate
with
exi
stin
g P
ower
plan
tsy
stem
(s) f
or re
gula
tory
acc
ount
ing;
als
o in
clud
es a
Sha
red
Ser
vice
s S
AP
busi
ness
w
areh
ouse
(BW
) an
d re
porti
ng
2G
as F
ront
Offi
ceA
sset
and
wor
k m
anag
emen
t m
igra
tion
to s
trate
gic
SA
P
plat
form
Mig
rate
to s
tand
ard
SA
P E
AM
and
Wor
k M
anag
emen
t pl
atfo
rms;
will
incl
ude
mig
ratio
n of
cu
rrent
Lea
k M
anag
emen
t sys
tem
s to
SA
P;
expa
nd S
AP
BW
to in
clud
e G
FO;
also
Incl
udes
re
-arc
hite
ctin
g an
alre
ady
cons
olid
ated
Gas
ES
RI i
nto
the
targ
et a
rchi
tect
ure
3G
as F
ront
Offi
ceG
IS c
onso
lidat
ion
on s
trate
gic
ES
RI p
latfo
rmE
arly
mig
ratio
n (a
head
of G
FO S
AP
tran
sitio
n) o
f all
Gas
GIS
from
1).
Smal
lwor
ld 4
.0 N
E
inst
ance
, 2)
. NR
G d
owns
tate
NY
, 3)
. Sm
allw
orld
3.1
.2 U
p-st
ate
NY
and
KS
to e
xist
ing
ES
RI
Gas
(MA
& N
H) i
nsta
nce;
inc
lude
s de
com
mis
sion
ing
of 1
& 2
onl
y
4
Gas
Fro
nt O
ffice
Mob
ile a
nd M
eter
Ser
vice
s st
rate
gic
mig
ratio
n to
Clic
k an
d S
yclo
Mig
ratio
n in
3 p
hase
s:1.
Ear
ly m
igra
tion
for R
hode
Isla
nd a
nd M
assa
chus
etts
(ahe
ad o
f the
mai
n G
FO &
ED
O
trans
ition
) to
solu
tion
set u
sing
Syc
loan
d C
lick
for G
as a
nd E
lect
ric M
eter
ing
Ser
vice
s co
verin
g th
e C
all C
entre
Cus
tom
er s
yste
m, D
ispa
tch
and
Mob
ile2.
Mig
ratio
n of
the
rem
aini
ng S
tate
s (s
ynch
roni
sed
with
GFO
tran
sitio
n) fo
r Gas
and
Ele
ctric
M
eter
ing
Ser
vice
s (s
ame
scop
e as
RI a
nd M
A a
bove
)3.
All
othe
r GFO
Mob
ile a
nd D
ispa
tch
solu
tions
to S
yclo
and
Clic
5E
lect
ric F
ront
Offi
ceA
sset
and
wor
k m
anag
emen
t m
igra
tion
to s
trate
gic
SA
P
plat
form
Mig
rate
to s
tand
ard
SA
P E
AM
and
Wor
k M
anag
emen
t pl
atfo
rms;
will
incl
ude
proj
ect a
nd
allia
nce
cons
truct
ion;
exp
ands
SA
P B
W to
incl
ude
ED
O
*Not
e: D
etai
led
initi
ativ
e pr
ofile
s w
ill be
dev
elop
ed in
imm
edia
te fo
llow
-on
step
s
Exhibit __ (ISP-3) Page 54 of 84
163
-55
-
New
Rou
tem
apIn
itiat
ives
-co
ntin
ued
No.
Rou
tem
apG
roup
Nam
eD
escr
iptio
n
6E
lect
ric F
ront
Offi
ceM
obile
and
Met
er S
ervi
ces
stra
tegi
c m
igra
tion
to C
lick
and
Syc
lo
Mig
ratio
n of
all
non-
Met
erin
g S
ervi
ces
mob
ile s
olut
ions
for E
lect
ric a
nd T
rans
mis
sion
.; w
ill b
e sy
nchr
onis
edw
ith th
e m
ain
SA
P E
DO
& T
x Fr
ont O
ffice
tran
sitio
n
7E
lect
ric F
ront
Offi
ceG
IS m
igra
tion
to s
trate
gic
ES
RI
plat
form
Mig
ratio
n of
lega
cy E
lect
ricity
GIS
Sm
allw
orld
to S
trate
gic
ES
RIs
olut
ion
as p
art o
f and
at t
he
sam
e tim
e as
the
ED
O S
AP
FO
tran
sitio
n
8G
as C
usto
mer
Rho
de Is
land
Cus
tom
er m
igra
tion
to s
trate
gic
CS
S p
latfo
rmE
arly
mig
ratio
n fro
m A
dvan
tage
& L
DC
M t
o C
SS
; in
clud
es A
dvan
tage
& L
DC
M
deco
mm
issi
onin
g an
d ch
ange
s th
e in
terfa
ces
to M
eter
ing
Ser
vice
s so
lutio
ns a
nd B
ack
Offi
ce;
incl
udes
ass
ocia
ted
Cus
tom
er B
illing
and
Bill
Prin
t
19G
as C
usto
mer
Long
Isla
nd C
usto
mer
mig
ratio
n to
st
rate
gic
CS
S p
latfo
rmM
igra
tion
of C
AS
Gas
-onl
y to
CS
S a
nd c
hang
ing
inte
rface
s to
Met
erin
g S
olut
ions
and
Bac
k O
ffice
; inc
lude
s as
soci
ated
Cus
tom
er B
illing
and
Bill
Prin
t; C
AS
for L
I Ele
ctric
ity c
usto
mer
s is
as
sum
ed to
con
tinue
(pen
ding
revi
ew o
f LIP
A S
ervi
ce A
gree
men
t )
10G
as C
usto
mer
Rem
aini
ng C
usto
mer
mig
ratio
ns
to s
trate
gic
CS
S p
latfo
rmM
igra
tion
of C
RIS
Gas
-onl
y cu
stom
ers
to C
SS
and
cha
ngin
g in
terfa
ces
to M
eter
ing
Sol
utio
ns
and
Bac
k O
ffice
; in
clud
es a
ssoc
iate
d C
usto
mer
Billi
ng a
nd B
ill P
rint.
11
CR
M S
trate
gic
Mig
ratio
n of
sal
es a
nd m
arke
ting
func
tions
and
dat
a to
stra
tegi
c C
RM
pla
tform
Mig
ratio
n to
stra
tegi
c C
RM
pla
tform
that
has
not
bee
n se
lect
ed y
et;
focu
s is
on
front
-end
sa
les
and
mar
ketin
g fu
nctio
ns (c
urre
ntly
on
Sie
bel)
and
perfo
rmin
g cu
stom
er a
naly
tics
on
cust
omer
dat
a th
at is
cur
rent
ly c
onta
ined
in s
ever
al d
ata
stor
es;
requ
irem
ents
to b
e fu
rther
re
fined
; O
ptio
nally
exp
ands
SA
P B
W to
sub
sum
e C
usto
mer
to a
lign
Cus
tom
er w
ith c
usto
mer
dr
iven
Wor
k, O
utag
e a
nd R
even
ue a
naly
sis,
etc
.
Exhibit __ (ISP-3) Page 55 of 84
164
Indi
cativ
e Fi
nanc
ial I
mpa
cts
Exhibit __ (ISP-3) Page 56 of 84
165
-57
-
RTB
Spe
nd A
void
ed -
cont
inue
d
Exhibit __ (ISP-3) Page 57 of 84
166
-58
-
RTB
Spe
nd A
void
ed -
cont
inue
d
Exhibit __ (ISP-3) Page 58 of 84
167
-59
-
Our
ana
lysi
s al
so id
entif
ied
~$35
M in
pro
ject
inve
stm
ents
that
pot
entia
lly c
an b
e el
imin
ated
by
impl
emen
ting
the
stra
tegi
c ro
utem
apin
itiat
ives
*
Canc
el, 3
5, 7
%
No C
hang
e,
308,
62%
Coor
dina
te, 6
7,
13%
TBD,
87,
18%
Can
cel
Coo
rdin
ate
No
Cha
nge
TBD
Tota
l
Tota
l Pro
ject
s30
4491
102
267
Spen
d (C
APE
X +
OPE
X)$
35 M
$ 67
M$3
08 M
$87
M$4
97 M
Pot
entia
l in
vest
men
t av
oide
d
US
Syst
em S
trat
egy
Impa
ct o
n U
S In
vest
men
t
C
ance
l: In
vest
men
t may
be
canc
elle
d as
the
requ
ired
func
tiona
lity
will
be d
eliv
ered
as
part
of
the
US
Syst
em S
trate
gy ro
utem
ap
C
oord
inat
e: R
equi
res
coor
dina
tion
with
US
Syst
em S
trate
gy ro
utem
apbe
caus
e of
de
pend
enci
es
N
o C
hang
e: U
S Sy
stem
Stra
tegy
has
littl
e or
no
impa
ct o
n th
e in
vest
men
t
TB
D: I
mpa
ct o
n th
e ro
utem
apre
quire
s fu
rther
an
alys
is
*Not
e: T
hese
est
imat
es w
ill be
furth
er re
fined
and
val
idat
ed in
imm
edia
te fo
llow
-on
step
s
Exhibit __ (ISP-3) Page 59 of 84
168
-60
-
Inve
stm
ents
to P
oten
tially
‘Can
cel’
Exhibit __ (ISP-3) Page 60 of 84
169
-61
-
Inve
stm
ents
to P
oten
tially
‘Can
cel’
-con
tinue
d
Exhibit __ (ISP-3) Page 61 of 84
170
Bur
ning
Pla
tform
App
licat
ions
Exhibit __ (ISP-3) Page 62 of 84
171
-63
-
No.
App
licat
ion
Nam
e /
Des
crip
tion
Des
crip
tion
Impa
ct o
n bu
sine
ss
Arc
hite
ctur
e/ t
echn
olog
y fit
issu
e
Prod
uctio
n st
abili
ty
Lim
ited
skill
s av
aila
bilit
y
SW v
endo
r su
ppor
t is
sues
Doe
s no
t m
eet
busi
ness
ne
eds
Lim
ited
flexi
bilit
yO
vera
ll Pr
iorit
y
Ope
ratio
nal
Cos
t($
‘000
)
1A
dvan
tage
(aka
-Ban
ner)
-RI
The
purp
ose
of th
is a
pplic
atio
n is
to
mai
ntai
n al
l cus
tom
er in
form
atio
n.
This
sys
tem
is re
ally
the
hub
for a
ll cu
stom
er in
form
atio
n. A
ll of
the
cust
omer
billi
ng, m
eter
read
ing,
ord
er
proc
essi
ng…
..etc
is c
ontro
lled
thro
ugh
this
app
licat
ion.
Hig
h
H
igh
47.8
2N
ucle
us
The
risk
syst
em (N
ucle
us, A
naly
tics,
W
eath
erD
elta
and
rela
ted
inte
rface
s)
supp
orts
hed
ging
act
iviti
es (f
inan
cial
de
rivat
ives
) and
the
purc
hase
/sal
e of
ph
ysic
al c
omm
oditi
es.
The
sys
tem
is
used
for f
inan
cial
repo
rting
, inv
oici
ng,
dete
rmin
ing
cost
of g
as. A
s of
Jan
. 20
06 N
ucle
us is
use
d to
cap
ture
all
LI
and
NY
phys
ical
gas
tran
spor
tatio
n an
d to
per
form
mon
th e
nd s
ettle
men
t. A
pplic
atio
n to
mon
itor r
isk
& e
xpos
ure
in c
omm
odity
trad
ing
syst
ems.
Hig
h
H
igh
780.
5
3TE
STi
me
entry
sys
tem
for N
G U
SH
igh
Hig
h59
.6
4C
AS
-LI
LI G
as a
nd E
lect
ric C
usto
mer
Billi
ngH
igh
H
igh
N/A
5M
axim
o C
orpo
rate
Cor
pora
te in
stan
ce to
faci
litat
e O
racl
e in
tegr
atio
n.H
igh
H
igh
11.2
6M
axim
o N
EN
E G
as W
ork
Man
agem
ent
Hig
h
Hig
h30
1.5
7M
axim
o T&
DT&
D W
ork
Man
agem
ent f
or
elec
tric/
Gas
LI &
NYC
Hig
h
Hig
h65
2.5
8LM
S-N
Y
A T
&D
leak
trac
king
sys
tem
that
re
cord
s th
e lif
e cy
cle
of a
leak
. Fu
nctio
ns in
clud
e w
ork
gene
ratio
n,
wor
k sc
hedu
ling,
PSC
and
inte
rnal
co
mpl
ianc
e re
porti
ng a
nd a
repo
sito
ry
of re
adin
g hi
stor
y.
Hig
h
Hig
h10
6.5
9LM
S-L
ILe
ak M
anag
emen
t Sys
tem
-Lon
g Is
land
Hig
h
Hig
h11
5.8
10P
eopl
eSof
t HR
N
GC
ompl
ete
HR
, Adm
in, b
enef
its –
NG
Hig
h
Hig
h10
41.9
Bur
ning
Pla
tform
App
licat
ions
(Hig
h Pr
iorit
y)
Exhibit __ (ISP-3) Page 63 of 84
172
-64
-
No.
App
licat
ion
Nam
e /
Des
crip
tion
Des
crip
tion
Impa
ct o
n bu
sine
ss
Arc
hite
ctur
e/ t
echn
olog
y fit
issu
e
Prod
uctio
n st
abili
ty
Lim
ited
skill
s av
aila
bilit
y
SW v
endo
r su
ppor
t is
sues
Doe
s no
t m
eet
busi
ness
ne
eds
Lim
ited
flexi
bilit
yO
vera
ll Pr
iorit
y
Ope
ratio
nal
Cos
t($
‘000
)
11M
AXIM
O
(Fac
ilitie
s)B
uild
ing
Mai
nten
ance
Sys
tem
Med
ium
Med
ium
43.8
12C
CH
(Con
tract
or
Cha
rges
LI &
NY)
Con
tain
s a
repo
sito
ry o
f con
stru
ctio
n co
ntra
cts
defin
ed b
y th
e cl
ient
are
a,
whi
ch a
re u
sed
to p
rice-
out a
ctua
l co
nstru
ctio
n w
ork.
Afte
r the
ap
prop
riate
app
rova
ls h
ave
been
m
ade,
cos
t dat
a is
pas
sed
to th
e ac
coun
ts p
ayab
le s
yste
m fo
r pay
men
t.
Med
ium
Med
ium
97.7
13LD
CM
M
arke
ter B
illing
Sys
tem
-R
IM
ediu
m
M
ediu
mN
/A
14LD
CM
Tra
nsla
tor
This
app
licat
ion
uses
onl
y on
e fo
rm a
s a
cont
rol p
anel
for e
xecu
ting
data
do
wnl
oads
and
upl
oads
bet
wee
n A
dvan
tage
and
LD
CM
. Eac
h co
ntro
l bu
tton
exec
utes
a m
acro
that
man
ages
da
ta ta
bles
, im
ports
a fi
xed-
leng
th te
xt
file,
con
verts
acc
ount
num
bers
and
ex
ports
a fi
xed-
leng
th te
xt fi
le. T
his
appl
icat
ion
runs
und
er A
cces
s 97
.
Med
ium
Med
ium
N/A
15M
AXIM
O (G
enco
, S
ubS
tatio
n, L
NG
)Foss
ilPl
ants
, LN
G P
lant
s, S
ubst
atio
nM
aint
enan
ce S
yste
mM
ediu
m
M
ediu
m50
.7
16C
HI
Val
ve a
nd re
gula
tor d
atab
ase
for I
&R -
New
Eng
land
& R
I onl
yM
ediu
m
Med
ium
N/A
17D
PM
SIM
S D
atab
ase
to h
old
wor
k da
ta to
in
tegr
ate
NYC
app
licat
ions
CC
H, D
IS,
Per
mits
, Pav
ing
Med
ium
M
ediu
mN
/A
18P
avin
g -K
SE
Trac
ks a
nd re
cord
s th
e pa
ving
requ
ests
th
at a
re a
ssoc
iate
d to
gas
con
stru
ctio
n an
d m
aint
enan
ce w
ork.
Con
tract
s ar
e de
fined
and
item
s ar
e pr
iced
-out
for
each
wor
k or
der.
Onc
e ap
prov
ed,
paym
ents
are
pas
sed
to th
e ac
coun
ts
paya
ble
syst
em.
Med
ium
M
ediu
m10
6.9
19S
mar
tTim
e(A
KA
SM
ARTI
)
Rul
e ba
sed
proc
ess
that
con
verts
Tim
e E
ntry
into
Pay
Det
ails
bas
ed o
n em
ploy
ee in
form
atio
n an
d un
ion
cont
ract
agr
eem
ents
. C
urre
ntly
sys
tem
ha
ndle
s 22
uni
on c
ontra
cts
alon
g w
ith
man
agem
ent r
ules
for 3
2 co
mpa
nies
.
Hig
h
M
ediu
m42
6.0
20C
RIS
Cus
tom
er B
illing
Sys
tem
for K
SE
Gas
N
YC/N
EH
igh
Med
ium
N/A
Bur
ning
Pla
tform
App
licat
ions
(Med
ium
/Low
Prio
rity)
Exhibit __ (ISP-3) Page 64 of 84
173
-65
-
No.
App
licat
ion
Nam
e /
Des
crip
tion
Des
crip
tion
Impa
ct o
n bu
sine
ss
Arc
hite
ctur
e/ t
echn
olog
y fit
issu
e
Prod
uctio
n st
abili
ty
Lim
ited
skill
s av
aila
bilit
y
SW v
endo
r su
ppor
t is
sues
Doe
s no
t m
eet
busi
ness
ne
eds
Lim
ited
flexi
bilit
yO
vera
ll Pr
iorit
y
Ope
ratio
nal
Cos
t($
‘000
)
21Fi
eld
Per
form
ance
M
anag
emen
t
Rep
ortin
g S
yste
m fo
r Fie
ld
Pro
duct
ivity
Mea
sure
men
ts fo
r Fi
eld
Ope
ratio
ns N
Y, L
I, N
ELo
w
M
ediu
mN
/A
22D
istri
butio
n In
form
atio
n S
yste
mN
YC S
ervi
ces
syst
ems
Low
Low
52.2
23W
ork
Mea
sure
men
t
Dat
a en
try is
per
form
ed in
a th
ree-
page
form
at t
he c
ompl
etio
n of
the
job.
A s
erie
s of
man
agem
ent
repo
rts a
re g
ener
ated
on
dem
and.
C
rew
leve
l per
form
ance
is n
o lo
nger
pro
vide
d.
Low
Low
N/A
24C
WQ
-C
omm
on W
ork
Que
ue
A c
omm
on p
orta
l to
man
age
gas
dist
ribut
ion
and
Gas
ser
vice
wor
k ac
ross
NY,
LI,
NE
. U
ses
spat
ial
appl
icat
ion
and
SDE
dat
abas
e.
Sys
tem
dev
ebop
edin
hous
ew
ith
vend
or c
ompo
nent
s
Hig
h
Low
531.
8
25P
eopl
eSof
t HR
-KS
EH
R, P
ayro
ll, B
enef
its fo
r Key
Spa
nH
igh
Lo
w15
80.6
26P
eopl
eSof
t Fin
anci
als
Com
plet
e pr
ojec
ts, G
LH
igh
Lo
w86
.7
27P
eopl
eSof
t S
CM
C
ompl
ete
supp
ly c
hain
, inv
ento
ry
mgm
tH
igh
Lo
w46
8.9
28LN
G P
lant
M
aint
enan
ce
An
elec
troni
c fil
e of
equ
ipm
ent
loca
ted
with
in th
e Ex
eter
LN
G
plan
t. Al
l val
ves,
pum
ps, c
ontro
l de
vice
s, fi
re fi
ghtin
g eq
uipm
ent,
gas
dete
ctor
s, li
ghts
, boi
lers
and
co
mpr
esso
rs, a
mon
g ot
her t
hing
s ar
e in
clud
ed. M
anuf
actu
rer a
nd
insp
ectio
n da
ta is
mai
ntai
ned.
M
aint
enan
ce s
ched
ules
are
pr
oduc
ed. E
mpl
oyee
trai
ning
and
ev
alua
tion
reco
rds
are
kept
.
Low
Lo
wN
/A
29P
erm
its (N
YC)
Allo
ws
requ
ests
to b
e en
tere
d in
to
Per
mit
syst
em in
Key
Spa
n an
d tra
nsm
itted
ele
ctro
nica
lly to
the
DO
T in
NYC
.
Low
Lo
w62
.2
30Fl
eetA
nyw
here
Flee
t Man
agem
ent -
KSE
Low
Low
233.
5
31Fl
eetA
nyw
here
Flee
t Man
agem
ent -
NG
US
Low
Low
121.
6
Bur
ning
Pla
tform
App
licat
ions
(Med
ium
/Low
Prio
rity)
-co
ntin
ued
Exhibit __ (ISP-3) Page 65 of 84
174
-66
-
No.
App
licat
ion
Nam
e /
Des
crip
tion
Des
crip
tion
Impa
ct o
n bu
sine
ss
Arc
hite
ctur
e/ t
echn
olog
y fit
issu
e
Prod
uctio
n st
abili
ty
Lim
ited
skill
s av
aila
bilit
y
SW v
endo
r su
ppor
t is
sues
Doe
s no
t m
eet
busi
ness
ne
eds
Lim
ited
flexi
bilit
yO
vera
ll Pr
iorit
y
Ope
ratio
nal
Cos
t($
‘000
)
32Fi
eld
Sm
art D
esig
n
Pro
vide
s th
e ab
ility
for W
ork
Ord
er
desi
gn fr
om w
orks
tatio
n or
ha
ndhe
ld d
evic
e in
fiel
d to
feed
M
axim
o. I
BM
writ
ten
softw
are
(JAV
A) t
hat u
ploa
ds/d
ownl
oads
da
ta to
Max
imo
Med
ium
Lo
w10
.5
33C
ombu
stib
le G
as
Indi
cato
r Tes
t (C
GI)
Dat
a is
reco
rded
by
test
dat
e an
d ve
hicl
e nu
mbe
r. Te
sts
perfo
rmed
in
clud
e vo
ltage
leve
l, sy
stem
le
akag
e, fi
lter c
ondi
tion,
and
new
ba
ttery
inst
alla
tion.
An
over
all
acce
ptab
ility
ratin
g is
giv
en. D
ata
entry
is v
ery
easy
bec
ause
ther
e is
on
ly o
ne ta
ble
disp
l
Low
Low
N/A
34O
racl
e Fi
nanc
ials
S
yste
mER
P E
npor
ion
and
Fina
ncia
ls
pack
aged
sol
utio
n.
Hig
h
Low
709.
0
35O
racl
e S
uppl
y C
hain
S
yste
mER
P S
uppl
y C
hain
pac
kage
d so
lutio
n fo
r AP
& In
vent
ory
Mgm
tH
igh
Lo
w80
1.5
36R
egul
ator
s
An
Acce
ss a
pplic
atio
n us
ed to
m
anag
e 45
3 di
stric
t reg
ulat
ors
and
test
/insp
ectio
n da
ta fr
om 1
995.
O
ld d
ata
abou
t drip
s, c
harts
, and
bo
ots
has
been
reta
ined
for
hist
oric
al p
urpo
ses.
Low
Low
N/A
37ST
OR
MS
Trac
k cu
stom
er o
rder
s an
d pr
ojec
ts, r
epor
t on
stat
uses
, PS
C
repo
rting
, per
form
ance
repo
rting
, ES
CO
's, G
SO
's, P
al's
, Met
er
Ord
ers
and
mis
cella
neou
s or
ders
. In
clud
es b
oth
capi
tal a
nd
mai
nten
ance
(lim
ited
capi
bilit
y)
wor
k fo
r Ele
ctric
and
Gas
.
Hig
h
Low
1652
.7
38To
olw
atch
Use
d as
a s
tora
ge m
anag
emen
t ap
plic
atio
n fo
r spe
cial
ized
tool
s ha
ndlin
g fo
r Gas
Dis
tribu
tion
Low
Lo
wN
/A
Bur
ning
Pla
tform
App
licat
ions
(Med
ium
/Low
Prio
rity)
-co
ntin
ued
Exhibit __ (ISP-3) Page 66 of 84
175
App
endi
x
Exhibit __ (ISP-3) Page 67 of 84
176
-68
-
We
perf
orm
ed a
ser
ies
of e
xecu
tive
inte
rvie
ws
with
the
follo
win
gN
G m
anag
emen
t te
am …
No.
Inte
rvie
wee
Stat
us
1Jo
hn C
aros
elli
Com
plet
e
2Se
an M
onga
nC
ompl
ete
3D
ave
Falk
owsk
iC
ompl
ete
4N
ick
Stav
ropo
ulos
Com
plet
e
5Ka
ssG
erag
hty;
Com
plet
e
6Ke
n D
aley
Com
plet
e
7C
hris
tine
Yord
tC
ompl
ete
8An
dy A
ggC
ompl
ete
9An
drew
Slo
eyC
ompl
ete
10Bi
ll Jo
nes
Com
plet
e
11C
hris
tine
Prit
char
dC
ompl
ete
12Ei
leen
Han
non
Com
plet
e
13M
ashe
edSa
idi
Com
plet
e
14N
abil
Hitt
iC
ompl
ete
15R
ich
Rap
pC
ompl
ete
16An
n M
arie
Lev
ine
Com
plet
e
No.
Inte
rvie
wee
Stat
us
17M
ike
Wes
tcot
tC
ompl
ete
18Bi
ll Bo
llbac
hC
ompl
ete
19M
att P
ower
sC
ompl
ete
20Jo
hn P
ettig
rew
Com
plet
e
21Ja
ne B
ecke
rC
ompl
ete
22Jo
n C
arlto
nC
ompl
ete
23R
oss
Turin
iC
ompl
ete
24Bi
ll Ed
war
dsC
ompl
ete
25Jo
nath
an C
allig
han
Com
plet
e
26Ja
ne C
avlin
Com
plet
e
27Tr
acey
McC
arth
yC
ompl
ete
28S
teve
Noo
nan
Com
plet
e
29Bi
ll Bo
llbac
hC
ompl
ete
30Ed
en A
lvar
ez-B
acku
sC
ompl
ete
31Ju
liette
Milr
oyC
ompl
ete
Exhibit __ (ISP-3) Page 68 of 84
177
-69
-
Func
tiona
l ana
lysi
s te
ams
wer
e fo
rmed
to g
athe
r inf
orm
atio
n on
bus
ines
s pr
iorit
ies,
re
quire
d ca
pabi
litie
s an
d co
nsid
erat
ions
for d
eplo
ying
them
Wor
k St
ream
NG
Lea
dD
eloi
tte L
ead
NG
Par
ticip
ants
Hot
Top
ics
LIPA
Kevi
n Br
ady
Abha
y Bo
rwan
ker
Dou
g C
hapm
an, J
ane
Beck
er,
Way
ne W
atki
ns, J
im L
omba
rdo
Maj
or F
unct
iona
l Are
as
Cus
tom
er (i
nclu
ding
RI G
as,
Shor
t/ M
ediu
m-T
erm
, Bill
ing,
m
obile
/dis
patc
h)
Ric
hard
Pilk
ingt
onG
abrie
l Tov
arD
oug
Cha
pman
. Sea
n M
onga
n,
Jeff
Mar
tin, D
an D
upee
, Mik
e Pa
wlo
wsk
i
Wor
k an
d As
set M
anag
emen
t –G
as (i
nclu
ding
mob
ile/d
ispa
tch)
Ric
hard
Pilk
ingt
onD
an M
cPar
tland
Andy
Pea
rman
, Kas
sG
erag
hty,
Bi
ll G
eer,
Cra
ig C
onst
anzo
Wor
k an
d As
set M
anag
emen
t, Tr
ansm
issi
on –
Elec
tric
(incl
udin
g ou
tage
, mob
ile/ d
ispa
tch)
Ric
hard
Pilk
ingt
onD
an M
cPar
tland
Dou
g C
hapm
an, J
ane
Beck
er,
Way
ne W
atki
ns, S
heen
a An
and
Back
Offi
ce –
Supp
ly C
hain
, HR
, Fi
nanc
eBo
nnie
Bur
khar
dtM
att M
illsM
adal
yn H
anle
y/R
uth
Sulliv
an,
Chr
istin
e Yo
rdt a
nd B
rian
Lang
h (F
inan
ce),
John
Fla
min
io (S
C),
Mat
t Pow
ers
(HR
), Je
ff Be
al
(Fle
et),
Lee
Hum
phrie
s
GIS
M
ike
Gal
eD
an M
cPar
tland
Andy
Pea
rman
, Kas
sG
erag
hty,
Bi
ll G
eer,
Cra
ig C
onst
anzo
, Dou
g C
hapm
an, J
ane
Beck
er, W
ayne
W
atki
ns
Exhibit __ (ISP-3) Page 69 of 84
178
-70
-
Cus
tom
er c
onsi
dera
tions
:
M
igra
tions
are
com
plex
pro
ject
s in
thei
r ow
n rig
ht
M
ultip
le p
aral
lel m
igra
tions
is to
be
avoi
ded
–hi
gh ri
sk, r
esou
rce/
skill
bottl
enec
ks.
“A
gent
Des
ktop
”int
egra
tion
tech
nolo
gies
will
cont
inue
to p
lay
a ro
le in
opt
imiz
ing
cust
omer
per
form
ance
in in
terim
R
egul
ator
y re
cove
ry
Cus
tom
erO
ur lo
ng te
rm o
bjec
tive
is to
ach
ieve
con
verg
ence
ont
o a
stra
tegi
c cu
stom
er p
latfo
rm th
at c
an s
uppo
rt cu
rrent
dem
ands
and
ena
ble
futu
re
inno
vatio
ns b
oth
inte
rnal
ly a
nd e
xter
nally
driv
en.
The
iden
tific
atio
n of
a s
trate
gic
cust
omer
pla
tform
is a
key
dec
isio
n to
ena
ble
the
conv
erge
nce
deci
sion
s as
soci
ated
with
the
olde
r cus
tom
er
syst
ems
CSS
is c
onsi
dere
d to
be
the
wor
kabl
e pl
atfo
rm to
sup
port
the
Cus
tom
er O
pera
tions
for a
t lea
st th
e m
ediu
m-te
rm (a
t lea
st fi
ve y
ears
). O
ur w
orki
ng
hypo
thes
is is
that
it is
cap
able
to b
e th
e lo
ng te
rm C
IS p
latfo
rm b
ut th
is w
ill ne
ed to
be
test
ed fu
rther
dow
n th
e ro
utem
ap
C
SS
is th
e m
ost s
tabl
e cu
rrent
cus
tom
er a
pplic
atio
n pl
us IS
has
the
know
ledg
e to
sup
port
it an
d th
ere
are
com
pani
es in
the
mar
ket t
o su
ppor
t it
C
SS
has
bee
n co
nfirm
ed a
s be
ing
scal
able
to s
uppo
rt th
e cu
rrent
US
cus
tom
er b
ase
and
beyo
nd.
A
t thi
s po
int i
n tim
e, th
e co
sts
to m
igra
te th
e ex
istin
g C
usto
mer
sys
tem
s to
CS
S a
re le
ss th
an m
igra
ting
to a
noth
er p
latfo
rm
C
SS
is a
ble
to s
uppo
rt th
e S
MA
RT
met
erin
g pi
lots
and
futu
re p
rodu
ctio
n ro
ll ou
t (ba
sed
on c
urre
nt S
MA
RT
unde
rsta
ndin
g)
Adv
anta
ge
CSS
CA
S (L
I Gas
)
CSS
CR
ISC
SS
?
CA
S (L
IPA
)
LIP
A s
peci
fic C
AS
sys
tem
rem
ains
and
sub
ject
to L
IPA
neg
otia
tion
Dec
isio
n po
int o
n C
RIS
to C
SS
ba
sed
on C
SS
long
evity
test
at t
his
poin
t and
SM
ART
expe
rienc
e
CSS
or n
ew
stra
tegi
c~$
15m
~$17
m~$
30m
The
Rat
iona
le fo
r Cus
tom
er
SM
AR
T P
ilot e
xper
ienc
e
Exhibit __ (ISP-3) Page 70 of 84
179
-71
-
GIS
Both
bus
ines
ses
reco
gniz
e th
at th
ere
is lo
ng te
rm v
alue
to b
e ob
tain
ed fr
om c
onve
rgen
ce o
f GIS
pla
tform
s. C
onve
rgen
ce o
f the
cur
rent
mul
tiplic
ity
of s
olut
ions
/inst
ance
s w
ill re
quire
sev
eral
mig
ratio
n ac
tiviti
esto
be
timed
app
ropr
iate
ly. A
GIS
hyp
othe
sis
is n
eede
d to
ena
ble
inve
stm
ent d
ecis
ions
to
be
take
n.
The
wor
king
hyp
othe
sis
is fo
r ESR
I to
be c
onsi
dere
d th
e ta
rget
pla
tform
for t
he U
S bu
sine
sses
E
SR
I is
curre
ntly
bei
ng a
dopt
ed b
y th
e U
K G
FO p
rogr
amm
e an
d in
vest
men
t bei
ng m
ade
to in
tegr
ate
with
SA
P, S
yclo
and
Clic
k. T
his
inte
grat
ion
prov
ides
a
prov
ing
grou
nd fo
r the
US
to g
ain
bene
fit.
E
SR
I is
the
mar
ket l
eade
r and
bot
h E
SR
I and
Sm
allw
orld
are
con
side
red
to b
e fu
nctio
nally
equ
ival
ent.
–su
bjec
t to
test
IS
eco
nom
ies
of s
cale
Th
e tim
ing
of th
e co
nver
genc
e sh
ould
be
whe
n th
e fro
nt o
ffice
cha
nges
are
mad
e –
this
is w
hen
the
inte
grat
ion
inve
stm
ent n
eeds
to b
e m
ade.
Sm
allw
orld
w
ill c
ontin
ue to
sup
port
the
Ele
ctric
ity b
usin
ess
until
its
front
offi
ce m
igra
tion
is m
ade
and
the
bene
fits
of G
as/E
lect
ric c
onve
rgen
ce c
an b
e fu
lly e
xplo
ited.
And
the
Rat
iona
le fo
r GIS
Wha
t a m
igra
tion
sequ
ence
cou
ld lo
ok li
ke:
Gas
Fron
tO
ffice
Elec
Fron
tO
ffice
ESR
I con
solid
ated
~201
2/13
?~2
014?
Gas
data
?
Smal
lwor
ld li
fecy
cle
man
agem
ent –
life
supp
ort
Early
mig
ratio
ns
in re
adin
ess
for
FO c
hang
e
Smal
lwor
ld 3
.1.2
+ E
SRI a
naly
sis
Ele
ctric
+Gas
–N
ew Y
ork
–U
psta
teE
lect
ric –
Mas
sach
uset
ts
ESR
I+A
rcFM
Ele
c(L
IPA
) -N
ew Y
ork
Dow
nsta
te
Cur
rent
situ
atio
n
Smal
lwor
ld 4
.0G
as (R
I) -N
ew E
ngla
nd
ESR
I+A
rcFM
Gas
(MA
+NH
) -N
ew E
ngla
ndN
RG
G
as -
New
Yor
k D
owns
tate
Hav
ing
esta
blis
hed
the
targ
et a
rchi
tect
ure,
the
chal
leng
e is
to id
entif
y th
e op
timum
dep
loym
ent p
ath
Exhibit __ (ISP-3) Page 71 of 84
180
Bus
ines
s C
apab
ility
Impa
ct A
naly
sis
Exhibit __ (ISP-3) Page 72 of 84
181
App
endi
x de
tail
by D
omai
n ar
ea
Exhibit __ (ISP-3) Page 73 of 84
182
-74
-
US
SAP
ERP
Bac
k O
ffice
US
HR
, Fin
anci
als,
Pro
cure
men
t and
Fle
et m
anag
erm
entt
rans
ition
ont
o SA
P EC
C a
nd P
ower
plan
tfor
re
gula
tory
acc
ount
ing.
Sha
red
Serv
ices
SAP
BW
Not
in s
cope
:1.
Faci
litie
s M
gmt.
2.U
K &
US
cons
olid
atio
n an
d En
terp
rise
solu
tions
3.C
orpo
rate
4.C
usto
mer
Bill
ing
and
Bill
Prin
t
Scop
e
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
22.3
10
4.1
9.9
136.
4
Inve
stm
ent A
void
ed(1
.4)
(3.6
)(3
.1)
(2.0
)(1
.6)
(0.6
)(1
2.4)
Net
Inve
stm
ent
20.9
100.
56.
8(2
.0)
(1.6
)(0
.6)
124.
0
Estim
ated
R
TB
New
RTB
Spe
nd
9.25
6.97
6.97
6.97
6.97
37.1
RTB
Spe
nd A
void
ed(0
.08)
(5.6
)(5
.6)
(5.6
)(5
.6)
(5.6
)(2
8.1)
Net
RTB
Spe
nd (*
)(0
.08)
3.6
1.4
1.4
1.4
1.4
9.0
Fina
ncia
ls -
$M
Ope
n Q
uest
ions
/ C
omm
ents
C
ost t
o ac
hiev
e, a
void
ed
inve
stm
ent &
RTB
are
est
imat
es
from
2nd
Dec
embe
r 09
draf
t E
xec
pape
r
R
TB a
ssum
es c
urre
nt s
tate
su
ppor
t mod
el a
nd re
sour
ce
leve
ls.
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
Tim
ing:
Sta
rt Ja
nuar
y 20
10 -
com
plet
e 20
10/1
1 Q
4
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
R.I
Adv
anta
ge to
CSS
CAS
(Gas
onl
y) to
CSS
CR
IS to
CSS
Exhibit __ (ISP-3) Page 74 of 84
183
-75
-
US
SAP
Gas
Fro
nt O
ffice
Mig
ratio
n to
SAP
-cen
tric
plat
form
for
Asse
t and
Wor
k M
anag
emen
t. As
sum
ptio
ns:
1.U
se S
AP to
repl
ace
curre
nt L
eak
Man
agem
ent s
yste
ms
2.Ex
pand
SAP
BW
to in
clud
e G
FO3.
Incl
udes
re-a
rchi
tect
ing
an a
lread
y co
nsol
idat
ed G
as E
SRI i
nto
the
targ
et a
rchi
tect
ure.
4In
clud
es M
eter
ing
Serv
ices
acr
oss
Gas
and
Ele
ctric
ity5G
as m
obile
occ
urs
at th
e sa
me
time/
prog
ram
me
–(s
ee s
epar
ate
slid
e)
Scop
eO
pen
Que
stio
ns /
Com
men
ts
As
sum
es n
o ot
her c
ross
GFO
/ ED
O im
pact
s ot
her t
han
Met
erin
g Se
rvic
es
A
subs
tant
ial p
art o
f the
lega
cy
NG
app
licat
ions
est
ate
are
shar
ed a
cros
s G
as a
nd
Elec
trici
ty. A
new
SAP
est
ate
add
cost
s un
til E
DO
tran
sitio
n to
th
e ne
w s
olut
ions
.
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
15.0
40.0
15.0
70.0
Inve
stm
ent A
void
ed(7
.0)
(7.0
)
Net
Inve
stm
ent
8.0
40.0
15.0
63.0
Estim
ated
R
TB
New
RTB
Spe
nd4.
54.
59.
0
RTB
Spe
nd A
void
ed(1
.7)
(1.7
)(3
.4)
Net
RTB
Spe
nd2.
82.
85.
6
Fina
ncia
ls -
$MM
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
Tim
ing:
Fol
low
s co
mpl
etio
n of
UK
Gas
Fro
nt O
ffice
in 2
010/
11 to
cap
ture
lear
ning
poi
nts
and
Follo
ws
deliv
ery
of U
S Ba
ck O
ffice
re b
andw
idth
, con
tinui
ty o
f res
ourc
e an
d m
inim
ize
prog
ram
me
star
t up
cost
s
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
Exhibit __ (ISP-3) Page 75 of 84
184
-76
-
US
Mob
ile G
as S
trat
egic
Impl
emen
tatio
n
All m
obile
sol
utio
ns fo
r Gas
and
Met
erin
g Se
rvic
es in
clud
ing
Ups
tate
NY.
Syn
chro
nise
dw
ith th
e m
ain
SAP
GD
O ro
ntO
ffice
tran
sitio
n.
Scop
eO
pen
Que
stio
ns /
Com
men
ts
C
osts
do
not i
nclu
de
repl
acem
ent m
obile
dev
ice
cost
s, w
hich
are
cov
ered
with
in
the
norm
al l
ifecy
cle
inve
stm
ent
plan
ning
pro
visi
ons.
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
20.0
20.0
40.0
Inve
stm
ent A
void
ed(1
.0)
(3.0
)(4
.0)
Net
Inve
stm
ent
19.0
17.0
36.0
Estim
ated
R
TB
New
RTB
Spe
nd
RTB
Spe
nd A
void
ed
Net
RTB
Spe
nd
Fina
ncia
ls -
$M
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
Tim
ing:
Fol
low
s co
mpl
etio
n of
UK
Gas
Fro
nt O
ffice
in 2
010/
11 to
cap
ture
lear
ning
poi
nts
and
Follo
ws
deliv
ery
of U
S Ba
ck O
ffice
re b
andw
idth
, con
tinui
ty o
f res
ourc
e an
d m
inim
ize
prog
ram
me
star
t up
cost
s
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
Incl
uded
in th
e G
as F
ront
Offi
ce R
TB i
mpa
ct
Exhibit __ (ISP-3) Page 76 of 84
185
-77
-
US
SAP
Elec
tric
Fro
nt O
ffice
(TX
& E
DO
)
Mig
ratio
n to
SAP
-cen
tric
plat
form
for A
sset
and
Wor
k M
anag
emen
t acr
oss
Elec
trict
yD
istri
butio
n an
d Tr
ansm
issi
on.
Assu
mpt
ions
:1.
Use
of S
AP fo
r pro
ject
and
allia
nce
cons
truct
ion
2.Ex
pand
SAP
BW
to in
clud
e ED
O
Not
in s
cope
:Ta
ctic
al E
DO
spe
nds
pend
ing
trans
ition
Scop
eO
pen
Que
stio
ns /
Com
men
ts
Ti
min
g of
ED
O &
Tx
will
be
influ
ence
d by
G
FO c
ompl
etio
n
Id
entif
icat
ion
of U
S re
gion
al
busi
ness
mod
el b
enef
its &
IS
RTB
redu
ctio
n
S
TOR
MS
ext
ende
d su
ppor
t un
likel
y to
go
beyo
nd 2
014
(stil
l to
be n
egot
iate
d)
N
eed
to re
leas
e th
e R
TB
asso
ciat
ed w
ith th
e le
gacy
es
tate
that
was
sha
red
acro
ss G
as a
nd E
lect
ricity
Ea
rly b
enef
its c
an b
e de
rived
from
w
ider
dep
loym
ent o
f leg
acy
mob
ile a
nd
Tx
ado
ptio
n of
col
labo
rativ
e 3r
d
party
wor
king
In
terim
NPV
inve
stm
ents
nee
d to
be
heav
ily c
onst
rain
ed (a
lthou
gh n
on
iden
tifie
d)
R
TB a
ssum
es c
ontin
ued
inte
rnal
su
ppor
t mod
el
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
30.0
25.0
55.0
Inve
stm
ent A
void
ed(2
.5)
(2.9
)5.
3
Net
Inve
stm
ent
-2.5
27.2
25.0
49.7
Estim
ated
R
TB
New
RTB
Spe
nd4.
64.
6
RTB
Spe
nd A
void
ed(6
.6)
(6.6
)
Net
RTB
Spe
nd(2
.0)
(2.0
)
Fina
ncia
ls -
$MM
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
Tim
ing:
Rea
lisat
ion
c 20
14, w
hen
Stor
ms
supp
ort l
ikel
y to
exp
ire, R
egio
nal b
enef
itsm
odel
cle
arer
and
ED
O d
evel
op n
ext s
tep
chan
ge b
enef
it op
portu
nitie
s
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
R.I
Adv
anta
ge to
CSS
CAS
(Gas
onl
y) to
CSS
CR
IS to
CSS
Exhibit __ (ISP-3) Page 77 of 84
186
-78
-
US
Mob
ile E
lect
ric S
trat
egic
Impl
emen
tatio
n
All n
on-M
eter
ing
Serv
ices
mob
ile s
olut
ions
for E
lect
ric a
nd T
rans
mis
sion
. Syn
chro
nise
dw
ith th
e m
ain
SAP
EDO
& T
x Fr
ont O
ffice
tran
sitio
n.
Not
in s
cope
:M
eter
ing
Serv
ices
Mob
ile a
nd D
ispa
tch
(Syc
loan
d C
lick)
Scop
eO
pen
Que
stio
ns /
Com
men
ts
C
osts
do
not i
nclu
dem
obile
de
vice
cos
ts
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
20.0
20.0
40.0
Inve
stm
ent A
void
ed0.
0
Net
Inve
stm
ent
20.0
20.0
40.0
Estim
ated
R
TB
New
RTB
Spe
nd0.
00.
00.
00.
00.
00.
00.
0
RTB
Spe
nd A
void
ed0.
00.
04.
74.
74.
74.
718
.6
Net
RTB
Spe
nd0.
00.
0-4
.7-4
.7-4
.7-4
.7-1
8.6
Fina
ncia
ls -
$MM
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
Tim
ing:
Rea
lisat
ion
c 20
14, w
hen
Stor
ms
supp
ort l
ikel
y to
exp
ire, R
egio
nal b
enef
itsm
odel
cle
arer
and
ED
O d
evel
op n
ext s
tep
chan
ge b
enef
it op
portu
nitie
s
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
R.I
Adv
anta
ge to
CSS
CAS
(Gas
onl
y) to
CSS
CR
IS to
CSS
Incl
uded
in th
e G
as F
ront
Offi
ce R
TB i
mpa
ct
Exhibit __ (ISP-3) Page 78 of 84
187
-79
-
US
GA
S G
IS C
onso
lidat
ion
Early
mig
ratio
n, a
head
of G
FO S
AP tr
ansi
tion
of a
ll G
as G
IS fr
om 1
). Sm
allw
orld
4.0
NE
inst
ance
, 2)
. N
RG
dow
nsta
te N
Y, 3
). Sm
allw
orld
3.1
.2 U
p-st
ate
NY
& M
S (n
ote
Gs
only
) to
exis
ting
ESR
I Gas
(MA
& N
H) i
nsta
nce.
Incl
udes
dec
omm
issi
onin
g of
1 &
2 o
nly
Not
in s
cope
:1.
Ele
ctric
on
Smal
lwor
ld 3
.1.2
Up-
stat
e N
Y &
MS
2.R
e-ar
chite
ctin
g G
IS to
the
Stra
tegi
c ar
chite
ctur
e w
hich
wou
ld ta
ke p
lace
in th
e co
re G
FO S
AP
trans
ition
Scop
eO
pen
Que
stio
ns /
Com
men
ts
N
etw
ork
Des
ign
busi
ness
or
gani
satio
n m
ay h
ave
to
chan
ge to
sup
port
this
spl
it in
U
psta
te N
Y (p
er K
ass
Ger
aght
y 27
Oct
200
9)
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
1.5
6.0
7.5
Inve
stm
ent A
void
ed0.
0
Net
Inve
stm
ent
1.5
6.0
7.5
Estim
ated
R
TB
New
RTB
Spe
nd
RTB
Spe
nd A
void
ed
Net
RTB
Spe
nd
Fina
ncia
ls -
$M
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
Tim
ing:
Thr
ough
201
0/11
in re
adin
ess
for m
ain
Gas
Fro
nt O
ffice
re-a
rchi
tect
ing
on G
as F
ront
Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
Gas
GIS
con
vers
ion
RTB
neu
tral
Exhibit __ (ISP-3) Page 79 of 84
188
-80
-
US
Elec
tric
GIS
Con
solid
atio
n to
Str
ateg
ic
Mig
ratio
n of
lega
cy E
lect
ricity
GIS
Sm
allw
orld
to S
trate
gic
ESR
Isol
utio
n as
par
t of a
nd a
t the
sam
e tim
e as
the
EDO
SAP
FO
tran
sitio
n
Not
in s
cope
:1.
Excl
udes
the
tact
ical
upg
rade
2.
Excl
udes
LIP
A ES
RI m
igra
tion,
whi
ch is
ass
umed
to c
ontin
ue p
endi
ng L
IPA
Man
aged
Ser
vice
s Ag
reem
ent r
evie
w.
Scop
eO
pen
Que
stio
ns /
Com
men
ts
Th
e m
igra
tion
from
Sm
allw
orld
to
a c
omm
on E
SRI s
olut
ion
will
min
imiz
e th
e ov
eral
l FO
cos
t to
achi
eve
and
ongo
ing
TCO
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
4.0
11.0
2.0
17.0
Inve
stm
ent A
void
ed0.
0
Net
Inve
stm
ent
4.0
11.0
2.0
17.0
Estim
ated
R
TB
New
RTB
Spe
nd0.
00.
0
RTB
Spe
nd A
void
ed0.
00.
0
Net
RTB
Spe
nd0.
00.
0
Fina
ncia
ls -
$MM
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
Tim
ing:
201
2/13
in s
ync
with
Ele
ctric
ity F
ront
Offi
ce m
igra
tion
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
Gas
GIS
con
vers
ion
Elec
tric
ity G
IS c
onve
rsio
n
RTB
neu
tral
Exhibit __ (ISP-3) Page 80 of 84
189
-81
-
US
Rho
de Is
land
Cus
tom
er M
igra
tions
to C
SS
Early
mig
ratio
n of
RI A
dvan
tage
& L
DC
M t
o C
SS a
void
ing
Adva
ntag
e up
grad
e.In
clud
es :
1.Ad
vant
age
& LD
CM
dec
omm
issi
onin
g.2.
Cha
nges
the
inte
rface
s to
Met
erin
g Se
rvic
es s
olut
ions
3.B
ill pr
int s
witc
hes
to C
SS
Bill
Prin
t 4.
Rol
lout
of M
Wor
kto
R.I
Met
erin
g Se
rvic
es m
obile
dev
ices
(cur
rent
ly u
sing
PC
AD) a
nd a
dd G
as
Met
erin
g Se
rvic
es c
rew
s to
iSch
edul
e
Scop
eO
pen
Que
stio
ns /
Com
men
ts
Im
med
iate
act
ion
nece
ssar
y to
co
nsid
er c
ompl
etio
n to
al
ign
with
BO
tran
sitio
n to
S
AP a
void
ing
rew
ork
of
inte
rface
s
Av
oid
Adva
ntag
e u/
g
It
is a
ssum
ed th
at R
I will
Cus
tom
er M
eter
Ser
vice
s w
ill
adop
t MW
OR
K
PC
AD S
ched
uler
in R
.I ca
n al
so
be d
ecom
mis
sion
ed o
n m
igra
tion
to M
WO
RK
.
R
TB s
avin
gs is
from
Adv
anta
ge,
IVR
and
Lab
trak
in
crea
sed
Fiel
d W
ork
effic
ienc
y an
d av
oida
nce
of te
mpo
rary
sta
ff (c
olle
ctiv
ely
with
RI a
nd M
ass
$2.5
M p
.a.)
C
ost t
o ac
hiev
e in
clud
es$1
2M to
mig
rate
Adv
anta
ge$4
M ro
ll ou
t of M
WO
RK
to
exis
ting
Met
erin
g Se
rvic
es G
as
mob
ile d
evic
es (c
.100
off)
and
se
t up
crew
s in
iSch
edul
eto
ena
ble
com
mon
sol
utio
ns fo
r C
MS
fiel
d ac
tiviti
es
0.25
0.05
0.05
0.05
0.05
0.05
Net
RTB
Spe
nd
Estim
ated
R
TB
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
1616
.0
Inve
stm
ent A
void
ed(0
.8)
(0.8
)N
et In
vest
men
t15
.215
.2N
ew R
TB S
pend
0.0
IS R
TB A
void
ed0.
050.
050.
050.
050.
050.
25
***B
us B
enef
it p.
a.4.
04.
04.
04.
04.
020
.0
Fina
ncia
ls -
$M
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
R.I
Adv
anta
ge to
CSS
CAS
(Gas
onl
y) to
CSS
CR
IS to
CSS
Early
mig
ratio
n of
Adv
anta
ge in
201
0 is
nec
essa
ry to
avo
id a
n up
grad
e an
d en
able
Met
erin
g Se
rvic
es R
I bu
sine
ss b
enef
its p
lus
avoi
danc
e of
tem
pora
ry s
taff
recr
uitm
ent
Stro
ng N
PV
Exhibit __ (ISP-3) Page 81 of 84
190
-82
-
US
CA
S G
as C
usto
mer
Mig
ratio
n to
CSS
Mig
ratio
n of
CAS
Gas
onl
y to
CSS
and
cha
ngin
g in
terfa
ces
to M
eter
ing
Solu
tions
and
Bac
k O
ffice
Asso
ciat
ed C
usto
mer
Billi
ng a
nd B
ill Pr
int.
Not
in s
cope
:C
AS fo
r LI E
lect
ricity
that
is a
ssum
ed to
con
tinue
pen
ding
revi
ew L
IPA
Serv
ice
Agre
emen
t
Scop
eO
pen
Que
stio
ns /
Com
men
ts
C
ost e
stim
ates
bas
ed o
n su
ffici
ent e
xper
ienc
ed B
usin
ess
and
IS re
sour
ce a
vaila
bilit
y. It
is
view
ed th
at W
orkf
orce
redu
ctio
n w
ill in
crea
se c
osts
.
C
AS c
osts
app
ortio
ned
to G
as
coul
d sw
ing
onto
LIP
A –
Assu
med
zer
o R
TB im
pact
LI
PA a
gree
men
t exp
ires
2013
so
need
to c
ompl
ete
by 2
013
$1
1M p
.a. r
egul
ator
y al
low
ance
for e
ach
cale
ndar
ye
ar 2
010,
201
1 an
d 20
12 o
nly
Rec
omm
enda
tion
for
Reg
ulat
ion
to e
xplo
re
optio
n to
rene
gotia
te th
e al
low
ance
dur
atio
n.
Po
ssib
le o
ptio
n fo
r CAS
m
igra
tion
to s
tart
to a
nd ru
n in
pa
ralle
l with
Adv
anta
ge
mig
ratio
n, B
usin
ess
reso
urce
co
nstra
int.
N
ew ra
te c
ase
in 2
012
is a
st
rong
driv
er to
com
plet
e be
fore
th
is e
vent
to d
eliv
er c
hang
e in
C
SS
Fina
ncia
ls -
$MM
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Dur
atio
n 18
mth
s, s
eque
ntia
lly d
epen
dent
upo
n co
mpl
etio
n of
Adv
anta
ge m
igra
tion
re IS
ski
ll ba
ndw
idth
.C
AS a
head
of C
RIS
re ro
bust
ness
and
CAS
als
o at
tract
s £1
1M p
.a. a
llow
ance
to 2
012.
2.4
0.8
0.8
0.8
***B
us B
enef
it p.
a.0.
0N
et R
TB S
pend
Estim
ated
R
TB
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
10.0
7.7
17.7
Inve
stm
ent A
void
ed0.
0N
et In
vest
men
t10
.07.
717
.7N
ew R
TB S
pend
0.0
IS R
TB A
void
ed0.
0
Reg
ulat
ory
bene
fit$1
1M p
.a. f
rom
201
0 to
201
2 lo
st
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
R.I
Adv
anta
ge to
CSS
CR
IS to
CSS
CAS
(Gas
onl
y) to
CSS
Sta
rt as
soo
n as
pos
sibl
e
Exhibit __ (ISP-3) Page 82 of 84
191
-83
-
US
CR
IS M
igra
tion
to C
SS
Mig
ratio
n of
CR
IS G
as o
nly
to C
SS a
nd c
hang
ing
inte
rface
s to
Met
erin
g So
lutio
ns a
nd B
ack
Offi
ce.
Asso
ciat
ed C
usto
mer
Billi
ng a
nd B
ill Pr
int.
Com
plet
ion
alig
ned
to G
as F
ront
Offi
ce m
igra
tion
to a
void
dou
ble
mig
ratio
n of
Met
erin
g Se
rvic
es
Dis
patc
h an
d M
obile
sol
utio
ns
Scop
eO
pen
Que
stio
ns /
Com
men
ts
Al
ignm
ent w
ith e
arly
opt
ion
to
adop
t Stra
tegi
c M
obile
and
D
ispa
tch
solu
tions
for R
I
BO
tran
sitio
n to
SAP
avo
idin
g re
wor
k of
inte
rface
s
**
* ind
icat
ive
Busi
ness
ben
efits
-M
ike
Paw
low
ski
Ba
se a
ssum
ptio
n fo
r the
cos
t es
timat
es a
re s
uffic
ient
ex
perie
nced
/ kn
owle
dgea
ble
Busi
ness
and
IS re
sour
ce
avai
labi
lity
for t
he c
onve
rsio
n ac
tiviti
es.
Wor
kfor
ce re
duct
ion
in e
ither
of b
oth
coul
d in
crea
se
cost
s.
N
ote
that
if c
ompl
etio
n is
not
al
igne
d to
Gas
FO
mig
ratio
n an
d D
ispa
tch
and
Fiel
d is
tact
ical
ly
inte
grat
ed to
lega
cy -
Addi
tiona
l ind
icat
e co
st c
.$5-
7M
Fina
ncia
ls -
$MM
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
(6.6
)(3
.3)
(3.3
)N
et R
TB S
pend
Estim
ated
R
TB
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
12.0
26.0
38.0
Inve
stm
ent A
void
ed(3
.0)
(3.0
)N
et In
vest
men
t9.
026
.035
.0N
ew R
TB S
pend
+0.2
+0.2
+0.4
IS R
TB A
void
ed(3
.5)
(3.5
)(7
.0)
***B
us B
enef
it p.
a.3.
53.
57.
0
Dur
atio
n 18
mth
s,
As th
e m
ost s
tabl
e of
cus
tom
er s
olut
ions
CR
IS fo
llow
s C
AS.
Stro
ng N
PV
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
R.I
Adv
anta
ge to
CSS
CAS
(Gas
onl
y) to
CSS
CR
IS to
CSS
Exhibit __ (ISP-3) Page 83 of 84
192
-84
-
US
CR
M S
trat
egic
–Sa
les
Forc
e A
utom
atio
n
Sale
s Fo
rce
auto
mat
on to
sup
port
the
proc
ess
of S
uspe
ct, P
rosp
ect,
Lead
to C
usto
mer
and
cro
ss s
ellin
g to
exi
stin
g cu
stom
ers.
Scop
eO
pen
Que
stio
ns /
Com
men
ts
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
Tota
l
Estim
ated
In
vest
men
t
New
Inve
stm
ent
5.0
5.0
Inve
stm
ent A
void
ed0.
0
Net
Inve
stm
ent
5.0
Estim
ated
R
TB
New
RTB
Spe
nd1.
01.
01.
01.
01.
05.
0
RTB
Spe
nd A
void
ed(1
.5)
(1.5
)(1
.5)
(1.5
)(1
.5)
(7.5
)
Net
RTB
Spe
nd(0
.5)
(0.5
)(0
.5)
(0.5
)(0
.5)
(2.5
)
Fina
ncia
ls -
$M
Estim
ated
Tim
elin
e an
d K
ey M
ilest
ones
2013
/14
2011
2/13
2011
/12
2010
/11
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
An is
land
sol
utio
n -
can
run
in p
aral
lel t
o ot
her a
ctvi
ties
Gas
Fro
nt O
ffice
US
Bac
k O
ffice
Elec
tric
ity D
x &
Tx
Fron
t Offi
ce
RI G
as F
ront
Offi
ce
Rem
aind
er G
as F
ront
Offi
ce
US
Bac
k O
ffice
com
plet
es
Join
t Ele
c&
Gas
Des
ign
R.I
Adv
anta
ge to
CSS
CAS
(Gas
onl
y) to
CSS
CR
IS to
CSS
Sale
s Fo
rce
Auto
mat
ion
O
ptio
ns
1.S
ales
Forc
e.co
m50
0 lic
ense
s $8
0/m
th/u
ser =
$50
0K
p.a.
Cus
tom
isat
ions
nom
inal
est
imat
e $1
M
2.St
and-
alon
e S
AP C
RM
Del
oitte
adv
ise
that
SA
P C
RM
can
st
and
alon
e to
sup
port
this
ca
pabi
lity
for a
roun
d $3
m -
$6m
de
pend
ing
on th
e nu
mbe
r of
inte
rface
s to
lega
cy s
yste
ms.
In
dica
tivel
y th
e in
terfa
ces
are
low
w
ithou
t the
nee
d fo
r rea
l tim
e in
form
atio
n, p
ullin
g ou
r cos
t to
the
low
er e
nd o
f the
rang
e.
Est
imat
e R
TB a
s 20
% A
ssum
e $1
M
H
oste
d se
rvic
e re
quire
s cu
rrent
ap
p "A
naly
tics
Dat
abas
e / I
nsig
ht
and
Ana
lytic
s",
whi
ch is
cur
rent
ly
bein
g up
grad
ed a
nd h
as d
ata
load
s fro
m C
SS a
nd e
xter
nal
dem
ogra
phic
s da
ta.
Ext
ract
s ba
tch
load
to
Sal
esFo
race
.com
.
SA
P C
RM
wou
ld a
llevi
ate
the
need
A
naly
tics
Dat
abas
e
Fo
llow
ing
apps
can
go
unde
r eith
er
optio
nO
NYX
,In
Dem
and
(cur
rent
ly
supp
ortin
g E
nerg
y E
ffici
ency
P
rogr
amm
es) &
2 in
stan
ce o
f iA
venu
e(D
irect
RTB
$1.
5M p
.a.)
Exhibit __ (ISP-3) Page 84 of 84
193
Exhibit __ (ISP-4)
Testimony of the Information Services Panel
Exhibit __ (ISP-4)
June 29, 2011 SAP Benefits Validation Report Prepared By Capgemini
194
nationalgridTHE POWER OF ACTION
National Grid SAP Benefits Validation Final Report
June 29, 2011
Exhibit __ (ISP-4) Page 1 of 34
195
Page i
Table of Contents
Executive Summary....................................................................................................................1
Competitive Alternative Analysis ..............................................................................................3 Guiding Principles ...............................................................................................................................3
Cost Model Considerations ............................................................................................................6 Scope of Phases ............................................................................................................................7 Cost Basis ......................................................................................................................................7 Schedule.........................................................................................................................................9 Benefits Enablement ......................................................................................................................9 Magnitude of Change ...................................................................................................................10 Risk...............................................................................................................................................10
The SAP Solution ..............................................................................................................................10 Cost Over Time ............................................................................................................................11 Relative Benefits...........................................................................................................................11 Magnitude of Change ...................................................................................................................11 Risk...............................................................................................................................................11
ALTERNATIVE 1 - PEOPLESOFT 9.1 TO FUSION.........................................................................12 Alternative 1 Timeline...................................................................................................................14 Cost Over Time ............................................................................................................................15 Relative Benefits...........................................................................................................................15 Magnitude of Change ...................................................................................................................16 Risk...............................................................................................................................................16
Alternative 2 – Oracle eBusiness Enterprise to Fusion.....................................................................16 Alternative 2 Timeline...................................................................................................................18 Cost Over Time ............................................................................................................................18 Relative Benefits...........................................................................................................................18 Magnitude of Change ...................................................................................................................19 Risk...............................................................................................................................................19
RATING, RANKING, WEIGHTING.............................................................................................20 Cost Over Time Factor ......................................................................................................................20 Benefit Enablement Factor................................................................................................................21 Magnitude of Change Factor.............................................................................................................22 Risk Factor ........................................................................................................................................23 Weighted Ranking of SAP and Competitive Alternatives..................................................................25 Rating and Ranking Summary ..........................................................................................................26
SUMMARY OF FINDINGS .........................................................................................................28
Exhibit __ (ISP-4) Page 2 of 34
196
Page ii
APPENDIX A - Cost Assumptions ...........................................................................................29
APPENDIX B – Benefit Opportunity Categories.....................................................................30
Exhibit __ (ISP-4) Page 3 of 34
197
National Grid SAP Benefits Benefits Validation – Final Report
Page 1
EXECUTIVE SUMMARY OBJECTIVE Capgemini was engaged under Purchase Order #0000139616, dated February 7, 2011, to conduct an
assessment of the competitive alternatives to SAP and to conduct a review of the benefit opportunities
associated with SAP and the competitive alternatives. This review was conducted between February 7,
2011 and May 31, 2011. Our findings are detailed in the relevant sections of this Final Report. Any
questions regarding this report or the associated findings should be directed to David Crawford at
(770)377-8491.
BACKGROUND National Grid has embarked on an ambitious hardware, software and process rationalization to improve
operational and shared services efficiency, while simplifying and consolidating the IS infrastructure
which supports the business. The objective of this process is to reduce the cost of IS services and to
create a technology and process foundation that can enable significant cost of service efficiencies. The
cornerstone of this process is the US Foundation Program with the SAP Enterprise Resource Planning
(ERP) solution as the core application to enable Back Office as well as Front Office improvements.
The Back Office and Front Office portions of the US foundation Program are being implemented in two
phases. The primary objective of the Back Office phase of the US foundation Program is to transform and
integrate the HR, Supply Chain and Finance processes that continue to operate across a fragile
“patchwork” of disparate applications since the acquisition of KeySpan in August 2007. This
transformation includes the redesign of business processes and consolidation of the functionality now
being delivered in the US, by the Oracle and PeopleSoft Enterprise Resource Planning Suites, Hyperion
Planning and associated legacy planning, budgeting and allocation systems and legacy fixed asset systems
onto a centralized SAP solution. Once these Back Office applications are installed, National Grid plans to
add the Front Office components of SAP ERP to consolidate and integrate Asset Management, Work
Management, Mobile Workforce Management, and Geospatial Information System applications.
National Grid has evaluated the SAP platform from an enterprise perspective, and concluded that it will
lead to substantial benefits over the long term. To confirm this view, they concluded that there is a need
to further validate benefit assumptions and confirm that SAP is the best choice among other potential
alternatives for its customers in the US, as well as, the best choice for the National Grid enterprise.
Exhibit __ (ISP-4) Page 4 of 34
198
National Grid SAP Benefits Benefits Validation – Final Report
Page 2
It is within this context that in January, 2011, shortly after his appointment as Senior VP of US Finance
and Executive Sponsor of the US Foundation Program, Alan Foster commissioned the US ERP Benefits
Validation Initiative. This initiative includes a review of competitive alternatives to SAP that may also be
viable for consolidating Back Office and Front Office systems in the US, as well as, a benefit opportunity
assessment performed from the perspective of the US regulated companies and their customers.
It is anticipated that this Benefits Validation Initiative will provide the Executive Committee an additional
data point to consider before sanctioning the post-design activities required to complete the Back Office
phase of the US Foundation Program.
APPROACH Capgemini developed an overall understanding of the business mandates, scope, scale and status of the
US Foundation Program by reviewing sanctioning, design and program management documentation as
well as conducting fact finding interviews with a wide range of program stakeholders. Two competitive
alternatives to SAP were developed and a 10 year program timeline was established as the basis for
evaluating the cost over time for SAP and the competitive alternatives. Capgemini estimated
implementation and operating costs for the each competitive alternative and SAP implementation and
operating costs were provided by National Grid. Based upon the business mandates, scope and scale of
the US Foundation Program benefit opportunities enabled by the SAP solution were identified and the
benefit opportunities enabled by each competitive alternative to SAP were compared with those enabled
by SAP. In addition to cost over time and benefit opportunities enabled, organizational change impact
and risk were also quantified for the SAP solution and each competitive alternative. Cost over time,
benefit opportunities enabled, organizational change impact and risk were combined to establish a
comparative ranking of the SAP solution and the competitive alternatives.
SUMMARY OF FINDINGS National Grid has recognized the need to consolidate the KeySpan and Legacy National Grid US
operations since closing the KeySpan acquisition in 2007. Reviewing the background documents
associated with this consolidation indicates an ongoing internal debate on how to optimize this
consolidation investment and achieve a greater degree of scale-driven efficiencies. The decision to use
SAP in the US, was a logical approach in this context.
Our review of cost for the two Oracle-based Competitive Alternatives indicates that one may be cheaper,
but, neither has the same benefit enablement potential of SAP. In fact, when we add the realities of risk
to the assessment, our review provides additional confirmation that while the market alternatives to SAP
Exhibit __ (ISP-4) Page 5 of 34
199
National Grid SAP Benefits Benefits Validation – Final Report
Page 3
ERP for Utilities are clearly maturing, the SAP path National Grid has begun can enable greater benefits
with lower risks.
Finally, the only way to achieve most of the benefits identified in this assessment is by structuring the
next phases of the SAP implementation so that activities are linked to benefit enablement and those cost
centers that own the impacted processes and resources are onboard and accountable for benefits
realization. Tightly managing the cost of the implementation and linking outcomes to benefits will
position National Grid to achieve both the needed US consolidation and the desired broader energy
company synergies.
COMPETITIVE ALTERNATIVE ANALYSIS Guiding Principles In this section we describe the analyses that were performed to develop and evaluate competitive
alternatives to SAP and the principles that guided the study.
Three key principles guided the development of alternatives. First, each competitive alternative must
deliver the functionality required to achieve the business objectives established by National Grid for the
US Foundation Program (USFP). Second, each alternative must be built using proven commercially
available software packages that are vendor-supported through at least 2020. Third, major changes to
individual processes should occur only once during the USFP to limit organizational impact. These
principles had a direct impact on the number of competitive alternatives and the structure of each
alternative, as discussed below.
The business objectives established by National Grid for the Back Office, Phase 1 and Front Office Phase
2 of the US Foundation Program (USFP) were used as a reference for the task of identifying potential
competitive alternatives to SAP. These business objectives can be grouped into three main categories;
1) reduce operational and compliance risk,
2) enable real back office benefits as part of Phase 1,
3) establish a foundation to enable significant front office operational performance improvements as
part of the Front Office phase.
The Back Office business objectives were documented in National Grid’s December 2009 Foundation
Project investment proposal1 and are listed below for reference:
1 Capital/Revenue Investment Proposal – Summary, Phase 1- Foundation Project, US Shared Services, Project No. INVP 2506, (A
sanction paper by Andrew Sloey– December 2009)
Exhibit __ (ISP-4) Page 6 of 34
200
National Grid SAP Benefits Benefits Validation – Final Report
Page 4
to reduce business risk by (a) providing a consistent and robust financial/regulatory reporting and
business planning capability and (b) replacing IS assets, which due to age, present an increased
risk of failure and significant costs when business/process modifications are required
to improve controls
to provide a process/systems capability foundation upon which to build the Common Operating
Model vision (a common set of processes and systems company wide with minor adjustment to
accommodate unique local requirements).
to lay the groundwork for delivering savings via future Projects focused on work delivery, asset
and customer systems/processes
to support the delivery of efficiencies and savings across all Lines of Business
to improve customers’ experience and satisfaction with Financial, Supply Chain and HR
processes
to simplify the US Back Office landscape and business processes by consolidating the Oracle and
PeopleSoft ERP Suites onto a single integrated platform
Front Office, Phase 2, business objectives for the USFP are described in the US System Strategy
Routemap, but not yet formally sanctioned. Consolidated Gas and Electric Front Office business
objectives were compiled from this routemap and are presented below for reference:2
Work Management
– Plan and manage all required resources for a job in one system
– Common planning, approval scheduling, execution and closeout process
– Customer focused processes integrated with Customer System and GIS processes
– Integrated time reporting system
– Mobile enabled processes
– Project / work order planning, sanctioning, cost collection and settlement fully integrated
with financial systems and visible within one system
– Common performance measures and KPIs
2 US System Strategy and Routemap, Final Report, December, 2009
Exhibit __ (ISP-4) Page 7 of 34
201
National Grid SAP Benefits Benefits Validation – Final Report
Page 5
– Integrated capital spend program
– Integrated resource scheduling application
– Standardized work plans for repetitive work
Asset Management
– Standard location and asset hierarchy definitions
– Common location and equipment data records
– Integrated asset and work management
– Standardized preventive and predictive maintenance plans
– Integrated GIS, Asset and Work Management processes
– Asset strategy driven equipment trend analysis
These business objectives touch nearly all major functional organizations within National Grid, which
points to the need for a multi-functional, integrated, enterprise solution. Enterprise solutions that include
Back Office and Front Office functionality are available from two companies, Oracle and SAP. Two
strategies were considered as we developed Competitive Alternatives:
1) integrated ERP solutions where all applications are provided by a single vendor
2) best of breed solutions, where leading applications are selected and integrated with a core ERP
backbone in order to obtain specialized functionality and industry-dedicated support for some
components of an end-to-end solution, i.e., Power Plant for Fixed Asset Accounting and Tax,
Maximo for Asset Management, Manhattan Systems for Warehouse Management.
Integrated ERP solutions benefit from less custom integration to external applications and data sources,
but usually require restructuring existing business processes to closely align with delivered vendor
functionality. Best of breed solutions benefit from the ability to select functional applications that most
closely align with an utilities’ unique business requirements, but they suffer from the need to build, and
requirement to support, complex integration points between applications and data sources in order to
achieve process integration that enables seamless operations.
Implementing a fully integrated ERP system is the logical strategy to pursue; however, all integrated ERP
solutions suffer from the lack of fixed asset accounting and reporting applications which meet utility
industry requirements. A large number of utilities, including National Grid, have decided to use a utility
industry-specific application, Power Plant, to perform these functions. A key reason for their decision is
Exhibit __ (ISP-4) Page 8 of 34
202
National Grid SAP Benefits Benefits Validation – Final Report
Page 6
the timeliness and frequency with which the Power Plant vendor provides application updates to tax and
unique utility regulatory requirements, enabling utilities to remain compliant with less internal oversight
and manual intervention. This decision places Power Plant in a central position of most utility ERP
accounting systems making most ERP deployments less than a single vendor solution, but not a full Best
of Breed solution. The National Grid USFP Team has taken this approach with SAP. We agree with that
decision and have included Power Plant as a key component in all Competitive Alternatives.
Asset and Work Management is another area where many utilities find integrated applications too rigid.
While the USFP team has selected to use the Asset and Work Management module provided with SAP,
we have incorporated a Best of Breed Asset and Work Management system for one of the Competitive
Alternatives.
Guided by these principles and with consideration for the noted product dynamics, three Competitive
Alternatives to SAP were identified:
• PeopleSoft 9.1 to Oracle Fusion Enterprise with Maximo Asset and Work Management
• Oracle eBusiness Enterprise including Oracle EAM migrating to Oracle Fusion
• Moving Directly to Oracle Fusion Enterprise
Based upon the lack of maturity, industry experience and general release status of the Oracle Fusion
Enterprise Suite of applications, the third alternative, Moving Directly to Oracle Fusion ERP, was
eliminated early in our analysis. Two Competitive Alternatives remained viable alternatives to SAP and
the following Cost Models were developed for each.
Cost Model Considerations The Back Office Phase of National Grid’s US Foundation Program, is the first step in a multiyear
program that includes delivery of highly integrated Back Office, Front Office and GIS Systems. For that
reason the implementation and operating costs for the SAP solution and each alternative option has been
evaluated over a 10 year evaluation period, starting in 2012.
The figure below is a graphical representation of the deployment phases and operational support period in
the evaluation model.
Exhibit __ (ISP-4) Page 9 of 34
203
National Grid SAP Benefits Benefits Validation – Final Report
Page 7
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Phase 1
Operate and Support Solution
Phase 2
Phase 3
Scope of Phases The scope of each project Phase is summarized below:
• Back Office: The scope of work for each alternative includes a Phase 1, Back Office, which
includes the same functional scope of work as the USFP. This includes Finance, with an
upgrade and consolidation of Power Plant, plus implementation of the Supply Chain, Human
Resources and Time Entry modules.
• Front Office: Each alternative included a Phase 2, Front Office implementation, which
includes Asset and Work Management, Scheduling, Mobile Workforce Management;
consolidation of GIS for gas into a single instance of ESRI; conversion of Electric GIS to
ESRI; and incorporation of field design functionality into the Mobile Workforce Management
solution.
• Upgrades and Migrations: A version upgrade for SAP was included in 2017. The PeopleSoft
and Oracle-based alternatives included a migration to Oracle Fusion, Oracles new Integrated
ERP platform, in 2017.
Cost Basis
Capgemini did not develop an independent cost estimate for Phase 1 of the USFP SAP implementation.
We used National Grid’s May 2011 program estimate as the SAP placeholder for comparison. Similarly,
we did not develop independent implementation cost estimates for SAP Phase 2. The Phase 2, Front
Office, cost estimates prepared as part of the US System Strategy and Routemap were incorporated into
this analysis.
Exhibit __ (ISP-4) Page 10 of 34
204
National Grid SAP Benefits Benefits Validation – Final Report
Page 8
Capgemini developed cost estimates for the Phase 1, Back Office, costs for each Competitive Alternative.
For Phase 2 of each Competitive Alternative we estimated the incremental hardware, software and
implementation costs considered to be over and above those included in the US System Strategy and
Routemap estimates for SAP Phase 2. We also estimated the costs associated with migrating to Oracle
Fusion.
Operation and support costs were estimated and included in the cost model for each alternative.
Note: The operation and support costs of legacy applications being eliminated are included as potential
benefits enabled in the Benefits Section of this report. The synergies associated with operating and
supporting a single ERP system, SAP, globally were also included as potential benefit opportunities.
The Capgemini team did not develop independent estimates for the following items, but relied on existing
estimates:
• SAP Back Office project cost
• SAP Software license cost
• SAP Hosting cost
• SAP Application Support cost
• SAP Version Upgrade cost
• Baseline Front Office costs used as input to all Alternatives based upon US System Strategy
Routemap issued in December, 2009.
The cost estimates for these items were provided by National Grid from either the USFP Back Office
project or from the US System Strategy Routemap; however, Capgemini developed independent cost
estimates for the following:
• Phase 1, Alternative 1 and Alternative 2
• Phase 2 incremental costs beyond the scope of the SAP Project estimates,
• Phase 3 Alternative 1 and Alternative 2
• Operations and Support cost estimates for Alternative 1 and Alternative 2.
Exhibit __ (ISP-4) Page 11 of 34
205
National Grid SAP Benefits Benefits Validation – Final Report
Page 9
Operation and Support
Operation and support activities for each alternative begin with the transition to production at the
completion of Phase 1 and continue through the end of 2021. Three primary categories of cost are
included in Operation and Support costs:
• Application Hosting
• Software Maintenance
• Application Support
Schedule
This analysis model is based upon a ten (10) year timeline beginning in 2012 as described earlier in the
Approach and Guiding Principles section. We developed a high level implementation schedule for Phase
1 of each Alternative, but we used the 24 months implementation estimate for Phase 2 that was included
in the US Systems Strategy Routemap for SAP and both Alternatives. In addition, the Phase 3 schedule
for each Alternative was estimated at 12 months or less.
Benefits Enablement
The idea that combining two ERP systems and associated business processes will generate benefits is a
somewhat obvious conclusion, i.e., using less hardware, less software, and less people, should lead to
tangible savings. The requisite task of assigning these benefits to specific cost centers and resources, and
then actually achieving them, is always more difficult. National Grid began the process of defining
benefits well before the USFP began and has continued to define and assign benefits as work continues in
the project Design Phase.
Phase 1 is expected to enable significant Back Office savings while creating a foundation that could also
enable significant benefits as part of the Phase 2, Front Office deployment.
The categories of Back Office and Front Office Benefit opportunity enabled by a program of this scope
and scale are detailed in Appendix B. Due to National Grid’s US Restructuring Program, National Grid is
unable to definitively quantify, at this point in time, all of the incremental benefits that will be enabled by
Exhibit __ (ISP-4) Page 12 of 34
206
National Grid SAP Benefits Benefits Validation – Final Report
Page 10
the US Foundation Program; however, the differences between the benefit opportunities enabled by the
SAP solution and those enabled by each of the Competitive Alternatives have been documented and
incorporated into the ranking of alternatives.
Realizing benefits from technology enabled transformation programs is a process, not an event, and it
requires commitment across the organization to achieve a prescribed set of shared objectives. The benefit
opportunities that Capgemini has identified through this engagement represent a benefit hypothesis, the
first step in the benefit realization process. Subsequent steps include validation of the benefits hypothesis,
defining the activities and changes that must be made to achieve benefits, building ownership and
commitment for taking these steps and making these changes; delivering the benefits by taking the steps
and making the changes; reporting progress against the plan and adapting where necessary.
Magnitude of Change
The Magnitude of Change is also a significant factor that needs to be taken into consideration.
The magnitude of organizational change that National Grid would be required to accommodate in order to
adopt SAP and each Competitive Alternative was determined using a change impact rating. A change
impact rating was developed based upon the number of employees and processes impacted during each of
the three program phases; Back Office, Front Office and Upgrade for SAP and each Competitive
Alternative. Change Impact was then incorporated into the ranking of options. The Magnitude of
Change rating and ranking for SAP and each Competitive Alternative are detailed below in the Rating and
Ranking section of this report.
Risk While the cost and benefit assessments are significant contributors to any decision regarding the best path
ahead for National Grid, there are other important considerations. These considerations include several
categories of Risk including technology risk, implementation risk and solution complexity risk. SAP and
each of the Alternative Options were assessed with regards to these risk factors. The Risk rating and
ranking for SAP and each Competitive Alternative are detailed below in the Rating and Ranking section
of this report.
The SAP Solution
Exhibit __ (ISP-4) Page 13 of 34
207
National Grid SAP Benefits Benefits Validation – Final Report
Page 11
Cost Over Time The total estimated cost of ownership for SAP Back and Front office, GIS consolidation, 2017 upgrade
and ten (10) years of solution operations and support costs is approximately $550M.
Relative Benefits While our assessment found many of the same benefit opportunities were enabled with either SAP or the
two Competitive Alternatives, we found a greater level of potential business operational benefits and IS
operational benefits can be enabled by the SAP solution. Supply Chain benefit enablement is an example
of where Alternative 1 provides less potential benefits than SAP and a longer Back Office implementation
schedule for Alternative 2 resulted in lower Back Office benefits over the analysis period.
Additionally, SAP offers the National Grid IS organization the opportunity to achieve benefits of scale
associated with purchasing and operating the same application in the US and the UK. The potential IS
savings achievable with SAP ERP are somewhat unique to National Grid. As an energy company that
already uses SAP in the UK, the single vendor and combined scale of operations should result in
significant SAP cost savings. Additionally, IS operating synergies that result from this simplified
technology footprint, are expected to yield ongoing savings. The total cost of ownership for adding
another instance of SAP in the US is therefore expected to be lower than adding/enhancing Oracle
platforms in the existing SAP-centric IS infrastructure.
Magnitude of Change From a Change Impact perspective, SAP rated slightly more favorably with regards to Change Impact,
because the eventual Fusion upgrade required for both Alternative 1 and Alternative 2 involve significant
process and systems change.
Risk Technical Risk
SAP rated most favorably with regards to the Technical Risk due to the fact that its product set is
commercially available and there is a significant installed utility base. The solution is a much more
mature suite of applications, which reduces the range and scope of issues that normally face a new
software release.
Exhibit __ (ISP-4) Page 14 of 34
208
National Grid SAP Benefits Benefits Validation – Final Report
Page 12
Implementation Risk SAP rated most favorably with regards to implementation risk due to the fact that skilled resources are
readily available in the US.
Solution Complexity Risk SAP rated less complex than Alternative 1 and of equal complexity to Alternative 2 based upon the fact
that the Alternative 2 Oracle eBusiness Suite, like SAP, is a highly integrated ERP system that requires
fewer integration points than the Alternative 1, PeopleSoft/Best of Breed, solution.
ALTERNATIVE 1 - PEOPLESOFT 9.1 TO FUSION
This is a best of breed alternative that begins with a reimplementation of an updated release of the
existing National Grid PeopleSoft application suite. The scope of work for each Phase of this Alternative
is described below:
Phase 1 – Back Office • Reimplementation of PeopleSoft 9.1 Finance, Supply Chain, HRMS and Payroll
• Implementation PeopleSoft Time and Labor
• Upgrade and consolidate to a single instance of Power Plant 10
• Retain the existing STS tax application
• Retain the existing Fleet Anywhere applications
• Retain the existing Manhattan Warehouse Management applications
• Retain the existing Asset Management, Work Management, Scheduling and Mobile
Workforce Management applications
This alternative consolidates Legacy KeySpan back office systems onto re-implemented versions of
PeopleSoft applications currently in use at Nation Grid operations in New England Electric and Upstate
New York Gas and Electric. A financial redesign has been included to incorporate the new accounting
code blocks, organizational restructuring, allocation and accounting rule changes that National Grid has
identified. Beyond the Finance and Accounting processes, additional benefit-justified process and
configuration changes are included in the cost estimate for this alternative; however, a significant number
of existing National Grid processes, configurations and interfaces will be reused with this Alternative 1.
Exhibit __ (ISP-4) Page 15 of 34
209
National Grid SAP Benefits Benefits Validation – Final Report
Page 13
The interfaces required to integrate Legacy KeySpan Front Office applications with PeopleSoft 9.1 have
been included in the scope of work and cost estimate. The work required to accommodate the modified
accounting, supply chain and time entry processes in the Legacy KeySpan and NG Front Office
applications has been considered in the scope and cost estimate.
Based upon Oracle’s current published position, we anticipate extended support for version 9.1 of
PeopleSoft through 2017. If Oracle support agreements are maintained, existing KeySpan Oracle licenses
can be swapped out for PeopleSoft licenses at no cost to National Grid. Oracle has also stated their
intention to provide a migration path from PeopleSoft 9.1 to Oracle Fusion3. If PeopleSoft extended
support agreements are maintained, PeopleSoft licenses will be converted to Oracle Fusion licenses at no
cost to National Grid.
Phase 2 – Front Office/GIS
Phase 2 is the consolidation and replacement of legacy Gas and Electric Front Office Application
throughout National Grid US. These applications include Asset Management, Work Management,
Scheduling, Mobile Workforce Management and GIS. This alternative includes implementing Maximo
as National Grid’s Asset and Work Management System, Click Software’s scheduling application and
SyClo’s Mobile Work Management Application.
Maximo, an IBM product, and the leader in the Asset and Work Management applications4, is included in
this Alternative. Maximo is currently in use in the former KeySpan operations. National Grid’s New
England and Upstate New York operations currently use the Logica Storms work management system.
The Storms application is now part of Logica’s new Asset & Resource Management (ARM) suite of
applications. Since being released in 2006 ARM has not met with a great deal of success in the utility
industry. Several other Asset and Work Management applications, as outlined by Gartner, could be used
in place of Maximo; however, we selected Maximo for application maturity and a broad industry installed
base, which can normally be expected to improve application enhancements and support.
3 Oracle Fusion refers to the most recent release of ERP applications from Oracle Corporation. The applications make use of
Oracle’s latest technology stack including, most notably, Fusion Middleware. Fusion Middleware is a collection of technologies such as Business Process Execution Language (BPEL), Service Oriented Application Protocol (SOAP), Extensible Markup Language (XML), Java Enterprise Edition (J2E), Java Messaging Service (JMS), etc. Oracle Fusion shows promise for combining the best functionality of Oracle’s eBusiness Suite, JDEdwards, PeopleSoft, and Siebel applications on a common technology stack. The migration path to Oracle Fusion Applications varies significantly depending on the current ERP platform.
4 Gartner, Magic Quadrant for Power Generation Enterprise Asset Management Software, 16-September-2009, ID 600170793
Exhibit __ (ISP-4) Page 16 of 34
210
National Grid SAP Benefits Benefits Validation – Final Report
Page 14
Implementing Fleet Management in Maximo to replace National Grid’s existing instances of Fleet
Anywhere is included in this Phase. Consolidating the multiple GIS systems currently being used in the
Gas business onto a single instance of ESRI and converting the Electric business from GE SmallWorld to
ESRI is included in the scope of this phase.
The Front Office cost estimates included in the US System Strategy Routemap Report issued in
December, 2009 based upon an end-to-end SAP solution were used as the baseline cost estimate for Phase
2 in each Competitive Alternative. The Phase 2 implementation costs were adjusted upward to account
for the following incremental differences between an SAP solution and this best of breed solution:
• Additional Software license and support costs associated with Maximo
• Additional hardware cost associated with Maximo
• Additional integration costs associated with integrating Maximo with SAP
Phase 3 – Upgrade Phase 3 includes implementing a version upgrade for each major component of the solution. In the case
of Alternative 1 this includes:
• Maximo version upgrade
• Click Software version upgrade
• SyClo version upgrade
• A migration between PeopleSoft version 9.1 and Oracle Fusion
The Oracle Fusion ERP solution represents the consolidation of existing PeopleSoft and Oracle
applications into a single enhanced and integrated solution that replaces Oracle’s current multi-product
strategy. Because the Fusion product is not yet generally available, we have timed the migration to
Fusion from PeopleSoft 9.1 for 2017, which is the Oracle announced end of Support for PeopleSoft 9.1.
Capgemini is presently working with Oracle on testing and developing migration tools for the migration
to Fusion. Estimates for the time and effort required to migrate from PeopleSoft 9.1 to Fusion are based
upon this experience.
Alternative 1 Timeline PHASE 1
The overall Phase 1 schedule for Alternative 1 is 15 months as described in the graph below.
Exhibit __ (ISP-4) Page 17 of 34
211
National Grid SAP Benefits Benefits Validation – Final Report
Page 15
1 2 3 4 5 6 7 8 9 12 11 12 13 14 15
TransitionTest
Plan Design
Build
15 Mo
High Level Schedule Alternative 1 Phase 1
Note- this timeline excludes the requisite procurement and commercial start-up period, estimated by
National Grid at 6 months
PHASE 2
The schedule for Alternative 1 is assumed to be 24 months, beginning with the completion of Phase 1.
Cost Over Time The total estimated cost of ownership for Alternative 1 Back and Front office, GIS consolidation, 2017
upgrade and ten (10) years of solution operations and support is approximately $500M.
Relative Benefits
While our assessment found many of the same benefit opportunities were enabled with either SAP or the
two Competitive Alternatives, we found that Alternative 1 enables a lower level of potential business
operational benefits and IS operational benefits than the SAP solution, while enabling higher benefits than
those found in Alternative 2. Supply Chain benefit enablement is lower for Alternative 1 than SAP and
Alternative 2; however, this advantage for Alternative 2 is offset by a lower level of overall Back Office
operational benefits enabled over the analysis period by Alternative 2 due to a longer Back Office
implementation schedule for that Alternative.. Additionally, Alternative 1 enables lower IS benefits than
SAP for the reasons described in the SAP solution section above.
Exhibit __ (ISP-4) Page 18 of 34
212
National Grid SAP Benefits Benefits Validation – Final Report
Page 16
Magnitude of Change From a Change Impact perspective, Alternative 1 rated slightly less favorable than the SAP solution with
regards to Organizational Change. While the initial Change impact for the Back Office implementation
may take advantage of an existing installed base of PeopleSoft users, the eventual Fusion Upgrade that
will be required will necessitate more change than an SAP upgrade.
Risk Technical Risk Alternative 1 rated less favorably than the SAP solution with regards to the Technical Risk inherent in
the eventual Fusion Upgrade that will be required. As of March 31, 2011, Fusion was not commercially
available.
Implementation Risk Alternative 1 rated less favorably than the SAP solution with regards to implementation risk because the
final phase of he program, the Fusion Upgrade relies upon the development of an experienced resource
pool in the external market that has not yet developed. This market is expected to be well established by
the time these resources are required, but this does add some risk to Alternative 1.
Solution Complexity Risk Alternative 1 rated less favorably than the SAP solution with regards to Solution Complexity. A
PeopleSoft/Best in Breed solution dictates the need for multiple complex interfaces spanning multiple
applications on multiple platforms.
Alternative 2 – Oracle eBusiness Enterprise to Fusion This is an Integrated Enterprise Solution using Oracle’s eBusiness Enterprise Suite. This alternative
builds on Oracle technology currently in use in the legacy KeySpan organizations. The scope of work
included in each phase of the program for this alternative is summarized below.
Phase 1 – Back Office
This option is very similar in scope to the SAP strategy currently being implemented on USFP. In this
alternative fleet management and warehouse management will be implemented in Oracle eBusiness and
tax will be implemented in Sabrix. During this phase the existing Maximo and Storms Work
Exhibit __ (ISP-4) Page 19 of 34
213
National Grid SAP Benefits Benefits Validation – Final Report
Page 17
Management applications and their associated Scheduling / Mobile Workforce Management systems will
not be replaced. These applications will be replaced with functionality in Oracle eBusiness EAM for
Asset and work Management during the Front Office Phase. Click software and SyClo will be
implemented to replace the existing Scheduling and Mobile Workforce Management systems.
Based upon Oracle’s statement of direction, Oracle eBusiness, like PeopleSoft, will be supported through
2017. If PeopleSoft support agreements are maintained, existing National Grid PeopleSoft licenses can
be swapped out for Oracle eBusiness licenses at no cost. Oracle will also provide a migration path from
Oracle eBusiness to Oracle Fusion at no cost.
Phase 2 - Front Office/GIS
The Phase 2 scope for this alternative is the same as the Front Office scope contemplated in the US
Systems Strategy Routemap issued in December, 2009. This scope includes the consolidation and
replacement of legacy Gas and Electric Front Office Application throughout National Grid US. These
applications include: Asset Management, Work Management, Scheduling, Mobile Workforce
Management and GIS. This alternative includes implementing Oracle eBusiness EAM as National Grid’s
Asset and Work Management System, Click Software’s scheduling application and SyClo’s Mobile Work
Management Application, as well as, consolidating the multiple GIS systems currently being used in the
Gas business onto a single instance of ESRI and converting the Electric business from GE SmallWorld to
ESRI.
As noted earlier, this approach is similar to the scope currently contemplated on the USFP SAP
implementation. With this Alternative, the end-to-end Oracle eBusiness ERP solution is being substituted
for SAP. As a result of this similarity, the baseline cost estimates for Phase 2, which was developed as
part of the US Systems Strategy Routemap, were used without adjustment for this Alternative.
Phase 3 – Upgrade
In each Alternative, the Upgrade includes implementing a version upgrade for each major component of
the solution. In the case of Alternative 2, this includes:
• Click Software version upgrade
• SyClo version upgrade
• A migration between Oracle eBusiness and Oracle Fusion
Exhibit __ (ISP-4) Page 20 of 34
214
National Grid SAP Benefits Benefits Validation – Final Report
Page 18
Alternative 2 Timeline PHASE 1
The overall Phase 1 schedule for Alternative 2 is 23 months. The major elements of the schedule are
similar to those described above for Alternative 1; however, this is essentially a new installation of Oracle
eBusiness Suite. For this reason the duration of each stage is significantly longer than they are for
Alternative 1. The high level schedule for Phase 1 of Alternative 2 is presented in the graph below.
1 2 3 4 5 6 7 8 9 0 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Test TestTransition
DesignBuild
TransitionTest
Plan
23 Mo
High Level Schedule Alternative 2 Phase 1
Note- timeline excludes the requisite procurement and commercial start-up period, estimated by National
Grid at 6 months
PHASE 2
The schedule for Alternative 2 is assumed to be 24 months, beginning with the completion of Phase 1.
Cost Over Time The total estimated cost of ownership for Alternative 2 Back and Front office, GIS consolidation, 2017
upgrade and ten (10) years of solution operations and support is approximately $630M.
Relative Benefits While our assessment found many of the same benefit opportunities were enabled with either SAP or the
two Competitive Alternatives, we found that Alternative 2 enables a lower level of potential business
operational benefits and IS operational benefits than the SAP solution. A lower level of Back Office
operational benefits are enabled over the analysis period by Alternative 2 due to a longer Back Office
Exhibit __ (ISP-4) Page 21 of 34
215
National Grid SAP Benefits Benefits Validation – Final Report
Page 19
implementation schedule for this Alternative. Additionally, Alternative 2 enables lower IS benefits than
SAP for the reasons described in the SAP solution section above.
Magnitude of Change From a Change Impact perspective, Alternative 2 rated less favorable than either the SAP solution or
Alternative 1. For the Back Office and Front Office phases of the program, National Grid could expect
the same amount of Change Impact as with the SAP solution. The eventual Fusion upgrade; however,
would require a reimplementation of the Oracle solution, which will necessitate significant process and
system changes.
Risk
Technical Risk Alternative 2 rated less favorable with regards to the Technical Risk than the SAP solution or Alternative
1. The eventual Fusion Upgrade that will be required was one factor. As of March 31, 2011, Fusion was
not commercially available. In addition the Click and Syclo Front Office integration with Oracle was
viewed as not having a significant utility installed base.
Implementation Risk Alternative 2 rated less favorably than the SAP solution, with regards to implementation risk, because the
final phase of the program, the Fusion Upgrade relies upon the development of an experienced resource
pool in the external market that has not yet developed. This market is expected to be well established by
the time these resources are required, but this does add some risk to Alternative 2.
Solution Complexity Risk Alternative 2 rated better than Alternative 1 and equal to SAP with regards to Solution Complexity given
that Oracle eBusiness Suite, like the SAP solution, is a highly integrated ERP system that minimizes the
integration points necessary with a PeopleSoft/Best of Breed solution..
Exhibit __ (ISP-4) Page 22 of 34
216
National Grid SAP Benefits Benefits Validation – Final Report
Page 20
RATING, RANKING, WEIGHTING The fundamental objective of this SAP Benefits Validation Assessment was to develop an unbiased
perspective on the viability of Competitive Alternatives to SAP. This assessment necessarily included
consideration for cost and the potential for each option to deliver benefits from a strict US perspective.
We also found that for an assessment of cost and benefits to have value, all of the options had to be
considered within the context of project risk. This need to rate and then rank multiple related variables
from multiple points of view created a fairly complex body of data. In order to simplify the presentation
of this data, a Rating and Ranking model was developed to compare SAP and the Competitive
Alternatives. Once all the elements were rated and ranked, the categories were weighted based on
internal priorities and industry experience. This Rating and Ranking system and the approach used to
develop and incorporate each element into an overall comparative ranking is described below.
Four primary categories were developed that combined multiple individual data points into simple
categories for rating and ranking. These categories are: Cost over Time, Benefit Enablement, Magnitude
of Change, and Risk. In order to combine the individual data points it was necessary to create category
factors. The following factors were used: a factor that combines Cost and Time, a factor for Benefit
Enablement; a factor that quantifies the magnitude of change required by each option; and a factor that
consolidates multiple variations of risk. Each factor is explained below.
Cost Over Time Factor This factor combines the cost and schedule to implement and operate with the time value of money. The
basis for developing this factor was a traditional 10 year cost analysis using a 15% annual discount rate to
approximate the weighted average cost of capital. The primary elements of the analysis were:
• Software Cost • Implementation Cost • Annual Vendor Software Maintenance Cost • Annual Hardware and Software Operating Cost
Exhibit __ (ISP-4) Page 23 of 34
217
National Grid SAP Benefits Benefits Validation – Final Report
Page 21
Summary of Ten Year Cost
SAP Alternative 1 Alternative 2
Software Cost 12,000 32,280 50,500
Implementation Cost 470,200 385,720 470,872
Vendor Maintenance Cost - SW 16,200 28,180 55,040
Operating Cost – HW/SW -Annual 53,200 57,520 55,020
Total Cost* 551,600 503,700 631,432
* It is important to note that the cost comparison in the Ten Year Cost Summary necessarily uses numbers which have a varying degree of confidence.
Once Cost and Time were consolidated, a 1 to 3 numerical scale was used to rank each alternative with 3
being the most desirable option and 1 being the least desirable. In the case of Cost over Time, Alternative
1 received the highest rating.
Cost over Time
Options SAP Alternative 1 Alternative 2
Overall Ranking 2 3 1
Once ranked, a weighting was assigned. The Cost over Time ranking was weighted at 40% (the highest)
of the overall weighting scale. The method used for combining rankings and weightings to determine the
overall final ranking of each option is described in the Weighted Ranking section below.
Benefit Enablement Factor While National Grid is implementing an ERP solution for many reasons, one of the primary drivers is the
desire to improve the cost of service and streamline operations. Each solution has been considered from
this perspective. The functionality that delivers many of the benefits and the ability to configure the
application to the desired business process are common across the three options; however, as noted earlier
SAP has some advantages from a benefits enablement perspective. Among these advantages is:
• The potential created by using the same software and vendor in both the US and UK. Since
National Grid UK already uses SAP, this advantage allows National Grid US to gain a level of
scale and degree of efficiency that cannot be achieved with either of the Alternatives.
Exhibit __ (ISP-4) Page 24 of 34
218
National Grid SAP Benefits Benefits Validation – Final Report
Page 22
• Supply chain benefit enablement is another area where Alternative 1 provides less potential
benefits than SAP and Alternative 2.
• Longer Back Office implementation schedule for Alternative 2 resulted in lower Back Office
benefits over the analysis period
Accordingly, we have rated the options below with SAP as the best option from a Benefit Enablement
perspective.
Benefits Enablement
SAP Alternative 1 Alternative 2 Overall Ranking 3 2 1
Because the level of benefits is a key driver for any ERP implementation, we assigned the second highest
weighting to this section, a 30% weighting factor. Again, weighting is explained in more detail below.
Magnitude of Change Factor The magnitude of organizational change that National Grid would be required to accommodate in order to
adopt SAP and each Competitive Alternative was determined using a change impact rating. A change
impact rating was developed based upon the number of employees and processes impacted during each of
the three program phases; Phase 1 - Back Office, Phase 2 - Front Office and Phase 3 – Upgrade. For this
analysis, lower impact ratings mean less internal disruption and are more desirable than higher impact
ratings. This rating was calculated for each alternative using the following equation.
Change Impact Rating = [(# employees Phase 1 x # processes Phase 1)/10,000] + [(# employees Phase 2 x # processes Phase 2)/10,000] + [(# employees Phase 3 x # processes Phase 3)/10,000]
Baseline Alternative 1 Alternative 2SAP PS 9.1 to Fusion & Maximo Oracle eBusiness to Fusion
Employees Impacted - Phase 1 12000 8000 12000Employees Impacted - Phase 2 11000 11000 11000Employees Impacted - Version / Fusion Upgrade 16000 16000 16000Processes Impacted - Phase 1 79 41 79Processes Areas Impacted - Phase 2 60 60 60Processes Impacted - Version / Fusion Upgrade 1 41 139Change Impact Phase 1 95 32 95Change Impact Phase 2 66 66 66Change Impact - Version / Fusion Upgrade 2 66 222Combine Change Impact Rating 162 164 383
Magnitude of Change
Element and Category RatingRating Elements within CategoriesRanking Category
Exhibit __ (ISP-4) Page 25 of 34
219
National Grid SAP Benefits Benefits Validation – Final Report
Page 23
Magnitude of Change
SAP Alternative 1 Alternative 2
Phase 1 2 1 2 Phase 2 2 2 2 Phase 3 1 3 3 Total 5 6 7
Based upon the Change Impact Rating of each alternative a 1 to 3 numerical scale was used to rank each
alternative with 3 being the most desirable alternative from a change impact point of view and 1 being the
least desirable. In this case, SAP received the highest ranking.
Magnitude of Change
SAP Alternative 1 Alternative 2
Overall Ranking 3 2 1
The Magnitude of Change ranking was weighted lowest among the rankings at 10% of the overall
weighting scale.
Risk Factor The risk associated with SAP and each Competitive Alternative was assessed by combining three (3) risk
criteria; Technical, Implementation; and Solution Complexity. A 1 to 3 numerical scale was used to
establish ratings for each of these criteria with 3 being highest risk and 1 being lowest risk. Risk was
assessed and scored for each alternative by phase and the phase scores added to determine the overall risk
score for each option using the formulas that follow.
Technical Risk
The guidelines used to apply the 1 to 3 numerical rating to the Technical Risk criteria were:
1. Software is commercially available and has a significant installed base in the utility industry
2. Software is commercially available, but does not have a significant utility installed base
3. Software is not commercially available as of 31-March 2011
Technical Risk = Technical Risk Score Phase 1+ Technical Risk Score Phase 2 + Technical Risk Score Phase 3
Exhibit __ (ISP-4) Page 26 of 34
220
National Grid SAP Benefits Benefits Validation – Final Report
Page 24
Technical Risk
SAP Alternative 1 Alternative 2
Phase 1 1 1 1 Phase 2 1 1 2 Phase 3 1 3 3 Total 3 5 6
.
Implementation Risk The guidelines used to apply the 1 to 3 numerical scale to the Implementation Risk criteria were:
1 – National Grid resources with experience on the software are available in the US;
2 – Resources with experience on the software are readily available in the external market in the
US;
3 – There is limited access to resources with experience on the software available in the external
market in the US.
Implementation Risk = Implementation Risk Score Phase 1+ Implementation Risk Score Phase 2 + Implementation Risk Score Phase 3
Implementation Risk
SAP Alternative 1 Alternative 2
Phase 1 2 2 2 Phase 2 2 2 2 Phase 3 2 3 3 Total 6 7 7
Solution Complexity Risk
The guidelines used to apply the 1 to 3 numerical scale to the Solution Complexity Risk criteria were:
1 – End to End ERP solution;
2 – ERP solution plus Power Plant;
3 – ERP solution plus Power Plant plus Best of Breed EAM.
Exhibit __ (ISP-4) Page 27 of 34
221
National Grid SAP Benefits Benefits Validation – Final Report
Page 25
Solution Complexity Risk = Solution Complexity Risk Phase 1 + Solution Complexity Risk Phase 2 +
Solution Complexity Risk Phase 3
Solution Complexity Risk
SAP Alternative 1 Alternative 2
Phase 1 2 2 2 Phase 2 2 3 2 Phase 3 2 3 2 Total 6 8 6
Overall Risk Overall Risk was a simple consolidation of the individual categories listed above. It is important to note here that the higher the consolidated scores, the greater the degree of risk.
Overall Risk Rating = Technical Risk + Implementation Risk + Solution Complexity Risk
Consolidated Risk Ratings
SAP Alternative 1 Alternative 2
Overall Ranking 15 20 19
Risk Ranking
Once an Overall Risk Rating was established for each alternative, the consolidated scores were ranked
using a simple 1 to 3 numerical scale. In this ranking process, a ranking of 3 is the most desirable
alternative indicating reduced level of risk relative to the other options. A ranking of 1 represents the
highest relative risk.
Risk Ranking
SAP Alternative 1 Alternative 2
Overall Ranking 3 1 2
The Overall Risk ranking was weighted at 20% of the overall weighting scale.
Weighted Ranking of SAP and Competitive Alternatives Our approach to weighting assigned a higher value (multiplier) to the categories in which we found
National Grid to be most concerned. National Grid executives appear to place a higher degree of value on
Exhibit __ (ISP-4) Page 28 of 34
222
National Grid SAP Benefits Benefits Validation – Final Report
Page 26
Cost and Benefits, and a lower relative value on Risk and Change. Our experience has found a similar
industry approach, especially at this stage of an ERP project, so we assigned weightings accordingly. For
the overall assessment, the combined category of Cost over Time received a 40% weighting, Benefits
Enablement a 30% weighting, Magnitude of Change a 10% weighting and Risk received a 20%
weighting. These percentages were used as multipliers for each of the rating categories as indicated
below:
Overall Alternative Ranking = [(Cost over Time Ranking x Weighting Factor) + (Benefit Enablement x Weighting Factor) + (Magnitude of Change Ranking x Weighting Factor) + (Overall Risk Ranking x Weighting Factor)]
Rating and Ranking Summary Reviewing a 10 year cost of ownership Alternative 1 has a cost advantage over SAP and Alternative 2.
Our opinion is that the overall financial comparison is directionally correct and that Alternative 1
provides a cost advantage over SAP. This view is; however, only one half of the financial consideration.
It is important to note here that our cost comparison necessarily uses numbers, which have a varying
degree of confidence. Because Phase 1 of the SAP project is in flight, the costs are a mix of actual and
estimated costs. The only estimated costs for SAP are for those implementation activities that remain,
while the Alternative project estimates address a full implementation of all phases. It is also fair to
assume that the smaller number of project estimates for SAP moving forward will have a higher degree of
confidence given the 17 months of project and vendor experience within the National Grid Project team
that developed the estimates. We believe this is at least true for the remainder of Phase 1. In order to take
into account this varying degree of confidence, we have added a contingency element to our Phase 1 costs
as noted earlier. For the two Alternatives, the Phase 1 estimates have been increased by 30%, while for
SAP the estimate includes a contingency of 3.9% of the overall Phase 1 cost. This SAP contingency is
the actual number built into the current program estimates.
Because we do not quantify Benefits here, we cannot definitively state a position on the business case for
either SAP or the Alternatives. We can show that SAP has the potential to enable more benefits than both
Alternatives and our analysis supports that conclusion.
The Magnitude of Change slightly favors SAP, although the difference is small enough to be immaterial.
The 10% weighting factor does not significantly alter this conclusion.
Exhibit __ (ISP-4) Page 29 of 34
223
National Grid SAP Benefits Benefits Validation – Final Report
Page 27
The Overall Risk factors clearly favor SAP. Probably more important than which option wins in this
category is the fact that Alternative 1 is the least desirable option relative to risk. This fact, in our view,
should be given significant consideration in any deliberations regarding the lower estimated cost of
Alternative 1.
In this combined overall ranking, the higher score is the more desirable option. The total Scores,
unweighted, show a clear advantage for SAP in the combination of areas considered.
Overall Ranking
SAP Alternative 1 Alternative 2
Cost over Time 2 3 1
Benefits Enablement 3 2 1
Magnitude of Change 3 2 1 Risk 3 1 2 Total 11 8 5
A weighting or importance factor was applied to the overall ranking for each Category to develop a
weighted ranking for each option. The results of this weighting process are presented in the table below.
Overall Ranking
Category Weighting SAP Alternative 1 Alternative 2
Cost over Time 40% 8 12 4 Benefits Enablement 30% 9 6 3 Magnitude of Change 10% 3 2 1 Risk 20% 6 2 4 Total 100% 26 22 12
There is a degree of subjectivity involved in even the most sophisticated methods of rating and ranking.
We have attempted to base our approach on a clear, logical and simple set of ranking categories, rating
elements and weighting methods that balance what we can quantify against what we can only estimate or
assume. Using this approach, we have combined thousands of pages of data and years of experience
into the simple table above. Our results indicate that of the three options that could be used as the
Exhibit __ (ISP-4) Page 30 of 34
224
National Grid SAP Benefits Benefits Validation – Final Report
Page 28
foundation for infrastructure and process consolidation for National Grid US operations, SAP appears to
be the best overall option.
SUMMARY OF FINDINGS
In conclusion, our review of the drivers for a National Grid US process and infrastructure consolidation,
finds the need to complete this work to be immediate and critical. Delays continue to impact National
Grid and all other stakeholders. While our assessment finds that there are other technologies that could
deliver many of the same business functions, at least one at a lower estimated cost, the maturity of the
SAP product and the range of potential benefits enabled by SAP creates an opportunity for additional
operational efficiencies and cost of service improvements, above and beyond those enabled by either of
the alternatives. Adding the important categories of Change and Risk to the assessment reinforces this
view of SAP as the better option.
It is our view that the key take away from a simple cost and benefit assessment is that benefit realization
needs to become a key driver, regardless of the option selected. We have demonstrated one possible
approach to benefits realization in the Benefits section. We cannot overstate the need to link any ERP
implementation project deliverables to specific benefits enablement activities. This link should be made
with the support and agreement of the business cost centers that must deliver the benefits.
Exhibit __ (ISP-4) Page 31 of 34
225
National Grid SAP Benefits Benefits Validation – Final Report
Page 29
APPENDIX A - COST ASSUMPTIONS • SAP Phase 1 Implementation cost estimate of $231MM provided by National Grid including first
year software maintenance.
• SAP software license cost allocated to the US of $10MM was provided by National Grid and
does not include other software components included in the solution.
• Average annual SAP software maintenance is estimated at 18% of allocated license cost
• SAP upgrade costs of $15MM were provided by National Grid
• The baseline cost estimate for Phase 2 of each alternative (Gas and Electric Front Office) was
assumed to be $230MM from National Grid’s US System Strategy Routemap dated December,
2009
• Alternative 1 – existing Oracle licenses will be converted to PeopleSoft licenses at no additional
license cost to National Grid
• Alternatives 1 and 2 – PeopleSoft and Oracle eBusiness license costs were estimated by applying
a 40% discount factor to list prices
• Alternative 2 – Existing PeopleSoft and Oracle licenses will be converted to eBusiness Suite
licenses at no additional license cost to National Grid
• Hourly rates shown in the cost estimate summary tables include an average allowance of
approximately 20% for travel and living expenses for SI and Vendor and an allowance of 10% for
National Grid resources.
• SI Management and Functional hours are assumed to be on-shore in the US
• SI Technical hours are assumed to be split 66% on-shore in the US and 34% off-shore in India
• Oracle eBusiness Suite licenses will be upgraded to Oracle Fusion licenses for similar
functionality at no additional license cost to National Grid.
• In addition to application licenses, upgrading to Oracle Fusion requires licenses for eight (8)
Process Integration Products (PIPs)
Exhibit __ (ISP-4) Page 32 of 34
226
National Grid SAP Benefits Benefits Validation – Final Report
Page 30
APPENDIX B – BENEFIT OPPORTUNITY CATEGORIES
BACK OFFICE BENEFIT OPPORTUNITIES
General Accounting2 systems to 1, streamlined service company structure, consistent allocation rules. quantity of manual work reduced, efficiency improved
Financial Close 2 systems to 1, quantity of manual work reduced, efficiency improvedTax 2 systems to 1, efficiency improvedPlant Accounting 2 systems to 1, increased level of automation, estimated required for KS work.Budgeting 2 systems to 1, more automation, efficiency improvedTreasury 2 processes to 1, consolidated view of requirements, efficiency improvedInternal Audit and SOX
Single GL, enhanced code block, streamlined service company structure and allocations reduces quantity audit work and improves efficiency of auditing process
Regulatory SupportSingle GL, enhanced code block, streamlined service company structure and allocations improves efficiency of regulatory accounting, research and reporting processes
EDO FinanceBenefits of improved General Accounting, Plant Accounting and Budgeting processes are also realized in EDO Finance
Gas FinanceBenefits of improved General Accounting, Plant Accounting and Budgeting processes are also realized in Gas Finance
T&D Tech. Svc. FinBenefits of improved General Accounting, Plant Accounting and Budgeting processes are also realized in T$D Technical Services Finance
US Procurement Operations 2 systems to 1, consolidated view of requirements, and vendors, efficiency improvedUS Procurement Strategy/Supplier Mgmt 2 systems to 1, consolidated view of requirements, and vendors, efficiency improvedPurchased Material and Services
2.4 billion annual spend, 7.5% off contract, 10% of off contract moved on contract @8-12% savings
Material Planning & Support 2 systems to 1, consolidated view of requirements, and vendors, efficiency improvedFleet Administration & Support 2 systems to 1, efficiency improvedAccounts Payable 2 systems to 1, increased level of automation, efficiency improvedCompensation & Benefits 2 systems to 1, efficiency improvedEmployee Relations 2 systems to 1, consolidated database to use for managing cases, efficiency improvedPayroll 2 systems to one, efficiency improved
Billing2 systems to one, web application available to bill generators, less work require by centralized group
Accounts Receivable2 systems to 1, receivable now managed by centralized group, increase in number of incoices processed, decrease in number of exceptions
Customer Order Fulfillment - Electric
Self service interface reduces the amount of manual work required to generate quotations and invoices for customer fulfillment staffs in Electric
Customer Order Fulfillment - Gas
Self service interface reduces the amount of manual work required to generate quotations and invoices for customer fulfillment staffs in Electric
Supply Chain
HR
Miscellaneous AR
Business Area
Functional Area Opportunity Drivers
Finance
Exhibit __ (ISP-4) Page 33 of 34
227
National Grid SAP Benefits Benefits Validation – Final Report
Page 31
FRONT OFFICE BENEFIT OPPORTUNITIES
Elec - Distribution Asset ManagementIntegrated view of assets, cost and operations / maintenance history improves efficientcy of strategy development, maintenance planning and asset planning activites
Elec - T&D Services
Better integration of fleet, employee and material data with scheduling processes and better integration of time entry and as built data with mobile technologies improve the efficiency of distribution support, scheduling and work coordination and customer order fulfillment activities.
Elec - PM & Construction
Better Integration of fleet, employee and material data with scheduling processes and better integration of time entry and as built data with mobile technologies will reduce the amount of manual work required to manage construction projects.
Elec - HVDC O&MElec - Protection & TelecomElec - Construction & Maintenance Svcs.Elec - Division OperationsElec - Engineering RecordsElect - Distribution DesignGas - Distribution FinanceGas - Distribution Support Services
Gas - Network StrategyIntegrated view of assets, cost and operations / maintenance history improves efficientcy of strategy development, maintenance planning and asset planning activites
Gas - Scheduling & Dispatch
Gas - Sales Order FulfillmentGas - Meter Shops
Gas - Operations and Maintenance
Gas -CMS
Gas - Maps & RecordsComprehensive integration of mobile field design tools with GIS and Work Order process can reduce the amount of central design and as built updating required.
Opportunity Drivers
Asset Management / Work Management / Scheduling / Mobile Workforce Management
Elec
tric
Gas
Business Area Functional Area
Better Integration of fleet, employee and material data with scheduling processes and better integration of time entry and as built data with mobile technologies improve workforce utilization by reducing time at barns at beginning and end of day as well as reducing the number of orders that cannot be completed on the first visit.Comprehensive integration of mobile field design tools with GIS and Work Order process can reduce the amount of central design and as built updating required.Better integration of fleet, employee and material data with scheduling processes and better integration of time entry and as built data with mobile technologies improve the efficiency
Better integration of fleet, employee and material data with scheduling processes and better integration of time entry and as built data with mobile technologies improve the efficiency of scheduling dispatch and sales order fulfillment activities.Better Integration of fleet, employee and material data with scheduling processes and better integration of time entry and as built data with mobile technologies improve workforce utilization by reducing time at barns at beginning and end of day as well as reducing the number of orders that cannot be completed on the first visit.
Exhibit __ (ISP-4) Page 34 of 34