NEED OF SHORE PROTECTION WORKS TO SAFEGUARD THE APPROACH ROAD TO BE
CONSTRUCTED ON THE EASTERN SIDE
![Page 2: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/2.jpg)
Satelite Map showing the Thengapattanam Coast on 1st december 2005 .
![Page 3: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/3.jpg)
Location of site:The fishery harbor at Thengapattanam village (Lat 805’ 19”N
and Long. 770 33’ 20” E) is situated at a distance of 42km from Nagercoil.
It is also at a distance of 11 km from Marthandam town and all weather motorable road joining the National Highway connecting Trivandrum and Kanyakumari connects the site .
The proposed location is on the estuary of the tambraparaniriver draining into the Arabian sea on the west coast of TamilNadu.
![Page 4: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/4.jpg)
Satelite Maps showing the Thengapattanam Coast at 2002,2005 and 2007 before Construction of Fishing Harbour
![Page 5: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/5.jpg)
Tidal ValuesMHWS +0.79 m
MHWN +0.55 m
MLWN +0.43 m
MLWS +0.18 m
MSL +0.49 m
![Page 6: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/6.jpg)
Wave characteristics for the Shoreline evolution
MonthDeep water
Wave direction w.r.t North (θo)
Wave height (m)
Wave period (sec), T
Wave direction from shore normal
(θ) in d=6m
January 3600 1.5 5 -66.68
February 3400 1.0 5 66.14
March 1800 1.0 5 -38.73
April 2700 1.0 5 -38.73
May 2700 1.0 5 48.21
June 2700 2.0 5 43.23
July 2700 2.0 6 43.23
August 2700 2.0 6 43.23
September 2700 2.0 5 43.23
October 2700 1.0 5 43.23
November 1800 1.5 5 -35.08
December 1800 1.0 5 -35.08
![Page 7: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/7.jpg)
Shoreline Evaluation
19.11.13
9.1.14
1.5.14
19.11.13 9.1.14
1.5.14
19.11.13
9.1.14
1.5.14
![Page 8: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/8.jpg)
Thengapattanam Coast before Construction of Fishing Harbour on 1st june 2007
![Page 9: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/9.jpg)
APPROACH ROAD• The Chief Engineer, Fishing Harbour Projects Circle ,
Chennai has informed that 1.75.7 ha . of land has been acquired in S.No :445/1 of Painkulam Village .
• Further ,land has been acquired and alloted for creating approach road to Thengapattinam Fishing Harbour in Survey No : 464/1 ,466/1 ,3,467/2B , 9 , 10 ,12, 13 and 468/16B ,17,18D,19 and 20
![Page 10: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/10.jpg)
Approach to Leeward Breakwater before high wind waves
![Page 11: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/11.jpg)
EXPENDITURE DETAIL An approach of 350m length has been formed with the expenditure of 110 lakhs as below
SI No
Details of Work
As per the Estimate As per Execution
Qty Rate Amount Qty Rate Amount1 Earth
Work3500 23.7 82950 3500 27 94500.00
2 Core Layer
14800 312.6 4626480 14752.25 370 5458332.50
3 Secondary Layer
13600 378.25 4917250 12999.12 420 5459630.00
9626680 11012462
![Page 12: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/12.jpg)
Approach to Leeward breakwater before sea erosion
![Page 13: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/13.jpg)
DAMAGE TO APPROACH ROAD• In the original estimate 1150 mt .length has been proposed for
approach road . • The proposed approach road has been damaged due to sea erosion
and sea water has occupied . • There is a need for selection of alternative site for the approach
road to Thengapattinam Fishing Harbour.• The approach has been damaged due to high wind waves on 11.08.2010 to 19.08.2010 25.02.2011 20.06.2012 to 30.06.2012 02.09.2012 to 03.09.2012
![Page 14: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/14.jpg)
Approach to Leeward breakwater under erosion due to high wind waves
![Page 15: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/15.jpg)
News paper report – about damage caused by high windwaves
![Page 16: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/16.jpg)
News paper report – about damage caused by high windwaves
![Page 17: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/17.jpg)
ALTERNATIVE SITE• During the site inspection on 25.03.2013 at
Thengapattinam Fishing Harbour by the Chief Engineer , Fishing Harbour Projects Circle , Chennai, alternative site has been identified for creating approach road to Thengapattinam Fishing Harbour.
• The details of alternative site are furnished below .Vilvankodu Taluk , Amsi Junction - Parakani Road : S.No
:444/2,3 and 445/2,222mt . length and 10mt . breadthThengapattinam – Enayamputhurai Road : S.No :467/2A ,9A
and 468/4A,4B,14A,16A,360 mt.length and 10 mt. breadth.
![Page 18: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/18.jpg)
Approach to Leeward breakwater after washed away by the sea erosion
![Page 19: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/19.jpg)
SHORE PROTECTION • Due to long shore drift accompanied by the
cross shore sediment movement, coastal protection measures have to be suitably proposed.
• From the coastal side, it is proposed to construct one L-shaped and one T-shaped groin of 50m length on the eastern side of the eastern breakwater.
![Page 20: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/20.jpg)
Photo showing high wind waves on Eastern side of Leeward Breakwater -15 April 2014
![Page 21: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/21.jpg)
LOCATION PROPOSED FOR SHORE PROTECTION
• The Location of the one L-shaped and one T-shaped groin of 50m length on the eastern side of the eastern breakwater with +5m height is proposed as below.
• At the Eastern end – from existing RMS wall on Mullurthurai side one L-shaped- groin of 50m length -UTM 739171.78mE and 911169.87mN.
• At the Centre of 350m shore one T-shaped groin of 50m length– UTM 739040.69m E and 911276.73m N.
![Page 22: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/22.jpg)
Eastern side of Leeward breakwater on 22nd April 2014
![Page 23: Need of shore protection works to safeguard the approach toThengapattanam Fishing Harbour](https://reader031.fdocuments.net/reader031/viewer/2022020208/55aa57301a28ab45448b45c5/html5/thumbnails/23.jpg)
Proposed coastal protection by groin field