New Wildlife Hospital
-
Upload
mrs-claw -
Category
Art & Photos
-
view
217 -
download
0
description
Transcript of New Wildlife Hospital
13 January 08 - old hospital13 January 08 - old hospital will become a research will become a research
centercenter
13 January 08 - new hospital13 January 08 - new hospital
13 January 08 – workers 13 January 08 – workers officesoffices
20 January 08 – the walls go20 January 08 – the walls go upup
7 February 08 – and up7 February 08 – and up
7 February 087 February 08
6 March 08 – starting to take6 March 08 – starting to take shapeshape
9 March 089 March 08
16 March 08 - “It's going to rain”16 March 08 - “It's going to rain”
16 March – just bales on 16 March – just bales on walls . . .walls . . .
30 March 08 – then they are 30 March 08 – then they are renderedrendered
30 March 0830 March 08
3 April 08 – view from zoo 3 April 08 – view from zoo carparkcarpark
3 April 08 - insulation3 April 08 - insulation
17 April 08 – out back is a 17 April 08 – out back is a mess mess
17 April 0817 April 08
17 April 0817 April 08
17 April 08 – looking through17 April 08 – looking through from the from the
outsideoutside
17 April 08 – around reception17 April 08 – around reception
17 April 08 – the public area17 April 08 – the public area
17 April 08 – conference room17 April 08 – conference room
17 April 08 – turtle window17 April 08 – turtle window
17 April 08 – Hall ceiling17 April 08 – Hall ceiling
17 April 08 – main surgery17 April 08 – main surgery has rammed has rammed
earth wallsearth walls
27 April 08 – coming along 27 April 08 – coming along
8 May 08 – the drain out front8 May 08 – the drain out front
8 May 08 – walls go up 8 May 08 – walls go up
8 May 08 – turtle picture on a 8 May 08 – turtle picture on a straw balestraw bale
8 May 08 – bamboo walls &8 May 08 – bamboo walls & rammed-earth rammed-earth
wallswalls
8 May 08 – Gail & John's 8 May 08 – Gail & John's office office
8 May 08 – looking down hall8 May 08 – looking down hall
8 May 08 – Necropsy room8 May 08 – Necropsy room
8 My 08 – volunteers room
8 May 08 – straw ceiling slats8 May 08 – straw ceiling slats
8 May 08 – laundry8 May 08 – laundry
8 May 08 – out the back once8 May 08 – out the back once moremore
12 June – outside public area12 June – outside public area
12 June 08 12 June 08
12 June 08 – side12 June 08 – side
12 June 08 – ambulance 12 June 08 – ambulance drivedrive
12 June 08 – loading bay12 June 08 – loading bay
26 June 08 26 June 08
26 June 08 – laying bitumen26 June 08 – laying bitumen
29 June 0829 June 08
3 July – new ambulance drive3 July – new ambulance drive
10 July 08 – concrete being10 July 08 – concrete being pumpedpumped
10 July 08 10 July 08
10 July – out the back once 10 July – out the back once moremore
17 July 08 – wire fence is 17 July 08 – wire fence is gone gone
17 July – air conditioning 17 July – air conditioning units units
17 July 08 17 July 08
3 August – the walkway goes 3 August – the walkway goes in in
3 August 08 - wheelie bin 3 August 08 - wheelie bin areaarea
3 August 08 – the completed 3 August 08 – the completed ambulance drive ambulance drive
3 August 08 – outside 3 August 08 – outside volunteer,volunteer, bird & reptile bird & reptile areas areas
14 August 08 14 August 08
14 August 0814 August 08
- design on - design on doorsdoors
14 August 0814 August 08
- Gail's - Gail's handshands
holding a holding a possumpossum
joeyjoey
14 August 08 – the bushes 14 August 08 – the bushes getget
removed . . . removed . . .
14 August 08 14 August 08
14 August 08 – and a garden14 August 08 – and a garden goes in goes in
21 August 08 – going in the21 August 08 – going in the front door front door
21 August 0821 August 08
- lizard door - lizard door handleshandles
21 August 08 - reception21 August 08 - reception
21 August - looking into 21 August - looking into surgerysurgery
21 August 08 – and the 21 August 08 – and the nurserynursery
21 August 08 – bamboo ceiling21 August 08 – bamboo ceiling in public areain public area
21 August 08 – conference 21 August 08 – conference roomroom
21 Augus08 – Theatre21 Augus08 – Theatre
21 August 08 – staff room21 August 08 – staff room
21 August 08 - neocropsy21 August 08 - neocropsy
21 August – a bit of painting 21 August – a bit of painting
21 August 08 – volunteers 21 August 08 – volunteers roomroom
21 August 08 - pathology21 August 08 - pathology
21 August 08 – looking into 21 August 08 – looking into public areapublic area
21 August 08 – that air-21 August 08 – that air- conditioningconditioning unit unit
21 August 08 – the old sign is 21 August 08 – the old sign is removed,removed,
and . . .and . . .
28 August – a new sign goes 28 August – a new sign goes upup
28 August 08 – the back is 28 August 08 – the back is ready for turf ready for turf and a fenceand a fence
28 August - the turf gets laid28 August - the turf gets laid
28 August 08 – the front is 28 August 08 – the front is fertilized . . .fertilized . . .
28 August 08 – then turfed28 August 08 – then turfed
31 August 08 – the giant31 August 08 – the giant handshands
31 August 08 – front entrance31 August 08 – front entrance
11 September – and again11 September – and again
11 September – Red-back in11 September – Red-back in garden-bed garden-bed
11 September - surgery11 September - surgery
11 September – animal food11 September – animal food preparation roompreparation room