Networking from the UK Richard Hughes-Jones PPNCG

9
ICFA SCIC Meeting CERN 28 Sep 02 R. Hughes-Jones Manchester Networking from the UK Richard Hughes-Jones PPNCG

description

Networking from the UK Richard Hughes-Jones PPNCG. SuperJANET4 Upgrade. Core network running at 10 Gbit since July 02 Access links upgrades Newcastle Cardiff, Bristol 2.5Gbit Manchester 10 Gbit (Oct 02) Reading 622 Mbit (Oct 02) TVN now at 2.5 Gbit - PowerPoint PPT Presentation

Transcript of Networking from the UK Richard Hughes-Jones PPNCG

Page 1: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

Networking from the UK

Richard Hughes-Jones PPNCG

Page 2: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

SuperJANET4 Upgrade

Core network running at 10 Gbit since July 02Access links upgrades

Newcastle Cardiff, Bristol 2.5GbitManchester 10 Gbit (Oct 02) Reading 622 Mbit (Oct 02)

TVN now at 2.5 GbitSuperJANET backbone upgrade in Scotland complete

Page 3: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

NorMAN

YHMAN

EMMAN

EastNet

External Links

LMN

Kentish MAN

LeNSESWERN

South WalesMAN

TVN

MidMAN

NorthernIreland

North WalesMAN

NNWC&NLMAN

Glasgow Edinburgh

WarringtonLeeds

ReadingLondon

Bristol Portsmouth

EaStMAN

UHI Network

Clydenet

AbMAN

University CollegeLondon connectionto test-bed network

ExternalLinks

University ofManchesterconnection totest-bednetwork 10Gbit/s

multiplexed4*2.5Gbit/schannels

FaTMAN

Due Summer 2002

Page 4: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

International Connectivity

Global IP Access KPNQWest – administration May 02 Interim arrangement with Worldcom in place early June 02 Accelerated procurement for Global IP transit in June 02 Sprint & Level3 both at 2.5 Gbit

Research Link Teleglobe ceased its voice and data services on 30th June

2002 Following tests on 25th June the research traffic to Abilene

and ESNET was transferred to the GEANT service

Page 5: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

International Connectivity

InternetWorldcom

InternetLevel3

InternetSprint

LINX

GEANTTeleCity

TelehouseLondonC-PoP

ReadingC-PoP

GE

Page 6: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

RAL to SLAC (14th August to 3rd September 2002)

UK->US

US->UK

UK-FR-DE-Abilene UK-ESnet

US-DE-FR-UK US-AT-CH-FR-UK US-DE-FR-UK US-UK US-AT-CH-FR-UK

RAL-SLAC Rtt

Page 7: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

ICFAMON Plot from RAL to SLAC for 24 Aug to 6 Sep 2002

Connectivity to US

Very similar to Feb-Mar 02 plot150 s Almost zero packet loss

Page 8: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

ICFAMON Plot from RAL to CERN for 24 Aug to 6 Sep 2002

Connectivity to Europe

Similar to earlier this yearRtt variable, DESY similar

Page 9: Networking from the UK Richard Hughes-Jones PPNCG

ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester

Summary

UKERNA has maintained continuity of service despite changes in suppliers.

Performance delivered to user remained good.