What’s inside...
03 TheSeven Borealis -AWorld-ClassStrategicEnabler
04 OnTargettoDeliverFirstCommercialAIV
05 Hyperflow®RiserTowers–AnInnovativeUltraDeepwaterSolution
06 MechanicalLinedPipeInstallationbyReel-layoffersSignificantCostSavings
09 ReeledCladSCRWeldFatigueQualification
10 Seven AtlanticandNormand Subsea–OneYearOn
deepInnovativetechnologysolutionsforthesubseaindustry
ASubsea7publication-May2011
www.subsea7.com seabed-to-surface
Newtechnologyforpre-saltAmilestoneUS$1billionSURFcontractbyPetrobrasforfourdecoupledrisersystemstobeinstalledintheGuará-LulaNEfields,Brazil,inwaterdepthsofbeyond2,100metres.
3D animation model showingone of the 2,000t buoys
WelcometothefirstissueofthenewDeep7,aSubsea7publicationfocussingoninnovativetechnologyforthesubseaindustry.Prior to their merger and formation into the new Subsea 7 in January 2011, Subsea 7 and Acergy were renowned within the Subsea industry for their implementation of new technology. An ongoing commitment to embracing new technology will underpin much of the way we execute our work and develop the company in the future.
The new Technology and Asset Development department is part of the Commercial Group, where our primary objective is to investigate industry requirements and opportunities and to develop future capabilities with significant strategic importance, in support of developing the business and winning tenders.
An important aspect of our approach will be the relationship we have with our clients and key partners, in particular, the contribution that third parties can make is of great value to Subsea 7 and it is therefore essential that this is encouraged. Our philosophy is largely an open door approach to parties that feel they have a technology that may be of mutual benefit and which has the potential to be of significant value to the Subsea industry.
In this first edition of the new Deep 7 we hope you will find information on technologies that are of benefit to you and your companies.
New technology for pre-salt ...cont’d from page 1
Subsea7hasbeenawardedamilestoneUS$1billionSubseaUmbilical,RiserandFlowline(SURF)contractbyPetrobrasforfourdecoupledrisersystemstobeinstalledintheGuará-LulaNEfieldslocatedintheSantosBasin,offshoreBrazil.Thisisthelargestengineering,procurement,installationandcommissioning(EPIC)SURFcontractawardedtodateinBrazil.
Despitetheirpotential,thepre-saltfielddevelopmentsliebeyond2,100mofseawaterandareextremelytechnicallychallenging,evenforacompanylikeSubsea7whichhasasuccessfultrackrecordinmanagingextremelylargeEPICprojects.
TheGuará-LulaNEprojectisbasedoninstallingfourverylargesubmergedbuoys(eachweighingaround2,000t)approximately250mbelowthesurface,alongwithtwenty-sevensteelcatenaryrisers(SCRs)of3.9km,ofwhicheighteenare7.5-inchproductionlines,three9.5-inchwaterinjectionlinesandsix8-inchgasinjectionlines,togetherwiththeassociatedretentionpiles,crossingsandpipelineendterminations.TheseSCRswillbereel-laidbytheSeven Oceans rigidpipelayvesselandhookeduptothesubmergedbuoys.
TheproductionandwaterinjectionlineswillbeconstructedpredominantlyfromMechanicalLinedPipe(BUTTINGBuBi®).ThisisaresultofajointdevelopmentprogrammebySubsea7andBUTTING,muchofwhichwaswitnessedbyPetrobras.BUTTINGBuBi®linedpipewastechnicallyqualified‘Fit-for-Service’byDNVincompliancewithDNVRPA–203.FindoutmoreontheBUTTINGBuBi®linedpipesolutiononpages6/7ofthisissueofDeep7.
DEEP7 May 2011
02
To find out more about any of the technologies featured in this issue contact John Mair, Technology Development Director at [email protected] or email [email protected]
seabed-to-surface
The world’s biggest mast crane
Theinstallationofthe5,000tmastcrane,thelargestoffshoremastcraneeverconstructed,iscompleteandwillnowbefollowedbyfinalcommissioningandaloadtestingprogramme.ThecranefeaturesafullyheavecompensateddeepwaterloweringsystemandwillbeanimpressiveaspectoftheSeven Borealis’silhouette.
ThemastcranemaximisestheavailabilityofdeckspaceonboardtheSeven BorealisandiscapableoftheselfinstallationandremovalofsystemssuchastheJ-laytowerandafutureflex-laytower.
Thescaleandambitionoftheconversiontoaheavylift/pipelayvesselhascreatedanumberofchallengesandSubsea7hasbeenworkingcloselywiththeoriginaldesignerstooptimisethevessel’sdesign.
Theconversionprojectincludesthedesign,constructionandinstallationofastate-ofthe-art600tS-laysystemandinstallationofa1,000tJ-laytower.
Anumberofmaincomponentsforthe600tS-laysystem,includingthetensioners,stingerandstingersupportframe,havebeenspecificallydesignedfortheSeven Borealis.Thesystemwilloffertremendousflexibilityinhowthefiringlineisconfiguredandthetypesofpipelinesthevesselcanhandle,aswellasfeedingtheJ-laysystem.
Duringdelicatepipelayoperations,dampingtheeffectsofdisplacedloadsorwavemotioncanbecriticaltoensuringsafeandpreciseinstallation.TheSeven Borealisfeaturesanti-heelandanti-rollsystemsdesignedtoensureastableworkingenvironment,eveninchallengingseastatesandwhileworkingwithheavyloads.
Heeliscausedbyloadoffset,ortheunequaldistributionofweight.Onavesselofthisscale,withits5,000tmastcrane,theseoffsetloadscanbesignificant.Tocompensateheel,waterisautomaticallypumpedbetweenfivepairsofballasttanks.15pumps,eachcapableoftransferringupto13m3ofwaterperminute,keepthevesselbalancednomatterwherethecraneandloadarepositioned.
TheSeven Borealisalsohasa‘passive’rolldampingsystem,designedtoreducetherollmotioninducedbyheavyseastates.Fourlargeflumetanksareusedtocreateadditionalrolldamping.Thefillinglevelofthewaterineachtankisadjustedforspecificloadingconditionssuchthatthewaterwill
oscillateatthesamerollperiodastheship.However,thewatermovementisinanti-phasetotheship’srollandcreatesadampingeffectonthemotion.Theinternalstructurewithineachtankactsasabafflethatrestrictstheflowandinfluencesthedamping.Thiseffectisassessedthroughmodeltesting.Whenusedcorrectly,thetankscanreducetherollbyaround40%andthereforeincreasetheoperabilityofthevessel.
03
The Seven Borealis - A World-Class Strategic EnablerThe Seven Borealis (to be officially named), is Subsea 7’s world-class strategic enabler. The new pipelay / heavy lift vessel has been designed to meet the exacting requirements of ultra-deep and deepwater challenges, representing a significant leap forward in deepwater capabilities.
Key facts:
• Length182mxbreadth46m
• 600ttensionS-laysystemupto46-inchpipediameterutilising3tensioners
• 600tA&Rwinchutilising135mmdiameterwirefor3,000mwaterdepth
• 1,000ttoptensionJ-laysystemupto24-inchpipediameter
• 2,400tonboardpipestorage
• 5,000tmastcranewithaheavecompensateddeepwaterloweringsystem
• Accommodationfor400people
• 2xworkclassROVs
• Enhancedsurveycapability.
ThecranecapacitywillbetestedatitsfullcapacitybeforeinstallationoftheJ-laytower.
ThevesseliscurrentlyundergoingconversionattheSembawangshipyard,SingaporeafterwhichitwilltransittotheNetherlandsreadytoreceivepipelayequipment.TheSeven Borealisisduetobedeliveredduringthefirsthalfof2012.
“The crane is the world’s biggest mast crane. The top of the crane mast is 87m above the main deck”.
Subsea 7 has an ambitious plan to develop a series of Autonomous Inspection Vehicles (AIV), initially capable of general visual inspection, through to a fully capable work-class sized intervention vehicle.
AcombinedprojectteamcomprisinghardwaredevelopersandoperationalpersonnelfromSubsea7andSeebyte,aScottishbasedsoftwaredeveloperfortheautonomousroboticsmarket,hasbeenworkingtogethertodeliverthefirstvehicle.Throughthedevelopmentprocess,manytechnicalchallengeshavebeenovercomeandatthetimeofprint,thefirsttanktrialsandopenwatertestinghascommenced.
04
DEEP7 May 2011
On Target to Deliver First Commercial ‘AIV’
Thevehicleisfullyautonomousandcanoperatefora24-hourperiodonasinglechargeofitslithium-ionbatteries,whicharehousedinpressurevesselswithinthehull.Thesebatterieshavebeenspecificallydesignedforthevehicleandprovideamorecost-effectivesolutiontopressuretolerantbatteries,withalowercapitalcostandmuchimprovedcyclelives.Thebatteriesarehousedwithtwoterabytesofonboarddatastoragewhichdownloadsasthebatteriesarechargedoffthevehicle.
Thesensorpackagehasbeendevelopedtocovertherequirementsofgeneralvisualinspection;itcomprisesthelatestsonartechnologycoupledwithhighqualityvideocamerasandlowpowerLEDlighting.
Asignificantsoftwareintegrationanddevelopmentprojecthasbeenrunninginparallelwiththehardwaredevelopmentandthistoohasusedthemostadvancedtechniquestomanage,debugandcontrolthedevelopment.Thedevelopmentprogrammehasbeenaugmentedbytheextensiveanduniqueuseofsimulators,bothintheindividualsoftwaremoduledesignandtestingandtheintegratedsystem.Byusingasurfaceversionofthe
“First commercial vehicle will be available in late 2011”
subseaelectronicsandanadvancedcustombuiltsimulator,thesoftwaredevelopmentteamhasachieved1000’sofhoursofsimulatedmissions,longbeforethevehiclehardwarewasreadyforthewater.
WithanA-framedeploymentsystemanddedicatedbasket,theAIVwillbereadyforoperationsfromtraditionalsupportvesselsdeployingsingleormultipleunitsandalsofromFPSOsforsupportvesselfreeoperations.
ThefirstcommercialAIVwillbeavailableinlate2011followingextensivein-watertestingandcapabilitydevelopment.
Vehicle Commissioning trials in autonomous mode
TheshapeofthevehiclehaschangedfromtheoriginaldesignconceptduetothesignificantworkdoneusingthelatestCFDM(ComputationalFluidDynamicsModelling)tooptimisethevehicle’sshapewithregardtostabilityandmanoeuvrability,whileconservingtheonboardpowerresources.UnliketraditionalRemotelyOperatedVehicles,theAIVisbasedaroundafibreglassmonocoquehulldesignwiththestructuralstrengthcomingfromthepressurehullswithin.Thedesignhasresultedinaverycompactandrigiddesignwithouttheneedforheavystructuralframemembers.
Subsea 7 first adopted the Hyperflow® Hybrid Riser Tower on the Total Girassol Deepwater Development Project, Angola, during 1999, connecting three free-standing riser towers to the FPSO by flexible jumpers.
HybridRiserTowershavenowbecomeoneofthemostinvestigatedsolutionsatbidstageforultradeepwaterfielddevelopments,duetotheircapabilitytoaccommodatelargediameterrisers,reducedloadonFPSOsanddemandingflowassurancerequirements.Theyallowarobustlayoutwithalargeflexibilityforfutureexpansionsofthefield.
BasedonitsexperienceandthelessonslearnedalongtheGirassoldevelopmentandmorerecentlytheGreaterPlutonioproject,alsoinAngola,Subsea7hasdevelopeda“preferred”architectureoftheHybridRiserTower.ThepreferredarchitecturewassubjectedtoaFailureMode,EffectsandCriticalityAnalysis(FMECA),coveringitsdesign,fabrication,installationandin-servicelife.Thisthoroughreviewprovided:
• atechnicalhierarchyofsystem/sub-system/unit/equipment/partthatsetsinperspectivealltheelementsoftherisertower;thisisthecommonbasisforthestandardisationofbothengineeringandprocurementinviewofreductionofcostanddelivery
• asemi-quantitativemethodoffailureassessmenttoensurethatanyriskassociatedwiththedesignorconstructionwasadequatelymitigated
Asatypicalexample,largeheatlossesgeneratedbyconvectionheattransferismitigatedbyusingseparatematerialforinsulationandbuoyancy.
Hyperflow®isatrademarkofSubsea7,patentsandpatentspending.
Hybrid Hyperflow® Riser Towers – An Innovative Ultra Deepwater Solution
05
seabed-to-surface
Many of the Hyperflow® Hybrid Riser Towers have been fabricated at Subsea 7’s Sonamet Yard in Lobito, Angola
TheHyperflow®HybridRiserTowerconsistsofabundleofrisersofvaryingdiameterandfunction(production,waterandgasinjection,serviceline,gasliftriser)bundledtogether.
Thebottomoftherisertowerisanchoredbyaflexiblejointtoalockingdevicewhichanchorsthetowerfirmlytotheseabed.Thetopoftherisertowerbundleisconnectedtoabuoyancytankwhichmaintainsitintension.ThetopsoftherisersareinturnconnectedwithflexiblejumperstotheFPSO.
TheHybridRiserTowerensuresefficientprojectdelivery,providingafastroutetofirstoil.ThesystemcanbeinstalledpriortothearrivaloftheFPSOon-siteandquicklyconnected.
Technology Development
Thereelingprocessimposesplasticstrainsonthepipewhichcanpotentiallycausewrinklingintheliner.Theinitialdevelopmentprojectwasthereforesplitintofivephasestoaddressthisissue:
1. Finite Element Modelling
Adetailed3DFiniteElement(FE)modelwasdevelopedtosimulatecyclicstrainingoflinedpipeinactualtestrigloadingconditions.
GoodcorrelationbetweentheFEanalysisresultsandthefull-scalebendingtrialsallowtheFEmodeltobeusedwithconfidencetoinvestigatetheeffectsofdifferentpipesizesandmaterialcombinations.
06
DEEP7 May 2011
Mechanical Lined Pipe Installation by Reel-lay offers Significant Costs Savings
2. Reel-lay Simulation test rig
ThebendingtestrigatHeriot-WattUniversityEdinburgh,Scotlandwasusedtoperformsimulatedreelingtestswherebendingandstraighteningcycleswererepeatedonavarietyofpipesizesandmaterialcombinations,bothwithandwithoutmoderate,internalpressuretoreplicatethefullreelingandinstallationprocedureonthevessel.
TheBuBi®bendingtrialsthereforedemonstratedthattheSubsea7installationmethodologyincombinationwiththeBUTTINGmanufacturingprocesscanpreventformationofwrinklinginthelinerduringreeling.
In many instances, there is a significant economical prize to be gained by using a mechanical lined pipe alternative such as the BUTTING BuBi® pipe for bundle and reel-lay applications as opposed to solid corrosion resistant alloys (CRAs) and metallurgically clad pipe, combined with the additional benefits of onshore fabrication.
Subsea7firstincorporatedtheBUTTINGBuBi®pipeintotheirbundlesin1995fortheBPCyrusprojectintheNorthSeaandsincethenthecompanyhassuccessfullyincorporatedtheproductintonumeroussubseabundleprojectswithatotallengthexceeding100kmnowdeployed.Thisdemonstratesthattheproductisbothcost-effectiveandafit-for-purposesolutiontoalternativepipelineoptions.
Buildinguponthisexperience,Subsea7andBUTTINGembarkeduponatechnologydevelopmentprogrammetoultimatelydemonstrateandqualifytheBuBi®linedpipeforreel-layinstallationforflowlinesandlowfatigueriserapplications.
Construction
TheBUTTINGBuBi®pipeisahighqualitymechanicallinedpipeconsistingofathinwalledcorrosionresistantlinerwhichistelescopicallyalignedinsideacarbonsteelpipeandthensubjectedtoauniforminternalhydraulicexpansion,resultinginapersistent,consistenttightgripbetweenthetwopipes.Thelinerisweldedtotheoutercarbonsteelpipewithasealweldapproximately50mmfromtheendofthepipeandthesectiontothepipeendoverlayedwithAlloy625resultinginahighqualityfatigueresistanttermination.
Unlikethemetallurgicallycladpipes,themechanicallylinedBuBi®pipe,bythenatureoftheconstructionprocesscanalsoofferalargevarietyofmaterialsizesandcombinationsofinnerandouterpipes.
Seven Oceans reel-laying pipe
07
3. Fatigue Testing
ReeledsampleswerefatiguetestedonafullscaleresonancefatiguetestassemblyatTWI.
TheinspectionresultsconfirmedthattheBuBi®pipehadsufferednodetrimentalmechanicalorcorrosionimpactfromthereelingandfatiguetestingandthereforedemonstratedfurtherthattheBuBi®mechanicallinedpipecouldbereliablyinstalledbythereel-laymethod,evenfordynamicriserssubjecttomoderatefatiqueexposure.
4. DNV Qualification
ThedevelopmentprogrammewasexecutedinaccordancewiththeDNVrecommendedpracticefornewtechnologyqualificationDNVRPA-203resultinginSubsea7beingawarded-“Fitness-for-Purpose”oftheReelableBuBi®LinedPipeSystem.
Inparticular,thehighqualitymanufacturingprocessadoptedbyBUTTINGandthein-depthanalysisperformedbySubsea7ensurestherobustnessoftheinstalledproduct.
5. Safety
Anin-depthindependentreviewofallaspectsofthereelingandinstallationprocess,whilstmaintaininganinternalpressurewithinthepipeline,hasbeenconductedandconcludedthatnospecialmeasuresneedtobeadopted.
BP Andrew Area Development Project, UK sector of the North Sea
TheSubsea7workscopeistoengineer,procure,fabricate,installandcommissiona28kmpipelinebundlesystemconsistingofproduction,gasliftandmethanolpipelines.Thepipelinebundlesystemconsistsoffourdaisychainpipelinebundles(totallingapprox.28km)interconnectedbyrigidspooljumpers.ThisparticularprojectfurtherdemonstratestheuniquedesignsavailablewithinthepipelinebundlerangeasitwillbethelongestbundleSubsea7hasproducedandinstalledtodate.Installationisexpectedtotakeplaceduringsummer2011.28kmof14-inchBuBi®linedpipehasbeenusedfortheAndrewbundle.
Apache North Sea Bacchus subsea development project, UK sector of the North Sea
TheSubsea7workscopeistoengineer,procure,fabricate,installandcommissiona7kmpipelinebundleconsistingofproduction,gaslift,methanolandheatingpipelinesandcontrolsumbilical.Thepipelinebundlesystem,installedusingtheControlledDepthTowMethodology,willconnectthreenewwellsattheBacchusdevelopmentinasubseatie-backtotheexistingFortiesAlphaplatform.13.4kmof6-inchand13.4kmof4-inchBuBi®linedpipehasbeenusedfortheBacchusbundle.
Petrobras Guará-Lula NE fields, Santos Basin, offshore Brazil
Ashighlightedonpage2ofthisissueofDeep7,Bubi®mechanicallinedpipewillalsobeusedinBrazil’spre-saltdevelopmentsintheGuará-LulaNEfields,SantosBasin,offshoreBrazil,whichliebeyond2,100mwaterdepth.
seabed-to-surface
Bundle launch at Wick, Scotland
RecentdevelopmentstouseBUTTINGBuBi®pipe
The installation of subsea systems is becoming ever increasingly challenging as equipment weights increase and the equipment becomes more sophisticated and sensitive to impact.
Arecentexampleisrotatingmachineryforsubseapumpingandprocessingapplications,nowbeingdeployedinbothshallowandultra-deeplocations.
Oneofthekeychallengesistheriskofresonanceduringdeploymentwhichmaypotentiallyhaveanumberofundesiredconsequencesi.e.:
• largeverticalmotionduringdockingontheseabedfoundation,leadingtounacceptableimpact
• largedynamictensioninthecablesduetoheaveorslackwire.
Thetraditionalcriteriaforthistypeofoffshoreoperationarebasedonenvironmentalcharacteristics(e.g.maximumsignificantwaveheight,peakperiodoftheseastate),thataredeterminedfromanalysesthatmaybeinaccurateastheyuseidealisedwaveconditions(singlepeakwavespectrum)andvesselmotionResponseAmplitudeOperators,whichcouldbeunderorover-estimated,particularlywhentheseaconditionismulti-directional(seaandswell),whichisoftenthecaseoffshoreWestAfricaandBrazil.
Subsea7hasdevelopedanin-houseMotionMonitoringSoftwarepackagethatrecordsandprocessesdatarelatedtotheheavemotionofthevesselviatheMotionRecordingUnits(MRUs)primarilyusedforthedynamicpositioningsystemofthevessel.
TheMRUislocatedtowardsthecentreofthevesselorbargeandthemovementatthecranetip(heave,heavevelocityandheaveacceleration)iscalculated.The
Operational Criteria Offers Increased Weather Window for Deployment
softwareanalysesthestatisticaldataofthemotionduringaspecifiedperiod(30minutesapprox.)andperformsaspectralanalysisofthedata.
Inordertoverifythemodel,themotionofthestructurebeingloweredisalsoprocessedinthesamemannerasthevesselorbargemotion.ThustheDynamicAmplificationFactoriscalculatedinrealtimeandcanbecomparedtoamodelsuchasthosedescribedinDNV-RP-103.
Thistechnologymaythereforeincreasetheweatherwindowforinstallationandeliminatestheuncertaintyinthecablebehaviour.
08
DEEP7 May 2011
A new dimensionThe availability of information on the web has given Geographic Information Systems a new dimension.
GeographicInformationSystemsorganisedatainsuchawaythattheend-usercangaindirectaccesstoalltherelevantinformationrelativetoasubseastructureorcomponent,byclickingtoitssetpositiononadiagramormap.Informationavailableincludesgeoscience,designandengineeringdata,installationandoperationsdata,aswellassurveyandinspectiondata.Subsea7hasdevelopedanewonlineapplicationthatallowsthecombinationof“historical”datawith“live”informationavailable,whichalsohastheabilitytosupportforecasting.
Theonlinebenefitsarewide:
• Consistencyandbuild-upofthedataduringthecourseofafielddevelopmentproject,fromdesigntoas-built
• Readinessanddistributionofinformationduringtheoperation
• Accuracyandtraceabilityofas-builtdata
• ReliabilityoftheinputdataforLife-of-FieldandIMRactivities.
Thisnewweb-basedGeographicInformationSystemsserviceisalreadyoperationalonvariousFieldDevelopmentandLife-of-Fieldprojects.Itisprogressivelyexpandingwithbespokeapplicationsacrossprojects,disciplines,departmentsandregions.Thisispartofthecompany’sgrowingportfolioofGISservices,managedbytheLife-of-FieldGroupwithinSubsea7.
Reeled Clad SCR Weld Fatigue QualificationSteel Catenary Risers (SCRs) have been an attractive cost-effective choice for deepwater field development. One of the major design and fabrication challenges for SCRs is the achievement of the required fatigue performance at highly stressed regions. Additionally, the need for the transmission of corrosive constituents has demanded the use of corrosion resistant alloy line-pipe materials.
Todate,themostattractivepipematerialoptionforhighfatigueSCRs,istheuseofmetallurgicallybondedcladpipe.InstallationofsuchSCRsbythereel-laymethodisacosteffectiveapproach.Uptothepresenttime,reel-layinstallationhasbeenlimitedtocarbonsteelSCRs.ThelackoffatiguetestdatatodemonstratethesuitabilityofinstallationofcladSCRsbythereel-laymethodhasimpededtheutilisationofthistechnique.
Giventhehighlevelofindustryinterest,aqualificationprojectwascarriedoutbySubsea7incollaborationwithtwomajoroperators.TheoverallaimwastodevelopandqualifyasuitableweldingprocedureforinternallycladpipeforSCRserviceandtodemonstratethattherequiredfatiguelifecouldbeachievedafterinstallationbythereel-laymethod.
Thefourprimarycriteriathatwouldverifythesuitabilityofreelingincluded:
• Confirmbymechanicalandcorrosiontestingthatthegirthweldsmadeinalloy825cladpipemeettherelevantindustrystandards
• Confirmbyphysicaltestingthatsuchgirthweldsarereelable
• AutomatedUltrasonicTesting(AUT)verification
• ConfirmthatthefatigueperformanceofweldsmadeincladpipethathavebeenreeledwillmeetorexceedthetargetlevelsoffatigueClassC/2
Forthisspecificqualificationprogramme,materialGrade415(whichalsometGradeX65specificationrequirements)wasidentified,withanAlloy825metallurgicallybondedliner.Thenominalpipedimensionswere263.5mmIDx21.5mmWTand3mmcladlayer.
Attheprojectoutset,Subsea7proposedaweldingsolutionbasedontheuseofthemechanisedHotWirePulsedGasTungstenArcWelding(PGTAW)processandAlloy625fillerwireforthegirthweldingofcladpipe.SuchprocedureshavebeenpreviouslyqualifiedandsuccessfullyappliedfortheSkarvFlowlineprojectinNorway.Subsea7alsohadprevioussuccessfulexperienceintheuseoftheHotWirePGTAWprocessfortheweldingofcarbonsteelSCRsnamely,BC-10,BrazilandBlindFaith,GulfofMexicoprojects.
ThequalificationprogrammewasperformedingeneralaccordancewiththerequirementsofDNVOSF101-2007andtypicalindustrySCRspecifications.Allstandard
mechanicaltestsmetthespecificationrequirements.Fracturetoughnesstesting,bothweldmetalandfusionline,wasperformedinordertodemonstratetheachievementofadequatefractureresistanceinthegirthweldsduringpipelineinstallationandinsubsequentservice,whilstmaintainingrealisticwelddefectacceptancelevels.Thetestresultsshowedvaluesconsistentwithexpectedgoodbehaviour.CorrosiontestingwasperformedtoassessbothresistancetopittingcorrosionandtosulphidestresscorrosioncrackingandthesemetSCRprojectspecificrequirements.
TheprimarymethodofNDEforthegirthweldsincladpipewasAUTusingamultiphasedigitalpulseechotechnique.Theweldacceptancecriteriawerebasedonatypicalriserspecification.ValidationoftheAUTprocedurewasperformedusingrepresentativebutdeliberatelydefectivegirthwelds.Thisdemonstratedthatplanarflawsofconcerncouldbereliablydetectedandsized.
Cladpipestringscomprisingrepresentativebuttweldswerethenmanufacturedandinspected.TheseweresubjectedtoafullscalesimulatedreelingandinstallationprocedurewhichwasrepresentativeofpipelineinstallationbytheSeven Oceans reel-layvessel.Thesebuttweldsweresubsequentlysubjecttofullscalefatiguetestingusingthehighfrequencyresonancetestingtechnique.Thefatigueperformancefarexceededexpectations,withmosttestsamplesfailingintheparentmaterialwithfatiguelevelsclosetotheClassBmeancurve.
ThisqualificationprogrammegivesconfidencethatthefatigueperformanceofreeledcladpipesatisfiestherequirementsofSCRapplicationswithasignificantsafetyfactor.Furthermore,allotherSCRrequirementsintermsofweldintegrity,mechanicalandcorrosionperformancewerealsocomfortablyachieved. Weld Macro
09
seabed-to-surface
DEEP7 May 2011
10
TheSeven Atlantic,oneoftheworld’snewest,mosttechnicallyadvancedandcapabledivingsupportvesselsandtheNormand Subsea,anInspection,MaintenanceandRepairvessel,equippedwiththelatestROVtechnology,havepredominantlybeensupportingtheShellUnderwaterServicescontractacrossEurope,inadditiontoundertakingseveralworkscopesforotherNorthSeaclients.Oneyearon,thenewbuildvesselsarelivingupto,andinsomecasesexceedingoperationalexpectations.
Diving support Stability, Performance & SpeedTheSeven Atlantichasprovedhersuperiorstationkeepingperformanceanddemonstratedthatshecanoperatecomfortablyinextremeweatherconditions.Thevessel’sstabilitysignificantlyreducesdependencyonportcallsforcrewchangeandasanexampleinApril2010,helicoptercrewchangesof38personnelweresafelyconductedinForce7conditions.Thevesselhasprovedshecanoperateateaseinfullydevelopedseaconditionsinexcessof4.5mHswithtransitspeedsofupto15knots.
Endurance & Capacity
Astheintegratedchemicaltreatmenttanksandequipmentarelocatedbelowdeck,the1200m2offreedeckhavebeenfrequentlyutilisedforsubseaprojectfacilities.Asanexample,afullriserinstallationcampaignacross4jacketswasexecutedinone30daytriplastsummer.Beingabletocarrytheentireinstallationpackageandsupportfull24hrairandsatdivingteamswithinthe150personnelon-boardcapacity,deliveredaseamlessresultfortheclient.
Diving & ROV System Versatility
CoveringShell’sassetsfromtheSouthernNorthSeathroughtotheNorthernNorthSeameansdepthtransitionsfromsurfaceto165m.Withher24-mansaturationsystem,theSeven Atlantic hasbeenabletoavoiddelaysthroughdecompression.Similarly,havingduplicatedair,sat,hoopandequipmentdeploymentsystemsonbothsidesofthevesselandumbilicallengthsgreaterthan
conventionalDSVs,meansshehasbeenabletomitigatetheconstraintsofplatformoverhangsandrestrictedaccessthroughouttheyear.
Sometimesswitchingbetweenoperatorshasmeantasignificantchangeindepth.TheSeven Atlanticsaturationsystemversatilityandcapacityhasenableddivingcrewstomakethesedepthtransitionswithout
decompressiondelaystojobs,thereforeavoidinglosttime.
TheSeven Atlantichassurpassedherdesignobjectivesandhasjustcompletedher1000thdive.Overthelast12monthsshehasreceivedanumberofclientcommendationswhichistestimonytoanexemplarydesignandacommittedteam,bothonshoreandoffshore.Shehasalsoachieved1yearLTIfreeinMarch2011.
Seven Atlantic and Normand Subsea - One Year On
“HavingbeeninvolvedintheSeven Atlanticfromtheconceptthroughtothebuildstageithasbeenincrediblysatisfyingtofollowherprogressinherfirstyearofoperations.Mostimportantlyithasbeentremendoustoseethevesselcompleteherfirstyearofoperationswithoutsufferinganylosttimeinjuries.SheisalargecomplexnewvesselandthissuccesshasonlycomeaboutthroughalotofhardworkandcommitmentfromtheVesselOffshoreManagementTeamandhercrew.ShellsetthebarhighintermsoftheoperationalrequirementsforthevesselandshehasnotonlymetalloftheirexpectationsbutonmanyoccasionsexceededthemthusestablishingatremendousreputationintheNorthSeamarket.” Steph McNeill, Subsea 7 UK VP
Fitted with a computer based control system providing automation of life support equipment and the hyperbaric environment, including depth control
seabed-to-surface
11
The Normand Subsea, Inspection, Maintenance & Repair
ThevesselisequippedwithsixROVs(twoworkclassHerculesandfoureyeballCougars)thathavesuccessfullyoperatedsimultaneouslyduringinspectionwork,whereeachindividualROVcanbeconfiguredtoconductdifferenttasksandbelaunchedasrequired,significantlyincreasingefficienciesanddecreasingvesseltimeattheworksite.AllsixROVsarecontainedwithintheconfinesandprotectionofthehangar,fouroftheROVsystemsaremoonpooldeployedwithtwoeyeballCougarsdeployedovertheportside.
TheModuleHandlingSystem(MHS)hasbeensuccessfullyusedonmanyoccasions,completingchokeandsubseacontrolmodulechange-outsintheharshenvironmentsoftheDraugenandOrmenLangefieldsintheNorwegiansectoroftheNorthSea.TheMHShasalsobeenusedfordeploymentoperations,whereweatherconditionshavepreventedcraneoperationscontinuing,againincreasingefficienciesanddecreasingweatherdowntime.
TheintegralwelltreatmentplantwasusedforthefirsttimetocompleteascalesqueezeoperationintheBitternfieldintheUKsectoroftheNorthSea.AnewROVfriendlyinterfaceunitwasspecificallydesignedforthetreeconnectionsandfollowingsuccessfuloperationsatBittern,theunitisbeingdevelopedandinstalledonfurtherwells.Previousscalesqueezeoperationshaverequiredafullspreadofequipmenttobemobilisedonthebackdeck.TheNormand Subseaavoidsthisbyhavingthetanksandmixingequipmentalreadybuiltinbelowdeck.
TheNormand SubseahascompletedTree-On-Wireoperations,atechniquewhereChristmastreesareinstalledusinganoffshoresupportvessel,ratherthanfromaDynamicallyPositioneddrillship.ThetechniquewasfirstcarriedoutintheNorthSeabySubsea7forShellin2009,bytheSkandi Seven.Thislessexpensivemethodisaquickerandmoreflexiblesolution,reducingtimebetweeninstallationandcommissioningandmostimportantly,freeingupvaluabletimeforthedrillship.
HighspecificationpipelineOutofStraightnessandhighresolutionroutesurveyswerecompletedontheOrmenLangepipelinesandfutureroutes,utilisingacomplexsuiteofequipmentnotpreviouslyusedbySubsea7.Againanotherfirstforthevessel,completedwithexcellentresults/dataproduced.
ThevesselalsocontinuestooperateastheprimarysubseainterventionvesselforOrmenLangeandDraugen.
Theperformanceandstationkeepinghavebeenexcellent,withthevesselprovingtobeanextremelystablework
“TheperformanceofboththeSeven AtlanticandtheNormand Subseahasprovedtobefantasticafteroveroneyearofoperation.Thesuccessofourjointventuresiswhollyattributabletotheprofessionalapproachofourpersonnel,notjustoffshoreonthevessels,butalsoonshoreintheofficewithallthepreparatoryworksthatgointothejobsthatwedo.
Whilstwecannotbecomplacentaboutouractivities,theterrificsafetyperformanceonbothvesselsisnoaccidentandistestimonytothepeopleandtheircultureandbehaviourswhenitcomestoconductingouroperations.
Ithasbeenhugelyrewardingtoseethesaferesponsesandperformanceachievedonmanyextremelychallengingworkscopesanddemandingschedules.
Aswelookforwardtofurtherdemandsinthecomingyears,Iamconfidentthatwiththevesselsandteamsinplace,wewillcontinuetoseeevermoreefficienciesandimprovementsinourcombinedactivities.”
George Thomson, Team Lead - Underwater Vessel Operations, Shell U.K. Limited
“TheNormand SubseaisnowwellintohersecondyearofserviceandhasbeenequallysuccessfulworkingcontinuouslyandmoreimportantlysafelyforShellintheharshestofenvironments.ThevesseliscriticalinkeepingtheOrmenLangegasfieldoperationalwhichisofstrategicimportancetotheUKasitprovidesupto20%ofourgas.WhileIamsureshewouldbewellusedbyourotherClientsshehasbeenfullyutilisedbyShellanddoesnotlooklikeshewillhaveanysparedaysforalongtimetocome.TogetherwithourpartnersSolstadwesetouttocreateanewclassofROVconstructionvesselandtheNormandSubseacertainlyticksthebox.”
Steph McNeill, Subsea 7 UK VP
platform.WithallROVandMHSbeingcompletedfrominsidethehangar,thecrewhasbeenunawareofjusthowpoorweatherconditionshavebeen,provinghowstablethevesselis.
A truly multipurpose vessel.
www.subsea7.comDEEP7 May 2011©Subsea7,2011.Informationcorrectattimeofgoingtopress.
DNV Qualification for Electrically Heated Pipe-in-Pipe
Thefollowingistypicaloftheanalysesandtestingcarriedout.
• Reelingtrialsandmonitoringofstrain
• FEAanalyses
• Thermaltestingonfull-scalepipe-in-pipesamples(pre&postreelinginpassiveandactivemode)
• Acceleratedwireageingshowingfeasibilityofcontinuous25-yearoperation
•Wiringconnectionandinterfacing
• Powerfeedandinterfacing.
Additionalconsiderations:•Methodstatementsforonshoreconstructionandoffshoreinstallation
• Identificationofkeyfabricationsteps
• Developmentofrelevantinspectionandtestingprocedures.
A key aspect in many new deeper and more challenging subsea developments is maintaining the appropriate product temperature within the pipeline infrastructure to avoid the formation of hydrates or waxing which would result in restriction to flow and potential complete shutdown.
Tohelpaddressthis,Subsea7haspartneredwithITPInTerPipe(ITP)tocommercialisetheElectricallyTraceHeatedFlowline(ETHF)pipe-in-pipesystemdevelopedbyITP.
Thetechnologycombinesthebestavailablethermalinsulationsystemonthemarketwithlow-powerresistiveheatingelements.Innormaloperation,thesystemprovides“no-touch”timesof72hoursormore,beforeheatingneedstobeswitchedon.5-10kW/kmisenoughforhydratemitigation.
Theadvantagesforoperatorsinclude:
• Tie-backsofunlimitedlength
• Shutdownsofunlimitedduration
• Safeproductionofreservoirtails
• Safeproductiongellingorhigh-viscosityfluids.
ThequalificationofthenewtechnologywasrecentlyconductedinaccordancewithDNVRP–A203“QualificationProcedureforNewTechnology”.The
technologywentthrougharigorousreviewprocessculminatingintheissueofDNV’sCertificateofFitness-for-Service.
ThetechnologyqualificationofthereeledETHFpipe-in-pipesystemwascompletedintwostages.
Firstly,thesystemwasqualifiedinpassivemode(withoutheatingelements),andsubsequentqualificationofthecompleteETHFsystemwithheatingwiresfollowed.Thetwosystemscombinedofferahighlyefficientmeansofmaintainingproducttemperatureintoday’schallengingsubseaenvironments.
Insulation
Production Pipe
Heating wires
Outer Pipe
ThetieredreviewprocesswithfrequentinteractionsbetweenSubsea7,ITPandDNVensuresearlyidentificationandresolutionofanygapsinthetechnologyqualification.
ThequalificationofthecombinedETHFpipe-in-pipetechnologyincludedtechnicalanalysesandtestingor,acombinationofthetwo.
TheDNVRP-A203isathree-stagequalificationprocessfocussingheavilyonthenewandunprovenelements.Thegatedapproachidentifies:
• Stage1Feasibility
• Stage2Endorsement
• Stage3FitforService
Insulation being applied to inner pipe over trace heating wires