NGABar Code GPS / Scanning PilotCapturing & Integrating System
Information to Support DIMP
Who is Unitil?
Public Utility Holding Company
• Unitil Energy Systems (NH)29,600 (E) Capital44,300 (E) Seacoast
• Fitchburg Gas & Electric Light Company (MA)
28,500 (E)15,120 (G)
• Northern Utilities (NH and ME)54,200 (G)
• Granite State Gas Transmission87 miles of
Interstate Pipeline
Speakers
Mel CiullaManager, Gas Distribution Operations
John ClossonManager, Procurement & Supply Chain
Stacey KilroyProject Leader, Gas Operations
OVERVIEW
• GPS Program / Logistics• GPS Scanning Initiative / Pilot • Scanning / Construction Logistics• Procurement Asset Management• Data Risk Management
Evolution
• Evolution of GPS with Contractors / Company
• Oppositional to Learning Curve / Culture• Contractors, Multiple Year Contract, Massachusetts, Maine, New
Hampshire
• Mains & Services
• Company Workforce• Union environment
• Leak Investigation• Leak Repair• Relocations• Surveys• Valve Inspections
Evolution
• Concept• GPS
• One field Scanning Feature
Evolution
• GPS / Scanning
• NGA Fall Conference 2010
• Suppliers• Common Approach
• Pilot Main Renewal with Services
• 2013 Expectations
Evolution
• GPS Changes• Six Scanning fields Per GPS
Point• Main Connections• Services• Valve Installation• Maintenance Activities
• Capture Non-Scanning Features
• Type of facility• Existing Facility• Free Form Field
Evolution
Pilot GPS Scanning
• Wibird Street Portsmouth New Hampshire• Relay 2,600’ of 2” HDPE main & services
• Install 500’ of 2” HDPE 40’ stick pipe• Remaining 2” HDPE 2,100’ of coil pipe• Service Replacements
• Inserts• Relays• Reconnects
• GPS Points / Scans• Butt Fusion• Change of direction• Main Fitting / Component (GPS-Scan)• Services (GPS / Scan)
• Tees / Valves / Risers - Meter Fits
Wibird St & Orchard St Portsmouth NH
Wibird St Main GPS Scanning Data
Wibird St Main GPS Scanning Data
Wibird St Service GPS Scanning Data
Wibird St Service GPS Scanning Data
John Closson
2013 Expectations
• Full GPS / Scanning Implementation• Material Procurement / Validation /
Traceability • Unitil’s barcoding initiative has benefits that go beyond traceability and
Distribution Integrity Management Program (DIMP). Various back office functions have the opportunity for streamlining based on the data collected in the field. The back office functions of inventory management, project closeout, and plant asset allocation all rely on data associated with components and their installation within Unitil’s gas systems.
Approve Material Database (SAM)
All materials used in Unitil’s gas systems are subject to Engineering approval. Specific characteristics of an approved item are stored in Unitil’sSystem Approved Material Database (SAM). Some of these characteristics include :
• Item Description• Manufacture Part Number• Design Pressure• To be included Subset of the
item’s 16 Character Bar Code
Material Procurement / Validation / Traceability
Gas System Identification Data
Gas System Identification Data
Pre-
Cons
tructi
onDu
ring C
onstr
uctio
nPo
st Co
nstru
ction
Component is installed in the field where barcode provides manufacture part number and lot information. Additionally, geospatial data and the identification of the gas system which the component is installed will also be collected.
Component is received into inventory with material cost, part number and lot number information recorded into "on-hand" inventory account.
Component Manufacturer Part Number and Lot Number DataGeospacial Data
Component receipt is electronically verified against the Engineering's System Approved Material Database for the receiving division.
Geospacial Data
Component Manufacturer Part Number and Lot Number Data
GIS Database
Inventory Database
System Approved Materials (SAM) Database
GIS Database
Inventory Database
System Approved Materials (SAM) Database
Component installation data is verified against System Approved Materials database to ensure component is approved for gas system to which the component is installed. Exceptions are reported for follow up action; otherwise, component material quantity and dollars are decremented from "on hand" inventory account and charged to the project account.
Verified componentinstallation data is electronically updated to AS-Built record for Operation's review and approval. Facilitating project "close out".
Approved AS-Built records electronically allocate dollars associated with component installation to Plant.
Pre-Construction
During Construction
Post Construction
Benefits to the Back Office
• Improved Accuracy of Material Management
• Shortened project lifecycle from Project Estimate to Project Close Out (As-Built)
• Balanced Resource Allocation – Core Competencies
• KPI’s for Project Estimates
Material Replacement Post Installation
Items replaced in the field after installation due to maintenance or leak survey activity will also be recorded into our GIS applications. The replaced items data will be retired and archived, but not deleted. This approach will allows us to ensure our gas system information is accurate while providing data for trending component failures.
Next Steps
The path to accomplishing this important initiative is through strong partnerships with our vendors.
Risk Based Asset Management Stacey Kilroy
September, 2012
Risk Assessment Gas Service Territories
Code Requirements
• §192.1007 (a) (5) Provide for the capture and retention of data on any new pipeline installed. The data must include, at a minimum, the location where the new pipeline is installed and the material of which it is constructed.IS THE MINIMUM ENOUGH TO ASSESS
RISK?
GIS Risk Asset Management
Key Data Examples
Pipe Size & Sizing System
1” IPS
Wall Thickness SDR 11
Product Name Driscoplex
Series 8100
Pipe Material Designation
PE3408/PE4710
Manufacturing Standard
ASTM D 2513
Date of MFG July 1, 2012
Plant Code & Extrusion Line
KV-4 (Knoxville Tennessee)
Resin Code RN-B53m1
Shift & Operator No. 04-201
Unitil Installer Employee No. 7066
Key Data Examples
Pipe Size & Sizing System
1” IPS
Wall Thickness SDR 11
Product Name
Series
Pipe Material Designation
Plastic HDPE
Manufacturing Standard
Date of MFG
Plant Code & Extrusion Line
Resin Code
Shift & Operator No.
Unitil Installer
Aldyl A Example
Key Data Examples
Pipe Size & Sizing System
1” IPS
Wall Thickness SDR 11
Product Name Driscoplex
Series 8100
Pipe Material Designation
PE3408/PE4710
Manufacturing Standard
ASTM D 2513
Date of MFG July 1, 2012
Plant Code & Extrusion Line
KV-4 (Knoxville Tennessee)
Resin Code RN-B53m1
Shift & Operator No. 04-201
Unitil Installer Employee No. 7066
Key Data Examples
Install Date 1965-1984
Pipe Material Plastic
Pressure IP
Risk Based Initiatives
Pipe Replacement Dynamic Leak Survey
At Risk Pipe Analysis -- Dynamic
At Risk GIS ID #’s
Weekly/Monthly
DIMP Criteria
Work Orders CMS
DIMP Criteria
Automated Mobile Leak Surveying
Automated Survey Tracking
• Seeking to replace the antiquated process of highlighting maps of survey areas or “From/To Street Lists” that so many operators are using
• These antiquated methods do not offer definitive proof that the exercise was satisfied
Automated Survey Tracking Software Audit Trail
• Goal is to provide an audit trail of all pipe id #’s (Mains, Services, Valves) that have been surveyed. Trail can show GPS points paired with corresponding Gas Measurements.
• Records• When• Who• Gas Test Unit ID#• Observations
• Leaks, Field Notes
Partnership with Ubisense
• Ubisense formally known as InMaps• Expertise lies within GIS space• Provider of VeroTrack Automated Survey Tracking
Software
• Unitil: Client/Server application installed in May. • Excellent Preliminary Results• Building requirements for future releases
How Does the Software Work? Server
• Supervisors create Survey Definitions on VeroTrack Server
• Flexible tool that is leveraging GIS data
• Peridocity / Schedule• Attributes
Mobile Techs Process
Sniffer Cones
Senseit PMD
VeroTrack Mobile
VeroTrack Server Reporting
Benefits
• Operators can manage At Risk Pipe more effectively• Pre-VeroTrack Unitil had 3 survey definitions for Mains
• Cast Iron • Business District• Annual
• Post VeroTrack Unitil has increased survey definitions based on our DIMP analysis
• Weekly At Risk Pipe• Monthly At Risk Pipe• Aldyl A At Risk Pipe (annual)• Inside Business District• Outside Business District
Benefits Continued
• Audit Trail• Overtime can clean up any GIS anomolies• Reporting capability
Questions