New Tampa Data Center - Peak 10
-
Upload
peak-10 -
Category
Technology
-
view
504 -
download
5
description
Transcript of New Tampa Data Center - Peak 10
![Page 1: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/1.jpg)
Presented By: Tampa Team
IT infrastructure | cloud | managed services
Peak 10 Tampa Data Center 3
Ready to Grow with You
![Page 2: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/2.jpg)
Welcome to Tampa 3• Peak 10’s
newest data center - #25
• Rated Category 5 for 3 second wind gusts – Hurricane safe facility
• Total Building 60,000 SF
• 23,600 SF office and support space
• 36,400 SF data center space
• Available Spring 2015
8350 Park Edge Drive Tampa, FL 33637
6.88 acres in Hidden River Corporate ParkCentral to the I-75 business sector
2
![Page 3: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/3.jpg)
The Dig Begins
![Page 4: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/4.jpg)
Location
• Peak 10,Tampa8350 Park Edge Drive Tampa, FL 33637
• 25 miles/30 min. to TPA airport.
• 3.2 Miles/5 min. from I.75
• Private Road
• No flood zone
• Close to Moffitt and USF
4
![Page 5: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/5.jpg)
From Our CEO
"Our new facility is a significant, long-term investment for the company as Tampa continues to be one of our highest growth markets."
Peak 10, CEO David Jones With Mayor Buckhorn
5
![Page 6: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/6.jpg)
From the City
“When a business makes a multi-million dollar investment in Tampa, it sends a pretty clear message about the economic strength of our community. We’re leading Florida out of the recession, and companies like Peak 10 are helping us do it.
We congratulate them on their latest expansion, and look forward to future growth in the years ahead.”
Bob BuckhornMayor, City of Tampa
6
![Page 7: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/7.jpg)
About Peak 10
Peak 10 is an IT infrastructure solutions provider serving customers around the world since 2000.
We enable innovation and business growth by providing maximum uptime and reliability for critical data and applications.
7
![Page 8: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/8.jpg)
Audited and Compliant
• SSAE-16 type II (SOC1, 2, 3) audited
• ISAE 3402 audited
• PCI DSS certified
• HIPAA/HITECH compliant
• Self certified for Safe Harbor
• Audit ready to help companies meet a variety of regulatory requirements
8
![Page 9: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/9.jpg)
Driven by Values
9
![Page 10: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/10.jpg)
IT Infrastructure Solutions
• Managed data center services (co-location) • Network services
Best-in-breed technologies/equipment 24/7/365 on-site technical support Robust private network to provide clients
with the highest level of performance SSAE 16 audited operations Redundant power distribution and
environmental controls
10
![Page 11: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/11.jpg)
Cloud
Enterprise | Private | Recovery | HIPAA compliant
PCI compliant | Cloud-based Managed Services
SLA-backed uptime and reliabilityDesigned to handle production workloads;
cost effective for all application tiersHybrid solutions availableCisco® Cloud Provider Certification with a
Cisco Powered Cloud Infrastructure-as-a-Service (IaaS) designation
11
![Page 12: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/12.jpg)
Your Tampa Team
![Page 13: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/13.jpg)
Managed Services
Application Support | Management & Monitoring
Managed Security | Data Services | Disaster Recovery
SecureCost effectiveTailoredDepth and breadth of expertise
13
![Page 14: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/14.jpg)
The Extras
• Consultative approach
• Tailored solutions
• Customer-first, community-focused
• Empowered local leadership
• Engineering expertise/consultation
• New products and services based on changing business and customer needs
14
![Page 15: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/15.jpg)
Tampa Customers
![Page 16: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/16.jpg)
Enterprise Customers
![Page 17: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/17.jpg)
Mayor Buckhorn with Tampa Team
![Page 19: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/19.jpg)
Awards/Reviews
19
For six years straight, Florida Trend magazine
has named Peak 10 one of the Best Companies to
Work for in Florida.
In 2014 Peak 10 reached #1
![Page 20: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/20.jpg)
Cisco Powered
20
First in the Americas to Achieve Cisco Powered DRaaS Certification
Cisco Certified Cloud Provider IaaS & DRaaS
![Page 21: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/21.jpg)
We Take Our Work Seriously But Not Ourselves
![Page 22: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/22.jpg)
22
Pathfinder Portal: • Provides SLA, performance, bandwidth and other data.• Systematic report generation to meet customer
requirements.
Features Robust DNS infrastructure Bandwidth reporting Alert information IP assignment reports Inventory lists Resource monitoring Support ticketing Maintenance calendar
24/7/365 Support & Visibility
![Page 23: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/23.jpg)
Facility Design
23
![Page 24: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/24.jpg)
Facility Design
24
![Page 25: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/25.jpg)
Facility Design
25
![Page 26: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/26.jpg)
Facility Design
26
![Page 27: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/27.jpg)
Site
27
![Page 28: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/28.jpg)
Tampa 3 Features
• Designed/built to industry “tier 3” standards
• 99.982% uptime, 1.6 hours downtime per year
• Tampa Electric Company – Primary Electrical Power Feed
• Square D components for all electrical infrastructure
• Dual secondary power feeds (utility side)
• 24” raised floors
28
![Page 29: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/29.jpg)
• Building will support Category 5 three second wind gusts
• Reinforced steel and precast skin – increased wind rating 150 mph
• 14” concrete tilt wall construction with Reinforced steel infrastructure
• EPDM mechanically fastened roof for key loading efficiency
• Supports N+1 or 2N on all facility infrastructure components
Tampa 3 Features
29
![Page 30: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/30.jpg)
Tampa 3 Features
• Two diverse power feeds from TECO
• 2.6 MW of continuous utility power
• Power whips and LV cabling routed under raised floor and cable tray for low voltage cabling
• Two 2.5 MW Caterpillar backup generators
• 72 hour generator fuel supply, indefinite runtime with refueling
30
![Page 31: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/31.jpg)
Tampa 3 Features
• Four 750 kW Mitsubishi UPS battery systems
• UPS in A / B configuration, either side can support full load
• Available power to the floor is 1.5 MW
• All customer branch circuits monitored real time for utilization
31
![Page 32: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/32.jpg)
Tampa 3 Features
• FE-25 Gas-based fire suppression system
• VESDA (Very Early Smoke Detection Apparatus) Smoke detection system
• Heat and Smoke sensors
• Sensor coverage below floor, on floor and above ceiling
32
![Page 33: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/33.jpg)
• Mechanical loads are fed from disparate mechanical panels and sources
• Mechanical devices can be fed from alternate sources during planned maintenance or in response to a failure
• A/B electrical rooms
• All access control equipment powered via UPS system and equipment-specific on-device batteries, providing power for control devices and door locks in the event of a source-power disruption
Tampa 3 Features
33
![Page 34: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/34.jpg)
• Cold-aisle containment with mandatory unused-cabinet-face-area blanking and sealable floor grommets
• Rack densities up to 12 kW can be selectively supported with cold aisle containment and high air flow vent tiles; higher density can be considered with in row cooling
Tampa 3 Features
34
![Page 35: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/35.jpg)
Peak 10 Network• Total network capacity 387 Gbps
• Connections to Peak 10 private network
• BGP peering with multiple Internet carriers via 10 Gbps connections
• Two divergent fiber vault entries into the facility
• Multiple network carriers for customer MPLS and point to point connections
Tampa 3 Features
35
![Page 36: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/36.jpg)
Datacenter Cooling
• 3 x 320 ton air cooled chillers (N+1)
• Closed-loop, water based system
• Two separate cooling loops
• Concurrently maintainable components
• Hot / Cold aisle design with Cold aisle containment
Tampa 3 Features
36
![Page 37: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/37.jpg)
• Critical load and support space HVAC N+1 or better
• HVAC equipment electrically fed via disparate sources • Concurrently maintainable components (chillers, pumps,
CRAHs, piping)
• All controls systems are fed from redundant UPS feeds
Tampa 3 Features
37
![Page 38: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/38.jpg)
• Supply-air is distributed via an under floor plenum. Separation between the surface of the raised floor and the ceiling is generally 11’
• Critical facility cooling equipment utilize highly efficient VFD components, including air-cooled chillers, variable-flow/speed pumps and EC plug fans in CRAHs on the chilled water loop
Tampa 3 Features
38
![Page 39: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/39.jpg)
• 24/7/365 secured building
• Badge/PIN/Biometric identification required
• Interior/exterior video camera surveillance including access doors, gates and fence openings
• DVR video retention
Tampa 3 Features
39
![Page 40: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/40.jpg)
• Personnel trained in operational/security best practices
• On-site, 24/7/365 technical assistance center (TAC)
• GM and Director of Service Delivery empowered to make all decisions, providing unparalleled service and value
Tampa 3 Features
40
![Page 41: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/41.jpg)
• Large office space to accommodate growth
• Large event room adjacent to data center offices
• Customer work areas and public break area
Amenities
41
![Page 42: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/42.jpg)
Locally Empowered Management TEAM
![Page 43: New Tampa Data Center - Peak 10](https://reader033.fdocuments.net/reader033/viewer/2022052506/5570516cd8b42a85618b5218/html5/thumbnails/43.jpg)
Thank You. We Look Forward to Working With You…
Today and Tomorrow!