Next Step for Virtualization: Pre-production Testing

25
Next Step for Virtualization – Pre Production Testing Dennis Powell StackSafe, Inc.

description

IT organizations struggle to perform efficient change and release management. ITIL best practice guidelines clearly identify pre-production testing as a very important step to improve change and release management efficiency. Effective pre-production testing includes building realistic staging environments for IT testing, testing all changes that are targeted for production, and testing the impact of a change across the entire software infrastructure stack from end-to-end. This is sound advice in theory, but IT professionals face a ‘Perfect Storm’ of challenges: • Production system availability expectations are extremely high• IT supports very complex production environments with multiple inter-dependencies• the volume, diversity, and acceleration of changes requested of production systems is overwhelmingIT organizations that adopt a structured change and release management approach also enjoy a smoother, more mature, change process. ‘Second generation’ virtualization serves as an enabling technology upon which to create a structured approach to improve change and release management maturity. It introduces both benefits and challenges of its own. While virtualization is not a complete answer for change and release management, it offers promise that IT organizations should consider. Takeaways:• IT Operations faces a 'perfect storm' of extreme availability demands, highly interdependent systems, voluminous and accelerated change, and confusing system complexity • Structured change management processes according to ITIL best practices includes setting up a staging environment for IT testing, testing all changes, and testing changes from end-to-end across the infrastructure.• For companies that have adopted structured Change Management processes, Change drives 25-30% of incidents in production. For companies with less structured processes, Change drives 75-80% of incidents in production• Virtualization can improve efficiency of pre-production preparation and the adequacy of the testing of changes, but it comes with its own costs and challenges.

Transcript of Next Step for Virtualization: Pre-production Testing

Page 1: Next Step for Virtualization: Pre-production Testing

Next Step for Virtualization – Pre Production TestingDennis Powell

StackSafe, Inc.

Page 2: Next Step for Virtualization: Pre-production Testing

Agenda• Virtualization, The Second Generation• Pre-production testing and virtualization

– The impact of downtime

– Calming the Perfect Storm

– Challenges

• Summary

Page 3: Next Step for Virtualization: Pre-production Testing

VirtualizationThe Second Generation

Page 4: Next Step for Virtualization: Pre-production Testing

Virtualization Red Hot Technology

• Traditional drivers: – Consolidation cost savings

– Simplified QA testing

• Innovation drives the second generation– Green computing

– Business continuity

– Service-oriented virtualization

– Data center automation

– Pre-production infrastructure testing

Page 5: Next Step for Virtualization: Pre-production Testing

ServiceTransition

Virtualized Pre-production Testingand Service Transition

• Change Management• Validation Management• Release Management• Deployment Management• Evaluation Management

Cope with higher volumes ofchange without impactingservice quality

Page 6: Next Step for Virtualization: Pre-production Testing

Pre-Production Testing

The Impact of Downtime

Page 7: Next Step for Virtualization: Pre-production Testing

IT Operations and Service Transition:The Perfect Storm

• Extreme availability demands• Highly complex environments• Inter-dependencies• High volume of changes

Page 8: Next Step for Virtualization: Pre-production Testing

DowntimeA Leading Critical Concern

• The highest concern by all sized companies in managing multi-tier applications

Concern Rank

Small Enterprise(750-4999 employees)

Medium Enterprise(5000-9999) employees)

Large Enterprise(10,000 + employees)

1Minimizing Downtime (48%)

Minimizing Downtime (38%)Minimizing Downtime (51%)

2 Troubleshooting (45%)Speedy Deployment of Changes (38%)

Insuring High Performance (48%)

3 Security (39%)Insuring High Performance (34%)

Troubleshooting (38%)

4 Complexity (37%) Troubleshooting (32%) Security (36%)

5Insuring High Performance (35%)

Security (32%) Complexity (36%)

Statistical source: “IT operations Buyer Behavior Study”, June 2007. Research Edge

Page 9: Next Step for Virtualization: Pre-production Testing

Inadequate TestingA Leading Cause of Downtime

• Companies consider insufficient pre-production testing a key reason for downstream production problems

• Particularly considered a problem for companies:– with high change volumes

– that consider e-commerce a top priority application (32%)

– that operate in the financial services sector (25%)

Page 10: Next Step for Virtualization: Pre-production Testing

Software Changes, IT Resources, and Downtime

• 65% of companies see patches, software changes, or OS updates as the most significant cause of downtime*

• Impact on resources– Average business loses more than 2,000 IT staff hours annually due

to downtime*

* “IT operations Buyer Behavior Study”, June 2007. Research Edge

IT HOURS REQUIRED DUE TO UNPLANNED DOWNTIME BY COMPANY SIZE

1,441

2,079

3,184

0

500

1,000

1,500

2,000

2,500

3,000

3,500

IT S

taff

Ho

urs

( Small Enterprise)750-4,999 Medium Enterprise (5,000-9,999) Large Enterprise (10,000+)

2,115 hrs = Average # of IT Staff Hours Due to DowntimeAll Firms

Page 11: Next Step for Virtualization: Pre-production Testing

Pre-Production Testingand VirtualizationCalming the Perfect Storm

Page 12: Next Step for Virtualization: Pre-production Testing

Improving Testing Maturity During Service Transition

• Adopt best practices for smoother process• Set customer expectations

– Regularly schedule changes

• Establish a consistent evaluation framework – Maintain a staging environment for IT operation testing

• Reduce predicted vs. actual performance variation– Invest in automated change management

• Thoroughly test to reduce known errors and risk– Test changes across the stack before deploying to production

Page 13: Next Step for Virtualization: Pre-production Testing

Benefits of Improved Testing Maturity

• 30% less downtime incidents on an annual basis • Reduction of change impacts to production

– 22% lower problem rate – 33% lower rollback rate– 21% lower delay rate

• 17% reduction in IT hours spent per test • Smoother change/release management process

Statistical source: “IT operations Buyer Behavior Study”, June 2007. Research Edge

Page 14: Next Step for Virtualization: Pre-production Testing

Virtualization Helps IT Maintain Consistent Change Schedules

Rapid test platform build/update reduces change schedule dependency on the ‘right’ test platform

Regularly scheduled changes generate business benefits across all change management maturity factor categories:• 6% fewer production problems caused by changes• 5% reduction in IT staff devoted to change management • 7% reduction in emergency changes • 4% have greater confidence that changes will work properly• 33% describe smoother change management process

Eliminates ad-hoc reactivity, sets customer expectations

Page 15: Next Step for Virtualization: Pre-production Testing

Virtualization Facilitates Automated Change Management Process

Automated provisioning (test images, DR…) quickly delivers representative systems for change management

Automated change management improves business benefits in four of five categories:• 7% fewer production problems caused by changes• 4% reduction in IT staff devoted to change management• 6% greater confidence that changes will work properly• 33% described smoother change management process

Reduces variance between predicted and actual performance

Page 16: Next Step for Virtualization: Pre-production Testing

Virtualized Environments are Easily Maintained for Change Testing

Less time and effort needed to build, copy, replace, and delete staged images

Companies that manage a testing environment gain business benefits in three of five categories:• 9% reduction in emergency changes • 12% have greater confidence that changes will work properly• 12% describe smoother change management process

Establishes consistent framework from which to evaluate change

Page 17: Next Step for Virtualization: Pre-production Testing

Virtualized Environments Support Completeness of Change Testing

End-to-end testing across multi-tiered infrastructure stacks, hybrid imports, virtual and physical networks

Companies that test changes on the entire infrastructure stack gain greater business benefits in two categories:

• 4% fewer production problems caused by changes• 40% describe smoother change management process

Reduce known errors and risk in the reality of today’s Data Center

Page 18: Next Step for Virtualization: Pre-production Testing

Virtualization Supports Process Adoption of Choice

Customers deploying virtualization can select change and release guidelines of choice without limitation

Companies that adopt ITIL or another process gain business benefits in two categories:

• 4% have greater confidence that changes will work properly• 30% describe smoother change/release management process

Smoother processing increases confidence and buy-in

Page 19: Next Step for Virtualization: Pre-production Testing

Business Benefits of Virtualized Pre-production Testing

Less Mature More Mature

Change Testing Environment

None Staging Platform

Process Adoption

None ITIL or Other

Change Scheduling

Ad Hoc Regular Intervals

Change Management Process

Manual Automated

• Fewer Production Problems

• Lower Percent of IT Staff Devoted to Change

• Fewer Emergency Changes

• Greater Confidence in Changes

• Smooth Change Management Process

Change Management Maturity Factors Business Benefits

Completeness of Change Testing

No test or partial test Test Against Entire Stack

Page 20: Next Step for Virtualization: Pre-production Testing

Pre-Production Testingand VirtualizationChallenges and Summary

Page 21: Next Step for Virtualization: Pre-production Testing

Virtual Testing Limitations

• The virtual environment– Avoid mixed hypervisor environments– x86 OS support – Verify physical license restrictions– Lack of fine-grained security control

Page 22: Next Step for Virtualization: Pre-production Testing

Virtual Testing Limitations

• The virtual environment– Network devices don’t import– Each virtual processor “believes” that it has 100% of its

physical processor resources• Don’t oversubscribe physical processors

– ISO isn’t for shops with high disk utilization• Verify free space before copying files

Page 23: Next Step for Virtualization: Pre-production Testing

Virtual Testing Limitations

• Testing the enterprise– Network administration needed to connect to non-

virtualized components– Imported test tools take up disk space– Virtual production increases testing complexity

Page 24: Next Step for Virtualization: Pre-production Testing

Summary

• IT operations’ perfect storm impacts change testing, leads to downtime

• Change maturity within Service Transition limits impacts/downtime• Virtualization builds change maturity for IT operation pre-

production testing– Establishes formal staging and testing platform

– Quickly builds, updates staging and testing platform

– Minimizes dependency on ‘right’ test platform availability

– Helps test changes across E2E infrastructure stack

– Helps IT operations test much higher percentage of changes

– Nurtures the adoption of best practice guidelines

Page 25: Next Step for Virtualization: Pre-production Testing

Follow up

• Questions: Dennis Powell, Sr. Product Manager, StackSafe, Inc.– [email protected]

– 301-992-2989

Thank you!