Newada DuoAct. 4.1 – Upgrading of IENC with depth information
Croatia – Agency for Inland Waterways
Damir ObadRegensburg 14.05.2014.
Agenda:
• ENC production process
• Sample ENC
• Conclusion
ENC Production Process
• Equipment used:
• Reson Navisound 110 – singlebeam echosounder
• ELAC SEA BEAM 1185 - MULTIBEAM SONAR
ENC Production Process
• Cross sections every 50m (single beam)
• dGPS provided by national system CROPOS or reference stations every 5 km along the river
• Software tools used:
• AutoCAD / PDS 2000 for post processing
• 7C’s tools for ENC production
• DXF Converter
• ENC Designer
• ENC Optimizer
• ENC Analyzer
Agenda:
• ENC production process
• Sample ENC
• Conclusion
Sample ENC
• Test stretch defined rkm 1320 to rkm 1305
• Rocky bottom of the river bed
• Training works planned
• Single beam 1320-1305
• Multi beam 1310-1308 (measurements ongoing)
Agenda:
• ENC production process
• Sample ENC
• Conclusion
Conclusion
• Depth information definitely brings added value to the ENCs
• Single beam vs. Multi beam
• Multi beam definitely recommended for the critical sections
• Single beam usable for the non critical sections
• Full coverage with the depth data???