New customer pack
-
Upload
smoke-control-systems-ltd -
Category
Documents
-
view
217 -
download
0
description
Transcript of New customer pack
New Customer Pack
New Customer Pack
New Customer Pack
New Customer Pack
New Customer Pack
New Customer Pack
New Customer Pack
REQUEST FOR CREDIT ACCOUNT
Company Name Telephone
Address Company Reg No
VAT Reg No
Post Code Telephone
Business Type: Public Limited Company / Private Limited Company / Partnership / Sole Trader Other(please specify)
Name of Proprietor/Managing Director or Partners in Partnership:
Bank Details Full Name & Address Post Code
Account Number Sort Code
Trade Reference (1) Address Post Code
Trade Reference (2) Address Post Code
Amount of credit per month £
Invoicing Address(if different from above) Post Code
General Contact Name Telephone email
Accounts Contact Name Telephone email
CREDIT TERMS see attached Standard Terms and Conditions of Sale January 2005
We accept Standard Terms and Conditions of Sale January 2005.
Signature Print Name Position Date
Details
Smoke Control Systems worked closely the main and elec-trical contractor to install two powered shaft systems dur-ing a conversion from commercial to residential use above Wallington Square Shopping Centre.
Each system comprised of a pressure controlled powered shaft with damper and grille assemblies at each fl oor level and a control panel with dual power supply monitoring and change over.
Client
Project
Value
Duration
Canvey Contractors - Wallington Square ph1 2 Powered Smoke Shaft Control Systems£50,000.00
5 Weeks
Wallington Square - London
Details
Removal of existing roof vents and Control System and re-place with new.
Due to the poor state of the existing vents and their instal-lation system Smoke Control Systems came up with a vent design and installation not only reducing the installation costs but 50% but also did not eff ecting any of the existing glazing system seals.
This was a very time critical job with the fi rst vents being de-livered to site and fi tted within 3 weeks of receipt of order.
Working closely with Fanhear staff all work was carried out, out of hours thus not aff ecting footfall for the centre.
Client
Project
Value
Duration
Merseyway Shopping Centre
Roof Vent & Controls Refurbishment£75,000
6 Weeks
Merseyway - Stockport
Details
Smoke Control Systems worked closely the main contrac-tor to help them achieve their completion dates on time, in-stalling a pressure diff erential controlled smoke shaft over 7 stories.
Installing all hardware including AOV Doors, Fansets and controls. Due to last minute building design change SCS were also asked at short notice to supply, install and com-mission a Smoke Curtain to the entrance lobby.
Client
Project
Value
Duration
Cubbitt - Idis Hotal Bristol
Powered Smoke Shaft & Smoke Curtian£50,000.00 +£5,000.00
10 Weeks
Ibis - Bristol
Details
Design and Supply of control system for a natural smoke shaft
Working with the Ventilation Contractor Smoke Controls Systems designed a controls package incorporating the CommsMaster Control System to operate a series of damp-ers and ventilators in a natural smoke shaft.
Client
Project
Value
Duration
Cosaf - Great Ormand Street Hospital Natural Smoke Shaft Control system
£10,000.00
3 Weeks
Great Ormand Street Hospital-London
Details
Smoke Control Systems worked closely the electrical con-tractor to help them achieve their completion dates on time for all phases of the in town waterside development for Mil-lar Homes
Each of the multi occupancy apartment blocks was installed with multizone control panels to interface the fi re alarm with a range of AOV windows and Roof vents.
Client
Project
Value
Duration
DJR Smith / Miller Homes -
Yarn Street-H2010
£50,000.00
52 weeks
H2010 - Leeds