NextGen 2011 Mark Kellett MAGNET NETWORKS

19
Agenda Mark Kelle- Magnet Networks “Hindsight in Is a Wonderful Thing”

Transcript of NextGen 2011 Mark Kellett MAGNET NETWORKS

Agenda  Mark  Kelle-  Magnet  Networks  

 “Hindsight  in  Is  a  Wonderful  Thing”  

Agenda  

► Magnet  Overview  

► FTTH  Insights  

► Hindsight  Is  Wonderful!  

► Lessons  Learned  

► Conclusions  

         No,  Not  The  Kitchen  Guys!  

Magnet  Model  

Part  of  Something  Bigger  

“Simply  The  Fastest”  Bristol On the Express Path…..Opportunities!

Business  Side  

How  we’ve  helped  

► Detailed  maps  proving  no  single  point  of  failure  ► AutomaNc  rerouNng  of  traffic  –  tested!  ► MiNgate  Against  External  A-acks  DDOS  

DATE

17/05/2011

TITLE

XXXXXXXXXXXXXXXXXXXXXXDRAWN BY

NetDevDESCRIPTION

Low Level Network Design for ESB XX XXXXX

xx.xxxxxx.xxx

MAGNET NETWORK (AS XXXXX)

xx.xxxxxx.xxx

xx.xxxxxx.xxxxx.xxxxxx.xxx

996 ESBXXX

ESBXXX995

VLAN_ID Description

xx.xxxxxx.xxx

Gi8/10

xx.xx.xx.xx

xx.xx.xx.xx

IP Network

Gi8/10

xx.xxxxxx.xxx

xx.xxxxxx.xxx

A End

xx.xxxxxx.xxx

xx.xxxxxx.xxx

B End

1590 nmESB Router xxx Port 3

xx.xxxxxx.xxx

xx.xxxxxx.xxxxx.xxxxxx.xxx

Gi0/2.996

xx.xxxxxx.xxx

Port 2ESB router xxx xx.xxxxxx.xxx

1550 nm

xx.xxxxxx.xxx

d-deg-wdm1

1510 nm

xx.xxxxxx.xxx

xx.xxxxxx.xxx

xx.xxxxxx.xxx

Vlan995

Gi1/0/3

Gi2/0/3

BGP

BGP

ESB NETWORK

FTTH  Deployments:  Magnet  Built  Fibre  

•  Started 2005

•  38 Housing Developments.

•  12k Homes….35k Build Commit.

•  96% Penetration.

•  2.7 RGU’s.

•  Active Fibre.

•  100Mb Triple Play

FTTH  Deployments:  Eircom  FTTH/FTTC  

•  20,000 FTTH/FTTC Passed

•  Plan for 250,000 per year

•  Magnet Only Operator On the Network

•  FTTC downstream speeds of Up to 50Mb

•  FTTH – GPON = 100Mb

Hindsight:  ConstrucNon  Industry  

“One Way Rocket Ride”

Hindsight:  ConstrucNon  Industry  View  

 

► The  property  boom  here  is  different!  

► 90,000  in  ’07  Units  to  7,000  in  ‘11  

► 70%  Price  Drop  from  ‘07  

► FTTH  Build  Plan  –130,000  Units  Planned  

► Reality  Now  =  12,000  Connected  (96%  PenetraNon)  

Hindsight:  “Beware  Of  The  Man  With  the  JCB!”  

► All  UNliNes  in  1  Trench.  

► 3rd  Party  Contractors…Dirty  Fibre  &  TV.  

► Surely  Fibre  Is  Resilient?  

► Lik  Lines  &  Sierra  Leone!  

► Diversity  on  it’s  own  may  not  be  enough…DDOS  

 

Hindsight:  Product  AdopNon  

OveresNmate  the  Short  Term  and  UnderesNmate  the  Long  Term  

Looking  Ahead  

► Bandwidth  demand  acceleraNng  

► Yo-abyte….it’s  here  

► Performance  Benchmarks  are  Increasing  

► Picosecond  

► Law  of  Unintended  Consequences  

► New  Business  Models….Telemedicine  

Looking  Ahead    Bandwidth  Demands….AerTV.ie  

► Bandwidth  demand  acceleraNng….www.aertv.ie  

What  Is  AerTV  ?  

Looking  Ahead  Speed  is  the  UlNmate  Weapon!  

► Speed…not  only  high  frequency  trading.  

In  Summary  ► There  are  many  pracNcal  issues…  

► Network  Design  ► Customer  Experience  with  TV  ► Resilience  

► There  are  known  knowns….Bandwidth  and  speed  going  1  way.  ► Virgin  Media  report  

► LTE  is  not  a  replacement  for  Fibre  (Ofcom)  

► Fibre  Is  The  OpNmal  Future  

► Our  UK  Market  Entry  Plans  &  Project  Express