Doc# E171703 V.1.06 QS - 1 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTechPowered by Innovation™ Nexus® 1450 Meter Quickstart Guide CAUTION! Installation of the Nexus® 1262/1272 meter must be performed only by qualified personnel who follow standard safety precautions during all procedures. Those personnel should have appropriate training and experience with high voltage devices. Appropriate safety gloves, safety glasses and protective clothing are recommended. During normal operation of the Nexus® meter, dangerous voltages flow through many parts of the unit, includ- ing: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid contact with any current-carrying surfaces. Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can only be used as secondary protection. IMPORTANT! Refer to your meter’s Installation and Operation Manual for additional safety warnings before performing installation, wiring, or maintenance of your meter. See the link to the manual, below. NOTE: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter operation and programming information, refer to your meter’s Installation and Operation Manual and the Communi- cator PQA TM , MeterManagerPQA TM , and EnergyPQA.com TM Software User Manual on EIG’s website: User Manual: https://www.electroind.com/products/https://www.electroind.com/products/nexus-1450-cyber-secure-energy- panel-meter-with-advanced-power-quality-and-multiport-communication/ From the webpage, click Technical Documents>User Manual. Software Manual: https://www.electroind.com/products/communicatorpqa-software-application-5/ From the webpage, click Technical Documents>User Manual. CommunicatorPQA TM Setup Software: https://www.electroind.com/products/communicatorpqa-software-application-5/ From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email sales@elec- troind.com or call 516-334-0870. All EIG’s metering and software products’ literature can be accessed from: https://www.electroind.com/all-products/ For software and metering integration, EIG’s Technical Support Engineers are available on an hourly or daily basis to help with typical commissioning assistance, which includes: Verifying meter installation and wiring. Verifying proper system integration. Working with 3rd parties to ensure cross compatibility. Advising users on best practices for optimal implementation. You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.

Transcript of Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS...

Page 1: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 1

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

Nexus® 1450 Meter Quickstart Guide

CAUTION! Installation of the Nexus® 1262/1272 meter must be performed only by qualified personnel who follow standard safety precautions during all procedures. Those personnel should haveappropriate training and experience with high voltage devices. Appropriate safety gloves, safetyglasses and protective clothing are recommended.

During normal operation of the Nexus® meter, dangerous voltages flow through many parts of the unit, includ- ing: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid contact with any current-carrying surfaces.

Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can only be used as secondary protection.

IMPORTANT! Refer to your meter’s Installation and Operation Manual for additional safety warnings before performing installation, wiring, or maintenance of your meter. See the link to the manual, below.

NOTE: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter operation and programming information, refer to your meter’s Installation and Operation Manual and the Communi-cator PQATM, MeterManagerPQATM, and EnergyPQA.comTM Software User Manual on EIG’s website:

User Manual:https://www.electroind.com/products/https://www.electroind.com/products/nexus-1450-cyber-secure-energy-panel-meter-with-advanced-power-quality-and-multiport-communication/From the webpage, click Technical Documents>User Manual.

Software Manual:

https://www.electroind.com/products/communicatorpqa-software-application-5/From the webpage, click Technical Documents>User Manual.

CommunicatorPQATM Setup Software:

https://www.electroind.com/products/communicatorpqa-software-application-5/From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email [email protected] or call 516-334-0870.

All EIG’s metering and software products’ literature can be accessed from:https://www.electroind.com/all-products/

For software and metering integration, EIG’s Technical Support Engineers are available on an hourly or daily basis to help with typical commissioning assistance, which includes:

• Verifying meter installation and wiring.

• Verifying proper system integration.

• Working with 3rd parties to ensure cross compatibility.

• Advising users on best practices for optimal implementation.

You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.

Page 2: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 2

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

Mechanical Installation: Mount the Nexus® 1450 Meter against any firm, flat surface. Use a #10 screw in each of the four slots on the flange to ensure that the unit is installed securely. For safety reasons, mount the meter in an enclosed and pro-tected environment, such as in a switchgear cabinet. Install a switch or circuit breaker nearby; label it clearly as the meter’s disconnecting mechanism.

Installing an External Display:The LED display P40N+ (shown above) and the LCD touchscreen display P70N mount using a standard ANSI C39.1 drill plan. • For the P40N+, secure the four mounting studs to the back of the panel with the supplied nuts. • For the P70N, use the SMKP70N ANSI Mounting kit.

2X 4.00in 10.16cm

10.70in 27.19cm

2X 3.35in 8.51cm

6.74in 17.12cm

6.25in 15.88cm

4X 0.22in 0.56cm THROUGH-SLOT FOR #10 SCREW

Connect from one of the meter’s RS485 ports to the RS485 connection

on the back of this display.

1. 2. 3.

6.1. P70N display2. P70N ANSI Mounting unit3. Panel4. Studs and washers from the ANSI Mounting kit5a and 5b. Mounting brackets and studs shipped with the P70N display6. Washers and nuts from the ANSI Mounting kit

4. 5b.

5a.

Slots

Page 3: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 3

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

Mounting Brackets (MBIO)

Male RS485 Side Port

Female RS485 Side Port

I/O Port (Size and PinConfiguration Vary)

Reset Button

LEDs

The recommended order of assembly for the ANSI Mounting kit is:

a. Attach the top bracket (5a) with its stud to the top back of the P70N display (1) - the bracket has two hooks that fit into the slots on the top of the display.

b. Slide the top of the display with attached bracket under the front lip of the ANSI Mounting unit (2) and

tighten stud snugly - torque is to 3.1 in-lb.

c. Attach the bottom bracket (5b) with its stud to the bottom back of the P70N display - the bracket has

two hooks that fit into the slots on the bottom of the display; tighten stud snugly - torque is 3.1 in-lb.

d. Once the display is secured inside the ANSI Mounting unit, attach the studs and washers from the ANSI

Mounting kit (4) to the back of the unit.

e. Use the washers and nuts from the ANSI Mounting kit (6) to attach the ANSI Mounting unit with P70N

display to the panel (3) - torque is 3.5 in-lb.

Insert one end of the supplied RS485 cable into one of the meter’s RS485 ports set to Modbus RTU, Slave, Address 1, and Baud Rate of 9600. Insert the other end of the cable into the back of the P40N+ or P70N display (see below). See the meter’s user manual for detailed information and alternate P70N mounting.

Installing Input Output (I/O) Modules:1. Secure the mounting brackets to the I/O module using the supplied screws (#440 pan-head screws).2. Secure the brackets to a flat surface using a #8 screw with a lock washer. • Six feet of RS485 cable harness is supplied. Using the cable, connect the I/O module’s male RS485 side port to the meter’s Port 4. • If multiple I/O modules are connected together, secure a mounting bracket to both ends of the group. (See figure below.) Connect multiple I/O modules by connecting the male RS485 port on one module to the female RS485 port on the next module. See Chapter 10 of the meter’s User Manual for more information.

!DANGER

On

L(+)

Power SupplyPSIO

Max Power: 12 VA

Input Voltage: 12-60V DC

www.electroind.com

Output Voltage: 12V DC

ElectroIndustries/GaugeTech

90-240V AC/DC

N(-)

Power In

RESET

COM

INPUT 1

INPUT 2

INPUT 3

INPUT 4

0-1mAAnalog Input

Module

INPUT 5

INPUT 6

INPUT 7

INPUT 8

RESET

COM

INPUT 1

INPUT 2

INPUT 3

INPUT 4

0-1mAAnalog Input

Module

INPUT 5

INPUT 6

INPUT 7

INPUT 8

RESET

COM

OUT 1

OUT 2

OUT 3

OUT 4

TX

RX

CT

0-1mAAnalog Output

Module

RX

RX

CT

CT

TX

TX

P40N+ connections P70N connections

Page 4: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 4

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

Wiring Diagrams:Please refer to the Nexus® 1450 Meter User Manual for additional wiring diagrams and information.

A

A

C

C

LOAD

B N

B N

LINE

Ia

Ib

Ic

In

N -

Vref

Vb

Vc

L +

Vaux

Va

AUXILIARY VOLTAGE

POWER SUPPLY (DEPENDENT ON EQUIPPED SUPPLY OPTION)

FUSES

LO

LO

LO

LO

HI

HI

HI

HI

TEST BLOCK SHORTING SWITCH OR

CTs

EAR

TH G

RO

UN

D

EARTH GROUND

FUSEA

A

C

C

LOAD

B N

B N

LINE

Ia

Ib

Ic

N -

Vref

Vb

Vc

L +

Vaux

Va

AUXILIARY VOLTAGE

POWER SUPPLY (DEPENDENT ON EQUIPPED SUPPLY OPTION)

FUSES

LO

LO

LO

HI

HI

HI

TEST BLOCK SHORTING SWITCH OR

CTs

PTs

EAR

TH G

RO

UN

D

EARTH GROUND

FUSEEARTH GROUND

4 Wire 3 Element with 3 PTs and 3 CTs 4 Wire 3 Element Direct Voltage with 4 CTs

B

LOAD

A C

A B C

LINE

Ia

Ic

N -

Vb

Vc

L +

Va

POWER SUPPLY (DEPENDENT ON EQUIPPED SUPPLY OPTION)

FUSES

LO

LO

HI

HI

TEST BLOCK SHORTING SWITCH OR

CTs

PTs

EAR

TH G

RO

UN

D

EAR

TH G

RO

UN

D

EARTH GROUND

FUSEA

A

C

C

LOAD

B N

B N

LINE

Ia

Ib

Ic

N -

Vref

Vc

L +

Vaux

Va

AUXILIARY VOLTAGE

POWER SUPPLY(DEPENDENT ON EQUIPPED SUPPLY OPTION)

FUSES

LO

LO

LO

HI

HI

HI

TEST BLOCKSHORTING SWITCH OR

CTs

PTs

EAR

TH G

RO

UN

D

EARTH GROUND

FUSEEARTH GROUND

3 Wire 2 Element Open Delta with 2 PTs and 2 CTs 3 Phase 4 Wire 2.5 Elements with 2 PTS and 3 CTs

Page 5: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 5

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

Programming the Meter through CommunicatorPQATM Software

1. From the CommunicatorPQATM software’s Main screen, click the Connect icon in the Icon Bar.

• If you are connecting through a serial port (ports 1-4), use a cable to communicate from the meter to your PC and click the Serial Port radio button.

a. Enter device address.

b. Select baud rate (default for both RS485 and RS232 ports is 9600).

c. Select communication port you are using.

d. Select protocol (default for RS485 is Modbus RTU and for RS232 is Modbus ASCII).

e. Select parity (for RS485 - the default is None). You can leave the other fields as they are.

f. Click Connnect.

• If you are connecting through an Ethernet port, connect from theRJ45 port on the meter’s face to your PC and make sure the switch under the RJ45 the port is set to FIXED.

a. From the CommunicatorPQATM software, click Connect and the Network radio button.

b. Enter device address.

c. Enter the meter’s default IP address: 10.0.0.1.

d. Enter the Network port (the default is 502).

e. Network protocol is Modbus TCP.

f. Click Connect.

NOTE: You can change the meter’s IP address

once you are connected. See the instructions for

Communications settings, beginning on page QS-7.

Page 6: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 6

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

2. The Device Status screen opens, displaying information about the meter.

3. Click OK to close the Device Status screen, and then click the Profile icon in the Icon Bar.

4. The meter’s Device Profile screen opens, giving you access to the programmable settings for the meter.

NOTE: A few basic settings are explained here. Refer to the Nexus® 1450 Meter Installation and Operation

Manual and the CommunicatorPQATM, MeterManagerPQATM, and EnergyPQA.comTM Software User Manual for expanded instructions. The manual is available on the EIG website (see page QS-1 for the download link) and

from the CommunicatorPQATM application: click Help>Contents from the Main screen to open the manual.

Page 7: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 7

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

Program CT, PT Ratios: 1. From the Device Profile screen, double-click General Settings>CT, PT Ratios and System Hookup>one of the items in the list.

a. Enter CT Ratios Primary (1-65535). The Secondary is display only.

b. Enter PT Ratios Primary (1-99999999) and Secondary (1-65535) voltage.Example CT Setting:200/5 Amps: set the Primary cur-rent value as 200.00.Example PT Settings:14400/120 Volts: set the Primary voltage value as 14400.00; set the Secondary voltage as 120.00.

c. Select the Hookup (e.g., Wye).

d. Operational Frequency Range is 50/60 Hz or Wide Band Auto [(20-500) Hz].

e. Click OK.

Program Communications Setting:

1. From the Device Profile screen, double-click General Settings> Communications>a listed port.

2. The settings shown here for the four serial ports (ports 1-4), the Main Network card (port 5) and the Fiber Optic Network card (port 6) are the default settings. You can change the settings, if necessary for your system.

a. For the serial ports, the settings are Address, Baud Rate, Data Bits, Parity, Stop Bits, Tx Delay, Protocol, and Mode.

Page 8: Nexus® 1450 Meter Quickstart Guide - Electro Industries · 2021. 8. 9. · Doc# E171703 V.1.06 QS - 2 Nexus® 1450 Meter Quickstart Electro Industries/GaugeTech™ Powered by Innovation™

Doc# E171703 V.1.06 QS - 8

Nexus® 1450 Meter Quickstart

Electro Industries/GaugeTech™Powered by Innovation™

b. For the Network card ports, the settings are IP Address, Subnet Mask, and Default Gateway. You can use this setting to change the default IP address to a new IP address.

c. The Advanced Settings button lets you set up additional features for the Network cards. See the

CommunicatorPQATM, MeterManagerPQATM, and EnergyPQA.comTM Software User Manual for instructions on these settings.

d. Click OK.

Program Meter Time:.

The meter is preset to Eastern time. To change the meter time:

1. From the Main screen’s Title bar, click Tools>Set Device Time.

2. You can either enter the time in the Time fields, or click Use PC Time to set the time using your PC’s time.

3. Click Send.

NOTE: The meter offers multiple Time Synchronization methods. See Chapter 27, Section 27.1.3 in the software manual (click Help>Contents from the Main screen to open the manual) for instructions on setting up Time Sync for the meter.

Program Meter Name:

The meter’s name is used in database files and report titles. To enter a unique name for the meter:

1. From the Device Profile screen, double-click General Settings>Labels.

2. Enter a name for the meter in the Meter Designation field.

3. Click OK.

IMPORTANT! When you have made changes to the meter’s Device Profile, click Update Device at the bottom of the Device Profile screen, to send the new settings to the meter. The meter will reboot and then you can reconnect to it. If you changed the IP address, make sure to use the new address in the Network Connect screen and make sure the switch under the RJ45 the port is set to PROG.