Networking from the UK Richard Hughes-Jones PPNCG
description
Transcript of Networking from the UK Richard Hughes-Jones PPNCG
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
Networking from the UK
Richard Hughes-Jones PPNCG
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
SuperJANET4 Upgrade
Core network running at 10 Gbit since July 02Access links upgrades
Newcastle Cardiff, Bristol 2.5GbitManchester 10 Gbit (Oct 02) Reading 622 Mbit (Oct 02)
TVN now at 2.5 GbitSuperJANET backbone upgrade in Scotland complete
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
NorMAN
YHMAN
EMMAN
EastNet
External Links
LMN
Kentish MAN
LeNSESWERN
South WalesMAN
TVN
MidMAN
NorthernIreland
North WalesMAN
NNWC&NLMAN
Glasgow Edinburgh
WarringtonLeeds
ReadingLondon
Bristol Portsmouth
EaStMAN
UHI Network
Clydenet
AbMAN
University CollegeLondon connectionto test-bed network
ExternalLinks
University ofManchesterconnection totest-bednetwork 10Gbit/s
multiplexed4*2.5Gbit/schannels
FaTMAN
Due Summer 2002
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
International Connectivity
Global IP Access KPNQWest – administration May 02 Interim arrangement with Worldcom in place early June 02 Accelerated procurement for Global IP transit in June 02 Sprint & Level3 both at 2.5 Gbit
Research Link Teleglobe ceased its voice and data services on 30th June
2002 Following tests on 25th June the research traffic to Abilene
and ESNET was transferred to the GEANT service
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
International Connectivity
InternetWorldcom
InternetLevel3
InternetSprint
LINX
GEANTTeleCity
TelehouseLondonC-PoP
ReadingC-PoP
GE
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
RAL to SLAC (14th August to 3rd September 2002)
UK->US
US->UK
UK-FR-DE-Abilene UK-ESnet
US-DE-FR-UK US-AT-CH-FR-UK US-DE-FR-UK US-UK US-AT-CH-FR-UK
RAL-SLAC Rtt
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
ICFAMON Plot from RAL to SLAC for 24 Aug to 6 Sep 2002
Connectivity to US
Very similar to Feb-Mar 02 plot150 s Almost zero packet loss
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
ICFAMON Plot from RAL to CERN for 24 Aug to 6 Sep 2002
Connectivity to Europe
Similar to earlier this yearRtt variable, DESY similar
ICFA SCIC Meeting CERN 28 Sep 02R. Hughes-Jones Manchester
Summary
UKERNA has maintained continuity of service despite changes in suppliers.
Performance delivered to user remained good.