Networking updates: Westnet
description
Transcript of Networking updates: Westnet
Networking updates: Westnet
1
Marla MeehlUCAR/FRGP/UPoP/BiSON Manager
UCAR/NCAR2014-01-08
2
Acronym soup• University Corporation for
Atmospheric Research (UCAR; http://www.ucar.edu)– National Center for Atmospheric Research
(NCAR)– Front Range GigaPoP (FRGP)– UCAR Point of Presence (UPoP)– Bi-State Optical Network (BiSON)
• Questions and discussions throughout as needed – and as for acronym soup ingredients, please ask if I miss one or check decoder page at http://bit.ly/acronym-soup
3
Front Range GigaPoP (FRGP)• http://www.frgp.net
• Replaced David Mitchell with Scot Colburn effective 12/23/13
• Netflow replacement - icmynetflow• Continued LANDER support and
partnership• PerfSonar continues to be valuable
tool• Juniper training
• One caused flood• One caused record cold
FRGP Cont’d
4
• Installed 10/100Gbps Juniper interface card to support growth
• In process of upgrading connection to ESnet to 2x10G or 40G
• Activated IPv6 with ESnet• Colocation updates – No change
– 1850 Pearl– 1200 Larimer– 910 15th
• Continued steady growth in all traffic (peering, commodity, I2, etc.)
FRGP Cont’d
4
• Peering – No change– 10G Google peering active at 910– Comcast– TR/CPS – largest single FRGP/UPoP usage– Akamai – Netflix active at 1850 Pearl – carrying ~4Gbps of traffic and
increasing– Open to other peering opportunities
6
FRGP/UPoP Traffic – 6-12/13
• percent commercial 13.2• percent peering 55.22• percent other 31.5
Bi-State Optical Network (BiSON)
4
• Major fiber move on BiSON-owned Mcleod fiber 10/13• Successfully completed• Windstream/McLeod shared funding – good
precedent• ~$450K move
• Expanding BiSON to CSM, Microsoft/UW Dry Creek Facility, and State of Wyoming• CSM Submitted NSF CC-NIE that was not awarded
BiSON Cont’d
4
• Considering submitting NSF CC-NIE in March 2014 round to upgrade and expand BiSON south
• Continuing to build ADVA replacement fund
• Installed Boulder BiSON B node to remove single point of failure for UCAR, NOAA-Boulder, and the City of Boulder
• Monitoring upgrade to 100G
9
UCAR Point of Presence (UPoP)• http://upop.ucar.edu
• 10G MOE installed and active at 1200 Larimer
• National Renewable Energy Laboratory (NREL) planning on using BiSON via Colorado School of Mines fiber path to reach ESnet
• National Ecological Observatory Network (NEON)• fiber being installed• I2 membership discussed
• State of Wyoming requested UPoP membership
• Jefferson County School District in discussions
Internet2
4
• NET+ roll out• Expansion to further RONs on hold pending I2 five per
quarter• Considering having third party manage for FRGP
• Marla co-chairing I2 Diversity Initiative – starting Spring 2013
• Steve and Marla participating in I2 Network/Connector call/meeting agenda development
• Monitoring I2 TR/CPS changes and plans• I2 Global Summit in Denver, April 2014
• Pat Burns Program Chair
NLR/CBREC
4
• CBREC meeting regularly• Ongoing discussions with NLR
• Working on MoU for continued relationship• Considering NLR alternatives for WRN, NWAVE,
colo, TSIC
CDOT
4
• Lots of fiber activity in various parts of the State
• I-25 build – nearly complete by EAGLE-Net
• US36 fiber into Boulder of great interest – ongoing discussion
• Southern Colorado
WRN
4
• Regular WTC and WPC calls• LEARN has left WRN• WRN I2 KC Move to Chicago – close
• 50Gbps• 100G ports in LA, Seattle, and
Chicago• Designing 100G connection for
UNM and FRGP to WRN/I2
14
Quilt items• http://www.thequilt.net• NOAA: Federal Government OMB
Mandate for Trusted Internet Connections (TIC) and Potential Opportunities for Regional Networks• all Federal Civilian Agencies will be impacted• http://
www.dhs.gov/trusted-internet-connections• Large impact to RONs – will shift traffic and
funding• FRGP working with NOAA-Boulder
Futures/Challenges• New agreements and new
algorithms in 2014 – in-progress• BiSON growth, upgrade, funding• Supporting/funding services –
NET+, etc.• Replacing expiring fiber IRUs• Supporting/funding 40/100Gbps
18
16
EAGLE-Net• Partnered with Affiniti to operate
and manage network– http://www.affiniti.com/– https://www.co-eaglenet.net/wp-content/uploa
ds/2013/12/Affiniti_Backgrounder.pdf
• Completing build out of network by end of August 2014
Discussion
18
Any follow up questions or feedback?
Other items?