New Clean Low cost · 2020. 9. 8. · Low LCOE() High 30 100~ 40 /kWh Solution for Energy...
Transcript of New Clean Low cost · 2020. 9. 8. · Low LCOE() High 30 100~ 40 /kWh Solution for Energy...
DG
/kWh
City Remote island / Isolated
Low
LCO
E()
Hig
h
30 100~
40 /kWh
Solution for Energy Localization
Connect local grid
Electric Demand
Hydrogen Demand
Toshiba EPC scope
HydrogenStorage Tanks
WaterElectrolyzer
Battery Units
Fuel Cell
Renewable Energy
Back up DG
LCOE Levelized cost of energy
(Early 2020s release model )
Clean Lowcost
Energy Security
EPC:Engineering,Procurement,and Construction
*Distribution limited in Japan, U.S.A., EU, India, Kenya, Indonesia, and Philippines.
Planning Design / Manufacturing /Procurement
Construction andCommissioning O&M/Capacity BuildingFEED
Co-creation Process for Development
Co-creation work generate
Long-term Roadmap.
Toshiba organize workshop
to analyze stakeholder,
risks, outside-inside
environment to build value
chain.
Various studies take place
to figure out technical
issues and estimate project
cost through Feasibility
Study for
Basic Engineering. The
service is called FEED (Front
End Engineering Design).
The basic plant construction
flow can be broken down into
E (Engineering),
P (Procurement) and
C (Construction &
Commissioning).
Toshiba can conduct
Engineering and
Procurement for Hydrogen
Solution which is established
During Construction and
Commissioning phase, it is
important which is
communication with
gridoperator and local
stakeholder.
Toshiba know-how will iron
Toshiba provide services
Training Operators, O&M
manuals, O&M plans, and
online-monitoring services.
Above services are
established by co-creation
method between customer
and Toshiba.FEED : Front End Engineering
Design
Hydrogen Storage Tanks(Long term)
3,000Nm
Fuel Cell300kW
Water Electrolyzer50Nm3/h
Control panelEMS:- Control System- Electrical equipment
Battery(Short term)5,000kWh (1,250kWh×4 )
×2