NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate SAMUNDRATAR – TRISHULI 3B HUB 132 KV TRANSMISSION LINE PROJECT BIDDING DOCUMENT FOR DESIGN, SUPPLY AND CONSTRUCTION OF 132/33 KV SUBSTATION & 132 kV TRANSMISSION LINE Single-Stage, Two-Envelope Bidding Procedure Issued on: March 31, 2015 Invitation for Bids No.: ST3BSTL – 071/72-01 ICB No.: ST3BSTL – 071/72-01 Employer: Nepal Electricity Authority Country: Nepal VOLUME –III OF III March 2015 Samundratar- Trishuli 3B Hub 132 kV Transmission Line Project NEA Training Center, Kharipati Tel./Fax: +977- 1-6616784 Bhaktapur, NEPAL E-mail: s[email protected]

Transcript of NEPAL ELECTRICITY AUTHORITY - nea.org.np · Section – 4, Bidding Forms (Price Schedules) 4-1...

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

Project Management Directorate

SAMUNDRATAR – TRISHULI 3B HUB

132 KV TRANSMISSION LINE PROJECT

BIDDING DOCUMENT

FOR

DESIGN, SUPPLY AND CONSTRUCTION OF 132/33 KV

SUBSTATION & 132 kV TRANSMISSION LINE

Single-Stage, Two-Envelope

Bidding Procedure

Issued on: March 31, 2015

Invitation for Bids No.: ST3BSTL – 071/72-01

ICB No.: ST3BSTL – 071/72-01

Employer: Nepal Electricity Authority

Country: Nepal

VOLUME –III OF III

March 2015

Samundratar- Trishuli 3B Hub 132 kV Transmission Line Project

NEA Training Center, Kharipati Tel./Fax: +977- 1-6616784

Bhaktapur, NEPAL E-mail: [email protected]

Section – 4, Bidding Forms (Price Schedules) 4-1

Bidding Document for Substation Procurement of 132/33kV Samundratar Substation and Transmission Line

Single-Stage: Two-Envelope

Letter of Price Bid

[Bidder’s Letterhead]

Date: ..................................................

ICB No.: ..................................................

Invitation for Bid No.: .................................................. To: .............................................................................................................................................................

We, the undersigned, declare that:

(a) We have examined and have no reservations to the Bidding Document, including Addenda issued in accordance with Instructions to Bidders (ITB) 8;

(b) We offer to design, manufacture, test, deliver, install, precommission and commission in conformity with the Bidding Document the following Plant and Services: . . . . . . . . . . . . . . . ;

(c) The total price of our Bid, excluding any discounts offered in item (d) below is the sum of:

(d) The discounts offered and the methodology for their application are:

(e) Our bid shall be valid for a period of ............. days from the date fixed for the submission deadline in accordance with the Bidding Documents, and it shall remain binding upon us and may be accepted at any time before the expiration of that period;

(f) If our bid is accepted, we commit to obtain a performance security in accordance with the Bidding Document;

(g) We have paid, or will pay the following commissions, gratuities, or fees with respect to the bidding process or execution of the Contract: **

Name of Recipient Address Reason Amount

......................................... ........................................ ............................... ......................

......................................... ........................................ ............................... ..................... .

(h) We understand that this bid, together with your written acceptance thereof included in your notification of award, shall constitute a binding contract between us, until a formal contract is prepared and executed; and

(i) We understand that you are not bound to accept the lowest evaluated bid or any other bid that you may receive.

Section – 4, Bidding Forms (Price Schedules) 4-2

Bidding Document for Substation Procurement of 132/33kV Samundratar Substation and Transmission Line

Single-Stage: Two-Envelope

(j) We agree to permit ADB or its representative to inspect our accounts and records and other documents relating to the bid submission and to have them audited by auditors appointed by the Bank.

Name .................................................................................................................................................

In the capacity of ...............................................................................................................................

Signed ...............................................................................................................................................

Duly authorized to sign the Bid for and on behalf of .........................................................................

Date ...................................................................................................................................................

** If none has been paid or is to be paid, indicate “none”

Section – 4, Bidding Forms (Price Schedules) 4-3

Bidding Document for Substation Procurement of 132/33kV Samundratar Substation and Transmission Line

Single-Stage: Two-Envelope

Price Schedules

PREAMBLE

General

1. The Price Schedules are divided into separate Schedules as follows:

Schedule No. 1: Plant (including Mandatory Spare Parts) Supplied from Abroad

Schedule No. 2: Plant (including Mandatory Spare Parts) Supplied from within the Employer’s Country

Schedule No. 3: Design Services

Schedule No. 4: Installation and Other Services

Schedule No. 5: Grand Summary

Schedule No. 6: Recommended Spare Parts

2. The Schedules do not generally give a full description of the plant to be supplied and the services to be performed under each item. Bidders shall be deemed to have read the Employer’s Requirements and other sections of the Bidding Document and reviewed the Drawings to ascertain the full scope of the requirements included in each item prior to filling in the rates and prices. The entered rates and prices shall be deemed to cover the full scope as aforesaid, including overheads and profit.

3. If bidders are unclear or uncertain as to the scope of any item, they shall seek clarification in accordance with ITB 7 prior to submitting their bid.

Pricing

4. Prices shall be filled in indelible ink, and any alterations necessary due to errors, etc., shall be initialed by the Bidder.

As specified in the Bid Data Sheet and Special Conditions of Contract, prices shall be fixed and firm for the duration of the Contract, or prices shall be subject to adjustment in accordance with the corresponding Appendix (Price Adjustment) to the Contract Agreement.

5. Bid prices shall be quoted in the manner indicated and in the currencies specified in the Instructions to Bidders in the Bidding Document.

For each item, bidders shall complete each appropriate column in the respective Schedules, giving the price breakdown as indicated in the Schedules.

Prices given in the Schedules against each item shall be for the scope covered by that item as detailed in Section 6 (Employer’s Requirements) or elsewhere in the Bidding Document.

6. Payments will be made to the Contractor in the currency or currencies indicated under each respective item.

7. When requested by the Employer for the purposes of making payments or part payments, valuing variations or evaluating claims, or for such other purposes as the Employer may reasonably require, the Contractor shall provide the Employer with a breakdown of any composite or lump sum items included in the Schedules.

Section – 4, Bidding Forms (Price Schedules) 4-4

Bidding Document for Substation Procurement of 132/33kV Samundratar Substation and Transmission Line

Single-Stage: Two-Envelope

Schedules of Rates and Prices Schedule No. 1 - Plant and Mandatory Spare Parts Supplied from Abroad Schedule No. 2 - Plant and Mandatory Spare Parts Supplied from Within the Employer’s Country Schedule No. 3 - Design Services Schedule No. 4 - Installation and Other Services Schedule No. 5 - Grand Summary Schedule No. 6 - Recommended Spare Parts

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTGrand Summary (Price Schedule No. S-6)Grand Summary (Price Schedule No. S-6)Grand Summary (Price Schedule No. S-6)Grand Summary (Price Schedule No. S-6)

Foreign CurrencyForeign CurrencyForeign CurrencyForeign Currency Local (NRS)Local (NRS)Local (NRS)Local (NRS)

1111 Plant and Equipment Supplied from Abroad Plant and Equipment Supplied from Abroad Plant and Equipment Supplied from Abroad Plant and Equipment Supplied from Abroad

1(a) 132 kV Samundratar Substation, S-1

1(b) 132kV Line Bays at Trishuli 3B Substation Hub S-1

1(c) Transmission Line, T-1A & T-1B

2222 Plant and Equipment Supplied from within Nepal, Plant and Equipment Supplied from within Nepal, Plant and Equipment Supplied from within Nepal, Plant and Equipment Supplied from within Nepal,

2(a) 132 kV Samundratar Substation, S-2

2(b) 132kV Line Bays at Trishuli 3B Substation Hub S-2

2(c) Transmission Line, T-2

3333 Spare PartsSpare PartsSpare PartsSpare Parts

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Price Price Price Price ScheduleScheduleScheduleSchedule

DescriptionDescriptionDescriptionDescriptionTOTAL AMOUNTTOTAL AMOUNTTOTAL AMOUNTTOTAL AMOUNT

3(a) 132 kV Samundratar Substation S-3

3(b) 132kV Line Bays at Trishuli 3B Substation Hub S-3

3(c) Transmission Line, T-4

4444 Construction & Installation ServicesConstruction & Installation ServicesConstruction & Installation ServicesConstruction & Installation Services

4(a) 132 kV Samundratar Substation S-4

4(b) 132kV Line Bays at Trishuli 3B Substation Hub S-4

4(c) Transmission Line, T-3

4(d) Total of Miscellaneous, M-8

5555 Tools and Equipment (Transmission Part), T-5Tools and Equipment (Transmission Part), T-5Tools and Equipment (Transmission Part), T-5Tools and Equipment (Transmission Part), T-5

IN WORDS:

Total excluding Custom and VATTotal excluding Custom and VATTotal excluding Custom and VATTotal excluding Custom and VAT

1

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

TOTAL OF SUBSTATION (Price Schedule No. S-5)TOTAL OF SUBSTATION (Price Schedule No. S-5)TOTAL OF SUBSTATION (Price Schedule No. S-5)TOTAL OF SUBSTATION (Price Schedule No. S-5)

Foreign Currency Foreign Currency Foreign Currency Foreign Currency Local (NRS)Local (NRS)Local (NRS)Local (NRS)

1111 Plant and Equipment Supplied from Abroad (S-1)Plant and Equipment Supplied from Abroad (S-1)Plant and Equipment Supplied from Abroad (S-1)Plant and Equipment Supplied from Abroad (S-1)

1(a) 132 kV Samundratar Substation S-1

1(b) 132kV Line Bays at Trishuli 3B Substation Hub S-1

2222 Plant and Equipment Supplied from within Nepal (S-2)Plant and Equipment Supplied from within Nepal (S-2)Plant and Equipment Supplied from within Nepal (S-2)Plant and Equipment Supplied from within Nepal (S-2)

2(a) 132 kV Samundratar Substation S-1

2(b) 132kV Line Bays at Trishuli 3B Substation Hub S-3

3333 Spare Parts S-3Spare Parts S-3Spare Parts S-3Spare Parts S-3

3(a) 132 kV Samundratar Substation S-3

TOTAL AMOUNTTOTAL AMOUNTTOTAL AMOUNTTOTAL AMOUNTDescriptionDescriptionDescriptionDescription

Price Price Price Price ScheduleScheduleScheduleSchedule

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

3(a) 132 kV Samundratar Substation S-3

3(b) 132kV Line Bays at Trishuli 3B Substation Hub S-3

4444 Construction & Installation Services (S-4)Construction & Installation Services (S-4)Construction & Installation Services (S-4)Construction & Installation Services (S-4)

4(a) 132 kV Samundratar Substation S-4

4(b) 132kV Line Bays at Trishuli 3B Substation Hub S-4

IN WORDS:

Name and Seal of the bidder

Date

Authorized Signature

Total excluding Custom and VATTotal excluding Custom and VATTotal excluding Custom and VATTotal excluding Custom and VAT

1

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

AAAA Samundratar SubstaionSamundratar SubstaionSamundratar SubstaionSamundratar Substaion1111 ELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKS

1.11.11.11.1 Power transformer Power transformer Power transformer Power transformer

1.1.1132/33 kV, Three phase 24/30 MVA, ONAN/ONANF Power transformer complete with on load tapchanger (OLTC) & RTCC Facility with Tank mounted LA at LV side and Bushing CT on both sides, star/star connected complete with all accessories as specified

2 sets

1.1.2 33/11 kV, Three phase 6/8 MVA, ONAN/ONAF Power transformer complete with on load tapchanger (OLTC) & RTCC Facility with Tank mounted LA at LV side and Bushing CT on both sides, delta/star connected complete with all accessories as specified (One of the Transformers is to be supplied & delivered at Chaughada S/S)

3 sets

1.1.3 33/0.4 kV, Three phase 200 kVA, ONAN Distribution transformer with Off load tapchanger delta/star connected complete with all accessories as specified

1 Set

1.2.1.2.1.2.1.2. Circuit breakers/SwitchgearsCircuit breakers/SwitchgearsCircuit breakers/SwitchgearsCircuit breakers/Switchgears

1.2.1 145 KV, 1250 A, 3 phase, SF6 circuit breaker (individual pole operation type) complete with all accessories for line as per specification

2 sets

1.2.2 145 KV, 1250 A, 3 phase, SF6 circuit breaker (three pole operation type) complete with all accessories as per specification

3 sets

1.2.3 36 KV, 1250 A, 3 phase, Vacuum circuit breaker (three pole operation type) complete with all accessories as per specification

4 sets

1.2.4 12KV, 1250 A, 3 phase, VCB Switchgears for Incomer complete with control, protection, metering and all accessories as per specification

2 sets

1.2.5 12KV, 1250 A, 3 phase, VCB Switchgears for Bus Coupler Panel complete with control, protection, metering and all accessories as per specification

1 set

1.2.6 12KV, 1250 A, 3 phase, VCB Switchgear and Trunking chamber for Incomer complete with control, protection, metering and all accessories as per specification (For Chaughada S/S)

1 set

1.2.7 12KV, 800 A, 3 phase, VCB Switchgears for Outgoing Feeders complete with control, protection, metering and all accessories as per specification

5 sets

1.31.31.31.3 Disconnecting switchesDisconnecting switchesDisconnecting switchesDisconnecting switches

1.3.1 145 KV, 1250 A, 3 phase Centre Break disconnecting switch without grounding switch complete with all accessories as per specification

8 sets

1.3.2 145 KV, 2000 A, 3 phase Centre Break disconnecting switch without grounding switch complete with all accessories as per specification

2 sets

1.3.3 145 KV, 1250 A, 3 phase disconnecting switch with grounding switch complete with all accessories as per specification

2 sets

1.3.4 36 KV, 1250A, 3 phase disconnecting switch with grounding switch complete with all accessories as per specification

5 sets

1.3.5 36 KV, 400A, 3 phase disconnecting switch without grounding switch complete with all accessories as per specification

1 set

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

PRICE SCHEDULE: 1 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

1.41.41.41.4 Instrument transformersInstrument transformersInstrument transformersInstrument transformers1.4.1 145 KV, 50 VA, 132/√3 kV/110/√3, 110/√3V, CLASS:0.5/3P capacitor voltage

transformer complete with all accessories as specified12 nos.

1.4.2 145 KV, 30 VA, 5 core current transformer complete with all accessories as per specification

9 nos.

1.4.3 145 KV, 30 VA, 4 core current transformer complete with all accessories as per specification

6 nos.

1.4.4 36KV, 30 VA, 33/√3 kV/110/√3, 110/√3 V voltage transformer complete with all accessories as per specification

6 nos.

1.4.5 36 KV, 30 VA, 2 cores current transformer complete with all accessories as per specificationincluding 3 Nos. for Chaughada S/S

15 nos.

1.51.51.51.5 Lightening ArresterLightening ArresterLightening ArresterLightening Arrester1.5.1 120 kV, 10 kA lightning arrestor including discharge counter complete with all accessories

as per specification12 nos.

1.5.230 kV, 10 kA lightning arrestor complete with all accessories as per specification 6 nos.

1.61.61.61.6 Control and relay panelControl and relay panelControl and relay panelControl and relay panel1.6.1 132/33 kV transformer control and relay panel complete with all accessories as per

specification2 sets

1.6.2 132 kV transmission line control and relay panel complete with all accessories as per specification

2 sets

1.6.3 33/11 kV transformer control and relay panel complete with all accessories as per specification including 1 set for Chaughada S/S

3 sets

1.71.71.71.7 Substation Automation SystemSubstation Automation SystemSubstation Automation SystemSubstation Automation System

1.7.1Adaptaion Works for SAS (Substation Automation System) 1 Lot

1.7.2 Remote Supervisory control, Visual monitoring and Substation Automation System as per specification with necessary spares

1 Lot

1.81.81.81.8 GroundingGroundingGroundingGrounding1.8.1

Galvanized E.H.S. steel wires of size 7/3.35 for lightning shield wire in take off and internal structures, with accessories to complete the specified scope of works

1 lot

1.8.2 Earthing of substation with conductors, electrode grounding materials and accessories to complete the specified scope of works

1 lot

PRICE SCHEDULE: 2 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

1.91.91.91.9 Control and power cablesControl and power cablesControl and power cablesControl and power cables

1.9.1 600 V power and lighting cable for all works to complete the specified scope of work 1 lot

1.9.2 600 V control cable to complete the specified scope of works 1 lot

1.9.3

36 kV, 630 sq. mm 3xsingle core XLPE copper Power Cable including termination and accessories complete from LV sides of 132/33kV Power Transformers to Proposed 33kV Switchyard Bays as per Drawings, running meter Plus single core cable of 110m with termination as a spare

767 m

1.9.4

12 kV, 400 sq. mm 3xsingle core XLPE copper Power Cable including straight joints with accessories complete from LV sides of 33/11kV Power Transformers to Indoor 11kV Switchgear Room as per Drawings, running meter Plus single core cable of 110m with termination as a spare

494 m

1.9.512 kV, 185 sq. mm 3 cores XLPE Aluminium Power Cable including straight joints with accessories complete for 4 nos. of outgoing distribution feeders as specified, running meter

1269 m

1.101.101.101.10Miscellaneous materialMiscellaneous materialMiscellaneous materialMiscellaneous material

1.10.1 145 kV Insulator strings with necessary hardwares, clamps for substation works andconnection between line tower, take off gantry & internal gantry structure, complete asper the specified scope of works

1 lot

1.10.2 36 kV Insulator strings with necessary hardwares, clamps for substation works andconnection between line tower, take off gantry & internal structure, complete as per thespecified scope of works

1 lot

1.10.3 AAAC "UPAS" conductors and accessories to complete the specified scope of worksincluding for line tower to take off and internal structure (including stringing of conductorbetween tower to gantry for 132 kV."UPAS" CONDUCTOR to be supplied by NEA

1 lot

1.10.4132 kV Tubular bus (Outer Dia 100mm and thickness 10mm) and Bus Support Insulator (36Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.10.5145 kV Support Insulators (30Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.10.633 kV Tubular bus (Dia 75mm, thickness 8mm) and Bus Support Insulator (24Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.10.7 33 kV Power Fuse with Support Insulator (3Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.10.8 11 kV Overhead Distribution Line with all accessories complete from Substation to Outdoor existing lines including breakdown of existing line to separate feeder lines

3 KM

1.10.9 Switchyard lighting (including lighting for internal road) 1 lot

1.10.10 Fire Fighting System (Fire Alrm and Extinguisher) 1 lot1.111.111.111.11 BATTERY / BATTERY CHARGERBATTERY / BATTERY CHARGERBATTERY / BATTERY CHARGERBATTERY / BATTERY CHARGER

1.11.1 110 V maintenance free lead acid battery complete with all accessories 1 Set1.11.2 48 V maintenance free lead acid battery complete with all accessories 1 Set1.11.3 Battery charger for 110 V battery complete with all accessories 2 Sets1.11.4 Battery charger for 48 V battery complete with all accessories 2 Sets1.11.5 110 V DC distribution board complete with all accessories 1 Set1.11.6 48 V DC distribution board complete with all accessories 1 Set

PRICE SCHEDULE: 3 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

2222 COMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADA

2.1Optical line terminal equipment (OLTE) including multiplexer complete with all accessories 1 lot

2.2 SCADA marshalling cubicle 1 lot2.3 Remote terminal unit including cables, connectors, transducers, adaption materials, other

hardware and software required for data transmission and remote operation1 lot

2.4Telephone system (inbuilt in the multiplexer as 2 wire remote and local subscriber), coaxial cable & all associated material as shown in the drawing to complete specified job

1 lot

2.5 Optical approach cable 1 lot2.6 Optical distribution frame 1 lot

Sub Total of Electrical and Communication of Samundratar S/S)Sub Total of Electrical and Communication of Samundratar S/S)Sub Total of Electrical and Communication of Samundratar S/S)Sub Total of Electrical and Communication of Samundratar S/S)

3333 CIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKS3.13.13.13.1 Steel structure for post, beam and equipment supporting frame complete with bolts, Steel structure for post, beam and equipment supporting frame complete with bolts, Steel structure for post, beam and equipment supporting frame complete with bolts, Steel structure for post, beam and equipment supporting frame complete with bolts,

nuts and all accessories:nuts and all accessories:nuts and all accessories:nuts and all accessories:

3.1.1 Rail Structure for 132/33kV Power Transformer including access from Internal Road 2 Lots3.1.2 132 kV take off gantry structures as per drawing 5 Bays3.1.3 132 kV gas circuit breaker 5 sets3.1.4 132 kV disconnecting switch with earth switch 2 sets3.1.5 132 kV disconnecting switch without earth switch 10 set3.1.6 132 kV Capacitive voltage transformer 12 no3.1.7 132 kV current transformer 15 no3.1.8 120 kV lightning arrestor 12 no3.1.9 132 kV Bus Post Insulator 36 Nos.

3.1.10 132 kV Support Insulator 30 Nos.3.1.11 33 kV Vacuum Circuit Breaker 4 sets3.1.12 33 kV Disconnecting Switch with earth switch 2 sets3.1.13 33 kV Disconnecting Switch without earth switch 6 sets3.1.14 33 kV Current Transformer 12 Nos.3.1.15 33 KV Voltage Transformer 6 Nos.3.1.16 30 kV Lightning Arrestor 6 Nos.3.1.17 33 kV Bus Support Insulator 24 Nos.3.1.18 33 kV Power Fuse Support Insulator 3 Nos.3.1.19 Earth mast 1 lot3.1.20 132 kV, outdoor type cable termination/sealing-end and all accessories complete. 6 Nos.3.1.21 Switchyard fence as per Specifications (including fence with gate for 132kV) 250 Rm

3.1.22 Switchyard fence as per Specifications (including fence with gate for 132kV) 180 Rm

3.1.23 Indentification plate, danger notice etc 1 lot

Sub Total of Civil & Architectural Works of Samundratar substationSub Total of Civil & Architectural Works of Samundratar substationSub Total of Civil & Architectural Works of Samundratar substationSub Total of Civil & Architectural Works of Samundratar substation

SUB TOTAL" A" (SAMUNDRATAR SUBSTATION)SUB TOTAL" A" (SAMUNDRATAR SUBSTATION)SUB TOTAL" A" (SAMUNDRATAR SUBSTATION)SUB TOTAL" A" (SAMUNDRATAR SUBSTATION)

PRICE SCHEDULE: 4 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

BBBB LINE BAYS AT TRISHULI 3B HUB SUBSTATIONLINE BAYS AT TRISHULI 3B HUB SUBSTATIONLINE BAYS AT TRISHULI 3B HUB SUBSTATIONLINE BAYS AT TRISHULI 3B HUB SUBSTATION1111 ELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKS1.11.11.11.1 Circuit breakers/SwitchgearsCircuit breakers/SwitchgearsCircuit breakers/SwitchgearsCircuit breakers/Switchgears

1.1.1 145 KV, 1250 A, 3 phase, SF6 circuit breaker (individual pole operation type) complete with all accessories for line as per specification

2 sets

1.21.21.21.2 Disconnecting switchesDisconnecting switchesDisconnecting switchesDisconnecting switches1.2.1 145 KV, 1250 A, 3 phase Centre Break disconnecting switch without grounding switch

complete with all accessories as per specification4 sets

1.2.2 145 KV, 1250 A, 3 phase disconnecting switch with grounding switch complete with all accessories as per specification

2 sets

1.31.31.31.3 Instrument transformersInstrument transformersInstrument transformersInstrument transformers1.3.1 132 KV, 50 VA, 132/√3 kV/110/√3, 110/√3V, CLASS:0.5/3P capacitor voltage

transformer complete with all accessories as specified6 nos.

1.3.2 132 KV, 30 VA, 5 core current transformer complete with all accessories as per specification

6 nos.

1.41.41.41.4 Lightening ArresterLightening ArresterLightening ArresterLightening Arrester1.4.1 120 kV, 10 kA lightning arrestor including discharge counter complete with all accessories

as per specification6 nos.

1.51.51.51.5 Control and relay panelControl and relay panelControl and relay panelControl and relay panel1.5.1 132 kV transmission line control and relay panel complete with all accessories as per

specification2 sets

1.61.61.61.6 GroundingGroundingGroundingGrounding1.6.1 Galvanized E.H.S. steel wires of size 7/3.35 for lightning shield wire in take off and internal

structures, with accessories to complete the specified scope of works1 lot

1.6.2 Earthing of Line Bay Equipments with conductors, electrode grounding materials and accessories to complete the specified scope of works

1 lot

1.71.71.71.7 Control and power cablesControl and power cablesControl and power cablesControl and power cables

1.7.1 600 V power and lighting cable for all works to complete the specified scope of work 1 lot

1.7.2 600 V control cable to complete the specified scope of works 1 lot

1.7.3132 kV, 800 sq. mm single core XLPE Power Cable (straight joints if required) with accessories complete from Dead End Tower to Samundratar Line Bay as specified, running length (for 2x3x1 core plus 1 core cable spare) including support structure

2450 m

1.7.4132 kV, outdoor type cable termination/sealing-end and all accessories complete with 1 core cable spare

7 Sets

1.7.5 Flexible pipe for power cable 1980 m

1.7.6 High voltage warning sheets for cable trench 300 m

PRICE SCHEDULE: 5 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

1.81.81.81.8 Miscellaneous materialMiscellaneous materialMiscellaneous materialMiscellaneous material

1.8.1 132 kV Insulator strings with necessary hardwares, clamps for substation works andconnection between line tower, take off gantry & internal gantry structure, complete asper the specified scope of works

1 lot

1.8.3 AAAC "UPAS" conductors and accessories to complete the specified scope of worksincluding for line tower to take off and internal structure (including stringing of conductorbetween tower to gantry for 132 kV."UPAS" CONDUCTOR to be supplied by NEA

1 lot

1.8.4132 kV Tubular bus (Outer Dia 100mm and thickness 10mm) and Bus Support Insulator (18Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.8.5 132 kV Support Insulators (12Nos.) including all other accessories required to complete the specified scope of work

1 lot

2222 COMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADA

2.1 Adaptation works and extension of RTU at Trishuli 3B Hub Substation (cards, including cable, connectors, other hardware and software required for data transmission and remote operation)

1 lot

Sub Total of Electrical and Communication of Line Bays at Trishuli 3B Hub substationSub Total of Electrical and Communication of Line Bays at Trishuli 3B Hub substationSub Total of Electrical and Communication of Line Bays at Trishuli 3B Hub substationSub Total of Electrical and Communication of Line Bays at Trishuli 3B Hub substation

PRICE SCHEDULE: 6 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADPRICE SCHEDULE NO. S-1: PLANT AND EQUIPMENT SUPPLIED FROM ABROADL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

4=24=24=24=22222

3=13=13=13=1

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Unit RateUnit RateUnit RateUnit Rate

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

1111

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Unit RateUnit RateUnit RateUnit RateItem No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation Forwarding and Transportation

up to Siteup to Siteup to Siteup to SiteEstimatedEstimatedEstimatedEstimated

UnitUnitUnitUnit

3333 CIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKS3.13.13.13.1 Steel structure for post, beam and equipment supporting frame complete with bolts, Steel structure for post, beam and equipment supporting frame complete with bolts, Steel structure for post, beam and equipment supporting frame complete with bolts, Steel structure for post, beam and equipment supporting frame complete with bolts,

nuts and all accessories:nuts and all accessories:nuts and all accessories:nuts and all accessories:

3.1.1 132 kV take off gantry structures as per drawing 2 Bays3.1.2 132 kV gas circuit breaker 2 sets3.1.3 132 kV disconnecting switch with earth switch 2 sets3.1.4 132 kV disconnecting switch without earth switch 4 set3.1.5 132 kV Capacitive voltage transformer 6 no3.1.6 132 kV current transformer 6 no3.1.7 120 kV lightning arrestor 6 no3.1.8 132 kV Bus Post Insulator 18 Nos.3.1.9 132 kV Support Insulator 12 Nos.

3.1.10 Indentification plate, danger notice etc 1 lot

Sub Total of Civil & Architectural Works at Trishuli 3B Hub SubstationSub Total of Civil & Architectural Works at Trishuli 3B Hub SubstationSub Total of Civil & Architectural Works at Trishuli 3B Hub SubstationSub Total of Civil & Architectural Works at Trishuli 3B Hub Substation

SUB TOTAL" A" (TRISHULI 3B HUB SUBSTATION)SUB TOTAL" A" (TRISHULI 3B HUB SUBSTATION)SUB TOTAL" A" (TRISHULI 3B HUB SUBSTATION)SUB TOTAL" A" (TRISHULI 3B HUB SUBSTATION)

Name and Seal of the bidder NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND

Date EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Authorized Signature

PRICE SCHEDULE: 7 PLANT AND EQUIPMENT

2. Item no in the following table shall match those in Price schedule S-1Price Schedule S-2: Supply and Delivery of Plant and Equipment Locally ManufacturedPrice Schedule S-2: Supply and Delivery of Plant and Equipment Locally ManufacturedPrice Schedule S-2: Supply and Delivery of Plant and Equipment Locally ManufacturedPrice Schedule S-2: Supply and Delivery of Plant and Equipment Locally Manufactured LC: Local Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

Samundratar Substaion & Samundratar Substaion & Samundratar Substaion & Samundratar Substaion & Line Bays at Trishuli 3B Hub S/SLine Bays at Trishuli 3B Hub S/SLine Bays at Trishuli 3B Hub S/SLine Bays at Trishuli 3B Hub S/S OriginOriginOriginOrigin

L/C L/C L/C L/C L/CL/CL/CL/C

( NRS) ( NRS) ( NRS) ( NRS)L/CL/CL/CL/C

(NRS) (NRS) (NRS) (NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=1+23=1+23=1+23=1+2 4444 5555

NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Name and Seal of the bidder

Date

Authorized Signature

L/CL/CL/CL/C

Ex Faxtory Price Ex Faxtory Price Ex Faxtory Price Ex Faxtory Price (Excluding VAT)(Excluding VAT)(Excluding VAT)(Excluding VAT)

Inland Transportation Inland Transportation Inland Transportation Inland Transportation up to Siteup to Siteup to Siteup to Site

Total Total Total Total AmountAmountAmountAmount

(Excluding (Excluding (Excluding (Excluding Taxes & Taxes & Taxes & Taxes & Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Project : Project : Project : Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTPROJECTPROJECTPROJECT

Estimated Estimated Estimated Estimated

Total Total Total Total AmountAmountAmountAmount

(Including (Including (Including (Including Taxes & Taxes & Taxes & Taxes & Duties) Duties) Duties) Duties)

LCLCLCLC

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

1. If a bidder wishes to supply some items(s) listed in Price schedule no S-1 from manufacturing plant in Nepal, then such item(s) and price of such item(s) shall be quoted in this Price Schedule S-2 only . Columns against such item(s) shall be left blank in Price Schedule no S-1

PRICE SCHEDULE: 1 PLANT AND EQUIPMENT

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

PRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount

AAAA Samundratar SubstaionSamundratar SubstaionSamundratar SubstaionSamundratar Substaion4.04.04.04.0 Spare PartsSpare PartsSpare PartsSpare Parts4.14.14.14.1 For 132 /33 kV transformer For 132 /33 kV transformer For 132 /33 kV transformer For 132 /33 kV transformer

4.1.1 132 kV & 33 kV bushing (one of each type) 1 set4.1.2 Dial type thermometers 1 set4.1.3 Oil level gauges 1 set4.1.4 Insulating oil (10% of total supply) 1 lot

4.1.5 Indicating lamps (25% of used) 1 lot4.1.6 All types at fuses (25% of used ) 1 lot4.1.7 Complete set of gaskets of each type 1 set4.1.8 Complete set of pressure relief devices 1 set4.1.9 All type of auxiliary, current, voltage and thermal relays, contactors and timers for

control, protection and cooling circuit (one of each type) 1 set

4.1.10 OLTC motor contactor 1 set4.1.11 Complete set of Buchholz relay 1 set4.1.12 OLTC motor 1 set

4.24.24.24.2 For 33/11kV transformer (Samundratar) For 33/11kV transformer (Samundratar) For 33/11kV transformer (Samundratar) For 33/11kV transformer (Samundratar) 4.2.1 33 kV & 11 kV bushing (one of each type) 1 set4.2.2 Dial type thermometers 1 set4.2.3 Oil level gauges 1 set4.2.4 Insulating oil (10% of total supply) 1 lot

4=24=24=24=21111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4Item No. Item No. Item No. Item No.

QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate Unit RateUnit RateUnit RateUnit Rate 3=13=13=13=1

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) (Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION EstimatedEstimatedEstimatedEstimated

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Forwarding and Forwarding and Forwarding and

Transportation up to SiteTransportation up to SiteTransportation up to SiteTransportation up to Site

4.2.5 Indicating lamps (25% of used) 1 lot4.2.6 All types at fuses (25% of used ) 1 lot4.2.7 Complete set of gaskets of each type 1 set4.2.8 Complete set of pressure relief devices 1 set4.2.9 All type of auxiliary, current, voltage and thermal relays, contactors and timers for

control, protection and cooling circuit (one of each type) 1 set

4.2.10 OLTC motor contactor 1 set4.2.11 Complete set of Buchholz relay 1 set4.2.12 OLTC motor 1 set

4.34.34.34.3 For 33/11kV transformer (Chaughada) For 33/11kV transformer (Chaughada) For 33/11kV transformer (Chaughada) For 33/11kV transformer (Chaughada) 4.3.1 33 kV & 11 kV bushing (one of each type) 1 set4.3.2 Dial type thermometers 1 set4.3.3 Oil level gauges 1 set4.3.4 Insulating oil (10% of total supply) 1 lot

4.3.5 Indicating lamps (25% of used) 1 lot4.3.6 All types at fuses (25% of used ) 1 lot4.3.7 Complete set of gaskets of each type 1 set4.3.8 Complete set of pressure relief devices 1 set4.3.9 All type of auxiliary, current, voltage and thermal relays, contactors and timers for

control, protection and cooling circuit (one of each type) 1 set

4.3.10 OLTC motor contactor 1 set4.3.11 Complete set of Buchholz relay 1 set4.3.12 OLTC motor 1 set

PRICE SCHEDULE: 1 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount4=24=24=24=2

1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4Item No. Item No. Item No. Item No. QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate Unit RateUnit RateUnit RateUnit Rate 3=13=13=13=1

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) (Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION EstimatedEstimatedEstimatedEstimated

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Forwarding and Forwarding and Forwarding and

Transportation up to SiteTransportation up to SiteTransportation up to SiteTransportation up to Site

4.44.44.44.4 For 145kV SF6 circuit breaker For 145kV SF6 circuit breaker For 145kV SF6 circuit breaker For 145kV SF6 circuit breaker

4.4.1 Complete set (one chamber) of interrupter 3 sets

4.4.2 Tripping coils 6 nos.

4.4.3 Closing coils 6 nos.

4.4.4 Pressure switch, relays and contactors (one of each type) 2 sets

4.4.5 Motors for mechanism of each type 2 nos.

4.4.6 Gas filling equipment complete with accessories 1 set

4.4.7 Complete set (one chamber) of Sealing rings & Gaskets 2 sets

4.54.54.54.5 For 36kV Vacuum Circuit Breaker For 36kV Vacuum Circuit Breaker For 36kV Vacuum Circuit Breaker For 36kV Vacuum Circuit Breaker

4.5.1 Tripping Coils, 4 Nos.

4.5.2 Closing Coils, 4 Nos.4.5.3 Relays and Contactors (One of each type), 2 Sets4.5.4 Motor for Mechanism, Set 1 Set4.5.5 Interrupter for VCB, No 1 No4.64.64.64.6 For 12kV VCB Switchgears (Samundratar S/S) For 12kV VCB Switchgears (Samundratar S/S) For 12kV VCB Switchgears (Samundratar S/S) For 12kV VCB Switchgears (Samundratar S/S)

4.6.1 11kV Vacuum Interrupter 2 Nos.

4.6.2 Tripping Coils, Nos 4 Nos.4.6.3 Closing Coils, Nos 4 Nos.4.6.4 Spring Charging Motor, Set 2 Set4.6.5 Protection RelaysProtection RelaysProtection RelaysProtection Relays

4.6.5.1 3 phase Overcurrent Relay with ground fault for 11kV side, Sets 3 Sets3 phase Overcurrent Relay with ground fault for 11kV side, Sets 3 Sets4.6.6 Ammeter, Nos 4 Nos.4.6.7 Voltmeter, Nos 2 Nos.4.6.8 kVA Meter, Nos 2 Nos.4.6.9 11kV CTs as in Outgoing Feeder, Sets 2 Sets

4.6.10 Operating Handle 2 Sets4.6.11 Indicating lamps (100% of used), Lot 1 Set

4.74.74.74.7 For 12kV VCB Switchgears (Chaughada S/S) For 12kV VCB Switchgears (Chaughada S/S) For 12kV VCB Switchgears (Chaughada S/S) For 12kV VCB Switchgears (Chaughada S/S)

4.7.1 11kV Vacuum Interrupter with Trunking Chamber 1 Nos.

4.7.2 Tripping Coils, Nos 2 Nos.4.7.3 Closing Coils, Nos 2 Nos.4.7.4 Spring Charging Motor, Set 1 Set4.7.5 Protection RelaysProtection RelaysProtection RelaysProtection Relays

4.7.5.1 3 phase Overcurrent Relay with ground fault for 11kV side, Sets 1 Sets4.7.6 Ammeter, Nos 1 Nos.4.7.7 Voltmeter, Nos 1 Nos.4.7.8 kVA Meter, Nos 1 Nos.4.7.9 11kV CTs as in Outgoing Feeder, Sets 1 Sets

4.7.10 Operating Handle 1 Sets4.7.11 Indicating lamps (100% of used), Lot 1 Set

PRICE SCHEDULE: 2 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount4=24=24=24=2

1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4Item No. Item No. Item No. Item No. QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate Unit RateUnit RateUnit RateUnit Rate 3=13=13=13=1

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) (Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION EstimatedEstimatedEstimatedEstimated

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Forwarding and Forwarding and Forwarding and

Transportation up to SiteTransportation up to SiteTransportation up to SiteTransportation up to Site

4.84.84.84.8 For 145 kV disconnecting switches For 145 kV disconnecting switches For 145 kV disconnecting switches For 145 kV disconnecting switches 4.8.1 Porcelain insulator 4 nos.4.8.2 Main contact assemblies (one assembly) 4 set4.8.3 Auxiliary contacts 2 sets4.8.4 Interlocking coil 2 nos.4.94.94.94.9 For 36 kV disconnecting switches For 36 kV disconnecting switches For 36 kV disconnecting switches For 36 kV disconnecting switches

4.9.1 Porcelain insulator 4 nos.4.9.2 Main contact assemblies (one assembly) 3 sets4.9.3 Auxiliary contacts 2 sets4.9.4 Interlocking coil 2 nos.4.104.104.104.10 Instrument transformers of used type Instrument transformers of used type Instrument transformers of used type Instrument transformers of used type

4.10.1 145 kV current transformer 2 nos.4.10.2 145 kV Capacitive voltage transformer 2 nos.4.10.3 36 kV current transformer 2 nos.4.10.4 36 kV potential transformer 2 nos.4.114.114.114.11 Lightning arrester Lightning arrester Lightning arrester Lightning arrester

4.11.1 120 kV single phase lightning arrester (pedestal-type) 2 nos.4.11.2 30 kV single phase lightning arrester (pedestal-type) 2 no4.124.124.124.12 For 132/33 kV control and relay panel For 132/33 kV control and relay panel For 132/33 kV control and relay panel For 132/33 kV control and relay panel

4.12.1 Indicating lamps (50% of used) 1 lot4.12.2 Fuses for each type (50% of used) 1 lot4.12.3 Color caps of each color for indicating lamps (30% of used) 1 lot4.12.4 One of each type of switch, timer and other special devices 1 set4.12.5 3 Phase over current relays with earthfault inbuilt 1 set4.12.6 3 Phase Transformer Differential relays 1 set4.12.7 Each type of auxiliary relay 1 set4.12.7 Each type of auxiliary relay 1 set4.12.8 Ammeter 3 no.4.12.9 Voltmeter 3 no.4.134.134.134.13 132 kV Control and Protection Panel132 kV Control and Protection Panel132 kV Control and Protection Panel132 kV Control and Protection Panel

4.13.1 Indicating lamps (50% of used) 1 lot4.13.2 Fuses for each type (50% of used) 1 lot4.13.3 Color caps of each color for indicating lamps (30% of used) 1 lot4.13.4 One of each type of switch, timer and other special devices 1 set4.13.5 Distance relay for line protection 1 no.4.13.6 One of each type of Over current and earth fault relays 1 lot4.13.7 Carrier auxiliary relay 1 no.4.13.8 Syncro check relay 1 no.4.13.9 Trip-circuit supervision relay 1 no.

4.13.10 Ammeter 3 nos.4.13.11 Voltmeter 3 nos.

PRICE SCHEDULE: 3 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount4=24=24=24=2

1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4Item No. Item No. Item No. Item No. QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate Unit RateUnit RateUnit RateUnit Rate 3=13=13=13=1

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) (Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION EstimatedEstimatedEstimatedEstimated

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Forwarding and Forwarding and Forwarding and

Transportation up to SiteTransportation up to SiteTransportation up to SiteTransportation up to Site

4.144.144.144.14 For 33/11kV Transformer control and relay panel For 33/11kV Transformer control and relay panel For 33/11kV Transformer control and relay panel For 33/11kV Transformer control and relay panel 4.14.1 Indicating lamps (50% of used) 1 lot4.14.2 Fuses for each type (50% of used) 1 lot4.14.3 Color caps of each color for indicating lamps (30% of used) 1 lot4.14.4 One of each type of switch, timer and other special devices 1 set4.14.5 3 Phase over current relays with earthfault inbuilt 1 set4.14.6 3 Phase Transformer Differential relays 1 set4.14.7 Each type of auxiliary relay 1 set4.14.8 Ammeter 3 no.4.14.9 Voltmeter 3 no.4.154.154.154.15 Communication / SCADACommunication / SCADACommunication / SCADACommunication / SCADA

4.15.1 Series of cards for RTU one of each type 1 Lot4.15.2 Series of cards for OLTE and Multiplexer one of each type 1 Lot

4.164.164.164.16 110 V Battery Charger 110 V Battery Charger 110 V Battery Charger 110 V Battery Charger 4.16.1 Fuses of each type (50% of used) 1 lot4.16.2 Indicating lamp (50% of used) 1 lot4.16.3 One of each type of switch, relay and other special devices 1 lot4.16.4 Ammeter 1 no4.16.5 Voltmeter 1 no

4.174.174.174.17 48 V Battery Charger 48 V Battery Charger 48 V Battery Charger 48 V Battery Charger 4.17.1 Fuses of each type (50% of used) 1 lot4.17.2 Indicating lamp (50% of used) 1 lot4.17.3 One of each type of switch, relay and other special devices 1 lot4.17.4 Ammeter 1 no4.17.5 Voltmeter 1 no

SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)SUB TOTAL SPARE PARTS " A" (SAMUNDRATAR SUBSTATION)

PRICE SCHEDULE: 4 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount4=24=24=24=2

1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4Item No. Item No. Item No. Item No. QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate Unit RateUnit RateUnit RateUnit Rate 3=13=13=13=1

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) (Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION EstimatedEstimatedEstimatedEstimated

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Forwarding and Forwarding and Forwarding and

Transportation up to SiteTransportation up to SiteTransportation up to SiteTransportation up to Site

5.05.05.05.0 Spare Parts (132kV LINE BAYS AT TRISHULI 3B HUB SUBSTATION)Spare Parts (132kV LINE BAYS AT TRISHULI 3B HUB SUBSTATION)Spare Parts (132kV LINE BAYS AT TRISHULI 3B HUB SUBSTATION)Spare Parts (132kV LINE BAYS AT TRISHULI 3B HUB SUBSTATION)5.15.15.15.1 For 145kV SF6 circuit breaker For 145kV SF6 circuit breaker For 145kV SF6 circuit breaker For 145kV SF6 circuit breaker

5.1.1 Complete set (one chamber) of interrupter 2 sets

5.1.2 Tripping coils 4 nos.

5.1.3 Closing coils 4 nos.5.1.4 Pressure switch, relays and contactors (one of each type) 1 sets

5.1.5 Motors for mechanism of each type 1 nos.

5.1.6 Gas filling equipment complete with accessories 1 set

5.1.7 Complete set (one chamber) of Sealing rings & Gaskets 1 sets

5.25.25.25.2 For 145kV disconnecting switches For 145kV disconnecting switches For 145kV disconnecting switches For 145kV disconnecting switches 5.2.1 Porcelain insulator 2 nos.5.2.2 Main contact assemblies (one assembly) 2 set5.2.3 Auxiliary contacts 1 sets5.2.4 Interlocking coil 1 nos.5.35.35.35.3 Instrument transformers of used type Instrument transformers of used type Instrument transformers of used type Instrument transformers of used type

5.3.1 145 kV current transformer 1 nos.5.3.2 145 kV Capacitive voltage transformer 1 nos.5.45.45.45.4 Lightning arrester Lightning arrester Lightning arrester Lightning arrester

5.4.1 120 kV single phase lightning arrester (pedestal-type) 2 nos.5.55.55.55.5 132 kV Control and Protection Panel132 kV Control and Protection Panel132 kV Control and Protection Panel132 kV Control and Protection Panel

5.5.1 Indicating lamps (50% of used) 1 lot5.5.2 Fuses for each type (50% of used) 1 lot5.,5.3 Color caps of each color for indicating lamps (30% of used) 1 lot5.5.3 One of each type of switch, timer and other special devices 1 set5.5.3 One of each type of switch, timer and other special devices 1 set5.,5.4 Distance relay for line protection 1 no.5.5.4 One of each type of Over current and earth fault relays 1 lot5.,5.5 Carrier auxiliary relay 1 no.5.5.5 Syncro check relay 1 no.5.,5.6 Trip-circuit supervision relay 1 no.5.5.6 Ammeter 3 nos.5.,5.7 Voltmeter 3 nos.

PRICE SCHEDULE: 5 PLANT AND EQUIPMENT

PRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSPRICE SCHEDULE NO. S-3: SPARE PARTSL/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign CurrencyF/C=Foreign Currency

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

DescriptionDescriptionDescriptionDescription AmountAmountAmountAmount AmountAmountAmountAmount4=24=24=24=2

1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4Item No. Item No. Item No. Item No. QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate Unit RateUnit RateUnit RateUnit Rate 3=13=13=13=1

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) (Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)(Including Taxes & Duties)

F/C F/C F/C F/C L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION EstimatedEstimatedEstimatedEstimated

Total CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal BorderTotal CIP-Nepal Border Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Insurance, Clearing, Forwarding and Forwarding and Forwarding and Forwarding and

Transportation up to SiteTransportation up to SiteTransportation up to SiteTransportation up to Site

5.65.65.65.6 Communication / SCADACommunication / SCADACommunication / SCADACommunication / SCADA

5.6.15.6.15.6.15.6.1 Remote Terminal UnitRemote Terminal UnitRemote Terminal UnitRemote Terminal Unit5.6.1.1 Digital Input Card 2 no.5.6.1.2 Digital Output Card 2 no.5.6.1.3 Analogue Input Card 2 no.5.6.1.4 Command cards 1 set5.6.1.5 GPS card 1 no.5.6.1.6 Power Supply Card 2 no.5.6.25.6.25.6.25.6.2 Transducer and Interposing Relay Transducer and Interposing Relay Transducer and Interposing Relay Transducer and Interposing Relay

5.6.2.1 Relays 1 no.5.6.2.2 MW/MVAR Transducer 2 no.

5.6.2.3 Current Transducer 2 no.5.6.2.4 Voltage Transducer 2 no.

SUB TOTAL SPARE PARTS " A" (TRISHULI 3B HUB SUBSTATION)SUB TOTAL SPARE PARTS " A" (TRISHULI 3B HUB SUBSTATION)SUB TOTAL SPARE PARTS " A" (TRISHULI 3B HUB SUBSTATION)SUB TOTAL SPARE PARTS " A" (TRISHULI 3B HUB SUBSTATION)

Name and Seal of the bidder NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND

Date EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Authorized Signature

PRICE SCHEDULE: 6 PLANT AND EQUIPMENT

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

AAAA Samundratar SubstaionSamundratar SubstaionSamundratar SubstaionSamundratar Substaion1111 ELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKS

1.11.11.11.1 Power transformer Power transformer Power transformer Power transformer 1.1.1 132/33 kV, Three phase 24/30 MVA, ONAN/ONANF Power transformer complete with on load tapchanger (OLTC) & RTCC

Facility with Tank mounted LA at LV side and Bushing CT on both sides, star/star connected complete with all accessories as specified

2 sets

1.1.2 33/11 kV, Three phase 6/8 MVA, ONAN/ONANF Power transformer complete with on load tapchanger (OLTC) & RTCC Facility with Tank mounted LA at LV side and Bushing CT on both sides, delta/star connected complete with all accessories as specified (One of the Transformers is to be supplied & delivered at Chaughada S/S with dismantling of Old 33/11kV, 1.5MVA TRF)

3 sets

1.1.3 33/0.4 kV, Three phase 200 kVA, ONAN Distribution transformer with Off load tapchanger delta/star connected complete with all accessories as specified

1 set

1.2.1.2.1.2.1.2. Circuit breakersCircuit breakersCircuit breakersCircuit breakers1.2.1 145 KV, 1250 A, 3 phase, SF6 circuit breaker (individual pole operation type) complete with all accessories for line as per

specification2 sets

1.2.2145 KV, 1250 A, 3 phase, SF6 circuit breaker (three pole operation type) complete with all accessories as per specification 3 sets

1.2.336 KV, 1250 A, 3 phase, Vacuum circuit breaker (three pole operation type) complete with all accessories as per specification 4 sets

1.2.4 12KV, 1250 A, 3 phase, VCB Switchgears for Incomer complete with control, protection, metering and all accessories as per specification

2 sets

1.2.5 12KV, 1250 A, 3 phase, VCB Switchgears for Bus Coupler Panel complete with control, protection, metering and all accessories as per specification

1 set

1.2.6 12KV, 1250 A, 3 phase, VCB Switchgear and Trunking chamber for Incomer complete with control, protection, metering and all accessories as per specification (For Chaughada S/S)

1 set

1.2.7 12KV, 800 A, 3 phase, VCB Switchgears for Outgoing Feeders complete with control, protection, metering and all accessories as per specification

5 sets

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

PRICE SCHEDULE 1 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

1.3.1.3.1.3.1.3. Disconnecting switchesDisconnecting switchesDisconnecting switchesDisconnecting switches1.3.1 145 KV, 1250 A, 3 phase Centre Break disconnecting switch without grounding switch complete with all accessories as per

specification8 sets

1.3.2 145 KV, 2000 A, 3 phase Centre Break disconnecting switch without grounding switch complete with all accessories as per specification

2 sets

1.3.3 145 KV, 1250 A, 3 phase disconnecting switch with grounding switch complete with all accessories as per specification 2 sets

1.3.4 36 KV, 1250A, 3 phase disconnecting switch with grounding switch complete with all accessories as per specification 5 sets

1.3.5 36 KV, 400A, 3 phase disconnecting switch without grounding switch complete with all accessories as per specification 1 sets

1.41.41.41.4 Instrument transformersInstrument transformersInstrument transformersInstrument transformers1.4.1 145 KV, 50 VA, 132/√3 kV/110/√3, 110/√3V, CLASS:0.5/3P capacitor voltage transformer complete with all accessories as

specified12 nos.

1.4.2 145 KV, 30 VA, 5 core current transformer complete with all accessories as per specification 9 nos.1.4.3 145 KV, 30 VA, 4 core current transformer complete with all accessories as per specification 6 nos.1.4.4 36KV, 30 VA, 33/√3 kV/110/√3, 110/√3 V voltage transformer complete with all accessories as per specification 6 nos.1.4.5 36 KV, 30 VA, 2 cores current transformer complete with all accessories as per specification 12 nos.1.51.51.51.5 Lightening ArresterLightening ArresterLightening ArresterLightening Arrester

1.5.1 120 kV, 10 kA lightning arrestor including discharge counter complete with all accessories as per specification 12 nos.1.5.2 30 kV, 10 kA lightning arrestor complete with all accessories as per specification 6 nos.1.61.61.61.6 Control and relay panelControl and relay panelControl and relay panelControl and relay panel

1.6.1 132/33 kV transformer control and relay panel complete with all accessories as per specification 2 sets1.6.2 132 kV transmission line control and relay panel complete with all accessories as per specification 2 sets1.6.3 33/11 kV transformer control and relay panel complete with all accessories as per specification including 1 set for Chaughada S/S 3 sets

1.71.71.71.7 Substation Automation SystemSubstation Automation SystemSubstation Automation SystemSubstation Automation System1.7.1

Adaptaion Works for SAS (Substation Automation System) 1 lot

1.7.2 Remote Supervisory control, Visual monitoring and Substation Automation System as per specification 1 lot

PRICE SCHEDULE 2 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

1.81.81.81.8 GroundingGroundingGroundingGrounding1.8.1 Galvanized E.H.S. steel wires of size 7/3.35 for lightning shield wire in take off and internal structures, with accessories to complete

the specified scope of works1 lot

1.8.2Earthing of substation with conductors, electrode grounding materials and accessories to complete the specified scope of works 1 lot

1.91.91.91.9 Control and power cablesControl and power cablesControl and power cablesControl and power cables1.9.1 600 V power and lighting cable for all works to complete the specified scope of work 1 lot1.9.2 600 V control cable to complete the specified scope of works 1 lot

1.9.336 kV, 630 sq. mm 3xsingle core XLPE copper Power Cable including termination and accessories complete from LV sides of 132/33kV Power Transformers to Proposed 33kV Switchyard Bays as per Drawings, running meter Plus single core cable of 110m with termination as a spare

767 m

1.9.412 kV, 400 sq. mm 3xsingle core XLPE copper Power Cable including straight joints with accessories complete from LV sides of 33/11kV Power Transformers to Indoor 11kV Switchgear Room as per Drawings, running meter Plus single core cable of 110m with termination as a spare

494 m

1.9.512 kV, 185 sq. mm 3 cores XLPE Aluminium Power Cable including straight joints with accessories complete for 4 nos. of outgoing distribution feeders as specified, running meter

1269 m

PRICE SCHEDULE 3 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

1.101.101.101.10 Miscellaneous materialMiscellaneous materialMiscellaneous materialMiscellaneous material

1.10.1 145 kV Insulator strings with necessary hardwares, clamps for substation works and connection between line tower, take offgantry & internal gantry structure, complete as per the specified scope of works

1 lot

1.10.2 36 kV Insulator strings with necessary hardwares, clamps for substation works and connection between line tower, take off gantry& internal structure, complete as per the specified scope of works

1 lot

1.10.3 AAAC "UPAS" conductors and accessories to complete the specified scope of works including for line tower to take off and internalstructure (including stringing of conductor between tower to gantry for 132 kV."UPAS" CONDUCTOR to be supplied by NEA

1 lot

1.10.4 132 kV Tubular bus (Outer Dia 100mm and thickness 10mm) and Bus Support Insulator (36Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.10.5 145 kV Support Insulators (30Nos.) including all other accessories required to complete the specified scope of work 1 lot1.10.6 33 kV Tubular bus (Dia 75mm, thickness 8mm) and Bus Support Insulator (24Nos.) including all other accessories required to complete the specified scope of work1 lot

1.10.7 11 kV Overhead Distribution Line with all accessories complete from Substation to Outdoor existing lines including breakdown of existing line to separate feeder lines

3 KM

1.10.833 kV Power Fuse with Support Insulator (3Nos.) including all other accessories required to complete the specified scope of work 1 lot

1.10.9 Switchyard lighting (including lighting for internal road) 1 lot

PRICE SCHEDULE 4 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

1.111.111.111.11 BATTERY / BATTERY CHARGERBATTERY / BATTERY CHARGERBATTERY / BATTERY CHARGERBATTERY / BATTERY CHARGER

1.11.1 110 V maintenance free lead acid battery complete with all accessories 1 Set1.11.2 48 V maintenance free lead acid battery complete with all accessories 1 Set1.11.3 Battery charger for 110 V battery complete with all accessories 1 Set1.11.4 Battery charger for 48 V battery complete with all accessories 1 Set1.11.5 110 V DC distribution board complete with all accessories 1 Set1.11.6 48 V DC distribution board complete with all accessories 1 Set

2222 COMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADA

2.1 Optical line terminal equipment (OLTE) including multiplexer complete with all accessories 1 lot2.2 SCADA marshalling cubicle 1 lot2.3 Remote terminal unit including cables, connectors, transducers, adaption materials, other hardware and software required for

data transmission and remote operation1 lot

2.4 Telephone system (inbuilt in the multiplexer as 2 wire remote and local subscriber), coaxial cable & all associated material as shown in the drawing to complete specified job

1 lot

2.5 Integration of all substation data into the SINAUT spectrum of LDC and commissioning works complete as mentioned in the scope of the technical specifications including adoptation / reprogramming of voice communication system

1 lot

2.6 Optical approach cable 1 lot2.7 Optical distribution frame 1 lot

Sub Total of Electrical and Communication works of Samundratar SubstaionSub Total of Electrical and Communication works of Samundratar SubstaionSub Total of Electrical and Communication works of Samundratar SubstaionSub Total of Electrical and Communication works of Samundratar Substaion

PRICE SCHEDULE 5 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

3333 CIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKS3.13.13.13.1

Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:

3.1.1 Rail Structure for 132/33kV Power Transformer including access from Internal Road 2 Lots

3.1.2 132 kV take off gantry structures as per drawing 5 Bays

3.1.3 132 kV gas circuit breaker 5 sets

3.1.4 132 kV disconnecting switch with earth switch 2 sets

3.1.5 132 kV disconnecting switch without earth switch 10 set

3.1.6 132 kV Capacitive voltage transformer 12 no

3.1.7 132 kV current transformer 15 no

3.1.8 120 kV lightning arrestor 12 no

3.1.9 132 kV Bus Post Insulator 36 Nos.3.1.10 132 kV Support Insulator 30 Nos.3.1.11 33 kV Vacuum Circuit Breaker 4 sets3.1.12 33 kV Disconnecting Switch with earth switch 2 sets3.1.13 33 kV Disconnecting Switch without earth switch 6 sets3.1.14 33 kV Current Transformer 12 Nos.3.1.15 33 KV Voltage Transformer 6 Nos.3.1.16 30 kV Lightning Arrestor 6 Nos.3.1.17 33 kV Bus Support Insulator 24 Nos.3.1.18 33 kV Power Fuse Support Insulator 3 Nos.3.1.19 Earth mast 1 lot3.1.20 Switchyard fence as per Specifications (including fence with gate for 132kV switchyard) 250 Rm3.1.21 Switchyard fence as per Specifications (including fence with gate for 33kV switchyard) 180 Rm3.1.22 Indentification plate, danger notice etc 1 lot

Sub Total of Steel structure works of Samundratar SubstaionSub Total of Steel structure works of Samundratar SubstaionSub Total of Steel structure works of Samundratar SubstaionSub Total of Steel structure works of Samundratar Substaion

PRICE SCHEDULE 6 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

3.23.23.23.2Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works and reinforcement barsand reinforcement barsand reinforcement barsand reinforcement bars

3.2.1 132/33 kV, Three phase 24/30 MVA, Power transformer complete as specified 2 Lots

3.2.2 33/11 kV, Three phase 6/8 MVA, Power transformer complete including Chaughada S/S 3 Lots

3.2.3 33/0.4 kV, Three phase 200 kVA, ONAN Distribution transformer with Off load tapchanger delta/star connected complete with all accessories as specified

1 Lot

3.2.4 132 kV take off gantry structures as per drawing 5 Bays

3.2.5 132 kV gas circuit breaker 5 sets

3.2.6 132 kV disconnecting switch with earth switch 2 sets

3.2.7 132 kV disconnecting switch without earth switch 10 set

3.2.8 132 kV Capacitive voltage transformer 12 no

3.2.9 132 kV current transformer 15 no

3.2.10 120 kV lightning arrestor 12 no

3.2.11 132 kV Bus Post Insulator 36 Nos.

3.2.12 132 kV Support Insulator 30 Nos.

3.2.13 33 kV Vacuum Circuit Breaker 4 sets

3.2.14 33 kV Disconnecting Switch with earth switch 2 sets

3.2.15 33 kV Disconnecting Switch without earth switch 6 sets3.2.16 33 kV Current Transformer 12 Nos.3.2.17 33 KV Voltage Transformer 6 Nos.3.2.18 30 kV Lightning Arrestor 6 Nos.3.2.19 33 kV Bus Support Insulator 24 Nos.3.2.20 33 kV Power Fuse Support Insulator 3 Nos.3.2.21 Switchyard fence as per Specifications (including fence with gate for 132kV switchyard) 250 Rm3.2.22 Switchyard fence as per Specifications (including fence with gate for 33kV switchyard) 180 Rm3.2.23 Cable Trench, Duct Bank, Conduit and Handhole and Cable Tray as per spec 1 Lot3.2.24 Switchyard Drainage (running at two corners of Substation) with RCC slab covering as per specification 1 Lot

Sub Total of civil works of Samundratar SubstaionSub Total of civil works of Samundratar SubstaionSub Total of civil works of Samundratar SubstaionSub Total of civil works of Samundratar Substaion

PRICE SCHEDULE 7 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

3.33.33.33.3 Miscellaneous Miscellaneous Miscellaneous Miscellaneous 3.3.1 Clearing and stripping 1 Lot

3.3.2 Exploration works for soil strength of foundations including laboratory tests 6 locations

3.3.3 Soil Resistivity test 1 lot3.3.4 Site Grading with earth filling by borrow pit earth, including compaction and leveling etc all complete 1 Lot3.3.5 Identification plates, danger notice etc 2 lot3.3.6 Crushed Rock Surfacing 1 Lot3.3.7 Water Level Alarm System as per Specification 1 Lot

Sub Total of miscellaneous works of Samundratar substationSub Total of miscellaneous works of Samundratar substationSub Total of miscellaneous works of Samundratar substationSub Total of miscellaneous works of Samundratar substationTotal of Civil & Architectural WorksTotal of Civil & Architectural WorksTotal of Civil & Architectural WorksTotal of Civil & Architectural Works

Total of SAMUNDRATAR SUBSTATION "A' Total of SAMUNDRATAR SUBSTATION "A' Total of SAMUNDRATAR SUBSTATION "A' Total of SAMUNDRATAR SUBSTATION "A'

PRICE SCHEDULE 8 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

BBBB Line Bays at Trishuli 3B Hub SubstaionLine Bays at Trishuli 3B Hub SubstaionLine Bays at Trishuli 3B Hub SubstaionLine Bays at Trishuli 3B Hub Substaion1111 ELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKSELECTRICAL WORKS1.11.11.11.1 Circuit breakers/SwitchgearsCircuit breakers/SwitchgearsCircuit breakers/SwitchgearsCircuit breakers/Switchgears

1.1.1 145 KV, 1250 A, 3 phase, SF6 circuit breaker (individual pole operation type) complete with all accessories for line as per specification

2 sets

1.21.21.21.2 Disconnecting switchesDisconnecting switchesDisconnecting switchesDisconnecting switches1.2.1 145 KV, 1250 A, 3 phase Centre Break disconnecting switch without grounding switch complete with all accessories as per

specification4 sets

1.2.2 145 KV, 1250 A, 3 phase disconnecting switch with grounding switch complete with all accessories as per specification 2 sets1.31.31.31.3 Instrument transformersInstrument transformersInstrument transformersInstrument transformers

1.3.1 145 KV, 50 VA, 132/√3 kV/110/√3, 110/√3V, CLASS:0.5/3P capacitor voltage transformer complete with all accessories as specified

6 nos.

1.3.2 145 KV, 30 VA, 5 core current transformer complete with all accessories as per specification 6 nos.1.41.41.41.4 Lightening ArresterLightening ArresterLightening ArresterLightening Arrester

1.4.1 120 kV, 10 kA lightning arrestor including discharge counter complete with all accessories as per specification 6 nos.1.51.51.51.5 Control and relay panelControl and relay panelControl and relay panelControl and relay panel

1.5.1 132 kV transmission line control and relay panel complete with all accessories as per specification 2 sets1.61.61.61.6 GroundingGroundingGroundingGrounding

1.6.1 Galvanized E.H.S. steel wires of size 7/3.35 for lightning shield wire in take off and internal structures, with accessories to complete the specified scope of works

1 lot

1.6.2 Earthing of Line Bay Equipments with conductors, electrode grounding materials and accessories to complete the specified scope of works

1 lot

1.71.71.71.7 Control and power cablesControl and power cablesControl and power cablesControl and power cables1.7.1 600 V power and lighting cable for all works to complete the specified scope of work 1 lot1.7.2 600 V control cable to complete the specified scope of works 1 lot

1.7.3132 kV, 800 sq. mm single core XLPE Power Cable (straight joints if required) with accessories complete from Dead End Tower to Samundratar Line Bay as specified, running length (for 2x3x1 core plus 1 core cable spare)

2450 m

1.7.4 132 kV, outdoor type cable termination/sealing-end and all accessories complete with 1 core cable spare 7 Sets1.7.5 Flexible pipe for power cable 1980 m1.7.6 High voltage warning sheets for cable trench 300 m

PRICE SCHEDULE 9 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

1.81.81.81.8 Miscellaneous materialMiscellaneous materialMiscellaneous materialMiscellaneous material1.8.1 145 kV Insulator strings with necessary hardwares, clamps for substation works and connection between line tower, take off

gantry & internal gantry structure, complete as per the specified scope of works1 lot

1.8.3 AAAC "UPAS" conductors and accessories to complete the specified scope of works including for line tower to take off and internalstructure (including stringing of conductor between tower to gantry for 132 kV."UPAS" CONDUCTOR to be supplied by NEA

1 lot

1.8.4 132 kV Tubular bus (Outer Dia 100mm and thickness 10mm) and Bus Support Insulator (18Nos.) including all other accessories required to complete the specified scope of work

1 lot

1.8.5 132 kV Support Insulators (12Nos.) including all other accessories required to complete the specified scope of work 1 lot

2222 COMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADACOMMUNICATION / SCADA

2.1 Adaptation works and extension of RTU at Trishuli 3B Hub Substation (cards, including cable, connectors, other hardware and software required for data transmission and remote operation)

1 lot

2.2 Integration of all substation data into the SINAUT spectrum of LDC and commissioning works complete as mentioned in the scope of the technical specifications including adoptation / reprogramming of voice communication system

1 lot

Sub Total of Electrical and Communication works of Line Bays at Trishuli 3B Hub substationSub Total of Electrical and Communication works of Line Bays at Trishuli 3B Hub substationSub Total of Electrical and Communication works of Line Bays at Trishuli 3B Hub substationSub Total of Electrical and Communication works of Line Bays at Trishuli 3B Hub substation3333 CIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKSCIVIL AND ARCHITECTURAL WORKS3.13.13.13.1 Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:Steel structure for post, beam and equipment supporting frame complete with bolts, nuts and all accessories:

3.1.1 132 kV take off gantry structures as per drawing 2 Bays3.1.2 132 kV gas circuit breaker 2 sets3.1.3 132 kV disconnecting switch with earth switch 2 sets3.1.4 132 kV disconnecting switch without earth switch 4 set3.1.5 132 kV Capacitive voltage transformer 6 no3.1.6 132 kV current transformer 6 no3.1.7 120 kV lightning arrestor 6 no3.1.8 132 kV Bus Post Insulator 18 Nos.3.1.9 132 kV Support Insulator 12 Nos.

3.1.10 Indentification plate, danger notice etc 1 lot

PRICE SCHEDULE 10 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. PRICE SCHEDULE NO. S-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICESS-4: CONSTRUCTION & INSTALLATION SERVICES

Item Item Item Item Unit RateUnit RateUnit RateUnit RateNo.No.No.No. Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Estimated Estimated Estimated Estimated Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

DescriptionDescriptionDescriptionDescription QuantityQuantityQuantityQuantity UnitUnitUnitUnit

L/C (NRS)L/C (NRS)L/C (NRS)L/C (NRS)

Project : Project : Project : Project : SAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATIONSAMUNDRATAR 132/33 kV SUBSTATION

Sub Total of Steel structure works of Line Bays at Trishuli 3B Hub substationSub Total of Steel structure works of Line Bays at Trishuli 3B Hub substationSub Total of Steel structure works of Line Bays at Trishuli 3B Hub substationSub Total of Steel structure works of Line Bays at Trishuli 3B Hub substation

3.23.23.23.2Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works Concrete Foundation for Equipment and Steel Structures complete with excavation, backfilling, form works, concrete works and reinforcement barsand reinforcement barsand reinforcement barsand reinforcement bars

3.2.1 132 kV take off gantry structures as per drawing 2 Bays3.2.2 132 kV gas circuit breaker 2 sets3.2.3 132 kV disconnecting switch with earth switch 2 sets3.2.4 132 kV disconnecting switch without earth switch 4 set3.2.5 132 kV Capacitive voltage transformer 6 no3.2.6 132 kV current transformer 6 no3.2.7 120 kV lightning arrestor 6 no3.2.8 132 kV Bus Post Insulator 18 Nos.3.2.9 132 kV Support Insulator 12 Nos.

Sub Total of civil works of Line Bays at Trishuli 3B Hub substationSub Total of civil works of Line Bays at Trishuli 3B Hub substationSub Total of civil works of Line Bays at Trishuli 3B Hub substationSub Total of civil works of Line Bays at Trishuli 3B Hub substation3.33.33.33.3 Miscellaneous Miscellaneous Miscellaneous Miscellaneous

3.3.1 Clearing and stripping 1 Lot3.3.2 Exploration works for soil strength of foundations including laboratory tests 1 locations3.3.3 Soil Resistivity test 1 lot3.3.4 Site Grading with earth filling by borrow pit earth, including compaction and leveling etc all complete 1 Lot3.3.5 Identification plates, danger notice etc 1 lot3.3.6 Crushed Rock Surfacing 1 Lot

Sub Total of miscellaneous works of Samundratar substationSub Total of miscellaneous works of Samundratar substationSub Total of miscellaneous works of Samundratar substationSub Total of miscellaneous works of Samundratar substationTotal of Civil & Architectural WorksTotal of Civil & Architectural WorksTotal of Civil & Architectural WorksTotal of Civil & Architectural Works

Total of Line Bays at Trishuli 3B Hub substation "B' Total of Line Bays at Trishuli 3B Hub substation "B' Total of Line Bays at Trishuli 3B Hub substation "B' Total of Line Bays at Trishuli 3B Hub substation "B'

Name and Seal of the bidder NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND

Date EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Authorized Signature

PRICE SCHEDULE 11 CONSTRUCTION AND INSTALLATION

Project Management DirectorateSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

TOTAL -MISCELLANEOUS (Price Schedule No. M-8)TOTAL -MISCELLANEOUS (Price Schedule No. M-8)TOTAL -MISCELLANEOUS (Price Schedule No. M-8)TOTAL -MISCELLANEOUS (Price Schedule No. M-8)

TOTAL AMOUNTTOTAL AMOUNTTOTAL AMOUNTTOTAL AMOUNT

Local (NRS)Local (NRS)Local (NRS)Local (NRS)

1 Boundary Wall as per Specification and Drawings. M01

2 Control Building as per Specification and Drawing. M02

3 Triple storey "C - Type" Quarter Building as per Specification and Drawing. M03

4 Single Storey Store Building as per Specification and Drawing M04

5 Single Storey Guard House as per Specification and Drawing. M05

6 Septik Tank and Soakpit as per Specification and Drawings. M06

7 Construction of Asphalt Concrete Road ( 330* 4 ) m as per Specification and Drawing.

M07

SCHEDULESCHEDULESCHEDULESCHEDULE

NEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITYNEPAL ELECTRICITY AUTHORITY

Total excluding Taxes & VAT (Miscellaneous)Total excluding Taxes & VAT (Miscellaneous)Total excluding Taxes & VAT (Miscellaneous)Total excluding Taxes & VAT (Miscellaneous)

Name and Seal of the Bidder

Date

Authorized Signature

Price Price Price Price ScheduleScheduleScheduleSchedule

DescriptionDescriptionDescriptionDescription

Page 1 of 22

PRICE SCHEDULE-M01

Job : Construction of Boundary Wall at Samundratar SubstationUnit Rate (Rs.)

(Exclusive of Tax)

In figure

1 Boundary Wall as per Specification and Drawings.

1 Earth work

1.1 Earthwork in excavation as specified. m3 1,554.61

1.2 Back filling ( Earth filling ) works as spefied. m3 155.46

2 Soling work

2.1 Stone soling work in foundation as specified. m3 131.63

3 Cement concrete work

3.1 Lean cement concrete (1:3:6) work as specified. m3 74.96

3.2 Cement concrete (1:2:4) work as specified. m3 69.67

3.3 Reinforcement Cement Concrete C20 in Compound Shear walls

(50*4) m (1:1.5:3) work as specified. m

3 105.95

4 Stone masonry work

4.1 Stone masonry in 1:4 cement sand mortar as specified. m3 1344.66

5 Brick work

5.1 First class brickwork in 1:4 cement sand Mortar as specified. m3 291.56

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.) Remarks

Page 2 of 22

PRICE SCHEDULE-M01

Job : Construction of Boundary Wall at Samundratar SubstationUnit Rate (Rs.)

(Exclusive of Tax)

In figure

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.) Remarks

6 Cement plaster and pointing work

6.1 12.5 mm Thick Plaster in 1:4 C/S Mortar as specified. m2 2660.53

6.2

Pointing Works: Providing mixing & Pointing cement mortar

(cement:sand) 1:3 over rubble masonary including scaffolding etc all

complete as per specification lead 30m as specified.

m2 1596.00

7

Fabrication of fencing with 50 mm dia iron black pipe post erecting

in spacing of 2/2 m c/c connecting by 25*25*4 mm angle frame and

welding 7 mm dia bar with diagonal mesh of size 62*62 mm and

welding of 3*20 mm grill of height 0.15 mm including primer paints.

m2 408.00

8

Construction of gate of compound with fixing 16 guage iron sheet in

frame angle 50*50*5 mm external and 40*40*5 internal as per

drawingm

2 15.19

9

Making of Gabion Box including rolling, cutting, weaving and crate

filling (Hexagonal mesh size 100x120mm with 10SWG and salvage

wire 7 SWG Box Size 2.0x1.0x0.5m)

m3 1000.00

10

Site preparation works including clearing and cleaning of site before

and after finishing the job and other works as instructed by the site

incharge.

lot 1.00

Total Amount

Total Amount In words :-

Name and Seal of the Bidder

Date

Authorized Signature

Page 3 of 22

PRICE SCHEDULE-M02

Job : Construction of Control Building at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

1 Control Building as per Specification and Drawing.

1 Earth work

1.1 Earthwork in excavation as per site condition. Lot 1.00

1.2Back filling works (Earth filling, Sand filling and Gravel

filling) as specified.Lot 1.00

2 Soling work as per Specification.

2.1 Stone soling work in foundation as specified. Lot 1.00

2.2 Brick soling work (brick on edge) as specified. Lot 1.00

3 Cement concrete work

3.1 Flooring Lean concrete C15 (1:3:6) work as specified. Lot 1.00

3.2 Reinforcement Cement Concrete C20 in foundation footings,

columns Tie beams etc. (1:1.5:3) work as specifiedLot 1.00

3.3

Reinforcement Cement Concrete C20 in Superstructure

columns, Roof beams, Roof Slabs and Parapet walls etc.

(1:1.5:3) work as specified.

Lot 1.00

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

Page 4 of 22

PRICE SCHEDULE-M02

Job : Construction of Control Building at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

4 Brick masonary work

4.1First class brickwork infoundation wall ( 1:4 cement sand

Mortar) as specified.Lot 1.00

4.2First class brick masonary works in superstructure walls

( 1:4 cement sand Mortar ) above ground floor.Lot 1.00

5 Doors and Windows

5.1

Aluminium doors and windows from section (101*45*1.5)

mm with ventilator and 5 mm glass, with fly mesh shutter

in windows and doors as specified.

Lot 1.00

6 Cement plaster and pointing work

6.120 mm Thick Plaster in 1:4 C/S Mortar inside building as

specified.Lot 1.00

6.212.5 mm Thick Plaster in 1:4 C/S Mortar outside building as

specified.Lot 1.00

6.3Skirting Works inside rooms 10 cm height in 1:1 cm as

specified.Lot 1.00

6.4 Construction of edge strip (pani patti in edge of slab) as specified.Lot 1.00

7 Flooring work

7.138 mm thick cement concrete screeding(1:2:4) in floor as

specified.Lot 1.00

7.2 3mm thick cement punning in floor as specified. Lot 1.00

Page 5 of 22

PRICE SCHEDULE-M02

Job : Construction of Control Building at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

8 Painting work

8.1

Two coat of weather coat apex or equivalent with one coat

primer after application of one coat white wash out side of

building as specified.

Lot 1.00

8.2Two coat Emulsion paint after application of one coat primer

and wall putty plaster in 2 mm in side of building as specified.Lot 1.00

9 Terrazzo Tiling in floor of Control Room as specified. Lot 1.00

10 Heat insulation and water proofing as specified. Lot 1.00

1112 mm gypsum board false ceiling including all materials

as specified.Lot 1.00

12Laying of porcelean glazed tile in bath room , Kitchen room

and Battery Room as specified.Lot 1.00

13 Construction of circular staircase as specified Lot 1.00

14 Interior cable trench Cable tray as specified. Lot 1.00

15Supply and Installation of Rolling Shutter with 16-18 Gauze

Strip sheetLot 1.00

Page 6 of 22

PRICE SCHEDULE-M02

Job : Construction of Control Building at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

16 Water supply and Sanitary works

16.1

Supplying and fitting of pipe and accessories for water supply,

sanitaryware , sewer pipe and fittings including overhead tank

in the Control Building as specified.

Lot 1.00

16.2 75mm dia Rain water pipe Lot 1.00

17Supplying and installation of electrical accessories,

Ventilations and A/C as specified.Lot 1.00

18Furnishing and mislleneous work in Control Building as

specified.Lot 1.00

19 Fire fighting system ( Fire Alarm and Extinguisher) Lot 1.00

20

Site preparation works including clearing and cleaning of site

before and after finishing the job and other works as instructed

by the site incharge.

Lot 1.00

Total Amount

Total Amount In words :-

Name and Seal of the Bidder DateAuthorized Signature

Page 7 of 22

PRICE SCHEDULE-M03

Job : Construction of Staff Quarter at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Triple storey "C - Type" Quarter Building as per Specification and

Drawing.

1 Earth work

1.1 Earthwork in excavation as per site condition. Lot 1.00

1.2Back filling works (Earth filling, Sand filling and Gravel filling) as

specified.Lot 1.00

2 Soling works as per Specification.

2.1 Stone soling work in foundation as specified. Lot 1.00

2.2 Brick soling work (brick on edge) as specified. Lot 1.00

3 Cement concrete work

3.1 Flooring Lean concrete C15 (1:3:6) work as specified. Lot 1.00

3.2Cement Concrete C15 in floor of room, Floor of Berandah, in peti of

Building outside, in bed level of drain (1:2:4) work as specifiedLot 1.00

3.3 Reinforcement Cement Concrete C20 in foundation footings, columns Tie

beams etc. (1:1.5:3) work as specifiedLot 1.00

3.4 Reinforcement Cement Concrete C20 in Superstructure columns, Roof

beams, Roof Slabs and Parapet walls etc. (1:1.5:3) work as specified. Lot 1.00

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

Page 8 of 22

PRICE SCHEDULE-M03

Job : Construction of Staff Quarter at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

4 Brick masonary work

4.1First class brick masonary work in foundation wall ( 1:4 cement sand

Mortar) as specified.Lot 1.00

4.2First class brick masonary works in superstructure walls (1:4 cement sand

Mortar ) as specified.Lot 1.00

5 Doors and Windows

5.1 Sal wood work for frame of door and window as specified. Lot 1.00

5.238 mm thick flush door shutter with 4mm thick teak plywood fitted and

fixing moisquito proof wire mesh in the frame of sal wood as specified. Lot 1.00

5.3Aluminium doors and windows from section (101x45x1.5) with ventillator

and 5mm glass, with fly mesh shutter in windows and doors as requiredLot 1.00

6Construction of railing of 3' height in staircase with 3/4"x3/4" square

pipe and 3"x4" hand rail of sal or sisau wood as specified.Rm 38.88

7 Cement plaster and pointing work

7.1 20 mm Thick Plaster in 1:4 C/S Mortar inside building as specified. Lot 1.00

7.2 12.5 mm Thick Plaster in 1:4 C/S Mortar outside building as specified. Lot 1.00

7.3 Skirting Works inside rooms 10 cm height in 1:1 cm as specified. Lot 1.00

7.4 Construction of edge strip (pani patti in edge of slab) as specified. Lot 1.00

Page 9 of 22

PRICE SCHEDULE-M03

Job : Construction of Staff Quarter at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

8 Flooring work

8.1 38 mm thick cement concrete screeding(1:2:4) in floor as specified. Lot 1.00

8.2 3mm thick cement punning in floor as specified. Lot 1.00

9 Painting work

9.1 Two coat water proof cement (snocem) painting after application of one

coat white cement as specified.Lot 1.00

9.2Two coat Emulsion paint after application of one coat primer and wall

putty plaster in 2 mm as specified. Lot 1.00

10Laying of porcelain glazed tile in Bath room and Kitchen room (wall and

floor) as specified.Lot 1.00

11 Construction of stone railing post of length 45 cm and fixing at 20 cm c/c

.Lot 1.00

12 Construction of circular staircase as specified Lot 1.00

Page 10 of 22

PRICE SCHEDULE-M03

Job : Construction of Staff Quarter at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

13 Water supply and Sanitary works

13.1

Supplying and fitting of pipe and accessories for water supply,

sanitaryware , sewer pipe and fittings including overhead tank in the Staff

Quarter as specified.

Lot 1.00

14Supplying and installation of electrical accessories & Air Conditioning

System in staff quarter as specified.Lot 1.00

15 Furnishing and miscellaneous work in the Staff Quarter as specified. Lot 1.00

16Excavation, levelling and protection works constructing Retaining

Structures in Land for building. (At back side as per site requirement)Lot 1.00

17Site preparation works including clearing and cleaning of site before and

after finishing the job and other works as instructed by the site incharge.Lot 1.00

Total Amount Total Amount In words :-

Name and Seal of the Bidder DateAuthorized Signature

Page 11 of 22

PRICE SCHEDULE-M04

Job : Construction of Store Building at Samundratar SubstationUnit Rate (Rs.)

( Exclusive of Tax)

In figure

Single Storey Store Building as per Specification and

Drawing

1 Earth work

1.1 Earthwork in excavation as per site condition. Lot 1.00

1.2Back filling works ( Earth filling, Sand filling and Gravel

filling) as specified.Lot 1.00

2 Soling works .

2.1 Stone soling work in foundation as specified. Lot 1.00

2.2 Brick soling work (brick on edge) as specified. Lot 1.00

3 Cement concrete work .

3.1 Flooring Lean concrete C15 (1:3:6) work as specified. Lot 1.00

3.2Cement concrete C15 in floor of room, in peti of building

outside, in bed level of drain, in ramp (1:2:4) work as specifiedLot 1.00

3.3 ReinforcementCement concrete C20 in foundation footings,

columns (1:1.5:3) work as specifiedLot 1.00

3.4 ReinforcementCement concrete C20 in Superstructure

columns, Roof (1:1.5:3) work as specified. Lot 1.00

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

Page 12 of 22

PRICE SCHEDULE-M04

Job : Construction of Store Building at Samundratar SubstationUnit Rate (Rs.)

( Exclusive of Tax)

In figureRemarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

4 Brick masonary work

4.1First class brick masonary work in foundation wall ( 1:4

cement sand Mortar) as specified.Lot 1.00

4.2First class brick masonary works in superstructure walls (1:4

cement sand Mortar ) as specified.Lot 1.00

5 Doors and Windows

5.1 Sal wood work for frame of door and window as specified. Lot 1.00

5.2

38 mm thick flush door shutter with 4mm thick teak plywood

fitted and fixing moisquito proof wire mesh in the frame of sal

wood as specified.

Lot 1.00

5.3

Construction of aluminium framed sliding window with

ventilation and moisquito net shutter from section

(101*45*1.5) mm and 5 mm glass as specified.

Lot 1.00

6 Cement plaster and pointing work

6.120 mm Thick Plaster in 1:4 C/S Mortar inside building as

specified.Lot 1.00

6.212.5 mm Thick Plaster in 1:4 C/S Mortar outside building as

specified.Lot 1.00

6.3Skirting Works inside rooms 10 cm height in 1:1 cm as

specified.Lot 1.00

6.4 Construction of edge strip (pani patti in edge of slab) as specified.Lot 1.00

Page 13 of 22

PRICE SCHEDULE-M04

Job : Construction of Store Building at Samundratar SubstationUnit Rate (Rs.)

( Exclusive of Tax)

In figureRemarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

7 Flooring work

7.138 mm thick cement concrete screeding(1:2:4) in floor as

specified.Lot 1.00

7.2 3mm thick cement punning in floor as specified. Lot 1.00

8 Painting work

8.1 Two coat water proof cement (snocem) painting after

application of one coat white cement as specified.Lot 1.00

8.2Two coat Emulsion paint after application of one coat primer

and wall putty plaster in 2 mm as specified. Lot 1.00

8.3Two coat enamel painting after application of one coat primer

as specified.Lot 1.00

8.4Application of three coat chappra polish in flush door as

specified.Lot 1.00

9 Laying of porcelean glazed tile in bath room as specified. Lot 1.00

10 Water supply and Sanitary works

Page 14 of 22

PRICE SCHEDULE-M04

Job : Construction of Store Building at Samundratar SubstationUnit Rate (Rs.)

( Exclusive of Tax)

In figureRemarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

10.1

Supplying and fitting of pipe and accessories for water supply,

sanitaryware , sewer pipe and fittings including overhead tank

in the Store Building as specified.

Lot 1.00

11Supplying and installation of electrical accessories as

specified.Lot 1.00

12 Furnishing and mislleneous work as specified. Lot 1.00

13Supply and Installation of Rolling Shutter with 16-18 Gauze

Strip sheet as specified.Lot 1.00

14

Site preparation works including clearing and cleaning of site

before and after finishing the job and other works as instructed

by the site incharge.

Lot 1.00

Total Amount

Total Amount In words :-

Name and Seal of the Bidder DateAuthorized Signature

Page 15 of 22

PRICE SCHEDULE-M05

Job : Construction of Guard House at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Single Storey Guard House as per Specification and Drawing.

1 Earth work

1.1 Earthwork in excavation as per site condition. Lot 1.00

1.2Back filling works ( Earth filling, Sand filling and Gravel filling) as

specified.Lot 1.00

2 Soling works as per Specification

2.1 Stone soling work in foundation as specified. Lot 1.00

2.2 Brick soling work (brick on edge) as specified. Lot 1.00

3 Cement concrete work

3.1 Flooring Lean concrete C15 (1:3:6) work as specified. Lot 1.00

3.2Cement concrete C15 in floor of room, in peti of building outside, in bed

level of drain, in ramp (1:2:4) work as specifiedLot 1.00

3.3 ReinforcementCement concrete C20 in foundation footings, columns

(1:1.5:3) work as specifiedLot 1.00

3.4 ReinforcementCement concrete C20 in Superstructure columns, Roof

(1:1.5:3) work as specified. Lot 1.00

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

Page 16 of 22

PRICE SCHEDULE-M05

Job : Construction of Guard House at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

4 Brick masonary work

4.1First class brick masonary work in foundation wall ( 1:4 cement sand

Mortar) as specified.Lot 1.00

4.2First class brick masonary works in superstructure walls (1:4 cement sand

Mortar above ground floor) as specified.Lot 1.00

5 Doors and Windows

5.1 Sal wood work for frame of door and window as specified. Lot 1.00

5.238 mm thick flush door shutter with 4mm thick teak plywood fitted and

fixing moisquito proof wire mesh in the frame of sal wood as specified. Lot 1.00

5.3

Construction of aluminium framed sliding window with ventilation and

moisquito net shutter from section (101*45*1.5) mm and 5 mm glass as

specified.

Lot 1.00

6 Cement plaster and pointing work

6.1 20 mm Thick Plaster in 1:4 C/S Mortar inside building as specified. Lot 1

6.2 12.5 mm Thick Plaster in 1:4 C/S Mortar outside building as specified. Lot 1.00

6.3 Skirting Works inside rooms 10 cm height in 1:1 cm as specified. Lot 1.00

6.4 Construction of edge strip (pani patti in edge of slab) as specified. Lot 1.00

Page 17 of 22

PRICE SCHEDULE-M05

Job : Construction of Guard House at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

7 Flooring work

7.1 38 mm thick cement concrete screeding(1:2:4) in floor as specified. Lot 1.00

7.2 3mm thick cement punning in floor as specified. Lot 1.00

8 Painting work

8.1 Two coat water proof cement (snocem) painting after application of one

coat white cement as specified.Lot 1.00

8.2Two coat Emulsion paint after application of one coat primer and wall putty

plaster in 2 mm as specified. Lot 1.00

8.3 Two coat enamel painting after application of one coat primer as specified. Lot 1.00

8.4 Application of three coat chappra polish in flush door as specified. Lot 1.00

9 Laying of porcelean glazed tile in bath room and Kitchen room Lot 1.00

Page 18 of 22

PRICE SCHEDULE-M05

Job : Construction of Guard House at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

10 Water supply and Sanitary works

10.1

Supplying and fitting of pipe and accessories for water supply,

sanitaryware , sewer pipe and fittings including overhead tank in the Guard

House as specified.

Lot 1.00

11Supplying and installation of electrical accessories in Guard House as

specified.Lot 1.00

12 Furnishing and mislleneous work in the Guard House as specified. Lot 1.00

Total Amount

Total Amount In words :-

Name and Seal of the Bidder DateAuthorized Signature

Page 19 of 22

PRICE SCHEDULE-M06

Job : Construction work of (2 nos. ) Septik Tank and Soak Pit at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figure

Septik Tank and Soakpit as per Specification and

Drawings.

1 Earth work

1.1 Earthwork in excavation as per site condition. Lot 1.00

1.2Back filling works ( Earth filling, Sand filling and Gravel

filling) as specified.Lot 1.00

2 Soling works as per Specification

2.1 Stone soling work in floor of septic tank as specified. Lot 1.00

3 Cement concrete work

3.2Plain cement concrete (1:2:4) work in floor of Septik tank as

specified.Lot 1.00

3.3Reinforcement cement concrete (1:1.5:3) work in cover slab of

septik tank and soak pit as specified.Lot 1.00

4 Brick masonary work

4.1First class brick masonary work in walls ( 1:4 cement sand

Mortar) as specified.Lot 1.00

Remarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

Page 20 of 22

PRICE SCHEDULE-M06

Job : Construction work of (2 nos. ) Septik Tank and Soak Pit at Samundratar Substation

Unit Rate (Rs.)

(Exclusive of Tax)

In figureRemarks

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Price Schedule

Item

No.Description of Items Unit Quantity Amount (Rs.)

5 Cement plaster and pointing work

5.120 mm Thick Plaster in wall & floor of septik tank( 1:4 C/S

Mortar ) as specified.Lot 1.00

5.2 3mm thick cement punning in floor and four side wall of septic

tank as specified.Lot 1.00

5.3 Brick ballast filling in soak pit as specified. Lot 1.00

Total Amount

Total Amount In words :-

Name and Seal of the Bidder DateAuthorized Signature

Page 21 of 22

PRICE SCHEDULE-M07Job :- Access Road Construction approximately 330 m

S.No. Description of Items Units Quantities Rate Amount Remarks

Construction of Asphalt Concrete Road ( 330* 4 ) m as per

Specification and Drawing.

1

Construction of Asphalt concrete road including cutting,

filling compaction, subgrade preparation, sub-base

preparation, base course and other required works as per

specification and drawing.

Lot 1.00

2Random Rubble masonry in 1:6 C/S mortar for protection

works for road as specified.cu.m 843.75

3 Stone masonry 1:4 works for Side drain as per specification. cu.m 92.07

4 PCC works below drain as per specification. cu.m 17.325

5 Stone Soling works below drain as per specification. cu.m 23.1

Total Amount In words :-

Date

Authorized Signature

Nepal Electricity Authority

Project Management Directorate

Samundratar Trishuli 3B Hub 132 kV Transmission Line Project

Total Amount Rs.

Name and Seal of the Bidder

22 of 22

F/C: Foreign CurrencyF/C: Foreign CurrencyF/C: Foreign CurrencyF/C: Foreign Currency L/C: Local CurrencyL/C: Local CurrencyL/C: Local CurrencyL/C: Local Currency

1 Plant and Equipment Supplied from Abroad Plant and Equipment Supplied from Abroad Plant and Equipment Supplied from Abroad Plant and Equipment Supplied from Abroad

1.1 Total Schedule T-1A: Plant and Equipment Supplied from Abroad

1.2 Total Schedule T-1B: Plant and Equipment Supplied from Abroad

2 Total Schedule T-2: Plant and Equipment Supplied from within NepalTotal Schedule T-2: Plant and Equipment Supplied from within NepalTotal Schedule T-2: Plant and Equipment Supplied from within NepalTotal Schedule T-2: Plant and Equipment Supplied from within Nepal

3 Total Schedule T-3: Spares PartsTotal Schedule T-3: Spares PartsTotal Schedule T-3: Spares PartsTotal Schedule T-3: Spares Parts

Total Amount(excluding Taxes &Duties)Total Amount(excluding Taxes &Duties)Total Amount(excluding Taxes &Duties)Total Amount(excluding Taxes &Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Price Schedule T-6: Summary Bid Price for Samundratar - Trishuli 3B Hub 132 kV Transmission Line

Bill of Bill of Bill of Bill of

QuantitiesQuantitiesQuantitiesQuantitiesDescriptionDescriptionDescriptionDescription

4 Total Schedule No.T-4 (A&B): Construction and Installation ServicesTotal Schedule No.T-4 (A&B): Construction and Installation ServicesTotal Schedule No.T-4 (A&B): Construction and Installation ServicesTotal Schedule No.T-4 (A&B): Construction and Installation Services

5 Total Schedule T-5: Tools and EquipmentTotal Schedule T-5: Tools and EquipmentTotal Schedule T-5: Tools and EquipmentTotal Schedule T-5: Tools and Equipment

Grand TotalGrand TotalGrand TotalGrand Total

Name and Seal of the Bidder

Date

Authorized Signature

Grand Total in Words:

GRAND

1

PRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1A

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOriginF/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

1 1 1 1 Supply of Towers including bolt and nuts, hangers, U-Supply of Towers including bolt and nuts, hangers, U-Supply of Towers including bolt and nuts, hangers, U-Supply of Towers including bolt and nuts, hangers, U-

bolts completebolts completebolts completebolts complete

1.1 1.1 1.1 1.1 Tower Type DATower Type DATower Type DATower Type DA

a Stub 80 No.

b Basic Tower 20 No.

c DA -4.5M Extension. 0 No.

d DA -3M Extension. 3 No.

e DA -1.5M Extension. 6 No.

f DA +/-0M Extension. 29 No.

g DA +1.5M Extension. 9 No.

h DA +3M Extension. 11 No.

i DA +4.5M Extension. 11 No.

l DA+9 M Extension. 9 No.

1.2 1.2 1.2 1.2 Tower Type DBTower Type DBTower Type DBTower Type DB

a Stub 92 No.

b Basic Tower 23 No.

c DB -4.5M Extension. 2 No.

d DB -3M Extension. 3 No.e DB -1.5M Extension. 7 No.f DB +/-0M Extension. 53 No.

g DB +1.5M Extension. 21 No.

h DB +3M Extension. 4 No.

i DB +4.5M Extension. 1 No.

j DB +6M Extension. 1 No.

k DB+7.5M Extension. 1 No.

l DB+9 M Extension. 5 No.

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project Management Directorate

Total Amount Total Amount Total Amount Total Amount

(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity Authority

Taxes and Taxes and Taxes and Taxes and

VATVATVATVAT

L/CL/CL/CL/C

Insurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Forwarding andForwarding andForwarding andForwarding and

Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV

TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTEstimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border

Signature and Seal of Bidder Page 1 of 25

PRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1A

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOriginF/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project Management Directorate

Total Amount Total Amount Total Amount Total Amount

(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity Authority

Taxes and Taxes and Taxes and Taxes and

VATVATVATVAT

L/CL/CL/CL/C

Insurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Forwarding andForwarding andForwarding andForwarding and

Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV

TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTEstimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border

1.3 1.3 1.3 1.3 Tower Type DCTower Type DCTower Type DCTower Type DC

a Stub 56 No.

b Basic Tower 14 No.

c DC -4.5M Extension. 0 No.

d DC -3M Extension. 1 No.

e DC -1.5M Extension. 1 No.

f DC +/-0M Extension. 39 No.

g DC +1.5M Extension. 8 No.

h DC +3M Extension. 3 No.

i DC +4.5M Extension. 1 No.

j DC +6M Extension. 1 No.

k DC+7.5M Extension. 1 No.

l DC+9 M Extension. 1 No.

1.4 1.4 1.4 1.4 Tower Type DD/DDESTower Type DD/DDESTower Type DD/DDESTower Type DD/DDES

a Stub 68 No.

b Basic Tower 17 No.

c DD/DDES -4.5M Extension. 2 No.

d DD/DDES -3M Extension. 2 No.

e DD/DDES -1.5M Extension. 4 No.

f DD/DDES +/-0M Extension. 31 No.

g DD/DDES +1.5M Extension. 17 No.

h DD/DDES +3M Extension. 5 No.

i DD/DDES +4.5M Extension. 4 No.

j DD/DDES +6M Extension. 1 No.

k DD/DDES+7.5M Extension. 1 No.

l DD/DDES+9 M Extension. 1 No.

Signature and Seal of Bidder Page 2 of 25

PRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1A

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOriginF/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project Management Directorate

Total Amount Total Amount Total Amount Total Amount

(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity Authority

Taxes and Taxes and Taxes and Taxes and

VATVATVATVAT

L/CL/CL/CL/C

Insurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Forwarding andForwarding andForwarding andForwarding and

Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV

TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTEstimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border

1.5 1.5 1.5 1.5 Tower Type DFTower Type DFTower Type DFTower Type DF

a Stub 12 No.

b Basic Tower 3 No.

c DF -4.5M Extension. 0 No.

d DF -3M Extension. 0 No.

e DF -1.5M Extension. 0 No.

f DF +/-0M Extension. 7 No.

g DF +1.5M Extension. 3 No.

h DF +3M Extension. 2 No.

i DF +4.5M Extension. 0 No.

j DF +6M Extension. 0 No.

k DF+7.5M Extension. 0 No.

l DF+9 M Extension. 0 No.

1.6 1.6 1.6 1.6 Additional Galvanized steel works other than above Additional Galvanized steel works other than above Additional Galvanized steel works other than above Additional Galvanized steel works other than above

for leg extension etc for all tower for leg extension etc for all tower for leg extension etc for all tower for leg extension etc for all tower 13 tons

2 2 2 2 Supply of Tower Accessories & EarthingSupply of Tower Accessories & EarthingSupply of Tower Accessories & EarthingSupply of Tower Accessories & Earthing

2.1 2.1 2.1 2.1 Tower AccessoriesTower AccessoriesTower AccessoriesTower Accessories

a Danger Plate 90 No.

b Number Plate 90 No.

c Anti Climbing Device 90 Sets

d Phase Plate (set of 3) 90 Sets

e Circuit Plate (set of 1) 90 Sets

f Bird Guards 35 Sets

Signature and Seal of Bidder Page 3 of 25

PRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1A

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOriginF/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project Management Directorate

Total Amount Total Amount Total Amount Total Amount

(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity Authority

Taxes and Taxes and Taxes and Taxes and

VATVATVATVAT

L/CL/CL/CL/C

Insurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Forwarding andForwarding andForwarding andForwarding and

Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV

TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTEstimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border

2.2 2.2 2.2 2.2 Supply of Tower Earthing MaterialSupply of Tower Earthing MaterialSupply of Tower Earthing MaterialSupply of Tower Earthing Material

a Pipe Type 360 No.

b Counterpoise Type

i) Counterpoise Type - 25 m 35 No.

ii) Counterpoise Type - 50 m 25 No.

iii) Counterpoise Type - 100 m 20 No.

3 3 3 3 Supply of Line MaterialsSupply of Line MaterialsSupply of Line MaterialsSupply of Line Materials

3.1 3.1 3.1 3.1 Conductor and AccessoriesConductor and AccessoriesConductor and AccessoriesConductor and Accessories

a AAAC "UPAS" Conductor including armour-rod,

mid-span joints, repair sleeves, etc. (single wire).196 km

b Mid-span joints 160 Nos.

c Repair sleeves 125 Nos.

d Stockbridge vibration damper for AAAC "UPAS"

conductor with accessories1494 set

3.23.23.23.2

Steel ground wire with optical fiber (OPGW) and Steel ground wire with optical fiber (OPGW) and Steel ground wire with optical fiber (OPGW) and Steel ground wire with optical fiber (OPGW) and

accessoriesaccessoriesaccessoriesaccessories

a Steel ground wire with optical fibre including

intermediate splice boxes, terminal splice boxes and

additional length as required30 km

b Stockbridge Vibration damper for OPGW overhead

ground wire with preformed armour rods 350 set

Signature and Seal of Bidder Page 4 of 25

PRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1A

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOriginF/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project Management Directorate

Total Amount Total Amount Total Amount Total Amount

(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity Authority

Taxes and Taxes and Taxes and Taxes and

VATVATVATVAT

L/CL/CL/CL/C

Insurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Forwarding andForwarding andForwarding andForwarding and

Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV

TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTEstimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border

3.33.33.33.3

Steel ground wire with optical fiber (OPGW) and Steel ground wire with optical fiber (OPGW) and Steel ground wire with optical fiber (OPGW) and Steel ground wire with optical fiber (OPGW) and

accessoriesaccessoriesaccessoriesaccessories

a Optical approach cable For Samundratar and Trishuli

3B Hub Substation1 kM

b Optical Distribution Frame For Samundratar and

Trishuli 3B Hub Substation 2 Set

3.4 3.4 3.4 3.4

Insulator strings with insulators, attachment Insulator strings with insulators, attachment Insulator strings with insulators, attachment Insulator strings with insulators, attachment

assemblies and arcing horns all complete for AAAC assemblies and arcing horns all complete for AAAC assemblies and arcing horns all complete for AAAC assemblies and arcing horns all complete for AAAC

"UPAS" conductor and attachment assemblies all "UPAS" conductor and attachment assemblies all "UPAS" conductor and attachment assemblies all "UPAS" conductor and attachment assemblies all

complete for OPGWcomplete for OPGWcomplete for OPGWcomplete for OPGW

aSingle suspension Insulator Strings complete with all

accessories including Armour Rod. 126 Set

bDouble suspension Insulator Strings complete with all

accessories including Armour Rod. 54 Set

cSingle tension Insulator Strings complete with all

accessories including Armour Rod. 486 Set

dDouble tension Insulator Strings complete with all

accessories including Armour Rod. 342 Set

eJumper set with pilot insulators & suitable counter

weight complete with all accessories. 402 Set

Signature and Seal of Bidder Page 5 of 25

PRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1APRICE SCHEDULE NO. T-1A

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOriginF/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project Management Directorate

Total Amount Total Amount Total Amount Total Amount

(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity Authority

Taxes and Taxes and Taxes and Taxes and

VATVATVATVAT

L/CL/CL/CL/C

Insurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Forwarding andForwarding andForwarding andForwarding and

Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)

F/CF/CF/CF/C

Total AmountTotal AmountTotal AmountTotal Amount

(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV

TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTEstimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border

fOPGW suspension set complete with all acessories

including Armour Rod. 120 set

gOPGW tension set including Armour Rod. (complete

with all acessories on both sides) 360 set

4 4 4 4 Proto Type Testing of towersProto Type Testing of towersProto Type Testing of towersProto Type Testing of towers

aTower Type DA with extension +9m 1 no.

bTower Type DB with extension +9m 1 no.

cTower Type DC with extension +9m 1 no.

dTower Type DD/DDES with extension +9m 1 no.

eTower Type DF with extension +9m 1 no.

fTower Type FB with extension +9m 1 no.

Total (to Schedule No.1. Grand Summary)

NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Name and Seal of the bidder

Date

Authorized Signature

Signature and Seal of Bidder Page 6 of 25

PRICE SCHEDULE NO. T-1BPRICE SCHEDULE NO. T-1BPRICE SCHEDULE NO. T-1BPRICE SCHEDULE NO. T-1B

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINESECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOrigin

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

1 1 1 1 Supply of Towers including bolt and nuts, hangers, Supply of Towers including bolt and nuts, hangers, Supply of Towers including bolt and nuts, hangers, Supply of Towers including bolt and nuts, hangers, U-bolts completeU-bolts completeU-bolts completeU-bolts complete

1.1 1.1 1.1 1.1 Tower Type FATower Type FATower Type FATower Type FA

a Stub 16 No.

b Basic Body 4 No.

c FA -4.5M Extension. 1 No.

d FA -3M Extension. 1 No.

e FA -1.5M Extension. 0 No.

f FA +/-0M Extension. 8 No.

g FA +1.5M Extension. 0 No.

h FA +3M Extension. 4 No.

i FA +4.5M Extension. 2 No.

l FA+9 M Extension. 0 No.

1.2 1.2 1.2 1.2 Tower Type FBTower Type FBTower Type FBTower Type FB

a Stub 28 No.

b Basic Body 7 No.

c FB -4.5M Extension. 0 No.

d FB -3M Extension. 1 No.e FB -1.5M Extension. 6 No.f FB +/-0M Extension. 5 No.

g FB +1.5M Extension. 8 No.

h FB +3M Extension. 1 No.

i FB +4.5M Extension. 1 No.

j FB +6M Extension. 0 No.

k FB+7.5M Extension. 0 No.

l FB+9 M Extension. 0 No.

Forwarding andForwarding andForwarding andForwarding and

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site

F/CF/CF/CF/C L/CL/CL/CL/C

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECT

Estimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal BorderInsurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

Signature and Seal of Bidder Page 1 of 25

PRICE SCHEDULE NO. T-1BPRICE SCHEDULE NO. T-1BPRICE SCHEDULE NO. T-1BPRICE SCHEDULE NO. T-1B

Supply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign OriginSupply and Delivery of Plant and Equipment Foreign Origin L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINESECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOrigin

F/C F/C F/C F/C L/C L/C L/C L/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS) F/C F/C F/C F/C L/C ( NRS)L/C ( NRS)L/C ( NRS)L/C ( NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

Forwarding andForwarding andForwarding andForwarding and

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site

F/CF/CF/CF/C L/CL/CL/CL/C

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECTTRANSMISSION LINE PROJECT

Estimated Estimated Estimated Estimated

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal BorderInsurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties)

1.3 1.3 1.3 1.3 Tower Type FCTower Type FCTower Type FCTower Type FC

a Stub 4 No.

b Basic Body 1 No.

c FC -4.5M Extension. 1 No.

d FC -3M Extension. 0 No.

e FC -1.5M Extension. 0 No.

f FC +/-0M Extension. 2 No.

g FC +1.5M Extension. 0 No.

h FC +3M Extension. 0 No.

i FC +4.5M Extension. 1 No.

j FC +6M Extension. 0 No.

k FC+7.5M Extension. 0 No.

l FC+9 M Extension. 0 No.

1.4 1.4 1.4 1.4 Tower Type FD/FDESTower Type FD/FDESTower Type FD/FDESTower Type FD/FDES

a Stub 4 No.

b Basic Body 1 No.

c FD/FDES -4.5M Extension. 0 No.

d FD/FDES -3M Extension. 0 No.

e FD/FDES -1.5M Extension. 0 No.

f FD/FDES +/-0M Extension. 4 No.

g FD/FDES +1.5M Extension. 0 No.

h FD/FDES +3M Extension. 0 No.

i FD/FDES +4.5M Extension. 0 No.

j FD/FDES +6M Extension. 0 No.

k FD/FDES+7.5M Extension. 0 No.

l FD/FDES+9 M Extension. 0 No.

NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Name and Seal of the bidder

Date

Authorized Signature

Signature and Seal of Bidder Page 2 of 25

2. Item no in the following table shall match those in Price schedule T-1,T-4 and T-5Price Schedule T-2: Supply and Delivery of Plant and Equipment Locally ManufacturedPrice Schedule T-2: Supply and Delivery of Plant and Equipment Locally ManufacturedPrice Schedule T-2: Supply and Delivery of Plant and Equipment Locally ManufacturedPrice Schedule T-2: Supply and Delivery of Plant and Equipment Locally Manufactured LC: Local Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINESECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOrigin

L/C L/C L/C L/C L/CL/CL/CL/C

( NRS) ( NRS) ( NRS) ( NRS)

L/CL/CL/CL/C

(NRS) (NRS) (NRS) (NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=1+23=1+23=1+23=1+2 4444 5555

NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Name and Seal of the bidder

Date

Authorized Signature

LCLCLCLC L/CL/CL/CL/C

Ex Faxtory Price Ex Faxtory Price Ex Faxtory Price Ex Faxtory Price

(Excluding VAT)(Excluding VAT)(Excluding VAT)(Excluding VAT)

Inland Inland Inland Inland

Transportation up to Transportation up to Transportation up to Transportation up to

SiteSiteSiteSite

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION

LINE PROJECTLINE PROJECTLINE PROJECTLINE PROJECT Estimated Estimated Estimated Estimated

Total Total Total Total

AmountAmountAmountAmount

(Excluding (Excluding (Excluding (Excluding

Taxes & Taxes & Taxes & Taxes &

Duties)Duties)Duties)Duties)

Taxes Taxes Taxes Taxes

and VATand VATand VATand VAT

Total Total Total Total

AmountAmountAmountAmount

(Including (Including (Including (Including

Taxes & Taxes & Taxes & Taxes &

Duties) Duties) Duties) Duties)

1. If a bidder wishes to supply some items(s) listed in Price schedule no T-1,T-4,T-5 from manufacturing plant in Nepal, then such item(s) and price of such item(s) shall be quoted in this Price Schedule T-2 only . Columns against such item(s) shall be left blank in Price Schedule no T-1,T-4 and T-5

Page 3 of 25

PRICE SCHEDULE NO. T-3PRICE SCHEDULE NO. T-3PRICE SCHEDULE NO. T-3PRICE SCHEDULE NO. T-3Supply and Delivery of Spare PartsSupply and Delivery of Spare PartsSupply and Delivery of Spare PartsSupply and Delivery of Spare Parts L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINESECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOrigin

F/C F/C F/C F/C L/C L/C L/C L/C L/C L/C L/C L/C

(NRS)(NRS)(NRS)(NRS)F/C F/C F/C F/C

L/C L/C L/C L/C (NRS)(NRS)(NRS)(NRS)

Item Item Item Item UnitUnitUnitUnit QuantityQuantityQuantityQuantity Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

C-1.C-1.C-1.C-1. SPARE PARTSSPARE PARTSSPARE PARTSSPARE PARTS

C-1.1C-1.1C-1.1C-1.1 Galvanized steel tower Complete Galvanized steel tower Complete Galvanized steel tower Complete Galvanized steel tower Complete

with all Leg Extensions and Stubs: with all Leg Extensions and Stubs: with all Leg Extensions and Stubs: with all Leg Extensions and Stubs:

C-1.1.1 Tower type DA+9 Nos. 2.00

C-1.1.2 Tower type DB+9 Nos. 2.00C-1.1.3 Tower type DC+9 Nos. 2.00

C-1.1.4 Tower type DD/DDES+9 Nos. 2.00

C-1.1.5 Tower type FB+9 Nos. 1.00

Sub total C-1.1Sub total C-1.1Sub total C-1.1Sub total C-1.1

C-1.2C-1.2C-1.2C-1.2 Insulator strings and Preformed fittings for OPGW groundwire attachment assemblesInsulator strings and Preformed fittings for OPGW groundwire attachment assemblesInsulator strings and Preformed fittings for OPGW groundwire attachment assemblesInsulator strings and Preformed fittings for OPGW groundwire attachment assembles

C-1.2.1

Single suspension insulator string with armour rod for "UPASS" Conductor. Sets 8.00

C-1.2.4 Double tension insulator string for "UPASS" Conductor. Sets 15.00

C-1.2.5 OPGW suspension assembly for one tower. Sets 12.00

C-1.2.6 OPGW tension assembly complete for one tower. Sets 12.00

C-1.2.7

Structure mount splicing box complete with acessories for OPGW. Sets 4.00

Sub total C-1.2Sub total C-1.2Sub total C-1.2Sub total C-1.2

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTLINE PROJECTLINE PROJECTLINE PROJECT

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal BorderInsurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) Forwarding andForwarding andForwarding andForwarding and

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site

F/CF/CF/CF/C L/CL/CL/CL/C

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)EstimatedEstimatedEstimatedEstimated

Signature and Seal of Bidder Page-1 of 25

PRICE SCHEDULE NO. T-3PRICE SCHEDULE NO. T-3PRICE SCHEDULE NO. T-3PRICE SCHEDULE NO. T-3Supply and Delivery of Spare PartsSupply and Delivery of Spare PartsSupply and Delivery of Spare PartsSupply and Delivery of Spare Parts L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINESECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOrigin

F/C F/C F/C F/C L/C L/C L/C L/C L/C L/C L/C L/C

(NRS)(NRS)(NRS)(NRS)F/C F/C F/C F/C

L/C L/C L/C L/C (NRS)(NRS)(NRS)(NRS)

Item Item Item Item UnitUnitUnitUnit QuantityQuantityQuantityQuantity Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTLINE PROJECTLINE PROJECTLINE PROJECT

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal BorderInsurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount(Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) (Including Taxes & Duties) Forwarding andForwarding andForwarding andForwarding and

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site

F/CF/CF/CF/C L/CL/CL/CL/C

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)EstimatedEstimatedEstimatedEstimated

3333 Conductor and accessoriesConductor and accessoriesConductor and accessoriesConductor and accessories3.1 Mid span compression sleeves for AAAC "UPASS" conductor. Nos. 15.00

3.2 Repair sleeve for AAAC "UPASS" conductor. Nos. 10.00

3.3 Vibration Damper for AAAC "UPASS" Conductor. Nos. 10.00

3.4 Porcelain insulator 70 kN capacity Pcs. 150.00

3.5 Porcelain insulator 120 kN capacity Pcs. 200.00

Sub total C-1.3Sub total C-1.3Sub total C-1.3Sub total C-1.3

4444 Overhead OPGW and accessoriesOverhead OPGW and accessoriesOverhead OPGW and accessoriesOverhead OPGW and accessories

4.1 Mid span compression sleeve for OPGW. Nos. 20.00

4.2 Repair sleeve for OPGW. Nos. 15.00

4.3 (a) Optical fiber ground wire (24 fibers) Km. 1.00

4.4 Vibration Damper for OPGW. Nos. 30.00

Sub total C-1.4Sub total C-1.4Sub total C-1.4Sub total C-1.4

Grand Total of Price Schedule 4Grand Total of Price Schedule 4Grand Total of Price Schedule 4Grand Total of Price Schedule 4

NOTE: TAXES AND DUTIES ARE JUST FOR REFERENCE AND EVALUATION SHALL BE CARRIED OUT EXCLUDING TAXES AND VAT

Signature and Seal of Bidder Page-2 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

1 1 1 1 SurveySurveySurveySurvey

a Check survey and review of profile including L/R profile in undulation, tower spotting, staking of tower locations and

survey on tower location . 25.671 Km.

b. Conduct detail survey along the rought alignment including Draw plan and profile in covering areas lying within its

9*9m ROW. 7 Km.

C. Measurement of ground resistance/soil resistivity 90 locationsd Numbering and Marking of Trees along ROW (Tentative) 1 Lot

2 2 2 2 Soil InvestigationSoil InvestigationSoil InvestigationSoil Investigation

a All kinds of Soils except fissured rock & hard rock22 Loc.

b Fissured Rock 12 Loc.c Hard Rock 28 Loc.

d River Crossing 4 Loc.e Furnishing Bore Log Data 40 Loc.b Fissured Rock 3600 Cum.c Hard Rock 2000 Cum.

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

Signature and Seal of Bidder Page 1 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

4 4 4 4 ErectionErectionErectionErection ofofofof towerstowerstowerstowers &&&& itsitsitsits bodybodybodybody extensionsextensionsextensionsextensions (Complete)(Complete)(Complete)(Complete) includingincludingincludingincluding boltsboltsboltsbolts &&&& nuts,nuts,nuts,nuts, tacktacktacktack weldingweldingweldingwelding andandandand supplysupplysupplysupply andandandandapplication of enamel & zinc rich paintapplication of enamel & zinc rich paintapplication of enamel & zinc rich paintapplication of enamel & zinc rich paint

4.1 4.1 4.1 4.1 Tower Type DATower Type DATower Type DATower Type DA

a Stub 80 No.

b Basic Body 20 No.c DA -4.5M Extension. 0 No.d DA -3M Extension. 3 No.

e DA -1.5M Extension. 6 No.

f DA +/-0M Extension. 29 No.

g DA +1.5M Extension. 9 No.

h DA +3M Extension. 11 No.

i DA +4.5M Extension. 11 No.

j DA +6M Extension. 1 No.

k DA+7.5M Extension. 1 No.

l DA+9 M Extension. 9 No.

4.2 4.2 4.2 4.2 Tower Type DBTower Type DBTower Type DBTower Type DB

a Stub 92 No.

b Basic Body 23 No.

c DB -4.5M Extension. 2 No.

d DB -3M Extension. 3 No.

e DB -1.5M Extension. 7 No.

f DB +/-0M Extension. 53 No.

g DB +1.5M Extension. 21 No.

h DB +3M Extension. 4 No.

i DB +4.5M Extension. 1 No.

j DB +6M Extension. 1 No.

k DB+7.5M Extension. 1 No.

l DB+9 M Extension. 5 No.

Signature and Seal of Bidder Page 2 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

4.3 4.3 4.3 4.3 Tower Type DCTower Type DCTower Type DCTower Type DC

a Stub 56 No.

b Basic Body 14 No.

c DC -4.5M Extension. 0 No.

d DC -3M Extension. 1 No.

e DC -1.5M Extension. 1 No.

f DC +/-0M Extension. 39 No.

g DC +1.5M Extension. 8 No.

h DC +3M Extension. 3 No.

i DC +4.5M Extension. 1 No.

j DC +6M Extension. 1 No.

k DC+7.5M Extension. 1 No.

l DC+9 M Extension. 1 No.

4.4 4.4 4.4 4.4 Tower Type DD/DDESTower Type DD/DDESTower Type DD/DDESTower Type DD/DDES

a Stub 68 No.

b Basic Body 17 No.

c DD/DDES -4.5M Extension. 2 No.

d DD/DDES -3M Extension. 2 No.

e DD/DDES -1.5M Extension. 4 No.

f DD/DDES +/-0M Extension. 31 No.

g DD/DDES +1.5M Extension. 17 No.

h DD/DDES +3M Extension. 5 No.

i DD/DDES +4.5M Extension. 4 No.

j DD/DDES +6M Extension. 1 No.

k DD/DDES+7.5M Extension. 1 No.

l DD/DDES+9 M Extension. 1 No.

Signature and Seal of Bidder Page 3 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

4.5 4.5 4.5 4.5 Tower Type DFTower Type DFTower Type DFTower Type DF

a Stub 12 No.

b Basic Body 3 No.

c DF -4.5M Extension. 0 No.

d DF -3M Extension. 0 No.

e DF -1.5M Extension. 0 No.

f DF +/-0M Extension. 7 No.

g DF +1.5M Extension. 3 No.

h DF +3M Extension. 2 No.

i DF +4.5M Extension. 0 No.

j DF +6M Extension. 0 No.

k DF+7.5M Extension. 0 No.

l DF+9 M Extension. 0 No.

4.6 4.6 4.6 4.6 Additional Galvanized steel works other than above for leg extension etc for all tower Additional Galvanized steel works other than above for leg extension etc for all tower Additional Galvanized steel works other than above for leg extension etc for all tower Additional Galvanized steel works other than above for leg extension etc for all tower 13 tons

5555

RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete works and RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete works and RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete works and RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete works and reinforcement bars reinforcement bars reinforcement bars reinforcement bars

5.1 5.1 5.1 5.1 Tower Type DA (for all type of body and leg extensions)Tower Type DA (for all type of body and leg extensions)Tower Type DA (for all type of body and leg extensions)Tower Type DA (for all type of body and leg extensions)a Dry Soil 5 No.

b Wet Soil 2 No.

c Fully Submerged Soil 1 No.

d Dry Fissured Rock 3 No.

e Wet Fissured Rock 1 No.

f Submerged Fissured Rock 0 No.

g Hard Rock 7 No.

h Sandy Soil 1 No.

Signature and Seal of Bidder Page 4 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

5.2 5.2 5.2 5.2 Tower Type DB (for all type of body and leg extensions)Tower Type DB (for all type of body and leg extensions)Tower Type DB (for all type of body and leg extensions)Tower Type DB (for all type of body and leg extensions)a Dry Soil 3 No.

b Wet Soil 2 No.

c Fully Submerged Soil 1 No.

d Dry Fissured Rock 5 No.

e Wet Fissured Rock 2 No.

f Submerged Fissured Rock 1 No.

g Hard Rock 8 No.

h Sandy Soil 1 No.

5.3 5.3 5.3 5.3 Tower Type DC (for all type of body and leg extensions)Tower Type DC (for all type of body and leg extensions)Tower Type DC (for all type of body and leg extensions)Tower Type DC (for all type of body and leg extensions)a Dry Soil 3 No.

b Wet Soil 2 No.

c Fully Submerged Soil 1 No.

d Dry Fissured Rock 2 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 0 No.

g Hard Rock 4 No.

h Sandy Soil 2 No.

Signature and Seal of Bidder Page 5 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

5.4 5.4 5.4 5.4 Tower Type DD/DDES (for all type of body and leg extensions)Tower Type DD/DDES (for all type of body and leg extensions)Tower Type DD/DDES (for all type of body and leg extensions)Tower Type DD/DDES (for all type of body and leg extensions)a Dry Soil 5 No.

b Wet Soil 1 No.

c Fully Submerged Soil 0 No.

d Dry Fissured Rock 6 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 0 No.

g Hard Rock 5 No.

h Sandy Soil 0 No.

5.5 5.5 5.5 5.5 Tower Type DF (for all type of body and leg extensions)Tower Type DF (for all type of body and leg extensions)Tower Type DF (for all type of body and leg extensions)Tower Type DF (for all type of body and leg extensions)a Dry Soil 1 No.

b Wet Soil 1 No.

c Fully Submerged Soil 0 No.

d Dry Fissured Rock 1 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 0 No.

g Hard Rock 0 No.

h Sandy Soil 0 No.

6 6 6 6 Installation of Tower Accessories & EarthingInstallation of Tower Accessories & EarthingInstallation of Tower Accessories & EarthingInstallation of Tower Accessories & Earthing

6.1 6.1 6.1 6.1 Tower AccessoriesTower AccessoriesTower AccessoriesTower Accessoriesa Danger Plate 90 No.

b Number Plate 90 No.

c Anti Climbing Device 90 Sets

d Phase Plate (set of 3) 90 Sets

e Circuit Plate (set of 2) 90 Sets

f Bird Guards 35 Sets

Signature and Seal of Bidder Page 6 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

6.2 6.2 6.2 6.2 Installation of Tower Earthing MaterialInstallation of Tower Earthing MaterialInstallation of Tower Earthing MaterialInstallation of Tower Earthing Materiala Pipe Type 360 No.

b Counterpoise Type

i) Counterpoise Type - 25 m 35 No.

ii) Counterpoise Type - 50 m 25 No.

iii) Counterpoise Type - 100 m 20 No.

7 7 7 7 Installation of Line MaterialsInstallation of Line MaterialsInstallation of Line MaterialsInstallation of Line Materials

7.1 7.1 7.1 7.1 Stringing of Conductor and GroundwireStringing of Conductor and GroundwireStringing of Conductor and GroundwireStringing of Conductor and Groundwirea AAAC UPASS Conductor including armour-rod, mid-span joints, repair sleeves, etc. (Double wire). 196 km

b Steel ground wire with optical fiber (36/24 -fiber) including intermediate splice boxes and necessary terminalsplice boxes, etc. 30

km

7.27.27.27.2 Installation of 132 kV Insulator StringsInstallation of 132 kV Insulator StringsInstallation of 132 kV Insulator StringsInstallation of 132 kV Insulator Stringsa Single suspension Insulator Strings complete with all accessories. 126 Set

b Double suspension Insulator Strings complete with all acessories. 54 Set

c Single tension Insulator Strings complete with all acessories. 486 Set

d Double tension Insulator Strings complete with all acessories. 342 Set

e Jumper set with pilot insulators & suitable counter weight complete with all accessories. 402 Set

7.3 7.3 7.3 7.3 Installation of Preformed fittings for OPGWInstallation of Preformed fittings for OPGWInstallation of Preformed fittings for OPGWInstallation of Preformed fittings for OPGW

a OPGW suspension set complete with all acessories. 120 set

b OPGW tension set (complete with all acessories on both sides) 360 set

Signature and Seal of Bidder Page 7 of 25

PRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4APRICE SCHEDULE NO. T-4ACONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Construction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

7.4 Installation of Vibration Dampers

a Vibration Dampers for AAAC "UPASS" 1494 set

b Vibration Dampers for OPGW350 set

7.57.57.57.5 Optical Approach Cable and Optical Distribution FrameOptical Approach Cable and Optical Distribution FrameOptical Approach Cable and Optical Distribution FrameOptical Approach Cable and Optical Distribution Frame

a Optical approach cable For Samundratar and Trishuli 3B Hub Substation 1 Lot

b. Optical Distribution Frames for Samundratar and Trishuli 3B Hub Substation 2 Lot

8888 Protection of tower footingProtection of tower footingProtection of tower footingProtection of tower footinga Random rubble stone masonry including excavation (1:4 , cement : sand) 2500 CUM

b Stone bound in galvanizing wire netting including excavation 3500 CUM

c Back filling and leveling of volumes enclosed by revetment 2200 CUM

d M15 Conc. Nominal Mix 1:2:4 for foundation lean concrete top seal cover 850 CUM

e Reinforcement Bars 20 tons

9 9 9 9 Transportation of Conductors (UPAS) Transportation of Conductors (UPAS) Transportation of Conductors (UPAS) Transportation of Conductors (UPAS)

aaaa Transportation of Conductors (UPAS) for required quantity from Bharatpur and Hetauda Substation (NEAStore) up to sites including loading and unloading. 1 Lot

bbbb Re-drumming of Existing Conductor (UPAS) including supply of new wooden Drum (As per requiredquantity verified at site) with hermitically sealed drumming for spare conductors 211 No.

cccc Open Shed with Galvanized corrugated metal sheet with metallic truss, with PCC base foundation and 1

meter high wall for storing (14mx10m) 1 Lot

Total ( Grand Summary) Total ( Grand Summary) Total ( Grand Summary) Total ( Grand Summary)

Signature and Seal of Bidder Page 8 of 25

PRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

1 1 1 1 ErectionErectionErectionErection ofofofof towerstowerstowerstowers &&&& itsitsitsits bodybodybodybody extensionsextensionsextensionsextensions (Complete)(Complete)(Complete)(Complete) includingincludingincludingincluding boltsboltsboltsbolts &&&& nuts,nuts,nuts,nuts, tacktacktacktack weldingweldingweldingwelding andandandandsupply and application of enamel & zinc rich paintsupply and application of enamel & zinc rich paintsupply and application of enamel & zinc rich paintsupply and application of enamel & zinc rich paint

1.1 1.1 1.1 1.1 Tower Type FATower Type FATower Type FATower Type FA

a Stub 16 No.

b Basic Body 4 No.

c FA -4.5M Extension. 1 No.

d FA -3M Extension. 1 No.

e FA -1.5M Extension. 0 No.

f FA +/-0M Extension. 8 No.

g FA +1.5M Extension. 0 No.

h FA +3M Extension. 4 No.

i FA +4.5M Extension. 2 No.

l FA+9 M Extension. 0 No.

1.2 1.2 1.2 1.2 Tower Type FBTower Type FBTower Type FBTower Type FB

a Stub 28 No.

b Basic Body 7 No.

c FB -4.5M Extension. 0 No.

d FB -3M Extension. 1 No.e FB -1.5M Extension. 6 No.f FB +/-0M Extension. 5 No.

g FB +1.5M Extension. 8 No.

h FB +3M Extension. 1 No.

i FB +4.5M Extension. 1 No.

j FB +6M Extension. 0 No.

k FB+7.5M Extension. 0 No.

l FB+9 M Extension. 0 No.

L/CL/CL/CL/C

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTConstruction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

Signature and Seal of Bidder Page 1 of 25

PRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTConstruction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

1.3 1.3 1.3 1.3 Tower Type FCTower Type FCTower Type FCTower Type FC

a Stub 4 No.

b Basic Body 1 No.

c FC -4.5M Extension. 1 No.

d FC -3M Extension. 0 No.

e FC -1.5M Extension. 0 No.

f FC +/-0M Extension. 2 No.

g FC +1.5M Extension. 0 No.

h FC +3M Extension. 0 No.

i FC +4.5M Extension. 1 No.

j FC +6M Extension. 0 No.

k FC+7.5M Extension. 0 No.

l FC+9 M Extension. 0 No.

1.4 1.4 1.4 1.4 Tower Type FD/FDESTower Type FD/FDESTower Type FD/FDESTower Type FD/FDES

a Stub 4 No.

b Basic Body 1 No.

c FD/FDES -4.5M Extension. 0 No.

d FD/FDES -3M Extension. 0 No.

e FD/FDES -1.5M Extension. 0 No.

f FD/FDES +/-0M Extension. 4 No.

g FD/FDES +1.5M Extension. 0 No.

h FD/FDES +3M Extension. 0 No.

i FD/FDES +4.5M Extension. 0 No.

j FD/FDES +6M Extension. 0 No.

k FD/FDES+7.5M Extension. 0 No.

l FD/FDES+9 M Extension. 0 No.

Signature and Seal of Bidder Page 2 of 25

PRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTConstruction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

2222

RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete RCC foundation works for Tower Structures- complete excavation, backfilling, forms, concrete works and reinforcement bars works and reinforcement bars works and reinforcement bars works and reinforcement bars

2.1 2.1 2.1 2.1 Tower Type FA (for all type of body and leg extensions)Tower Type FA (for all type of body and leg extensions)Tower Type FA (for all type of body and leg extensions)Tower Type FA (for all type of body and leg extensions)a Dry Soil 1 No.

b Wet Soil 0 No.

c Fully Submerged Soil 0 No.

d Dry Fissured Rock 1 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 1 No.

g Hard Rock 1 No.

h Sandy Soil 0 No.

2.2 2.2 2.2 2.2 Tower Type FB (for all type of body and leg extensions)Tower Type FB (for all type of body and leg extensions)Tower Type FB (for all type of body and leg extensions)Tower Type FB (for all type of body and leg extensions)a Dry Soil 1 No.

b Wet Soil 0 No.

c Fully Submerged Soil 0 No.

d Dry Fissured Rock 2 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 1 No.

g Hard Rock 3 No.

h Sandy Soil 0 No.

Signature and Seal of Bidder Page 3 of 25

PRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BPRICE SCHEDULE NO. T-4BCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATIONCONSTRUCTION & INSTALLATION L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency

PARTPARTPARTPART

132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE

SECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111

L/CL/CL/CL/C

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : Project : Project : Project :

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTConstruction & InstallationConstruction & InstallationConstruction & InstallationConstruction & Installation

Estimated Estimated Estimated Estimated (Excluding Taxes)(Excluding Taxes)(Excluding Taxes)(Excluding Taxes)

2.3 2.3 2.3 2.3 Tower Type FC (for all type of body and leg extensions)Tower Type FC (for all type of body and leg extensions)Tower Type FC (for all type of body and leg extensions)Tower Type FC (for all type of body and leg extensions)a Dry Soil 0 No.

b Wet Soil 0 No.

c Fully Submerged Soil 0 No.

d Dry Fissured Rock 0 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 0 No.

g Hard Rock 1 No.

h Sandy Soil 0 No.

2.4 2.4 2.4 2.4 Tower Type FD/FDES (for all type of body and leg extensions)Tower Type FD/FDES (for all type of body and leg extensions)Tower Type FD/FDES (for all type of body and leg extensions)Tower Type FD/FDES (for all type of body and leg extensions)a Dry Soil 0 No.

b Wet Soil 0 No.

c Fully Submerged Soil 0 No.

d Dry Fissured Rock 1 No.

e Wet Fissured Rock 0 No.

f Submerged Fissured Rock 0 No.

g Hard Rock 0 No.

h Sandy Soil 0 No.

Total ( Grand Summary) Total ( Grand Summary) Total ( Grand Summary) Total ( Grand Summary)

Signature and Seal of Bidder Page 4 of 25

PRICE SCHEDULE NO. T-5PRICE SCHEDULE NO. T-5PRICE SCHEDULE NO. T-5PRICE SCHEDULE NO. T-5Supply and Delivery of Tools and EquipmentSupply and Delivery of Tools and EquipmentSupply and Delivery of Tools and EquipmentSupply and Delivery of Tools and Equipment L/C : Local CurrencyL/C : Local CurrencyL/C : Local CurrencyL/C : Local Currency F/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign CurrencyF/C : Foreign Currency

CountryCountryCountryCountry

ofofofof

PARTPARTPARTPART132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINE132kV TRANSMISSION LINESECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUBSECTION-SAMUNDRATAR TO TRISHULI 3B HUB OriginOriginOriginOrigin

F/C F/C F/C F/C L/C L/C L/C L/C L/C L/C L/C L/C (NRS)(NRS)(NRS)(NRS)

F/C F/C F/C F/C L/C L/C L/C L/C (NRS)(NRS)(NRS)(NRS)

Item Item Item Item QuantityQuantityQuantityQuantity UnitUnitUnitUnit Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount Unit RateUnit RateUnit RateUnit Rate AmountAmountAmountAmount

No.No.No.No. DescriptionDescriptionDescriptionDescription 1111 2222 3=13=13=13=1 4=24=24=24=2 5=3+45=3+45=3+45=3+4 6666 7777

TOOLS AND EQUIPMENTTOOLS AND EQUIPMENTTOOLS AND EQUIPMENTTOOLS AND EQUIPMENT

1.1Flat wrench for bolts

10 nos.

1.2Pipe wrench for common bolts

10 nos.

1.3Come along clamp for UPASS

6 nos.

1.4Come along clamp for OPGW

6 nos.1.5 Torque Wrench 6 nos.

1.6 Safety belt 5 sets

1.7 Portable Hydraulically operated Crimping tools with 2 sets of dies each for Conductor "BEAR", "DOG", "PANTHER", "WOLF",

1 sets

1.8Safety helmet

10 sets

1.9

Double sheeve pulley block 5 MT capacity complete with all accessories 2 sets

1.10Four sheeve pulley block 10 MT capacity complete with all accessories

2 sets

1.13132 kV Line Tester

1 set

1.14

Earth resistance tester, battery operated with measuring range 0-1000 ohms, complete with accessories 2 set

Nepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityNepal Electricity AuthorityProject Management Directorate

SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTSAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECT

Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION Project : SAMUNDRATAR-TRISHULI 3B HUB 132kV TRANSMISSION LINE PROJECTLINE PROJECTLINE PROJECTLINE PROJECT

CIP-Nepal Border CIP-Nepal Border CIP-Nepal Border CIP-Nepal BorderInsurance, ClearingInsurance, ClearingInsurance, ClearingInsurance, Clearing

Estimated Estimated Estimated Estimated

Taxes and Taxes and Taxes and Taxes and VATVATVATVAT

Total AmountTotal AmountTotal AmountTotal Amount(Including Taxes & (Including Taxes & (Including Taxes & (Including Taxes &

Duties) Duties) Duties) Duties) Forwarding andForwarding andForwarding andForwarding and

(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties)(Excluding Taxes & Duties) Transport up to SiteTransport up to SiteTransport up to SiteTransport up to Site

F/CF/CF/CF/C L/CL/CL/CL/C

Total Amount Total Amount Total Amount Total Amount(Excluding Taxes & (Excluding Taxes & (Excluding Taxes & (Excluding Taxes &

Duties)Duties)Duties)Duties)

Signature and Seal of Bidder: Page 1 of 25