New AICD Heavy oil canada - Tendeka Website · 2019. 3. 16. · AICD completion before deployment...

2
AICD compleon before deployment in heavy oil well Taking a new look at heavy oil cold producon strategies Alberta, Canada Background This is a mature, brownfield play that has been developed for 30+ years. Wells in this area have a very high water cut, oſten above 99% for many years. The reservoir is supported by a strong water aquifer, so the pressure is high, but the oil/water mobility rao keeps oil producon low. The Challenge The operator requested a fit-for-purpose compleon to be developed that would be economical in this challenging heavy oil environment. The goal was to reduce water producon and increase oil rates with an AICD compleon system for both new wells and retrofits. Case Study: FloSure AICD improves heavy oil cold producon in Western Canada Tendeka Soluon A horizontal compleon can be segregated into stages (10-30 per well) by Tendeka’s low-temp, hybrid swellable packers, and each of these stages is controlled by AICD valves. Regardless of where the water is entering the wellbore (heel area, high-permeability streaks, swept zones, proximity to the oil-water-contact), each stage autonomously controls and limits the volume of water that can enter through the AICD. This allows for higher pressure drawdowns to be applied to the zones that are “drier”, allowing for increased oil producon and lower water volumes. Economically speaking, advanced inflow control technology is oſten considered overly expensive for low-rate heavy oil wells with no thermal injecon. However, a single AICD valve with low-cost sand screens and packers allowed us to design an open-hole AICD compleon soluon that was virtually cost neutral vs. a tradional cemented and perforated wellbore. Tendeka’s new hybrid swell rubber compound was extensively tested to opmise its reacon in low temperature condions. This advanced compound is acvated by both oil and water, and has the fastest swell performance at temperatures as low as 30°C. With more than a dozen AICD-completed wells now online, there is considerable evidence that these mul-stage AICD compleons consistently control water cut and improve oil producon. The onset of water is delayed, and it is limited, allowing for a more aggressive producon strategy to accelerate recovery and improve the return on investment by up to 250%. INFLOW CONTROL July 2017 First Installaon date: Well Data Alberta, Canada Locaon: Heavy Oil/Extra Heavy Oil Reservoir type: Horizontal Wells, Retrofits Well Design: Cold Producon, Water Drive Applicaon:

Transcript of New AICD Heavy oil canada - Tendeka Website · 2019. 3. 16. · AICD completion before deployment...

  • AICD completion before deployment in heavy oil well

    Taking a new look at heavy oil cold production strategies

    Alberta, Canada

    BackgroundThis is a mature, brownfield play that has been developed for 30+ years. Wells in this area have a very high water cut, often above 99% for many years. The reservoir is supported by a strong water aquifer, so the pressure is high, but the oil/water mobility ratio keeps oil production low.

    The ChallengeThe operator requested a fit-for-purpose completion to be developed that would be economical in this challenging heavy oil environment. The goal was to reduce water production and increase oil rates with an AICD completion system for both new wells and retrofits.

    Case Study:FloSure AICD improves heavy oil cold productionin Western Canada

    Tendeka SolutionA horizontal completion can be segregated into stages (10-30 per well) by Tendeka’s low-temp, hybrid swellable packers, and each of these stages is controlled by AICD valves. Regardless of where the water is entering the wellbore (heel area, high-permeability streaks, swept zones, proximity to the oil-water-contact), each stage autonomously controls and limits the volume of water that can enter through the AICD. This allows for higher pressure drawdowns to be applied to the zones that are “drier”, allowing for increased oil production and lower water volumes.

    Economically speaking, advanced inflow control technology is often considered overly expensive for low-rate heavy oil wells with no thermal injection. However, a single AICD valve with low-cost sand screens and packers allowed us to design an open-hole AICD completion solution that was virtually cost neutral vs. a traditional cemented and perforated wellbore.

    Tendeka’s new hybrid swell rubber compound was extensively tested to optimise its reaction in low temperature conditions. This advanced compound is activated by both oil and water, and has the fastest swell performance at temperatures as low as 30°C.

    With more than a dozen AICD-completed wells now online, there is considerable evidence that these multi-stage AICD completions consistently control water cut and improve oil production. The onset of water is delayed, and it is limited, allowing for a more aggressive production strategy to accelerate recovery and improve the return on investment by up to 250%.

    Project resultsWell designs were modified, and production strategies were tweaked to optimise deliverability, with the results being truly significant. Oil production is increased by150-250%, and water volumes are reduced by 40-50%. The overall result is a return on investment that is improved by more than 250% per well, with a far lower risk of water problems.

    – New wells are completed with 4-1/2” AICD screens and swellable packers

    – Older wells are re-completed with 2-7/8” AICD subs and swellable packers

    – PCP pump selection is optimised to produce wells with higher drawdown, lower total fluid volumes

    – Reduced water production per well, allows more wells to be produced into surface facilities

    – Wells can be drilled through depleted/swept zones in the reservoir and maintain productivity

    INFLOW CONTROL

    July 2017First Installation date:

    Well Data

    Alberta, CanadaLocation:

    Heavy Oil/Extra Heavy OilReservoir type:

    Horizontal Wells, RetrofitsWell Design:

    Cold Production, Water DriveApplication:

  • ©2019 Tendeka. All rights reserved. www.tendeka.com TDK-CS-FSWC-0319

    AICD completion being prepared for deployment on site

    BackgroundThis is a mature, brownfield play that has been developed for 30+ years. Wells in this area have a very high water cut, often above 99% for many years. The reservoir is supported by a strong water aquifer, so the pressure is high, but the oil/water mobility ratio keeps oil production low.

    The ChallengeThe operator requested a fit-for-purpose completion to be developed that would be economical in this challenging heavy oil environment. The goal was to reduce water production and increase oil rates with an AICD completion system for both new wells and retrofits.

    Tendeka SolutionA horizontal completion can be segregated into stages (10-30 per well) by Tendeka’s low-temp, hybrid swellable packers, and each of these stages is controlled by AICD valves. Regardless of where the water is entering the wellbore (heel area, high-permeability streaks, swept zones, proximity to the oil-water-contact), each stage autonomously controls and limits the volume of water that can enter through the AICD. This allows for higher pressure drawdowns to be applied to the zones that are “drier”, allowing for increased oil production and lower water volumes.

    Economically speaking, advanced inflow control technology is often considered overly expensive for low-rate heavy oil wells with no thermal injection. However, a single AICD valve with low-cost sand screens and packers allowed us to design an open-hole AICD completion solution that was virtually cost neutral vs. a traditional cemented and perforated wellbore.

    Tendeka’s new hybrid swell rubber compound was extensively tested to optimise its reaction in low temperature conditions. This advanced compound is activated by both oil and water, and has the fastest swell performance at temperatures as low as 30°C.

    With more than a dozen AICD-completed wells now online, there is considerable evidence that these multi-stage AICD completions consistently control water cut and improve oil production. The onset of water is delayed, and it is limited, allowing for a more aggressive production strategy to accelerate recovery and improve the return on investment by up to 250%.

    Project resultsWell designs were modified, and production strategies were tweaked to optimise deliverability, with the results being truly significant. Oil production is increased by 150-250%, and water volumes are reduced by 40-50%.The overall result is a return on investment that isimproved by more than 250% per well, with a far lowerrisk of water problems.

    – New wells are completed with 4-1/2” AICD screensand swellable packers

    – Older wells are re-completed with 2-7/8” AICD subsand swellable packers

    – PCP pump selection is optimised to produce wells withhigher drawdown, lower total fluid volumes

    – Reduced water production per well, allows more wellsto be produced into surface facilities

    – Wells can be drilled through depleted/swept zones inthe reservoir and maintain productivity

    INFLOW CONTROL

    40000.0

    35000.0

    25000.0

    30000.0

    45000.0

    50000.0

    Cummulative oil over time - oil over water horizontal wells

    20000.0

    15000.0

    10000.0

    5000.0

    0.00 50 100 150 200 250 300 350 400 450 500

    240% higher oil recovery over 450 days using Tendeka AICD