Coal-Fired Power Plants in Indonesia - other islands
Barru Location: South Sulawesi
Operator: PT PLN PerseroConfiguration: 2 X 50 MW
Fuel: coal
Operation: 2011Boiler supplier: Hangzhou
T/G supplier: NanjingEPC: Hubei Hongyuan Power Engineering Co Ltd,
PT Bagus Karya, PT Gemilang Pratama KaryaQuick facts: Emerson supplied an Ovation controlsystem for PLTU Labuanm Banten. The first unit
was connected in Jul 2009 and officially opened byPresident Susilo Bambang Yudhoyono on 28 Jan
2010
Photograph by iqbal.bakaru (Panoramio)Posted 18 Aug 2012
Bukit Asam Location: South Sumatra
Operator: PT PLNConfiguration: 4 X 65 MW
Operation: 1989-1995Fuel: subbituminous coal, oil
Boiler supplier: SteinT/G supplier: Rateau, GEC-Alsthom
EPC: Sogeah, Japan Jurong Engineering
Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005
Lampung Location: South Sumatra
Operator: PT PLNConfiguration: 2 X 100 MW
Operation: 2012Fuel: coal
Boiler supplier: JinanT/G supplier: Wuhan Turbine
EPC: Jiangxi Electric Power Overseas Engineering,PT Adhi Karya
Quick facts: In Mar 2008, PLN broke ground onPLTU Lampung in Kec Katibung, Tarahan
Lampung. In Jul 2009, PLN secured financing forthe $154.3mn project from Bank Rakyat Indonesia.
Photograph by RiZaL MuKhTaR (Panoramio)Posted 30 Sep 2012
Nagan Raya Location: Aceh
Operator: PT PLNConfiguration: 2 X 110 MW
Operation: 2013-2014Fuel: coal
Boiler supplier: WuxiT/G supplier: Nanjing
EPC: Sinohydro, Sinohydro No 8, Northwest PowerConstruction Group Corp
Quick facts: Nagan Raya is atSuak Puntong Village,Kuala District, Nagan Raya Regency. The kickoffmeeting was held on on 8 May 2008, the first pile
was driven on 25 Nov. It was a $247mn contract forSinohydro.
Photograph courtesy of PT PLNPosted 25 Jan 2014
Ombilin Location: West Sumatra
Operator: PT PLNConfiguration: 2 X 100 MW
Operation: 1996-1997Fuel: subbituminous coal, oil
Boiler supplier: SteinT/G supplier: GEC-Alsthom
EPC: GEC-Alstom, Cegelec, LahmeyerQuick facts: EPC contract awarded in late 1993.
The ESPs were built by Walther.
Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005
Palu Location: Central Sulawesi
Operator: PT Pusaka Jaya Palu PowerConfiguration: 2 X 15 MW
Operation: 2006Fuel: coal
Boiler supplier: WuxiT/G supplier: Qingdao, Jinan
EPC: SEPCO No 3Quick facts: This is an IPP project of PT TobaSejahtera. Coal is supplied by PT PLN via barge
from East Kalimantan.
Photograph courtesy of SEPCO No 3Posted 6 Nov 2011
Page 1 of 2st-coal-indonesia
2/12/2014http://www.industcards.com/st-coal-indonesia.htm
8/10/2019 New Coal Power Plant
http://slidepdf.com/reader/full/new-coal-power-plant 2/2
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 25-Jan-2014
Home
Punagaya Location: South Sulawesi
Operator: PT Bosowa MakassarConfiguration: 2 X 125 MW
Operation: 2012Fuel: coal
Boiler supplier: ??T/G supplier: ??
EPC: Chengda, Southwest Electric Power DesignInstitute, Wika
Quick facts: In Nov 2010, local industrial andinfrastructure conglomerate PT Bosowa Corpbegan construction on this IPP at Pungaya,Bangkala, Kab Jeneponto. The project was
completed by SPV PT Bosowa Makassar at a costof about $250mn with China’s Chengda acting aslead EPC contractor. Bosowa has a 200-MW PPA
with PLN for the Phase-I plant at US 5.5 cents/kWhexcluding fuel costs. The project took only 19mos to
complete according to the owner, a substantialimprovement over the original 30mo schedule.
Photograph courtesy of ekonomi.inilah.comPosted 12 Sep 2012
Tanjung Tabalong Location: South Kalimantan
Operator: PT Adaro Energy TbkConfiguration: 2 X 30 MW
Operation: 2012Fuel: subbituminous coal
Boiler supplier: BHELT/G supplier: Siemens
EPC: Punj Llyod, International Development andEngineering Associates
Quick facts: This power station is associated withthe largest single-site coal mine in the southern
hemishpere. This is located in Tabalong andBalangan districts. Annual production is on the
order of 40mn typy of ultra low-sulfur, moderate CV
subbituminous coal. The new thermal plant willreplace a 20-MW diesel plant. Electricity will beused to power the converyor system and other
mine and handling infrastructure as well as the localgrid. The development company is Adaro subsidiaryPT Makmur Sejahtera Wisesa (MSW). The projectcost about $160mn. Fuel burn is expected to be
about 300,000 tpy.
Photograph courtesy of PT AdaroPosted 3 Mar 2012