MINIMIZE INITIAL COSTS when evaluating an expansion or a new facility

description

MINIMIZE INITIAL COSTS: when evaluating an expansion or a new facility

Transcript of Neenan slide deck

Page 1: Neenan slide deck

MINIMIZE INITIAL COSTS when evaluating an expansion

or a new facility

Page 2: Neenan slide deck

TOTALCOST

FACTORS

Page 3: Neenan slide deck

LAND

site specific costs

Page 4: Neenan slide deck

ENTITLEMENTS

site specific costs

Page 5: Neenan slide deck

UTILITY INSTALL

site specific costs

Page 6: Neenan slide deck

PERMITS

site specific costs

Page 7: Neenan slide deck

macro costs

OTHER FACTORS

location

land configuration

exit strategy potential

political value

approval timing

Page 8: Neenan slide deck

macro costs

COSTS

real estate taxes

personal property taxes

utility rates

Page 9: Neenan slide deck

macro costs

INCENTIVES

tax credits

job credits

equipment exemptions

tax rebates

Page 10: Neenan slide deck

RURAL SITE8.2 acres$1.03/SF

URBAN SITE8.89 acres$1.50/SF

Page 11: Neenan slide deck

RURALSITE

$1.03/SFRURAL SITE

$3.38/SF

7.5 Developable Acres (Detention Pond Required)

No Sewer or WaterStreet Improvements

Power CostsMunicipal Devt. Fees

Sewer & Water Street Oversizing Fees Storm Drainage Fees

Water Right FeesPlanning/Civil Fees

Total Cost - $1,247,879

Page 12: Neenan slide deck

URBANSITE

$1.50/SFURBAN SITE

$2.42/SF

8.89 Developable Acres Utilities to the Site

Power CostsMunicipal Devt. Fees

Sewer & WaterStreet Oversizing FeesStorm Drainage Fees No Water Right Fees Planning / Civil Fees Total Cost - $937,137

Page 13: Neenan slide deck

DEVELOP AMASTER PLAN

plan for growth

Page 14: Neenan slide deck

GROWTH CAN BE INTERNAL

Page 15: Neenan slide deck

GROWTH CAN BE EXTERNAL

Page 16: Neenan slide deck

HAVE A MASTER PLAN & STRATEGY TO GROW

Page 17: Neenan slide deck

AVOID “CONSTRAINED THINKING”