New Housing coming...Resource Consent Issue Hastings Tranche 4 - Nikau Sites 182-184, 185-187,...

2
JULY 2020 Drop in session We will be hosting a drop-in session for you to find out more about this proposed development, meet the team, ask questions, and give us feedback. Once we have further details around the drop-in session, we will send you an invite. Kāinga Ora – Homes and Communities is looking at how we can build new, modern homes on Nikau Street and better utilise our landholdings. Across the country Kāinga Ora is building new homes that will mostly consist of one or two bedroom warm and dry houses, with some three and four bedroom homes, and will cater to those most in need of state housing. What is the timeline? Plans decided From March 2020 Resource consent From June 2020 Construction begin From December 2020 Keeping disruption to a minimum We will ensure that site and traffic management plans are in place for these developments. These provide rules and guidelines for what happens during construction. New Housing coming to Hawkes Bay We are looking at building new state housing in your neighbourhood to help meet the need for housing in your region. We are mindful of the impact building has on your community and want to keep you involved with the process. www.kaingaora.govt.nz

Transcript of New Housing coming...Resource Consent Issue Hastings Tranche 4 - Nikau Sites 182-184, 185-187,...

Page 1: New Housing coming...Resource Consent Issue Hastings Tranche 4 - Nikau Sites 182-184, 185-187, 300-306 Nikau St Project Scale Drawing no. 20002 NK-A1015 Title Project no. Rev. Issued

JU

LY 20

20

Drop in sessionWe will be hosting a drop-in session for you to find out more about this proposed development, meet the team, ask questions, and give us feedback.Once we have further details around the drop-in session, we will send you an invite.

Kāinga Ora – Homes and Communities is looking at how we can build new, modern homes on Nikau Street and better utilise our landholdings.

Across the country Kāinga Ora is building new homes that will mostly consist of one or two bedroom warm and dry houses, with some three and four bedroom homes, and will cater to those most in need of state housing.

What is the timeline?

Plans decided From March 2020

Resource consent From June 2020

Construction begin From December 2020

Keeping disruption to a minimumWe will ensure that site and traffic management plans are in place for these developments. These provide rules and guidelines for what happens during construction.

New Housing coming to Hawkes Bay

We are looking at building new state housing in your neighbourhood to help meet the need for housing in your region.

We are mindful of the impact building has on your community and want to keep you involved with the process.

www.kaingaora.govt.nz

Page 2: New Housing coming...Resource Consent Issue Hastings Tranche 4 - Nikau Sites 182-184, 185-187, 300-306 Nikau St Project Scale Drawing no. 20002 NK-A1015 Title Project no. Rev. Issued

Rev Date Notes

A

B

C

D

E

F

18.05.2020

19.05.2020

20.05.2020

22.05.2020

27.05.2020

TBA

RC Draft Compliance Sheets

RC Draft Areas compliance Update

Nikau Sites 30% Review

Draft Resource Consent Set

Updated Site Massing

Resource Consent Issue

Hastings Tranche 4 - Nikau Sites 182-184, 185-187, 300-306 Nikau St

Project

Scale

Drawing no.

NK-A101520002

Title

Rev. Project no.

Issued For

Proposed Site Massing Plan

RESOURCE CONSENT

Do not scale.

The contractor shall verify all dimensions before commencing work,

and all discrepancies to be referred to Context Architects Limited for

clarification. These plans are confidential and are not to be discussed or

copied without the express permission of Context Architects Limited.

1:300 @ A1

F

Client

Urban design

Architecture

Landscape

Retail design

Interior design

Graphic design

BIM / Digital

Sustainability

Consultants

Cadastral Surveyor - Development Nous

Geotechnical Consultants - RDC

Civil Engineer - Development Nous

Structural Engineer - Design Phase

Landscape Architects - Development Nous

Reference notes:

Landscape Architects plan referenced into architectural set for information only.

Please refer to Landscape Architects drawings for details

SS

LB

LB

LB

LBLB

LB

LB

LB

LBLB

LBLB

LBLB

LB

LB

LB

LB

LBLB

LBLB

LB

Lot 1

Lot 2

Lot 3

Lot 4

Lot 5

Lot 6

Lot 7

Lot 8

Lot 9

Lot 10

Lot 11

Lot 12

Lot 13

Lot 16

Lot 15

Lot 14

Lot 18

Lot 19

Lot 20

Lot 21

Lot 22

Lot 17

NI

KA

U

ST

RE

ET

NI

KA

U

ST

RE

ET

Lot 101

Lot 102

Lot 103

NI

KA

U

ST

RE

ET

NI

KA

U

ST

RE

ET

SCHEDULE OF HOUSES BY SITE ZONE / LOT

1. Nikau North

2. Nikau Central

3. Nikau South

Lot

Lot 01

Lot 02

Lot 03

Lot 04

Lot 05

Lot 06

Lot 07

Lot 101

Lot 08

Lot 09

Lot 10

Lot 11

Lot 12

Lot 102

Lot 13

Lot 14

Lot 15

Lot 16

Lot 17

Lot 18

Lot 19

Lot 20

Lot 21

Lot 22

Lot 103

Typology

1B Standalone

1B Duplex

1B Duplex

1B Terrace

1B Terrace

1B Terrace

1B Terrace

JOAL

1BN Standalone

1BN Standalone

1BN Terrace

1BN Terrace

1BN Terrace

JOAL

3B Standalone

2B Standalone

2B Standalone

3B Standalone

2B Standalone

2B Duplex

2B Duplex

2B Duplex

2B Duplex

2B Standalone

JOAL

Storeys

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

N/A

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

N/A

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

Single Storey

N/A

Plan Ref.

RH - B1

RH -A1

RH - B1

RH - A2

RH - B2

RH - A2

RH - A2

Bespoke

Bespoke

Bespoke

Bespoke

Bespoke

RH - F1

RH - C1

RH - D1

RH - E1

RH - D2

RH - D2

RH - C2

RH - D2

RH - C2

RH - C2

/Multiproof

- A10187

--

--

--

--

--

--

N/A

based on BN1

based on AN1

based on BN2

based on BN2

based on AN2

N/A

- A10193

- A10171

- A10175

- A10191

- A10177

--

--

--

--

- A10173

N/A

Carparks

0

1

1

0

0

0

0

5

7

0

0

0

0

0

5

5

2

2

2

2

2

2

2

2

2

2

0

20

32

Area (m²)

198.5

186.6

192.2

159.1

125.4

125.4

161.7

481.1

1,630.0 m²

170.8

170.8

158.0

135.4

157.9

360.1

1,153.0 m²

310.8

259.0

259.0

311.6

326.8

219.0

219.0

219.0

219.0

330.4

406.5

3,080.1 m²

5,863.1 m²

Earthquake Zone: Zone 3Exposure Zone: Zone BWind Zone: Low (North), Medium (Central, South)Climate Zone: Zone 2Snow Loading Zone: N1District Plan Zone: Hastings General Residential

SITE INFORMATION

N

1 Proposed Site Plan (1:300)

www.kaingaora.govt.nz

Questions?If you have any further questions or, feedback about the proposed development please contact:

Jess Wilson Stakeholder Relationship Manager

Phone: 0800 801 601 (please ask to be transferred)

Email: Jess.Wilson@kaingaora. govt.nz

The plans will cover items like the hours during which work can be carried out, where contractors can park their vehicles and the control of dust and noise. When the construction phase begins, we expect building activity to take place between 7:00am and 6:00pm Monday to Friday and 8:00am to 5:00pm on Saturdays, but not on Sundays and public holidays.

Who will live in the new homes?For the state homes being built, Kāinga Ora will match these homes to individuals and families on the Ministry of Social Development’s Housing Register with the highest priority for a home of that size and in that location.

Supporting tenants We always help our new tenants settle in to their new home and community. A key focus of ours is to ensure that tenants understand their responsibilities and that includes being good neighbours and connecting with their communities. Kāinga Ora is also looking at new ways of how we support tenants and help them connect to support services when and if they need it.