New SUDMEADOW ROAD KEEPCLEARKEEPCLEARKEEPCLEAR · 2020. 10. 8. · (remains of) Spinnaker House...

1
(remains of) Spinnaker House SPINNAKER ROAD El Sub Sta Priory Wall (remains of) Priory Gate SUDMEADOW ROAD ESTATE LLANTHONY INDUSTRIAL Gloucestershire College Llanthony Business Park N DEMOLITION AREA HEMMINGSDALE ROAD SUDMEADOW ROAD SPINNAKER ROAD Llanthony Industrial Estate Proposed right turn lane into Hemmingsdale Road Proposed right turn lane into Sudmeadow Road Proposed toucan crossing Assumed Peel Retaining Wall in same position as existing fencing Assumed Peel Retaining Wall at the back of the footway New signalised junction Island to incorporate pedestrian refuge and dropped kerbs Existing footway widened to 4m Proposed two lane approach to the junction Existing footway widened to 2.5m Proposed dedicated right turn lane into Llanthony Road Carriageway widening to accommodate 3m wide left turn lane into Hempsted Lane Second right-turn lane and straight on (shared) Existing shared use pedestrian/cycle track unaltered Existing shared pedestrian/ cycleway providing access to alternative pedestrian/cycleway at Gloucester and Sharpness Canal with signing to promote usage. Pedestrian access only ST ANN WAY Existing shared use pedestrian/cycle track realigned and widened to 3.0m Existing shared use pedestrian/cycle track realigned and widened to 3.5m Proposed right turn lane into Llanthony Business Park Existing shared use pedestrian/cycle track realigned and widened to 3.5m Existing shared use pedestrian/cycle track to be widened to 3.5m Proposed two lanes southbound 1 1 1 1 1 1 1 3 2 2 1 1 1 1 1 2 1 3 3 KEEP CLEAR KEEP CLEAR KEEP CLEAR KEEP CLEAR VRS to replace existing NOTES 1. General arrangement drawings specific to the various design elements such as site clearance, fencing, road restraint system, drainage etc. will be produced separately. The drawing numbers will have the respective Specification for Highway Works (SHW) Series Number contained with it : L1- 200-01 to 03 General Site Clearance L1- 300-01 to 03 Proposed Fencing L1- 400-01 to 02 Road Restraint System and Pedestrian Guardrail L1- 500-01 to 03 Proposed Ducting L1- 500-04 to 06 Proposed Drainage Layout L1- 600-01 to 03 Earthworks L1- 700-01 to 03 Proposed Pavement L1- 1100-01 to 03 Proposed Footways and kerbs L1- 1200-100 to 103, -200 to 202, -300, -1200-01 to 03 2. This drawing will accompany the geometrical design data submission for certification in accordance with the Works Information and are to be read in conjunction with the proposed geometrical alignment relaxation and departure from standard details. 3. The other information shown on this drawing showing fencing, lighting, road signs, lighting columns is indicative and for reference purposes only. For latest details, refer to appropriate discipline drawings. 4. The exact location of all Statutory Undertakers plant and equipment must be verified by the Contractor in accordance with HSG47 and GS6 before commencement of works on site. Refer to Vol 2 Site information for Statutory Undertakers Plans and Drawing No's L1-101-01 to 03. 5. In addition to the hazards/risks normally associated with the types of work detailed on this drawing take note of the above. It is assumed that all works on this drawing will be carried out by a competent contractor working, where appropriate, to an appropriate method statement. RESIDUAL DESIGN HAZARDS (The following information has been collected from Preconstruction Information and Amey Process PLC-H&S-201 – Hazard Management for Designers.) 1. Underground services (Gas, Electricity, Water, BT). 2. Overhead services (BT). 3. Working adjacent to Priory Wall. File ref - p:\gbglj\gloucester psc\gcc\major projects\llanthony road widening\5.1 cad-drawings idh\5.0 cad - drawings\work area\highways\1 live drawings\detailed design 2017\l1-100_06 general arrangement rev p9.dwg 0 Project Name Rev Drawing No Scale : Original Drawing Size : Drawing Title Dimensions : A1 Date Client Revision details Designed: Approved: Rev Drawn: Checked: Chkd Appd 100 c Copyright Amey www.amey.co.uk Date: Date: Date: Date: Drawing Status Suitability Drwn RM 11-05-18 RM 11-05-18 LM 11-05-18 RS 11-05-18 GSWB (Llanthony Road) Widening General Arrangement 1:600 m FOR TENDER D2 L1-100-06 P9 KEY Proposed Footway Improvement Proposed Highway Improvement Scheme Extents Reproduced from the Ordnance Survey map with the permission of the controller of H.M. Stationery Office. © Crown copyright reserved. Licence no.100033905. Traffic Signal Proposed Lighting Column Proposed Keep Left Bollard Proposed Pedestrian Guardrail to be installed Dropped kerbs and buff coloured tactile paving Dropped kerbs and red coloured tactile paving P1 Amends as per RS comments 03/07/18 SR . . 03/07/18 P2 Amends as per RS comments 24/07/18 SR 24/07/18 Existing Lighting Column to remain MLC AP P3 Amended to incorporate cycelway/footwaychanges SR AP AP 12/11/18 16/11/18 P4 Amended as per AB comments SR 16/11/18 MLC AP P5 To show updates since planning application submitted SR 27/11/18 MLC AP P6 Amended as per Collision Assessment Report SR 14/12/18 MLC AP P7 Amended as per BT STATS diversions 09/01/19 SR Proposed Corduroy tactile paving 11/01/19 MLC SC Proposed fencing to be installed New VRS to be installed Proposed location of substantial sign P8 Amended as per GE fencing changes SR MLC 04/03/19 Proposed Gates SC P9 Annotation revised LJ RS 01/10/19 RS

Transcript of New SUDMEADOW ROAD KEEPCLEARKEEPCLEARKEEPCLEAR · 2020. 10. 8. · (remains of) Spinnaker House...

Page 1: New SUDMEADOW ROAD KEEPCLEARKEEPCLEARKEEPCLEAR · 2020. 10. 8. · (remains of) Spinnaker House SPINNAKER ROAD El Sub Sta Priory Wall (remains of) Priory Gate SUDMEADOW ROAD ESTATE

(

r

e

m

a

i

n

s

o

f

)

S

p

i

n

n

a

k

e

r

H

o

u

s

e

S

P

IN

N

A

K

E

R

R

O

A

D

E

l

S

u

b

S

t

a

P

r

i

o

r

y

W

a

l

l

(

r

e

m

a

i

n

s

o

f

)

P

r

i

o

r

y

G

a

t

e

SU

DM

EA

DO

W R

OA

D

E

S

T

A

T

E

L

L

A

N

T

H

O

N

Y

I

N

D

U

S

T

R

I

A

L

G

l

o

u

c

e

s

t

e

r

s

h

i

r

e

C

o

l

l

e

g

e

L

l

a

n

t

h

o

n

y

B

u

s

i

n

e

s

s

P

a

r

k

N

D

E

M

O

L

I

T

I

O

N

A

R

E

A

H

E

M

M

I

N

G

S

D

A

L

E

R

O

A

D

SU

DM

EA

DO

W R

OA

D

S

P

IN

N

A

K

E

R

R

O

A

D

L

l

a

n

t

h

o

n

y

I

n

d

u

s

t

r

i

a

l

E

s

t

a

t

e

Proposed right turn

lane into

Hemmingsdale Road

Proposed right turn

lane into Sudmeadow

Road

Proposed toucan crossing

Assumed Peel Retaining

Wall in same position as

existing fencing

Assumed Peel Retaining

Wall at the back of the

footway

New signalised junction

Island to incorporate pedestrian

refuge and dropped kerbs

Existing footway widened

to 4m

Proposed two lane

approach to the junction

Existing footway widened to 2.5m

Proposed dedicated right

turn lane into Llanthony

Road

Carriageway widening to

accommodate 3m wide left

turn lane into Hempsted

Lane

Second right-turn lane

and straight on (shared)

Existing shared use

pedestrian/cycle track

unaltered

Existing shared pedestrian/

cycleway providing access

to alternative

pedestrian/cycleway at

Gloucester and Sharpness

Canal with signing to

promote usage.

Pedestrian access only

S

T

A

N

N

W

A

Y

Existing shared use

pedestrian/cycle track

realigned and widened

to 3.0m

Existing shared use

pedestrian/cycle track

realigned and widened to

3.5m

Proposed right turn lane

into Llanthony Business

Park

Existing shared use

pedestrian/cycle track

realigned and widened

to 3.5m

Existing shared use

pedestrian/cycle track

to be widened to 3.5m

Proposed two lanes

southbound

1

1

1

1

1

1

1

3

2

2

1

1

1

1

1

2

1

3

3

KE

EPC

LE

AR

KE

EPC

LE

AR

KE

EPCLE

AR

KE

EPCLE

AR

VRS to

replace

existing

NOTES

1. General arrangement drawings specific to the various design

elements such as site clearance, fencing, road restraint system,

drainage etc. will be produced separately. The drawing numbers

will have the respective Specification for Highway Works (SHW)

Series Number contained with it :

L1- 200-01 to 03 General Site Clearance

L1- 300-01 to 03 Proposed Fencing

L1- 400-01 to 02 Road Restraint System and Pedestrian Guardrail

L1- 500-01 to 03 Proposed Ducting

L1- 500-04 to 06 Proposed Drainage Layout

L1- 600-01 to 03 Earthworks

L1- 700-01 to 03 Proposed Pavement

L1- 1100-01 to 03 Proposed Footways and kerbs

L1- 1200-100 to 103, -200 to 202, -300, -1200-01 to 03

2. This drawing will accompany the geometrical design data

submission for certification in accordance with the Works

Information and are to be read in conjunction with the proposed

geometrical alignment relaxation and departure from standard

details.

3. The other information shown on this drawing showing fencing,

lighting, road signs, lighting columns is indicative and for reference

purposes only. For latest details, refer to appropriate discipline

drawings.

4. The exact location of all Statutory Undertakers plant and equipment

must be verified by the Contractor in accordance with HSG47 and

GS6 before commencement of works on site. Refer to Vol 2 Site

information for Statutory Undertakers Plans and Drawing No's

L1-101-01 to 03.

5. In addition to the hazards/risks normally associated with the types

of work detailed on this drawing take note of the above. It is

assumed that all works on this drawing will be carried out by a

competent contractor working, where appropriate, to an appropriate

method statement.

RESIDUAL DESIGN HAZARDS

(The following information has been collected from Preconstruction

Information and Amey Process PLC-H&S-201 – Hazard

Management for Designers.)

1. Underground services (Gas, Electricity, Water, BT).

2. Overhead services (BT).

3. Working adjacent to Priory Wall.

File ref - p:\gbglj\gloucester psc\gcc\major projects\llanthony road widening\5.1 cad-drawings idh\5.0 cad - drawings\work area\highways\1 live drawings\detailed design 2017\l1-100_06 general arrangement rev p9.dwg

0

Project Name

RevDrawing No

Scale :Original Drawing Size :

Drawing Title

Dimensions :

A1

Date

Client

Revision details

Designed:

Approved:

Rev

Drawn:

Checked:

Chkd Appd

100

c

Copyright Amey

www.amey.co.uk

Date:

Date:

Date:

Date:

Drawing Status Suitability

Drwn

RM 11-05-18

RM 11-05-18

LM 11-05-18

RS 11-05-18

GSWB (Llanthony Road) Widening

General Arrangement

1:600

m

FOR TENDER D2

L1-100-06 P9

KEY

Proposed Footway Improvement

Proposed Highway Improvement

Scheme Extents

Reproduced from the Ordnance Survey map with the

permission of the controller of H.M. Stationery Office.

© Crown copyright reserved. Licence no.100033905.

Traffic Signal

Proposed Lighting Column

Proposed Keep Left Bollard

Proposed Pedestrian Guardrail to be installed

Dropped kerbs and buff coloured tactile paving

Dropped kerbs and red coloured tactile paving

P1

Amends as per RS comments

03/07/18

SR . . 03/07/18

P2

Amends as per RS comments

24/07/18

SR24/07/18

Existing Lighting Column to remain

MLC AP

P3

Amended to incorporate

cycelway/footwaychanges

SR APAP

12/11/18

16/11/18

P4Amended as per AB comments

SR

16/11/18MLC AP

P5

To show updates since planning

application submitted

SR

27/11/18

MLC AP

P6

Amended as per Collision

Assessment Report

SR

14/12/18

MLC AP

P7

Amended as per BT STATS

diversions 09/01/19

SR

Proposed Corduroy tactile paving

11/01/19

MLC SC

Proposed fencing to be installed

New VRS to be installed

Proposed location of substantial sign

P8

Amended as per GE fencing

changes

SR

MLC

04/03/19

Proposed Gates

SC

P9 Annotation revised LJ RS 01/10/19RS

AutoCAD SHX Text
S001
AutoCAD SHX Text
12.688
AutoCAD SHX Text
S002
AutoCAD SHX Text
10.272
AutoCAD SHX Text
S003
AutoCAD SHX Text
10.446
AutoCAD SHX Text
S004
AutoCAD SHX Text
10.330
AutoCAD SHX Text
S005
AutoCAD SHX Text
10.286
AutoCAD SHX Text
S006
AutoCAD SHX Text
10.644
AutoCAD SHX Text
S007
AutoCAD SHX Text
11.059
AutoCAD SHX Text
S008
AutoCAD SHX Text
12.064
AutoCAD SHX Text
SF01
AutoCAD SHX Text
11.874
AutoCAD SHX Text
SF02
AutoCAD SHX Text
12.446
AutoCAD SHX Text
SF03
AutoCAD SHX Text
11.731
AutoCAD SHX Text
SF04
AutoCAD SHX Text
10.305
AutoCAD SHX Text
SF05
AutoCAD SHX Text
10.079
AutoCAD SHX Text
SF07
AutoCAD SHX Text
10.774
AutoCAD SHX Text
SF08
AutoCAD SHX Text
10.518
AutoCAD SHX Text
13.76
AutoCAD SHX Text
13.62
AutoCAD SHX Text
13.44
AutoCAD SHX Text
13.53
AutoCAD SHX Text
C2
AutoCAD SHX Text
C4
AutoCAD SHX Text
C1
AutoCAD SHX Text
12
AutoCAD SHX Text
B
AutoCAD SHX Text
A1
AutoCAD SHX Text
A4
AutoCAD SHX Text
A2
AutoCAD SHX Text
A3
AutoCAD SHX Text
16
AutoCAD SHX Text
L Twr
AutoCAD SHX Text
Warehouse
AutoCAD SHX Text
6
AutoCAD SHX Text
Warehouse
AutoCAD SHX Text
10
AutoCAD SHX Text
8
AutoCAD SHX Text
18
AutoCAD SHX Text
C3
AutoCAD SHX Text
Llanthony
AutoCAD SHX Text
Priory
AutoCAD SHX Text
Priory Church
AutoCAD SHX Text
(site of)
AutoCAD SHX Text
Llanthony
AutoCAD SHX Text
Severnside
AutoCAD SHX Text
16a
AutoCAD SHX Text
Bridge
AutoCAD SHX Text
Sub Sta
AutoCAD SHX Text
FB
AutoCAD SHX Text
MoP
AutoCAD SHX Text
Warehouse
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
Llanthony Priory
AutoCAD SHX Text
Trading
AutoCAD SHX Text
7
AutoCAD SHX Text
Pond
AutoCAD SHX Text
LG
AutoCAD SHX Text
14a
AutoCAD SHX Text
founded 1136)
AutoCAD SHX Text
(Augustinian
AutoCAD SHX Text
17
AutoCAD SHX Text
24
AutoCAD SHX Text
Estate
AutoCAD SHX Text
26
AutoCAD SHX Text
12
AutoCAD SHX Text
9
AutoCAD SHX Text
2
AutoCAD SHX Text
13
AutoCAD SHX Text
Remains of
AutoCAD SHX Text
22
AutoCAD SHX Text
20
AutoCAD SHX Text
18
AutoCAD SHX Text
125 Business Park
AutoCAD SHX Text
Ppg Sta
AutoCAD SHX Text
El
AutoCAD SHX Text
F2
AutoCAD SHX Text
1 to 5