NEW Micahelle Jean French Immersion School
-
Upload
principalmoore -
Category
Education
-
view
430 -
download
1
description
Transcript of NEW Micahelle Jean French Immersion School
Welcome to École Élémentaire
Michaëlle Jean
Parent Information MeetingJune 19, 2012
6:00 pm-Welcome & Introductions 6:10-7:00 pm-Student Tour/Team Building
Activities 6:10-6:50 pm-Parent Information Session 6:50 pm-Question Period 7:00-7:30 pm-Parent Tour with child
Board Staff will be available during the tour to answer any questions that come up!
Agenda
Mr. Greg Moore-Principal Mrs. Julie Anderson-Vice-Principal Alex Johnstone-Trustee Ashlie Duckett-Umbrella Family Daycare Christine Rees-French Consultant Mrs. Flett Ms. Marsillo Mr. Lanillos Mrs. Daniels
Introductions
Our school website is now active and can be
found at http://schools.hwdsb.on.ca/michaellejean/
This presentation will be uploaded to the site
Stay Informed
Currently, we are expecting 60 students Tentative Organization is as follows:
Staffing
Teacher Assignment
Mrs. Flett Grade 1/2
Ms. Marsillo Grade 3/4
Mr. Lanillos Grade 5/6
Mrs. Daniels Resource (0.5)
TBD Prep (0.5)
TBD Prep (0.1)
TBD LIPT (0.25)
TBD School Secretary
2121 Highway 56, Binbrook, ON L0R 1C0 Phone number not yet assigned School Secretary is often first point of contact Classroom Teacher Vice-Principal Designated Teacher
Contact Information
Transportation Department has worked hard to
give us a PRELIMINARY transportation plan Five (5) stops are required Bus ride is approximately 30 minutes in length All Group Stops as Door-to-Door Transportation
is not provided under the FI Transportation Policy
Stops have been placed geographically near where students reside
Transportation
Paramount & Astra
Valley Park CC
First Rd W & Highland
Summit Park (Pinehill Dr)
Magnificent Way & Great Oak Trail
Michaelle Jean
School Bound Home Bound
8:11 am
Paramount Dr. & Astra St. 3:20 pm
Michaëlle Jean
8:14 am
Valley Park CC 3:25 pm
Magnificent & Great Oak
8:18 am
First Rd W & Highland Rd W
3:37 pm
Summit Park (212 Pinehill Dr)
8:24 am
Summit Park (212 Pinehill Dr)
3:43 pm
First Rd W & Highland Rd W
8:36 am
Magnificent & Great Oak 3:48 pm
Valley Park CC
8:40 am
Michaëlle Jean 3:51 pm
Paramount Dr. & Astra St.
Preliminary Stops & Times
This information is preliminary (Stops won’t likely
won’t change, but times could) Confirmation letter will arrive in August with times
and stop, based on your home address Parents can request a change to an EXISTING stop,
if it is more convenient (i.e. caretaking needs) Some students were not designated a stop as it
would be easier to drop off at the school We do encourage all students to ride the bus, but
if parents are dropping off, no cars are allowed in driveway until all buses have left school property
Transportation-Key Points
A high demand for before and after school
care from the community Process has been overseen by the Umbrella
Family www.umbrellafamily.com for more information Ashlie Duckett to provide updates on
information for the fall
Day Care
Significant upgrades are to be done over the
course of the summer, into the beginning of school year
NEW roof system to be installed (mid July-beg Aug)
NEW Boiler system to be installed (beg Aug-end Aug)
Main electrical work to be completed Paving of parking, round-about and playground Retaining wall repaired Portables to be removed during the summer
Building Upgrades
While the school is in good shape for a 55 year
old school, there are projects we are looking to complete
Remaining funds from building renovation budget will go towards:
Tiling of remaining classrooms not yet completed
Painting of school hallways/classrooms Washroom upgrades
School Renovations
New school signage Hardtop playground to be painted with
games/activities in late August Basketball court and hoops to be added Capital projects of new lockers and
gymnasium floor and paint to be submitted for approval
Additional Items
It was a priority to give students a similar
experience to their current location (Lawfield) Projectors installed in all classrooms SMARTboards in all classrooms Teacher laptops have been purchased for staff Internet access in all classrooms Dedicated Computer Lab with 20 workstations
Classroom Set Up
A multi-disciplinary team have been meeting to order
materials for the school French Consultant, classroom teachers, Learning
Commons (Library), 21st Century Fluencies (Technology), PE&H Consultant, Principal & Vice-Principal, Math Facilitator
A dedicated start-up budget was given to provide for adequate and up-to-date resources for the new school
Process has been co-ordinated by the French Consultant, Christine Rees
Classroom Resources
Many things for the fall still under
consideration Opening Celebration/Ribbon Cutting/Media
Coverage Establishing school mascot/colours Inaugural School Council (elected in
September) Time Capsule creation Spirit Wear/School Uniforms Fridge magnets/pens with contact information
In Planning Stage
Questions